ACTION AGENDA ITEM ABSTRACT
Meeting Date: June 21, 2011
Action Agenda
Item No. ~~j -Q
SUBJECT: Comprehensive Plan and Unified Development Ordinance (UDO) Amendment
Schedule for Au ust Joint Quarter) Public Hearin and Re ular Meeting Items
DEPARTMENT: Planning and Inspections PUBLIC HEARING: (Y/N) No
ATTACHMENT(S):
Amendment Outlines (4)
INFORMATION CONTACT:
Craig Benedict, Planning Director,
245- 2592
PURPOSE: To consider and approve the process components and schedule for three
government-initiated items currently scheduled to be heard at the August 22, 2011 Quarterly
Public Hearing and one item currently scheduled for the August 23, 2011 BOCC regular
meeting.
BACKGROUND: If the Board approves a separate item on the June 21, 2011 agenda to allow
staff to work with the Chair, Vice-Chair, and Manager over the summer break on the August
Quarterly Public Hearing legal advertisement, staff intends to have three government-initiated
items on the Quarterly Public Hearing agenda:
1. Unified Development Ordinance (UDO) Text Amendment to ensure connectivity between
parcels, consistent with adopted access management plans, in situations that do not involve
subdividing property.
2. UDO Text amendment to uncouple Class II Kennels and Riding Stables as a use and to
have separate Standards sections for each use. (Note: Actual standards are not being
changed at this time; this action is only to split the uses so future work on standards of each
use can occur.)
3. UDO Text Amendment to update the "Commercial-Industrial Transition Activity Node Land"
definition in Article 10 to be consistent with the definition update in the 2030 Comprehensive
Plan scheduled for adoption on June 21, 2011.
Additionally, staff intends to have an item on the August 23, 2011 regular Board meeting
agenda for review and consideration:
Access Management Plan for the Efland Commercial-Industrial Transition Activity Node
(CITAN) area.
Attached are Amendment Outlines for the four government-initiated amendments for the
Board's consideration and approval.
FINANCIAL IMPACT: The Financial Impact is included in each attached Amendment Outline.
RECOMMENDATION(S): The Manager recommends the Board approve the attached
Amendment Outlines and direct staff to proceed accordingly.
~7
LAND USE AND UNIFIED DEVELOPMENT ORDINANCE (UDO)
AMENDMENT OUTLINE
UDO/ZONING 2011-03
A. AMENDMENT TOPIC -VARIOUS CATEGORIES
1. Land. Use and/o~- Zoning (Map and/or Text)
1.a Land Use Text
1.b Land Use Map From: To:
1.c UDO Text Article Two (2) Procedures Section 2.5.3 Plan Specifications of the
Unified Development Ordinance (UDO). Revise existing
reeulations for protects requiring site plan approval to
demonstrate compliance with County adopted transportation
access rnana~ement plans.
1.d Zoning Map From: To:
2. UDO Development Standards
3. UDO Development Approval Processes
B. RATIONALE
• Purpose/Mission
In accordance with the provisions of Section 2.8 Zoning Atlas and Unified
Development Ordinance Amendments of the UDO, the Planning Director has initiated
a text amendment requiring development projects subject to site plan approval to
demonstrate compliance with adopted County access management and
transportation improvement and access- management-..plans to ensure protection of
proposed, delineated, roadways and promote connectivity amongst adjacent
properties.
• Comprehensive Plan Linkage (i.e. Principles, Goals and Objectives)
Land Use Overarching Goal: Coordination of the amount, location, pattern and
designation of future land uses, with availability of County services and facilities
sufficient to meet the needs of Orange County's population and economy consistent .
with other Comprehensive Plan element goals and objectives.
Objective LU-1.1: Coordinate the location of higher intensity / high density
residential and non-residential development with existing or planned locations of
public transportation, commercial and community services, and adequate
supporting infrastructure (i.e., water and sewer, high-speed Internet access, streets,
and sidewalks), while avoiding areas with protected natural and cultural resources.
Page 1 of 3
4
This could be achieved by increasing allowable densities and creating new mixed-
use zoning districts where adequate public services are available.
Transportation Goal 3: Integrated land use planning and transportation planning
that serves existing development, supports future development, and is consistent
with the County's land use plans which include provisions for preserving the natural
environment and community character.
Transportation Goal 4: A countywide and regionally-integrated, multi-modal
transportation planning process that is comprehensive, creative and effective.
