HomeMy WebLinkAboutAgenda - 10-19-2010 - 8a ORANGE COUNTY
BOARD OF COMMISSIONERS
ACTION AGENDA ITEM ABSTRACT
Meeting Date: October 19, 2010
Action Agenda
Item No. a.
SUBJECT: NC 5411-40 Corridor Study Presentation
DEPARTMENT: Planning & Inspections PUBLIC HEARING: (Y/N) No
ATTACHMENT(S): INFORMATION CONTACT:
1. Draft Report Executive Summary Karen Lincoln, 245--2580
2. Powerpoint Handout Craig Benedict, 245-2592
3. Peripheral Issues of Hwy 54 and 1-40
Interchange and the Regional Transit
Light Rail Alternative
PURPOSE: To receive a presentation on the draft NC 541 1-40 Corridor Study from Durham-
Chapel Hill-Carrboro Metropolitan Planning organization staff.
BACKGROUND: The Durham-Chapel Hill-Carrboro (DCHC) Metropolitan Planning
Organization (MPO) Transportation Advisory Committee JAC) has released the draft NC 541 1-
40 corridor Study report for local government and public review. The DCHC MPO initiated the
study to identify transportation and land use strategies for accommodating current and future
transportation needs in the corridor.
The NC 54 corridor serves as one of the major gateways between Chapel Hill and southwest
Durham and western Wake County. Its interchange with 1-40 has consistently ranked as the top
congested location in the region. Development pressures within the corridor coupled with
mobility and capacity issues have highlighted the concern that the existing and planned
transportation infrastructure in this area is insufficient to accommodate growth and to address
land use and transportation problems. Short and long-range solutions are needed to preserve
this important corridor.
Multi-modal transportation systems are an integral part of the overall strategy recommended by
the study. Complementing a `super street' design suggestion, a planned light rail system, a
network of premium Bus Rapid Transit lines, expanded local bus service, and additional park-
and-ride lots are recommended for the corridor.
See Attachment 3 for the Peripheral Issues of Hwy 54 and 1-40 Interchange and the Regional
Transit Light Rail Alternative.
The Board may want to consider directing staff to submit comments regarding the NC 541 1-40
Corridor Study to the DCHC M PO.
FINANCIAL IMPACT: There is no immediate financial impact to the County.
Recommendations from the study may be incorporated in the Regional Transit Plan and
ORANGE COUNTY
BOARD OF COMMISSIONERS
ACTION AGENDA ITEM ABSTRACT
Meeting Date: October 19, 2010
Action Agenda
Item No. a.
SUBJECT: NC 5411-40 Corridor Study Presentation
DEPARTMENT: Planning & Inspections PUBLIC HEARING: (Y/N) No
ATTACHMENT(S): INFORMATION CONTACT:
1. Draft Report Executive Summary Karen Lincoln, 245--2580
2. Powerpoint Handout Craig Benedict, 245-2592
3. Peripheral Issues of Hwy 54 and 1-40
Interchange and the Regional Transit
Light Rail Alternative
PURPOSE: To receive a presentation on the draft NC 541 1-40 Corridor Study from Durham-
Chapel Hill-Carrboro Metropolitan Planning organization staff.
BACKGROUND: The Durham-Chapel Hill-Carrboro (DCHC) Metropolitan Planning
Organization (MPO) Transportation Advisory Committee JAC) has released the draft NC 541 1-
40 corridor Study report for local government and public review. The DCHC MPO initiated the
study to identify transportation and land use strategies for accommodating current and future
transportation needs in the corridor.
The NC 54 corridor serves as one of the major gateways between Chapel Hill and southwest
Durham and western Wake County. Its interchange with 1-40 has consistently ranked as the top
congested location in the region. Development pressures within the corridor coupled with
mobility and capacity issues have highlighted the concern that the existing and planned
transportation infrastructure in this area is insufficient to accommodate growth and to address
land use and transportation problems. Short and long-range solutions are needed to preserve
this important corridor.
Multi-modal transportation systems are an integral part of the overall strategy recommended by
the study. Complementing a `super street' design suggestion, a planned light rail system, a
network of premium Bus Rapid Transit lines, expanded local bus service, and additional park-
and-ride lots are recommended for the corridor.
See Attachment 3 for the Peripheral Issues of Hwy 54 and 1-40 Interchange and the Regional
Transit Light Rail Alternative.
The Board may want to consider directing staff to submit comments regarding the NC 541 1-40
Corridor Study to the DCHC M PO.
FINANCIAL IMPACT: There is no immediate financial impact to the County.
Recommendations from the study may be incorporated in the Regional Transit Plan and
2
Orange County Transit Plan to be funded by a future 'h percent County sales tax for transit,
subject to referendum.
RECOMMENDATION(S): The Manager recommends the Board receive the report and
consider directing staff to submit comments regarding the NC 54/ 1-40 Corridor Study.
Attach,
DQR s r�DY
n �
TRANSPOR,"rA-r USE MAS
TER PLAN
lec
uIrl
V t UG
Us2 NARY
�
Durham.Cha
'V^�"`►A
/We tropolitan Plann
1 'ing p °r°
' ization
4
NC 54/1-40 CORRIDOR STUDY EXECUTIVE SUMMARY
Executive Summary
Overview
A primary route connecting much of southern Orange, Durham and Wake Counties, as well as new growth
occurring in Chatham County, with the academic and medical destinations at the University of North
i
Carolina at Chapel Hill (UNC) and the Research Triangle Park,the NC 54/1-40 corridor is facing pressures
unlike many others in the region. In addition to the regional access that NC 54 provides for UNC and its
medical facilities for commuters, patients and visitors from across the state and region, the corridor is
facing rising traffic levels that relate both to regional growth and substantial development activity within
i
the corridor. NC 54 is in transition as both institutional and private development activity lead to long-term
changes in the corridor's character. These potential land use changes require careful planning with needed
transportation improvements to serve the long-term vitality of the corridor and its surrounding
neighborhoods. With environmental, physical and policy constraints limiting expansion of portions of the
roadway and the development of parallel roadway connections, the corridor requires a multimodal
solution to meet future demand while improving safety for all users and traffic operations.
