Loading...
HomeMy WebLinkAboutAgenda - 03-15-2011- 7bORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: March 15, 2011 Action Agenda Item No. ~_ SUBJECT: Resolutions Providing Comments Regarding Draft 2011-2020 State Transportation Improvement Program (STIP) and the Draft 2012-2018 Metropolitan Transportation Improvement Program (MTIP) DEPARTMENT: Planning and Inspections PUBLIC HEARING: (Y/N) No ATTACHMENT(S): 1. Draft Resolution to NCDOT with Comments 2. Draft Resolution to DCHC MPO with Comments 3. OUTBoard Recommendation Background: 4. Draft 2011-2020 STIP for Orange County 5. Draft 2012-2018 MTIP for Orange County 6. Orange County Priority List Project Status INFORMATION CONTACT: Karen Lincoln, 245-2594 Craig Benedict, 245-2592 PURPOSE: To consider resolutions providing comments regarding the Draft 2012-2018 State Transportation Improvement Program (STIP). The two resolutions are: 1. A Resolution Providing Comments to the North Carolina Department of Transportation (NCDOT) Regarding the Draft 2011-2020 State Transportation Improvement Program Division 7 Projects in Orange County; and 2. A Resolution Providing Comments to the Durham-Chapel Hill-Carrboro Metropolitan Planning Organization (DCHC MPO) Transportation Advisory Committee (TAC) Regarding the Draft 2012-2018 Metropolitan Transportation Improvement Program (MTIP). BACKGROUND: Federal Planning Rules (23 CFR § 450.216) require that each State "develop a statewide transportation improvement program (STIP) for all areas of the State", including the Transportation Improvement Programs (TIP) created by Metropolitan Planning Organizations (MPOs). The 84-page Draft MTIP is available on the County website. Attachment 5 provides background information on the MTIP and changes to the STIP proposed in the MTIP. The STIP must contain all projects that will use federal aid highway funds. The Federal Rules require the STIP to cover a period of no less than four years and be updated at least every four years. State law (§ 1436-350(f)(4)) requires the Department of Transportation to adopt a seven year Transportation Improvement Program. Attachment 4 includes the Draft STIP for Orange County and background information regarding its development. NCDOT updates the STIP every two years. The next update starts this year with submittal of local priority projects to MPOs and Rural Planning Organizations (RPOs) to be ranked in the regional priority lists submitted to NCDOT. Priority protects submitted by the regional transportation planning 2 agencies and not included in the Draft STIP are scheduled for reprioritization in 2012. The DCHC MPO must submit to NCDOT any changes (deletions or additions) to its priority list by July NCDOT will apply its strategic prioritization criteria to projects and return the results to the regional agencies prior to DCHC MPO and the Triangle Area Rural Planning Organization (TARPO) submitting their ranked lists of projects to NCDOT. Regional organizations have been asked to submit ranked priority lists by October. Schedule • DCHC MPO anticipates adopting a final 2012-2018 MTIP by May 2011. • Changes to Priority Lists for 2014-2020 TIP to be submitted to NCDOT by July 2011. • NCDOT anticipates adopting the final 2012-2018 STIP by August 2011. The Orange Unified Transportation Board (OUTBoard) reviewed that Draft STIP. The OUTBoard recommends comments submitted in Attachment 3 to be endorsed by the BOCC and forwarded from Orange County to NCDOT and the DCHC MPO. Project Comment Summary The Resolutions contain comments on the following projects. 1 TIP Project E-4980, pedestrian bridge on Orange Grove Road over I-40. Orange County urges this project to remain in, and be funded in the 2011-2020 Transportation Improvement Program 2 EB-5108, Dairyland Road (SR 1112), Union Chapel Grove Road (SR 1111) to Orange Grove Road (SR 1006), add wide paved shoulders. Orange County requests NCDOT to proceed without delay with the feasibility study scheduled in the 2009-2011 TIP. 3 B-5348, Old Greensboro Road ASR 1005), replace bridge number 85 over Phil's Creek. Orange County recommends accelerating this project. 4 Project I-0305, widen I-85 to six lanes and reconstruct interchanges and structures. Orange County requests that NCDOT consider comments submitted for previous TIP updates by Orange County regarding the I-85 widening project. 5 Projects to alleviate congestion in downtown Hillsborough. Orange County requests that studies be programmed for the following projects to alleviate congestion in downtown Hillsborough: • R-2825, South Churton Street improvements from I-40 to the Eno River; • U-3436, Realignment of the Eno Mountain and Mayo Street intersections with Orange Grove Road; • Anew project to extend Orange Grove Street to US 70 A; and • Anew project to widen NC 86 from US 70 Bypass to NC 57 with intersection improvements at US 70. Please note projects that were shown in previous versions of the STIP as "unfunded" and were not funded in this DRAFT STIP have been removed from the DRAFT STIP document. These projects are scheduled for reprioritization in 2012. Orange County priority projects scheduled for reprioritization in 2012 are noted in Attachment 6. Other projects of interest to Orange County scheduled for reprioritization include: 1 TIP Project R-2716, convert grade separation at Mattress Factory Road and I-85/ I-40 to an interchange; and TIP Project I-0305B, widen I-85 to six lanes and reconstruct interchanges east of Lawrence Road to the Durham County Line. (TIP Project I-0305A, widen I-85 to six lanes and reconstruct interchanges from I-40 to Lawrence Road, is scheduled in the Draft STIP for right-of-way acquisition in 2017-2019, with construction to 2020.) FINANCIAL IMPACT: There is no immediate financial impact associated with this item. RECOMMENDATION(S): The Manager recommends the Board: 1. Review and consider the comments; 3 2. Approve the Resolution Providing Comments to the North Carolina Department of Transportation Regarding the Draft 2012-2018 State Transportation Improvement Program; and 3. Approve the Resolution Providing Comments To the Durham-Chapel Hill-Carrboro Transportation Advisory Committee Regarding the Draft 2012-2018 Metropolitan Transportation Improvement Program. Based on discussion at the February 24 Joint Orange CountylTown of Hillsborough Commissioners meeting, the Board may consider adding some or all of the following comments in the resolutions: • Orange County recognizes the importance of the I-85 widening project to economic development, and urges NCDOT to accelerate Project I-0305A, widening I-85 from I-40 to west of SR 1709, Lawrence Road with reconstruction of interchanges at Old NC 86 and NC 86. • The County also. recognizes the importance to economic development of improvements to Buckhorn Road, scheduled for reprioritization in 2012. Orange County urges the NCDOT and the MPO to give due consideration to the need for those improvements in the next STIP and MTIP. • Additionally, MPO transportation projects along I-85 and I-40 corridors need to be prioritized in a synchronized manner. TIP Project I-0305 to widen I-85 consists of two phases: 1 Phase A from I-40 to ~~~ psaa~ss ~~ a ~~~~~ ~ west of Lawrence Road ~~~ - includes reconstruction - - ~~ ~RaJECT t-oaos e ~~ ~;. of the interchanges at Old NC 86 and NC 86. ; _ _ : 2 Phase B from east of :~ Lawrence Road to the Durham County Line includes reconstruction ~~~~o.