• New Statutes and Rules
Proposal-will involve the adoption of a new standard requiring all site plans
to demonstrate compliance with adopted- access management plans.
C. PROCESS
C.1 TIMEFRAME/MILESTONES/DEADLINES
a. Setting of a Quarterly Public Hearing date
August 22, 2011
b. BOCC updates/checkpoints
June 21, 2011- BpCC approval to proceed
C.2 PUBLIC INVOLVEMENT PROGRAM
Mission/Scope: Public Hearine process consistent with NC State Statutes and
Oranee County ordinance requirements.
a. Planning Board Review
August 3, 2011 Briefing
September 7, 2011 (for recommendation)
b. Advisory Board Input
The BOCC may wish to consider seeking input from the OUTBoard on the
proposed text change, recognizing that there will be a need for a quick
turnaround on this amendment package by the Planning Board for BOCC
consideration.
c. Loeal Government Invitation
N/A
d. Outreach
d.1 General Public
Public Hearine process. consistent with NC State Statutes and Oranee
Page 2 of 3
5
County ordinance requirements
d.2 Small Area Plan Workgroup
N/A
C.3 FISCAL IMPACT
Consideration and approval will not create the need for additional funding
for the provis-ion of County services. Costs for the required legal
advertisement wial be paid from FY2011-12 Departmental funds budgeted
for this purpose. Existing Planning staff included in the Departmental
staffing budget will accomplish the work required to process this
amendment.
D. AMENDMENT IMPLICATIONS
Anaiysis
As is typical process, the analysis required- under Section 2.8.5 of the Orange County Unified
Development Ordinance will be provided to the Planning Board and Board of County
Commissioners after the public hearing for the item.
E. SPECIFIC AMENDMENT LANGUAGE
Currently proposed language is as follows and may be modified in preparation for the
August 22, 2011 Quarterly Public Hearing:
Site plans shall be required to demonstrate compliance with County adopted access
management or connectivity plans and denote future roadway locations on the site to
encourage future connectivity.
Page 3 of 3
6
LAND USE AND UNIFIED DEVELOPMENT ORDINANCE (UDO)
AMENDMENT OUTLINE
UDO/ZONING 2011-04
A. AMENDMENT TOPIC-VARIOUS CATEGORIES
1. Land Use and/or Zoning (Map and/or Text)
1.a Land Use Text
1.b Land Use Map
From: To:
1.c UDO Text Section 5.2 Table of Permitted Uses and Section 5 6 5 Kennels and
Ridina Stables /Academies of the Unified Development Ordinance
UDO .
1.d Zoning Map From: To:
2. UDO Development Standards
3. UDO Development Approval Processes
B. RATIONALE
• Purpose/Mission
In accordance with the provisions of Section 2.8 Zoning Atlas and Unified
Development Ordinance Amendments of the UDO, the Planning Director has
initiated a text amendment to split these existing- land use categories into
separate uses. This is being done to eliminate existing contradictions identified
as part of the UDO development process concerning the development of a
kennel or a riding stable. This amendment will also allow staff to begin the
process of completing a comprehensive assessment of existing- regulatory
requirements associated within each independent use as detailed- within the
UDO Implementation Bridge.
• Comprehensive Plan Linkaee (i a Principles Goals and Obiectives)
No direct linkage to the Principles, Goals, and Objectives of the Comprehensive Plan.
This amendment is proposed in order to engage in "good housekeeping" by
eliminating a previously identified problem/contradiction within the Ordinance
• New Statutes and Rules
The proposal will involve adoption of a text amendment splitting these two
land use categories apart. Regulations governing development will remain the
same for the time being.
C. PROCESS
Page 1 of 3
7
C.1 TIMEFRAME/MILESTONES/DEADLINES
a. Setting of a C<uarterly Public Hearing date
August 22, 2011
b. BOCC updates/checkpoints
June 21, 2011- BOCC approval to proceed
C.2 PUBLIC INVOLVEMENT PROGRAM
Mission/Scope _ Public Hearing process consistent with NC State Statutes and
Orange County ordinance requirements.
a. Planning Board Review
August 3, 2011 Briefing
September 7, 2011 (for recommendation)
b. Advisory Board Input
N/A
c. Local Government Invitation
N/A
d. Outreach
d.1 General Public
Public Hearine process consistent with NC State Statutes and Orange
County ordinance requirements
d.2 Small Area Plan Workgroup
N/A
C.3 FISCAL IMPACT
Consideration and approval will not create the need for additional funding
for the provision of County services. Costs for the required- legal
advertisement will be paid from FY2011-12 Departmental funds budgeted
for this purpose. Existing Planning staff included in the Departmental
staffing budget will accomplish the work required to process this
amendment.
