HomeMy WebLinkAboutRES-2005-021 Orange County Transportation Priority List for 2007-2013 TIP3 --i.s ~ ar~.S
~L
ORANGE COUNTY BOARD OF COUNTY COMMISSIONERS
A RESOLUTION CONCERNING ORANGE COUNTY'S PRIORITY TRANSPORTATION PROJECTS
FOR THE DURHAM-CHAPEL HILL-CARRBORO METROPOLITAN PLANNING ORGANIZATION
REGIONAL PRIORITY LIST FOR THE 2007 - 2013 TRANSPORTATION IMPROVEMENT
PROGRAM
WHEREAS, the North Carolina Board of Transportation, every two years, prepares a
Transportation Improvement Program that identifies transportation projects scheduled for State and
Federal funding over the next seven years; and
WHEREAS, the North Carolina Board of Transportation, on July 8, 2004, moved the seven
year, biennial Program to be effective beginning and ending in odd numbered years; and
WHEREAS, the North Carolina Board of Transportation solicits input for identifying
transportation projects of local and regional importance to be included in the FY 2007-2013
Transportation Improvement Program; and
WHEREAS, Orange County gives priority to identified safety needs on existing roads and
bridges, to other transportation projects that encourage alternatives to automobile travel, to projects
that minimize adverse impacts on the natural environment and cultural sites, and to those projects
that foster economic development in the designated Economic Development Districts; and
WHEREAS, Orange County strongly encourages the North Carolina Department of
Transportation (NCDOT) to design all highway projects, where appropriate, to accommodate bicycle
and pedestrian traffic to provide alternative means of transportation that may result in reduced
automobile traffic and related air and water impacts; and
WHEREAS, Orange County encourages the NCDOT to design all new or replacement bridges
with sufficient clearance to allow wildlife to cross safely under them, and to allow pedestrian passage
along any existing or planned trail-system connectors;
NOW, THEREFORE, BE IT RESOLVED by the Orange County Board of Commissioners that:
The Board of County Commissioners endorses the attached project priority list of transportation
projects to be considered for inclusion in the FY 2QD~7-2013 Transportation Improvem t Program.
Upon motion of Commissioner ;'~ r~seconded b Commissioner "'t-f'-~ ,
the foregoing resolution was ado ted this the day of ~~,,II ~ 005
~~M
I, Donna Baker, Clerk to the Board of Commissioners for the County of Orange, North Carolina, DO
HEREBY CERTIFY that the foregoing is a true copy of so much of the proceedings of said Board at a
meeting held on March 15, 2005, as relates in any way to the adoption of the foregoing and that said
proceedings are recorded in the minutes of said Board. fh
WITNESS my hand and the seal of said County, this _~ day f " ;-605.
ti~~~ ~ p`
~+` -~
~~~ ;~~1~¢1~;, Clerk to the Board of Commissioners
~~F,~- )vim
:~•
ORANGE COUNTY TRANSPORTATION PRIORITY LIST WITHIN
THE DURHAM-CHAPEL HILL-CARRBORO
METROPOLITAN AREA BOUNDARY
FOR CONSIDERATION OF FUNDING IN
THE 2007 - 2013 TRANSPORTATION IMPROVEMENT PROGRAM
SR 1006, Orange Grove Road at Interstate 40: Construct a pedestrian bridge
over I-40. New Grady Brown Elementary and newly constructed Cedar Ridge
High School are located on New Grady Brown School Road that has access
from Orange Grove Road south of I-40. The schools are within walking and
cycling distance from residential areas north of I-40. Bicyclists and pedestrian
must share the roadway with motor vehicles crossing the narrow two-lane
bridge that carries Orange Grove Road over Interstate 40. The bridge is too
narrow to accommodate a pedestrian walkway. Lack of an adequate
pedestrian crossing presents an unsafe environment for students to walk to
the schools.
2. U-2805, Homestead Road (SR 1777 Improvements: Improve Homestead
Road from SR 1834, High School Road, to NC 86. This project should
include bicycle and pedestrian facilities. There are three schools in the
vicinity of Homestead Road: Chapel Hill High School, Smith Middle School
and Seawell Elementary School. Many students live within walking distance
and cycling distance to Chapel Hill High School and must walk or cycle along
Homestead Road, and cross the road daily.. Provision of sidewalks is of
utmost importance for the safety of students and other pedestrians who use
this corridor. Provision of bicycle facilities is, likewise, necessary for the
safety of students and others.
This project should also include appropriate safety improvements to the
intersection of Homestead Road with High School Road.
3. R-2825. Improvements to South Churton Street: Develop congestion
management, limited access, aesthetic and capacity improvements between
US 70 Business and Interstate 40. The portion between Interstates 40 and
85 will conform to the design criteria of the Economic Development District
Design Manual (4-lane divided section with bike and pedestrian
improvements). The feasibility study completed in February 2002
recommends a 4-lane divided, with 16-foot median, curb and gutter cross
section for the entire corridor from I-40 to Eno River. Orange County stresses
the need to study improvements within the current right-of-way for the
segment north of Interstate 85. Improved capacity through widening is not
the County's first choice because of significant constraints between Interstate
85 and US 70 Business and the proximity of the historic district north of the
project limits. Orange County requests that, where conditions do not prevent
the addition of frontage roads, the feasibility study include the addition of
frontage roads with limited access from the corridor.