~EC~r~~c~sP~-sEc of the interchange at US 70. fi ~ ~ -~ TIP Project I-3306 to widen -40 will most likely be _ ~rr~~ P~r~,,FCr ~~~ P,~~~ ~ phased, given the ~~RO ~c~~- ~ ~ ~ constrained financial picture n~~K,as~A _ _ s of recent years. The DCHC =_ ' ~~''~~~ MPO has proposed to construct this project before ~~~ widening I-85. ° °~~ ' 2 ~ ~~~ ~~~- col I - o~~ 4 - Attachment 1 ORANGE COUNTY BOARD OF COUNTY COMMISSIONERS A RESOLUTION PROVIDING COMMENTS TO THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION REGARDING THE DRAFT 2012 - 2018 STATE TRANSPORTATION IMPROVEMENT PROGRAM DIVISION 7 PROJECTS IN ORANGE COUNTY WHEREAS, Orange County welcomes the opportunity to participate in development of the North Carolina Transportation Improvement Program; and WHEREAS, Orange County gives priority to identified safety needs in the vicinity of schools, on existing roads and bridges, to other transportation projects that encourage alternatives to automobile travel, to projects that minimize adverse impacts on the natural environment and cultural sites, and to those projects that foster economic development in the designated Economic Development Districts; and WHEREAS, Orange County has submitted a Priority List of transportation projects for inclusion in the State Transportation Improvement Program (STIP); and WHEREAS, the North Carolina Department of Transportation has revised its process for developing the State TIP to be more transparent, and has released the 201.1-2020 Work Program containing a Draft 2012 - 2018 STIP for public comment; and WHEREAS, Orange County, as a member of the Durham-Chapel Hill-Carrboro (DCHC) Metropolitan Planning Organization (MPO) has submitted comments to the Transportation Advisory Committee of the DCHC MPO regarding transportation projects within the Metropolitan Area Boundary (MAB); and WHEREAS, the North Carolina Board of Transportation is the sole approving authority for the STIP for areas of the State outside Metropolitan Area Boundaries; and WHEREAS, a large portion of Orange County lies outside the DCHC MPO MAB; NOW, THEREFORE, BE IT RESOLVED by the Orange County Board of Commissioners that Orange County submits the following comments regarding transportation projects in the County, as recommended by the Orange County Unified Transportation Board, for consideration by the North Carolina Department of Transportation in development of the Final 2012- 2018 State Transportation Improvement Program: 1. Orange County supports greater funding for alternative modes for transportation, particularly for improvements that make bicycling safer on County roads. Funding for bicycle -and pedestrian projects is insufficient for implementing viable bicycle networks. Many of Orange County's top priorities are bicycle/pedestrian projects. 2. TIP Project E-4980, pedestrian bridge on Orange Grove Road over I-40: Orange County urges this project to remain in, and be funded in the 2011-2020 Transportation Improvement Program. The County also requests that the feasibility study completed in Attachment 1 5 2010 be ;reconsidered to include in the project a small stretch of sidewalk (approximately miles) from the future pedestrian overpass to Timbers Avenue. The pedestrian overpass is the most important element of the Safe Routes to School (SRTS) Action Plan for the Grady Brown Elementary School (and by extension to Cedar Ridge High School). Without it in place, funding requests or grant applications for sidewalks may not be considered viable projects. Orange County is completing a Safe Routes to School Action Plan, with anticipated adoption by local jurisdictions in spring 2011. The North Carolina Department of Transportation (NCDOT) completed a feasibility study for this project and the Director of the Bicycle and Pedestrian Transportation Division recommends removing the project from the TIP based on the lack of supporting pedestrian facilities to connect to the bridge. Orange County Schools Superintendent has committed to the construction of a pedestrian walking path on the school property to provide connection from the current bridge to the Cedar Ridge High School entrance. If a small stretch of sidewalk were constructed from the future pedestrian overpass to Timbers Avenue, an estimated 50-60 Cedar Ridge students could walk safely to school. Student counts, per Orange County Schools, show 126 high school students living within one mile of Cedar Ridge. Most of these students live in one of three neighborhoods just over I-40 from the school: Patriot's Pointe, Colonial Estates, and the Timbers. (Patriot's Pointe is one of the largest apartment complexes in Hillsborough and has the highest density population in the town as well.) The SRTS project has identified a short cut for kids living in Patriot's Pointe and Colonial Estates that makes the walk along Orange Grove Road very short. Construction of a crosswalk on New Grady Brown School Road from Cedar Ridge High to Grady Brown Elementary would provide access to many of the one hundred thirty-six (136) Grady Brown Elementary School students living within a mile of the school. 3. EB-5108, Dairyland Road (SR 1112), Union Chapel Grove Road (SR 1111 to Orange Grove Road (SR 1006), add wide paved shoulders Orange County requests NCDOT to proceed without delay with the feasibility study scheduled in the 2009-2011 TIP. This area experiences high levels of bicycle traffic from Carrboro and Chapel Hill to rural routes. This route is a portion of the number 3 priority listed in Orange County's Priority List for the 2009-2015 TIP for projects outside the MAB. The entire project would connect the urbanized areas of Carrboro and Chapel Hill to Efland and Mebane via Dairyland Road, Orange Grove Road, and Buckhorn Road. The portion from Union Grove Church Road to Orange Grove Road is part of a loop that, along with Old NC 86, has been designated as a North Carolina Scenic Corridor. NCDOT, through the Moving Ahead Program and the Resurfacing Program has provided 2-ft. paved shoulders on Orange Grove Road, improving conditions for cyclists from Dairyland Road to NC 54. Orange County requested this project as a rural project, as most of the route was outside The DCHC MPO planning area. Recently the state approved an expansion of the Metropolitan Area Boundary, which now includes most of this route. Attachment 1 4. B-5348, Old Greensboro Road (SR 1005), replace bridge number 85 over Phil's Creek: Orange County recommends accelerating this project. The Draft STIP proposes replacement of this bridge in 2019. NCDOT has programmed his portion of Old Greensboro Road to be resurfaced in 2011 and Orange County has requested 2' paved shoulders be included in the repaving project. The bridge will not handle being repaved and has been patched repeatedly to repair recurring potholes. Old Greensboro Road is identified in the Orange County Bicycle Plan and the DCHC Long Range Transportation Plan as a priority bicycle route, and is part of the NCDOT Mountains to Sea Bicycle Route (Route 2). 5. Project I-0305, widen I-85 to six lanes and reconstruct interchanges and structures: Orange County requests that NCDOT consider comments submitted for previous TIP updates by Orange County regarding the I-85 widening project. The OUTBoard requests the following based on previous County comments: • Provide, in consultation with county staff, sidewalks and bike lanes along roads where interchange improvements are required, and to include adequate guardrails on overpasses; • Provide 12' wide travel lanes and 4' wide bicycle lanes for a total paved width of 32' for any roads that may be relocated as part of the project (NCDOT Division of Highways Planning and Environmental Branch has previously indicated that Herman Church Road, SR 1713, and Old NC 10, SR 1710, may be relocated as part of I-305); • Widen the overpass on NC 86 to accommodate increased traffic volumes resulting from recent development in the adjacent Economic Development District; • As part of the project, widen NC 86 from US 70 A to Old NC 10, SR 1710, including bicycle lanes and sidewalks; and Consult with county staff regarding design of the US 70 interchange to: - To bring to the attention of the NCDOT Staff Biologist, the proposed construction of a wildlife corridor under I-85 in the vicinity of US70 Interchange, as recommended in the "The New Hope Corridor Open Space Master Plan: Proposals for Linking Duke Forest and Eno River State Park"; and - To provide a pedestrian trail under I-85 linking New Hope Creek and the Eno River (New Hope Rustic Woodland Trail proposed as an element of the Lands Legacy Program). 