HomeMy WebLinkAboutRES-2005-043 Comments Draft 2006-2012 State Transp Imp Prog Division 7 Projects in Orange Co~ ~S r ~Oo S ®~/..~
~ .~ -PZr~a..~
~~
ORANGE COUNTY BOARD OF COUNTY COMMISSIONERS
A RESOLUTION PROVIDING COMMENTS TO THE
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION
REGARDING THE
DRAFT 2006 - 2012 STATE TRANSPORTATION IMPROVEMENT PROGRAM
DIVISION 7 PROJECTS IN ORANGE COUNTY
WHEREAS, Orange County gives priority to identified safety needs on existing roads
and bridges, to other transportation projects that encourage alternatives to automobile travel,
to projects that minimize adverse impacts on the natural environment and cultural sites, and
to those projects that foster economic development in the designated Economic Development
Districts; and
WHEREAS, Orange County has submitted a Priority List of Transportation Projects for
inclusion in the 2006 - 2012 State Transportation Improvement Program (STIP); and
WHEREAS, the North Carolina Department of Transportation has considered the
Priority Lists submitted by local jurisdictions in the development of the 2006 - 2012 State
Transportation Improvement Program (STIP), and has released the Draft 2006 - 2012 STIP
for public comment;
NOW, THEREFORE, BE IT RESOLVED by the Orange County Board of
Commissioners that the Board submit the attached comments to the North Carolina
Department of Transportation for consideration by the North Carolina Board of Transportation
when adopting the 2006 - 2012 State Transportation Improvement Program.
Upon motion of Comm' sione ,and seconded by Commissioner
the foregoi resolution was adopted
this the /7 day of , 2005.
I, Donna Baker, Clerk to the Board of Commissioners for the County of Orange, North
Carolina, DO HEREBY CERTIFY that the foregoing is a true copy of so much of the
proceedings of said Board at a meeting held on May 17, 2005, as relates in any way to the
adoption of the foregoing and that said proceedings are recorded in the minutes of said
Board.
WITNESS my hand and the seal of said County, this _~ day of , 2005.
ORANGE COUNTY BOARD OF COMMISSIONERS
COMMENTS REGARDING THE
DRAFT 2006-2012 TRANSPORTATION IMPROVEMENT PROGRAM
May 17, 2005
Orange County appreciates the opportunity to participate in the North Carolina
Transportation Improvement Program process. Like so many jurisdictions across the
state, we have transportation needs we feel are necessary to provide our citizens with a
safe and efficient multi-modal system throughout the County.
Orange County submits the following comments on selected projects in the Draft
2006-2012 NC Transportation Improvement Program.. These are provided as two
distinct sets of comments, with the majority of the comments included in the first set, as
follows: Comments Regarding the Draft 2006-2012 North Carolina Transportation
Improvement Program for Orange County Projects Within the Durham-Chapel Hill-
Carrboro Metropolitan Area Boundary; and Comments Regarding the Draft 2006-2012
North Carolina Transportation Improvement Program for Orange County Projects
Outside the Durham-Chapel Hill-Carrboro Metropolitan Area Boundary.
ORANGE COI~NTY PRO!J'ECTS WITHIN
THE DURHAM-CHAPEL. HILL-CARRBORO
I~IETR4POUTAN AREA BOUNDARY`
As a member of the Durham-Chapel Hill-Carrboro Metropolitan Planning
Organization, Orange County will continue to work with the Transportation Advisory
Committee (DCHC TAC) to develop the Transportation Improvement Program for the
portion of Orange County that lies inside the Metropolitan Area Boundary. Given below
are comments on selected projects in Orange County, presented in four sections: (1)
Projects Requested by Orange County; (2) Comments on Project U-3808, Elizabeth
Brady Road Extension; (3) Comments on Two TIP Projects Initiated by NCDOT; and (4)
Comments on Other TIP Projects.
Projects Requested By Orange County
A. SR 1006 Orange Grove Road, at Interstate 40: Construct a pedestrian bridge
over I-40. Orange County is gratified that the Draft 2006-2012 STIP includes a
feasibility study for this project. Grady Brown Elementary and newly constructed
Cedar Ridge High School are located on New Grady Brown School Road that
has access from Orange Grove Road south of I-40. The schools are within
walking and cycling distance from residential areas north of I-40. Bicyclists and
pedestrian must share the roadway with motor vehicles crossing the narrow two-
lane bridge that carries Orange Grove Road over Interstate 40. The bridge is too
narrow to accommodate a pedestrian walkway. Lack of an adequate pedestrian
crossing presents an unsafe environment for students to walk to the schools.
