ORANGE COUNTY
HOUSING REHABILITATION PROGRAM
SPECIFICATIONS
FOR
JAMES GRADY
AT
205 RENCHER ST.
HILLSBOROUGH
DATE: July 1, 2004
BY: David Saconn
Rehab Specialist
NOTE TO CONTRACTOR
CONTRACTOR SHOULD REFER TO THE BASIC SPECIFICATIONS, PROPERTY
REHABILITATION STANDARDS, GE ~RAL CONDITIONS, NORTH CAROLINA
BUILDING CODES MANUAL, AND ORANGE COUNTY MI]vIlVIUM HOUSING
CODE DOCUMENTS.
IT IS NOT THE INTENT OF THE WRITER TO DIRECT ANY CONTRACTOR TO A
SPECIFIC SUPPLIER OF MATERIALS CALLED FOR IN THIS WORK WRITE-UP
ONLY TO SPECIFY A TYPE THAT WOULD BE ACCEPTABLE TO THE
HOMEOWNER AND ORANGE COUNTY HOUSING REHABILITATION
PROGRAM.
Name: James Grady
Address: 205 Rencher St.
City: Hillsborough, NC 27278
Phone Number: 245-1298
Date: July 1, 2004
EXTERIOR:
1. Remove the brick foundation wall at the front of the unit.
Use a brick saw to cut a straight line at the front left corner.
The foundation shall be removed to below ground level.
Add soil to level the grade at the exposed wall area.
Seed & straw the exposed soil. All brick & debris shall be
hauled to the landfill.
2. Install a treated crawlspace door & frame located at the front right
corner. Install a pressure treated 2x6 frame & 3/4 inch pressure
treated plywood. Install galvanized hinges & locking hasp.
3. Trim all brush to ground level at the front of the unit. Remove
all cut brush. Hand-rake the area to loosen the soil. Seed & straw
the exposed area.
4. Install a 5' x 5' front porch & steps. All wood shall be pressure
treated lumber. Install the porch floor tight against the door
threshold. Use 5/4 decking for the porch floor. Install a 2x10 outer
band. Install a 36" railing around the porch. Install handrails on
both sides of the steps. Install 2x2 pickets placed 4" apart on the
guardrail & handrail. All porch work shall meet the NC Building
Codes for Porches & Decks.
5. Remove ALL existing wood framing located near the back door.
Install a 5' x 5' treated landing level with the door threshold.
Install a 42" wide ramp leading to the driveway. The ramp slope
shall be a 1/12. The porch & ramp floor surface shall be 5/4 treated
decking. Install railings around the landing & ramp. All work
shall meet the NC Residential Codes for Porches & Ramps.
6. Remove one truck load ofhome-owner trash & debris. Remove
all appliances & debris from the yard. The truck size shall be
1 ton minimum.
Name: James Grady
Address: 205 Rencher St.
City: Hillsborough, N.C. 27278
Phone Number: 245-1298
Date: July 1, 2004
ROOF:
1. Install a new galvanized roof shell over the existing roof.
The contractor shall verify all measurements and dimensions.
Remove the chimney flue. Install new plumbing & exhaust vents.
Install all necessary trim & mini gutters.
WINDOWS:
Install a new matching kitchen window. Install new matching trim
on the interior. The window shall beweather-tight.
INSULATION:
Repair all damaged & loose insulation in the crawlspace. Install
black board over the new insulation. Install treated wood strips &
6 mil poly.
2. Install a 6-mil vapor barrier in the crawlspace.
MECHANICAL:
1. Install a new propane heat/air system. The Mechanical Contractor
shall size the unit appropriately. Make all electrical & mechanical
connections. Install a gas line from the propane tank to the unit.
Install a new thermostat in a central location. Install new floor
registers in all rooms. Install heat/air system to code.
PLUMBING:
1. Install a PVC cleanout cap on the sewer line located in the back
yard.
6
2. Install a new 40 gallon electric hot water located in the front
master bedroom closet. Make all plumbing & electrical connections
per code. _
Name: James Grady
Address: 205 Rencher St.
City: Hillsborough, NC 27278
Phone Number: 245-1298
Date: July 1, 2004
PLUMBING:
Install a new double bowl stainless steel sink, single lever faucet
& sprayer. The faucet shall be a Delta orpre-approved equal.