6. Projects to alleviate congestion in downtown Hillsborough Orange County requests that studies be programmed for projects to alleviate congestion in downtown Hillsborough, now that the Elizabeth Brady Road Extension project has been canceled. These projects include: • R-2825, South Churton Street improvements from I-40 to the Eno River; • U-3436, Realignment of the Eno Mountain and Mayo Street intersections with Orange Grove Road; • Anew. project to extend Orange Grove Street to US 70 A; and • Anew project to widen NC 86 from US 70 Bypass to NC 57 with intersection improvements at US 70. 6 Attachment 1 Upon motion of Commissioner ,and seconded by Commissioner the foregoing resolution was adopted this the 15th day of March, 2011. I, Donna Baker, Clerk to the Board of Commissioners for the County of Orange, North Carolina, DO HEREBY CERTIFY that the foregoing is a true copy of so much of the proceedings of said Board at a meeting held on March 15, 2011, as relates in any way to the adoption of the foregoing and that said proceedings are recorded in the minutes of said Board. WITNESS my hand and the seal of said County, this day of , 2011. 7 Clerk to the Board of Commissioners Attachment 2 ORANGE COUNTY BOARD OF COUNTY COMMISSIONERS A RESOLUTION PROVIDING COMMENTS TO THE DURHAM-CHAPEL HILL- CARRBORO TRANSPORTATION ADVISORY COMMITTEE REGARDING THE DRAFT-2012 -2018 METROPOLITAN TRANSPORTATION IMPROVEMENT PROGRAM WHEREAS, Orange County, as a member of the DCHC MPO, has participated in the development of the Durham-Chapel Hill- Carrboro (DCHC) Metropolitan Priority List for the State Transportation Improvement Program (STIP); and. WHEREAS, the North Carolina Department of Transportation has revised its process for developing the State TIP to be more transparent, and has released the 2011-2020 Work Program containing a Draft 2012 - 2018 STIP for public comment; and WHEREAS, the DCHC MPO Transportation Advisory Committee (TAC) is charged with the development of the Metropolitan Transportation Improvement Program (MTIP) to be included in the STIP, and has released the draft MTIP for public comment; and WHEREAS, the Board of County Commissioners has reviewed the Draft 2012- 2018 DCHC Metropolitan Transportation Improvement Program; NOW, THEREFORE, BE IT RESOLVED by the Orange County Board of Commissioners that Orange County submits the following comments to the DCHC Transportation Advisory Committee to be considered in the development of the final 2012-2018 DCHC Metropolitan Transportation Improvement Program: TIP Project E-4980, pedestrian bridge on Orange Grove Road over I-40' Orange County urges this project to remain in, and be funded in the 2011-2020 Transportation Improvement Program. The pedestrian overpass is the most important element of the Safe Routes to School (SRTS) Action Plan for the Grady Brown Elementary School (and by extension to Cedar Ridge High School). Without it in place, funding requests or grant applications for sidewalks may not be considered viable projects. The County also requests NCDOT reconsider the feasibility study completed in 2010 and include a small stretch of sidewalk (approximately 0.14 mile) along the north side of Orange Grove Road from the future pedestrian overpass to Timbers Avenue. The Director of the Bicycle and Pedestrian Transportation Division recommends removing the project from the TIP based on the lack of supporting pedestrian facilities to connect to the bridge. Orange County Schools Superintendent has committed to the construction of a pedestrian walking path on the school property to provide connection from the Attachment 2 current bridge to the Cedar Ridge High School entrance. If a small stretch of sidewalk were constructed from the future pedestrian overpass to Timbers Avenue, 50-60 Cedar Ridge students could walk safely to school. Student counts in 2010, per Orange County Schools, indicate 126 high school students living within one mile of Cedar Ridge. Most of these students live in one of three neighborhoods just over I-40 from the school: Patriot's Pointe, Colonial Estates, and the Timbers. (Patriot's Pointe is one of the largest apartment complexes in Hillsborough and has the highest density population in the town as well.) The SRTS project has identified a short cut for kids living in Patriot's Pointe and Colonial Estates that makes the walk along Orange Grove Road very short. Construction of a crosswalk on New Grady Brown School Road from Cedar Ridge High to Grady Brown Elementary would provide access to many of the one hundred thirty-six (136) Grady Brown Elementary School students currently living within a mile of the school. 2. EB-5108. Dairyland Road (SR 1112) Union Chapel Grove Road (SR 1111) to Orange Grove Road (SR 1006), add wide paved shoulders Orange County requests NCDOT proceed without delay with the feasibility study scheduled in the 2009-2011 TIP. This area experiences high levels of bicycle traffic from Carrboro and Chapel Hill to rural routes. This route is a portion of the number 3 priority listed in Orange County's Priority List for the 2009-2015 TIP for projects outside the MAB. The entire project would connect the urbanized areas of Carrboro and Chapel Hill to Efland and Mebane via Dairyland Road, Orange Grove Road, and Buckhorn Road. The portion from Union Grove Church Road to Orange Grove Road is part of a loop that, along with Old NC 86, has been designated as a North Carolina Scenic Corridor. NCDOT, through the Moving Ahead Program and the Resurfacing Program has provided 2' paved shoulders on Orange Grove Road, improving conditions for cyclists from Old NC 86 to Dairyland Road to NC 54. Orange County requested this project as a rural project, as most of the route was outside The DCHC MPO planning area. Recently the state approved an expansion of the Metropolitan Area Boundary, which now includes most of this route. 3. B-5348. Old Greensboro Road (SR 1005) replace bridge number 85 over Phil's Creek: Orange County recommends accelerating this project. The Draft STIP proposes replacement of this bridge in 2019. NCDOT has programmed this portion of Old Greensboro Road to be resurfaced in 2011 and Orange County has requested 2' paved shoulders be included in the repaving project. The bridge will not handle being repaved and has been patched repeatedly to repair recurring potholes. Old Greensboro Road is identified in the Orange County Bicycle Plan and the DCHC Long Range Transportation Plan as a priority bicycle route, and is part of the NCDOT Mountains to Sea Bicycle Route (Route 2). 