ORANGE COUNTY TRANSPORTATION PRIORITY LIST WITHIN
THE DURHAM-CHAPEL HILL-CARRBORO
METROPOLITAN AREA BOUNDARY
FOR CONSIDERATION OF FUNDING IN
THE 2007 - 2013 TRANSPORTATION IMPROVEMENT PROGRAM
4. Old NC 86 (SR 1009) Bicycle Lanes: Construct bicycle lanes (4-foot paved
shoulders) from Carrboro (Eubanks ..Road) to Hillsborough (I-40). This
project, from the Carrboro Transition area (Hickory Forest Road) to Lafayette
Drive, is priority 6 of the primary bicycle routes listed in the Orange County
Bicycle Transportation Plan, and would extend bicycle accommodations
requested in TIP .Project R-2825 to Carrboro, where its Transportation
Advisory Committee has also established bicycle routes on Old NC 86 as a
transportation priority connection between proposed bicycle facilities along
Old Fayetteville Road, Homestead Road and Eubanks Road.
The feasibility study for TIP Project R-2825, improvements to South Churton
Street, recommends afour-lane divided section for Old NC 86 (S. Churton
St.) from I-40 to Lafayette Drive. That study also anticipates accommodations
for bicycles (wide outside lanes) from I-40 to I-85. This project would connect
bicycle facilities proposed in the South Churton Street project to Carrboro.
Carrboro's Priority List for the 2006-2012 TIP included two bicycle projects on
Old NC 86 that, along with this request and TIP project R-2825, would
complete aHillsborough-Carrboro bicycle route:
from Old Fayetteville Road to Homestead Road; and
from Homestead Road to Eubanks Road.
5. NC 86, Bicycle Lanes: Construct bicycle lanes (4-foot paved shoulders) from
Chapel Hill (Whitfield Road) to Hillsborough (US 70 Business). This project
will extend bicycle lanes on Airport Road (NC86) in Chapel Hill to US 70
Business in Hillsborough. Bicycle lanes have recently been completed along
NC 86 from UNC to Whitfield Road (SR 1731) in Orange County. NC 86 from
Chapel Hill to Hillsborough is experiencing increasing numbers of bicyclists
using this route and there are. also two schools along this route. This route is
listed as priority I of the primary bicycle routes proposed in the Orange
County Bicycle Transportation Plan adopted April 6, 1999. This project is
included in the Bicycle Program as an incidental need. Orange County
requests that bicycle lanes be constructed as an independent project, and, if
necessary, programmed in phases.
ORANGE COUNTY TRANSPORTATION PRIORITY LIST WITHIN
THE DURHAM-CHAPEL HILL-CARRBORO
METROPOLITAN AREA BOUNDARY
FOR CONSIDERATION OF FUNDING IN
THE 2007 - 2013 TRANSPORTATION IMPROVEMENT PROGRAM
6. NC 86 (North of Hillsborough) Improvements• Widen NC 86, from US 70
Bypass north of Hillsborough to SR 1332, Coleman Loop (Coleman Loop also
being the intersection area of the planned connector between NC 86 and NC
57), to four lanes with intersection improvements at US 70 Bypass to include
extending the queuing lane for traffic turning east onto US 70 Bypass from
northbound Churton Street/NC 86. NC 86 is the major north-south route
through Orange County. NC 57 converges into US 86 just north of US 70
Bypass. The segment of NC 86 between NC 57 and US 70 is congested,
rendering a high accident location at the intersection of US 70 Bypass at NC
86.
7. US 70 Bypass Widening; Widen, from the Orange/Durham County Line to
the US 70 - I-85 Connector east of Efland, US 70 Bypass to a four-lane
divided section with bike and pedestrian improvements. This project should
be phased to address traffic counts and existing congestion. Orange County
requests that this project be identified as a need and included in the 2006-
2012 STIP.
8. U-3436, SR 1148 (Eno Mountain Road) and SR 1192 (Mayo Street) at SR
1006 (Orange Grove Road): realign intersection and make safety
improvements. This project is listed in the 2004 - 2010 TIP as an unfunded
project. It was a "first priority project" in the Town of Hillsborough
Thoroughfare Plan for 1989 but the Hillsborough Town Board removed the
realignment from the Hillsborough Transportation Plan in 1997. More
recently, Hillsborough Commissioners and Orange County Commissioners
have endorsed the project in two joint studies that included commissioners
from both jurisdictions, the Economic Development District (EDD)
Transportation Work Group and the Joint Orange Grove Road Transportation
Group (JOGRTG). Both the "EDD Transportation Work Group
Recommendations" and the "Access Management and Awareness Project
and Report for Orange Grove Road" recommend this project for improved
traffic flow and safety.
9. Extend Orange Grove Road east to US 70 business. The "EDD
Transportation Work Group Recommendations" and the "Access
Management and Awareness Project and Report for Orange Grove Road"
recommend this project as an alternative access to the US 70 Business/NC
86 corridor to alleviate congestion on Churton Street.