Loading...
HomeMy WebLinkAboutAgenda - 09-09-2004 - 7aORANGE COUNTY BOARD OF COUNTY COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: September 9, 2004 Action Agenda Item No. 7 -a SUBJECT: Report on Air Quality Conformity and Durham - Chapel Hill - Carrboro Metropolitan Planning Organization 2030 Long -Range Transportation Plan DEPARTMENT: Planning and Inspections ATTACHMENT(S): 1. Map of Triangle Ozone Nonattainment Area 2. Triangle Air Quality Conformity Partnership 3. Triangle Air Quality Conformity Calendar 4. Overview of Transportation Conformity Process 5. 2030 DCHC MPO LRTP Draft and changes 6. Summary of public comments on Draft LRTP PUBLIC HEARING: (Y /N) No INFORMATION CONTACT: Karen Lincoln Ext. 2594 TELEPHONE NUMBERS: Hillsborough 732 -8181 Chapel Hill 968 -4501 Durham 688 -7331 Mebane (336)227 -2031 PURPOSE: To receive an update on the air quality conformity process and Draft 2030 Long - Range Transportation Plan (LRTP) for the Durham - Chapel Hill - Carrboro Metropolitan Planning Organization (DCHC). BACKGROUND: Orange County is among the seven whole counties and portion of an eighth county in the Triangle Area that were designated as an ozone non - attainment area by the U.S. Environmental Protection Agency (EPA) last April 15, 2004. The Triangle Ozone Nonattainment Area (Durham, Franklin, Granville, Johnston, Orange, Person and Wake Counties and 4 townships in northeast Chatham County as depicted in Attachment 1), as a region, must demonstrate transportation conformity for the new 8 -hour ozone standard by June 15, 2005. If any part of that region fails to meet transportation conformity by the June 15th lapse date, the entire region fails to meet conformity. Failure to meet transportation conformity, i.e. to not have a conforming Long -Range Transportation Plan (LRTP) and /or Transportation Improvement Program (TIP) in place and approved by the Federal Highway Administration (FHWA) and EPA by June 15, 2004, will result in no new authorizations of federal aid projects. "Only project phases that received funding commitments or an equivalent approval or authorization prior to a conformity lapse may continue during a lapse. Transit projects that have received a Full Funding Grant Agreement or equivalent approval prior to the conformity lapse may proceed during a lapse." Attachment 2 is a list of organizations participating in the transportation conformity process. Attachment 3 is the Triangle Air Quality Conformity Calendar developed by the Triangle transportation conformity partnership, an interagency group consisting of staff from area jurisdictions, Rural Planning Organizations, Metropolitan Planning Organizations, Triangle J Council of Governments (TJCOG), FHWA, Federal Transit Administration (FTA), EPA Region IV, North Carolina Department of Environment and Natural Resources (NCDENR) Division of Air 2 Quality (DAQ), and North Carolina Department of Transportation (NCDOT). Attachment 4 is a powerpoint presentation produced by the FHWA that gives an overview of the transportation conformity process including tasks, agency roles /responsibilities, and required documents. The State Transportation Improvement Program (STIP) is the planning document for the rural areas outside of Metropolitan Planning Organization boundaries. Metropolitan Planning Organizations (MPO) within the Triangle Ozone Nonattainment Area must adopt Long -Range Transportation Plans (LRTPs) that have been approved for air quality conformity by the Federal Highway Administration (FHWA) and EPA. The DCHC MPO Transportation Advisory Committee (TAC) held a public hearing on August 25th regarding the attached draft of the DCHC MPO 2030 Long -Range Transportation Plan (Attachment 5). Attachment 6 is a summary of comments received prior to the public hearing. The TAC released the draft LRTP for public comment on June 23rd, and will accept comments until September 22 "d. The TAC will review a final draft of the plan on September 22 "d, and anticipates adopting the LRTP September 29, 2004. FINANCIAL IMPACT: There is no direct financial impact associated with this item. Depending on the fiscal analysis, local jurisdictions may have to develop funding sources for needed projects that are not covered by existing revenue sources. RECOMMENDATION(S): The Administration recommends that the Board receive the report on Air Quality Conformity process and Draft 2030 DCHC Long -Range Transportation Plan. Triangle Ozone Ikon- Attainment Area Legew Triangle Oione Non- attainment Area /�. TRM Modelled Area ♦ vj MPO Boundaries RTP nutdiviLle Township Major Road or Highway Municipal Limit /V County 9ewndary 2 i !. We 2ml ral Person Granville 41 Franklin D D- C� m z W ATTACHMENT 2 Triangle Air Quality Conformity Partnership Participating Organizations Metropolitan Planning Organizations (MPOs): Transportation Advisory Committees (TACs) Technical Coordinating Committees (TCCs) Capital Area MPO (CAMPO) Durham - Chapel Hill - Carrboro MPO (DCHC) Burlington- Graham MPO (BG MPO) Rural Planning Organizations (RPOs): Transportation Advisory Committees (RTACs) Technical Coordinating Committees (RTCCs) Kerr -Tar RPO Triangle Area RPO (TARPO) Upper Coastal Plain RPO (UCP RPO) Interagency (IA) consultation Local AQ Agencies, MPOs, RPOs, Triangle J Council of Governments (TJCOG), NC Department of Environment & Natural Resources (NCDENR) Division of Air Quality (DAQ), NC Department of Transportation ( NCDOT) , US Environmental Protection Agency (EPA), Federal Highway Administration (FHWA), Federal Transit Administration (FTA) Abbreviations AQ Air Quality CDR Conformity Determination Report FTA Federal Transit Administration (within USDOT) IA Interagency IC Interagency Consultation (Meeting) ITRE Institute for Transportation Research and Education (Service Bureau for the Triangle Regional Model/Travel Demand Model) LRTP Long Range Transportation Plan (MPOs) MPO Metropolitan Planning Organization NCBOT North Carolina Board of Transportation NCDOT North Carolina Department of Transportation RPO Rural Transportation Planning Organization RTAC Rural Transportation Advisory Committee (within RPO) RTCC Rural Technical Coordinating Committee (within RPO) SIP State Implementation Plan STIP State Transportation Improvement Program TAC Transportation Advisory Committee (within MPO) TCC Technical Coordinating Committee (within MPO) TDM Travel Demand Model or Transportation Demand Management TRTM Triangle Region Transportation Model (also called Travel Demand Model) TPB Transportation Planning Branch (within NCDOT) TTA Triangle Transit Authority VMT Vehicle Miles Traveled 4 6 ATTACHMENT 4 7 ...._......._..._...... _ Transportation Conformity Tasks *LRTP (MPO) (2 -3 year process) — TAC endorsement of LRTP pending conformity determination P, 1r!( — Conformity work begins at year 2 of this Y (MPO/NCDOT /FHWA) w, process y NCDENR, FHWA, EPA, FTA '.. • Document conformity parameters — LRTP horizon year, conformity analysis year, MVEB, mobile model, TDM, etc. Transportation Conformity Tasks P, 1r!( *Interagency Consultation ( IC ) Meeting Y (MPO/NCDOT /FHWA) • MPO, Local AQ Agency, NCDOT, NCDENR, FHWA, EPA, FTA '.. • Document conformity parameters — LRTP horizon year, conformity analysis year, MVEB, mobile model, TDM, etc. Yd • Conformity schedule • Agency concurrence Q 11 rACHMENT 4 L-*J ....._.. _........ _..... _... . to Transportation Conformity Tasks *Transportation Modeling (MPO/NCDOT) If 70 Days — Travel Demand Model (TDM) — Extract VMT and Speeds N - "I °` « • Used to develop emission factors N" *Emission Factor Development (NCDENR) 15 Days Transportation Conformity Tasks ry *Draft Conformity Determination Report (CDR)(MPO/NCDOT) 10 Days *Review and Comment of draft CDR (NCDENR) 21 Days — Mandated by State Law — Document is also reviewed by EPA, FHWA, FTA, Local AQ Agency and NCDOT — Major conformity issues addressed/resolved ATTACHMENT 4 0 Transportation Conformity Tasks *Final CDR Public Review and Comment Period (MPO) 30 Days Address comments and document responses * IC Meeting (if necessary) (MPO/NCDOT /FHWA) * MPO TAC makes conformity determination and adopts LRTP /TIP ,,. (M PO) G° TTAC HMEHT 46 Transportation Conformity Tasks *Federal Review of Final CDR and LRTP 4 (EPA/FTA/FHWA) 30 Days *Clean" Review Letter (EPA) * USDOT Conformity Determination (FTA/FHWA) *Process Complete tt — 9 to 12 months Transportation Conformity Tasks W dam£ H *Rural (Donut Area) Conformity �9. is described J7 N — Conformity process the same as for MPO except for the following: • STIP is the planning document for the rural area • The NCDOT "rural spreadsheet" is the TDM for K "m the rural area. • The NCDOT makes the conformity determination . • NCBOT adopts STEP H ATTACHMENT 4 11 Transportation Conformity Process: Agency RQes/Respons it es. A-4 y _ * MPO — LRTP m� — IC Meetings IX — Participates in running the TDM — Compose CDR 5 =` — Public Review and Comment Period ,._ — Response to Agency/Public Comments — TAC makes the conformity determination and adopts x4' the LRTP /TIP — Final CDR/LRTP packages provided to review `� agencies 11 * RPO — Participates in the IC Meetings — Review and comment on analysis and E documentation — Assist with Public Review and Comment Period — Assist with responses to Agency/Public ,._ Comments 11 ATTACHMENT 4 12 Transportation Conformity Process: Agency H l ' 00 * NCDOT ` — Participates in running the TDM F� — Conformity Process Schedule 2 — Monitors MPO Conformity Process Schedule — IC Meetings — Assist with drafting CDR Assist MPO with Commitment Follow -Up o- 12 Transportation Conformity Process: Agency H l ' 00 * NCDENR F� — SIP — Mobile Model -M6 — Develops Emission Factors. — CDR 21 Day Review and Comment Period — CDR Review and Comment Letter 12 ATrAC' HMC MT 4 13 *Local AQ Agency 4 a — Review conformity documentation — Provide technical advice /guidance Transportation Conformity Process: Agency o: s * FHWA x — Coordinate conformity determination federal review process — Schedule /coordinate /facilitate IC meetings Monitors MPO Conformity Process Schedule — Assist MPO/NCDOT with commitment follow -up bra; — Provide technical advice /guidance on conformity — Review conformity documentation USDOT conformity determination letter ATTACHMENT 4 x Transportation Conformity Process: Agency 12n1,0 0A 2,0V Vihilitivr a *EPA — Regulations — Approve the SIP Provide technical advice /guidance on conformity — Review conformity determinations — CDR review and comment letter IN .y 14 ATTACHMENT 4 iN72 Transportation Conformity Process: Documents * LRTP *CDR * NCDENR review and comment letter *EPA review and comment letter MPO TAC /State DOT resolution that makes the conformity determination and w: It adopts the LRTP /TIP r, * USDOT conformity determination letter ty a Member Governments: Town of Carrboro Town of Chapel Hill County of Chatham City of Durham County of Durham Town of Hillsborough N.C. Department of Transportation County of Orange ATTACHMENT 5 Durham - Chapel Hill - Carrboro Metropolitan Planning Organization Draft 2030 Long Range Transportation Plan (June 23, 2004) City of Durham Transportation Division 101 City Hall Plaza Durham, NC 27701 (919) 560 -4366 16 Executive Summar 17 The 2030 Long -Range Transportation Plan is the long -range guide for major transportation investments in the Durham - Chapel Hill - Carrboro (DCHC) metropolitan area. The 2030 Long -Range Transportation Plan (LRTP) recommends major transportation projects, systems, policies and strategies designed to maintain our existing systems and serve the region's future travel needs. The DCHC -MPO LRTP is integrated with land use and air quality strategies and goals for the urban area. Official endorsements of the Plan by the Transportation Advisory Committee (TAC), USDOT, and the Environmental Protection Agency (EPA) are required in order for the MPO to receive Federal funds for its transportation investment needs. The plan emphasizes improvements to existing highway, transit, bicycle and pedestrian facilities and includes policies in support of intermodal freight needs (urban goods movement). To stretch our transportation dollars, the plan incorporates Travel Demand Management (TDM), Transportation System Management (TSM), Intelligent Transportation Systems (ITS), and Congestion Management Systems (CMS) strategies. The adopted 2025 Transportation investments formed the foundation for the proposed modal elements identified in this 2030 Plan. The plan's assessment of the projected financial resources indicates that about $5.8 billion can be expected to be available for transportation projects through 2030, not nearly enough to substantially expand the transportation system and meet the increase in demand from a growing region. The majority of projected resources will barely be enough to keep pace with the growing operating and maintenance needs of the existing - plus - committed systems, which include repair, bus replacement, reconstruction of portions of the system, and Intelligent Transportation Systems. The gap between the region's transportation needs and available funding presents several challenges that the DCHC MPO, along with other Triangle region stakeholders, must soon address: • Aggressively pursue both short and long term non - traditional funding sources as well local revenue options • Advance LRTP components to implementation through the Transportation Improvement Program (TIP) consistent with the air quality conformity project implementation schedule. • Monitor regional growth to ensure the Plan stays abreast of the region's needs • Initiate feasibility studies for post year projects (projects not included in the 2030 LRTP) • Engage in the process to solve the region's air quality problems and meet the new 8 -Hour Air Quality Standard Failure to address these challenges may result in deterioration of the transportation infrastructure, degradation in mobility, and harm to the regional economy. 2 Public Involvement The goal of the 2030 LRTP public involvement process is to develop and support an early, full and effective exchange of information and ideas among all transportation stakeholders in the metropolitan area. The MPO employed a wide range of techniques to promote citizen involvement, including direct mailings, open houses, public meetings in all parts of the metropolitan area, and newspaper advertisements. One of the premises of the updated public involvement process is the MPO's commitment to increase public understanding of how transportation decisions are made, and to encourage participation in the planning process. With this goal in mind, MPO developed a website and published two newsletters. Socio- Economic & Demographic Forecasts Accurate forecasts of future population, households, and employment are essential components of effective transportation planning. Local jurisdictions and the Lead Planning agency (LPA) are responsible for preparing these forecasts for the MPO. The forecast project began with generation of County totals for population, households and employment. It is assumed that implementation of the 2030 LRTP would have a significant impact on land use because most of the proposed transportation systems are either new capital highway and fixed guideway projects or widening/expansion of existing highway and transit infrastructure. With the socio- economic forecast for the proposed 2030 LRTP, MPO wide job levels are expected to grow 89% from 2002 to 2030 and population is expected to increase by 72% over the same period. Substantial population and job growth is also projected in Durham, Orange, and Chatham Counties. The growth forecasts for 2030 are shown in the following table and graphs. Population, Households, and Employment Forecasts for 2030 iBl ......................... MPO Counties .................................................................. ............................ 1990 Census ..... ........ ....... ........................................................................................... 2000 Census (percent ............................... 2030 Forecasts change) (% change from 2000) Population Durham 181,835 223,314 (23 %) 374,117 (68 %) Orange 93,851 118,227 (26 %) 177,948 (51 %) Chatham 38,759 49,329 (27 %) 1 118,883 (141 %) MPO Total 3141445 390,870 (24 %) E 670,948 (72 %) Households Durham 72,297 89,015 (23 %) ' 141,672 (59 %) Orange 36,104 45,863 (27 %) 79,793 (74 %) Chatham 15,293 19,741 (29 %) 30,143 (53 %) MPO Total ............................................ ........ . ............................................ _. ............................... .... ............................... .123,694...................... ......................._154,619 (25 %) ............................................. ........E 251,608 (63 %) ........................................................................................ ............................... Employment Durham 115,549 167,186 (45 %) 337,023 (74 %) Orange 1 51,870 63,660 (23 %) 108,486 (63 %) Chatham l 21,380 26,460 (24 %) 39,558 (50 %) MPO Total IL 188,799 257,306 (36 %) 485,067 (89 %) 3 300000 250000 200000 150000 100000 50000 0 000000 500000 400000 300000 200000 100000 0 4 Household Growth by Area 2002 -2030 1990 Census 2000 Census 2030 Forecasts Employment Growth By Area 2002 -2030 1990 Census 2000 Census 2030 Forecasts 19 ■Chatham ■Orange ❑Durham OMPO Total OChatham MO range ®Durham OMPO Total OChatham MOrange MDurham OMPO Total ATTACHMENT 5 Population Growth by Area 2002 -2030 800000 700000 600000 0 w 500000 v Oct C) CT co rn M M 400000 d to M ch 00 300000 °�°- N co 00 200000 r co 0) 00 N N N 0 00 ti °r° LO C6 M r 100000 00 M � 0 1990 Census 2000 Census 2030 Forecasts 300000 250000 200000 150000 100000 50000 0 000000 500000 400000 300000 200000 100000 0 4 Household Growth by Area 2002 -2030 1990 Census 2000 Census 2030 Forecasts Employment Growth By Area 2002 -2030 1990 Census 2000 Census 2030 Forecasts 19 ■Chatham ■Orange ❑Durham OMPO Total OChatham MO range ®Durham OMPO Total OChatham MOrange MDurham OMPO Total Transportation Goals and Obiectives One of the major challenges of the 2030 LRTP is to develop a transportation system that provides improved mobility and preserves existing infrastructure. The 2030 LRTP should also support regional and local land use goals and work toward the region's attainment of national air quality standards. The DCHC MPO Committee considered many sources of information in developing the final goals and objectives. Ultimately, the overarching goal of the transportation strategy remains to maintain and improve upon the safety and efficiency of the existing system. The goals include the following: GOALS OF THE 2025 TRANSPORTATION PLAN ,erall Transportation System: safe, efficient, attractive, multi -modal transportation system that: supports local land use; aommodates trip- making choices; maintains mobility; protects the environment and ighborhoods; and improves the quality of life for urban area residents. lti -Modal Street & Highway System: attractive multi -modal street and highway system that allows people and goods to be ved safely, conveniently, and efficiently. 20 iblic Transportation System: convenient, accessible, and affordable public transportation system, provided by public and ivate operators, that enhances mobility and economic development. sdestrian & Bicycle System: pedestrian and bicycle system that: provides an alternative means of transportation; allows eater access to public transit; and supports recreational opportunities. tegration of Land Use & Transportation System: Transportation Plan that is integrated with local land use plans and development policies. Protection of Natural Environmental & Social Systems: A multi -modal transportation system which provides access and mobility to all residents, Yhile protecting the natural environment, cultural resources, and social systems. rlic Involvement: ongoing program to inform and involve citizens throughout all stages of the development, ate, and implementation of the Transportation Plan. 5 21 Highlights of the 2030 Long -Range Transportation Plan Investments Attached are maps and tables showing the planned investments for Highway, Fixed Guideway, Transit and Bicycle/Pedestrian improvements. ATTACHMENT 5 22 Durham-Chapel Hill-Carrboro Metropolitian Plarming Area 2030 Long Range 'Transportation Plan Recommended Highways A N I DCHC MPO Highway Investments 2030 LRTP 2030 - Ref roposed X 2004 -2010 Length 2030 Total Cost Proposed Funct. 2030 -Reg. Funding No Project Project Limits ection TIP No. County (miles) (2005$) Improvement Class Sig. AQ Year Source 1 Alexander Dr Cornwallis Rd to NC 147 K2-lane4-lane -lane U -3309 Durham 1 $2,088,23 Widening Principal No 2010 Federal/State vided Arterial 2 Alexander Dr NC 54 to NC 55 Durham 2.41 $9,156,000 Widening Principal No 2020 Federal/State divided Arterial /Private 3 Alexander Dr NC 54 to Cornwallis Rd 2 -lane 4 -lane Durham 1.89 $7,412,000 Widening Principal No 2020 Federal/State divided Arterial 4 Alston Ave Ext Holloway St to Old New 3 -lane Durham 4.26 $19,511,000 New Minor No 2030 Local/Privat Oxford/Roxboro Arterial e 5 Aviation Parkway Northern Durham Parkway to New 4 -lane Durham 0.2 $1,000,000 New Principal Yes 2030 FederaVState Wake County Line freeway Arterial 6 Berryhill/Old Old Fayetteville Rd to NC 54 New 2 -lane Orange 0.2 $545,000 New Urban No 2010 Private Fayetteville Conn. Bypass Collector 7 BPW Club,'Rock Loop at Smith Level Road New 2 -lane Orange 0.2 $545,000 New Urban No 2010 Private Haven Conn. Collector 8 Briggs Ave Ext So -Hi Dr to Riddle Rd New 2 -lane U -2831 Durham 1.6 $5,833,000 New Urban No 2020 Federal/State Collector 9 Carver Street Ext Armfield St to Old Oxford Rd New 3 -lane Durham 0.73 $3,379,000 New Urban No 2010 Local Collector 10 Chin Page Ext. Page Rd to Wake County Line New 3 -lane Durham 0.66 $3,052,000 New Urban No 2030 Federal/State Collector /Private 11 Churton Connector Old NC 86 to NC 86 (Between I- New 4 -lane Orange 0.57 $4,796,000 New Minor No 2010 Private 85 & I-40) divided Arterial 12 Cornwallis Rd MLK to Alexander Dr 2 -lane 4 -lane Durham 1.18 $4,796,000 Widening Principal No 2020 Federal/State divided Arterial 13 Cornwallis Rd Ext Miami Blvd to Chin Page Rd New 2 -lane Durham 0.78 $3,379,000 New Principal No 2030 Federal/State Arterial 14 Davis Dr NC 54 to County Line 2 -lane 4 -lane U -4026 Durham 1.93 $5,925,439 Widening Principal No 2010 Federal/State divided Arterial 15 East End NC 147 to US 70 E; US 70:EEC New /4 In 6 -lane U -71 Durham 2.5 $99,941,077 New /6 In frwy Freeway Yes 2020 State Trust Connector (EEC) to NC 98 frwy freeway Fund 16 Elizabeth Brady Rd US 70 Business to St Mary's Rd New 4 -lane U -3808 Orange 17 $15,500,000 New Minor No 2020 Federal/State Ext divided I Arterial 17 Estes Dr Greensboro Rd to NC 86 2 -lane 3 -lane U -2909 Orange 1.7 $5,950,000 Widening Minor No 2020 Federal/State Arterial 18 FarmHouse/Tramo Old NC 86 to Stratford Drive New 2 -lane Orange 0.25 $613,12r New Urban No 2030 Private re Conn. Collector 19 Farrington Mill Rd Jack Bennett Rd to Durham Co 2 -lane 4 -lane Chatham 2.42 $15,805,000 Widening Minor No 2030 FederaVState line divided Arterial 20 Farrington Mill Rd Barbee Chapel Rd to Chatham Co 2 -lane 4 -lane Durham 2.04 $13,298,000 Widening Minor No 2030 Federal/State line divided Arterial 21 Farrington Rd Barbee Chapel Rd to Stagecoach 2 -lane 4 -lane Durham 0.4 $2,507,000 Widening Minor No 2030 Federal/State Rd divided Arterial 22 Fayetteville Rd Woodcroft Pkwy to Cornwallis Rd 2 -lane 4 -lane Durham 2.31 $17,440,000 Widening Principal No 2020 Local divided Arterial 23 Garrett Rd NC 751 to US 