Loading...
HomeMy WebLinkAboutORD-2005-010 - Schools Adequate Public Facilities Ordinance (SAPFO) - Approval of Annual CertificationsORANGE COUNTY� Nic q qi1i FACILITIES ORDINANCE PREPARED B STAFF CO'.%'F.N-TTTTEE'* PLAN, N f NIG DJRECTOR-S, SCROOL REPRFSENTATATES5 TECIT-NTICAL ADN71SORY CO.NBUTTEE (SAPFOTAC) (PURSUAINT TO PROVISIONS OF A MEMORANDUM OF LT` DERSTANTI)ING ADOPTED IN 2002 & 200-3) (ORDINANCES, ADOPTTD IN JuLy, 2003) (BASED ON No E MBER 2004 DATA) CERTIFIED BY THE B OCC avXXX5 2005 Table of Contents, P Ag. C ExecutiveSummary ............,..... ... .................... .................................... Introduction. .......... ------------ - ------- ............ -------- .......... - ---------- ........ Schools Ad-equate Public Facilities Ordinance Partners ............ PlanninLa.z Directors, Sebool Representatives, Technical Advisory CO mmittee (SAPFOTAC) membm ............ ................ .......... ---1-- ........ 1. Base Memorandum of Underst2ndl.ng A.. Level of Service...., ................ -'-- ............................. ........ B. Building Capacity ................. ........ - ....................................•- ..... 2 4M','Ckment- f B� I, - Orange d fedAprz'130, 2(,02( 207 - BASE)..: ......... .. ...........ti 4�;c:chrveat I.B-1. - Cl. tjwl Hid adjd Cayml.-,ro Schmil Ca.E."wiries dated April 29 2002 (2002- ........ 6, L33, - Oninge colmin; School (Zlemernlary, Middle & High School; (2(10!`�'p '-crkwenf: 13A - Owpe.1 Capacay (Eleivenuay., Middle & H,�qh ScAww) Annxhmen;': 4 Jacks --er L R 6 - Owpel I-Id r7zt-TG Scmil CapacitV fElemelrlary, Middle & High Schao' 10' C. '-Nfembership Date,........ .... -- .... ................ ...... ...... ............... --21 11. Anna l Update to Schoots Adequate Public 14 acilifies Ordinance Sy-stem A.. Capital Investmentflan (CIP)........ . . . . .. ................. ......................... -,--22 B. Student Membership Projection 'NfethodolOgy- .............. .......... ........ ... 23 `7T 11 z ... ... ... ... ... ... ... ... ... ... . 4: ......... ...... 54 C. Student Membership Projections ............... ... ... ... ... ... . A l i d d l e & Hg I S oc. i-� J211 Y. C 1. OP474fo C tJn! Snidenz ( E - T e n z e w a n , fgf , went. .11, CC, 2 - Chapel Hill,'Carr1wro Syudr, t E. �naonlruy' Middi" & r'i' i-h Sc i� .4; 11, C. -3. - Orange cbunroSiu.den: Efonentaiy, Mflddlu & hiigh Scho;-,'j 11. C4. - Ch(doe I ]YOX"Zo-rharo Prqjeaiuns (Elnn en, mvy, A fiddle & Ilip`7 SCA, 0 R '5 g - " .11 'em st, I - pi-�j g , h ':-a wnewt: H� C 5. - Orange Cbi iov ieca'ans (Fleme-Oxhuy, Aliddke & Ph' j, -)c - ------ - .0-,�OJ-Q �7 II, C.6 - Chapel, j ' 1�1."' ' 7 D. Student Membership Grovvth Rate ...... -- ....... ....... ...... - ------ �fs a rhn! en :::R J. -Ora n ge Co., I tj n. & Ch upeTh"Ll f 'arrho -, ro Studo, i i Gro w.1h Ra tes 02arr dwes from 1003 - 2013 ha.�,-d or numbers {20 2) .................. ............... ...... IT D-2. - Orange Count v (It Carnbora Student Growdi Raiey h - ...... - .... 1 ar., -hites from 2004 -- 2014 based U11 1- znzmlzersh�p numbers (2003) ........ I ..... Ja.t is 11,L):3. - Orange C•unzv & C qp ! il*21-'Canrhnro Sxudeta Grawth Rates dares from 2005- 70,'5 bused on, I T/ 15'��O' nnev--�ersh�p numUrs (2)04" ................. ....... E. Student / Housing Generation Rate - . ... ... ... .. .. ... ... ... .-e-jimerl: If.. E 1. � Chapel ff.i[L-Ca.;-rt5vro S?-:c�Lnr Rates (2201t 227). ............ ------- ...... Iii, RoNvebart of Schools Adequate Public Facilities Ordinance Process, 44. Process - Capital Investment Pian ................. .....:...........:............� 111,x.1. ­ Process I Cf�.F;�u4 L'7' ;_rnenf PL?; .. .............................. 