The corridor is also extremely important to the communities in both Durham and Chapel Hill,where it serves
residential and commercial land uses, creating an eclectic mix of local and regional traffic competing for
limited space. The corridor is fast becoming the most congested in the region, and has begun a transition
from low-density suburban development with a semi-rural feel to a more urban pattern, with approved
and pending development proposals expected to accelerate that transition as the economy rebounds.
With more than 600 acres of vacant developable land surrounding it and likely development of UNC-
owned properties along the corridor in the next several years to expand its health care-related facilities,
NC 54 is poised for dramatic changes. As a result, the corridor is rising in statewide importance and
regional prominence.
However, rising congestion levels threaten property values and economic growth for both jurisdictions, as
well as the ability for UNC to compete for jobs and patients.There are policies in place in Chapel Hill and
on the University of North Carolina campus that restrict the amount of available parking, and encourage
the use of transit in reaching destinations served by this corridor. Yet the heavy traffic, high speeds and
lack of multimodal facilities along the corridor create barriers that limit the usefulness and safety of
walking and bicycling for transportation.This also influences transit usage,where heavy demand exists due
to the parking constraints, but better pedestrian access is needed to make transit more effective as a
travel option. As a result of those existing and anticipated future demands, NC 54 is an extremely
complex corridor, serving multiple travel markets and a diverse array of stakeholder and community
interests focused on the success of different transportation modes, protection of neighborhoods and the
economic viability of their land.
Study objectives
In that context, the Durham-Chapel Hill-Carrboro Metropolitan Planning Organization (DCHC MPO)
initiated the NC 54/1-40 Corridor Study to develop a land use -- transportation blueprint for this
regionally significant corridor. With its development potential and the plan to construct a regional light rail
system that would serve this corridor, the goal of the study is to define complementary land use and
transportation strategies that will guide public and private actions, investments and capital project
priorities to improve mobility, safety and access for all.modes. The dynamic nature of this critical corridor
AUGUST 2010— DRAFT FINAL REPORT 1
NC 54 / 1-40 CORRIDOR STUDY EXECUTIVE SUMMARY
requires a bold vision supported by practical, achievable strategies in the near term and set the right
foundation for longer term improvements through the 2035 horizon year.
Through a planning process that examined future land use-transportation scenarios, the NC 54/1-40
Corridor Study seeks to build upon various transportation and land use plans and engage corridor
stakeholders and the public in finding solutions that are effective and find the right balance between
mobility and accessibility for all users. Study recommendations in the draft final report offer a multimodal
approach to meeting existing and future transportation needs. They address the functional design for
specific geometric improvements at intersections along NC 54 and at the interchange with 1-40, the
expansion and integration of various types of transit services to help more people reach their destinations
as an alternative.to driving, an interconnected network of bicycle and pedestrian facilities to provide a
more comfortable environment with safe access along the corridor for walking and cycling, and a phased
implementation plan for capital projects and service improvements.
These transportation recommendations support a land use strategy designed to create more opportunities
for location-efficient housing and transportation in the corridor to improve livability and regional mobility.
The corridor is becoming increasingly employment-oriented, and more proximate housing choices —
particularly for a range of income levels —will create shorter trip distances and help make the use of non-
auto travel options more viable. The report includes design guidelines to provide further support for
implementing the recommended land use and transportation strategies.
Study Partners and Process
The DCHC MPG led the study, serving as the project manager in partnership with the consultant team hired
for the project, Renaissance Planning Group, in association with ICF International and Michael Baker
Corporation. The MPG coordinated the active involvement of a broad group of study partners that include
the North Carolina Department of Transportation (NCDGT), Triangle Transit Authority (TTA), the City of
Durham, Durham County, the Town of Chapel Hill, the University of North Carolina (UNC), Chapel Hill
Transit and the Durham Area Transit Authority (DATA). The MPG, the City of Durham, Durham County, and
the Town of Chapel Hill funded the study. The study partners formed a steering committee that met
monthly to guide the process, provide input at key milestones, and review study work products.
While the NC 54 corridor study limits are from 1-40 to US 15-501,the study did not just focus on the linear
right-of-way along NC 54. It captured a regional context, including growth patterns, transportation plans
and the planned regional light rail system anticipated to connect this corridor to other points in the Triangle
Region. The study area boundaries encompass surrounding neighborhoods and the existing and planned
street networks, including Ephesus Church Road, Barbee Chapel Road, Farrington Road, NC 751 and
others providing parallel routes or interconnecting with NC 54.
Public engagement is critically important to the study.A part of the corridor's complexity is the multitude of
interested stakeholders with diverse expectations about the future of the NC 54 corridor. These include
landowners, institutions, businesses, neighborhood residents, students and, of course, the commuting public.
A vigorous public participation process was employed to guide the development of study
recommendations. This entailed a series of in-depth focus group discussions with each of the key
stakeholder groups (residents and non-residents alike) early in the project and again once initial
recommendations were nearing completion. In addition, a series of three public workshops at key
milestones defined priority issues and opportunities, provided the basis for creation and evaluation of
scenarios, and enabled participants to react and suggest refinements to draft land use and transportation
master plan recommendations.
AUGUST 2010-- DRAFT FINAL REPORT 2
6
NC 54 / 1-40 CORRIDOR STUDY EXECUTIVE SUMMARY
These outreach activities were augmented through use of a project web site (http:Z/www.nc54-
i4ocorridyrstudy.c 1) to share information and provide additional opportunities for the community to
review materials and weigh in with ideas or issues of concern. The DCHC MPO staff and consultant team
also met informally with various individuals and groups throughout the study. The recommendations
contained in this report are a direct reflection of the input provided over the year-long public engagement
i
process.