15 -501 2 -lane 3 -lane Durham 3.12 $5,886,000 Widening Principal No 2020 Federal/State Arterial 24 Globe St Ext. Miami Blvd. To Wake County New 4 -lane Durham 1.98 $14,755,074 New Principal No 2030 Federal/State (Brier Creek Line divided Arterial /Private "Nay L--- 25 Glover Rd Glover Rd/NC 147 interchange; 2 -lane Interchg/4- Durham 1.94 $35,534,000 Widen/interch Minor No 2020 Federal/State 147 to Angier lane divided g. Arterial /Private 26 Glover Rd Angier to US 70 New 4 -lane Durham 1.37 $11,554,000 New Minor No 2020 I Federal/State divided I Arterial I /Private D D _I S f rl z U1 N W DCHC MPO Highway Investments 2030 LRTP 27 Hillandale Rd I -85 to Carver St. 2 -lane 4 -lane divided U -3804 Durham 0.7 $6,650,000 Widening Principal No 2010 Federal/State Arterial 28 Hillandale Rd Carver to Horton Rd 2 -lane 4 -lane divided Durham 1.53 $15,042,000 Widening Principal No 2020 Federal/State Arterial 29 Hillandale Rd Ext Horton Rd to Guess Rd New 4 -lane divided Durham 0.88 $7,957,000 New Principal No 2030 Federal/State Arterial 30 Hillsborough Rd/Old Lorraine St to Old Fayetteville/NC 54 2 -lane 2 -lane (36- U -3100 Orange 0.5 $2,050,000 Widening Principal No 2020 State Fayetteville curb /gutter) Arterial 31 Holloway Street US 70 to east of Junction Rd 2 -lane 5 -lane U-4010 Durham 0.3 $0 Widening Principal Yes 2010 Federal/State Arterial 32 Homestead Rd High School Rd to NC 86 2 -lane 3 -lane U -2805 Orange 1.7 $10,300,000 Widening Principal No 2020 Federal /State Arterial 33 Homestead Rd Old NC 86 to High School Rd 2 -lane 3 -lane Orange 1.47 $4,687,000 Widening Principal No 2020 Federal/State Arterial 34 Hopson Rd. Louis Stephens Dr to NC 55 2 -lane 2 -lane Durham n/a $2,884,000 Realignment Urban No 2020 State/Private realignment (RTP) Collector 35 Horace Williams Rd Horace Williams Campus New 2 -lane Orange 2.16 $18,857,000 New Urban No 2020 State/Private Network Collector 36 I -40 US 15.501 to NC 147 4 -lane 6 -lane freeway I -3306 Durham 9.28 $11,342,000 Widening Interstate Yes 2010 Federal/State freeway 37 I -40 I -85 to US 15- 501 4 -lane 6 -lane freeway I -3306 Orange 11.42 $47,000,000 Widening Interstate Yes 2020 FederaUState freeway 38 I -40 Wake County Line to NC 86 New HOV lane Durham 16.63 $255,332,500 New Interstate Yes 2030 Federal/State 39 I -540 (Durham Durham Co. Portion (I40/1540) New 6 -lane freeway R -2000 Durham 0.69 $0 New Interstate Yes 2010 Federal/State portion) 40 I -85 US 15 -501 Bypass N to US 70 4 -lane 8 -lane freeway I -306 Durham 9.7 $18,200,000 Widening Interstate Yes 2010 Federal/State freeway 41 I -85 I -40 to the Durham Co line 4 -lane 6 -lane freeway I -305 Orange 7.5 $0 Widening hnterstate Yes 2020 Federal/State freeway 42 I -85 US 70 to Red Mill Rd. 4 -lane 6 -lane freeway I -4743 Durham 5.68 $62,771,270 Widening Interstate Yes 2020 State Trus freeway I Fund 43 Infinity Rd Roxboro Rd to Snow Hill Rd 2 -lane 3 -lane Durham 2.77 $9,265,000 Widening Minor Arterial No 2020 Federal/State 44 Lake Hogan Farms Eubanks Road to Tramore Drive New 2 -lane Orange 1.2 $3,052,000 New Urban No 2010 Private Rd Collector 45 Latta Rd Guess Rd to Roxboro Rd 2 -lane 3 -lane Durham 1.2 $4,033,000 Widening Minor Arterial No 2020 Federal/State 46 Leesville Rd Ext Northern Parkway to US 70/Page Rd. New 2 -lane Durham 1.14 $2,398,000 New Minor Arterial No 2030 Federal/State/ Private 47 Leesville Rd East of Olive Branch Rd to County 2 -lane 2 -lane Durham 1.18 $1,090,000 Realignment Minor Arterial No 2030 Federal/State/ Realignment line Private 48 Louis Stephens Drive Hopson Rd to County Line New 2 -lane Durham 1.6 $4,635,000 New Minor Arterial No 2020 State/Private (RTP) 49 Lynn Rd. Ext NC 98 /Glover Rd Ext to Existing Lynn New 2 -lane Durham 0.86 $1,744,000 New Urban No 2030 Local/Private Rd. Collector 50 Mason Farm Rd Near S Columbia St 2 -lane 2 -lane Orange 1.1 $1,308,000 Realignment Urban No 2010 Federal/State Collector 51 Miami Blvd. Methodist Dr to Angier Ave 2 -lane 5 -lane U -4011 Durham 0.72 $1,850,000 Widening Minor Arterial No 2010 Federal/State 52 1 Midland Terrace NC 98 to Geer St New 2 -lane Durham 1.8 $9,156,000 New I Minor Arterial I No 1 2030 Federal/State n 1 0711 N DCHC MPO Highway Investments 2030 LRTP 53 Midland Terrace Dearborn to Old Oxford Rd/Hamlin New 2 -lane Durham 0.95 $4,796,000 New Minor Arterial No 2030 Local/Private Junction 54 MLK Parkway Old Chapel Hill Rd to NC 55 New 4 -lane divided MPO A -10 Durham 2.23 $0 New Principal Yes 2010 Local Arterial 55 MLK Pkwy NC 55 to Cornwallis Rd connector New 4 -lane divided U -2405 Durham 0.49 $25,800,000 New Principal Yes 2020 Federal/State Arterial 56 NC 147 Alston Ave to I -40 4 -lane 6-lane freeway Durham 6.69 $36,842,000 Widening Freeway Yes 2030 Federal/State freeway 57 NC 147 East End Conn to I-40 4 -lane HOV lane Durham 4.78 $100,171,000 Widening Freeway Yes 2030 Federal/State freeway 58 NC 147 (Triangle 1-40 to County Line New 6 -lane freeway Durham 2.4 $70,059,061 New Interstate Yes 2030 Federal/State Parkway) 59 NC 54 Miami Blvd to Wake Co line 2 -lane 4-lane divided Durham 1.23 $23,762,000 Widening Principal No 2020 Federal/State Arterial 60 NC 54 1-40 Interchange to NC 55 2 -lane 4 -lane divided Durham 3.91 $75,537,000 Widening Principal No 2020 Federal/State Arterial 61 NC 54 1-40 to Barbee Chapel Rd 2 -lane 6 -lane divided Durham 1.68 $36,188,000 Widening Principal No 2020 Federal/State Arterial 62 NC 54/NC Intersection Existing Upgrade Durham 1 $2,616,000 Upgrade Principal Yes 2020 Federal/State 75l /Garrett Rd Arterial 63 NC 54 /Page Rd Davis Dr to Miami Blvd 2 -lane 4 -lane divided R -2904 Durham 1.1 $3,100,000 Widening Principal Yes 2010 Federal/State Arterial 64 NC 54/US 15 -501 NC 54 to US 15 -501 4 -lane 6-lane divided Orange 0.88 $19,075,000 Widening Principal Yes 2020 Federal/State Bypass Arterial 65 NC 55 Cornwallis Rd to Wake Co. 2 -lane 4 -lane divided R -2906 Durham 4.66 $7,700,000 Widening Principal Yes 2010 Federal/State Arterial 66 NC 55 (Alston Ave.) NC 147 to NC 98 2 -lane 4 -lane divided U -3308 Durham 1 $15,700,000 Widening Principal Yes 2010 Federal/State Arterial 67 NC 751 US 64 (MAB) to Durham Co line 2 -lane 4 -lane divided Chatham 7 $106,820,000 Widening Principal Yes 2030 Federal/State Arterial 68 NC 751 Chatham Cc line to S Roxboro St 2 -lane 4 -lane divided Durham 4.71 $71,395,000 Widening Principal Yes 2030 Federal/State Arterial 69 NC 86 Old NC 10 to US 70 Business 2 -lane 4-lane divided Orange 1 $10,682,000 Widening Principal Yes 2020 Federal/State Arterial 70 NC 86 US 70 Bypass to NC 57 2 -lane 4 -lane divided Orange 0.42 $4,469,000 Widening Principal Yes 2020 Federal/State Arterial 71 NC 98 Oak Grove to Wake County Line 2 -lane 4 -lane divided Durham 6 $14,803,000 Widening Principal No 2030 Federal/State Arterial 72 Northern Durham US 70 E to 185 N New 4-lane divided U -4721B Durham 6.4 $88,072,000 New Principal Yes 2030 State Trus Pkwy - revised Arterial Fund 73 Northern Durham 185 North to Old Oxford Hwy New 4 -lane divided U -4721A Durham 2.4 $28,231,000 New Principal Yes 2030 State Trus Pkwy - revised Arterial Fund 74 Northern Durham Old Oxford Hwy to Roxboro Rd (0.98 New 2 -lane (4-lane U -4721C Durham 3.3 $17,113,000 New Principal Yes 2030 State Trus Pkwy - revised mile on nex location) ROW) Arterial Fund 75 O'KelleyChapel Rd NC751 to Wake County Line 24ane 2 -3 TSM Chatham 2.4 $1,200,000 Widening Urban No 2020 Federal/State Collector 76 Old NC 86 I -40 to Lafeyette Dr. 2 -lane 4-lane divided R -2825 Orange 0.8 $3,950,000 Widening Minor Arterial No 2020 Federal/State/ Private 77 Old NC 86 Lafeyette Dr to US 70 Business 2 -lane 4 -lane divided R -2825 Orange 1.7 $15,350,000 Widening Minor Arterial No 2020 Federal/State/ Private 78 Old Oxford Rd Roxboro Rd to Northern Durham 2 -lane 4 -lane divided Durham 3.61 $51,012,000 Widening Minor Arterial No 2020 Federal/State Parkway 79 Olive Branch Rd Ext NC 98 to US 70 New 2 -lane Durham 1.48 $2,289,00 New Minor Arterial No 2030 Private 80 Page Rd 1-40 to Page Rd Ext 2 -lane 4 -lane divided Durham 3.1 $14,933,00 Widening Minor Arterial No 2030 Federal/State 81 Riddle Rd. Extension Briggs Ave. to NC 147 New 2 -lane Durham 1.04 $1,635,000 New Urban No 2020 Federal/State/ Collector Private 10 Z I-Tl z Cil N)' 07. DCHC MPO Highway Investments 2030 LRTP 82 Roxboro Road (50IN) Duke Street to Goodwin Rd 4 -lane 6 -lane divided U -4722 Durham 2.65 $57,007,000 Widening Principal Yes 2030 State Trus divided Arterial Fund 83 Roxboro St Cornwallis Rd to MLK Pkwy New 4 -lane divided Durham 1 $10,137,000 New Minor Arterial No 2020 Local/Private 84 Scott King Rd Grandale Dr to Hopson New. 2 -lane Durham 0.95 $4,142,000 New Minor Arterial No 2020 Federal/State 85 Seawell School Lake Hogan Fames Rd to Seawel New 2 -lane Orange 1.7 $4,360,000 New Urban No 2030 Private Connector School Rd Collector 86 Smith Level Rd Rock Haven Rd to NC 54 bypass 2 -lane 4 -lane divided U -2803 Orange 0.6 $3,350,000 Widening Minor Arterial No 2010 State 87 South Columbia St NC 54 to Manning Dr. turn 2 -lane U -624 Orange 0.7 $2,950,000 Widening Principal No 2010 Federal/State lanes/bike Arterial 88 Stagecoach Rd Farrington Mill Rd to NC 751 2 -lane 4 -lane divided Durham 1.96 $13,298,000 Widening Minor Arterial No 2030 Federal/State 89 SW Durham Dr Rizzo Conf. Dr to I-40 New 2 -lane Durham 1.55 $9,265,000 New Minor Arterial No 2020 Federal/State/ Private 90 SW Durham Pkwy Farrington Rd from I-40 to Old Chapel 2 -lane 2 -lane Durham $0 Existing Minor Arterial No 2020 Federal/State/ Hill Rd Private 91 SW Durham Pkwy NC 54 to Rizzo Conf. Driveway New 4 -lane divided MPO- A -16 Durham 1.27 $0 New Minor Arterial No 2010 Private Finished? 92 T. W. Alexander Dr US 70 to Carpenter Ponds (Durham New 4 -lane divided Durham 0.66 $ 1,744,000 New Principal No 2020 7vate/Public Ext Portion) Arterial 93 UNC Access to the Manning Dr to 54/15 -501 Bypass New 4 -lane divided Orange 0.54 $2,616,000 New Urban No 2020 Private/Public Bypass I I Collector 94 US 15 -501 Mt Moriah Rd to Garrett Rd 44ane 6 -lane divided U-4012 Durham 0.9 $8,300,000 Widening Principal Yes 2010 Federal/State divided Arterial 95 US 15 -501 I-40 to Franklin St 4 -lane 6 -lane divided U -2807 Orange 1.4 $45,315,789 Widening Principal Yes 2030 Federal/State divided Arterial 96 US 15 -501 Bypass to Orange County Line (near I 4 -lane 6 -lane freeway U -2807 Durham 2.4 $77,684,211 Widening Urban Yes 2030 Federal/State 40) (freeway conversion) divided Freeway 97 US 15 -501 Bypass Pickett Rd to Morreene Rd 4 -lane 6 -lane freeway Durham 2.69 $78,807,000 Widening Urban Yes 2030 Federal/State freeway Freeway 98 US 15 -501 Service Relocation ofexisting service road. 2 -lane 2 -lane U-4009 Durham 0.3 $1,150,000 Realignment Service Road No 2010 Federal/State Rd (SR 1126) 99 US 70 Lynn Rd to Wake Co line 4 -lane 6 -lane freeway U-4720 Durham 4.11 $110,744,000 Widening Urban freeway Yes 2020 State Tras divided I I Fund 100 US 70 Bypass NC 86 to I -85 (exit 170) 24ane 4 -lane divided Orange 7.8 $100,280,000 Widening Urban freeway Yes 2020 Federal/State 101 Weaver Dairy Rd NC 86 to Erwin Rd 2 -lane 5 -lane/4 -lane U -3306 Orange 2.8 $10,700,000 Widening Minor Arterial No 2010 Federal/State divided 102 Weaver Dairy Rd Ext Horace Williams property to N 2 -lane 4 -lane divided Orange 1.23 $5,341,000 Widening Minor Arterial No 2020 Federal/State/ Private 103 Western Bypass US 70 to NC 86 New 2 -lane R- 3438 /Priv. Orange 2. $6,679,310 New Minor Arterial No 2020 Federal/State 104 Western Bypass NC 86 to Stroud Creek Rd New 2 -lane R- 3438/Priv. Orange 0.3 $770,690 New Urban No 2020 Private Collector 105 Woodcraft Pkwy Ext Garrett Rd to Hope Valley Rd New 2 -lane divided Durham 0.27 $2,398,000 New Urban No 2020 Local/Private Collector 2411 2,222,143,780 11 D= C� 171 z N ATTACHMENT 5 27 Durham-Chapel Hill-Carrboro Metropolitian Planning Area 2030 Long Range Transportation Plan Recommended Fixed Guideway 0'. ft'_ija"" ran { OMMM, Ac "'44"i 12 N A Legend - FiXed rAideWaY • w K.,11irrhio u ,nrnrkjr Prg.1Fx',:K'ifl I ,;trrvt Cantadinar. 