9 10 Attachment 2 4. Project I-0305, widen I-85 to six lanes and reconstruct interchanges and structures- Orange County requests that NCDOT consider comments submitted for previous TIP updates by Orange County regarding the I-85 widening project. The OUTBoard requests the following based on previous County comments: • Provide, in consultation with county staff, sidewalks and bike lanes along roads where interchange improvements are required, and to include adequate guardrails on overpasses; • Provide 12' wide travel lanes and 4' wide paved shoulders for a total paved width of 32' for any roads that may be relocated as part of the project (NCDOT Division of Highways Planning and Environmental Branch has previously indicated that Herman Church Road, SR 1713, and Old NC 10, SR 1710, may be relocated as part of I-305); • Widen the overpass on NC 86 to accommodate increased traffic volumes resulting from recent development in the adjacent Economic Development District; • As part of the project, widen NC 86 from US 70 A to Old NC 10, SR 1710, including bicycle lanes and sidewalks; and • Consult with county staff regarding design of the US 70 interchange to: - To bring to the attention of the NCDOT Staff Biologist, the proposed construction of a wildlife corridor under I-85 in the vicinity of US70 Interchange, as recommended in the "The New Hope Corridor Open Space Master Plan: Proposals for Linking Duke Forest and Eno River State Park' ;and - To provide a pedestrian trail under I-85 linking New Hope Creek and the Eno River (New Hope Rustic Woodland Trail proposed as an element of the Lands Legacy Program). 5. Projects to alleviate congestion in downtown Hillsborough Orange County requests that studies be programmed for projects to alleviate congestion in downtown Hillsborough, now that the Elizabeth Brady Road Extension project has been removed from the STIP. These projects include: • R-2825, South Churton Street improvements from I-40 to the Eno River; • U-3436, Realignment of the Eno Mountain and Mayo Street intersections with Orange Grove Road; • Anew project to extend Orange Grove Street to US 70 A; and • Anew project to widen NC 86 from US 70 Bypass to NC 57 with intersection improvements at US 70. Attachment 2 1 1 Upon motion of Commissioner ,seconded by Commissioner the foregoing resolution was adopted this the 15th day of March, 2011. I, Donna Baker, Clerk to the Board of Commissioners for the County of Orange, North Carolina, DO HEREBY CERTIFY that the foregoing is a true copy of so much of the proceedings of said Board at a meeting held on March 15, 2011, as relates in any way to the adoption of the foregoing and that said proceedings are recorded- in the minutes of said Board. WITNESS my hand and the seal of said County, this day of , 2011. Clerk to the Board of Commissioners Attachment 3 ~G~~'/b ~~~~--~ Orange Unif e~ Transportation Board PO Box 8T8T ~~ Hi[Isborough, NC 27278 ~~ Memorandum Date: January 19, 2011 To: Orange County Board of County Commissioners From: Nancy Baker, Chair Orange Unified Transportation Board Subject: Comments Regarding the Draft 2012 - 2018 State Transportation Improvement Program (STIP) and 2011 - 2020 Ten Year Transportation Work Plan. At its meeting on January 19, 2011, the Orange Unified Transportation Board (OUTBoard) discussed the Draft 2012-2018 State Transportation Improvement Program (STIP) for Orange County, as proposed in the North Carolina Ten Year Work Plan for 2011 - 2020. The OUTBoard approved the attached comments to recommend the Board of County Commissioners include in Orange County's comments to the North Carolina Department of Transportation and the Transportation Advisory Committee (TAC) of the Durham-Chapel Hill-Carrboro (DCHC) Metropolitan Planning Organization (MPO) regarding the Draft 2008-2015 STIP. 12 Attachment 3 ORANGE COUNTY UNIFIED TRANSPORTATION BOARD COMMENTS REGARDING THE DRAFT 2011-2020TRANSPORTATION IMPROVEMENT PROGRAM The OUTBoard supports greater funding for alternative modes for transportation, particularly for improvements that make bicycling safer on County roads. Funding for bicycle and pedestrian projects is insufficient for implementing viable bicycle networks. Many of Orange County's top priorities are bicycle/pedestrian projects. The OUTBoard submits the following comments regarding four particular projects: TIP Project E-4980, pedestrian bridge on Orange Grove Road over I-40: The The Orange Unified Transportation Board urges DOT to fund the construction of the pedestrian bridge in the 2011-2020 Transportation Improvement Plan. This pedestrian bridge is the central element in the Safe Routes to School plan for Grady A. Brown Elementary School and for Cedar Ridge High School. Without the bridge, the SRTS plan cannot move forward. We also recommend that the project be modified to include a short stretch of sidewalk on the north side of the bridge extending from the bridge to Timbers Avenue. This stretch is only 0.14 mile long, but when it is in place, it will provide connectivity from the bridge to three high-density neighborhoods: Patriot's Point, Colonial Estates, and the Timbers. To improve the pedestrian access to the south of the bridge, the Orange County School System has committed to constructing a safe and comfortable path from the pedestrian bridge to the Cedar Ridge entrance. In phase II of the SRTS project implementation, we plan to apply for funding to construct a crosswalk from the Cedar Ridge campus to Grady Brown, thereby completing the connectivity. This project will benefit many students and families. The Orange County school system estimates that over 126 high school students live within one mile of Cedar Ridge (2010 estimation). Most of these students live in the high-density Timbers, Patriot's Pointe, and Colonial Estates neighborhoods. The school system estimates that 136 Grady Brown Elementary students live in the same area. Safe walking routes will allow students (and families) to walk to school and to school-based activities such as sporting events and the completed routes will help the school system save transportation dollars through the reduction in hazard busing. 13 The pedestrian overpass is the central and essential component for safe routes to these schools. We urge you to move forward with this project. Attachment 3 14 2. EB-5108, Dairyland Road (SR 1112) Union Chapel Grove Road (SR 1111) to Orange Grove Road (SR 1006) add wide paved shoulders The OUTBoard requests NCDOT to proceed without delay with the feasibility study scheduled in the 2009-2011 TIP. This area experiences high levels of bicycle traffic from Carrboro and Chapel Hill to rural routes. This route is a portion of the number 3 priority listed in Orange County's Priority List for the 2009-2015 TIP for projects outside the MAB. The entire project would connect the urbanized areas of Carrboro and Chapel Hill to Efland and Mebane via Dairyland Road, Orange Grove Road, and Buckhorn Road. The portion from Union Grove Church Road to Orange Grove Road is part of a loop that, along with Old NC 86, has been designated as a North Carolina Scenic Corridor. NCDOT, through the Moving Ahead Program and the Resurfacing Program has provided 2-ft. paved shoulders on Orange Grove Road, improving conditions for cyclists from Old NC 86 to Dairyland Road to NC 54. Orange County requested this project as a rural project, as most of the route was outside The DCHC MPO planning area. Recently the state approved an expansion of the Metropolitan Area Boundary, which now includes most of this route. 3. B-5348, Old Greensboro Road (SR 1005) replace bridge number 85 over Phil's Creek: The OUTBoard recommends accelerating this project. The Draft STIP proposes replacement of this bridge in 2019. NCDOT has programmed this portion of Old Greensboro Road to be resurfaced in 2011 and Orange County has requested 2' paved shoulders be included in the repaving project. The bridge will not handle being repaved and has been patched repeatedly to repair recurring potholes. Old Greensboro Road is identified in the Orange County Bicycle Plan and the DCHC Long Range Transportation Plan as a priority bicycle route, and is part of the NCDOT Mountains to Sea Bicycle Route (Route 2). 