Vision for the Corridor
Through the study process, analysis and broad-based. feedback, a vision emerged for a regionally
significant multimodal corridor that serves both regional and local travel through an expanded and more
efficient network of streets, bus routes, bicycle facilities and pedestrian enhancements. The integrated land
use and transportation vision is to promote community livability by guiding future development into
targeted mixed-use areas to reduce trip lengths, enable greater use of non-auto travel options and
provide location-efficient choices for housing and transportation. These areas are within 3/4 to 1/2 mile of
the four planned light rail stations in the corridor. This will effectively support the investment in rail
passenger service that will strengthen regional and local travel options between the UNC campus, Orange
County, Durham County and elsewhere in the Triangle Region. Over time, the centers help transform the
corridor from a drive-by strip into highly accessible, well-connected places that function as vibrant focal
points serving local and regional needs.
Land Use Strategy
Figure ES-1 presents the recommended nodal development vision for the corridor. This land use-
transportation blueprint embraces livability principles that provide more transportation choices, promote
equitable, affordable housing through location and energy-efficiency, enhance economic competitiveness
through reliable and timely access to employment, educational opportunities and services, and by
supporting existing communities through transit-oriented, mixed-use development that will help safeguard
existing neighborhoods and preserve rural landscapes.
Table ES-1 shows the recommended height and density targets for the nodal development plan, which
provides the compact, mixed-use framework necessary to create a series of vibrant walking districts that
enables reliance primarily on non-auto travel modes as they approach build-out of the development
program. The density minimum and maximum thresholds identified in the table provide a targeted range
that allows some flexibility and variation along the corridor, and the upper limit does not have to be
achieved to make the transit-oriented development work effectively. There is no one-size-fits-a,11 approach,
but having good jobs-housing balance and sufficient numbers of households in the '/4 mile core radius from
the station have proven to be essential to strong transit ridership elsewhere in the country, particularly from
those who can access the station by walking and bicycling.
The creation of highly developed mixed-use centers can help mitigate automobile travel demand by
creating an environment where walking and access to transit is the priority. It also provides a mechanism to
advance transportation funding opportunities that are unlikely to be available with the status quo or trend
development pattern. For instance, allowing more dense development in the core and immediately
adjacent areas of planned light rail stations to create mixed-use "nodes" along the corridor provides the
incentive to obtain mitigation funding from future development to advance funding for the roadway
improvements that eventually will be needed in the corridor even without the development. This is because
AUGUST 2010 —DRAFT FINAL REPORT 3
NC 54 / 1-40 C0RRIDGR STUDY
EXECUTIVE SUMMARY 7
higher density development typically increases the return on investment and the development community
depends on good access to support their projects. If development is overly constrained in the corridor
despite market demand, growth will continue to occur elsewhere at lower densities in the nearby parts of
the region and people will still need to reach the corridor, primarily by automobile.
The traffic projections for the MPO's adopted 2035 Long Range Transportation Plan -- without the nodal
development plan in the NC 54 corridor—show that major capacity improvements to NC 54 and 1-40 will
be needed. Higher densities also enable developers to incorporate a greater percentage of workforce
housing into the development program, helping to shorten trip lengths and creating more purchasing power
for those residents who can effectively lower both housing and transportation costs.
Figure ES-7: Recommended Corridor Land Use Concepf
Proposed
light rail line
&stations
Recommended C
Land Use
Concept
Ephesus Ch
urch Road
A�
r
f
s
LEGEND
r
l ..
r
Mixed-Use 1 ....,.F .►.w ►+i
Lei h
Mixed-Use 2
Residential] "*
Residential 2 r As
Employment
Unchanged from Existing
OWrrig31 A °
• Ca, a Circle- E nnbri
n
Proposed .`�� 4F
Light RaR
r Fa�"Ecor►bri�;
4
r'
AUGUST 2010 DRAFT FINAL REPORT 4
NC 54/ 1-40 CORRIDOR STUDY EXECUTIVE SUMMARY
Table ES-1: Concept Laney Uses
No.of stories 3--8 2-4 2-4 1 —3 4- 12
Floor-to-area ratios
1.25-2.25 1.0- 1.5 - - 0.5- 1.0
(non-residential
Dwelling Units per Acre 35-75 25-35 15-35 6- 10
-
Employees per Acre 45-90 25-50 9- 15 b- 12 35- 175
Transportation has a profound influence to shape growth in a region and along a corridor. The parking
constraints on the UNC campus and elsewhere in the Town of Chapel Hill have certainly influenced the use
of transit, and, at least to a certain extent, where people choose to live. Developers and their clients
(businesses, residents) respond to transportation conditions when they decide where to build, live, or locate
their business. A new or improved roadway or transit project can make access to a location easier —
making it more attractive to develop. A transportation improvement can also improve visibility — an
important consideration for commercial developers. Many businesses rely on being seen by "pass-by"
traffic and want to locate where there is a lot of vehicle and/or pedestrian traffic. This has been the case
at the NC 54/Farrington Road intersection, where development depends on highway visibility. Conversely,
rail transit is likely to result in more compact development clustered within walking distance of the station,
and opens up new opportunities for how people choose to live and travel.
The response is also strongly influenced by the land use policy and planning context-- for example, when
the predominant mode of travel is the automobile, rail transit needs to be accompanied by strong land use
policies in order to concentrate development in station areas. This type of strategy in the NC 54 corridor
is necessary to avoid a future scenario where rising levels of congestion will occur due to regional growth
forecasts, which will still increase the demands placed on the NC 54 corridor and its 1-40 interchange for
major improvements. A well-designed, but intense nodal development program will enhance the potential
for higher levels of financial support from planned development within the corridor.