6 B. Process - Schools Adequate Public Facilities Ordinance; Certificate ofAdequate Public -Schools (CAPS) System,..... ... ....... ; U-C Ai wee, i - III B.1. — Process 2 Cerd ate rY �°'A i ,pme FuNic Shools (CUPS) Allocar .... ­­I ...... ­ IV. Additional Attachments fivTz Dinvw1ber 14, 27004 .............................................. 2005 SAPFOT.-tC Executive Surnmary 1. BaseMernorandurn of Understandina A. Level of Service .......................... .................... (-,VO arawgel.. I Ompel M&Carrhoro counly School Dis-irlct a. SchoolDistrier Eleinziltary 105. 41 10i% 7 co 7 107%* I Hog h 03 B. Building Capacity and Meniber-ship...........................(Chats ge) ... ...... P, 7126? 31 Chapel MIWarrbot -o Orange C41112tv School Dlstrkt School Dhqr!rr i capaedry Increase Capacity Membership trtcreaKc- f -am Prior from Prior Year year y 4695 Ele,mrwar 77f 71, 3 820( 3016 JW Viddre ?S_.0 i (1 0 466 1593 ..... . .. '�035 -42 3 -2 ... 05 7 171 C: i 4-z-m-uix i�s 3820. A I, w�dui,--,Ic! crg ",oii-pleriV9 M? 200 -0 , C. Membersbip Date -.Novemher 15, 2004........... (No Chang-eJ ....... P,-,. 21 II. Annu2l Update to SAPFO System A'. Capital Investment Phin (CIP) ........ : .................... (Challg,�). P-. 21 B. Student Alenibership Projection Metbodolop, ...... (No Changte).--.P 23 Yht- average of 3, 5. and `O year 2 Anc-ay, pro,'ecnrn, C. Student Nfernbcrship Projections.... ......................... (Ch 38 5 Year out Snapshot Comparison (&r-ovv indicates whether ;here was im zrcase or cecrerse, in t,)rOJeC1..on 'oull bzowetn prior,,,, r and subis.equent year) 1 Chap& IMZ,(-Arrrbvra SLhoal District e Cokoar school'Distriv D. Student Growth Rate......... .............. v ........... -(Change). .......... 1'* 49 Avera" Annijal Gro«'th Rate over 10 Years Chapel HilbCarrboro Orange Cvrrr?V Sdivol DhNIrkT Sellool District 2003 2004 2003 20►4 . ........... . .... . Eleyneiftanr- 2.34.4, 1-5A% 1.6S% Middle 2,63-5/� 1.9�-� C17 9%, 11 1. 5 G ?.SF 4 1,28% i 8.21 ra E Student / Housing Generation Rate .................... (A'O Chaage) ....... P,-. 52 2002 1 2003 1 2004 i 2002 2003 2004 03 i 66� 7126? 31 1 2954 1 M13, 7 1056 1 1 371. r} 2070 T, D. Student Growth Rate......... .............. v ........... -(Change). .......... 1'* 49 Avera" Annijal Gro«'th Rate over 10 Years Chapel HilbCarrboro Orange Cvrrr?V Sdivol DhNIrkT Sellool District 2003 2004 2003 20►4 . ........... . .... . Eleyneiftanr- 2.34.4, 1-5A% 1.6S% Middle 2,63-5/� 1.9�-� C17 9%, 11 1. 5 G ?.SF 4 1,28% i 8.21 ra E Student / Housing Generation Rate .................... (A'O Chaage) ....... P,-. 52 (100( 5 '2.xecui,:Ive Surm-nary writinued) SCHOOL ADEQUtATE PUBLIC FACTLITIES ORDINANCE STATUS (l aced on future year SLu,_Iellt M ei-nbtrship Projections) Th fblTowillg nifonnation relates to existir2 school oerti.ficd capacities and is not related to new It zis la'gon front DPI (Department of Public Instruction) a5ccting elementary schools. cIL-IpEL jjjLL1C,,jB_RB0R0 SCHOOL DISTRXT Fllementaz School District A. Docs not currently exceed 105% LOS standards (current LOS is 95.40/0). B. De,,-F,;,asc in the increase of the growth rate a, this level over the next 10 years. C. Chapel F1 T I.,'Carrhoro Elementary Scl.-ook) I "10 should be scheduled for a 2009 -10 open-i n g lfiddle Scheel, District A. Does not currently exceed 107%, LOS standards (current LOS is 90. 1%). B. Decrcasc, in the increase of the go%th rate at des level aver the next 10 years. C. Chapel Hilb"Carrboro Middle School --'5 would 11.1,ely be projected for 201-3-1-4 versus the prior year projection of.2009-1 0. High School District A, Curi-ent1v exceeds the 110% LOS standard (cum nt LOS is 112.8%), but IN'lemorandum o-f (-'\40U) suspended the: Cer-Lificaie Adf; =qualc Public Schools (C-ARS) ad,-quacy test at this level. so CAPS rnay still be issued. 