HomeMy WebLinkAboutAgenda - 03-03-2011 - 4fORANGE COUNTY
BOARD OF COMMISSIONERS
ACTION AGENDA ITEM ABSTRACT
Meeting Date: March 3, 2011
Action Agenda
Item No. ~'
SUBJECT: Contract Amendment for Engineering and Construction Administration Services
for Twin Creeks Greenway
DEPARTMENT: Asset Management, Planning PUBLIC HEARING: (Y/N) No
ATTACHMENT(S):
Attachment A: Budget
Attachment B: Professional Services Letter of
Amendment to an Existing
Contract Dated 2/7/2011
Attachment C: NCDOT Memo Regarding
ARRA Project Requirements
INFORMATION CONTACT:
Pam Jones, Asset Management,
919-245-2652
Jeff Thompson, Asset Management,
919-245-2658
Karen Lincoln, Planning, 919-245-2580
PURPOSE: To consider approval of the Contract Amendment not to exceed a total of $25,875
for additional Contract Administration Services with Coulter, Jewell, Thames, PA ("CJT") for the
Twin Creeks Greenway Project as specifically required by the North Carolina Department of
Transportation (NCDOT) as Contract Administrator for American Recovery and Reinvestment
Act ("ARRA") funds.
BACKGROUND: On June 27, 2006, the BOCC also awarded a professional services contract
to Coulter, Jewell, Thames, PA for design and construction administration services for Twin
Creeks Phase 1. This original contract includes $25,000 for Contract Administration ("CA")
services provided by the Designer of the project.
On December 7, 2009, the Board authorized a bid award in the amount of $498,992.40 to
McQueen Construction of Bahama, NC for the construction of the .62 mile Twin Creeks
greenway project within the Twin Creeks Park site near Morris Grove Elementary School. This
construction began in the spring of 2010 and is currently scheduled to be completed in the
spring of 2011. Attachment A illustrates the budget originally distributed as an attachment for
the December 7, 2009 construction bid award abstract.
In December 2009, the County was awarded reimbursement of up to $429,457 of this project
cost from the Federal Government through the American Recovery and Reinvestment Act
("ARRA") program funds. These funds will supplement the existing budget attached.
On February 16, 2010, the BOCC approved a contract amendment for CJT's services to fulfill
the required NCDOT oversight in an amount not to exceed $106,400. Due to prolonged
NCDOT review of the project's bridge element (designed and reviewed according to NCDOT
standards), this required oversight service will likely exceed the amended amount of $106,400.
CJT's request for the additional not-to-exceed amount of $25,875 addresses this delay (note
Attachment B, "Professional Services Contract Amendment dated 2R/2011 "). The bridge
2
design review delays required the bridge fabrication release of approximately 169 calendar
days, impacting the general construction schedule and delaying the project's completion.
ARRA requires that NCDOT administer fund reimbursements for all of its awarded projects.
NCDOT is administering these projects in accordance with its standard published Construction
guidelines. In accordance with these guidelines, NCDOT requires that all projects be staffed by
a Resident Project Representative that must be present during all of the construction activities
for inspections, reporting and engineering supervision of the project. The NCDOT ARRA
Project Requirements-Local Municipal Requirements Memorandum dated February 8, 2010
(Attachment C) states that Contract Administrator inspections "must be performed whenever
Contractor is working at all times". This level of on-site supervision is not customary with
County projects, but is required in this instance to receive the ARRA reimbursement funds.
Staff will continue to inspect the work and related charges invoiced by CJT through the
completion of the project. It has been noted that this level of CA oversight and the associated
additional cost to taxpayers may be excessive ("i.e. a concrete greenway trail built according to
the same oversight as a Federally funded highway project). However, it is required as part of
the ARRA funds' administrative requirements.
FINANCIAL IMPACT: The additional amount for these services is not to exceed $25,875, and
will be paid for out of the budgeted contingency funds within the Capital Project. ARRA funds
will reimburse the County up to $429,457 of the contracted $498,992.40 General Construction
Contract with McQueen Construction, provided that the County follow the NCDOT project
administration requirements. Should the Board not approve this amendment for
required services, the County may not be eligible for reimbursement up to the $429,457
amount since it would be in violation of the NCDOT project administration guidelines.