D. AMENDMENT IMPLICATIONS
Analysis
As is typical process, the analysis required under Section 2.8.5 of the Orange County Unified
Development Ordinance will be provided to the Planning Board and Board of County
Commissioners after the public hearing for the item.
Page 2 of 3
E. SPECIFIC AMENDMENT LANGUAGE
No new regulations or standards for review shall be adopted as part of this process. This
amendment will simply split #hese existing land uses into separate categories. The exact
changes to the UDO will be available prior to the August quarterly public hearing
Page 3 of 3
9
LAND USF AND UNIFtED DEVELOPMENT ORDINANCE (UDO)
AMENDMENT OUTLIN€
UDO/ZONING 2011-05
A. AMENDMENT TOPIC -VARIOUS CATEGORIES
1. Land Use and/or Zoning (.Map and/or Text)
1.a Land Use Text
1.b Land Use Map From: To:
1.c UDO Text Article 10 -Definitions. Update definition for "Commercial-
Industrial Transition Activity Node Land" to be consistent with
changes scheduled to be made to the same definition in the
Comprehensive Plan.
1.d Zoning Map From: To:
2. UDO Development Standards
3. UDO Development Approval Processes
B. RATIONALE
• Purpose/Mission
In accordance with the provisions of Section 2.8 Zoning Atlas and Unified
Development Ordinance Amendments of the Unified Development Ordinance,
the Planning Director has initiated an amendment to update the UDO text in
order to be consistent with the definition of the same term as it appears in the
adopted Comprehensive Plan.
• Comprehensive Plan Linkaee (i.e Principles Goals and Obiectives)
No direct linkage to the Principles, Goals, and Objectives of the Comprehensive Plan.
This amendment is proposed in order to engage in "good housekeeping" in keeping
terms found in both the Comprehensive Plan and UDO consistent between the two
documents.
• New Statutes and Rules
N/A
C. PROCESS
C.1 TIMEFRAME/MILESTONES/DEADLINES
a. Setting of a Quarterly Public Hearing date
August 22, 2011
Page 1 of 3
10
b. BOCC updates/checkpoints
June 21, 2011- BOCC approval to proceed
C.2 PUBLIC INVOLVEMENT PROGRAM
Mission/Scope Public Hearing process consistent with NCState Statutes and
Orange County ordinance requirements.
a. Planning Board Review
August 3, 2011 Briefing
September 7, 2011 (for recommendation)
b. Advisory Board Input
N/A
c. Local Government Invitation
N/A
d. Outreach
d.i General Public
Public Hearine process-consistent with- NC State Statutes and Orange
County ordinance requirements
d.2 Small Area Plan Workgroup
N/A
C.3 FISCAL IMPACT
Consideration and approval will not create the neec#for additional funding
for the provision of County services. Costs for the required legal
advertisement will be paid from FY2011-12 Departmental funds budgeted
for this purpose. Existing Planning staff included in the Departmental
staffing budget will accomplish the work required to process this
amendment.
D. AMENDMENT IMPLICATIONS
Analysis
As is typical process, the analysis required under Section 2.8.5 of the Orange County Unified
Development Ordinance will be provided to the Planning Board and Board of County
Commissioners after the public hearing for the item.
E. SPECIFIC AMENDMENT LANGUAGE
Page 2 of 3
11
Currently proposed language is as follows and may be modified after Comprehensive Plan
amendment is adopted by the BOCC (scheduled for lune 21, 2Q11):
Commercial-Industrial Transition Activity Node land
Land feE-erg near major transportation routes that could be provided with public water
and wastewater services
T..-..-.:a:.. .~ A.... .., a6 •.a and is appropriate for retail and other commercial uses; arrdfa-r
manufacturing and other industrial uses• office and limited (not to exceed 25% of any
Node) higher density residential uses.