2
B. U-2805: Homestead Road fSR 1777) Improvements: Improve Homestead Road
from SR 1834, High School Road, to NC 86. This project should include bicycle
and pedestrian facilities. This is an unfunded project in the Draft 2006-2012
STIP. Orange County appreciates NCDOT's cooperation and participation in the
Homestead and High School Roads Safety Task Force efforts to obtain
sidewalks on the north side of Homestead Road from Camden Lane to Rogers
Rd. through the NC Moving Ahead! program. Orange County is also aware that
projects funded in the TIP are not eligible for Moving Ahead funds. Although
NCDOT has agreed to include the Homestead Road sidewalk in the Moving
Ahead program for FY 06, NCDOT has not identified funding for this project. In
the case that this project is not funded in the NC Moving Ahead! program for FY
06, TIP project U-2805 should be funded and phased so that sidewalks on the
north side Homestead Road from Camden Lane to Rogers Road can be
constructed as soon as possible. .
There are three schools in the vicinity of Homestead Road: Chapel Hill High
School, Smith Middle School and Seawell Elementary School: Many students
live within walking distance and cycling distance to Chapel Hill High School and
must walk or cycle along Homestead Road, and cross the road daily. Provision
of sidewalks is of utmost importance for the safety of students and other
pedestrians who use this corridor. Provision of bicycle facilities is, likewise,
necessary for the safety of students and others.
C. NC 86, Bicvcle Lanes: Construct bicycle lanes (4-foot paved shoulders) from
Chapel Hill (Whitfield Road) to Hillsborough (US 70 Business). The Draft 2006-
2012 STIP does not include this project. This project will extend bicycle lanes on
Airport Road (NC86) in Chapel Hill to US 70 Business in Hillsborough. Bicycle
lanes have been completed along NC 86 from UNC to Whitfield Road (SR 1731)
in Orange County. NC 86 from Chapel Hill to Hillsborough is experiencing
increasing numbers of bicyclists using this route. Also, there are two schools
along this route (A.L. Stanback Middle School and New Hope Elementary
School). This route is listed as priority I of the primary bicycle routes proposed in
the Orange County Bicycle Transportation Plan adopted April 6, 1999. This
project is listed in the 2002-2008 TIP, as an incidental bicycle need. Orange
County requests that bicycle lanes be constructed as an independent project,
and, if necessary, programmed in phases.
D. Old NC 86 (SR 1009 Bicvcle Lanes: Construct bicycle lanes (4-foot paved
shoulders) from Carrboro (Eubanks Road) to Hillsborough (I-40). The Draft
2006-2012 STIP does not include this project. This route, from the Carrboro
Transition area- (Hickory Forest Road) to Lafayette Drive, is identified in the
Orange County Bicycle Transportation Plan, and would extend bicycle
accommodations requested in TIP Project R-2825 to Carrboro. The Town of
Carrboro Transportation Advisory Committee has also established bicycle routes
on Old NC 86 as a transportation priority connection between proposed bicycle
facilities along Old Fayetteville Road, Homestead Road and Eubanks Road.
3
E. R-2825 Improvements to South Churton Street: Develop congestion
management, limited access, aesthetic and capacity improvements between US
70 Business and Interstate 40. The Draft 2006-2012 STIP does not include this
project. Orange County requests that NCDOT fund this project.
The portion between Interstates 40 and 85 will conform to the design criteria of
the Economic Development District Design Manual (4-lane divided section with
bike and pedestrian improvements). The feasibility study completed in February
2002 recommends a 4-lane divided, with 16-foot median, curb and gutter cross
section for the entire corridor from I-40 to Eno River. Orange County stresses
the need to study improvements within the current. right-of-way for the segment
north of Interstate 85. Improved capacity through widening is not the County's
first choice because of significant constraints between Interstate 85 and US 70
Business and the proximity of the historic district north of the project limits.
Orange County requests that, where conditions do not prevent the addition of
frontage roads, the feasibility study include the addition of frontage roads with
limited access from the corridor.
Development of Waterstone, a 337-acre mixed use development, is underway off
the east side of South Churton Street in the Hillsborough Economic Development
District north of I-40. Current (2003) Average Annual Daily Traffic counts on
Churton Street in this corridor vary from 11,000 just north of I-40 to 15,000 south
of I-85 to 19,000 south of the Eno River. Traffic is expected to increase
dramatically as Waterstone's 134 single-family houses, 128 town home/patio
homes, .271 apartments, 450,000 square feet of retail space, 408,000 square feet
of mixed use, 150,000 square feet of office space, a 20-acre community college
site, and more, are completed.