4. Project I-0305, widen I-85 to six lanes and reconstruct interchanges and structures• The OUTBoard requests that NCDOT consider comments submitted for previous TIP updates by Orange County regarding the I-85 widening project. The OUTBoard rerquests the following based on previous County comments: • Provide, in consultation with county staff, sidewalks and bike lanes along roads where interchange improvements are required, and to include adequate guardrails on overpasses; • Provide 12' wide travel lanes and 4' wide paved shoulders for a total paved width of 32' for any roads that may be relocated as part of the project (NCDOT Division of Highways Planning and Environmental Branch has previously indicated that Herman Church Road, SR 1713, and Old NC 10, SR 1710, may be relocated as part of I-305); • Widen the overpass on NC 86 to accommodate increased traffic volumes resulting from recent development in the adjacent Economic Development District; • As part of the project, widen NC 86 from US 70 A to Old NC 10, SR 1710, including bicycle lanes and sidewalks; and • Consult with county staff regarding design of the US 70 interchange to: - To bring to the attention of the NCDOT Staff Biologist, the proposed construction of a wildlife corridor under I-85 in the vicinity of US70 Interchange, as recommended in the "The New Hope Corridor Attachment 3 ~ 5 Open Space Master Plan: Proposals for Linking Duke Forest and Eno River State Park"; and - To provide a pedestrian trail under I-85 linking New Hope Creek and the Eno River (New Hope Rustic Woodland Trail proposed as an element of the Lands Legacy Program). 5. Projects to alleviate congestion in downtown Hillsborough The OUTBoard requests that studies be programmed for projects to alleviate congestion in downtown Hillsborough, now that the Elizabeth Brady Road Extension project has been removed from the STIP. These projects include: • R-2825, South Churton Street improvements from I-40 to the Eno River; • U-3436, Realignment of the Eno Mountain and Mayo Street intersections with Orange Grove Road; • Anew project to extend Orange Grove Street to US 70 A; and • Anew project to widen NC 86 from US 70 Bypass to NC 57 with intersection improvements at US 70. 16 Attachment 4 BACKGROUND Draft STIP and 10-Year Work Program for Orange County (include web address) The North Carolina Department of Transportation (NCDOT) released the Draft STIP, included as years 2012-2018, of its 2011-2020 Work Program to the Metropolitan Planning Organizations, Rural Planning Organizations, local officials and other interested parties for their comment. The ten-year Work Program is financially constrained, and defines clearly what the department will do with anticipated resources. The NCDOT Work Program resulted from transportation reform efforts to make transportation planning and project selection a more transparent process. The 10-Year Work Program contains: • A 5-Year Work Program programmed in the first 5-years of the current 2009- 2015 STIP; • The draft 2012-2018 funding program (Draft STIP), and • Remaining 2-years of projects ready to move into the construction phase as anticipated funds become available in the 10-year time frame. Orange County, in December 2008, submitted/requested its priority list of projects for the 2012-2018 STIP through the DCHC MPO and the Triangle Area Regional Planning Organization. NCDOT, in developing the Draft 2012-2018 STIP, used adata-driven approach (the new Strategic Prioritization Process) to rank projects for highways in priority order based on the NC Department of Transportation's goals. Each MPO and RPO established its own criteria for ranking bicycle and pedestrian projects and submitted its top 5 highest ranked bicycle and 5 highest ranked pedestrian projects for NCDOT prioritization. Projects that were shown in previous versions of the STIP as "unfunded" and were not funded in this DRAFT STIP have been removed from the DRAFT STIP document. These projects are scheduled for reprioritization in 2012. Orange County priority projects scheduled for reprioritization in 2012 are noted in Attachment 6. Other projects of interest to Orange County scheduled for reprioritization include: 1 TIP Project R-2716, convert grade separation at Mattress Factory Road and I-85/ I-40 to an interchange; and 2 TIP Project I-03058, widen I-85 to six lanes and reconstruct interchanges east of Lawrence Road to the Durham County Line. (TIP Project 1-305A, widen I-85 to six lanes and reconstruct interchanges from I-40 to Lawrence Road, is scheduled in the Draft STIP for right-of-way acquisition in 2017-2019, with construction to 2020.) NCDOT POLICY TO PROJLCTS DIVISION COUNTY ROUTEICITYI ID SYSTEM NUMBER WAKE NC 00 ~ R-0000 ROUTE NUMBER Listed in order of I, US, NC, 6R, CfTY or NEW ROUTE IDENTIFICATK)N NUMBER Assigned to each project at conceptbn and remains with project until completion. AD -Administretbn B -Booklets C -Construction CG - ConaWUlon (GARVEE) CP - Captal F -Feasibility Study O - Greding and Structures 1-Inapectlana ' L • Landscaping M - Mitigation MP -Mapping N -Implementation -0 - Operatbna P - Paving PE - Prelknlnery Engineering R -Right of way RO -Right of way (GARVEE) S -Structures LOCATION I DESCRIPTION I-40 TO NC g8 EAST OF HOMETOWN. WIDEN TOAFOUR-LANE FACILITY WITH A BVPASS OF HOMETOWN ON NEW LOCATION. INDICATE8INTRASTATE PROJECT PROJECTSEGMENTS A - I.40 TO NC 3 B-NC3T0 SR 1003 C -SR 1003 TO NC 98. LOCATION /DESCRIPTION Project termini and a general work description. TRANSPORTATION PROGRAM TYPE OF WORK I ESTIMATED COST IN THOUSANDS 1 PROJECT BREAK9 FISCAL YEARS TOTAL PRIOR y _ STATE TRANSPOR7A710N IMPROVEMENT PROGRAM LENGTH (MILES) PROJECT COST YEAR8 COST a ~ = urcn rrcvurcnm ' "`rrc ~ II DEVELOPMENTAL PROGRAM UNFUNDED THOU T FUTURE ( ) ( HOU) FY 2011 FV 201Y ' FY 2013 FY 2014 FY 2015 FV 2016 FI'2077 F'Y 2078-~ FV 2010 FY 2020 YEARS 7.3 63,450 250 NHS R 4.000 A -- FUNDINO Sea Highway or Public Transportaton Funding Key for en ezplanatlon of funding categories used for each project phase. KEY TO AWATK)N FUNDING SOURCES FAA -Federal Aviation Adminlatratlon STATE -State Funds I PROJECT BREAKS WORK TYPE (ACTWITY) Pheaea of imDlemenlalion: preliminary engineering, right of way, mitigation, utilities or conatructlon. For other work types or aellvltlea see Work Type (ACUyty) box below, BOND -Revenue Bond BRGI -Bridge Inspection c - city CMAq - Congestion Mitigation DOD - Department of Defense DP - Discrelbnary or DemonslraUon FA-Bridge Repacemenl Oo-Federal-Aid System FLPF - Fetlerai Lands Program (Forest Highways) FLPI-Federal Lands Program (Indian Reservation Roads) FLPP -Federal Lends Program (Perk Roads) FLPR - Fadarel Lands Program (Rehge Roads) HES-High Hazard Safely HFA -Highway Fund Appropriation HP -Federal-Aid High Priority HRRR -High Rlsk Rurel Roads IM • Interstate Maintenance IM(E) -Interstate Maintenance Exempt IMPM - Interstate Preventative Maintenance L - Locel Matching Share MOB -Mobility Funds NFA -Bridge Replacement Og-Federal-Aid System NFAM- MunlGpal Bridge Replacement Progrem NHS -National Highway System NHS(E) • Natonal Highway System Exempt NRT -National Recreadon Treils O.Olhere PLF • Personal Automobile License %ate Funds RR -Rail-Highway Safety S • Stele S(E) -Stele Exempt SF • State Femiea 60 -Safely Orant S(M) -State Match S(5) -State (Highway) Trust Funds SRTS • Sefa Routes to Scholl STHSR -Stimulus High Speed Rail STP -Surface Transporiation Program STPDA -Surface Transportation Program • Direct Attributable STPEB - Surlece Transportation Program, Enhancements (Bike) STPEL -Surface Transportation Progrem, Enhancements (Local) 9TPEP -Surface Transportation Progrem, Enhancements (PedecMen) STPER -Surface Trensportatbn Program, Enhancements (Roadside) T -Highway Trust Funds T2D01 -State Reli Funds UNFUNDED ESTIMATED COST Preliminary engineering, right FUTURE of way, utility, mitigation and constructlon coat COMMITMENTS eatimalea by funding celagory In current dokara. PROJECT BREAK C Cost may include one or more funding types. MuIU-year funding of a project segment Indicates Cash-Fbw FundlnB with proposed work type Dr activity beginning in the Initial scheduled year. CMAO - Congestion