HomeMy WebLinkAboutAgenda - 09-09-2004 - 9aORANGE COUNTY
BOARD OF COUNTY COMMISSIONERS
ACTION AGENDA ITEM ABSTRACT
Meeting Date: September 9, 2004
Action Agenda
Item No. ~- Gt
SUBJECT• Town of Chapel Hill Funding Request -Bolin Creek Greenway Phase III Design
DEPARTMENT: Environment and Resource PUBLIC HEARING: (YIN) No
Conservation
ATTACHMENT
1) Letter from County/Town PPC
2) Proposed RFQ for Study
3) Town staff costs memorandum
INFORMATION CONTACT:
David Stancil, 245-2590
TELEPHONE NUMBERS:
Hillsborough 732-8181
Chapel Hill 968-4501
Durham 688-7331
Mebane 336-227-2031
PURPOSE: To consider a funding request from the Town of Chapel Hill for the planned
engineering and design study for the extension of the Bolin Creek Greenway.
BACKGROUND: In April 2004, the Orange County/Chapel Hill Project Planning Committee
(PPC) met to discuss options for use of bond funds designated for greenways in Chapel Hill.
The PPC has recommended that County bond funds be used in conjunction with Town bond
funds to extend the Bolin Creek Trail upstream of Airport Road. The extension of the existing
Bolin Creek Trail would be a step towards linking the existing trail with Carrboro, the
proposed woodland trail system of southern Orange County, Duke Forest, the proposed
Carolina North property, and the northwest areas of Chapel Hill.
On June 23, 2004, the Board of Commissioners received that recommendation and adopted
a resolution agreeing to Bolin Creek Greenway extension as the project for use of 2001
County bond funds identified for Chapel Hill greenways.
The -Town and the PPC have started the process of soliciting firms for the design/engineering
study, using the attached Request for Qualifications (RFQ). Interviews are expected to take
place in September or early October 2004.
The Town Council has agreed to provide the initial $100,000 required to start the design work
in 2004. The County is being asked to provide up to $75,000 during FY 04-05, which would
allow for beginning the design process in 2004 and possibly completion of the concept plan
in late 2005.
2
The proposed scope of work would include a concept plan for Phase III of the trail, as well as
cost estimates that would be used to determine the phasing of subsequent trail construction.
The concept plan would involve analyzing and recommending design solutions for a trail
alignment from Airport Road to three separate termination points: Seawell School Road,
Village Drive, and the area of Bynum Street. The concept plan would involve about 10,000
linear feet of proposed trail and would deal with numerous issues related to steep slopes,
narrow valleys, existing bridges, existing and planned utilities, FEMA flood plains, and other
existing conditions. The RFQ also anticipates analysis of the need for trail bridges, retaining
walls, underpasses, and other design solutions.
Once a recommended concept plan is developed and reviewed by the PPC, a public review
process with possible design options would be held (to be developed), prior to any
discussions about construction of Phase III.
FINANCIAL IMPACT: The cost of the concept plan is anticipated by Town staff to be in a
range of $125,000-$175,000. The Town has agreed to earmark $100,000 in 2003 Town
Parks bonds for this effort in the current fiscal year, and has asked the County to provide
$75,000. The source of the County share of this cost would be a portion of the $1 million in
2001 County Parks and Open Space bond funds that were specifically earmarked for Chapel
Hill greenways. Subsequent construction drawings and documents are projected to cost
$180,000 - $225,000 in FY 05-06 and beyond. The total project cost is tentatively estimated
to be in the range of $3.3 million, with $1 million coming from the aforementioned 2001
County bonds. The County would provide reimbursement to the Town for the County's share
of project expenses incurred in a manner similar to the approach that has been observed for
other partner capital projects involving the County and the Town, such as Southern Park.
If the Board approves the recommendation in this agenda item, staff would bring back for
Board adoption at a subsequent meeting a County capital project ordinance that would
appropriate for future expenditure the $75,000 in 2001 County bond funds.