13. Decrease in the hicrease of the growth rate at this tevel over the next 10 years_ C. Chapt-1 ffilVCarrboro, Hiah School E' ) is still needed as soon as possible with current Cunmft 11c'Llon schedule estimmes at 2006-2007 but, with a likely chwige to 200,17 -2008- OR�4.'VG' C'O: t YTY SC1100L DISTRICT Elementary School District Dees not currently exceed 105% LOS standard (cuTTMI LOS is 19.0%). B_ Increase IP the increase of the growth rate at this level over the next 10 yea s. C. Does not affect or prompt CT activity in 10-, m, Middle School District A� Presently= at 108,7% LOS which eNceed S 107 % LOS standard but Memorandum of Understanding (-N-40'U) suspended the C.-rdificzt-, Adequate Public Schools (CAPS) adlcquacy test at this level until Orange County School District (OCSID)NIVieditt School � - C. I .,,� Gp,.�,js so C. � S may still be ;ssu d. B. !,ncrtase in the increase of the gro•th rage �! this level over the next 10 years. C. OCSD Nfiddle School #3 is still ne,edc-sd zs soon as possIble with coil struction scl�,-Ohlule es i iniatt--!s at 2006-2007. High School District A� Does not currently exceed 1. 10% LOS: (currem LOS is 9 1 .7 %). B. Necrease in the increase of the gpowth rate w -.1-is lewd over the next 10 years, C. Docs not affect or prompt GIP amt_1"V'-_Zy -_rn 10-Year tire,- frame. m Orange County, NC School Adequate Public Facilities Ordinance YNTRODUCTION T-he Schoo I s A dequ ate, Fubllic F a cilitie-, 07d:-naunce, and Its; IN. I eniorandarn of Und-stand-in-go arre ordinances and agreeinc�ra& Ve-! ?. Si PPOrtill- dOCU.-IIICI'-,tS are arnt iciparcd' to be d,�,namic to incorporate thc armula>jl - chan, ing condlitions, of mlemlhez-a -hip, CaPaCUY Ot =d ud�.mt projections that may affect School Capiud hivest.m.ent Plan (CTP) timing. ThIs fo-nmaJ annual report will be Forthcoming' to all of "11-he Schools Ad rate Pulblic F,-tcih'ties Ond'irjan -P.aT,ntrs each year as =v ir, form --tiort is avadlable, -r 1 rlq� ,eed. s process. of the CaT,' al .1hus uodaied inforinat'on is -,s-,d in scho-c'is capital i- PEI'Lln �?rocess 1) and within eT-IeTmer.is of e, Schools Adequate Public Vacili.-Fts Oniinance C'n-dricatc oCAdoquate Pubfic Sch-vols (CILPS) spreadsheet syst c-s-'s 2 IM (pro L This, report and any commen-LS from, ilhe Schools Ad . equate Public Facit I it^e-;; Or DarIllers v.111 be consqide;z d in the Rr t half of'��ach Nrc�ar by the Board of Cojility C,cm-T-jssi0reT7S at a re_ slar or special ille-eting T he vanous elemEnts of - Jje report are then "cenlfied- and L L v colas idered in the process cif the upco= Capital Investrnent Kan. Th-e Ccriificate oE' Ad,-qua-a,, PUhHe Scbools system Is upda.ed after 'Nlbvtzmber 1-5 when data is ?, c,�-:Vcd �E-,O-m and capac-ity (i.e. CIP capaci-ty or -p. oo 1- 5 Ln. c ts k actual membershl ".;nint ac;*,on" capacity changes). Thl- Schools Adequate Public Facili? .3es Oj-d.mance and . Memorandum of halve d%man-iic aspects The derivation ofilie baScliine ar ;update to the variLheswifl m Z jh� futu,.rc as- a variety of school related issues zz-t En tined by techniQal mid pol,,cv gr TI-ne pr-innary Eacel of this report inciud-,S "Ine, creax;ori of mathematical projec-, �y school levels (Elemtnitt4az-v�, Mliddle and High) and by School T)I. ;t ncts ChU, pef -Ri I I 'Carrboro and Orange Cc untnv-' 171, is 91"o-mmation is found in Section 11, Sub-s ci.-] Ons 3, C, D, Lod B. In summary, this report serves as an u-,pdate to, Lhe dyrarnic conditions of school I- -CCAS future projections- as F,,, 71. nc 'Mil) School cap ael ty, and h ousing d, cvzjcip ent,whic tff Cap..,ial Invest-meth uji, g. It Flat. I T--erested parties niav make their k-nomm to the Board of Cow ty prior vlo, their re- view oftlic rtpor-4, ar.,Q. szhool CFP comph'-fion. N ANNUAL REPORT AS OUTLINED IN Schools Adequate Public Facilities Ordinance Memorandum of Understanding (Schools APFO'.