The timing of the nodal development plan is dependent on the schedule for light rail in the corridor, as well
as interim higher-capacity transit strategies like Bus Rapid Transit (BRT) and expansion of fixed route bus
service throughout the corridor. If the funding mechanism is approved and the light rail plan moves
forward, detailed station area plans would guide the development for the areas around each station in
the corridor. Build-out of the nodal development plan depends on the rail network or comparable BRT
service that can effectively support the planned development program and mitigate the demand for
automobile traffic driving to the development. In the interim, it is imperative that the corridor stakeholders
work to advance premium transit in the form of BRT (such as through bus signal priority, queue jump lanes
or other BRT strategies) to properly complement the phasing of proposed development plans. Due to the
significant roadway capacity challenges of this corridor, increases in development intensity must be timed
to occur with expansion of fixed route bus service, introduction of the higher capacity BRT service, and,
ultimately, when the light rail system becomes operational. Timing development with the interim BRT and
planned light rail network will help ensure that adequate transportation options exist as more intensive
development occurs.
AUGUST 2010 --DRAFT FINAL REPORT 5
NC 54 /1-40 GGRRIDGR STUDY
EXECUTIVE SUMMARY 9
Transportation Strategy
Table ES-2 presents the phased multimodal transportation recommendations associated with the
eco; ;x;e;;cled nr lc!l deyelop.m.ent plan: The recommendations are divided into short-term, mid-term and
long-term strategies. These are described in detail in the full report, with supporting data in a series of
appendices. In general, the short-term roadway strategies consist of a series of geometric modifications at
selected intersections to improve traffic flow and operational efficiency. These phased improvements serve
as interim components of the ultimate intersection design to make the most efficient use of the roadway.
Commonly referred to as a "superstreet," this strategy reduces delay and supports anticipated traffic
growth in the corridor through at least 2025.
The critical intersection along this corridor is the Farrington Road intersection, which causes significant
congestion due to its proximity to the 1-40 interchange. Beyond the short-term modifications that provide
additional capacity for a time, in the mid-term, a direct access flyover ramp from eastbound NC 54 on the
west side of Farrington Road to eastbound 1-40 is needed to maintain functionality of the Farrington
Road/NC 54 intersection. Other modifications to the interchange are also identified in the intermediate
term. Longer term, with the recommended nodal development, a more complete redesign of the 1-40
interchange at NC 54 will be needed, involving construction of additional ramps providing direct access
from the interstate into the proposed Leigh Village light rail station area.
Transit is an integral part of this overall strategy. In addition to the planned light rail system, a network of
premium Bus Rapid Transit lines, expanded local bus service, and additional park-and-ride lots are
recommended for the corridor. The key park-and-ride strategy is the relocation of the existing commuter
lot at the Friday Center to a parking structure near the I-40/NC 54 interchange in the vicinity of the
proposed Leigh Village development. This location would capture commuting trips entering the corridor at
that location, and the parking garage would eventually support additional development capacity at the
planned light rail station area in Leigh Village. This facility would become an intermodal hub, with transit,
bicycle and pedestrian access in addition-to-park and ride. While it will not eliminate trips from the
corridor, it shifts their location to a point where impacts on intersections will be reduced and a street
network is planned to help better disperse traffic than at the current park-and-ride location.
From a bicycle and pedestrian network standpoint, the recommended plan fills in gaps and improves
safety and access along NC 54 through geometric modifications and the creation of a 10' to 15' shared
use path adjacent to the roadway along the northern side. This is a critical gap in the corridor, and high
speed traffic precludes an on-road solution for the section east of the Friday Center. A 15' path would
allow more comfortable use in both directions for pedestrians and cyclists, but 10' is the minimum width for
safety. Additional non-motorized transportation recommendations are identified throughout the corridor,
including along Barbee Chapel Road and at US 15-501.
AUGUST 2010---DRAFT FINAL REPORT 6
10
NC 54/ 1-40 CORRIDOR STUDY EXECUTIVE SUMMARY
Table FS-2: List of Transportation Recommendations
PARK-AND-RIDE
Description Location Jurisdiction Phase O&M Cost Capital Cost
Increase visibility and Southpoint Mall park-and- Durham Short Term $670,000 $1,170,000(3
capacity at the Southpoint ride facility on the (2012-2017) buses at
Mall park-and-ride facility. southwest quadrant of the $390,000
Increase transit frequency to 1-40/Fayetteville Rd each)I
15-minute headways or less. interchange
Construct NC 751 park-and- Along Southpoint Auto Park Durham Short Term $50,0002 $625,0003
ride facility. Blvd off of NC 751 just (2012-2017)
north of 1-40
Construct highly visible At the 1-401 US 15-501 Chapel Hill Mid Term $50,0002 $30,000,0004
structured park-and-ride interchange with easy (2017-2022)
facility with easy access from access to light rail station
1-40 and US 15-501 near
proposed light rail station.
Implement a structured park- Leigh Village light rail Durham Mid Term $400,0002 $40,000,000-5
and-ride facility at the Leigh transit station area (2017-2022)
Village station area to be
phased with transportation
improvements.