RECOMMENDATION(S): The Manager recommends that the Board approve the allocation
of $75,000 from the 2001 Parks and Open Space Bond funds (Joint Town/County Open
Space portion) toward this project, to be provided to the Town in a manner similar to the
process for reimbursement funding of other current Town/County partner projects.
3
MEMORANDUM
TO: Board of Orange County Commissioners
FROM: Chapel HilUOrange County Project Planning Committee (PPC)
Margaret Brown
Kevin Foy
Barry Jacobs
Bill Strom
SUBJECT: Request to Use Orange County Bond Funds for Chapel Hill's Bolin Creek Trail
DATE: July 15, 2004
On June 23, 2004 the Orange County Board of County Commissioners adopted a resolution agreeing to
the selection of the Bolin Creek Trail as the project to be funded with $1,000,000 in Orange County bond
funds designated for greenways in Chapel Hill.
The PPC appreciates the County's support and now asks that the Board of Orange County Commissioners
take two additional actions:
• Appropriate $75,000 as early in 2004 as possible to begin design. The Chapel Hill Town Council
has already approved the sale of greenways related Parks bonds for this calendar year. That sale
includes $100,000 for initial design of the Bolin Creek Trail. If sufficient fixnding is secured we
would start design this fall.
• Appropriate the remaining $925,000 in early 2006 to complete final design and build the first
phase.
We believe that this project will provide an important facility for both recreational use and non-motorized
vehicle transportation that would serve all residents of.southern Orange County. The Committee and
staffs are at your disposal to answer any questions you may have regarding this proposal.
TOWN OF CHAPEL & ORANGE COUNTY
REQUEST FOR QUALIFICATIONS
DESIGN TEAM FOR
BOLIN CREEK TRAIL (PHASE III)
Bid: A/E 05-001
The Town of Chapel Hill and Orange County are partners in the development of a
proposed greenway trail along Bolin Creek in Chapel Hill. The governments are
requesting statements of qualification from firms interested in providing design services
related to developing a conceptual plan for the trail, securing all needed permits for the
project, cost estimating, preparation of construction documents, and construction
administration of the project.
Proposed Scope of Project
The proposed Bolin Creek Trail would be an improved trail that, within reason, meets all
AASHTO and NCDOT standards for abicycle/pedestrian path. We believe that there
would be two design components for this project:
Concept Plan: The concept plan would involve analyzing and recommending
design solutions for a trail alignment from Airport Road to three separate
termination points: Seawell School Road, Village Drive, and the area of Bynum
Street. The concept plan would involve about 10,000 linear feet of proposed trail
and would deal with numerous issues related to steep slopes, narrow valleys,
existing bridges, existing and planned utilities, FEMA flood plains, and other
existing conditions. We anticipate the need for trail bridges, retaining walls,
underpasses, and other design solutions. Once a recommended concept plan is
developed we would undergo a public review process. Where possible, options
would be developed for public review.
Phase One Construction: The successful design firm would be asked to prepare
cost estimates that would be used to determine a phase one project. The phase one
project would likely include a combination of paved and natural surface trail, with
the goal being to have the most paved trail that funds would allow. Once a phase
one project has been determined by Town and County elected officials the design
firm would prepare construction documents, secure all needed permits, and assist
in the administration of the construction project.
Budget
Budget has not been determined at this time. However, we believe that a budget of
approximately $3,300,000 is possible.
Design Teams
Teams should include at a minimum persons with the following skills:
• Registered engineers specializing in floodplain modeling, civil issues, soils,
stormwater control and any other engineering specialties required by the project.
• Landscape Architects
• Persons familiaz with the processes required to secure needed permits and
approvals from all authorities with oversight control (i.e., FEMA, Army Corps of
Engineers, NCDOT, OWASA, Duke Power, etc.)
• Construction administration and oversight.
We are especially concerned that the successful firm should have extensive knowledge in
the design of facilities adjacent to active streams that might require extensive flood
modeling and permitting to satisfy local and federal floodplain regulations.
Working Relationships
The design team will work directly with a project manager appointed by the Town. The
design team will meet regularly with a Park Project Planning Committee (PPC), which
consists of elected officials from the Town and the County governments. The PPC will
review plans and give direction at critical decision points.