—N10-LT), SECTION Id RESPECTFULLY SUBMITTED TO SCHOOLS ADEQUATE PUBLIC FACILITIES Chapel Hillo'Carrboro School District School APF0 Board or-County Commissioners C,arrboro Board of Aldermen Ch-t-apci Hill Town Council Chapel )41131...'Carrboro School Board Orange County School District SchoolAIRF0 Boal--d of County Commissioncrs H I I illsborough Town Council Orange County S ch oo I Board . LV P, lanning Directors/School Representatives Technical Ad-slsary Committee (aka SAPFOTAQ Orange County Planning Department Craig Benedict Planning Director 306-F Revere Road P.O. Box 8181 Hillsborough, NC Z7278r Z5 Town. of Chapel Hill Roger Waldon..' ' Planning Director 306 N. Columbia Street Chapel Hill. *-'-,orth Carolina 27516 Town of Hill. borough Margaret Muth, Planning Director Z.4 P.O. Box 429 Hillsborough, NC 27278 Orange County School District Shirley Carraway'. Superintendent 1-700 E. King, Street HillsborroUgh, NC 27278 Carrboro Planning Department Roy Williford, Planning Director P.O. Box 829 Carrboro, NC 27510 Chapel Mll-Carrboro Scbool District, Steve Scroggs, Support, Sere= =ices 7-50Merritt Mill Road Chapel Hill,, NC 25716 Includes: SAPFOTAC-,"O.C. Budect Liaison Donna Dean 208 South Carneron Street P.Q.'Box 8181 � - Hillsborotigh NC27278 �5 1. BASE MEMORANDUM OF UNDERSTANDING A. Level of Service 1. Responsible Enfityfor Suggesting Change - Chat ge cart only lie effectuated by ainen,ainent to -Meinaiandum of by all School APFO paTtnars- Deyinhion - Level of Sen4ce (LOS) rnears the amount (level) of students that ca-1- be- acco-n-,modzted (serviced) at a oeitzin school system -grade group U-'e" 1--le're)-itany ICN'-el (K-5), Micldlz- U.vcl (6-8), High School Level (9-12)j. -d for: Srandardfor. -1 StaffdW Chapel Hill. Carrboro School District Orange County School District Flement2n Middle ML�h School Flementary :diddle Ifi-h School In t5 105% 107% N/A 105% NLX 110% 110% 107% N,'A - This rneans t1h.e School APFO AdequacN Test has bem- "suspended" accordance will I ad dendunris to the MernorandUrn Of Uhi-derstanding until proposed capacity is added in thic s 'fie school level area. pec, 4. Anakysis of ExLyting, Conditions Chapel Hill Carrhoro School District standards are acceptable at this t;M- e. PI as-' ro-, I- -Chat the High School Adequacy '-St haas been suspended (i,e., does not appLly) UjItil ilrie new Hlei Sehool opeiis which is scheduled 10N at which dinc the test lbr the all Hiu' L -i School will be awom tically reimwtd. 5. Recommendation — Nkt Chang,.e from above standard A it a lyshv of Existliq Can ditivn s Oran ,ge County School District T'he-Sestandard -, are acceptable at this P]---ise note that the Middle School Adecuacv test has been -suspended (Le, does not appl-,') u it the new Middle School opens which is nni scheduled for Fall, 2006 at which time tlaetcsi tree ?diddle School tx'ill tie ac.to -cal"Y nc h,staicd. Recommendation- : o ChwigE from above standard H sec,!�f-n f B. Building Capacity L Rexpansible- Entityfor Suggesdj��, Change -The Ptanning Directors, School Rcgresentatives, Technical Advisor Cominnizftee (SAPF0TAQ will rec -ve r.- ui�_,ste r, ei q, Ali changes that are CIS related and adopted hi -thc- prior year. CIF' capacity changg s. wifl, be LTD.- �a7e_d along wiLli actual rriember111110 T: celvecll In Noven-lb-tr of each yc,---. Othe-, changes will be sent to a `Joix"Jz ActLion Committee' of the BOCC and Boo-rd of Edncation, as noted in the MOU. %,vao, wili rn-a-k-c rocommendations and �brwzird chain -Tes (4 --in The specific forins with justification) to Che fiUR Board of County Comjnissioni�rs for re%�iew and action. These non-C2 clan -g-1-3 vxuld be updated in the upcorrung No tuber CAPS sys�,cn recalibration aridi,C!Lided in the SAPFOTAC report. 