AUGUST 2010 -- DRAFT FINAL REPORT 7
NC 54 / 1-40 CORRIDOR STUDY EXECUTIVE SUMMARY 1 1
Description Location Jurisdiction Phase O&M Capital
Expanded Local Bus Service North along Burning Tree Dr Chapel Hill Short Term $1,35514001 $700,000(2
with 30 minute frequency. & Pinehurst Dr from NC 54 (2012-2017) buses at
to Ephesus Church Road $354,000
each)2
Expanded Local Bus Service Southeast along Barbee Durham Short Term $1,355,400' $700,040(2
with 30 minute frequency. Chapel Rd and returning (2012-2417) buses at
north back to NC 54 along $350►000
Farrington Rd each)2
Express Bus along NC 54 From NC 751 park-and- Durham& Short Term $1,355,400' $704,000(2
from Route 751 Park-and- ride lot north of 1-40 to Chapel Hill (2012-2017) buses at
ride. downtown Chapel Hill $350,004
alongNC 751 and NC 54 each)2
Expanded Local Bus Service North of NC 54 along Durham Mid-Term $1,355,400' $7001000(2
with 30 minute frequency. Farrington Rd &SW (2015-2020) buses at
Durham Dr to US 15-501 $350►000
(Durham-Chapel Hill Blvd) each)2
Bus Rapid Transit- Phase l. From Meadowmont along Chapel Hill Mid-Term $11,566,0803 $31400,000
Five minute frequency with NC 54 to downtown Chapel (2015-2020)
daily peak vehicle need of Hill
six buses.
Bus Rapid Transit- Phase 2. From NC 751 park-and- Durham Long Term $111566,0803 $3,404,400
Five minute frequency with ride lot north of 1-40 along (2022-2035)
daily peak vehicle need of NC 54 towards Chapel Hill,
six buses. aligning with Bus Rapid
Transit-- Phase 1
Flex Route General service north and Chapel Hill Long Term $41066,2004 $3071200(4
south of study area along (2022-2035) buses at
Barbee Chapel Rd, $76,840
Pinehurst Dr,Farrington Rd, each)2
Ephesus Church Rd,serving
AUGUST 2010-- DRAFT FINAL REPORT 8
12
NC 54 11-40 CORRIDOR STUDY EXECUTIVE SUMMARY
■
Description Location Jurisdiction Phase O&M Capital
the Falconbridge
Community,Donwing Creek
community,and Glen
Lennox
Light Rail Transit(Preliminary Durham to Chapel Hill Durham & Long Term TBDs $2175010002
Engineering and Design) Chapel Hill (2022-2035)
PEDESTRIAN ■ BICYCLE
Description Location Jurisdiction Phase Cost
Install crosswalks and pedestrian Burning Tree Dr/Finley Golf Chapel Hill Short Term $80,000
signals at signalized intersections with Course Rd& NC 54 (2012..
pedestrian refuge islands and street 2017)
lighting for crossing NC 54.1
W Barbee Chapel Rd & NC 54 Chapel Hill Short Term
(2012--
2017)
Meadowmont Ln/Friday Center Chapel Hill Short Term
Dr& NC 54 (2412-
2017)
E Barbee Chapel Rd & NC 54 Chapel Hill Short Term
(2012-
2017)
Huntingridge Rd & NC 54 Durham Short Term
(2012-
2017)
AUGUST 2010 —DRAFT FILIAL REPORT 9
NC 54 / 1-40 CORRIDGR STUDY
EXECUTIVE SUMMARY 13
PEDESTRIAN AND BICYCLE
Description Location Jurisdiction Phase Cost
Farrington Road (northern, Durham Short Term
southern and eastern approaches) (2012-
&NC 54 2017)
Leigh Farm Rd/Quadrangle Dr& Durham Short Term
NC 54 (2012-
2017)
Install crosswalks with pedestrian- US 15-501 on/off ramps Chapel Hill Short Term $40,000
activated flashers and expand refuge (2012-
islands. 2017)
Extend the solid marking designating From SB US 15-501 on ramp to Chapel Hill Short Term $2,700,000
the westbound exclusive right turn lane 500 feet to the east (2012-
for US 15-501 on—ramps to minimize 2017)
weaving movements at interchange
and increase safety for on-road
bicyclists.
Provide a minimum 5-foot wide on- NC 54 from Burning Tree Dr/ Chapel Hill Short Term
road bicycle lane by restriping travel Finley Golf Course Rd to the west (2012-
lanes to be 11 feet wide and making 2017)
minor median modifications.
Modify sloped abutment wall to NC 54 underneath US 15-501 Chapel Hill Short Term
provide 8-foot wide sidewalk behind overpass (2012-
overpass structural piers. 2017)
Pave road shoulders to accommodate From NC 54 to the American Durham Short Term $4,004,000
bicyclists on select roads to provide Tobacco Trail via Barbee Chapel (2012-
connections to the American Tobacco Rd,Farrington Rd,Stagecoach Rd, 2017)
Trail. NC 751,and Massey Chapel Rd
Ensure adequate facilities for cyclists Farrington Road through the study Durham Short Term Variable cost.
are available. Provide a 5-foot wide area (Old Chapel Hill Rd to (2012- Paving five-foot
bicycle lane where possible,or provide Stagecoach Rd) 2017) wide bike lanes
AUGUST 2010 —DRAFT FINAL REPORT 10
14
NC 54 /1-40 CORRIDOR STUDY EXECUTIVE SUMMARY
PEDESTRIAN ■ BICYCLE
Description Location Jurisdiction Phase Cost
"share the road"signage and a paved on both sides of
shoulder or sharrow markings for on- the roadway
road bicycle travel.Many of the Ephesus Church Rd from Durham& Short Term Would cost
collector streets are designed with for Farrington Rd to E Franklin St Chapel Hill (2012- approximately
low vehicular speeds with the intent for 2017) $1 1200,400
bicycles to share the travel lane. Fill in per lane
sidewalk gaps2. assuming
George King Rd &Crossland Dr Durham Short Term medium duty
pavement.
proposed collector street) from (2012- Striping a bike
Ephesus Church Rd to NC 54 2017) lane without
paving would
cost
SW Durham Dr from Ephesus Durham & Short Term approximately
Church Rd to NC 54 Chapel Hill (2012- $5,000 per
2017) mile. Installing
signage would
cost about
Lancaster Dr and E W collector Durham & Short T erm $1,500 per
street from Farrington Rd to Chapel Hill (2012-
sign.