9AI C�v of Oun Pqm1ril -rIIn!p Park rrAw. Cf chapal I 111 7Ly&n of Cmtrbcjrj '05vn of 4jjt5WOUah I i4j,"er— SITnamr, ECGHGIPO BWn Nr:kJrY j�uflvj BLUtld5ry ATTACHMENT 5 DCHC MPO 2030 LRTP Fixed Guideway Investment W 13 Fixed Guideway / High Capacity Transit No. Service Type Route Name (Description) Transit Agency Peak Headwa off peak Headway Year 1 Rail Duke Hospital./VA ->Spring Forest TTA Rail Phase 1 15110 30/20 08/15 2 Rail Spring Forest - >Duke Hospital/VA TTA Rail Phase 1 15/10 30/20 08/15 3 Fixed guideway Duke /9s' ST -> UNC/Horace Williams 15 -501 Fixed Guideway 10 20 2020 4 Fixed guideway UNC/Horace Williams -> Duke /9th Street 15 -501 Fixed Guideway 10 20 2020 5 high capacity I -40 via 15- 501- >Carrboro Plaza IB CHT 10 20 2025 6 high capacity Carrborro Plaza -> I -40 via 15 -501 OB CHT 10 20 2025 7 high capacity Eubanks -> Southern Village IB CHT 10 20 2030 8 high capacity Eubanks -> Southern Village OB CHT 10 20 2030 Rail protection NC 55 /A ex 2025 Rail protection Durham — Tre burn 2010 Rail protection Durham - Hillsborough/Mebane 2025 Rail protection Chapel Hill Eubanks - Hillsborough 2030 Rail protection Durham Beltline 2010 5 Fixed guideway UNC- >NC54/RTP (NC54/1 -40 fixed guideway) — IB Fixed Guideway 10 20 PY 6 Fixed guideway UNC- >NC54/RTP (NC54/I -40 fixed guideway) — OB Fixed Guideway 10 20 PY Year = Air Quality Year oflniplementation PY = Post Year 13 ATTACHMENT 5 DCHC MPO 2030 LRTP Fixed Guideway Investment 29 14 Fixed Guideway / High Capacity Transit No. Service Type Route Name (Description) Transit Agency Peak Headway off peak Headway Year 1 Rail DUKE HOSPITAL/VA -> SPRING FOREST TTA Rail Phase 1 15/10 30/20 08/15 2 Rail SPRING FOREST - >DUKE HOSPITAL/VA TTA Rail Phase 1 15/10 30/20 08/15 3 Fixed guideway Duke /9th ST -> UNC/Horace Williams 15 -501 Fixed Guideway 10 20 2020 4 Fixed guideway UNC/Horace Williams -> Duke /9th Street 15 -501 Fixed Guideway 10 20 2020 5 J high capacity I -40 via 15- 501- >Carrboro Plaza IB CHT 10 20 2025 6 high capacity Carrborro Plaza -> I -40 via 15 -501 OB CHT 10 20 2025 7 high capacity Eubanks -> Southern Village IB CHT 10 20. 2030 8 high capacity Eubanks -> Southern Village OB CHT 10 20 2030 Rail protection NC 55/A ex 2025 Rail protection Durham - Tre burn 2010 Rail protection Durham - Hillsborough/Mebane 2025 Rail protection Chapel Hill Eubanks - Hillsborough 2030 Rail protection Durham Beltline 2010 5 Fixed guideway UNC- >NC54/RTP C54/I -40 fixed guideway) -IB Fixed Guideway 10 20 PY 6 Fixed guideway UNC- >NC54/RTP NC54/I40 fixed guideway) -OB Fixed Guideway 10 20 PY Year = Air Quality Year of Implementation PY = Post Year 14 ATTACHMENT 5 30 Durham-Chapel Hill-Carrboro Metropolitian Planning Area 2030 Long Range Transportation Plan Recommended Transit Component % 49 VI. !% 57 Ov ;66 % 1% 157 0, 'f•,..- :r 7 _51 It 54 Legend - 110DO"eaded TWO k/ - W 50-40 Evrea Wo Soso C4nted►nos I ULY Of ouftm FMearch Toanale Park Tawn of Chapal 411 A Tawn of Cairborc -r~ Of Himboxo IYU0 1A.00m.ad by tt,iurA. -A IT ?,.-M Law Alvers, Strearns 1'v­v."_dk'r'.n."hqICCA'3 tr'v0'vrtP.fwAS D014C MPO Botmoary. C,tj TiN h I IIA-., P.m th- ­%oA %Ar.,6 mID ATTACHMENT ACCi1MEN T 5 31 Durham - Chapel Mil!- Carrboro Metropolitian Planning Area 2030 Long Range Transportation Plan Recommended Bicycle Component 1 , y. 1 i 1 1 4t S _ % 'a r.. r} . ' / } "• 1 i Rte_ 1 v • a f t 4 157 x' ° F A , • • 757 1 4 ,r 1dT l 107 Legend r I +r 3 t S?vat Celldttipej Cxtsmimh Trangkn Pak T,�:wv 4( Chav*l Nell FCwI� of CBtrtxi(4 i tawn Clt NIIF58jCr1�,.dHh ' -laC ;:rty 1's*i :7 T +a+r;p:lla ti(1 CI'3.Do 1:A�,^ 1 � .25�r L.jkrs Pil&-M SIM.- o-; tl4:Alnata�' cktwcYtlt h�nfnx a 4•, m'.}IN^raf �Irgc rFesl -n }'my'p Ctnpdc4'*a'J 3'o k>••".� r<;'a + °. *Cb mu'acs, S DGtiC h1PC [�Iwnd -+r 'r o Cty J C+i1A] • +Lll +hSrc CAJ'I) 9.'l, fr45:F0 r.5@'ar�l• :xsy ka u'YAS /l s.`V rll : i vulsuw ull as :rlat.. C*untjr ftundary DCHC MPO Bicycle/Pedestrian Investments 2030 LRTP No. I Facility Description Begin Segment (Limits from) End Segment (Limits to) Facility County Total Cost Length Municipality DURHAM CITY /COUNTY 1 Academy Rd. (NC 751) Cameron Blvd. University Dr. Bike lanes Durham $305,200 1.7 City /County 2 Alston Ave.(SR 1945) Holloway St. Wake County line Bike lanes Durham $1,667,700 9.3 City /County 3 American Tobacco Trail Morehead Ave. Chatham County Bike Path Durham $2,500,000 8.7 City /Count 4 Angier Ave. (SR 1926) Briggs Ave. S. Miami Blvd. Bike lanes Durham $588,600 3.3 City /County 5 Angier Ave. (SR 1926) Miami Blvd. US 70 Bike lanes Durham $141,700 1.2 City/County 6 Bahama Rd. (SR 1616) Person County line US 501 Bike lanes . Durham $981,000 8.6 City/County 7 Barbee Chapel Rd. (SR 1110) Farrington Rd. NC 54 Bike lanes Durham $283,400 1.6 Cit /County 8 Barbee Rd. Hemdon Rd. Fayetteville Rd. Bike lanes Durham $523,200 2.9 City /County 9 Bill Poole Rd. (SR 1470) Orange County line US 501 Bike lanes Durham $392,400 2.2 City /County 10 1 Biv ins Rd. (SR 1453) Orange County line Umstead Rd. Bike lanes Durham $555,900 3.1 City /County 1 l Briggs Ave. Riddle Rd. Holloway St. Bice lanes jDurharn $381,500 2.1 City/County 12 Briggs Ave. FA. Riddle Rd. So -Hi Dr. Bike lanes Durham $196,200 1.1 City /County 13 Broad St.(SR 1322) Main St. Carver St. Bike lanes Durham $468,700 2.6 City /County 14 Burton Rd. (SR 1818) East Geer St. Cheek Rd. Bike lanes Durham $250,700 1.4 City /County 15 Cameron Blvd. (NC 75 1) Orange County line Academy Rd. Bike lanes Durham $643,100 3.6 City /County 16 Carpenter Fletcher Rd. Woodcroft Pkwy Alston Ave. Bike lanes Durham $130,800 0.7 City/County 17 Carpenter Pond Rd. (SR 1901) Wake County line Wake County line Bike lanes Durham $1,002,800 5.6 City/County 18 Carver St. (SR 1407) Rose of Sharon Rd. US 501 Bike lanes Durham $719,400 4 City /County 19 Cass amRd. (SR 1622) Range Rd. Old Oxford Hwy. Bike lanes Durham $686,700 3.8 City /County 20 1 Chandler Rd. Ross Rd. to NW Parkway/Loop Bike lanes Durham $163,500 0.9 City /County 21 Cheek Rd. (SR 1800) East Geer St. Wake County line Bike lanes Durham $1,526,000 8.5 City /County 22 Chin Page Rd. (SR 1969) S. Miami Blvd. Page Rd. Bike lanes Durham $272,500 1.5 City /County 23 Club Blvd. (SR 1669) Hillandale Rd. Glenn School Rd. Bike lanes IDurham $948,300 5.3 City /County 24 Cole Mill Rd. (SR 1401) Orange County line Hillsborough Rd. Bike lanes Durham $773,900 4.3 City /County 25 lComwallis Rd. (SR 1308, 1158, 1118, Orange County line S. Miami Blvd. Bike lanes Durham $2,027,400 11.3 City /County 26 Davis Dr. (SR 1999) Cornwallis Rd. Wake County line Bike lanes Durham $501,400 2.8 City /County 27 Dearborn Dr. (SR 1666) Club Blvd. Old Oxford Hwy. Bike lanes Durham $283,400 1.6 City /County 28 Downtown Loop entire entire Bike lanes Durham $228,900 1.3 City/County 29 Duke St. US 501 Lakewood Ave. Bike lanes Durham $850,200 4.7 City /County 30 1 Duke University Rd. Cameron Blvd. Swift Ave. Bike lanes Durham $196,200 1.1 City /County 31 East Geer St. (SR 1670, SR 1827) Ferrell Rd. Red Mill Rd. Bike lanes Durham $185,300 1 City /County 32 East Geer St. / Geer St. (SR 1670) Club Blvd. Mangum St. Bike lanes Durham $610,400 3.4 City/County 33 Ellis Rd. (SR 1954) So -Hi Dr. S. Miami Blvd. Bike lanes Durham $327,000 1.8 City /County 34 Emperor Boulevard NC 54 Page Rd. Bike lanes Durham $196,200 1.1 City /County 35 Ephesus Church Rd. (SR 1113) Farrington Rd. Orange County line jBike lanes Durham $163,5001 0.9 City /County 36 Erwin Rd. (SR 1306) Cameron Blvd. Orange County line I Bike lanes Durham $414,2001 2.3 City /County 17 CA) N D 0 x M s� DCHC MPO Bicycle/Pedestrian Investments 2030 LRTP 37 Erwin Rd. (SR 1320 ) Cameron Blvd. Main St. Bike lanes Durham $414,200 2.3 City/County 38 Farrington Mill Rd. SR 1109) Barbee Chapel Rd. Chatham County line Bike lanes Durham $381,500 2.1 City/County 39 Farrington Rd. (SR 1110) Old Chapel Hill Rd. Stagecoach Rd. Bike lanes Durham $752,100 4.2 City/County 40 Fayetteville St. (SR 1118) Cornwallis Rd. Liberty St. Bike lanes Durham $664,900 3.7 City/County 41 lFerrell Rd. SR 1671) Glenn School Rd. East Geer St. Bike lanes Durham $250,700 1.4 City/County 42 IFulton St. Hillandale Rd. Erwin Rd. Bike lanes Durham $76,300 0.4 City/County 43 Garrett Rd. (SR 1116) Pickett Rd. Hope Valley Rd. Bike lanes Durham $741,200 4.1 City/County 44 Glover Rd. SR 1940) Ellis Rd. An ier Ave. Bike lanes Durham $218,000 1.2 Cit /Count 45 Grandale Dr. SR 1100 Scott King Rd. Sedwick Rd. Bike lanes Durham $76,300 0.4 City/County 46 Gre son St. Club Blvd. Lakewood Ave. Bike lanes Durham $250,700 1.4 City/County 47 Guess Rd. NC 157, Buchanan Blvd. Orange County line W. Chapel Hill St. Bike lanes Durham $1,562,363 12.2 City /Count 48 Hamlin Rd. SR 1634 Red Mill Rd. Old Oxford Hwy. Bike lanes Durham $610,400 3.4 City /Count 49 Hampton Rd.(SR 1603 ) Red Mountain Rd. Range Rd. Bike lanes Durham $795,700 4.4 City/County 50 lHillandale Rd. Rose of Sharon Rd. Fulton St. Bike lanes Durham $664,900 3.7 City/County 51 lHillsborough Rd. Cole Mill Rd. Ninth St. Bike lanes Durham $643,100 3.6 City/County 52 IHope Valle Rd. C 751) Cornwallis Rd. NC 54 Bike lanes Durham $752,100 4.2 City/County 53 lHopkins Rd. (SR 1466) Rou emont Rd. Orange County line Bike lanes Durham $555,900 3.1 City/County 54 lHopson Ave. SR 1978) Alston Ave. NC 54 Bike lanes Durham $468,700 2.6 City/County 55 Horton Rd. (SR 1443 ) Duke St. Hillandale Rd. Bike lanes Durham $359,700 2 City/County 56 Infinity Rd. (SR 1639 ) US 501 Snow Hill Rd. Bike lanes Durham $501,400 2.8 Cit /Count 57 Johnson Mill Rd. (SR 1461) South Lowell Rd. Mason Rd. Bike lanes Durham $632,200 3.5 City/County 58 Junction Rd. (SR 1838) NC 98 Ferrell Rd. Bike lanes Durham $490,500 2.7 City/County 59 Memp Rd. SR 1902 NC 98 Wake County line Bike lanes Durham $664,900 3.7 Cit /Count 60 lKerley Rd. (SR 1304) Orange County line Erwin Rd. Bike lanes Durham $76,300 0.4 City /Count 61 lKerley Rd. (SR 1309) NC 751 W. Cornwallis Rd. Bike lanes Durham $130,800 0.7 Cit /Count 62 ILakewood Ave. Roxboro Rd. University Dr. Bike lanes Durham $76,300 0.4 City/County 63 Latta Rd. SR 1448) Guess Rd. US 501 Bike lanes Durham $218,000 1.2 City/County 64 Leesville Rd. (SR 1906) Carpenter Pond Rd. NW Parkway/Loop Parkway/Loop Rd. Bike lanes Durham $305,200 1.7 City/County 65 Lumley Road Miami Blvd. Wake County line Bike lanes Durham $141,700 0.8 City/County 66 Lynn Rd. NC 98 Gibson Rd. Bike lanes Durham $130,800 0.7 City/County 67 Lon St. Broad St. Washington St. Bike lanes Durham $163,500 0.9 Cit /Count 68 IMain St. Ninth St. Alston Ave. Bike lanes Durham $436,000 2.4 Cit /Count 69 IMangurn St. Markham Ave. Lakewood Ave. Bike lanes Durham $283,400 1.6 City/County 70 IMason Rd. (SR 1002 ) US 501 Guess Rd. Bike lanes Durham $436,000 2.4 City/County 71 IMassey Chapel Rd. (SR 1192, 1106) Fayetteville Rd. Herndon Rd. Bike lanes Durham $337,900 1.9 City/County 72 Midland Terrace (and extension) SR Cheek Rd. Club Blvd. Bike lanes Durham $327,000 1.8 City /Count 73 Mineral Springs Rd. SR 1815 S. Miami Blvd. Sherron Rd. Bike lanes jDurham 1 $54,500 0.3 Cit /Count 74 MLK Jr. Pkwy University Dr. INC 55 Bike lanes IDurham I $135,705 5 Cit /Count in D M W W DCHC MPO Bicycle/Pedestrian Investments 2030 LRTP 75 NC 54 Orange County line Wake County line Bike lanes Durham $1,155,400 10.6 City/County 76 NC 55 Cornwallis Rd. Wake County line Bike lanes Durham $370,600 3.4 City/Coup 77 NC 751 Garrett Rd. NC 54 Chatham County line Bike lanes Durham $686,700 3.8 City/County 78 NC 98 Wake Forest Hwy, Holloway St. Roxboro Rd. Wake Co un line Bike lanes Durham $1,983,800 11 City/County 79 Northeast Creek Pkwy Cornwallis Rd. Cornwallis Rd. to So -Hi Bike lanes Durham $228,900 1.3 City/County 80 Northern Durham Pkway US 