Mitigetlon Air Quality (Flex to 5307) FBUB -Bus end Sue Fadlltiea Eermerk (5305) FED -Federal Unfunded Projects FEPD - Ekferly end persona wiU Dieabpity (5310) FMOD - Fized Guideway ModifkaUons FMPL -Metropolitan %enning (5303 antl/or 5307) FNF -New Freedom -Beyond ADA (5317) FNS -New Starts - Capltei (5308) FNU -Non-Urban, Small Urban end Inter-City (5311 end 5311Q FSPR-Slate %enning end Research FUZ -Urbanized Area Formula Progrem (5307) FUZST -Urbanized Area Formula Progrem Stimulus Funtla (5307) JARC -Job Assistance end Reverse Commula (5316) RTAP - Ruret Traneil Assistance Progrem (5311) STPDA- Surface Tranaporlatbn Program (MPO Direct Attributable - Flez l0 5307) STATE FUNDING EDTAP - Trensportatlon Tor Elderly end Persons with Disability EMP -Rural Empbymanl Trenaportelion NSTM -AdminlskalNe Aealatance -Human Services OAWP - Opereting Assistance (Work FIraQ ROP -Rural General Public Treneporiatlon RIMA - Regbnal end Inter-City Maintenance Aasisrence RTCH - Rurel Technobgy SFCP • State Facigty Capital Progrem SMAP -Urban Aree Maintenance Aeslatence STAT -State Match ContrlbuUan STATN -State New Star) Match 6TCP -Stale Trenslt Capital Progrem UTCH -Urban Technobgy LOCAL FUNDING ,J DIWBION 7 TYPE OF WORK/ESTIMATED COST IN THOUSANDSI PROJECT BRFAK ^ _~DO ^ Ppt.il;Y Tp PRp1ECiS TOTAL PRIOR STATE TRANSPORTATION IMPROYEMENTPROGRAM PROJ YEARS bYEAR WORK PROGRAM DEVELOPMENTAL PROGRAM UNFUNDED ID COST COST FUNDING COUNFY ROUTEICITY NUMBER LOCATION I DESCRIPTION LENGTH (THOU) (THOU) SOURCE fl 2011 FY 2012 FY 2013 FY 2011 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FUTURE YEARS PASSENGER RAIL PRQIECT8 GUILFORD CAMERON ROAD P•6101 PIEDMONT CORRIDOR, CAMERON ROAD 6638 716 STHSR PE 171 PE 17s PE 17A CRDSMNO CLOSURE AND ROAD STHSR R 870 R 17AI R 1891 REALIGNMENT. 0 R 114 R 21f R 191 o c feu c tee 2 A GUILFORD HIGH POINT P-1A11 PIEDMONT CORRIDOR, STATION 0.0 7621 7618 STHSR R 307 A REHAMUTATION ANO PMKING. A MDH POINT S7ATN)N PARKING. PART UNDER CONSTRUCTION INTERSTATE PROJECTS ORANGE e10 1.6761 EAST OF 6R 1771 (ERWIN R014D) TO 0.l 160 IMPM C 1 DURHAM COUMY LNIE. PAVEMENT REHAMlI7ATI0N OMNGE N0.86 46141 WEST DF 511111/1BUCKHDPN ROAD)TO 11000 11000 HdM INTERCHANGE. MILL, RESURFACE, PAVEMENT MARMNGS AND INSTALL RUMBLE STMPS. UNDER CONSTRUCTION ORANGE I~0 N718 45570 DURHAM COUNTY UNE. DIAMOND 11.0 37W 97W GRINDING, JOINT SEALIND, SLAB REPMR AND MARKING. UNDER CONSTRUCTION DURHAM 410 I,130B I-85IN ORANGE COUNTYTO NC 1/71BUCK 20.7 118161 M/511M C 47aoA C 1700A C A400p ORANGE DEAN FREEWAY) IN DURHAM COUNTY. NHS C 7080 A C 7050 A C 1410D A ADD ADDITIONAL LANES. A 4A6 TO DURHAM COUNTY LINE. B OMNOE COUNTY UNE TO NC 147 (BUCK DEAN FREEWAY)IN DURHAM-COMPLETE, ORANGE F86 46311 EAST OF440T0 DURHAM COUMY UNE. 7.8 8150 IMPM 6 0 PAVEMENT REHABIUTAiION A 6A 1006 NEAR NILLee0R0UGH TO EA6T OF SR 1708, B EAST OF SR f 708 7D WRHAM COUNTY LINE. PLANMNGiDE510N NI PROORE63 ORANGE 466 Id1ri I-4NB66PUT NEAR HILLSBOROUGH 2027 1818 TO 6111008 (ORANGE GROVE ROAD). MILL, RESURFACE AND OVERLAY. UNDER CONSTRUCTION RURAL PROJECTS ORANGE I~OAS R~16B HILLSBOROUGH WEIGH STATIOR 1961 1361 COMMERCIAL VEHICLE INFORMATION SYSTEM NETWORK (CVISN) TO SCREEN TRUCK ONBOARD TRANSPONDERS. R 10171 A R 10133 A R 10197 U /OB A U 10A A' U 108 A M file A C 10691 A C 16A00 A C 11066 A C 9160 A U 580 B R 1870 B M 758 B C 71800 9 C 17100 8 PART COMPLETE• PART UNDER CONSTRUCTION • 69A7,S0O IN FEDERAL EARMARK FUNDS TO BE ADMIMSTERED BY FEDERAL MOTOR CARRIER SAFETY ADMIM6TRATIDN ORANGE VARIOUS Rdi7e RESURFACIND DN FEDERAL-MD ROUTES. 1606 1606 A NC 67, NC B6 TO SR 151/ IPEARSON RDAO) • UNDER CONSTRUCTION. B NC B6 (SOUTH COLUMBIA 6TREE1) FROM SR 1010 (FRANKLW STREET) TO CAMERON AVENUE • UNDER CONSTRUCTION 'INDICATES INTRASTATE PROJECT COST AND 8CHEDULES ARE PRELIMINARY AND SUBJECT TO 810NIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE 170 NCDC~T DIVISION POLICY TQ PROJECTS TYPE OFWORK /ESTIMATED COST IN THOUSANDS I PROJECT BREAK TOTAL PRIOfl SlA7ETRANSPORTA710N1MPHOV M Ni PRO •AAM PflOJ YEARS SYEARWORK PROGRAM - DEVELOPMENTAL PROGRAM ^NFUNDED ID COST COST FUNDING COUNTY pOUTEICITY NUMBER LOCATION /DESCRIPTION LENGTH (THOU) (THOU) SOURCE FY 1011 FY 2012 FY 2013 FY 7074. FY 7015 FY 7016 FY 2017 FY 1018' FY 2016 FY 2020 FUTURE YEARS URBAN PROJECTS CHATHAM VMIDUS U3023 DURHAM•CHAPEL HIL4CARRBORO (DCHC) 20138 STPDA C 3730 C 4107 C 4107 C 4102 C 1187 DUPoIAM DA FUNDS ~ RESERVED FOR FUTURE - ORANGE PROGRAMMING. CHATHAM VMIOU6 _ U~777 OURHAM•CIIAPEL HILL{ARRBORO URBAN 13331 6738 STPDA PE 1778 PE 1131 '. PE "fl60 PE 770 PE 747 "' WRHAM AREA PLANMNG (DCHC)ALLOCATION AND L PE 307 PE ~ 351 pE M7 PE 100 PE 1&5 ORANGE UMFlED WORK PROOPAM, IN PROGRESS ORANGE CMRBORO URB03 SR 1918ISMITH LEVEL ROAD), ROCK 0.B 11061 3601 5 R 3100 HAVEN ROAD i0 BRIDGE N0. B4 S c use WIDEN TO MULTI•LANES. PIANMNWDERGNRSDHT OF WAY IN PgOGRE55 DURHAM WRHAM EB~707 SR 2720 (OlO CHAPEL HILL ROAD} 7.7 5150 1/50 STPDA C J2W ORANGE - CHAPEL HILL SR 1BJ8 (OlD DURHAM ROAD), SR 1115 C C SOD (OARRETT ROAD) IN DURHAM COUNTY TO US 16301 IN ORANGE (AUNTY. BICYCLE IMPROVEMENTS. DMSION DENGWIET • IN PROOREBS DURWIM CHAPEL HILL W70/ CHAPEL HIL4CARRBORO µ5p µ5p ORANGE COMPUTERIZED iRAFFlC SIGNAL SYSTEM UNDER CONSTRUCTION ORANGE CHAPEL HILL U.i306 SR 1733 (WEAVER DAIRY ROAD), NC M 18 17125 17025 STP C ela0 TO SR I7M IERWIN ROADF CORPoDOq UPGRADE, PART ON NEW LOCATIOR wnnnrA CHAPEL HIII U3118 BUS BARD TRANSIT OPERATIONAL 628 STPDA PE 4B ORANGE IMPROVEMEMS C PE 12 STPDA c ISi C C 113 PLANMND DESIGN FIGHT OF WAY AND 60NSTRUCTION BY TOWN ORANGE CHAPEL HILL UaN NCµ(SOUTH COLUMBIA STREET), 47 7310 JO106TP :.C.'.':IJ00 SR 1806 (PUREFOY ROAD) TO SR 1A02 (MANNING DRIVE). CORRIDOR UPGRADE TO INCLUDE BICYCLE LANES. RIGHT OF WAY IN PROGRESS OMNGE CHAPEL HILL U330/ US 15.501, NC 88 (SOUTH COLUMBIA AO 6150 NHS STREET) TO Sq 1712 (EPHESUS CHIttOCH C 6150 ROAD). SIDEWALKS, WIDE OUTNOE LANES AND TRANSIT ACCOMMODATIONS. F D et BRI ORANGE DGE PRO t T~ US 70 BYPASS 8.1862 END RIVER. REPLACE BRIDGE N0./6 6600 FA FA R 600 C bDOP ORANGE SR 1002 Bi218 STROUDS GREEK. 40 1054 1061 flEPLACE BRIDGE N0.68 UNDER CONSTRUCTION ORANGE SR 1005 B3J/B pML'S CREEK. REPLACE BPIDOE N0. BS 7083 FA R 91 FA C 888 OMNOE SR 1881 &6310 PRONG LITTLE FIVER. 317 NFA A 37 REPLACE BRIDGE N0.231 NFA C a 'INDICATES WTRABTATE PROJECT 171 COS7 AND 8CHEDULE6 ARE PRELIMINARY AND BUBJECT 70 BIONIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE DIVISION 7 TYPEOFWORK/ESTIMATED COST IN THOUSANDS/PROJECTBREAK NCDOT TOTAL PRIOfl STATE f7LelVCpORTAflONiMPROYEMEh PROCR 6' p~~.~GY74p~na~~Y$ PROD YEARS 6YEAR WORKPROGRdN ID CO5T COSt FUNDING DEVELOPMENTAL PROGRAM UNFUNDED COUNTY ROUTE/CITY NUMBER LOCATION/DESCRIPTION LENGTH (THOU) QHOU) SOURCE FY 2011 FY 2011 FY 7013 FY 20Mi 'FY 2016 i' FY 2016 pV 2017 FY 201Ai FY 2018 FY 2020 FUTURE YEARS FEDERAL BRIDGE PROJECTS OMNGE VARIOUS 83181 BRIDGE EXPANSION JOINT REPAWB AT 160 160 SELECTED LOCATIONS B1CY AND P D BTRL u PR Ta UNDER CONSTRUCTION ORANGE VMN)US E&6108 6q 11121DAIRYLAND ROADI, SR 1111 UMDN (CHAPEL OgOVE ROAD( TO Sq 1006 (ORANGE GROVE ROADG AOD WIDE PAVED SHOULDERS. SCHEDULED FOq FEASIBILITY 6TUDY OMNOE CAMBOgO ELd886 DRY CREEK GREENWAY. 726 26 0 CHAPEL HILL C ~ PLANMNG DESIGN g10HT OF WAY AND CONSTRUCTION BY TOWN-IN PRODRESS ORANGE CARRBOgO EWB8/ BOLIN CREEK OREENWAY. 1476 73B STPDA C 660 C C 14B PLANMNG DESIGN RIGHT OFWAY AND CONSTRUCTION BY TOWN ORANGE CARPBORO LL3100B SR 1107 (OLD FAYETTEWLLE POAD(, 0.6 8621 6621 NC 81 TO SR 1106 (STROUO LANE), PROWDE BICYCLE AND PEDESTIMAN FAgLITIEB AND TRANSIT ACCOMMODATIONS LINGER CONSTRUCTION - PROJECT U31aaA COMPLETE ORANGE CHAPEL HILL E&6110 BOON CREEK GREENWAY, NC 88 (MARTIN LUTHER KING, JR BOULEVARD TO UMSTEAD PARK. SCHEDULED FOq FEASIBILITY STUDY ORANGE COUNTYWIDE EB3606 BICYCLE gOUTE MAPPING ANO BICMNO. 