Page 3 of 3
12
LAND USE AND UNIFIED DEVELOPMENT ORDINANCE (UDO)
AMENDMENT OUTLINE
A. AMENDMENT TOPIC -VARIOUS CATEGORIES
1. Land Use and/or Zoning. (Map and/or Text)
1.aLand Use Text _
1.b Land- Use Map __From: T~
1.c UDO Text
1.d Zoning Map From:
2. UDO Development Standards
3. UDO Development Approval Processes
To:
4. Other Efland-Buckhorn-Mebane Commercial Industrial Transition Activity Nodes
and Economic Development Zones Access Management Plan
B. RATIONALE
• Purpose/Mission
The Efland Small Area Plan recommended transportation improvements to foster
implementation of desired plan elements. Orange County has limited
implementation avenues to require those recommended improvements unless
further adopted- into a regulatory framework.
Forrnally adopted transportation plans are necessary to procure federal and
state funding for projects and to require developer contribution-in providing
transportation infrastructure. An adopted Access Management Plan can be
incorporated into regional transportation plans. This will also enhance
collaboration with the western and eastern MPOs.
• Comprehensive Plan Linkage-(i.e. Principles, Goals and Objectives)
Principle 2: Sustainable Growth and Development
Land Use Overarching Goal: Coordination of the amount,
location, pattern and designation of future land uses, with
availability of County services and facilities sufficient to meet
the needs of Orange County's- population and economy
consistent with other Comprehensive Plan element goals and
objectives.
Objective LU-1.1: Coordinate the location of higher intensity /high. density
residential and non-residential development with existing or planned locations of
public transportation, commercial and community services, and adequate
supporting infrastructure (i.e., water and sewer, high-speed Internet access,
streets, and sidewalks), while avoiding areas with protected natural and cultural
resources....
Objective LU-3.8: Develop a process for implementing small area plan
recommendations through the revision of County policies and regulations.
13
Principle 3B: Promotion of Both Air Quality Protection and the Development of
an Effective Transportation System
Transportation Overarching Goal• An efficient and balanced transportation
system that uses multiple motorized and nonmotorized modes of transportation
and for which. the planning, design, and implementation will be guided by the
following ovErarching qualities
C. Encourages sustainable economic development
Objective T-3.2: Create and implement an Orange County Comprehensive
Transportation Plan that provides the framework for a comprehensive and
connected transportation system supporting a mix of all transportation modes,
including sidewalks and bicycle facilities, bus and rail transit facilities, and
highways.
Objective T-4.2: Plan and integrate the County's multi-modal transportation
routes and services with regional transportation agencies and transit service
providers, agencies and transit providers. in neighboring counties, the North
Carolina Department of Transportation, Amtrak, and the North Carolina Railroad.
Principal 7: Promotion of Economic Prosperity and Diversity
Economic Development (ED) Overarching Goal- Viable and sustainable
economic development that contributes to-both property and sales tax reve
Objective ED-1.5: Identify barriers to development of desirable businesses and
local businesses, and mitigate these barriers.
• New Statutes and Rules
N/A
D. PROCESS
C.1 TIMEFRAME/MILESTONES/QEADLINES (See Attachment 1)
a. Setting of a Quarterly Public Hearing date and remaining on target
b. BOCC updates/checkpoints
August 23, 2011, BOCC holds public hearing regarding the Efland-
Buckhorn-Mebane Commercial Industrial Transition Activity Nodes and
Economic Development Zones Access Management Plan and directs staff
how to proceed.
C.2 PUBLIC INVOLVEMENT PROGRAM
Mission/Scope Public Hearing process consistent with NC State Statutes and
Orange County ordinance requirements
Midpoint (Rough Draft)
Final Draft
14
a. Planning Board Review
October 2011
b. Advisory Board input
OUTBoard
c. Local Government Invitation
Mebane
d. Outreach
d.1 General Public
Public Hearine process consistent with NC State Statutes and Orange
County ordinance requirements
d.2 Other
d.3 Small Area Plan Workgroup
C.3 FISCAL IMPACT
Consideration and approval-will not create the need for additional funding for
the provision of County services. Staff time to coordinate with NCDOT and
develop Access Management Plan can be accomplished using existing
Planning staff. The associated advertising costs are included in the FY 11-
12 Budget.
E. AMENDMENT IMPLICATIONS
A formally adopted plan for proposed transportation connectivity in the EDD and CITAN areas is
imperative to a coordinated transportation system that can be included in the Comprehensive
transportation Plan and the Burlington-Graham MPO and Durham-Chapel Hill-Orange County
MPO regional plans and included in requirements for development in the Efland-Mebane Small
Area Plan area.
F. SPECIFIC AMENDMENT LANGUAGE
Companion UDO text amendments to be heard at the August 22, 2011, Joint Quarterly Public
Hearing.