70 Roxboro 501 Bike lanes Durham $1,384,300 12.1 Ci ty/County 81 Old Chapel Hill Rd. SR 2220 University Dr. Orange County line Bike lanes Durham $610,40 3.4 City/County 82 Old Oxford H SR 1004 US 501 Granville County line Bike lanes Durham $1,100,900 9.6 City/County 83 Olive Branch Rd. SR 1905 Leesville Rd. NC 98 Bike lanes Durham $697,600 3.9 City/County 84 Olympic Ave. Stadium Dr. US 501 Bike lanes Durham $54,500 0.3 City/County 85 Orange Facto Rd. SR 1628 US 501 US 501 to Staggsville Rd. Bike lanes Durham $555,900 3.1 City/County 86 Page Rd. SR 1973 S. Miami Blvd. T.W. Alexander Dr. Bike lanes Durham $719,400 4 Ci /Coun 87 Page Rd. SR 1973 T.W. Alexander Dr. US 70 Bike lanes Durham $414,200 2.3 Ci /Coun 88 Patrick Rd. SR 1462 US 501 Johnson Mill Rd. Bike lanes Durham $185,300 1 City/County 89 Patterson Rd. SR 1811 Cheek Rd. NC 98 Bike lanes Durham $643,100 3.6 City/County 90 Pickett Rd. SR 1303 Erwin Rd. Cornwallis Rd. Bike lanes Durham $588,600 3.3 City/County 91 Pope Rd. Ephesus Church Rd. Old Chapel Hill Rd. Bike lanes Durham $185,300 1 City/County 92 Quail Roost Rd. SR 1615 US 501 Bahama Rd. Bike lanes Durham $446,900 2.5 City/County 93 Range Rd. SR 1610 Hampton Rd. Cassam Rd. Bike lanes Durham $228,900 1.3 City/County 94 Red Mill Rd. SR 1632 Old Oxford Hwy E. Geer St. Bike lanes Durham $501,400 4.6 City/County 95 Red Mountain Rd. SR 1471 US 501 Wilkins Rd. Bike lanes Durham $468,700 2.6 City/County 96 Rose of Sharon Rd. SR 1404 Cole Mill Rd. Guess Rd. Bike lanes Durham $446,90 2.5 City/County 97 Ross Rd. Junction Rd. Chandler Rd. Bike lanes Durham $185,300 1 City/County 98 Rouge nt Rd. SR 1465 Bill Poole Rd. South Lowell Rd. Bike lanes Durham $490,500 2.7 City/County 99 Scott King Rd. SR 1103 Fayetteville Rd. Grandale Dr. Bike lanes Durham $305,200 1.7 City/County 100 Sedwick Rd. SR 1102 Grandale Dr. Alston Ave. Bike lanes Durham $359,700 2 City/County 101 Sherron Rd. SR 1811 Mineral Springs Rd. NC 98 Bike lanes Durham $250,700 1.4 City/County 102 Slater Road Page Rd Wake County line Bike lanes Durham $109,000 0.6 City/County 103 Snow Hill Rd. SR 1631 US 501 Old Oxford Hwy. Bike lanes Durham $555,900 3.1 City/County 104 So -Hi Dr. Northeast Creek Pkwy Ellis Rd. Bike lanes Durham $828,400 4.6 City/County 105 South Lowell Rd. SR 1464 Guess Rd. C 157 US 501 Bike lanes Durham $87,200 0.5 City/County 106 South Miami Blvd. SR 1959 NC 54 US 70 Bike lanes Durham $523,200 4.8 City/County 107 South Roxboro St. SR 1146 Lakewood Ave. Hoe Valle Rd. C 751 Bike lanes Durham $545,000 5 City/County 108 St. Mary's Rd. SR 1002 Mason Rd. Orange County line Bike lanes Durham $490,500 4.5 City/County 109 Stadium Dr. Stadium Dr. ext. Olympic Ave. Horton Rd. W Bike lanes Durham $436,000 2.4 City/County 110 Sta ecoach Rd. SR 1107 Farrington Rd. NC 751 Bike lanes Durham $283,400 1.6 City/County 111 Staggsville Rd. SR 1615 Bahama Rd. Old Oxford Hwy. Bike lanes Durham $414,200 3.8 City/County 112 Stallings Rd. SR 1814 Cheek Rd. Cheek Rd. to Patterson Rd. Bike lanes Durham $337 900 1.9 City/County 113 Swift Ave. Duke University Rd. Main St. Bike lanes jDurham 1 $109,000 0.6 City/County 114 Tri Center Boulevard Alston Ave. Cornwallis Road Bike lanes IDurharn 1 $109,000 0.6 City/County 19 D r ION, DCHC MPO Bicycle/Pedestrian Investments 2030 LRTP NC 55 " _ - Bike lanes U 115 T.W.Alexander Dr. SR 2028 Guess Rd. Cole Mill Rd. anes 116 Umstead Rd. SR 1449 Garrett Rd. Bike l D Lakewood Ave. Universi Dr. Bike lanes D 117 Universi Dr. S 15 /501 Bus Un Oran a Co un line 118 US 15/501 Ave. Bike lanes D 119 US 15/ Roxboro Rd. Roxboro St. US Person Coun line Wake Lakewood o Co un line Bike lanes L 120 US 70 An ier Ave. Duke St. Bike lanes L Duke Universi Rd. Co oration St. Bike lanes T 121 W. Ch a el Hill St. L on St. 122 Washin on St. Red Mo Bahama Rd. Bike lanes I untain Rd. Bike lanes I 123 Wilkins Rd. SR 161211 Ho e Valley Rd. Ca enter..-.-------- 124 Woodcroft P CHAPEL HILL/CARRBORO Community Center Bike lanes I Bolin Creek Bikeway CHPD Old Oxford Rd. Bike lanes ne suckle Rd. 2 Booker Creek Rd go Rosem St. Bike lanes 3 Bound St. Coun Club Rd. NC 54 E hesus Church Rd. Bike lanes 4 Burnin Tree Rd./Pinehurst Dr. Ralei St. Bike lanes Pittsboro St. Bike lanes Estes 5 Cameron Ave. Dr. Weaver Dai Rd. 6 Caswell -Sed efieid Dr. US 15 -501 South Bike lanes Smith Level Rd. Bike lanes 7 Culbreth Rd. Estes Dr. Weaver Dai Rd. g Curtis/Lakeshore/Hone suckle E. Franklin St. Bike lanes Curtis Rd. Bike lanes 9 Elliott Rd. US 15 -501 Farrin on Rd. IO E hesus Church Rd. Durham Co. line Bike lanes 11 Erwin Rd. Weaver Dai Rd. N, Greensboro St. Bike lanes US 15 -501 NC 86 Bike lanes 12 Estes Or. Old NC 86 13 Eubanks Rd. NC 54 B ass Bike lanes NC 54 East Bike lanes 14 Finle GC/ Mason Farm Rds. Old Durham -CH Rd. Culbreth Rd. 15 Fordham Blvd. Old Durham CH -Rd. Bike lanes Bounda St. Id NC 86 Bike lanes 16 Franklin St. ort Rd. 17 Homestead Rd. S. Columbia St. Bike lanes NC 54 B ass Bike lanes 18 Mannin Dr. Fordham Blvd. S. Columbia 5t. 19 Mason Farm Rd. NC 54 B ass Bike lanes Cameron Ave. � Bike lanes 20 Merritt Mill Rd. Chatham Co. line Pittsboro Rd. 15501. 21 Mt. Carmel Chh Rd. urc Whitfield Rd. Bike lanes 22 NC 86 Columbia St. to Erwin Rd. Bike lanes Old Oxford Rd. Bike lanes 23 Old Oxford Rd. pinehurst Dr. E hesus Church Rd. 24 Pinehurst Dr. Weaver Dai Rd. Bike lanes 25 Pine Mountain/Cedar Hills Cr. Ai rt Rd. Cameron Ave. S. Columbia St. Bike lanes 26 pittsboro St. 20 S 1 $41 !41 13 38 V R 218 141 7.3 LI i 3.4 Ci / 4.8 Ci i 4.9 Ci 18.7 Ci 43.801' 0.4 0.4 2.0 0.5 2.2 1.1 0.3 0.7 2.1 0.9 3.7 2.6 1.4 5.1 2.9 0.3 1.2 1.2 0.8 2.5 4.3 1 0.4 0.4 2.2 CH CH CH CH CH CH C, CH CH CH z CH CH CH CH CH CH CH CH CH CH CH CH CH CH CH CH CH Cn DCHC MPO Bicycle/Pedestrian Investments 2030 LRTP 27 1 Rogers Rd. Homestead Rd. Eubanks Rd. Bike lanes Orange $218,000 1.2 CH 28 Rosemary St. Boundary St. Carrboro city limits Bike lanes Orange $250,700 1.4 CH 29 Seawell School Rd. Homestead Rd. Estes Dr. Bike lanes Orange $272,500 1.5 CH 30 South Columbia Rd. Airport Rd. US 15 -501 Bypass Bike lanes Orange $32,700 0.2 CH 31 South Raleigh Rd. C 54 Country Club Rd. Durham Co. line Bike lanes Orange $76,300 0.4 CH 32 South Rd./Raleigh Rd. S. Columbia St. Burning Tree Rd. Bike lanes Orange $381,500 2.1 CH 33 Sunrise Dr. Whitfield Rd. Weaver Dairy Rd. Bike lanes Orange $228,900 1.3 CH 34 Umstead Dr. Estes Dr. Airport Rd. Bike lanes Orange $185,300 1.0 CH 35 US 15501 Corridor Old Durham CH -Rd. Durham Co. line Bike lanes Orange .$54,500 0.3 CH 36 US 15501 South NC 54 Bypass Chatham County Line Bike lanes Orange $87,200 0.5 CH 37 Weaver Dairy Rd. NC 86 Erwin Rd. Bike lanes Orange $76,300 0.4 CH 38 Weaver Dairy Rd. Ext. Homestead Rd. NC 86 Bike lanes Orange $228,900 1.3 CH $ 9,504,800 53 ORANGE COUNTY/HILLSBOROUGH 1 Ben Johnston Rd. US 70/I -85 Connector Dimmocks Mill Rd. 4' shoulders Orange $294,300 1.7 Orange Co. 2 Brookhollow Rd. Forrest Ave. Lebanon Rd. 4' shoulders Orange $283,400 1.6 Orange Co. 3 Buckhorn Rd. Orange Grove Rd. West Ten Rd. 4' shoulders Orange $1,220,800 7.0 Orange Co. 4 Butler Rd. NC 54 White Cross Rd. 4' shoulders Orange $174,400 1.0 Orange Co. 5 Calvin St. /Occonneechee/Mar aret Ln. Nash St. Cameron St. shared Orange $0 0.9 Hillsborough 6 Cameron St. Margaret Ln. St. Mary's Rd. shared Orange $0 0.1 Hillsborough 7 Carr Store Rd. NC 49 NC 86 4' shoulders Orange $1,155,400 6.6 Orange Co. 8 Churton St. Eno River US 70 Bypass shared Orange $0 0.9 Hillsborough 9 Coleman Loop SR1334 Frank Perry Rd. NC 86 4' shoulders Orange $119,900 0.7 Hillsborough 10 fCornwallis Rd. Durham County Line Murphey School Rd. 4' shoulders Orange $283,400 1.6 Orange Co. H Dairylan d Rd. Carrboro (Union Grove Ch. Rd. Orange Grove Rd. 4' shoulders Orange $1,079,100 6.2 Orange Co. 12 Dimmocks Mill Rd. Eno St. I- 40/1 -85 . shared Orange $0 1.8 Hillsborough 13 Dimmocks Mill Rd. I- 40/1 -85 Orange Grove Rd. 4' shoulders Orange $370,600 2.1 Orange Co. 14 Dodsons Crossroads Orange Grove Rd. NC 54 4' shoulders Orange $1,079,100 6.2 Orange Co. 15 Efland -Cedar Grove Rd. Highland Farm Rd. Carr Store Rd. 4' shoulders Orange $283,400 1.6 Orange Co. 16 Elizabeth Brady Rd. & Ext. US 70 A St. Mary's Rd. bike lanes Orange $228,900 1.3 Hillsborough 17 Eno Mt. Rd. Dimmocks Mill Rd. Orange Grove Rd. 4' shoulders Orange $141,700 0.8 Hillsborough 18 Exchange Park Ln. Churton St. Orange Grove Rd. shared Oran a $0 0.6 Hillsborough 19 Faucette Mill Rd. US 70 Bypass Thompson Ct. shared Orange $0 0.6 Hillsborough 20 Faucette Mill Rd. Thompson Ct. Frank Perry Rd. 4' shoulders Orange $228,900 1.3 Orange Co. 21 Forrest Ave. Mt. Willing Rd. Brookhollow Rd. 4' shoulders Orange $21,800 0.1 Orange Co. 22 Frank Perry Rd. Faucette Mill Rd. Coleman Loop SR1332 4' shoulders Orange $228,900 1.3 Orange Co. 23 Hassel St. Margaret Ln. Corbin St. shared Orange $0 0.7 Hillsborough 24 Highland Farm Rd. Coleman Loop Rd. Efland -Cedar Grove Rd. 4' shoulders Orange $545,000 3.1 Orange Co. 25 Jones Ferry Rd. Carrboro Edmister Ln Chatham County Line 4' shoulders Orange $719,40 4.1 Orange Co. r 21 D D I N DCHC MPO Bicycle/Pedestrian Investments 2030 LRTP 26 LakeshoreBrownvilleBellvue/Eno Latimer St. Dimmocks Mill Rd. shared Orange $0 0.7 Hillsborough 27 Latimer St. Nash St. Lake Shore Dr. shared Orange $0 0.3 Hillsborough 28 Lawndale Ave.* Torain St. ** Orange High School ** shared Orange .$0 0.8 Hillsborough 29 Lawrence Rd. Old NC 10 St. Mary's Rd. 4' shoulders Orange $490,500 2.8 Orange Co. 30 lLebanon Rd. Brookhollow Rd. Mill Creek Rd. 4' shoulders Orange $752,100 4.3 Orange Co. 31 Mao St. Orange Grove Rd. Churton St. bike lane Orange $32,700 0.2 Hillsborough 32 Mt. Herman Church Rd. Murphey School Rd. US 70 4' shoulders Orange $316,100 1.8 Orange Co. 33 Mt. Sinai Rd. NC 86 Durham County Line 4' shoulders Orange $850,200 4.9 Orange Co. 34 Mt. Willing Rd. West Ten Rd. Forrest Ave. 4' shoulders Orange $109,000 0.6 Orange Co. 35 Nash St. Revere Rd. Eno St. shared Orange $0 1.0 Hillsborough 36 NC 751 US 70 Durham County 4' shoulders Orange $119,900 0.7 Orange Co. 37 NC 86 N US 70 Bypass Coleman Loop SR1334 shared Orange $0 3.3 Hillsborough 38 NC 86 140 US 70 Business 4' shoulders Orange $1,242,600 7.1 Orange Co. 39 New Sharon Church Rd. St. Mary's Rd. NC 157 Guess Rd. 4' shoulders Orange $1,242,600 7.1 Orange Co. 40 Oakdale Dr. Old NC 86 /Churton St Orange Grove Rd. 4' shoulders 10range $196,200 1.1 Hillsborough 41 Old Greensboro Rd. Carrboro (Sturbridge Ln. Alamance County line 4' shoulders Orange $1,678,600 9.6 Orange Co. 42 Old NC 86 Eubanks Rd. Oakdale Dr. 4' shoulders Orange $1,068,200 6.1 Orange Co. 43 Orange Grove Rd. Dairyland Rd. Buckhorn Rd. 4' shoulders Orange $54,500 0.3 Orange Co. 44 Orange Grove Rd. Old NC 86 /Churton St. Dodsons Crossroads 4' shoulders Orange $926,500 5.3 I-Ellsborough 45 Pleasant Green Rd. US 70 St. Mary's Rd. 4' shoulders Oran e $1,024,600 5.9 Orange Co. 46 Revere Rd. /Corbin St.* US 70 Bypass Orange High School* shared Orange $0 1.7 Hillsborough- 47 Sawmill Rd. NC 86 Walnut Grove Church Rd. 4' shoulders Orange $327,000 1.9 Orange Co. 48 Schley Rd. St. Mary's Rd. Walnut Grove Church Rd. 4' shoulders Orange $1,689,500 9.7 Orange Co. 49 St. Mary's Rd. Margaret Ln. US 70 Bypass shared Orange $0 1.2 Hillsborough 50 St. Mary's Rd. US 70 Bypass New Sharon Ch. Rd. 4' shoulders Orange $261,600 1.5 o. 51 US 70 Business* Churton St.