Loading...
HomeMy WebLinkAboutAgenda - 04-19-2011 - 8cORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: April 19, 2011 Action Agenda Item No. ~ r G SUBJECT: Buckhorn-Mebane Economic Development Area Water and Sewer Design DEPARTMENT: Planning ATTACHMENT(S): 1. Buckhorn-Mebane EDD Concept Sewer Layout -Phase 2 2. Buckhorn-Mebane Area Map with Acreages PUBLIC HEARING: (Y/N) 0 INFORMATION CONTACT: Craig Benedict, Planning Director, 245- 2592 Kevin Lindley, Staff Engineer, 245-2583 PURPOSE: To consider an optional design alignment and sewer facility for Phase 2 of the Buckhorn-Mebane Economic Development Area (EDD) water and sewer infrastructure. BACKGROUND: The Board of County Commissioners (BOCC) approved a contract with Hobbs Upchurch Associates (HUA) in November 2010 for the design of water and sewer infrastructure to serve a portion of the Buckhorn-Mebane EDD known as Area "D1" (shown on Attachment 1). This portion of the EDD is generally described as being bounded by Gravelly Hill Middle School to the east, Buckhorn Road to the west, West Ten Road to the south and Interstate 85/40 to the north. The portion of the infrastructure being designed has been generally referred to as Phase 2 and is part of a multi-phase approach to design and build water and sewer infrastructure to eventually serve the entire Buckhorn-Mebane EDD. Phase 1 water and sewer infrastructure, which has already been installed and is currently in operation, serves Gravelly Hill Middle School and several houses along Buckhorn Road and West Ten Road. Design Options After an initial review of the topography in the area and the draft phasing plan provided by the County, HUA proposed two design scenarios to County staff. Option 1 is to pump the sewer flow from Area D1 of the EDD via a force main along West Ten and Bowman Roads all the way to Mebane's Southeast Regional Pump Station. This design option was the basis of HUA's design contract price of $192,000 which the BOCC approved in November 2010. Option 1 also added a backbone gravity sewer line westerly from Gravelly Hill Middle School towards Buckhorn Road in a 400+/- acre area. Option 2 is to pump via force main along West Ten Road to the intersection of West Ten Road and Bowman Road, at which point a gravity line could be constructed to flow cross-country north of Bowman Road to the Southeast Regional Pump Station. These two design alternatives are shown on Attachment 1 and labeled as "Phase 2B-Option 1" and "Phase 2B-Option 2". 2 Design and Construction Cost Considerations Both of the design options will accomplish the original design goal of providing sewer service to Area D1 of the Buckhorn-Mebane EDD. The design and construction of Option 1 would be the less expensive option. The design costs for Option 1 are already a part of the contract amount of $192,000, as noted above. For design Option 2, there would be additional design costs. Though many parts of the design process are similar, designing a gravity sewer system is more intricate work than designing a force main. However, HUA has stated its additional design costs for a gravity sewer line north of Bowman Road would not cause the total contract amount to exceed the original $200,000 cap placed in the design contract. This means that the maximum design cost differential would be $8,000. When considering the construction cost differential between the two design options, only the portions of the two design options that are different will be outlined in this abstract. The majority of the project will remain unchanged regardless of which of these design options is chosen. The current construction estimate for the roughly 1.8 miles of sewer force main along the north side of Bowman Road in Option 1 is .approximately $475,000. The construction of a gravity sewer line is much more expensive than construction of a force main. The work goes slower because precise slopes have to be maintained and often the excavation is deeper than for a force main. In addition, because of the need to follow the natural topography, the length of the line is longer. The current construction estimate for the roughly 2.2 miles of gravity sewer outfall north of Bowman Road in Option 2 is approximately $1,150,000. To put this into perspective, the total estimated cost for construction of Phase 2 water and sewer infrastructure is approximately $3,000,000 for Option 1, so choosing to construct the gravity outfall in Option 2 would represent about a 23% increase in the construction costs. Benefits of a Gravity Outfall in Option 2 As was noted above, choosing to construct a gravity outfall along Bowman Road will add to the design and construction costs. However, it also adds functionality and flexibility to the sewer design. The gravity outfall would be installed in Area "A" (shown on Attachment 1, 423 acres) which was recently added to the County's utility primary service area in the Water and Sewer Management, Planning, and Boundary Agreement (WASMPBA). The gravity outfall would serve the dual purpose of transporting sewer flow from the Phase 2 area of the EDD and allowing property owners in this 423 acre area access to public sewer. Also, because the length of force main would be reduced substantially, the pump station upgrades necessary to pump the wastewater to Mebane's Southeast Regional Pump Station could be less robust, e.g. smaller horsepower pumps could be used to pump the same amount of wastewater. If Option 1 is chosen and a force main is constructed along Bowman Road, there would be no access to public sewer for Area A. If service is desired, a gravity sewer outfall would eventually have to be designed and constructed to serve these properties at a later date. The design and construction costs for the gravity sewer as a stand-alone project would be approximately $1.25 million. In addition, once the gravity sewer outfall was in place, the force main along Bowman Road would most likely be taken out of service and abandoned and the initial $475,000 for the force main construction would have been spent on infrastructure that is no longer in use. Another point to consider is the current development activity in the area around the Southeast Regional Pump Station, west of Area A. If the County had a viable design for a gravity sewer outfall that connected to the SE Regional Pump Station, there is the potential for developers interested in this area to help fund the construction of this portion of the sewer infrastructure. It is much more feasible for a developer to pay for several hundred feet of sewer line extension to 3 a development in Area A along Bowman Road than it would be to pay for the major extension required to serve a development in the Phase 2 portion of the EDD. Regardless, because Area A is near existing development, it has the potential to develop before the Buckhorn-Mebane EDD Phase 2 area. Land Use Plan If the gravity outfall in Option 2 is chosen, there are some Land Use Plan changes that would have to made in Area A, north of Bowman Road. There has been a preliminary meeting with area residents in the Option 2 area. Staff explained the background of the area relating to land use and utility engineering. Staff will be proposing a Land Use Plan amendment for this area for the May 2011 quarterly public hearing to be consistent with the WASMPBA. The Efland- Mebane Small Area Plan recommended the change for this area from AR (Agricultural Residential) to Mixed Use (a new land use category) with a limited residential component. FINANCIAL IMPACT: Choosing design Option 1 will not result in any changes in either current design cost or the currently estimated construction cost in the County's draft Capital Investment Plan for FY2011-2016. Choosing design Option 2 will result in a maximum design cost increase of $8,000 which can be accomplished within the present budget. Construction estimates are in the Capital Investment Plan but are presently unfunded. A $675,000 increase in the total project construction cost could be lessened by the lower bid costs that are presently being realized in current economic conditions. RECOMMENDATION(S): The Manager recommends the Board: 1. Approve design Option 2 to add a 'backbone' gravity sewer to 423 acres; 2. Direcf staff (Attorney, Planning, Financial Services) to initiate any contract amendments necessary; 3. Authorize the County Manager to sign the contract amendment; and 4. Authorize staff to begin necessary Land Use Plan amendments. U Parcels ~ Area A ~ Central Efland Phase 2 Area D4 ~ City Limits Area B Area D1 Area EFGH ETJ 0 Area C ~ Area D2 Central Efland Phase 1 Area D3 1 inch = 5.000 Mt 0 1.ioo zaoo ~or..e orange Counp abnr~ng and Inrpactiwu oeparenmr~ QS Map Repared b/ Brian Carson Agri 07, 31ll V 1