Schedule
It is our intent to select a design firm in the fall of 2004. Work would begin immediately
upon execution of contract documents.
Selection Criteria
Each proposal will be evaluated based on the following factors:
- RELEVANT EXPERIENCE: Depth of relevant experience of the overall design
team including landscape architects, engineers, and other pertinent professionals.
We aze especially interested in reviewing relevant experience including design of
trails, roads, or other facilities in difficult azeas such as steep slopes and
regulatory floodplains.
- QUALITY OF REFERENCES: Responders must submit names and contact
information for individuals able to provide references from at least three clients.
(Additional references aze encouraged). References must be for work similar in
nature to the proposed Bolin Creek Trail project, and must include at least one
reference from a staff member of a public body.
- QUALITY: Quality of projects completed by consultants will be assessed.
- TIMING: Ability of the Vendor to begin work immediately.
- PROPOSAL: Quality of the proposal document will be considered.
- COMPUTER AIDED DESIGN: Ability of the design firm to prepare maps and
documents with commonly used computer programs.
- INSURANCE: Proof of insurance of type and amounts satisfactory to the Town.
The Town typically requires liability limits of at least $1,000,000 per occurrence
with a $2,000,000 aggregate coverage. Exact limits would be determined during
contract negotiations.
Selection of Design Firm
All proposals must be received (not postmarked) at the following address no later than
5:00 p.m., August 19, 2004:
Coco Hall, Purchasing Coordinator
Chapel Hill Finance Department
306 N. Columbia Street
Chapel Hill, NC 27516
- Please submit 5 copies of your proposal. If you are
short-listed we will ask for an additional 10 copies. t
The successful design firm will be selected in the following manner:
1. Selection of Short-Listed Firms: Staff will evaluate proposals, contact
references and, if possible, visit related projects. Ashort-list of 3-5 firms will
be selected.
2. Interview of Short-Listed Design Firms: The PPC will interview all of the
short-listed firms. The firm's proposed project manager must be present at the
interview and must provide a significant percentage of the overall
presentation. This is the person who will work with the staff and the PPC on a
day-to-day basis.
3. Selection of Desi iii: The Town Manager, or his designee, will make a
decision based on the initial proposal, recommendation of the PPC, and
recommendations of the staff.
4. Contract Negotiation: Staff will work with the successful design firm to draft
a final Scope of Services and fee schedule. The final agreement will be
reviewed by the PPC. If we are unable to agree to terms for a mutually
acceptable contract, one of the other short-listed firms maybe selected or the
process may be re-advertised.
For additional information concerning the project please contact Bill Webster at 919-968-
2787 X 214. Or a-mail at bwebster@townofchapelhill.org
MEMORANDUM
TO: ~ Chapel HilUOrange County Project Planning Committee (PPC)
FROM: Bill Webster, Assistant Director of Parks and Recreation
SUBJECT: Preliminary Cost Estimates for Design Services for Phase III of the Bolin Creek Trail
DATE: July 15, 2004
This memorandum addresses questions related to the costs of design services for phase III of the Bolin
Creek Trail.
We know that because of the physical constraints along this section of Bolin Creek that the proposed
Phase III project would be one of the most difficult greenways projects to design and build. We have
asked a local firm to estimate the costs based on the best available information at this time. They have
provided us the following estimates for design services:
Phase A -Concept Plan ($125,000 -175,000)
This would involve evaluation of existing conditions, surveys, geotechnical investigation, flood plain
modeling for bridges and improvements near the stream, and attendance at meetings throughout the
process. This phase would identify the ultimate trail alignment and a logical phase that could be built with
existing funds.
Phase B -Final Construction Documents ($180,000 - 225,000)
Fees would pay for detailed construction documents. Construction administration would not be covered
by this fee estimate.
The Town Council has agreed to provide the initial $100,000 required to start design work through the
issuance of Parks bonds in 2004. We believe that if the County could provide up to $75,000 this year we
could begin the design process in 2004 and possibly complete the concept plan in late 2005.