Another approved development on S. Churton Street, Oakdale Village, will add
over 122,000 square feet of retail and office development on the west side of
Churton Street north of Oakdale Drive.
The developers of both projects will make some improvements on South Churton
Street, and plans should be coordinated to provide the facilities as recommended
in the feasibility study for this corridor.
F. US 70 Bypass Widening: Widen, from the Orange/Durham County Line to the
US 70 - I-85 Connector east of Efland, US 70 Bypass to a four-lane divided
section with bike and pedestrian improvements. This project should be phased
to address traffic counts and existing congestion. The Draft 2006-2012 STIP
does not include this project.
G. NC 86 (North of Hillsborough) Improvements: Widen NC 86, from US 70 Bypass
north of Hillsborough to SR 1332, Coleman Loop (Coleman Loop also being the
intersection area of the planned connector between NC 86 and NC 57), to four
4
lanes with intersection improvements at US 70 Bypass. The Draft 2006-2012
STIP does not include this project. Orange County requests that this project be
identified as a need and included in the 2006-2012 STIP. The crash rate (for the
three-year period from January 1, 2001, to December 31, 2003) on the segment
of NC 86 from US 70 Bypass to NC 57 was 1147 crashes per 100-million vehicle
miles, compared to an average 217 crashes per 100-million vehicle miles on NC
routes in Orange County for the same three-year period.
NC 86 is the major north-south route through Orange County. NC 57 converges
into US 86 just north of US 70 Bypass. The segment of NC 86 between NC 57
and US 70 is congested, rendering a high. accident location at the intersection of
US 70 Bypass at NC 86. Development north of Orange County (in Caswell and
Person Counties) will exacerbate trafi:tc congestion and accident proliferation.
II. Comments on Project U-3808, Elizabeth Brady Road Extension: South Of US 70
Business to north of US 70 Bypass at SR 1002 (St. Mary's Road), construct
multilanes with new crossing of Eno River.
A. The proposed corridor, .discussed for many years, would require a crossing of the
Eno River and impact natural areas, the. river corridor and several historic
properties. The Orange County Board of Commissioners stresses that the
alignment and cross section for the project must be one that has the least impact
on the Eno River, the natural environment and cultural sites.
B. The Board would not support the option for an alignment along the ridge south of
the Eno River (Poplar Ridge) that creates no new crossing of the river if, of the
three alignments being studied, it would have the worst impact on biological and
hydrological environments and on cultural sites.
C. The Orange County Board of Commissioners supports a design that includes
bicycle and pedestrian facilities for the Elizabeth Brady Road Extension project
connecting US 70 Business with. US 70 Bypass. The Board prefers a road
configuration of two lanes with right-of-way reserved for four lanes (four lanes if
necessary).
III. Comments On Two TIP Projects Initiated By NCDOT
A. I-3306 Section A: widening of I-40 to six lanes from I-85 in Orange Countyto NC
147 (Buck Dean Freeway) in Durham CountLi.
The Orange County portion of this project is currently listed in the TIP as an
unfunded project; however, this project is nearing completion (estimated
completion in 2005) in Durham County. Project planning and design for this
facility was completed for both phases of the project and the environmental
studies rendered a Categorical Exclusion (CE) in 2000.
5
1. HOV Lanes
The studies for the project in Orange County should be reviewed prior to
construction, especially with respect to the recently completed study
concerning high occupancy vehicle (HOV) lanes.
Orange County is opposed to any widening of I-40 through Orange County
unless there is a commitment by NCDOT to provide HOV and/or dedicated
bus lanes (from NC 86 westward). Transportation modeling studies indicate
that the existing four-lane section from I-85 to NC 86 may be adequate to
handle projected future traffic, but HOV lanes, along with widening to a six-
lane section for general traffic, will be needed to help alleviate congestion
from NC 86 to US 1/64 in Wake County.
2. Design Features
Orange County also requests that NCDOT consider the following design
features for this project:
a. Use native plants in landscaping at interchanges for this project;
b. Include noise walls or other means to reduce the effects of traffic noise on
residential and other uses located along the corridor;
c. Include any available wildlife mitigation measures, particularly at bridges;
and
d. Incorporate bridge designs that allow wildlife to cross safely under the
bridge and that allow pedestrian passage along any existing or planned
trail-system connectors.