Pinehurst Dr 2017)
Pinehurst Dr from Ephesus Church Chapel Hill Short Term
Rd to Burning Tree Dr (2012-
2017)
Burning Tree Dr from Pinehurst Dr Chapel Hill Short Term
to NC 54 (2012-
2017)
Hamilton Rd from NC 54 to Chapel Hill Short Term
Brandon Rd (2012-
2017)
Construct an off-road shared-use path, Along north side of NC 54 from E Durham& Mid-Term The cost for
with a boardwalk bridge as an Barbee Chapel Rd to Farrington Chapel Hill (2017- these
alternative solution in environmentally Rd 2022) improvements is
sensitive areas. Path should have included in the
minimum 10-foot width; ideally 15 feet roadway
if possible. Through the Glen Lennox Mid-Term list
g Chapel H�II Mad Term
AUGUST 2010 --DRAFT FILIAL REPORT � �
i
NC 54 / 1-40 CORRIDOR STUDY
EXECUTIVE SUMMARY 15
PEDESTRIAN
Description Location Jurisdiction Phase Cost
property from Hamilton Rd at (2017- under the item
Brandon Rd to connect to S Estes 2022) "Widen NC 54
Dr utilizing existing trail and to six lanes in
along the NC 54 frontage to the Durham
connect to the existing multi-use section.
path at Burning Tree Dr Construct the
multi-use path
concurrent with
off-road hared-use path NC 54 from Farrington Rd to 1-40 Durham Mid-Term the road
Construct an o oad s p g project."
on the south side of NC 54 with overpass (2017-
accompanying signage to cross. Path 2022)
should have minimum 10-foot width;
ideally 15 feet if possible.
Construct sidewalk on south side of NC South side of NC 54 from Durham Mid-Term
54 to connect to 1-40 overpass. Huntingridge Rd east to 1-40 (2017-
overpass 2022)
Construct a 10-foot wide shared use NC 54 bridge over 1.40 Durham Mid-Term
path on south side of overpass. (2017-
2022)
Implement crosswalks and landscaped Meadowmont Ln/Friday Center Chapel Hill Mid-Term The cost for
median refuges at primary superstreet Dr&NC 54 (2017- these
intersections. 2022) improvements is
included in the
roadway
Huntin rid a Rd &NC 54 Durham Mid-Term projects list
g g
(2017-
under the item
2022) "Construct EB
NC 54 to EB I-
40 flyover from
Farrington
Adequately sign reverse superstreet E Barbee Chapel Rd & NC 54 Chapel Hill Mid-Term Road to I-40 EB
intersections. (2017- on-ramp."
2022)
Falconbridge Rd &NC 54 Durham Mid-Term
(2017-
2022)
AUGUST 2010— DRAFT FINAL REPORT 12
16 NC 54 11-40 CORRIDOR STUDY EXECUTIVE SUMMARY
PEDESTRIAN AND BICYCLE
Description Location Jurisdiction Phase Cost
During construction of superstreet Farrington Rd&NC 54 Durham Mid-Term
modifications,implement crosswalks (2017-
and landscaped medians on the 2022)
northern,southern and eastern
approaches,and provide adequate
signage for pedestrians to cross to
south side to travel over 1-40 bridge.
Design and construct light rail bridge Across NC 54 connecting Chapel Hill "Long Term TBD
over NC 54 to serve as an elevated Meadowmont and Friday Center (2022-
; pedestrian crossing. 2035)
Continue to make regional connections where possible Durham& Long Term Variable cost
with greenways. Chapel Hill (2022-
2035)
Description Location Jurisdiction Phase Cost
Construct channelized free flow Along C 54 at E Barbee Chapel Short Term
lane for eastbound right turns into g p Rd Chapel Hill (2012- $700,000
East Barbee Chapel Road 2017
Construct northbound right turn Short Term
channelization to free flow merge Friday Center Dr Chapel Hill (2012- $900"000
lane onto eastbound NC 54 2017)
Construct Farrington Road slip ramp Short Term
for northbound traffic on Farrington Farrington Rd Durham (2012- $3,300,004
Road to access eastbound 1-40 2017)
directly.Modify on-ramp to allow
AUGUST 201 0 -- DRAFT FINAL REPORT 13
i
NC 54 / 1-40 CORRIDOR STUDY
EXECUTIVE SUMMARY 17
Description Location Jurisdiction Phase Cost
for transition.
Short Term
As specified in the adopted (2012_
Construct collector street system Southwest Durham--Southeast Durham $31,400 1000
including turn lanes on NC 54. e! Hill Collector Street Plan 2017 and
Chapel beyond)
Construct access road behind the Short Term
Farrington Road shopping center Between Farrington Rd and Durham (2012- $4401000
for connection between Farrington Falconbridge Rd 2017)
Road and Falconbridge Road.
Obtain Marriot Way,then upgrade Short Term
Between Friday Center Dr and E Chapel Hill 2012- $$00,000
to NCDOT standards and extend to Barbee Chapel Rd p 4
Barbee Chapel Road. p 2017)
Construct other connections as Durham & Short to
opportunities arise through Through study area Variable cast
Chapel Hill Long Term
development proposals.
Improve 1-40 interchange to add
new partial cloverleaf ramp for I- Mid-Term
40 EB to NC54 EB,remove existing
1-40 Interchange with NC 54 Durham (2017- $1,1 OO,gOq
signal and install yield sign at the 1- 2022)
40 EB to NC54 WB ramp with
addition of merge lane.