Install a new PVC drain line assembly, cut-offs, supply lines &
mechanical vent. (Kitchen location)
4. Contact a septic tank pumping company. Pump the septic tank.
ELECTRICAL:
1. Install a new outdoor main lug load center below the meter base.
Install a new main breaker. Make all electrical connections.
7
2. Install a new GFI receptacle in the kitchen.
3. Install new GFI receptacles in both bathrooms.
4. Install a new wall switch & box in the left front bedroom. Make
all electrical connections.
5. Re-install the loose receptacles in both bedrooms.
6. Install a new weatherproof receptacle cover &GFI receptacle
beside the front door. Make all electrical connections.
7. Install a new exterior light fixture beside the front door. Make all
electrical connections.
8. Install hard-wired smoke detectors in all bedrooms, living room &
hallway. Install a total of four (4) smoke detectors. Make all
electrical connections.
9. Install arc-fault breakers on all sleeping room circuits.
10. Install a new 220 receptacle for the oven. Secure the box/receptacle
to the wall. Make all electrical connections.
11. Install a new vent-less range hood in the kitchen. Make all
electrical connections.
Name: James Grady
Address: 205 Rencher St.
City: Hillsborough, N.C. 27278
Phone Number: 245-1298
Date: July 1, 2004
LIVING ROOM:
Install a new combination exterior door unit & storm door.
The door unit shall be of matching size. The new door shall have
a diamond or rectangle glass. Install a entry lockset & deadbolt
keyed alike. Install new matching casing on the interior. Prime
the trim with an oil primer. Paint the casing with semi-gloss
latex paint. All paint shall cover completely.
2. Secure the fireplace pit with galvanized metal. The fireplace shall
be made inoperable.( Fireplace vent was removed)
3. Install new carpet & pad in the Living room and short hallway.
The carpet to cost not less than $ 14 sq yd.
4. Insta113 %a" molded baseboard & 3" crown molding in the living
room & hallway. Prime & paint the baseboard, crown molding &
casing with semi-gloss latex paint. Paint the walls with flat latex
paint. All paint shall cover completely.
5. Install paneling strips over the joints in the ceiling. The color
shall match the existing ceiling trim.
KITCHEN/DINING ROOM:
Remove all base cabinets & counter top. Install new base cabinets
& molded countertop. Insta117ft of factory built matching cabinets.
Homeowner shall choose the countertop color. Secure the new
cabinets to the wall studs. Install new cabinet hardware.
2. Prepare the walls and all trim for paint. Remove all dirt & grease.
Remove all loose wall covering. Apply sheetrock filler to all
damaged areas, holes & cracks. Sand the sheetrock filler smooth.
Apply a bonding oil primer to the walls & trim. Paint the walls &
Trim with semi-gloss latex paint. The paint shall cover completely.
3. Install missing corner trim on all inside & outside corners.
Match the trim as close as possible. Prime & paint the corner trim
with semi-gloss latex paint. The paint shall cover completely.
Name: James Grady
Address: 205 Rencher St.
City: Hillsborough, N.C. 27278
Phone Number: 245-1298
Date: July 1, 2004
HITCHEN/DINING:
4. Remove the top layer of vinyl & plywood in the kitchen, dining
room & hallway. Install '/4" lauan and a new vinyl floor. The vinyl
to cost not less than $ 14 sq yd. Install metal trim at all door
openings. Install shoe molding at all wall & cabinet areas.
Prime & paint the shoe molding. The paint shall cover completely.
5. Repair the damage wall behind the oven & prepare for paint.
6. Install a new matching exterior door. The new door shall have a
diamond glass. The door shall beweather-tight. Install an entry
lockset & deadbolt keyed to match the new front door. Install
new casing on the interior. Prime the new wood with oil primer.
Paint the trim with semi-gloss latex paint. The paint shall cover
completely.
7. Insta113 '/a"baseboard & 3" crown in the kitchen & dining room.
Paint the trim with semigloss latex paint.
LAUNDRY/HALL:
2
Prepare the floor for vinyl. Install 1/a" lauan plywood and a new
vinyl floor. The vinyl to cost not less than $ 14 sq yd. Install metal
trim at all door openings. Install shoe molding at all wall & cabinet
areas. Prime the molding using an oil based primer. Paint the trim
with semi-gloss latex paint. The paint shall cover completely.