* Lawrence Rd. 4' shoulders Orange $348,800 2.0 h Hillsborough 52 US 70 Bypass NC 86 1 -85 exit 170 4' shoulders Orange $1,308,000 7.5 o. 53 US 70/I -85 Connector West Ten Rd. Ben Johnston Rd. 4' shoulders Orange $109,0001 0.6 o. 54 Walnut Grove Church Rd. NC 86 Person Coun line 4' shoulders Oran e $1 427 900 8.2 o. 55 West Ten Rd. US 70/1 -85 Connector Mattress Facto Rd. 4' shoulders Oran a $850 200 4.9 o. 56 Western Bypass US 70 Bypass NC 57 4' shoulders Orange $490,500 2.8 Hillsborough 57 White Cross Rd. Butler Rd. Chatham County line 4' shoulders Orange $577,700 3.3 Orange Co. 58 Whitfield Rd. NC 86 Erwin Rd. 4' shoulders Orange $588,600 3.41 Orange Co. $ 26,541,500 167 CARRBORO 1 Bolin Creek Greenway Trail Estes Dr. Homestead Road Multi -Use Pa Orange $834,300 2.3 Carrboro 2 Bolin Creek Greenway Trail Homestead Road Lake Hogan Farms Multi -Use Pa Orange $412,000 1.0 Carrboro 3 Bolin Creek Greenway Trail Lake Hogan Farms Old NC 86 Multi -Use Pa Orange $123,600 0.2 Carrboro 4 BPW Club Rd / Rock Haven Connector BPW Club Rd Rock Haven Road 4 Ft. Bike Li Orange $32,700 0.2 Carrboro 22 111 M z DCHC MPO Bicycle/Pedestrian Investments 2030 LRTP 5 Dairyland Road Old NC 86 Union Grove Church Rd. 4 Ft. Bike Lz Orange $109,000 0.6 Carrboro 6 Farm House/Tramore Connector Farm House Drive Tramore Road 4 Ft. Bike L Orange $21,800 0.1 Carrboro 7 Jones Ferry Road Old Fayetteville Road Carr Planning Jurisdiction 4 Ft. Bike L Orange $119,900 0.7 Carrboro 8 Morgan Creek Greenway Trail Smith Level Road NC 54 Bypass at Oleander Multi -Use Pa Orange $669,500 1.7 Carrboro 9 N. Lake Hogan Farm Extension Hogan Hills Road Eubanks Road 4 Ft. Bike L Orange $174,400 1.0 Carrboro 10 Old Fayetteville Road Jones Ferry Road Strowd Lane 4 Ft. Bike L Orange $283,400 1.6 Carrboro 11 Old Greensboro Road Jones Ferry Road Sturbridge Lane 4 Ft. Bike L Orange $65,400 0.4 Carrboro 12 Old NC 86 Farm House Drive Eubanks Road 4 Ft. Bike L Orange $403,300 2.3 Carrboro 13 Pathway Drive Bolin Forest Seawell Road Multi -Use Pa Orange $309,000 0.4 Carrboro 14 Quail Roost Drive Hillsborough Road McDou le School 4 Ft. Bike L Orange $54,500 0.3 Carrboro 15 Roberson Place Bike path Eugene St. Rand Rd. Multi -Use Pa Orange $195,700 0.4 Carrboro 16 S. Lake Hogan Farm Road Tramore Road Homestead Road 4 Ft. Bike Li Orange $54,500 0.3 Carrboro 17 Seawell School Connector Lake Hogan Farm Road Seawell Road 4 Ft. Bike LE Orange $294,300 1.7 Carrboro 18 Smith Level Road NC 54 Bypass Rock Haven Road 4 Ft. Bike LE Orange $119,900 0.7 Carrboro 19 Strowd Lane Old Fayetteville Road Anderson Community Park 4 Ft. Bike L Orange $54,500 0.3 Carrboro 20 Tramore Road Extension Sunset Creek Stratford Drive 4 Ft. Bike L Orange $54,500 0.3 Carrboro 21 Tripp Farm Road Fairoaks Seawell Connector Multi -Use Pa Orange $360,500 0.5 Carrboro 22 Tripp Farm Road Hillsborough Road Fair Oaks 4 Ft. Bike Ld Orange $54,500 N• nn1 Inn 0.3 171 Carrboro �p'��VV l�I+VV ii.r CHATHAM COUNTY 1 American Tobacco Trail Durham County Line Cary Town Limit Bike Path Chatham $1,635,000 5.2 County 2 Mt. Carmel Church Road Orange County line Old Farrington Point Road Bike lanes Chatham $218,00 1.2 County 3 NC 751 Durham County line US 64 Hwy Bike lanes Chatham $577,70 3.2 County 4 Old Farrington Point Road Durham County Line Mt. Carmel Church Road Bike lanes Chatham $305,200 1.7 County �5_,US 15 -501 South 10range County line IUS 64 Bypass jBike lanes jChatm $577,7001 LAn 3.2 le 1 County TOTAL BIKE 23 090109VVV i✓ 108,352,768 651 0. 0 CITE ,U 4W Regional Trends and the Existing Transportation System Deficiency maps (labeled "2002 Volumes" and "2030 Volumes ") follow showing Average Daily Traffic Volumes for 2002 and 2030 on the schematic highway network map as produced by the Triangle Regional Model. Road segments on these maps are thicker or thinner according to the total daily volume of traffic, and they are colored to indicate the relative degree of congestion (ratio of traffic volume to road segment capacity). In general, when the Volume /Capacity ratio is greater than 1.0, drivers will experience some periods of congestion that are great enough to warrant changing departure time (leaving earlier or later) or re- routing the trip. At Volume /Capacity ratios greater than 1.2, the road segment will typically be in a congested state throughout the peak hour periods, and often outside the peak hours as well. 24 ATTACHMENT 5 40 _2002 V -.. O Mk I u ,Oml es Versi °n 2004 v3 6116120 e Regi cT Model Trian9 a Nr. �►,, y , �; j ono AA 49, 441— �: • *� go- MQWIIA rip 4d /i 330 v u Summary Information The following tables present trip and travel volume information from the Triangle Regional Model for these areas: Region The entire Triangle Regional Model area DCHC The area within the DCHC MAB Durham Durham County Orange Orange County Chatham The modeled portion of Chatham County Demographic Information Population and Employment are reported for each area. Motorized Trips Motorized trips are reported for each.of the areas. Total motorized trips Single- occupancy vehicle trips High - occupancy vehicle trips (HOV trips are any trips made with more than one person in the car, not just trips on HOV lanes) Local transit trips Premium transit trips (express bus and rail) Motorized Trips — 2002 Motorized Trips Pop ulation Em to ment 2002 2002 2030 2002 2030 Region 1,200,533 2,325,254 679,213 1,388,475 DCHC 363,993 558,343 255,328 441,611 Durham 241,799 374,096 197,105 337,081 Orange 125,683 177,948 58,307 108,483 Chatham 27,382 65,598 9,463 13,868 Motorized Trips Motorized trips are reported for each.of the areas. Total motorized trips Single- occupancy vehicle trips High - occupancy vehicle trips (HOV trips are any trips made with more than one person in the car, not just trips on HOV lanes) Local transit trips Premium transit trips (express bus and rail) Motorized Trips — 2002 Motorized Trips Area Trips 2002 2030 Total Region 4,048,568 8,036,972 DCHC 1,219,883 1,828,977 Durham 730,953 1,089,019 Orange 274,907 431,384 Chatham 27,849 45,224 27 42 Motorized Trips Area Tri s 2002 2030 Single- Occupancy Region 2,496,250 4,948,615 DCHC 739,445 1,124,826 Durham 466,415 700,398 Orange 156,514 257,493 Chatham 19,970 31,153 High- Occupancy Region 1,493,518 2,959,852 DCHC 439,214 631,522 Durham 247,760 350,135 Orange 96,725 146,977 Chatham 7,870 14,073 Local Transit Region 46,992 86,644 DCHC 33,593 49,412 Durham 11,970 28,559 Orange 18,825 17,973 Chatham 0 0 Premium Transit Region 3,020 26,405 DCHC 1,572 17,159 Durham 0 6,332 Orange 886 5,759 Chatham 0 0 Vehicle Miles and Congestion Various measures of congestion are reported by road type and area. Miles traveled (VMT - Vehicle Miles Traveled) Trip time (VHT - Vehicle Hours Traveled) Congested miles (Miles traveled with Volume /Capacity over 1.2) Percent congested (ratio of Congested miles to Miles traveled) 2002 Mileage, Time and Congestion Road Type Area VMT VHT VMT Congested Percent Congested Region 33,300,999 721,070 6,829,161 20.51 DCHC 11,602,135 306,202 2,718,282 23.43 All Roads Durham 8,150,892 215,420 2,500,865 30.01 Orange 3,743,771 97,325 218,617 7.57 Chatham 1,072,338 25,467 0 0.00 Region 13,224,822 221,560 3,401,777 25.72 DCHC 5,169,099 87,167 2,130,156 41.2 Freeway Durham 3,727,976 63,272 2,018,293 52.45 Orange 1,743,508 28,584 113,065 9.73 Chatham 134,749 2,077 0 0.42 MI 2030 Mileage, Time and Congestion Road Type Region 20,076,176 499,510 3,427,384 17.07 DCHC 5,726,792 151,099 588,126 10.27 Other Durham 3,907,359 101,446 482,573 12.36 All Roads Orange 1,775,440 48,700 105,553 5.80 Chatham 824,648 17,238 0 0.00 2030 Mileage, Time and Congestion Road Type Area VMT VHT VMT Congested Percent Congested Region 75,655,644 1,545,533 32,127,727 42.46 DCHC 22,879,157 588,278 8,016,661 35.04 All Roads Durham 16,410,027 428,446 6,444,678 38.87 Orange 7,131,064 175,788 1,582,292 21.99 Chatham 2,650,713 60,793 280,484 12.06 Region 34,250,274 545,856 16,718,567 48.82 DCHC 11,000,176 181,226 5,545,067 50.43 Freeway Durham 8,105,925 136,439 4,566,594 55.07 Orange 3,582,311 4755,414 978,473 27.37 Chatham 360,256 5,554 0 18.62 Region 39,709,487 973,521 15,401,435 38.78 DCHC 9,808,345 250,223 2,034,559 20.71 Other Durham 6,695,396 170,477 1,486,618 21.37 Orange 3,008,903 78,832 558,250 19.08 Chatham 1,810,367 35,761 18,227 2.28 Region 1,694,201 26,108 7,726 0.46 DCHC 441,279 6,798 1,801 0.41 HOV Durham 343,979 5,296 1,801 0.52 Orange 97,301 1,501 0 0.00 Chatham 0 0 0 0.00 29 CE, I I,l -=II- I����Y��� 45 DCHC MPO Long Range Transportation Plan Financial Analysis REVENUE 30 2005 Dollars 1 Highway /Enhancement 1.1 Federal /State (NHS, STP, CMAQ, NCDOT match, etc.) $2,463,247,434 1.2 State High Trust Fund (e.g., loop funds) $510,031,579 1.3 Local (CIP) $348,671,109 1.4 Private $81,988,684 Total Highway/Enhancement $3,403,938,806 2.1 Bus Transit -- Capital 2.1.1 Federal FTA $324,596,899 2.1.2 State — NCDOT $20,287,309 2.1.3 Local $60,861,927 Total bus transit -- capital $405,746,135 2.2 Bus Transit -- Operating & Maintenance (O & M 2.2.1 Federal FTA $65,076,878 2.2.2 State — NCDOT $110,558,122 2.2.3 2.2.4 Local Fare $255,549,132 $131,643,283 Total bus transit -- operating & maintenance $562,827,415 Total Bus Transit — Capital and O & M $968,573,550 3.1 Fixed Guideway Transit — Capital (i.e., TTA phase 1, US 15 -501 3.1.1 Federal FTA $469,873,440 3.1.2 State — NCDOT $234,936,725 3.1.3 Local $123,208,335 Total axed guideway transit capital $828,018,500 3.2 Fixed Guideway Transit -- O & M i.e., TTA phase 1, US 15 -501) 3.2.1 Federal FTA $98,905,722 3.2.2 State — NCDOT $157,156,154 3.2.3 Local $220,866,164 3.2.4 Fare $147,125,899 Total Fixed Guideway O & M $624,053,939 Total Fixed Guideway Transit — Capital and O & M $1,452,072,439 Total Bus and Fixed Guideway Transit $2,420,645,989 Total Transportation Plan Revenue $5,824,584,7951 30 FUNTii ,11 '-f [ m m i T 5 DCHC 2030 Long -Range Transportation Plan (LRTP) COSTS 31 COST ESTIMATES 2005 Dollars) No. Cost Components 2005 dollars 1 Hi hwa 1.1 Improvement $2,485,861,250 1.2 Maintenance $741,618,431 Total Highway Program $3,227,479,681 2 Public Transportation - Transit/Fixed Guideway/Rail 2.1 Bus Transit Cost $2,253,122,343 2.2 Transit High Capacity $102,257,642 2.3 Fixed Guideway (New Starts) $1,028,893,265 2.4 Rail ROW Corridor Protection $13,575,623 Total Public Transportation (Rail) $3,397,848,873 3 Non Motorized Transportation Bike Facilities $108,982,015 Sidewalks & Pedestrian Walkways $20,383,000 Total $129,365,015 4 TDM $49,785,750 5 ITS /TSM $56,680,000 TOTAL 2025 Transportation Plan T $6,861,159,319 31 47 DCHC 2030 Long -Range Transportation Plan Financial Analysis COST & REVENUE COMPARISON AND NON TRADITIONAL REVENUE SOURCES COST AND REVENUE COMPARISON 2005 Dollars 1 Total Transportation Cost Estimates $6,861,159,319 2 Total Transportation Revenue Forecast (traditional sources ) $5,824,584,795 Shortfall $1,036,574,524 NON TRADITIONAL REVENUE SOURCES A Motor Gasoline Fuel Tax - 22 ears $535,600,000 (5% on retail gas cost ($1.40 per gallon) B Vehicle Personal Property Tax Increase 22 ears $0 (10 cents tax per $100 of vehicle value) C Vehicle Registration - Phased implementation $370,800,000 ($10 /vehicle /year) Total Non Traditional Revenue Sources $906,400,000 TOTAL REVENUE traditional & non - traditional $6,730,984,795 Di fference- shortfall ($130,174,524 32 DCHC 2030 Long -Range Transportation Plan (LRTP) Fixed Guideway Transportation Costs Fixed Guideway Transportation Costs Cost Estimates 2005 Dollars Fixed Guideway Capital TTA Rail -Phase 1 DCHC Portion $349,050,700 US 15501 fixed guideway Duke -UNC /Horace Williams $299,299,830 Total Fixed Guideway Capital $648,350,530 Fixed Guideway Operating & Maintenance (O &M TTA Rail -Phase 1 DCHC Portion $312,374,925 US 15501 fixed guideway Duke -UNC /Horace Williams $101,239,898 Total Fixed Guideway O & M $413,614,823 Total Fixed Guideway Cost Estimates $1,061,965,353 High Capacity Transit High Capacity Transit I40- carrboro plaza; eubanks - southem village) - Capital $66,926,000 High Capacity Transit I40- carrboro plaza; eubanks - southem village) - O & M $35,331,642 Total High Capacity Transit Cost Estimates $102,257,642 Rail Corridor Protection/Feasibility Studies $13,575,623 Preservation of existing rail ROW Total Fixed Guideway/Rail Corridor Cost Estimates $1317727 618 33 .. DCHC 2030 Long -Range Transportation Plan (LRTP) Transit/Public Transportation Costs No. Description Cost Estimates 2005 Dollars 1 Fixed Guideway -New Starts 1.1a TTA Rail -Phase 1 DCHC Portion - Capital $349,050,700 1.1 b TTA Rail -Phase 1 DCHC Portion - O & M $312,374,925 1.2a US 15501 fixed guideway Duke -UNC /Horace Williams - Capital $274,587,000 1.2b US 15501 fixed guideway Duke -UNC /Horace Williams - O & M $92,880,640 Total Fixed Guideway (New Starts $1,028,893,265 High Capacity Transit 1.3a High Capacity Transit -Capital $66,926,000 1.3b High Capacity Transit - O & M $35,331,642 Total High Capacity Transit $102,257,642 2 Bus Transit/Park & Ride/Shelters/Bld . Facilities 2.1a Bus Transit -Capital $193,420,500 2.1 b Bus Transit - O & M $1,960,847,325 Total Bus Costs $2,154,267,825 2.2a Park & Ride - Capital 16 locations, 7500 spaces) $17,029,888 2.2b Park & Ride - O & M $170,299 Total Park & Ride Costs $17,200,187 2.3 Transit Amenities shelters, architecture /benches, etc $23,980,000 2.4 Transit Building transfer /maintenance Facilities $57,674,331 Total Bus Transit $2,253,122,343 3 Rail Corridor Protection $13,575,623 Preservation of existing rail ROW Total Transit/Public Transportation Costs $32397,848,873 34 50 2030 LRTP Issues yet to be resolved The Highway, Transit, Fixed - Guideway and Bicycle/Pedestrian plan elements and the Financial Plan are the same as those in the adopted 2025 LRTP with a few necessary changes, such as: 1. Costs have been updated to reflect dollars in the year 2005, and known changes to project costs in the NCDOT Transportation Improvement Program (TIP), transit hourly operations, bus capital costs, etc. 2. The implementation years for Air Quality purposes in the 2025 LRTP have been changed from 2005, 2010, and 2025 to 2010, 2020, and 2030. 