RECOMMENDATION(S): The Manager recommends the Board authorize the Manager to sign
the Contract Amendment not to exceed $25,875 for Contract Administration Services with
Coulter, Jewell, Thames, PA for the Twin Creeks Greenway Project as required by NCDOT as
Contract Administrator for American Recovery and Reinvestment Act ("ARRA") funds.
Attachment A -Project Budget
Twin Creeks (Moniese Nomp) Greenway Budget
Revenues/Funding SOIIrCPN
Source Amount
2001 Parks and O en S ace Bond $1,673,221.00
-minus remaining Soccer Superfund
ortion for soccer use elsewhere
-$625,000.00
-minus buildin stabilization funds -$150,000.00
+ARRA Trans ortation Stimulus tundin ' $429,457.00
TOTAL $1 327,678.00
Planned Expenditures rorininal RudnPtl•
Item Estimated Amount
.62 mile x 10' wide concrete greenway with
one 111.5' x 10' prefab steel bridge
(including design, clearing, grading, one
temporary bridge, sedimentation and
erosion control devices, raising one
manhole and term ora seedin $894,098.54
Additional ARRA/NCDOT Construction
Administration Fee (full time NCDOT
concrete certified site in ector $81,400.00
Geotechnical testin $26,000.00
Landscaping and site amenities (signage,
benches, doggie waste stations &
trash/rec clin rece tacles $65,000.00
Construction contin enc 10 % $89,409.85
TOTAL $1,155,908.39
Revised Twin Creeks Greenway Rudnat~
Item Estimated Amount
.62 mile x 10' wide concrete greenway with
one 111.5' x 10' prefab steel bridge
(including design, clearing, grading, one
temporary bridge, sedimentation and
erosion control devices, raising one
manhole and term ora seedin $498,992.40
2/16/10 Additional ARRAMCDOT
Construction Administration Fee (full time
NCDOT concrete certifed site in ector $81,400.00
onstructron
Administration Fee amendment (full
time NCDOT concrete certifed site
in ctor $25,875.00
Geotechnical testin $26,000.00
Landscaping and site amenities (signage,
benches, doggie waste stations &
trash/rec clin rece tacles $65,000.00
Construction contingency, less additional
re wired Construction Administration $48,973.86
TOTAL $746,241.26
1. Maximum amount not-to-exceed
A~d,~ l B
Coulter Jeweii Thames, PA
111 5aE5i M0.1 ~; 'a7A CET
DURHAk{, NOP,SH CAA~IINA 2F70'
p974.692.C350 1919.6$9.50^.5
LETTER OF AMENDMENT TO AN EXISTING CONTRACT
made this 7th day of February, 2011
To The OWNER
Orange County-Asset Managementand Purchasing Services
PO Box 8 ] 81
Hillsborough, NC 27278
Attn: Jeff Thompson
By The SITE CONSULTANT
Coulter Jewell Thames, P_A_
111 West Main Street
Durham, North Carolina 27701
For Landscape Architecture and Civil Engineering Services
For additional services related to the construction administration and inspection of the greenway trail at the
Twin Creeks District Park ioeated in Catrboro, North Carolina.
Bescription
The wnstruction phase services for the Twin Creeks greenway trail are outlined in a Letter ofAmendment
to an Existing Contract provided by Coulter Jewe}1 Thames PA dated January 7, 20i 0, and executed by
Orange County on March 11, 2010. In the Letter of Amendment, ahudget for construction phase services
was developed based on a construction duration of 28 weeks. The total construction phase services budget
was $106,400.00. Under the terms of the letter, Coulter Jewell ?'names, PA has invoiced monthly against
this budget for the Hours spent on the project.
A Notice to Proceed for the project was issued on February 17, 201D, with oonstruction beginning on
February 18, 2010. A 28 week construction duration beginning on February 18"' wauld have concluded on
September 2, 2010. _
Coulter J ewe11 Thames has invoiced Orange County a total of $86,675.00 for services provided though
October 31, 2010. By invoicing Otatsge County for the actual hours of construction phase services
provided, we have been able to work beyond the originally estmated construction period and remain within
construction phase services budget However, based on the current schedule for completion of the project,
we do expect to exceed our construction phase services budget prior to completon of the project.
We estimate that we will be required to provide the equivalent of 12 weeks of construction phase services
for the project for the period fram November 1, 201 Q thraugh completion of the project. Earn week of
construction phase services would include 40 hours for the resident project representative and 10 hours for
project manager. .