Prepare the walls & trim for paint. Remove all loose wall covering.
Fill all holes, cracks & seams with sheetrock filler. Sand the
Filler smooth. Prime all sheetrock filler. Paint the trim & walls with
semi-gloss latex paint. The paint shall cover completely. _
RIGHT/FRONT BATHROOM:
Repair all damaged walls in the bath. Remove the damaged section
of wall. Install new 3/8 material. Skim the joints with sheetrock
filler. Sand the filler smooth.
9
2. Install a new privacy lock on the bathroom door.
Name: James Grady
Address: 205 Rencher St.
City: Hillsborough, NC 27278
Phone Number: 245-1298
Date: July 1, 2004
RIGHT FRONT BATHROOM:
3. Remove the top layer of vinyl. Install t/4" lauan plywood and a new
vinyl floor. The vinyl to cost not less than $ 14 sq yd. Install 3 1/a"
baseboard and shoe molding.
4. Prepare the walls & ceiling for paint. Skim all damaged wall areas
with filler. Fill all holes & cracks with filler. Sand the sheetrock
filler smooth. Prime the walls & trim with an oil bonding primer.
Paint the walls, ceiling & trim using semi-gloss latex paint.
The paint shall cover completely.
5. Prepare the vanity for paint. Prime the vanity with an oil based
bonding primer. Paint the vanity with semi-gloss latex paint.
The paint shall cover completely.
6. Install matching door casing & door stop on the bathroom door.
MASTER BATHROOM:
1. Install two walls clips for the hand-held shower. Install one at
normal shower height. Install the 2"d clip approximately 40 inches
from the bottom of the tub.
2. Remove the crown molding over the tub. Properly insta113" crown
molding.
3. Install all necessary trim around the commode to cover the large
openings.
4. Install all missing door casing, window casing & corner trim.
The trim shall match the existing molding.
5. Install a new privacy lock on the bathroom door.
6. Prepare the walls, ceiling & trim for paint. Paint the trim, walls &
ceiling with semigloss latex paint.
The paint shall cover completely.
10
7. Install a shower rod & curtain.
Name: James Grady
Address: 205 Rencher St.
City: Hillsborough, NC 27278
Phone Number: 245-1298
Date: July 1, 2004
MASTER BEDROOM:
Install a 30 inch flush interior door unit. Install casing to match the
existing trim. Install a privacy lockset. Paint the door & trim with
semi-gloss latex paint. The paint shall cover completely.
2. Re-install all loose trim on the ceiling.
3
Repair the damaged wall below the window. Install insulation,
wall covering & trim. Prepare this section for paint. Apply sheetrock
filler and tape to all seams, holes & cracks. Sand the filler smooth. _
4. Remove all existing closet doors & hardware. Prepare the three
openings for new flush doors & jambs. Install a twin unit (72") and
single (36")interior door units. Install all necessary framing. Install
passage locksets on all three doors. Install a necessary hardware.
Paint the doors, jambs & trim with semi-gloss latex paint. _
5. Prepare the walls for paint. Apply sheetrock filler to all holes and
cracks. Prime the walls & trim with an oil bonding primer.
Paint the walls with flat latex paint. Paint the trim with semi-gloss
latex paint. The paint shall cover completely.
6. Install 3 %a"baseboard. Prime the new wood with an oil bonding
primer. Paint the baseboard with semi-gloss latex paint. The paint
shall cover completely.
FRONT RIGHT BEDROOM:
2.
Install an interior flush door unit. Install matching casing & privacy
lockset. Finish the door & casing to match the existing trim. _
Remove the existing crown molding. Install matching wall paneling
at all needed areas. Insta113" stained crown molding. _
11
3. Install a stained closet door & trim. Re-work the closet shelves so
the door will close properly. Install a passage lockset.
Name: James Grady
Address: 205 Rencher St.
City: Hillsborough, N.C. 27278
Phone Number: 245-1298
Date: July 1, 2004
TERMITE INSPECTION:
Provide a termite inspection & treatment. A Licensed Pest Control
Company must provide the inspection & treatment.