0.0 60 60 IN PROGRESS ORANGE SR 1006 EB-1860 CONSTRUCT PEOESTflMN BgIDOE ORANGE GgOYE OVER H0. ROAD CONGESTION M ITIGATION PROJECTS SCHEDULED FOq FEASIBILITY STUDY - DURHAM TRIANGLE TRANMT C3177 EKPAFB)ED EKPRESS BUS SERVICE, HOLLY 1486 GRANDE AUTHORITY 6PRINGS7000WNi0WN RALEIGH WA WAKE APEK AM) GARY. OPERA71N0 ASMSTANCE TO EXTEND CURREM ROUTE BETWEEN APE%AND DOWNTOWN RALEIGH AND CONSTRUCT 7W0 NEW PARK AND RIDE LOTS. ORANGE CARRBORO 06181 JONES CREEK GREENWAY, CONSTRUCT 200 A 160 FOOT BMDCE AIA1650 FOOT PAVED TRML TO FILL OAP BETWEEN iNE CARRBORO UPPER BOLIN TRNL AND TWIN CREEKS OREENWAY AND IMPLEMEM PROGRAM TO SUPPDRi N014VEHICLE TRIPS TO MORRIS GROPE ELEMENTRY scxooL. CMAO pE Y61 0 70 CMAO R 1760 0 R 221 CMAO 0 C C 665 164 CMAO 0 151 0 167 0 16t 0 0 1i3 0 i1J 0 110 CMAO PE 74 C PE e CMAO C 706 C C 62 CMAO N 10 C N 7 INDICATES INTRASTATE PROJECT COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT GRANDE A9 MORE INFORMATbN BECOMES AVAILABLE 172 N O NCDOT PQI.IGY Tp PRp1EGTS DIVISION 1YPE OF WORK I ESTIMATES COST IN THOUSANO51 PROJECT BREAK TOTAL PRIOR 6TA7E iRANSPORTAl10NIMPROVEMENTPROORAM '. PROJ YEARS 6YEAR WORKPROCRAM DEVELOPMENTAL PROGRAM UNFUNDED ID COST COST FUNDING COUNTY ROUTEICITY NUMBER LOCATIONIDESCRIPTION LENGTH (THOU) (THOU) SOURCE FY 2011 FY 2012 , FY 2p1J 'FY 7014 FY 2015 CONGESTION MITIGATION PROJECTS DURMAN CHAPEL HILL G61W PURCHASE TWO (2)HYBRIO ELECTMC 2100 1370 CMAD 0 ST ORANGE BUSES AND PROWDE PORTN)N OF C 0 79 OPERATING E%PEN6E FOR THREE YEARS. 1:T~7.~~: A FOUR FY 2018 FY 2017 FY 2018' FY 201$ FY 2020 FUTURE YEARS MECKLENBURG CHARLOTTE CS711 WSTALL TWO STALE MAINTAINED E36 350 250 ORANGE HILLSBOROUGH FUEUNO SITES. IN Pf100 RES5 CHATHAM TRIANOLEJ 03107 iRIANOLETRANSPORTATION DEMAND 8076 1677 C1MG N 343 A 771 A dIRHAM COUNdL OF MANAOEMENf PROGRAM SERWCES FOR FRANKLIN COVERNMENT6 EMPLOYERS ANO ORGANWTIONBIN R WL E THE TRUNDLE 020NE NOFLAITAINMENf G AN L HAIINETT REGION MARKETING AND OUTREACH. N soy B N 613 B JOHNSTON N S76 B N 807 0 GRANDE WAKE q CARTAL AREA MPO PARTICIPATION•IN PROGRESS BY TRIANGLEJCOUNdL OF GOVERNMENT. B W RHAM•dIAPEI HILL-CARRBORO MPO PARTICIPATION • IN PROGRESS BY TRANGLE J COUNGL OF GOVERNMEM. ORANGE COUNTYWIDE G0.71A CONSTRUCTAPARN AIA RIDE SHELTER 83 33 MILL680ROUGH AND INSTALL BIKE MCKS ON BUSES. SECTION A: DURHAM-CHAPEL MLL• CARRBORO (OCHC) MPO TO PARTICIPATE IN CONSTRUCTION AND OPEIUTING ASSISTANCE FOR ONE YEAR FOR A NEW TRANSIT SEPNq:. IN PiiDGRE95 GRANDE COUNIYYADE P4&17B CONSTRUCTAPARK ANO RIDE SHELTER 573 321 CMAD D 131 HILLSBOROUGH AMI WSTALL BIKE HACKS ON BUSES. L D 67 6ECTION B: TMANGLE AREA RPO (TAlIPO) TO PARTIOPATE IN CONSTRUCTION AND OPERATING ASSISTANCE FOR THREE YEAR6 FOR A NEW TRANSR SERVICE. C31M RIVERWALK TRAIL, PHASE IO. CONSTRUCT 831 CMAD PE 10 APAVED OFF•NOAO TAIL ALONG ENO C PE 10 RIVER CONNECTING RWER PARK, GOLD CMAD R 161 PARK AND THE OCCDNEECHEE MOUNTMN C R 160 STATE NATURALAREA C G 1 B COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO INDICATEB INTRASTATE PROJECT 81GNIFICANi CNANGEAB MORE INFORMATION BECOMES AVAILABLE 173 0 N 86 A 73 A CMAD N 276 B N 7H8 B 0 N TO B N 75 B CMAD N J57 B N Jbb B N ' 156 B 0 N 422 B N /31 B N 196 B N DMSION 7 TYPE OFWORKIESTINATEDCOSTINTHOUSANDS/PROJECTBREAK NCDOT POLICY TO PROJECTS TOTAL PRIOR STATE TRANSPORTATION IMPROVEMENT PRO •RAM PflOJ YEARS bYEAR WORK PROGRAM DEVELOPMENTAL PR OGRAM ID COST COST FUNDING ~ COUNTY CONGESTION ~ ROUTEICITY MIYIGATN)N PROJECTS NUMBER LOCATION I DESCRIPTION LENGTH (THOU) (THOU) SOURCE FY 4011' FY 7012 FY 7013 FY 2014 FY 7016 FY 7016. ' FY 7017 FY 2010 FY 2018 FY 2070 FUTURE YEARS WRHAM TMANOLEJ C•/921 TRIANGLE) COUNCIL OF OOVERNMENfS 6626 700 CMAO N 4B1 N /az N 677 H Bzo N s40 OMNGE COUNCL OF (COG(. DEVELOPA FLEXIBLE WORK C N 423 N 170 „N 191 `N 678 N 603 WAKE GOVERNMENfB SCHEDULE FOR EMPLOYEES IIND OROAM2ATIONS IN TRIANGLE OZONE NON- .. A7TNNMENi AREA FOR THREE YEARS A DEVELOP FLE%IBLE WORK SCHEDULES FOR EMPLOYEES IN CAPITAL AREA MPO (CAMPO) • IN PROGRESS B DEVELOP FLE%IBLE WOgK SCHEDULES FOR EMPLOYEES INDURHAM-CIBAPEL HILL-CARRBORO (DCHC) • IN WIOGgE66. IN PROGRESG BY TRIANGLE J COUNCIL OF GOVERNMENTS - ENHeuCE E TPROJECTS (LOCAL PR OJECTS) OMNDE VAgIOU6 EL3107 CARRBOgO, INSTALL BUS SHELTERS 76 16 AT SELECTED LOCATIONS UNDER CONSTRUCTION BY TOWN CHATHAM VARKHIS W726 OLHC URBAN AREA BICYCLE AND 11811 4608 STPDA C 1980 C 1676 c 2114 C 39 DURHAM PEDESTMAN ALLOCATIDR C C qBa C 3P6 C 6 C 7 ORANGE PLANMNG, DESIGN, MGHi OF WAY AND CONSTRUCTION BY OTHERS • IN PROGRESS ORANGE CARpBORO ELA62B MOROAN CgEEK OREENWAY (WEST). 696 wSTPDA C 9B6 SMITH IEVEt ROAD TO UNIVERMTY C C H LANE CONBTRUCT GREENWA7, PLANNING DEBICN RIGHT OF WAY AND CONSTRUCTION BY TOWN • IN PROGgE55 DMNGE CHAPEL HILL ELJ6M MORGAN CREEKOgEENWAY (EASTF 1280 129D US 15d01•CULBETH ROAD TO SMITH LEVEL ROAD. TEN FOOT MULTWSE ASPHALT PATH INCLUDNW ACCESS TO NERRITT PASTURE HAZARD ELIMI NATION PROJECTS - - PLANMNG DESIGN, RIONT OF WAY AND CONSTRUCRON BY TOWN IN PROGRESS ORANGE US 70 SFi907B INSTALL RIGNT TURN LANE. 166 166 Nc Tat IN PROGRESS ORANGE NC 67 SF4BWC WIDEN NC 67 FOR LEFT TURN LANES 851 b/HES R 6p NC 757 AND INSTALLATRAFRC SIGNAL AT HES C 560 THE INTERSECTION OF NC 167. M PROOgE6S ORANGE NC M WS718 NC b7 i0 CASWELL COUNTY UNE 123 1661 HES p 777 GEOMETRIC IMPIIOVEMENTS, PAYED HES C .417 SHOULDERS AND RUMBLE STRIPS. ORANGE SR 1W/(EFLAND• WSAJ NORTH OF INTERSECTION WRN Sq 1777. N7 MES R 119 - CEDAR GROVE ROAD) IMPROVE HOM20NTAL ALIGNMENT OF HES CURVE TO PROWDE A MIMMUM OF 80 MPH E 375 DESIGN SPEED, PASSENGER R e1L PRO.IECTS OMNGE CAIWBORO Zi007B SR 1927(BREWEq gOAD)IN CAggBORO AT 0.0 Ba 95 NORFOLK SOUTHERN gAILWAY CROSSING 73S 179M. SAFETY IMPROVEMENTS RURAL PROJEC TS FUNDED • CONSTRUCTION NOT AUTHORIZED ROCMNGNAM U57B R517B GMLFORD COUNTY LINE TO 1719 1719 - TROUBLESOMECREEK CONCRETE REHABILITATION AND SHOULDEq RECONBTRUCTION UNDER CONSTRUCTION COST AND SCNEDULES ARE PRELIMINARY AND SUB.IECT TO INDICATES INTRASTATE PROJECT SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE 174 N N Attachment 5 2 3 MTIP Background The Transportation Advisory Committee (TAC) of the Durham-Chapel Hill-Carrboro (DCHC) MPO, at its meeting on February 9, 2011, released the Draft STIP Local Supplement for DCHC MPO for public comment, along with proposed changes to be included as the Draft Metropolitan TIP (MTIP). The Draft 2012-2018 MTIP is available on the County website http://www.co.orange.nc.us/planning/documents/DCHCMP02012- 2018MTIPDraftwithlnserts.pdf . The TAC will hold a public hearing to receive comments on the Draft MTIP on March 9, 2011. The Metropolitan Transportation Improvement Program (MTIP) outlines the anticipated expenditure of local, state and federal transportation funds consistent with the elements of the adopted Long Range Transportation Plan. Metropolitan Planning Organization (MPO) and the Secretary of Transportation (as the Governor's representative) must approve the TIP within the Metropolitan Area Boundary (MAB). The Metropolitan TIP must be consistent with the STIP for the first four years of the funding period. The following tables list changes and additions to the Draft STIP proposed in the Draft MTIP. TAC 2/9/2011 Draft MTIP The Local Supplement is the draft State TIP developed by the NCDOT. The DCHC MPO uses the Local Supplement as a basis to develop the draft Metropolitan TIP. The draft MTIP indicates what changes were made to the Local Supplement. The tables below show which projects were changed in the Local Supplement and which projects were added to it to form the draft MTIP. Changes to Draft STIP Route ID Descri tion/Miles/Cost. 