HomeMy WebLinkAbout2005 NS Aging MOU between TTA & OPTfor Public Route Service between Hillsborough and Chapel Hill
MEMORANDUM OF UNDERSTANDING
This Memorandum of Understanding ("MOU") is made this day of
2005 by and between RESEARCH TRIANGLE REGIONAL PUBLIC
TRANSPORTATION AUTHORITY (d/b/a "TTA"), located at 68 T.W. Alexander
Drive, Research Triangle Park, North Carolina 27709 and ORANGE COUNTY, located
at 200 South Cameron Street Hillsborough, North Carolina 27278 (hereinafter "County").
This MOU outlines the basic points of discussion and tentative agreements between TTA
and the County. This MOU does not constitute a binding contract for any other purpose.
All agreements contemplated by this MOU shall become binding and enforceable only
when said agreements intending to be binding and enforceable are executed by TTA and
the County.
Now, it is hereby understood as follows:
Basic Responsibilities regarding the Orange Express Route between Hillsborough and
Chapel Hill are. listed below.
Operations•
• 100% of Route Operations provided by County staff using County vehicle(s).
The schedule, number of trips and timing of trips will be specified by TTA in an
attachment to this agreement.
• The Orange Express Route will operate every weekday that is not a holiday
according to the TTA Holiday list, which is included with this memorandum.
• If the Orange Express vehicle breaks down or is unable to leave the County
operations center for service, it is the responsibility of the County to deploy
another vehicle to serve the Orange Express Route using the exact same schedule
and route pattern, and to collect revenue as described in this document. If there
are individual trips on the Orange Express Route which regularly fill the bus
specified for the route to its full seated capacity, then any replacement service
provided by the County will provide a number of seats equal to the seated
capacity of the regularly used vehicle.
• Reporting of all operating statistics and ridership to the National Transit Database
would be divided according to the funding ratio, with 75% going to TTA and 25%
going to the County. Ridership figures from the County will be provided to TTA
on a monthly basis.
Funding•
• 75% operating funds. provided by Triangle Transit Authority (TTA)
• 25% operating funds provided by the County
• TTA's contribution to operations during the January -June 2006 period will be
capped at $41,126, which is based on a per-hour operating cost for the County of
$34 per hour.
• Fare revenue will be distributed to the County and TTA according to the 25/75
ratio listed in the above bullet points.
5
Fifteen days after the close of each quarter, the County will provide to TTA the
number of hours operated at $34 per hour for that quarter. During those same
fifteen days, TTA will tabulate revenue received during the quarter on the Orange
Express Route, and provide the County with dollar totals of the the County and
TTA shares of revenue. The two agencies will produce a balance based on the
difference between the operating cost to be charged to TTA and the fare revenues
allocated to TTA and the County, and the County will bill TTA for the balance.
Paratransit•
• 100% of cost of paratransit service associated with Orange Express Route will be
covered by the County
• TTA will continue to provide regional paratransit connections within the ADA-
specified 3/4-mile radius of Route 402/403/412/413 within Chapel Hill, where
County-based paratransit passengers can then make transfers regionally.
• After the first 6 months of operation, TTA and the County will study the overall
level of interest in using TTA paratransit for regional connections, and if TTA and
the County believe that demand can be served appropriately using TTA's
paratransit fleet, TTA and the County will examine the possibility of drafting a
"seamless service" agreement similar to the one that exists between TTA and
Accessible Raleigh Transit (ART) to provide regional trips without transfers and
interagency payments.
Planning and Fare Policy:
• TTA, as the primary funding agency, will be responsible for route planning, fare
policy, scheduling, and service changes associated with the route.
• While maintaining final authority over the route, TTA will include and consult
with County staff and advisory board members in discussions regarding all facets
of route planning and operation to maximize regional coordination.
• If TTA proposes any changes to the schedule, routing, fare, or other operational
characteristics of the service, TTA must inform the County of these changes at
least 30 days prior to implementation.
Maintenance•
• The GFI fareboxes require regular probing to remain in good operating condition.
The County will work with the TTA Maintenance Supervisor to schedule
preventative maintenance for the farebox through the Regional Farebox
Maintenance Shop. The County should contact the Regional Farebox
Maintenance Shop directly for all other needed repairs.
• General vehicle cleaning and maintenance on the Orange Express vehicle will be
conducted by County staff.
• Soon after route operations will begin, the warranty on the GFI farebox in the
County vehicle will end. TTA considers some maintenance costs to enter the
operating cost of the route, but due to the expense of farebox parts, TTA will limit
its contribution to farebox parts for the January -June 2006 period to a maximum
of $250.
(O
TTA will provide the County with one (1}lock and key set for the top cover of an
Odyssey farebox. Basic instruction for clearing bill and coin jams will be
provided to the appropriate County staff by TTA's Maintenance Supervisor.
TTA will make changes when necessary to the vehicle destination sign but will
not be responsible for repairs.