12
Total Labor & Material
13
ORANGE COUNTY
HOUSING REHABILITATION PROGRAM
SPECIFICATIONS
FOR
BER1vICE WHITE
AT
206 W. ORANGE ST.
HILLSBOROUGH
DATE: October 1, 2004
BY: David Saconn
Rehab Specialist
NOTE TO CONTRACTOR
CONTRACTOR SHOULD REFER TO THE BASIC SPECIFICATIONS, PROPERTY
REHABILITATION STANDARDS, GENERAL CONDITIONS, NORTH CAROLINA
BUILDING CODES MANUAL, AND ORANGE COUNTY MINIMUM HOUSING
CODE DOCUMENTS.
IT IS NOT THE INTENT OF THE WRITER TO DIRECT ANY CONTRACTOR TO A
SPECIFIC SUPPLIER OF MATERIALS CALLED FOR IN THIS WORK WRITE-UP
ONLY TO SPECIFY A TYPE THAT WOULD BE ACCEPTABLE TO THE
HOMEOWNER AND ORANGE COUNTY HOUSING REHABIIITATION
PROGRAM.
Name: Bernice White
Address: 206 W. Orange St.
City: Hillsborough, N.C. 27278
Phone Number: 644-7785
Date: October 1, 2004
EXTERIOR:
Repair all damaged and missing wood on the exterior. Install
matching lumber. Prime all new wood with an oil based primer.
2. Prepare the exterior boxing, eves, fascias and overhangs for coil
stock and soffit. Wrap all exterior wood with white coil stock.
Install solid vinyl soffit on the gable overhangs. Install vented
soffit on the front and back overhangs. Remove a 6" x 12" section
of soffit plywood Oft OC to allow ventilation into the attic.
3. Wrap all door and window frames with white coil stock. Wrap the
gable vents with white coil stock.
4. Install a new crawlspace door and frame. Install a pressure treated
2x4 frame and 3/a" plywood door. Install galvanized hinges and
locking hasp.
5. Prepare both gables for vinyl siding. Install'/4" fan fold insulation
and D-5 vinyl siding.
14
6. Install pressure treated handrails and guardrails on the front porch.
All work shall meet the NC Residential Building Codes.
Install 4x4 posts for handrail attachment. Instal12x2 pickets placed
4 inches apart on the guardrail and handrail. All railings shall be
secure.
CRAWLSPACE:
1. Remove all standing water from the crawlspace. Remove all debris
and soil from the discharge pipe that allows water from the
crawlspace.
2. Install a 6-mil vapor barrier in the crawlspace. Remove all wood
and debris before the vapor barrier in installed.
3. Install R-19 insulation in the crawlspace.
Name: Bernice White
Address: 206 W. Orange St.
City: Hillsborough, N.C. 27278
Phone Number: 644-7785
Date: October 1, 2004
WINDOWS:
1. Install 11 vinyl replacement windows. The windows shall have at
least one openable sash, lock and screen. Install all necessary trim.
MECHANICAL:
Remove all baseboard heaters in the unit. Install matching wood
baseboard. Finish the baseboard to match the existing trim.
2. Install a natural gas pack heat/air system with insulated ductwork.
The mechanical contractor shall size the unit appropriately.
Make all electrical and mechanical connections. All work shall
meet the NC Mechanical Codes.
ELECTRICAL:
1. Install a 200 amp breaker panel in the rear left bedroom. Make all
electrical connections.
15
2. Install two GFI receptacles in the kitchen.
3. Install a new GFI receptacle and circuit in the bathroom.
4. Install a new vanity light fixture in the bathroom. Locate the
fixture above the medicine cabinet.
Install a new light fixture at both exterior doors. The new fixture
shall be approved for exterior use. Make all electrical connections.
6. Install hard wired smoke detectors in all sleeping rooms, living
room & hallway. Install a total of five (5) smoke detectors. Make
all electrical connections.
7. Install arc fault interrupters circuits on all bedroom circuits.
8. Install a service light in the crawlspace. The light shall be controlled
by a switch within aft of the crawlspace opening. Make all
electrical connections.
Name: Bernice White 16
Address: 206 W. Orange St.
City: Hillsborough, N.C. 27278
Phone Number: 644-7785
October 1, 2004
ELECTRICAL:
9. Remove the baseboard heat circuits from the service panel.
Remove all baseboard wall thermostats from the walls.. Install
dummy covers over all existing controllers.
PLUMBING:
1. Install a new double bowl stainless steel sink and single lever
faucet with sprayer in the kitchen. The sink faucet shall be of
Delta quality orpre-approved equal. Install new PVC drain line
assembly, strainer, supply lines and cutoffs. Make all plumbing
connections.