Construct EB NC 54 to EB I-40 Mid-Term
flyover from Farrington Road to 1- 1-40 Interchange with NC 54 Durham (2017- $10,800,000
40 EB on-ramp. 2022)
Construct auxiliary lane widening Mid-Term
for 1-40 westbound off ramp to
1-40 Interchange with NC 54 Durham (201 7- $1,1 00,000
match the two lane section of the 2022)
ramp.
AUGUST 2010 -- DRAFT FILIAL REPORT 14
LJ NC 54/1-40 CORRIDOR STUDY EXECUTIVE SUMMARY
ROADWAY
Description Location Jurisdiction Phase Cost
Widen the bridge over 1-40 to
accommodate 4 lanes of westbound
NC 54 laneage. In conjunction with
Mid-Term
this,widen the westbound approach 1-40 Interchange with NC54 Durham (2017- $21300,000
to two lanes for 500 feet as' 2022)
needed for intersection capacity.
Reconstruct the Farrington Road
intersection to only allow the Mid-Term
northbound left turn through the Farrington Rd Durham (2017- $3,700,000
intersection.Channelize for freeflow 2022)
westbound right turn lane.
Widen NC54 to six lanes in the
Mid-Term
Durham section. Construct the
multiuse path concurrent with the -Durham section of NC54 Durham (2017-0 7 $18,7001000 road project. 2022)
Implement superstreet
configurations at Falconbridge Rd, Falconbridge Rd,Huntingridge Rd,E Mid-Term
Huntingridge Rd,E Barbee Chapel Barbee Chapel Rd and Friday Durham (2017- $3,800,000
Rd and Friday Center Dr Center Dr 2022)
intersections.
Install triple southbound lefts at Long Term
Falconbridge Road. Falconbridge Rd Durham 2022-
$400,000
2035)
Construct I-40 ramps into the Long Term
1-40 Interchange with NC54 and northern development(Leigh area to the north Durham (2022- $271700,000
Village) area 2035
Monitor for potential need to grade Durham & Beyond separate key intersections through Corridorwide y Variable cost.
the corridor.
Chapel Hill 2035
AUGUST 2010 —DRAFT FINAL REPORT 15
NC 54 / 1-40 CORRIDOR STUDY
EXECUTIVE SUMMARY 19
Conclusions
The analysis of growth and transportation indicates that substantial capacity improvements will be needed
y
by 2035 with or without new development anticipated to occur in the corridor. The 1-40 interchange at NC
54 is fast approaching its capacity, and the proximity of the Farrington Road intersection creates
operational challenges that affect much of the corridor. Heavy through traffic volumes projected along the
corridor require intersection modifications that will help reduce delay. While the planned light rail transit
system will help when it becomes operational sometime around 2025, it will not eliminate congestion.
Rather, the light rail network provides a sound basis to guide future growth into the planned station areas
as part of a nodal development strategy that will help reduce trip lengths, lower vehicle miles traveled
per capita, and provide for more location-efficient housing choices to-increase the f inancial flexibility of
those residents. Implementation of an interim service of higher-capacity Bus Rapid Transit can enable some
phasing of more intense development along the corridor until light rail becomes operational. Gaps in the
local transit network need to be filled with higher frequency service in the peak periods.
While the recommended land use plan increases,growth in the corridor beyond the levels assumed for the
adopted Long Range Transportation Plan, most of that additional growth is expected to occur in Grange
County because the LRTP assumptions appear low relative to development potential and future plans on
the part of the University of North Carolina.
The recommended phasing plan for the transportation network creates better mobility for the next 15 to
20 years through the "superstreet" operational improvements. The elevated bypass from eastbound NC
54 to eastbound 1-40 will also be needed between 2015 and 2020 to maintain a functioning intersection
at Farrington Road and NC 54, allowing access to adjacent properties. Additional direct access ramps
from 1-40 into the proposed Leigh Village development will be necessary before 2035 to support
anticipated growth that should only occur with the construction of a light rail system. These ramps can be
designed to avoid impacts to Leigh Farm Park and other sensitive neighborhoods. Geometric functional
designs have been developed to guide these needed capacity improvements.
As indicated, due to traffic impacts, much of the anticipated future growth will need to wait until the light
rail system is operational and can help moderate auto travel demand. However, the plan calls for
expanded park-and-ride opportunities, including a new parking structure immediately northwest of the I-
40/NC 54 interchange to improve mobility and regional access into the corridor.Additional park-and-ride
lots would serve other travel markets. Expanded local bus, Bus Rapid Transit, and commuter express routes
are planned to meet the corridor's growing needs in the interim to light rail, and these services will
complement the rail system when it is built.
A network of non-motorized transportation facilities, along with signage/markings for shared on-road use
where appropriate, is needed to create a more accessible corridor and study area. This addresses travel
along the NC 54 corridor by bicyclists and pedestrians, as well as crossing the corridor safely and
efficiently. Elsewhere in the study area, the network provides additional connections between residential
areas, commercial destinations and regional facilities, such as the American Tobacco Trail.
Establishing benchmarks and targets is an effective way to measure progress toward plan implementation.
The NC 54/1-40 Corridor Study is a multi-year, multi-phase master plan aimed at improving overall
mobility and accessibility, consistent with plans to create development focal points as places that become
multipurpose destinations. Given the concerns of some residents and many stakeholders about traffic
AUGUST 2010-- DRAFT FINAL REPORT 16
20
NC 54/ 1-40 CORRIDOR STUDY EXECUTIVE SUMMARY
conditions and future development plans, it makes sense to take an approach in partnership with NCDGT
and the local governments that addresses various aspects of this report to track progress toward achieving
outcomes of this planning effort, not merely the programming and construction of capital projects.
The recommended approach is for the MPG to prepare a biannual monitoring report every two years to
document progress toward achieving the mobility goals outlined in this study. This monitoring report would
document transportation system conditions over time using the performance measures defined through this
study and expanded to address specific implementation activities and accomplishments on the part of each
study partner or jurisdiction. The report would fit within the MPO's established Congestion Management
Process, and should document actions from a land .development, transportation and urban design
framework to implement the recommendations for improved livability,mobility, safety and access.