2. Di-y7thition- "For purposes of&us NIc-mnorandum, "building capacity" wi .1 b d by ref6rence to State gnfideliMes and the School District guidelines (consisrcnm wizh, Cu? School Constiuction Guidellne-s-!policits dcvcIc)-Lcd bythe School Di -strict and 0fe 0.f,countv Colymlissioners) ani will be detern-nined by ajoint action of the Sch�x-,T Boa I - MI: sand ih-- Orange County Bovril of Colun-.ussitiers. As used herein the le- nn "hull, nog capacitN," refers to permanent buildings_ Nfab-Ile classrooms and other temporary Stuckvt of ht coumtd in detr.-T-rnining the school districts buillding capacity Standardfor: Chapel Hill. Carrbolro School District Orange iCounty School DksLriCt Thl• on' ezr_rz a I ce -tLi fi ed capacity for each of i1he �chac]s was certified by the respective and. 171corliarated M the s.t'- -z a­.ion of the CAPS system (Chapel- Hi C�7,bloro School District April 29, 2002 - Bas,e ) (Sc-- Artachment. T. B. 2) Cap2cit_v i E ti S wcxe made each year as Theonigin al. ce fied capacity for eac_*,ivsji, Mi I I schlools was certified by the rc-spective s-iperintendent and incorporated in he Ii-nit'on of ffie CAPS sy-stem (Orange County- School District April 30, '20",12 - Base) (Sec Atytachn-ient I. B. 1.) Capacity changes ml re tirade each wear as 2 Section I 2003: Licrcasic of 619 at Rashkis, Eftanentzry, 2004; No chant -es at Elementary, Middle, or Hizh School ]eels. A r. 4jja.jysis of Existing Con-dilions: R "Alows: 2003: 'No net increase in capacity at Elenien tar licvel- No changes at.-Iiddic Sebool level. hicrease of 1,000 at Ctelar IRddz-- Higlh School. 2004: nett, increase in capacity a, El-,nitntary level. No changes at or High School levels- Analyst's of E.ristin'-, conditions Chapel Will Carrboro School District Orange County School District The Scho-olsFacilides Task Force d--velop,-d The Schaols Far-Ilifies Task Force deve�01)5d' a a to caic-ulate capacity. An y changes sy-s,-Pni to calculate capacity. Any change s ve.., r To year will be monitored, re%iewed, and year to year will be monitored, rcv;ev.4 and rtcorde4d by Lbe.SAPFOTA-C on.approved- fo-, =L.s distributed to SAPFO partners and certirffed Ipon approval by the Board of Coumay Coo-rnissionn-s each year. -TI;-- I he -:ezu'-sted 2004-5 t:uvalcity is noted on Aua--Iumcnt 1.13.6. re,cor�ded by the SAPFOTAC on approved fomns distribuW to -SA'FO partners and ceitified upon approval by the Board o-F Coijnty Com-missioners each year. Vnt requested 2004-5 ca city is notluttC- k}7kj Attachment 1.3.5 Please note that the information contained In this report relates to existing school certifier) capacities and is not related to new legislation from DPI (Department of Public instruction) affecting elementary schools. -Amy capacity changes related to DPI legislation A'Vill mquire reconvening of a School Facilities Task Force type of croup that can act as a Joint Action. ft ?�- Committee., 5- Recommendation - No Change at this time Afflicriniput 7,om SAPFO partners and car-nment, s from authorized Task Forces, thC Recainizzendation- No Change at this time A-Permpul ftom SA-PFO partners and ftom authorized Task Fo-cc& thz 8tiard of County Commissioncrs would render Boa ,dof Couniv Co-mmissiones would render a decision pnor to a Novenibe-r update. a d'---isic.n Prior '.o a November update. Poet Cat ° i- 56,2M SSS Cheeks 6,346 529 411 X541 SIAM 414 90AW, 500 4,27 Oros 0 644 nba* � rv+�rVn" I + 4 , y-+�, +} 0 w �4 t �r 1, x, �+�+, ' �+� i32 sl �. ` UAS . ltdas S', 243,,= ■ 1,452 L 241.111 4,� 3� �•. O= . 3 ? Sch=4. Z13tMg 44 ' y"7 Z. Ts L 't .3 - �. _ °t am _ '! ocilt, a-1 jv- al* PI IL oil Af 7 jjjjc a LAM Attadunent L13-a 1 of 3) Spoc;W Note% Foc 6* Nn-=b= IS, =2 but y&w Um b=d ttC P=L ul J= Ivy thz CLZ or (2) xn walm—Atd vmion of this fmn s is C; 2 fie d bylh.