3. Costs associated with projects completely financed before 2005 are not included. 4. Maintenance and operations costs for the years 2026 through 2030 have been added to coincide with the extension of the planning horizon from 2025 to 2030. 5. Revenue projections have been modified to reflect changes to national transportation legislation (i.e., follow -on legislation to ISTEA) currently under deliberation by the U.S. Congress, and to account for a difference in the 2025 LRTP and 2030 LRTP plan period (i.e., 2002 -2025 versus 2005- 2030). The MPO's Technical Coordinating Committee(TCC) believes that the 2025 LRTP plan elements and financial plan should be modified for adoption as the 2030 LRTP. These modifications would include: 1. The addition of highway and transit projects to help reduce high levels of congestion that are forecast by the TRM. 2. The addition and modification of projects to ensure design consistency among projects that cross the DCHC MPO and CAMPO border. 3. The addition and modification of transit projects to ensure the best routes (e.g., least congested) are used. 4. Adjustments to the Air Quality implementation year of projects to ensure that projected revenues match projected costs in the 2010, 2020 and 2030 periods. The Highway Trust Fund projects might be among these projects with modified implementation years. 5. , Modifications to revenue projections and needs to match the final project costs. 35 DCHC MPO DRAFT 2030 Long -Range Transportation Plan Highway Element Changes 1 Alexander Dr Cornwallis Rd to NC 147 24ane I-AMLl GJ 11LIKIIIIKI Ll U III -........� Principal Arterial Yes 1 2020 Federal /State Yes No. Project Project Limits Existing Cross - Section Proposed Cross - Section TIP No. Length (miles) Total Cost (2005 dollars) Functional Classification Region -ally Significant AQ year Funding Source E +C 1 Alexander Dr Cornwallis Rd to NC 147 24ane 4 -lane divided I U -3309 1.00 $3,955,000 Principal Arterial Yes 1 2020 Federal /State Yes 1 Alexander Dr Cornwallis Rd to NC 147 2 -lane 4 -lane divided I U -3309 1.00 $3,955,000 Principal Arterial Yes 1 2010 Federal /State Yes 2 Alexander Dr NC 147 to Miami Blvd 2 -lane 4 -lane divided U-3309 0.70 $0 Principal Arterial Yes 2010 Federal /State Yes 2 Alexander Dr NC 147 to Miami Blvd 2 -lane 4 -lane divided U -3309 0.70 $0 Princi al Arterial Yes 2009 Federal /State Yes 7 Benyhill /Old Fayetteville Old Fayetteville Rd to NC 54 New 24ane Private 0.20 $511,000 Urban Collector No 2010 Private Yes 6 Conn. Bypass New 2 -lane Private 0.20 $511,000 Urban Collector No 2010 Private Yes Benyhill /Old Fayetteville Old Fayetteville Rd to NC 54 I 1 Yes 6 Conn. Bypass New 2 -lane Private 0.20 $511,000 Urban Collector No 2009 Private 7 BPW Club /Rock Haven Conn. Loop at Smith Level Road New 24ane Private 0.20 $511,000 Urban Collector No 2010 Private Yes 7 1 BPW Club /Rock Haven Conn. Loop at Smith Level Road New 2 -lane I Private 0.20 $511,000 Urban Collector No 2009 Private Yes 8 Briggs Ave Ext So -Hi Dr to Riddle Rd New 2 -lane U -2831 1.60 $10,886,480 Urban Collector No 2020 Federal /State No 8 Briggs Ave Ext So -Hi Dr to Riddle Rd New 2 -lane U -2831 1.60 $4,942,000 Urban Collector No 2020 Federal /State No 11 I 1 Churton Connector Churton Connector Old NC 86 to NC 86 (Between I 85 & I40 Old NC 86 to NC 86 (Between I 85 & I-40) New New 4 -lane divided 4 -lane divided 1 0.57 0.57 $4,775,000 $4,775,000 Minor Arterial Minor Arterial Yes Yes 2020 2010 Federal /StatelPri vate Federal /State/Pri vale Yes Yes 14 1 Davis Dr NC 54 to County Line 2 -lane 4 -lane divided I U-4026 1.93 $13,521,090 Principal Arterial Yes 1 2020 Federal /State Yes 14 1 Davis Dr NC 54 to County Line 2 -lane 4 -lane divided I U-4026 1.93 $0 Principal Arterial Yes I 2010 Federal /State Yes D D C) 2 M Z --I Cn Cn DCHC MPO DRAFT 2030 Long -Range Transportation Plan Highway Element Changes L:.-L.1:_U._A *_ 72..1.1 Dr7..4 22 Fa etteville Rd Woodcroft Pkwy to South Point 2 -lane Proposed Cross - Section TIP No. Length (rifles) Total Cost (2005 dollars) Functional Classification Region -ally Significant AQ year Funding Source E +C No. Project Project Limits Existing Cross - Section 16 Elizabeth Brady Rd Ext US 70 Business to St Mary's Rd New 4 -lane divided U -3808 1.3 $12,331,950 Minor Arterial Yes 2020 Federal /State No 16 Elizabeth Brady Rd Ext I US 70 Business to St Mary's Rd New 4 -lane divided U -3808 1.40 $13,079,000 Minor Arterial I Yes 2020 Federal /State No 22 Fa etteville Rd Woodcroft Pkwy to South Point 2 -lane 4 -lane divided IPBon 1.63 $0 Principal Arterial Yes 2010 Private /local Yes 18 IFannHouse/Tramore Conn. Old NC 86 to Stratford Drive New 2 -lane Private 1 0.40 $1,022,420 Urban Collector No 2010 Private No FarmHouse/Tramore Woodcroft Pkwy to Cornwallis 5- lane /4 -lane I 1 18 Conn. Old NC 86 to Stratford Drive New 2 -lane Private 1 0.25 $639,000 Urban Collector No 2030 Private No 22 Fa etteville Rd Woodcroft Pkwy to South Point 2 -lane 4 -lane divided IPBon 1.63 $0 Principal Arterial Yes 2010 Private /local Yes 22 Fa etteville Rd Woodcroft Pkwy South Point 2 -lane 4 -lane divided IPBon 1.63 $0 Princi al Arterial Yes 2009 Private/local Yes 25 Garrett Rd/Chapel Hill Rd Woodcroft Pkwy to Cornwallis Intersection Upgrade I U -3105 1.00 $0 Principal Arterial Yes 1 2010 Federal /State i Yes 23 Fa etteville Rd Rd 2 -lane 4 -lane divided 1 1 2.31 $17,431,000 Principal Arterial Yes 2020 Local No Woodcroft Pkwy to Cornwallis 5- lane /4 -lane 23 Fa etteville Rd Rd 2 -lane 4 -lane divided U 2102 2.31 $17,431,000 Princi al Arterial Yes 2010 Local No 25 Garrett Rd/Chapel Hill Rd Intersection Improvements Intersection Upgrade I U -3105 1.00 $0 Principal Arterial Yes 1 2010 Federal /State i Yes 25 Garrett Rd/Chapel Hill Rd Intersection Impro vements Intersection Upgrade U -3105 1.00 $0 Principal Arteri al Yes 1 2009 Federal /State Yes 30 Hillandale Rd I -85 to Carver St. 2 -lane 5- lane /4 -lane I U -3804 0.70 $6,867,000 Principal Arterial Yes 2020 Federal /State Yes 29 Guess Rd Carver St to Umstead Rd 2 -lane divided U 2102 3.37 $0 Principal Arterial Yes 1 2010 1 Federal /State Yes 5- lane /4 -lane 29 1 Guess Rd Carver St to Umstead Rd 2 -lane divided U 2102 3.37 $0 Principal Arterial I Yes 1 2009 1 Federal /State Yes 30 Hillandale Rd I -85 to Carver St. 2 -lane 4 -lane divided I U -3804 0.70 $6,867,000 Principal Arterial Yes 2020 Federal /State Yes 30 1 Hillandale Rd I -85 to Carver St. 2 -lane 4 -lane divided I U -3804 0.70 $6,867,000 Principal Arterial Yes 2009 Federal /State Yes D D 0 2 K M z -I w Gn N DCHC MPO DRAFT 2030 Long -Range Transportation Plan Highway Element Changes r1in"aPe bia1111al'tPA in Rnlil VA.+ 34 lHolloway Street I US 70 to east of Junction Rd Existing Proposed U-4010 Length Total Cost Functional Region -ally 2010 Federal /State Yes No. Project Project Limits Cross- Section Cross - Section TIP No. (miles) (2005 dollars) Classification Significant AQyear Funding Source E +C Hillsborough Rd/Old Lorraine St to Old 2 -lane (36 -ft 33 Fayetteville Fayetteville/NC 54 2 -lane curb/ utter ) U-31001 1.90 $5,997,610 Principal Arteriall Yes 2020 IState No Hillsborough Rd /Old Lorraine St to Old 2-lane (36 -ft 33 Fa etteville Fayetteville/NC 54 2 -1ane curb/ utter ) 50 $1,578,000 Principal Arterial Yes 2020 State No 34 lHolloway Street I US 70 to east of Junction Rd 2 -lane 5 -lane U-4010 0.30 $3,226,500 Principal Arterial Yes 2010 Federal /State Yes 34 Holloway Street US 70 to east of Junction Rd 2 -lane 5-lane U-4010 0.30 $0 Principal Arterial Y­ 2009 Federal /State Yes 38 Ho son -Pa e Rd Ext NC 54 to Pa a Rd New 5 -lane U -3853 0.5 $0 Urban Collector Yes 2020 State /Private Yes 38 Ho son -Pa a Rd Ext NC 54 to Page Rd New 5 -lane U -3853 0.5 $0 Urban Collector Yes 2009 StateT ,,,te Yes 42 1-40 1 -85 to US 15 -501 4 -lane freewa 6-lane freeway I -3306 1 7.5 $39,436,000 Interstate I Yes 1 2030 Federal /State No 42 I40 I -85 to US 15 -501 4 -lane freewa 6 -lane freeway I -3306 1 11.4 $60,048,000 Interstate I Yes 1 2030 Federal /State No 43 I40 HOV County Line to NC 86 New HOV lane R -2000 16.63 $276,041,460 Interstate Yes 1 2030 Federal /State No 43 I40 HOV County Line to NC 86 New HOV lane R -2000 16.63 $364,900,000 1 Interstate Yes I 2030 Federal /State No 44 1 -540 Durham onion Durham Co. Portion I- 4011540 New 6 -lane freeway R -2000 0.69 $14,462,660 Interstate Yes 2020 Federal /State Yes 44 I -540 Durham portion) Durham Co. Portion I- 40/I540 New 64ane freeway R -2000 0.69 $0 Interstate Yes 2010 Federal /State Yes 45 I -85 US 15 -501 Bypass N to US 70 4 -lane freewa 8 -lane freeway I -306 9.70 $92,282,000 Interstate Yes 2020 Federal /State Yes 45 I -85 US 15 -501 Bypass N to US 70 4 -lane freewa 8 -lane freeway I -306 9.70 $6,239,000 Interstate Yes 2009 Federal /State Yes �I D n 2 K M z Cn Cn W DCHC MPO DRAFT 2030 Long -Range Transportation Plan Highway Element Changes No. Project Project Limits Existing Cross - Section �..uuaa Proposed Cross - Section TIP No. Length (miles) Total Cost (2005 dollars) Functional Classification Region -ally Significant AQ year Funding Source E +C 49 Lake Hogan Farms Rd Eubanks Road to Tramore Drive New 2 -lane Private 1.20 $3,067,000 Urban Collector No 2010 Private Yes 49 Lake Hogan Farms Rd 1 Eubanks Road to Tramore Drive New 2 -lane Private 1.20 $3,067,000 Urban Collector No 2009 Private Yes New I (RTP) Hopson Rd to County Line 2 -Lane 4 -Lane $1,143,000 IMinor Arterial I Yes 1 2030 State/ Private No 56 Farm Rd Methodist Dr to Angier Ave 24ane 5 -lane I U-4011 0.72 $2,016,000 1 Minor Arterial I Yes 2020 Federal /State Yes 55 lMason Realignment Near S Columbia St 2 -lane 2 -lane U-4011 Li $1,190,000 Urban Collector No 2010 Federal /State No 55 Mason Farm Rd Realignment Near S Columbia St 2 -lane 2 -lane 1.1 $1,190,000 Urban Collector No 2020 Federal /State No 56 Miami Blvd. Methodist Dr to Angier Ave 24ane 5 -lane I U-4011 0.72 $2,016,000 1 Minor Arterial I Yes 2020 Federal /State Yes 56 Miami Blvd. Methodist Dr to Angier Ave 2 -lane 5 -lane U-4011 1 0.72 $2,016,000 Minor Arterial I Yes 1 2009 Federal /State I Yes 59 MLK Parkway Old Chapel Hill Rd to NC 55 