'Chan es I-40 I-3306 I-85 in Orange Co. to US-15-501; add Define Phase A as NC 86 to Durham additional lanes. County Line (westbound) and Phase C • 20.7 miles as I-85 to NC 86 and NC 86 to • $47 million Durham County Line (eastbound) (Phase B is completed Durham County project) Fund Phase A in FY 2016 and FY 2017 for $10,208,000. Phase C $36,792,000 unfunded in post ear. I-85 I-0305 I-40 at Hillsborough to Durham County Include widening of NC 86 from US Line. Widen to six lanes and reconstruct 70A to Old NC 10. interchan es and structures. Old EB-4707 Garrett Rd. to US 15-501; bicycle and Add $lmillion in funding in FY 2012. Durham/ pedestrian improvements. (Placeholder for potential cost Chapel • 2.7 miles increase.) Hill Rd . $4 million US 15- U-5304 S. Columbia St. to Ephesus Ch. Rd.; Accelerate by three years, thus 501 sidewalks, wide outside lanes and transit construction starts FY 2016. accommodations. Include roadway, transit, bicycle and • 4 miles pedestrian improvements consistent • $5.1 million with recommendations of the Ephesus Church Road/Fordham Boulevard Transportation Study. + $5 million NC 54 FS-1005C I-40 to NC 55 in Ciry of Durham; Add $30.333 M in FY 2017, FY 2018, feasibility study and FY 2019 to fully fund the project. • 5.2 miles • $91 million Durham TN-5102 New Freedom -Beyond Am. Disability Delete -redundant with TM-5129B Oran e Act Re uirements Durham TM-5123B Job Access /Reverse Commute: Capital, Added Chatham County, funding Orange Planning, Operating Cost amounts to be updated Chatham Durham TM-5129B New Freedom -Beyond Am. Disability Added Chatham County, funding Orange Act Requirements amounts to be updated Chatham Durham TE- Fixed Guideway: Light Rail Service - Added Durham County, Changed to Oran e 4706Au Durham-Cha el Hill Ri ht-of-wa Tiian le Transit 24 10 TAC 2/9/2011 Route ID Descri tion/MilesJCost Cha' es Durham TE- Fixed Guidewajr Light Rail - Added Durham County, Changed to Orange 4706Bu Alternatives Analysis, PE & Design - Triangle Transit Durham-Cha el Hill Additions to Draft STIP 'Route ID ' Descri tion/Miles/Cost NC 54 New TIP I-40 to Fordham Blvd.; feasibility study that considers results of project MPO's NC 54 Study and includes roadway, bicycle, pedestrian and transit improvements. • 1.7 miles Add funding for short-term recommendations of the NC 54 corridor study in FY 2016-2020. (Use draft report recommendations as placeholder for final report recommendations.) Short-term improvements in draft report: • Park-n-Ride: $1,795,000 capital, $720,000 operating • Transit: $2,100,000 capital, $4,066,200 operating • Bicycle and Pedestrian $6,820,000 • Roadway $6,100,000 (without collector street network) • Total: $21,601,200 Fayetteville Road New TIP Woodcroft Pkwy to Riddle Rd.; widen to multilane and include project bicycle, pedestrian and transit improvements; add $7 million in funding each year from FY 2016 through 2018. • 2.3 miles • $21 million Erwin Road New TIP US 15-501 to NC 751; construct bicycle lanes, sidewalks and safety project improvements; add $5.5 million in funding in FY 2016. Statewide STP Enhancement program is suggested funding source. • 5.5 miles • $5.5 million Jack Bennett Road New TIP US 15-501 to Lystra Rd.; safety improvements; add $6.9 million in project funding in FY 2016. • 2.3 miles • $6.9 million Churton Street R-2825 US 70 Business to I-40; congestion mgmt., aesthetic and capacity improvements; add $9.5 million each year in FY 2019 and 2020. • 2.5 miles • $19 million Eno Mountain Road U-3436 Eno Mtn. Rd. and Mayo St. aligmnent; add $2.4 million in funding in FY 2020. • $2.4 million NC 86 New TIP US 70 Bypass to Coleman Loop Rd.; widen to multilanes; add $7.5 project million in funding in FY 2020. • 0.42 mile • $7.5 million 25 11 TAC 2/9/2011 :Route ID "' Descri tion/Miles/Cost Orange Grove Road New TIP Churton St. to US 70 Alternate; construct roadway; add X30 million project to FY 2020. • 0.40 mile • X30 million Park and Ride Facilities New TIP Construct park-n-ride lots in five corridors: US 501 north of project Durham; I-85 east of Durham; I-40/I-85 near Mebane; US 15-501 between Durham and Chapel Hill; and, I-40/NC 751 in Durham. • 2,500 total parking spaces • $5,625,000 Orange Grove Road EB-4980 Construct pedestrian bridge over I-40 (or retrofit existing vehicle Pedestrian Bridge bridge to accommodate pedestrians). • 0.04 mile • X400,000 26 12 27 Attachment 6 ORANGE COUNTY PRIORITY PROJECTS SUBMITTED TO TRIANGLE AREA RURAL PLANNING ORGANIZ4TION ORANGE STATUS COUNTY DESCRIPTION DRAFT 2011-2020 STIP PRIORITY #1 SR 1114 (Buckhorn Road) Widening Not included in Draft STIP; scheduled for from West Ten to US 70, with bicycle reprioritization in 2012. and edestrian facilities Scheduled in Draft STIP for feasibility #2 DairylandRoad/Orange Grove study: TIP Project # EB 5108 -wide Road/Buckhorn Road bicycle paved shoulders on SR 1112 (Dairyland facilities Road) from SR 1111 (Union Grove Church Road) to SR 1006 (Orange Grove Road #3 Buckhorn Economic Development New TIP project added in Draft MTIP for District park and ride lot years 2016 - 2020 to construct 5 park and ride lots -one in the I-40/I-85 corridor near Mebane US 70 East/I-85 Connector Not included in Draft STIP; scheduled for reprioritization in 2012. Scheduled for reprioritization in 2012; #5 SR 1004-SR 1357 (Efland-Cedar partially included in Draft STIP in 2014 Grove Road) improvements & bicycle as a Hazard Elimination Project to facilities improve horizontal alignment of curve north of intersection with SR 1332 Hi hland Farm Road Not included in Draft STIP. #6 SR 1005 (Old Greensboro Road) Scheduled for resurfacing in 2011. Staff bicycle facilities has asked that 2' paved shoulders be provided durin resurfacin . #7 SR 1006 (Orange Grove Road) and Not included in Draft STIP. Resurfacing SR 1102 (Dodson's Crossroad) project in 2009-2010 provided 2' paved bic cle facilities shoulders. NOTE; Orange County priority requests submitted to the Triangle Area Rural Planning Organization in 2008 are now either wholly or partially within the Metropolitan Area Boundary of Durham-Chapel Hill-Carrboro Metropolitan Planning Organization. Attachment 6 28 ORANGE COUNTY PRIORITY PROJECTS SUBMITTED DURHAM-CHAPEL HILL- CARRBORO METROPOLITAN PLANNING ORGANIZATION ORANGE STATUS COUNTY DESCRIPTION DRAFT 2011-2020 STIP PRIORITY DCHC TIP Project No. EB-4980 - SR 1006 Feasibility study completed - to be MPO (Orange Grove Road) pedestrian removed from STIP; #1 bridge over Interstate 40 Added in Draft MTIP for construction in 2019 DCHC Hillsborough Train Station MPO #2 DCHC TIP Project No.R-2825 - SR 1009 Not included in Draft STIP; scheduled for MPO #3 (South Churton Street) Improvements reprioritization in 2012. Added in Draft MTIP for 2019 and construction in 2020 DCHC SR 1009 (Old NC 86) bicycle facilities Not included in Draft STIP. MPO #4 DCHC SR 1006 (Orange Grove Road) Not included in Draft STIP; scheduled for MPO #5 extension to US 70 A reprioritization in 2012. New TIP project added in Draft MTIP for ri ht-of-wa ac uisition in 2020 DCHC Tip Project No. U-3436 -intersection Not included in Draft STIP; scheduled for MPO #6 realignment of SR 1148 (Eno reprioritization in 2012. Mountain Road) and SR 1192 (Mayo Added to in Draft MTIP for right-of--way Street) at SR 1006 (Orange Grove acquisition in 2020 Road DCHC U-2805, SR 1777 (Homestead Road) Not included in Draft STIP; scheduled for MPO #7 improvements to include bicycle reprioritization in 2012. lanes and sidewalks Not in Draft MTIP. DCHC SR 1727 (Eubanks Road) bicycle Not included in Draft STIP. MPO #8 lanes Resurfacing programmed for 2011 to provide 2'; paved shoulders. DCHC SR 1008 (Mt. Carmel Church Road) Not included in Draft STIP. MPO #9 bic cle lanes DCHC US 70 Bypass widening: Not included in Draft STIP. MPO #10 DCHC NC 86 (North of Hillsborough) Not included in Draft STIP. MPO #11 improvements with intersection New Project included in Draft MTIP fro improvements at US 70 b pass 2020 DCHC NC 86, bicycle facilities from SR Not included in Draft STIP. MPO #12 1730/SR 1731 (Whitfield Road) to US 70 A