HomeMy WebLinkAbout2005 NS Housing- William Long Construction Co Housing Rehabilitation Contract AwardsORANGE COUNTY
BOARD OF COMMISSIONERS
ACTION AGENDA ITEM ABSTRACT
Meeting Date: November 15, 2005
Action Agenda
Item No. ..c~
SUBJECT: Housing Rehabilitation Contract Awards ~~
DEPARTMENT: Housing/Comm. Development PUBLIC HEARING: (Y/N) No
ATTACHMENT(S):
Bid Results
Work Specifications
INFORMATION CONTACT:
Tara L. Fikes, 245-2490
PURPOSE: To award one contract for the County CDBG Scattered Site Housing Rehabilitation
Program.
BACKGROUND: The Housing and Community Development Department solicited bids from
qualified housing rehabilitation contractors participating in the County's Housing Rehabilitation
Program. The informal bidding process is governed by the North Carolina General Statues
§143-131 and does not require a minimum number of bids. Additionally, present program
procedures provide that housing rehabilitation contracts be awarded to the lowest responsible
bidder, and all contractors participating in the County's Rehabilitation Program are required to
utilize current deconstruction and material recycling methods during the repair process.
Sealed bids were solicited from participating contractors on October 5, 2005 with the bid
opening on October 13, 2005 with at least three bids received for the rehab job. Bid results. are
attached.
FINANCIAL IMPACT: The Orange County 2004 CDBG Scattered Site Program provides grant
funding for this repair project.
RECOMMENDATION(S): The Manager recommends that the Board award the following
housing rehabilitation contract:
Dwelling Unit Bid Amount Contractor
124 Merritt Mill Road, Chapel Hill $41,950 William Long Construction Co.
t
2
RESULTS OF BID OPENING
OWNER: Marian Jackson
ADDRESS: 124 Merritt Mill Road _
~Carrboro, NC 27510
PERCENTAGE OF BID OVER 9% UNDER
APPLICATION NUMBER: CD04-5
COST ESTIMATE: $38,210
COST ESTIMATE
CHECK ONE:JOB BID X JOB NEGOTIATED
COMPANY
1. Wm. Long Construction Company
2. Structure Building Company
3. Bull City Rug
4.
5.
6.
BID AMOUNT
$41, 950
$42,516
$70, 618
BID OPENED BY:
TIME OF BID OPENING:
DATE OF BID OPENING: October 13, 2005
WITNESSED BY: Sharkita Torain
******************************************************************
Lowest Acceptable Bid: $41,950
Negotiated Amount: N/A
Contractor: William Long Construction Company
NAME
3761 Phillips Chapel Rd.; Haw River, NC
ADDRESS
336-376-0170
TELEPHONE NUMBER
COMN~NTS:
Submitted by:
Bid Approval Date _
Proceed Order Issued
David Saconn
3:-00 PM
Date 10-14-05
David Saconn
l
3
ORANGE COUNTY
HOUSING REHABILITATION PROGRAM
SPECIFICATIONS
FOR
MAIEtIAN JACKSON
AT
124 MERRITT MII.L RD.
PHONE: 929-2083
DATE: October 5, 2005
BY: David Saconn
REHAB SPECIALIST
NOTE TO CONTRACTOR
CONTRACTOR SHOULD REFER TO THE BASIC SPECIFICATIONS, PROPERTY
REHABILITATION STANDARDS, GENERAL CONDITIONS, NORTH CAROLINA
BUILDING CODES MAN[JAL, AND ORANGE COUNTY MIl~TIMUM HOUSING CODE
DOCUMENTS.
TT IS NOT THE 1N'IBNT OF THE WRITER TO DIRECT ANY CONTRACTOR TO A
SPECIFIC SUPPLIER OF MATERIALS CALLED FOR IN THIS WORK WRITE-UP ONLY
TO SPECIFY A TYPE THAT WOULD BE ACCEPTABLE TO THE HOMEOWNER AND
ORANGE COUNTY HOUSING REHABILITATION PROGRAM.