3. Bridge on Orange Grove Road
Orange County requests that, if funding cannot be secured through another
project, this project include widening the bridge on Orange Grove Road over
I-40 to provide safe access for bicycle and pedestrian traffic over the
interstate as recommended in the (2002) Orange Grove Road Study executed
by a joint committee made up of Orange County and Town of Hillsborough
Commissioners and staff from Orange County and Hillsborough Planning
Departments, Orange County Economic Development Department, and
NCDOT.
B.
Widening of I-85 to six lanes and reconstructio
at H i
e
1. Environmental Considerations
This project would cross three tributaries of the Eno River (Cates Creek,
Stony Creek and Rhodes Creek). Care should be exercised to minimize
environmental and water quality degradation during construction and provide
culverts with sufficient space for wildlife migration. Additionally, a study from
1992 identified a possible connection between the Duke Forest and Eno River
State Park with a connection in this area (Mount Herman Church Road). The
County and the Triangle Greenways Council have discussed this concept as
6
part of the Triangle Greenprint project. Reservation of a pedestrian crossing
linking these two large open space and trail areas would be desirable.
2. Design Features
Planning and design for this project are in progress. Right-of-way acquisition
is scheduled to start in FFY 10 - FFY 12, with construction. starting in FFY 10.
Orange County requests that NCDOT consider the following design features
for this project:
a. Provide HOV lanes. Orange County is opposed to any widening of I-85
through Orange County unless there is a commitment by NCDOT to
provide HOV and/or dedicated bus lanes.
b. Use native plants in landscaping at interchanges for this project.
c. Include noise walls or other means to reduce the effects of traffic noise on
residential and other uses located along the corridor.
d. Include anv available wildlife mitigation measures, particularly at bridges.
e. Incorporate bridge designs that allow wildlife to cross safely under the
bridge and that allow pedestrian passage along anv existing or planned
trail-system connectors.
3. Infrastructure Improvements
Orange County requests the following infrastructure improvements as they
relate to the I-85/US 70 Economic Development District.
a. Erosion Control Measures -Orange County requests that permanent
erosion control measures be included in the project.
b. Landscaping of Interchanges -Orange County requests that NCDOT
landscape all reconstructed interchanges in an aesthetic manner.
c. Pedestrian and Bicycle Facilities -Orange County requests that its staff be
allowed to participate in the determination of where and what type of
facilities are to be included in this project. Among the features requested
for inclusion are sidewalks and bike lanes (see the Regional Bicycle Plan
for Durham and Orange Counties) along roads where interchange
improvements are required and adequate guardrails on overpasses.
d. Wildlife Corridor Under I-85 (in the vicinity of US70 Interchange) -Orange
County requests that its staff be allowed to participate during the planning
stage and that this issue be brought to the attention of the NCDOT Staff
Biologist. Constructing this wildlife corridor is one of the recommendations
presented in the "The New Hope Corridor Open Space Master Plan:
Proposals for Linking Duke Forest and Eno River State Park." Orange
7
County also requests that NCDOT consult county staff in designing the
interchange at US 70 to provide a pedestrian trail under I-85 (along Mt.
Herman Church Road) linking New Hope Creek and the Eno River (New
Hope Rustic Woodland Trail proposed as an element of the Lands Legacy
Program).
e. Intersection of Pleasant Green Road (SR .1567) & Mt Herman Church
Road (SR 1713 - NCDOT Division 7 Traffic Engineers have
recommended that this intersection be included as a part of I-305 because
of its proximity to the I-85/US 70 interchange. The entire intersection
should be realigned so that Pleasant Green Road intersects US 70 at a
90-degree angle.
f. US 70 Interchange: Orange County requests that reconstruction of the
interchange at US 70 be designed to accommodate future widening of US
70, and that a reasonable section of US 70 near the interchange be
upgraded to provide for a suitable transition from/to I-85.
g. Mt Herman Church Road (SR 1713) -Preliminary plans by the Planning &
Environmental Branch, Division of Highways of NCDOT indicate that this
road may be relocated as part of I-305. Orange County requests that this
road be designed with 12' wide travel lanes and 4' wide bicycle lanes for a
total paved width of 32'.
h. Old NC 10 (SR 1710) -Preliminary plans by the Planning & Environmental
Branch, Division of Highways of NCDOT indicate that this road may also
be relocated as part of I-305. Orange County requests that this road be
designed with 12' wide travel lanes and 4' wide bicycle lanes for a total
paved width of 32'.