2. Re-install the wall mount sink in the bathroom. Install a new
drain, supply lines and cutoffs.
3. Install a new handicap commode, supply line and cutoff.
Make all plumbing connections.
4. Install a new single lever combination tub/shower valve. The faucet
shall be of Delta quality orpre-approved equal. Make all plumbing
connections.
5. Install ahand-held shower with two (2) clips. Install one clip at
normal shower height. Install the 2"a wall clip approximately 40"
from the tub bottom.
6. Install a new PVC drain line assembly & trip lever for the tub.
Make all plumbing connections.
ROOF
1. Install a shingle type ridge vent. Remove a three inch section
from the ridge before the vent is installed.
2. Repair the damaged roof section over the kitchen sink area. Remove
approximately 2 bundles of shingles. Remove approximately 1 sheet
or 32 sq ft of damaged sheathing. Install matching plywood, felt paper
and shingles.
Name: Bernice White 1 ~
Address: 206 W. Orange St.
City: Hillsborough, N.C. 27278
Phone Number: 644-7785
Date: October 1, 2003
INSULATION:
1. Remove the insulation from the attic. Install R-30 insulation.
Install baffles as needed per code.
INTERIOR:
LIVING ROOM:
Install a six panel, metal insulated door unit with aluminum
threshold ,weather-stripping and matching casing. Install a
lockset and deadbolt keyed alike. Install a wide view peephole.
Prime the new casing with an oil based primer.
2. Install a full view aluminum storm door. The storm door to have
a pneumatic closure, vinyl sweep and limited lifetime warranty.
Door shall be complete with all hardware.
3. Prepare the ceiling for a sprayed texture. Fill all nail holes and
damaged areas with sheetrock filler. Sand all new sheetrock filler.
Prime the ceiling with a stain blocking primer. Spray a texture on
the ceiling. Install all needed plastic for over-spray.
4. Prepare all painted trim for paint. Caulk all cracks with latex caulk.
Fill all nail holes with painters putty. Paint all trim with semi-gloss
latex paint. The paint shall cover completely.
5. Prepare the front door for paint. Prime as necessary. Paint the door
with semi-gloss latex paint. The paint shall cover completely.
6. Install new carpet and pad. The carpet to cost not less than $ 14 sq.
yd. Install metal trim at the door opening to the kitchen. Trim all
doors that rub the carpet.
Name: Bernice White
Address: 206 W. Orange St.
City: Hillsborough, N.C. 27278
Phone Number: 644-7785
Date: October 1, 2004
KITCHEN/DINING & HALL:
1. Remove all cabinets, countertop and sink. Remove the existing
12"x 12" floor tiles.
2. Repair the sagging section of floor located near the sink and oven.
Install a dropped girder to help support the floor framing. The
dropped girder shall be a 4x6 treated. Install post jacks Oft OC.
The post jacks shall rest on solid masonry approved by the Orange
County Inspection Department.
3. Remove the particleboard from the kitchen and dining room floor.
Install matching plywood in both kitchen and dining rooms.
4. Prepare the floor for vinyl. Install'/4" lauan plywood and a new vinyl
floor. The vinyl to cost not less than $ 14 sq. yd. Install all necessary
metal trim in door openings. _
5. Install new shoe molding in the kitchen, dining room and hallway.
Stain the shoe molding to match the existing paneling and trim.
6.
Install factory made kitchen cabinets. The new cabinets shall match
the existing cabinet layout. Cabinets to have hardwood fronts and a
factory finish. The cabinets shall have new hinges and hardware.
Install all necessary trim to finish off the wall cabinets..
7. Install new rolled back formica tops on all base cabinets. Install all
necessary wall back-splash. All corner joints shall be tight to
prevent water intrusion.
8. Install a 91ite exterior, insulated door unit in the kitchen.
The unit shall have an aluminum threshold and weather-stripping.
Install matching solid trim on the interior. Install an entry lockset
and double cylinder deadbolt. Key both lockset and deadbolt to
match the new front door unit. Stain the casing to match the existing
trim. _
18
9. Install a baseboard door bumper for the kitchen door.
Name: Bernice White
Address: 206 W. Orange St.