AUGUST 2010 --DRAFT FINAL REPORT 17
A
ISO
NC-54/1-40 CORRIDOR
BLUEPRINT FOR MOBILITY
Recommended Master Plan
Background
F. Ole
.� a .. wit, .,�
AIM
Val
ox
LA
x;
�`T y
far: r+�a'•_- _ d' F
i
r
'-w
70,000 vehimcles
per day
Stu y .. � .. .. .. •fig� �•'r '5.�
•,gig -� ���.
Objectives
Vision
A:. ��Ta.'"� ... '•fitly�":�.i-.
,'•z a is•}�;x gab�. .wy,. .t.'.,;
uepr r
Trans.
9/24/29J0
1
Regionally significant multimodal corridor that
senses both: regional and bcal travel through an
expanded and mope efficient network of streets,
bus routes, bicycle facilities and pedestrian
enhancements.
Promote community livability by guiding future
development into targeted mixed-use areas to
reduce trip lengths., enable greater.:use of non-
auto travel options and provide:location-efficient
choices for housing_and transportation.
Partmicipants
DCHC .O �� Consulting Team
i '41§.-`, kENA:55ANCE PLANNINC`,GROUP
Chapel Hill
UNC
Ti
1CF
. INTERNATIONAL
Orange
f
Co �- Co i
'Funding Partners Focus
Groups
Steering Committee Workshops
3
24 9/24/2010
Study Process
• Challenges/Opportunities
Focus
Data Collection/Analysis
Community Profile
Trend Analysis
• 4F scenario Development/Testing
• Initial Preferred Scenario
• Full Analysis Preferred'Scenario
Targeted -- Refined Recommendations
Workshop
• Master Plan
What learned
Future development wjil,continue to occur.
■ The growth in traffic f'o : do tad lava gillit in
s
significant congestion
• There are insufricient alt gnat ves for parallel capacity.::...
* 8cisting development patterns do not.su pp ort transit or
encouraga.;non�motorized trips..
■ Vehicle tn'p§destined to the Friday Center and lJIV
contribute "'ifica to peak congestion
• There is a public desire for multimodal options
4
Recommendatmions
Land UselTransiVBicycle-Pedestrian
Nodal Land Development Pattern
•Guides grot%Jh into existing/ merging centei's
•0I)I)Ortullltles.to cal)tui-e sli art tt-lps via wall,'Ing or 1)€l4€ng
•Focal point for transit with focused,diverse activity
t Transit
y` Y •Expanded service aid 1111pro\-ed connections
•LRT connects corridor with the region
. ¢,.
Flex route shuttle service for loti,v,density areas
Pedestrian/Bicycle Improvements
` •Connectivity
•increased Safety
•Complementary
■
Recommendations
Park and RideZRoadwa,.Y--
Pa i-k a€�d Ride — U n kages for Success
Frt.c-€Llt'11t.IF;iE3E]lf',and C{�Ii�E'Cllt.'llt t[ I1SIt�t IVIt�
.L
ay C eCO111111{"'nd"tloll �lt,s_;esSiNlity
• lr�wd us influei ces I_is,i:;e
• New locations€ loposed
Short to Mid Term Roadway Improvements
• Geometric (,onnectivity IIII W CAS:(ll+ rlt 7
• Coi1struct co I I(:"C to r strcot systcI-n
•Widen NC 54 to 6-lanes in Dutham C(Dunty
• Increase offlciency/safety thl-011 h Superstreet design
Lang Term Major Investment
°' • Improve 1-46 interchange(ram ps and- idening)- Fig 6-20
-�� -4
s
• Farrington Road Flyover Ramp - Flg 6
=', P: • Ra rnp access into proposed Leigh V'i Page Fig 6-22,6-23
NG54/I-40 CORRIDOR
BLUEPRINT FOR MOBILITY ���
26 9/24/2010
www.nc54-i40corridorstudy.com
27
ATTACHMENT 3
Peripheral Issues of Hwy 54 and I-40 Interchange and
the Regional Transit Light Rail Alternative
The peripheral issues are complex and somewhat contradicting in this corridor
and area that spans the Chapel Hill/Orange and Durham county border.
1. Public transit is necessary to provide an alternative to the automobile
in this corridor. This is a high volume commuter route to UNC and
Chapel Hill/Carrboro.
2. The Park and Ride lot at the UNC/Friday Center in Orange County still
creates traffic problems at I-40/NC 54 intersection.
3. Moving the Park and Ride lot further east solves some of the NC 54
traffic but still does not correct intersection delays unless a Park and
Ride can be found east of the intersection.
4. A Park and Ride lot in Durham County by itself does not create a land
use that creates tax base.
5. Coupling a Park and Ride lot with a Transit Oriented Development
(TOD) (a mixed-use development) and a future light rail station is ideal.
However, the TOD location becomes a land use focal point that would
bring some exterior traffic but also the potential of commercial tax
base, a valuable commodity. Leigh Village, a potential TOD at the
northwest corner of I-40/NC 54 in Durham County would fit this
situation. However, does supporting this location create another
opportunity for people to shop outside of Orange County?
6. Between UNC hospital area and the potential Leigh Village project is
the segment that Triangle Transit has used in its draft financial plan of
the Light Rail Alternative as the link of which Orange County would be
financially responsible. Therein, Orange County would fund a 3-mile
length in Orange County and a 1.75-mile length in Durham County.
7. This corridor transverses a large north-south environmental area
owned by the ACOE for the Jordan Lake headwaters, which limits
alternative locations for Park and Ride/Transit Oriented Development
in the Orange County/Durham County general area.
28
i