2- lane /new 4 -lane divided IPBon 2.23 $12,519,010 Principal Arterial Yes 1 2010 Local Yes 59 IMLKParkway Old Chapel Hill Rd to NC 55 2- lane /new 4 -lane divided IPBon 2.23 $0 Principal Arterial Yes 1 2010 Local Yes 64 147 (Triangle Bumin Tree to Barbee Chapel 4 -lane 6 -lane divided Private 0.72 $0 Principal Arterial Yes 1 2010 Private Yes 63 INC Parkwa) I-40 to Coun Line New 6 -lane freeway__ Private 6.69 $36,825,100 Interstate Yes 2030 Federal /State No NC 147 (Triangle 63 Parkway) I-40 to County Line New 6 -lane freeway 2.4 $70,039,000 Interstate Yes 2020 Federal /State No 64 NC 54 Bumin Tree to Barbee Chapel 4 -lane 6 -lane divided Private 0.72 $0 Principal Arterial Yes 1 2010 Private Yes 64 INC 54 IBurning Tree to Barbee Chapel 4 -lane 6 -lane divided Private 0.72 $0 Princi al Arterial Yes 2009 Private Yes n 2 M Z CTl 67 N NC 54 I I-40 to Barbee Chapel Rd 6 6 -lane 6 6 -lane divided 1 1.68 $ $32,351,000 P Principal Arterial Y Yes 2 2020 F Federal /State N No C DCHC MPO DRAFT 2030 Long -Range Transportation Plan Highway Element Changes Chnnvee lhivhlivlhterl in RMA Print 69 NC 54/Page Rd Davis Dr to Miami Blvd Existing Proposed R -2904 Length Total Cost Functional Region -ally 2020 Federal /State Yes No. Project Project Limits Cross - Section Cross - Section TIP No. (miles) (2005 dollars) Classification Significant AQ year Funding Source E+C 69 NC 54/Page Rd Davis Dr to Miami Blvd 2 -lane 4 -lane divided R -2904 1.10 $6,322,000 Principal Arterial Yes 2020 Federal /State Yes 69 NC 54/Page Rd Davis Dr to Miami Blvd 2 -lane 4 -lane divided R -2904 1.10 $6,322,000 Princi al Arterial Yes 2010 Federal /State Yes 71 NC 55 Comwallis Rd to Wake Co. 24ane 4 -lane divided R -2906 4.66 $19,002,030 Principal Arterial Yes 2009 Federal /State Yes 71 NC 55 Cornwallis Rd to Wake Co. 2 -lane 4 -lane divided R -2906 4.6 $9,363,000 Princi al OrtPriall Yes 2009 Federal /State Yes 72 NC 55 (Alston Ave. ) NC 147 to NC 98 2 -lane 4 -lane divided I U -3308 1.00 $15,254,000 Princi al Arterial Yes 1 2020 Federal /State Yes 72 NC 55 Alston Ave. NC 147 to NC 98 2-lane 4 -lane divided U -3308 1.00 $15,254,000 Princi al Arterial Yes 2010 Federal /State Yes 91 Scott King Rd Hope Valley Farms to MLK 2 -lane 2 -lane 0.95 $4,100,000 1 Minor Arterial Yes 2020 ed era l /State/Pn No 78 Northeast Creek Pkwy Comwallis Rd to Ellis Rd New 2- lane U -2831 1.60 $0 Urban Collector No 2010 IFe vate Yes Hope Valley Farms to MLK Federal /State/Pri 78 Northeast Creek Pkwy Rd to Ellis Rd New 2- lane U -2831 ::1:60 $0 Urban Collector No 2009 vale Yes 91 Scott King Rd Hope Valley Farms to MLK 2 -lane 2 -lane 0.95 $4,100,000 1 Minor Arterial Yes 2020 ed era l /State/Pn No 83 Old NC 86 Lafe ette Dr to US 70 Business 2 -lane 4 -lane divided R -2825 1.70 $14,341,000 Minor Arterial Yes 201ate 4ederal/State/Pri Private No Hope Valley Farms to MLK 83 Old NC 86 Lafe ette Dr to US 70 Business 2 -lane 4 -lane divided R -2825 1.70 $14,341,000 Minor Arterial Yes 2020 vale No 91 Scott King Rd Hope Valley Farms to MLK 2 -lane 2 -lane 0.95 $4,100,000 1 Minor Arterial Yes 2020 Federal /State No 89 Roxboro St Pkwy 2 -lane 4 -lane divided I Private 1 1.10 $0 Minor Arterial I Yes 1 2010 Private Yes Hope Valley Farms to MLK 89 Roxboro St Pkwy 2 -lane 4 -lane divided I Private 1 1.10 $0 Minor Arterial I Yes 1 2009 Private Yes 91 Scott King Rd Grandale Dr to Hopson Rd 2 -lane 2 -lane 0.95 $4,100,000 1 Minor Arterial Yes 2020 Federal /State No 91 Scott King Rd Grandale Dr to Hop on Rd New 2 -lane 0.95 $4,I00,000 Minor Arterial Yes 2020 Federal /State , o (31 Cl D n K M z U1 DCHC MPO DRAFT 2030 Long -Range Transportation Plan Highway Element Changes r,1— .ems t,: ,l,l; .l,ro i ;n Rntrt Print No. Project Project Limits Existing Cross - Section �11R11 Proposed Cross - Section TIP No. Length (miles) Total Cost (2005 dollars) Functional Classification Region -ally Significant AQ year Funding Source E +C 92 Seawell School Connector Lake Hogan Farms Rd to Seawell School Rd New 2 -lane Private 1.00 $4,345,280 Urban Collector No 2010 Private Yes 92 Seawell School Connector Lake Hogan Farms Rd to Homestead Rd New 2 -lane Private 1.00 $2,556,000 Urban Collector No 2010 Private Yes New Seawell School Connector Homestead Rd to Seawell ISchool Rd New 2 -lane Private 0.70 $1,789,000 Urban Collector No 2030 Private No 93 Smith Level Rd Rock Haven Rd to NC 54 b as 2 -lane 4 -lane divided I U -2803 1 0.60 $3,678,750 Minor Arterial No 2010 State Yes 93 Smith Level Rd Rock Haven Rd to NC 54 b as 2 -lane multi -lane I U -2803 0.6 $$2,543,000 Minor Arterial No 2010 State Yes Moriah Rd. Mt. I New I 4 -lane divided I 0.351 $3,515,000 I Minor Arterial I N/A I 2020 I Private I No I New W Durham Pkw y 115-501 to Private South Point Pkwy Watkins Rd (Old Chapel Hill R 3 -lane curb & I Federal /State/Pri 95 (Renaissance) NC 751 to Fayetteville Rd New 44ane divided I Private 1 1.23 $0 Urban Collector No 1 2010 Private Yes South Point Pkwy Watkins Rd (Old Chapel Hill R 3-lane curb & 1 Federal /State/Pri 95 (Renaissance) NC 751 to Fayetteville Rd New 4 -lane divided I Private 1.23 $0 Urban Collector No 2009 Private Yes Moriah Rd. Mt. I New I 4 -lane divided I 0.351 $3,515,000 I Minor Arterial I N/A I 2020 I Private I No I New W Durham Pkw y 115-501 to Private Watkins Rd (Old Chapel Hill R 3 -lane curb & Federal /State/Pri 96 Stadium Drive Ext Shaftsbury Dr to Kirkwood Dr 2 -lane gutter IPBon 0.53 $0 Urban Collector No 2010 Local Yes Watkins Rd (Old Chapel Hill R 3-lane curb & Federal /State/Pri 96 Stadium Drive Ext Shaftsbu Dr to Kirkwood Dr 2 -lane utter IPBon 0.53 $0 Urban Collector No 2009 Local Yes Moriah Rd. Mt. I New I 4 -lane divided I 0.351 $3,515,000 I Minor Arterial I N/A I 2020 I Private I No I New W Durham Pkw y 115-501 to Private Watkins Rd (Old Chapel Hill R Federal /State/Pri 100 SW Durham P to US 15 -501 2 -lane 4 -lane divided ivate/Pub 1.16 $0 Minor Arterial Yes 2020 vase Yes Watkins Rd (Old Chapel Hill R Federal /State/Pri 100 S W Durham P to US 15 -501 2 -lane 4 -lane divided ivate/Pu 1.16 $0 Minor Arterial Yes 2009 vate Yes Moriah Rd. Mt. I New I 4 -lane divided I 0.351 $3,515,000 I Minor Arterial I N/A I 2020 I Private I No I New W Durham Pkw y 115-501 to Private ■ n 2 M Z QI CJl US 70 to Carpenter Ponds 102 T. W. Alexander Dr Ext (Durham Portion) New 4 -lane divided ivate/Pub 0.66 $1,744,000 Principal Arterial Yes 2030 Private/Public No US 70 to Carpenter Ponds 102 T. W. Alexander Dr Ext Durham Portion) New 4 -lane divided ivate/Pub 0.66 $1,744,000 Principal Arterial Yes 2020 Private/Public No ■ n 2 M Z QI CJl DCHC MPO DRAFT 2030 Long -Range Transportation Plan Highway Element Changes Changes highlighted in Bold Print 117 US 70/Miami Orange Co line to Chapel Hill Existing Proposed I Length Total Cost Functional Region -ally 2010 Private I No, Project Project Limits Cross - Section Cross - Section TIP No. (miles) (2005 dollars) Classification Significant AQyear Funding Source E +C US 70/Miami Pittsboro Bypass (MAD) to 34ane /4 -lane 1 104 US 15 -501 Orange Co. line 24ane 4 -lane divided R -942 5.18 $0 Principal Arterial Yes 2010 Federal /State Yes Pittsboro Bypass (MAD) to 104 US 15 -501 Orange Co. line 2 -lane 4 -lane divided R -942 5.18 $0 Principal Arterial Yes 2009 Federal /State Yes 117 US 70/Miami Orange Co line to Chapel Hill New 34ane /4 -lane 438/Pri 0.3 $766,000 Urban Collector No 2010 Private I 107 US 15 -501 Bypass 2 -lane 4 -lane divided I R -942 1 2.90 $0 Princi al Arterial Yes t 2010 Federal /State Yes US 70/Miami Orange Co line to Chapel Hill 34ane /4 -lane 1 107 US 15 -501 Bypass 2 -lane 4 -lane divided I R -942 1 2.90 $0 Princi al Arterial Yes 2009 Federal /State Yes 117 US 70/Miami NC 86 to Stroud Creek Rd New 34ane /4 -lane 438/Pri 0.3 $766,000 Urban Collector No 2010 Private No 113 Blvd/Mineral Intersection Upgrade. 2 -lane Upgrade U-28081 0.78 $0 Principal Arterial Yes 2010 Federal /State Yes US 70/Miami Barbee Rd to Carpenter- Fletcher 34ane /4 -lane 113 Blvd /Mineral Intersection Upgrade 24ane Upgrade U -2808 0.78 $0 Principal Arterial Yes 2009 Federal /State Yes 117 Western Bypass NC 86 to Stroud Creek Rd New 34ane /4 -lane 438/Pri 0.3 $766,000 Urban Collector No 2010 Private No 114 Weaver Dairy Rd NC 86 to Erwin Rd 2 -lane divid I U -3306 2.80 $12,043,000 Minor Arterial I No 1 2020 Federal /State Yes Barbee Rd to Carpenter- Fletcher 34ane /4 -lane 114 WeaverDairyRd NC 86 to Erwin Rd 24ane divid I U -3306 2.80 $12,043,000 Minor Arterial I No 1 2010 Federal /State I Yes 117 Western Bypass NC 86 to Stroud Creek Rd New 2 -lane 438/Pri 0.3 $766,000 Urban Collector No 2010 Private No 117 Western Bypass NC 86 to Stroud Creek Rd New 2 -lane 438/Pri 0.3 $766,000 Urban Collector No 2020 Private No n M Z CJ1 t31 v Barbee Rd to Carpenter- Fletcher 118 WoodcroftPkwy Rd. New 2 -lane divided Private 0.84 $0 Urban Collector No 2020 Private Yes Barbee Rd to Carpenter- Fletcher 118 Woodcroft P Rd. New 2 -lane divided Private 0.84 $0 Urban Collector No 2009 Private Yes n M Z CJ1 t31 v r k ATTACHMENT 6 Summary of Public Comments Highway • Improve 1 -85 in Orange County before 1 -40 in Orange County • Widen 1 -85 in Orange County before it gets worse (advance implementation) • Work with UNC to build Estes Drive improvements quickly • Remove "north- south" road on Horace Williams property from LRTP (stream beds and mature woods) • Widen US 15 -501 & Fordham Blvd to six lanes Summary of Public Comments Highway cont'd • Add Cornwallis /Riddle Rd. Connector in the 2030 ILRTP • Add 3 -lane improvement of Hillandale Road from 1 -85 to Club Blvd in LRTP • Widen Horton Road from Duke St. to Guess Rd. to a 3- lane facility • Thoroughfare Plan is outdated • Include medians and landscaping in highway projects 0 z 58 1 ATTACHMENT 6 Summary of Public Comments Transit • LRTP should include improved transit and express services to RDU • Improve Peak headway to 5 minutes • Provide more cross -town transit routes • Provide more shuttle buses to connect RTP and major activity center • Provide seamless transit service in the Triangle Region • LRTP does not address transit security and safety Summary of Public Comments Fixed Guideway • Do not remove Phase I Duke Station from the 2030 LRTP • Add rail service to RDU in the Plan • Advance implementation of Phase 2 rail from Duke to UNC • Study rail connection from Downtown Durham to Treybu rn • Develop Eubanks Park & Ride area with rail corridor 3 a 59 i•. 0. N AT ACHMENT . Summary of Public Comments Bicycle and Pedestrian Facilities • Add Leesville Rd /Shady Grove Rd to match bike project in Wake County • Add Morreene Rd Bike project (to service Duke commute) • Complete Airport Rd bike and pedestrian improvements from Estes to Homestead • Complete bike improvements to Calvander along Old NC 86 /Hillsborough Rd • Complete all sidewalk missing links Summary of Public Comments Bicycle and Pedestrian Facilities cont'd • Give sidewalk connections to schools high priority • Include sidewalks and bike facilities in all highway improvement projects • LRTP should include bike education • Greenways connectivity to parks • Develop implementation plan for completing sidewalks, bike projects, and greenways by 2010 5 6 [Yf, 3 ATTACHMENT NT 6 Summary of Public Comments General • Devise public outreach to make public more knowledgeable on the Plan • Establish Citizen Advisory Committee for Long Range Transportation Plan • Pursue opportunities to use bio- diesel in public -owned fleet of vehicles • Land use /transportation integration is not addressed in the Plan • Synchronize traffic signals • Emphasis on safety Summary of Public Comments Financial • Pursue dedicated funding for transit and non - motorized transportation • Set aside minimum of 8% funding for bicycle and pedestrian projects • Pursue high occupancy vehicle lanes and tolls on 1 -40 • Impact fees for transportation is low - increase 8 61 4