Loading...
HomeMy WebLinkAboutAgenda - 12-06-2010 - 7aORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: December 6, 2010 Action Agenda Item No. ~ - QI SUBJECT: Whiffed Buildin Health and Dental Clinic Project Approval DEPARTMENT: Asset Management/Health/ PUBLIC HEARING: (Y/N) No Financial Services ATTACHMENT(S): Proposed Floor Plans INFORMATION CONTACT: Pam Jones, Asset Management, 919 245-2652 Dr. Rosemary Summers, Health Director, 919 245-2411 Michael Talbert, Financial Services, 919 245-2153 Jeff Thompson, Asset Management, 919 245-2658 PURPOSE: To review and approve the Health and Dental Clinic renovations at the Whiffed Building and the associated estimated project costs. BACKGROUND: In January 2010 the Board authorized the reallocation of space within the Whitted Building to expand the Health and Dental Clinics. In September 2010, the Board also authorized consolidation of the dental clinics to the Hillsborough location, which will allow the lease at Carr Mill Mall to be released effective June 30, 2011 or shortly thereafter, at an estimated savings of $113,000 annually. In collaboration with the Health Director and staff, the project architect, Corley Redfoot Zack (CRZ), has completed a redesign of existing space within the Whiffed Building that will serve Health and Dental clinic needs, as well as provide needed space for support staff, for an estimated seven to ten years. The affected areas include the lower levels of both Buildings A and B; and the upper floor of Building A. CRZ will present the project plans at the meeting. The Board is asked to note that the plans and cost estimates include structural reinforcement for areas proposed for use by the Health Department on the upper level of Building A as well as sections of the old Library space that have been deemed insufficient for potential uses. While the structural work associated with the old Library space will not benefit the clinic in any way, significant operational disruption and destruction of newly renovated space would be necessary if it were done later. These costs will be isolated as alternates in the bid and can be awarded, or not, when the Board is asked to award the bid in January 2011. The project is being developed and constructed along the following timeline: TASK PROPOSED BEGINNING DATE END BY DATE BOCC Action re: Dental Clinic Consolidation 9121/10 9/21/10 Preparation of construction documents suitable for bidding the project and submittin for re ulato a royal 9/22/10 11/29/10 Biddin hase 12/8/10 12/29/10 BOCC Action: Phase 2 Bid Award 1/20/11 1/20/11 Phase !Construction - Building A (est. 90 day duration), Health Clinic move 1/21/11 4/21/11 Phase II Construction - Buildin Best. 45 da duration 4!21/11 6/5/11 Dental move from Carr Mill 6/13/11 6/17/11 FINANCIAL {MPACT: Deve{opment costs for this project are estimated at $1.47 million. This estimate, developed by staff, CRZ and CostPlus Estimators, a third party estimating firm, includes: design, construction, structural improvements, site improvements, all clinic equipment and furniture, as well as a contingency to support costs of unforeseen conditions. Adequate funding is available for the project within the Medicaid Maximization capital project (#30012) and the Dental Equipment capital project (#30039). Requisite budget amendments will be established simultaneous to the construction bid award scheduled for January 20, 2011. RECOMMENDATION(S): The Manager recommends the Board review and approve the project and the estimated project costs as presented. o ExISi ELECT 1>m BIM 1 Exl NiO FbSfY1E HYCOiE: BAY Y B ISO Bt]0 EXIST EXIBT a I.1 STO Tg Z~r B1~n ~E~ O atu siaAa B Iza B w latu~9~ Eta cawlDOB Xx90uuc) B In E1~ ~"ii ] B 120 9~ srem.lmna - e Izz sn c HYGIElE B 12S ' m ~µ O COBBIOOF 0 LIB B ne B ttt ~ HYfrOiE e ne Izl cotnxax+ B LIB PANaPMI[ B IM 81 10 CD FIWR BIB CORNODG - B 110 B bt x-Bnr B 119 ~ .ca ¢ASs CORBNI(IH B 110 B 118 0 11 B ExAH ST E ~ WEIWIT N.C0 1£ Q 0111 8112 ~ BIW ` C a O B III cuET HIE B1W - COBBANM Bbl B Exb1 BODY !1 ®~ B109 ROCVI tS ~~..N B LIB z Part Plan - Renovations A22 sak: va•-Iw• BuaowcB i Overall Plan -Basement Level A2,2 Bak: HB"-1'-0" BUILDBBGB VNLLL lYPE68CHEWlE ~~ sr Iv~ ~r wsa~°w sui••w pl. wb° ~..... GENERAL NDTEs ~ u~ir a m.r~m.... LEGEND CID m ® ~ un _:.~~._ ~:: NY- ~[Q8/,~ W __ F U~. v°'°~ W~ > ~ o~ ~xax a mm rnbb~u NdN BUBDDIO B B BABBbiENf LEVEL RPNOVATIONS PLAN _ GYM ® .8..1 A2.2 m SLAG. mw KEY PLAN P.pa no. °7 _~ ~~ ~3 4 7 [" e 7y a 0 m o' ~y ro > ~ ` a ~ ? ~ ~ ; (I~~~nl[~!, ;; 0,,.•. Orange County < „ iE Er ~ ~-' ~ ~ ~ s }~rL~e~j ,, ~ Health Department ~~ W $ N ~ ~> ~ 1~~~2jP~~ Renovations NNE, CoxL.>r~* REnFOOT Zncx ^~ o Hillsborough. North Corolino , 1 , .....,........~ ~~~...,~. ~...~~... ~> .o ~..,..