4. Additional Infrastructure Improvements
Orange County also requests the following infrastructure improvements
regarding two structures:
a. NC 86 -The 2-lane NC 86 overpass of I-85 is inadequate for increased
traffic volumes resulting from development in the adjacent Economic
Development District. Orange County requests that the NC 86 overpass
be widened, and include bicycle and pedestrian facilities.
b. Cates Creek -Orange County requests that the interstate be designed to
allow safe passage of wildlife and pedestrians along Cates Creek under
I-85.
8
IV. Comments On Other TIP Projects
A. U-0624, NC 86 (South Columbia Street Chapel Hill): From SR 1906 (Purefoy
Road) to SR 1902 (Manning Drive), upgrade corridor to include bicycle lanes.
The Draft 2006-2012 STIP shows construction completion has been delayed two
years (from FY 07 to FY 09.). This project is categorized as Regionally
Significant. Note that the DCHC 2030 Long-Range Transportation Plan (LRTP)
Conformity Analysis Determination Report was approved by the DCHC TAC in
April 2005 and that the DCHC 2030 LRTP indicates this project will be completed
by 2010. The project must be operational by 2010 to avoid the requirement for a
new air quality analysis to be executed to determine if the MTIP will meet air
quality requirements.
B. E-4779, St. Mary's Road (Orange County): Acquire scenic easements. The Draft
2006-2012 STIP lists this as a Hillsborough project for streetscaping on NC 86
(Churton Street) from King Street to Margaret Lane. Please correct the location
and description of this project to indicate it is an Orange County project.
C. U-4728, Orange and Durham County Emissions. This project is not listed in the
Draft 2006-2012 STIP. It was not completed in 2005 as indicated in the 2004-
2010 STIP, and will carried over in the FY 06 Unified Planning Work Program for
the Durham-Chapel Hill-Carrboro Metropolitan Planning Organization. Please
make this adjustment in the STIP.
9
ORANGE COUNTY PROJECTS OUTSIDE
THE DURHAM-CHAPEL HILL-CARRBORO
METROPOLITAN AREA BOUNDARY
Projects Requested By Orange County
I. Buckhorn Road (SR 1114) Widening• Widen from US 70 to West Ten Road (SR
1144) to a multilane facility with bicycle and pedestrian facilities. This stretch of
roadway borders the western boundary of the I-85/Buckhorn Road Economic
Development District (EDD), and the improvements are needed to support plans for
development of proposed uses within the EDD. This area is the focus of a growing
problem of traffic backing up on the northbound exit ramps of I-85 caused by
northbound traffic exiting I-85 onto southbound Buckhorn Road and turning left into a
nonconforming business use just south of the interchange.. With increased interest
in extending water and sewer and reconsidering proposed uses within the EDD,
improvements to the transportation system to support plans for that district are
necessary to attract the desired planned development.
II. Efland Cedar Grove Road (SR 1004 SR 1357)• straighten and make turn lane
improvements: make more direct connection to Interstate 85 Orange County
requests that this project be included in the 2006-2012 TIP, although this project was
not included in Orange County's Priority List for the 2006-2010 Transportation
Improvement Program. Orange County has included this project in the Priority List
for the 2007-2013 TIP.
Traffic has increased approximately 170% over the past ten years on Efland-Cedar
Grove Road just north of US 70, with the greatest increase between 1997 and 1999
when average annual daily traffic (AADT) increased from 2000 to 4200, a 110%
increase over the two year period. The most recent AADT counts show a 14% over
the period from 1999 to 2001. Much of that traffic "dog-legs" through Efland on
Forrest Avenue to Mt. Willing Road to access Interstate 85. Mt. Willing Road
provides an at grade crossing of the North Carolina Railroad corridor, the only
access across the railroad tracks between Hillsborough and Buckhorn Road. (The
I-85/US 70 Connector just east of Efland is not accessible to traffic on eastbound US
70.)
III. Park and Ride Lot in the Buckhorn Economic Development District: Orange County
requests a park and .ride facility (from the adopted Orange County Economic
Development District Design IVlanual) be funded in the Community Transportation
Improvement Plan for Orange Public Transportation. This project is clearly justified,
as it would provide an opportunity for coordination of public transportation efforts
between two growing regions in North Carolina, the Triad and Triangle. Orange
County recognizes this project as a priority with development of the EDD and
expansion of rural/regional public transportation services.