4
Marian Jackson
124 Merritt Mill Rd.
Chapel Hill, NC 27514
October 5, 2005
Ezterior
Page 1
1. Install 10 ft of gutter board on the rear section of the unit. Prime
the new wood with an oil based primer before the coil stock is
installed.
2. Wrap ALL fascias, eves & overhangs with smooth white coil stock.
Repair all damaged wood before the coil stock is installed.
Install vented soffit on all overhangs. Install solid soffit in the
gable overhangs. Install solid soffit on the front porch ceiling.
Prime all new wood with an oil based primer.
3. Install a pressure treated crawlspace door and frame. Install a 2x4
frame and 3/aD7 treated plywood door.
Install galvanized hinges & locking hasp.
4. Install continuous aluminum gutters and downspouts. Install
splash blocks under each downspout. Install gutters on all fascias.
5. Remove the front porch floor. Repair 20 ft of damaged outer band.
Install treated lumber. All nails shall be galvanized.
6. Repair five (5) damaged floor joists on the front porch. Install
matching treated lumber. All nails shall be galvanized.
7. Install a new pressure treated front porch floor. Install 5/4 decking.
Rabbet the decking against the house to 3/a" so the decking will slide
under the aluminum siding. Install an approved non- corrosive
flashing where the decking meets the siding.
8. Install a 36" wood door on the front of the unit. Install the door on
the existing frame. Install new hinges, threshold and weather-
stripping. Install a keyed lockset & deadbolt keyed alike. Install a
wide door viewer. Consult the homeowner for the correct height.
Prime & paint the door with semi-gloss~latex paint.
5
Marian Jackson
124 Merritt Mill Rd.
Chapel Hill, N.C. 27514
October 5, 2005
Ezterior:
9. Install a 36" metal insulated door unit on the back of the unit.
The door shall have an aluminum threshold &weather-stripping.
Install a keyed lockset & deadbolt to match the front door. Install
A wide view door viewer. Install matching casing on the interior.
Prime and paint the casing with semi-gloss latex paint. The paint
shall cover completely.
10. Install a new 1 '/a" aluminum over .solid wood core storm door
on the front. The door shall be a full view. The door shall be
complete with closer, push button handle and door sweep.
The door shall be a Larson orpre-approved equal.
The color shall be white.
11. Install a new vinyl clad storm door on the back of unit. The door
shall have aself-storing screen, push button lock, closer &
door sweep. The storm door shall a Larson orpre-approved equal.
The color shall be white.
Page 2
12. Repair all cracks on the front porch foundation wall. Apply a
scratch-coat to the entire front foundation wall. Apply a finish
coat of fiber reinforced wall coating to strengthen the walls.
Apply two (2) coats total.
Roof:
Install a new 25 year 3 tab shingle roof on the entire unit.
Install 151b felt paper & white eve starter. Remove the existing
two layers of shingles. Use proper fasteners for new shingles.
Install new vent boots on all plumbing stacks.
2. Remove the front dormer. Remove the sheathing from the dormer
opening to the ridge. Install new rafters from the ridge to the shed
roof. Install all necessary headers & hangers. Double the existing
rafters on both sides of the opening. All framing shall meet the
NC Building Codes. Install matching sheathing over the opening.
3. Install a shingle type ridge vent on the main ridge. Remove a
three (3) inch section from the ridge.
Marian Jackson
124 Merritt Mill Rd.
Chapel Hill, N.C. 27514
October 5, 2005
ROOF:
4. Remove the center chimney below the roof-line. Install matching
plywood and framing.
5. Remove the flashing on the side chimney. Install an approved
corrosion resistive flashing on the chimney. Install step and
counter-flashing.
WINDOWS:
1. Caulk around all existing windows where the window frame
meets the coil stock. The caulldng shall be 100% white silicone.
BATHROOM & LAUNDRY:
1. Remove the rear section (Bathroom & Laundry Room) to the ground.
Remove footings if they exist. Dig, frame & pour new footings
and install monolithic slab concrete floor. (Floor plan to match
the existing foot-print.) Install 6 mil poly & wire mesh.
(Note) Lead Based Paint is present on the bathroom door casing.
Use Lead Based Paint Safe Work Practices.