- UkCC Justification: An increase In Hiffsborough Ella mentaq CaPadtY Of 100 w*g$ completed prior to the start of 0p3-04 srhool yw in nwrd8nce,.vfth ti- a CEP- H", ever, dus to conOnugq, renovaUor s wrVILn tu—M fu 9 c a as of 514 S d, 9 .-eL s S s ft S .v,; 4 f a c h i av -- d teat t h e 200520 20, ADS Ospacity Certmc-ation: m -Atta-chmem T.B.3 (age 2 of 3) �Sch6�Tbfsfxictz Orm.-Cmil—mYS63677 School Year: -Novem= 73,- 3003 -N,5wmbtr i-1.3-M-4 I , -W[4 LNISCYCU IJ',' Lw-N= acrt-31=1 tapazifim as par, Cr " :bc S;..Ikwyzii Tai: Fore vview =-4 N',:* iA'snnm m4 Scha,I Repve�,=,=�vv Fccanical RtporL llrun—tespacifcs wT.13 rmmin erl6c—re =0 C. zzng.� C.? or (2) m me; dcd vm.-icyn orOMUS fam- ft: �s unif:'-,sd bY -it t V. Justification: No change in capacity. C2paC-t.ty Certificationt Superintendent Date =036 FT7 -Date Membership Certification.- Superi Mende nt Date BOCC Ch2ff Dote Attachment I-B-3 (pagge 3, of 3) SCRID01 a 0--ange County School,,; 3rho;IYear. �ovemberl5,2003-;�ov—einbei"i-4-,'2064 Special Note: Fm -d-x Ncree-nbcr 15, 2002 bzs.c year the boa -,d uo -4 LI--- -,zLTxm-n =no cnNmaieo cap am Lms Ps PEn or inc, -wncAui rvoliu- La-;e ",ama rcv1 and 2M-3 Pha-Imors and School Repmserilwive7rd' im-cz I Advi.zxy Commkriere- Repcxt. T*ht:scc2p=,I`Hcs will rmrain.zfRcdvt L va! char-=d by (I', (:-,w Sczh---ol CIF nr (2,k 2r, arkmdedvasiou of this Rrm Chat is C=iffcd by flzBOCIC. justIVIca-flon: Completed construction of Cedar Ridge High School. This sc•W opened in the fall of 2002 with a s&ool ca2adty of 1,000 students. Superintendent Cate BOCC Chak Dat8� Ps Atta-clumst tpap I - . .. . ... .... *pOsm I no MI EX 0*4 NwrInkoca. ;5.2,%2 SEW tap= w part of dIt SzhtXA NzAh�a—i4sk hool Rtpcm T, hm cap�,,;ilies se ra—mm-m e6cvovt -='A A Pj Rwft --t-itw End :&',S pia-mXem, =d SAO i1wen Now Cox Q===w�5dvcmjOa of 1116 Justificationt 0 , 7 VI i �,.—Zass an r0-;, Zvty of 6,,9 at Rsshid$ EMMeNSY %SS COMPieed PI-Iw to thO stad, K Va ZOC�3-04 SCN004 jew- ;n zoz=�antce wllh the CIP, Capaefty Oertirmation: Membership Certification.- Pox= VZ77 755-- Attachment I. .4 {page -2, of 3) ISr-hoof Yearr. Novcmbar 15, 2003 - No-mmlocr 14, 2004 1 SpeCial Note.' I�vr NDV-amf= 15, 2002 basc year the t)mrd capacities as pan of Scho*l F—acilitzim TzSk �: c mvivu.; aid 200.3 School Representative TocimicO, A&,iw.yCb=ni*=-RcperL by 0) the Sch,ao, CJ P ov (2) an am=dcd vemium of this form - , is =Tulmd ky &x EXX-C- Juttificatiort.. Mernbershfp Certification: Supedritendent Date ROCC Chah 57e7 e Attach-nient L3.4 I (Pa .) 1, -- -z� � 0 ) School District Cliapel Hill-Caitb6ro City School,-, School Year. November 15, 2003 - Novernh--r 14,2004 .Special Note: Fcw 2)e: Na,�wnber 15. 2C-32 caap6ties as part W—he Sclux:4, (-nflit4s Ts�ek Fo-ce 103 ?"Ennm and Schuot Reprmpffatz6vt Tc!c�micaj Ad ;!_XrY CC R--PCrL. 'Mmz CaPaci tics x l3 rznwin tnTcw'dve- xl� 0 cl=gad by (Z ) ft4 4j;AW.�jj CIP ,3) ;, mcn4cd vcrzion of :WS fpwm has is m-bItd 'n vhy. BOC.C. Justification: Date BOCC Chill Date Attachment (past I of 4) . . . .... .... ... 37choolEYWOU Oro-ve Comly schools School Year. November 15,2004. November 14, 2005 For.-c resit- =d 2WO:- Phunmem znd S&M RcprcsftUUv-. Techm,—J Advism) COMIU1W P-tPOrL n-0 CuPati-A Wia vun—la crfe=va ur-11 ct=ga by (:) th-- CIF w (2) xn *mmded version of LES rwM dw. is =aruzd hy LIV, BOCC. Justification: An increase in Hilsborough ElerneentW capacity of 100 was completad or to tine start of the M03-04 $0001 yeeLr in acoordance wfth the CIFI. However, due to oonfinuing renovation MWn the soh I, the avertual full oagto!!y of 514 student sets VAII not be ach' leved until the 2005MD6 school year. The above numbers reftect school ggE!,jt Mthout considembon of state dass size reductions in gcodes K-3. Cartifloation; Superir dent Date Chall Data Membership Certification: C- supe-, ndent Date Glatt 13 /Iv f a e Alladmient l.B.5 (pag w 2 of 4) SpA-clal Note: Far ;he.