Due to the extended construction period for the project, Coulter Jewell Thames, PA is requesting that our
construction phase service budget be increased by $25,875.00 to atotat of $132,275.00. Calculations of the
estimated services remaining. to be provided and the amountremaining in the budget are provided on the
next page.
5
Estimated Constn~ction Phase Services Reraaini_nQ November 1 _~01 D fhou~h comaletion of the Project
Personnel Weeks HourlWeek Billing Rate Amount
Resident Project Representative 12 40 $65.OO.Jhour $31,200.00
Project Manager 12 10 $120.00~'hour $14,400.00
$45,600.00
Original Construction Phase Services Budget: $ 106,400.00
Construction Phase Services Provided Through 3 0/31/20 ] 0 $ 86,675.00
Amount Remaining in Budget $ 19,725.00
Estimated Construction Phase Services Remaining to be Provided $ 45,600.00
Budget Deficit $ .25,875.00
COMPENSATION:
As per the existing Agreement, the exact amount of construction phase services to be provided. to Orange
County will vary depending on the actual construction duration and days worked by the Contractor. The
addition of the $25,875.00 to the Contract Amount provides a budget for services totaling $132,275.00.
All other terms of the existing Agreement shalt remain in effect.
Respectfully tendered this 7th day of February, 2011
For The Consultant
COULTER JEVVELL THAIYIES, P_A.
. Steven P. Bailey, PE Vice esident
7 ao/i
Date:
FOR The Ovrner•.
Attest
NamelTitle Date ~ Name/Date~I'itle
/ I~Cc~ _. i„~J
a~ ~
'Qwww~
STATE of NORTIi CAROLINA
DEPARTMENT OF fiRANSPORTATION
BEVERLY EAVES PERDUE EUGENE A. (:ONTI, JR.
GOVERNOR '
MEMORANDUM TO:
FROM:
SUBJECT:
SBCKL+TAxY
8 February 2410
Local Municipalities
J.M. Mills, PE
Division Engineer
ARRA Project Requirements-Local Municipal Responsibilities
NCDOT Construction Manual
• Online at:
httpJ/www.ncdot.gov/doh/operations/dp chief eng/constructionunit/formsmanua(s/construction/
Contract Administration
General Requirements (Attachment 1, Construction Manual, Division 1 General Requirements section
pg. 1-10)
• Prime Contractor
Prequalified bidders on NCDOT list only
• Subcontractors
Request for Subcontract (Attachment 1, Construction Manual, Records & Report section pg. R-
21&221)
Inspection
• Must be performed whenever Contractor is working at all times
• Inspector's Daily Report '
• Project Diary
(Attachment 2, Constriction Manual, Records & Report section pg. 207-214)
T~
• Minimum Testing requirements
Found online at:
httas:%/apps.dot.state.nc.us/vendor/approvedproducts/MSG.aspx
Search. by material type
• Independent sampling (Quality Assurance testing)
Material & Test Unit staff
Guardrail, steel, metal poles, torque on bolts
Resident Engineer staff
Concrete, asphalt
DBE ComQliance/Trackin~
• Submit payments monthly or at project completion if only one invoice is submitted to RE to enter
into DBE tracking system
• Changes/modifications/replacements must be approved
Page 2
ARRA Local Guidelines
Erosion Control
• Requirements
• Erosion & Sedimentation Control Report
(Attachment 3, Construction Manual, Erasion & Landscaping Division 16, pg 1-~
Record keepingldocumentation
• Progress Schedule Chart
• Engineer's Weekly SutYUUary
• Annual EEO Review '
(Attachment 4, Construction Manual, Records & Reporting, pg, R 211-216)
Supplemental Anreements~Chan~e Ordexs
• Determine purpose and~need
Must be within original project scope
• Contractor and Engineer negotiate fact and reasonable price
Pricing breakdown {documentation example attached) must be provided from Contractor to LPA
and forwarded to Resident Engineer with oversight
Documentation required describing work, location and justification (NCDOT example attached)
• FHWA concurrence required
• Prior to ANY work commencing, approval must be obtained. Verbal agreements wi#hout
approval may constitute ineligible charges
(Attachment 5, Construction Manual, Records & Reporting, pg. R-114123)
P. O. Box 14996 Greensboro, NC 274154996 Telephone No. (336) 334-3192 Fez No. (336) 334-3637