2. Frame the bathroom & laundry room using 2x6 walls, 2x8 ceiling
joists ,2x8 rafters & 5/8 plywood. All framing shall pass the NC
Building Codes. The new rafters shall rest on the main plate of the
unit. The rafters shall be on a 4/12 pitch. Refer to plan.
3. Install MR sheetrock on all walls & ceiling. Finish the sheetrock
smooth. Prime & paint the sheetrock with semi-gloss latex paint.
The paint shall cover completely. (Bathroom & laundry)
4. Insta113 %4 baseboard & shoe molding in the bathroom and laundry
room. Prime & paint the molding with semi-gloss latex paint. The
paint shall cover completely.
5. Install a new 36" wall cabinet in the laundry room. Install the wall
cabinet on the end wall. (Refer to plan). The finish shall be white.
Marian Jackson
124 Merritt Mill Rd.
Chapel Hill, N.C. 27514
October 5, 2005
BATHROOM & LAUNDRY:
Page 4
6. Install a new vinyl floor in the bathroom & laundry room. The
vinyl to cost not less than $ 14 sq yd. Install metal trim at all
door openings.
7. Install a privacy lockset and door bumper on the bathroom door.
8. Remove the exterior wall covering between the new addition ~i
the main house. Frame an opening with a 2x 10 header to receive
a 36"bathroom door unit. Install a 36" door & jamb. Prime and
paint the door, jamb and trim with semi-gloss latex paint. The paint
shall cover completely. Note: Lead paint maybe present on the wall
covering. Use Lead Based Paint Safe Work Practices.
9. Install a new cased opening between the Laundry room and the
kitchen. The opening shall match the existing framing. Install
new matching casing on both sides of the opening. Prime & paint
the cased opening with semi-gloss latex paint. The paint shall
cover completely.
10. Reinstall the existing vinyl windows in the laundry room.
(Refer to plan)
11. Install %2 OSB plywood & tyveck on the exterior walls of the
addition.
12. Install D-5 vinyl siding on the exterior walls. Prepare the exterior
for coil stock & soffit. Install smooth white coil stock on the fascias
& eves. Install vented vinyl soffit on the overhangs. _
INSULATION:
1. Install R-19 insulation in the bathroom & laundry ceiling.
2. Install R-13 insulation in the exterior walls of the new addition.
3. Install a 6 mil vapor barrier in the crawlspace.
1Vlarian Jackson
124 Memtt Mill Rd.
Chapel Hill, N.C. 27514
October 5, 2005
ELECTRICAL:
1. Remove the old meter base & conduit that is not being used.
Cover all missing sections of siding with smooth white coil stock.
Caulk all small holes with latex caulk before painting siding.
2. Install two GFI protected receptacles in the kitchen.
3. Bathroom- Install a recessed light over the tub/shower controlled
by a wall switch. Install a vanity bar light over the mirror
controlled by a wall switch.
4. Install an exhaust fan located within 2ft of the tub/shower.
The exhaust fan shall be controlled by a wall switch and capable
of removing 110 cfm. Vent the exhaust through the boxing per
code.
5. Install two (2) GFI receptacles in the bathroom.
6. Laundry Room- Install two recessed light fixtures on the ceiling
controlled by a wall switch. Center the lights on the ceiling.
7. Install three GFI receptacles in the laundry room. Install one on
the door wall and two on the interior wall.
8. Install a new circuit for the hot water heater. All connections shall
be made in a junction box.
9. Install a motion detector light fixture beside the back
door. The light shall be controlled by a wall switch in the laundry
room. Install a new breaker for the hot water heater.
(AIl electrical work shall pass the N.C. Electrical Codes)
10. Install hard-wired smoke detectors with battery back-up on the 1st
floor. Install a total of four on the 1st floor.
Install the smoke detectors in all sleeping rooms, living room and
Laundry room. Install new battery operated smoke detectors on the
2na floor. Install a total of three on the 2na floor.
11. Install arc fault interrupters on all sleeping room circuits.
~.:
g
Marian Jackson Page 6
124 Merritt Mill Rd.
Chapel Hill, NC 27514
October 5, 2005
EL. ECTRICAL:
12. Install a GFI protected receptacle on the exterior wall of the
Laundry room. Install an approved weather resistant cover for the
receptacle per code.