\vv=nb-r. 15, 2W2 We yea ft b*ard '!,e- ltqp- . ult-nd--m-C-trilsod =pAtitici -.L- Pwt of d1w SAOCI Fa:t* n izw An INR7, pamn= and Szboul Repm-s-enwive Tz%ftize, Ae-.Uory C--.n=-- R,:im-L 1> =V� Justification: An Increase in Hillsborough Sam antary cp-pacfty of 100 was completed prior to the start Of the 2003 -04 school year in accordance %vfth the CIP. However, due to qnntinui22 renovafions vvirhin the s&ool., t eventual full capacl_ty of 514 student scats w not be achieM until the 2005MO3 school year. Leolsla-flve adon taken In July, 2004 reduced class size in grade 3 to 21 or fewer studertm PiWic*-m leg= Bat ive action had already reduced class size in gradg$ K - 2 to 21 or fewer students. Th;s reduction in class size muirements for all grades K-3 reduces -tuts nvrrt er of students that can ta legaffy, place-: within K-3 classrooms, pffee5ve!y r-edw;ing the number of K-3 seats avatable wifthin all ,elementmm-y schools. The adjustment In capactyis a reflection al'all of these adons. Capacity Oedtfication; z, 41 , Membershlp CertMeationt. Tpdl� mttendent Date Attachn, (page 3 of 4 ) Schv,ol District-- Orange County Schools School, Yevx.- N-,uvcznbcr 15, 21W. - Novembtr 14-Z"005 Sp0*144 Xvfti Fbf Lk-- Nfovwubzr 15, 202 h� fi=r t—:- board --ccepwd Lhe vV$cjIm3 as p,,U-1 of &-- SChoa] F"—ffili,* T,-A Fov e revi,�-wamd 1,K).3 Mann= and Schmoi RrPrelmnM5NIC Tecbnkal Adv-i.wy Committ= Report. Thuce cV.,,%cifieg will m ru7ji anwatJ b t 1 thz School CIF or (2) in a=nded vcrsion of &is knn tba, is certiffic-4 lbv th-- 500C. Just tfication. No change in capacity. Capaetty Certification.. S u p e it:.at nd a nt Date Date I M mbership C Icatia": 6'r Supr;NR AI30 kendent Date BOG,G Ghajr Date 15 2003-2004 -124 2004- ,6 '206-2007 �2W 2005 -200 0 Afembersbi g, swdle Sqmunp- 200, 1113 1 - JLSUr=uOv - Reques" Requited Rt ed ed s e4 R"p�:q qu J Saco! Feet Capacity Footnote C;Pacitv c,�dty ;aPacRy C20a C schoal yead '140 J C N 107,6210 726 243,620 Sp0*144 Xvfti Fbf Lk-- Nfovwubzr 15, 202 h� fi=r t—:- board --ccepwd Lhe vV$cjIm3 as p,,U-1 of &-- SChoa] F"—ffili,* T,-A Fov e revi,�-wamd 1,K).3 Mann= and Schmoi RrPrelmnM5NIC Tecbnkal Adv-i.wy Committ= Report. Thuce cV.,,%cifieg will m ru7ji anwatJ b t 1 thz School CIF or (2) in a=nded vcrsion of &is knn tba, is certiffic-4 lbv th-- 500C. Just tfication. No change in capacity. Capaetty Certification.. S u p e it:.at nd a nt Date Date I M mbership C Icatia": 6'r Supr;NR AI30 kendent Date BOG,G Ghajr Date 15 A,tTa!-'hm=l (n au, d a o Special' Note., Fmrth--K qtmS.-r I I, zw2b;m m P=VfOlt schm-1 Fit-' iflulzek jusmcatiam 1.1410 a in capast . 16 AttacErnent 13.6 (page 1 of4) School Disrt;W*. Chapel Hill - Cardboro City Schools school Ve—ar-November 15, 2004 — November 14, 2005 SpecialNoto. PbrftXoN=rba 15.M2 cue priifi=as put of the Scbool fniliftsTuk A= :n --o and 2003 N=---s =4 S,-bwl Rqp==t24-.V T=hniz-J Advir=.T CO.T--tV&-- -Rrp0r-,, MM Mpuldcs will =--in cfrzCd%—. ca.IR rz pd by (1):t= Sz—hwaz CIF w (2) = ==dtd vmion of this Cam k 4 --ti *d by An increase in capacity of $19 at Rashkis Ekmentary was completed prior to" ttartof the 2003-04 schod year in accordance vAth the CIP. The above numbers reflect school capacityvdthout cons;deration of stale class size reductions in grades K-3. Capacity Certificatlan: supeanlw4ent soccchall' Date Membership, Cortiffcation: Date 500-77air Date 17 . ac rat !.i3. (page 2 of School III -strict". Chapel Hill - Carrboro City Schools School Year: November 15, 2004 —November 14, 2005 �N=�Id...Wzaxi ror me ovovemoer o3, Zuul base year the board