Marketing•
• TTA will have primary responsibility for marketing this route
• The County will operate this service using a vehicle with TTA-approved
markings on at least 90% of trips annually
• TTA will designate that the route is operated by the County in printed schedule
brochures
• The County will keep vehicle brochure racks stocked with current route brochures
and make the brochures available at all locations with their other materials
Fare Collection:
• The County will collect a cash fare or valid pass fare for each boarding according
to TTA's fare policy
• If the County wishes to offer fare-free service to employees other than County
Department of Aging staff, then they shall negotiate a fee with TTA for that value
• If the County wishes to sell Regional Monthly passes or other TTA fare media
from locations off the bus in Orange County, TTA will sell non-expiring fare
media to OPT at 75% of the regular price. The County may then keep any
revenue from the sale of these fare media without needing to settle accounts with
TTA.
Term•
This agreement is valid for the period between 3anuary 3, 2006 and June 30,
2006.
(SIGNATURE PAGE FOLLOWS)
7
ACKNOWLEDGED AND AGREED TO as of the date set forth above:
ORANGE COUNTY
By:
John Link, County Manager
Approved As to Legal Form:
By:
Geoff Gledhill, County Attorney
RESEARCH TRIANGLE REGIONAL
AUTHORITY
By:
John Claflin, General Manager
Approved As to Legal Form:
By:
Wib Gulley, Office of General Counsel
PUBLIC TRANSPORTATION
4
_ Cost Comparison
Current OPT Express Route and Proposed TTA/OPT Express Route
Fiscal Years 2005-06 and 2006-07
1. Current OPT Express Route Budget
ATTACHMENT` ~
emaimng isca u -ear ost
Current Service Expenses Year 2005-06 Anticipated 2006-07
Personnel Services
Driver salary plus fringes (includes required ADA
aratransit su ort driver $25,018. $50,036
Additional Administrative costs (dispatcher, relief
drivers, etc. $3,357 6,714
Total Personnel Services $28,375 $56,750
Operations
Milea e 5 tri s/da $15,309 $30,618
Total Operations $15,309 $30,618
Total Expenses $43,684 $87,368
Cost Per Hour (Based On 1,632 Service
Hours for 6 Monfhs and 3,264 for 12
Months) $26.77 $26.77
Current Service Offsetting Revenues
Trian le Transit Authori TTA Contribution $0 $0
NCDOT RFP Grant $25,342 $50,684
Fare Box Collections $3,102 $6,204
Oran a Coun Contribution $15,240 $30,480
Total Revenues $43,684 $87,368
2. Prooosed New TTA/OPT Express Route
emammg ~sca u -ear ost
Proposed Service Expenses Year 2005-06 Anticipated 2006-07
Personnel Services
Driver salary plus fringes (includes required ADA
aratransit su ort driver
$39,806
$79,612
Additional Administrative costs (dispatcher, relief
drivers, etc.
$8,827
$17,654
Total Personnel Services $48,633 $97,266
Operations
Milea a 11 tri s/da lus ADA aratransit service $29,657 $59,314
Marketin :Brochures, romotional items, fl ers, etc. $3,000 $6,000
Total Operations $32,657 $65,314
Capital-
Purchase of vehicle from TTA $5,800 $0
Total Operations $5,800 $0
Total Expenses $87,090 $162,580
ost Per Hour (Based On 1, 632 ervice
Hours for 6 Months and 3,264 for 12
Months)
$53.36
$49.81
Offsetting Revenues for Proposed Service
Trian le Transit Authori TTA Contribution $41,126 $81,926
NCDOT RFP Grant $25,342 $50,684
Fare Box Collections $2,000 $4,000
Revenue Generated by Sale of Vans (to offset cost of
vehicle urchase from TTA
$5,800
$0
Oran a Coun Contribution $12,822 $25,970
Total Revenues $87,090 $162,580
Orange Express Route ATTACHMENT 3
0
ATTACHMEl~T~ 4
10
Purpose: To determine cost to sell OPT (Orange County) an EI Dorado
vehicle with farebox.
El Dorado Vehicle
Cost: $109,646
Useful Life: 7 years
Depreciation Method: Straight Line
Depreciation per period: $15,663.71 Federal State Local
Fair. Market Value
3/16/01 109,646.00
3/16/02 $93,982.29
3/16/03 $78,318.57
3/16/04 $62,654.86
3/16/05 $46,991.14
3/16/06 $31,327.43
3!16/07 $15,663.71
GFI Farebox
FMV same as purchase price, installed 2005
Farebox 10,500.00
Farebox AVL Interface 100.00
Farebox Installation 490.00
11,090.00
Interest Interest Interest
80% 10% 10%
$37,592.91 $4,699.11
State
Interest
90%
$4,699.12
Local
Interest
10%
$0.00 $9,981.00
$1,109.00
Cost to Orange County $5,808.12