City: Hillsborough, N.C. 27278
Phone Number: 644-7785
Date: October 1, 2004
KITCHEN/DINING & HALL:
10. Prepare the ceiling for a texture. Fill and tape all areas that attention.
Sand the new sheetrock smooth. Prime the ceiling with astain-
block primer. Spray a texture on the kitchen, dining and hallway
ceilings.
19
11. Prepare all painted trim for paint. Prime all areas that need attention.
Caulk all cracks in trim. Fill any nail holes with painters putty. Paint
The trim with semi-gloss latex paint. The paint shall cover
completely.
12. Install a washable wall covering on the kitchen wall over the base
cabinets. Remove the existing wall material. Install a PVC type wall
covering that is water resistant. Install all necessary trim to finish off
the top of the wall material.
13. Install a new disappearing in the hallway. Install new matching
casing. Prime the casing and door with an oil based primer. Paint
the trim and stairway door with semi-gloss latex paint. All paint
shall cover completely.
14. Prepare the hall walls for paint. Repair any damaged areas with
sheetrock filler. Prime the walls with an oil bonding primer. Paint
the walls with flat latex paint. The paint shall cover completely.
BATHROOM:
Remove the commode. Remove all particle board around the
commode. Install matching plywood. Prepare the floor for vinyl.
Install '/a" lauan plywood and a new vinyl floor. The vinyl to
cost not less than $ 14 sq yd. Install new shoe molding and metal
trim at the door opening. Prime and paint the shoe molding with
semi-gloss latex paint. The paint shall cover completely.
2. Prepare the sheetrock walls and ceiling for paint. Re-mud all
exposed tape joints and corners. Fill all nail holes. Sand all filler
smooth. Prime all new sheetrock filler. Paint the walls and ceiling
with semi-gloss latex paint. The paint shall cover completely.
Name: Bernice White
Address: 206 W. Orange St.
City: Hillsborough, N.C. 27278
Phone Number: 644-7785
Date: October 1, 2004
BATHROOM:
4. Clean the the with a the cleaner. Remove all mildew and loose
grout. Re-grout and caulk the the shower with a mildew resistant
tub/tile caulk.
5. Prepare the bathroom trim for paint. Paint all trim with semi-gloss
latex paint. The paint shall cover completely.
6. Install a recessed medicine cabinet above the bath sink.
FRONT CENTER BEDROOM:
1. Prepare the ceiling for a textured spray. Fill all nail holes and
exposed tape with sheetrock filler. Sand the filler smooth. Spray
the ceiling with a textured spray.
2. Prepare all painted trim for paint. Paint the trim with semi-gloss latex
paint. Caulk all seams and cracks with latex caulk. The paint
shall cover completely. _
3. Prepare the walls for paint. Fill all nail holes and damaged areas
with sheetrock filler. Prime the walls with a kilt type oil primer.
Paint the walls with flat latex paint.
FRONT LEFT BEDROOM:
1. Repair the sagging ceiling. Install all necessary framing and sheetrock
to repair the damaged ceiling. Finish the new sheetrock smooth. Prime
the new filler with a sheetrock primer. Spray the ceiling with a
textured spray.
2. Install a new interior flush door unit. Install a privacy lockset.
Finish the door and casing to match the existing unit.
3. Prepare all painted trim for paint. Caulk all cracks with latex caulk. Fill
all holes with painters putty. Prime the trim with an oil based primer.
Paint the trim with semi-gloss latex paint. The paint shall cover
completely.
20
Name: Bernice White
Address: 206 W. Orange St.
City: Hillsborough, N.C. 27278
Phone Number: 644-7785
Date: October 1, 2004
REAR LEFT BEDROOM:
Remove the existing 30 inch door unit. Widen the opening to receive
a 32 inch door unit. Install a new 32" interior matching door unit.
Install a privacy lockset. Finish the door and trim to match the
existing unit.
2. Prepare the ceiling for a textured spray. Fill all nail holes and
exposed tape with sheetrock filler. Sand the filler smooth. Spray
the ceiling with a textured spray.
3. Prepare all painted trim for paint. Caulk all cracks and seams with
latex caulk. Paint the trim with semi-gloss paint. The paint shall
cover completely.
21
TERMITE TREATMENT:
Provide a termite inspection and treatment. All pest control work
must be performed by a licensed Pest Control Company.
Total Labor & Material