13. Install a new wall switch for the dining room ceiling light.
14. Install a new ceiling light fixture in the living room. Price range
for new fixture: 25.00- 35.00
PLUMBING:
1. Install new supply lines and drain lines in the bath & laundry room.
All rough in plumbing shall be installed & inspected before the
concrete is poured.
2. Install a 1-piece fiberglass tub/shower unit. The unit shall be complete
with shelves, acrylic grab bars &slip-resistant textured bottom.
Install a single control tub/shower faucet, drain line assembly
& trip lever. Make all plumbing connections.
3. Install ahand-held shower arm mount set. Install an extra clip
so the tenant may use a shower chair.
4. Install a handicap commode. The commode shall be a Kohler or
pre-approved equal. Install a new supply line & cut-off.
Make all plumbing connections.
5. Reinstall the vanity. Install a new 1 piece molded cultured sink/
vanity top. Install single lever lavatory faucet. The faucet shall be
a Delta orpre-approved equal. Install new supply lines & cut-offs.
6. Install a five piece bathroom accessory kit. The kit shall include the
following: 18" towel bar, 24" towel baz, tissue roll holder,
toothbrush/tumbler holder & soap dish.
7. Install a washing machine box in the laundry room. Make all
plumbing connections to the outlet box.
10
Marian Jackson
124 Merritt Mill Rd.
Chapel Hill, NC 27514
October 5, 2005
PLUMBING:
Page 7
8. Reinstall the hot water heater. Install an approved heater pan and
drain. Make provisions before the concrete floor is installed.
9. Install an expansion tank on the hot water heater per code.
10. Install a cleanout on the main sewer line. The cleanout shall be
within Oft of the unit. All plumbing work shall.pass the NC
Plumbing Codes.
MISCELLANEOUS:
1. Remove the oil tank from the back yard.
2. Install a triple 2x8 treated dropped girder across the kitchen floor.
Place post jacks every 7ft on center. The posts shall be placed on
solid masonry approved by the Inspection Department.
Level the floor as close to the original height as possible.
3. Install a new vent for the dryer.-The exhaust shall vent through the
exterior side wall.
4. Reinstall the heat/air vent in the laundry & bathroom. Prepare the
vent for the concrete floor.. Install metal ductwork to the floor
registers. Wrap the metal duct with 301b felt paper. Install new
floor registers.
5. Install 12 automatic foundation vents around the unit. Install vents
where possible. Install all necessary vent wells.
6. Place pine straw around the entire drip line of the unit. The pine
straw shall be placed a minimum of aft from the unit.
7. Install a new attic access panel in the 2°a floor bedroom ceiling.
Install a new plywood %i" door. Nail the loose trim and paint
the new access door with semi-gloss paint.
11
Marian Jackson
124 Merritt Mill Rd.
Chapel Hill, NC 27514
October 5, 2005
INTERIOR PAINTING:
1.
TERMITE TREATMENT:
1. Provide a termite inspection and treatment.
(,Note) Spray the bathroom and laundry area before the
concrete is poured.
Install door stop and a strike plate for the closet door in the right/rear.
bedroom. Prime the door and trim with an oil based primer. Paint the
door and trim with semi-gloss latex paint. All paint shall cover
completely.
Page 8
Total Labor & Material
_.._... _. 12.
MERRITT MILL RD.
81
32 ft
an Jackson
lerritt Miil Rd.
Hill, NC 27516
22 ff;
L1ViNG AREA
1379 sq ft
:.: .,
., ,:.
].3
MARIAN JACKSON
124 MERRITT MILL RD.
CHAPEL HILL, N.C. 27514
BATHROOM & LAUNDRY
ROOM
36 INCH DOOR I ~ ~ ~~/H
10 FT 10 FT 4 INCHE
5FT
TUB
LAUNDRY ROOM
22FT
L1VlNG AREA
846 sq. ft
24 Merritt Mil! Rd.
~hapet HiU, NC
8"
16" x 8"
t~ottom of footing at least 12" below
frost line (solid soil )