accepted the superintendent- certified capacities as part of the School Facilities Task Force review and 2003 Planners and School Representative Technical Advisory Committee Report These capacities will remain effective until changed by (I) the School CIP or (2) an amended version of this form that is certified by the BOCC. Justification: An increase in capacity of 619 at Rashkis Elementary was completed prior to the start of the 2003 -04 school year in accordance with the CIP. Legislative action taken in July, 2004 reduced class size in grade 3 to 21 or fewer students. Previous legislative action had already reduced class size in grades K - 2 to 21 or fewer students. This reduction in class size requirements for all grades K -3 reduces the number of students that can be legally placed within K -3 classrooms, effectively reducing the number of K -3 seats available within all elementary schools. The adjustment in capacity is a reflection of all of these actions. Capacity Certification: Ao�� Z44, 12--'20-0 Y Superintendent Date Membership Certification: Superintendent Date BOCC Chair Date BOCC Chair Date 18 Attachment 118 .6 rage 3 of 4) School District: Chapel Hill - Carrboro City Schools School Year: November 15, 2004 —November 14, 2005 Special Note. For the November 15, 2002 base year the board accepted the superintendent - certified capacities as part of the School Facilities Task Force review and 2003 Planners and School Representative Technical Advisory Committee Report. These capacities will remain effective until changed by (1) the School CIP or (2) an amended version of this form that is certified by the BOCC. Justification: No change in capacity requested Capacity Certification: Superintendent Date BOCC Chair Date Membership Certification., C 1 z Z v -4 79upgrintendent Date BOCC Chair Date z Attach n ._nt 1.B.6 (.pa`o 4 of 4) School District: Chapel Hill- Carrboro City Schools School Year: 1 November 15, 2004 —November 14, 2005 OPOCIUN ]Muse: ror me lvovember 15, 2002 base year the board accepted the superintendent - certified capacities as part of the School Facilities Task Force review and 2003 Planners and School Representative Technical Advisory Committee Report. These capacities will remain effective until changed by (1) the School CEP or (2) an amended version of this form that is certified by the BOCC.. Justification: No change in capacity requested Capacity Certification: ��Ad_ lZ— 0rvy Superintendent Date Membership Certification: &Lj&= lZ 24-oz* Superintendent Date BOCC Chair Date BOCC Chair Date 2�} C. N-lembership Date 1 Respaitsible Enthy fir Suggesling Change - Chan ce can be effectuate• only by In.- ers aj-, M m -,nt to N a . Ternorandum of Ulndt�manding (T OU by a cl o AP 0 pa 2. Deftnition - The date at which student miErnbevship is calculated. This date is updated eatc,h year and also serves as the bas:3 fo.- proj--ctions along with the history kom prc;-v)QUS. yee� 7—s. "For purposes of this Nf-,moi-a the term "school mein. iship" rnzw-� actual, number of students attending school as of November 15 of each year. Th.e fiTure ,ardl—s IS d-IerrninM by considering the number of students tnrolle-d (J-e� re'-ziste red re2 of .v a student is no longer arteending scbool) and making adjustments N-VAI-drawals, dropouts, deaths, retentions and pronnotions. Studen ts w hoare me-I Y absent fro class on the date Mu-XMbcr,,hip is de-Kammined as a result or Sickness or soine Other teL-,1porary reas-an are included in school nic mbirzrship figures. Each year the School e ar 1 S 0 taree-mert no, ialer thart District shall transmit its school nicmb4rsh P to Lh P lie I this fire (5) school days aftc.r Novernbtr l5, a.rdfor; Stand Chapel Hill Carrb.oro School District "'c-overnber 15 of each year 4. Anatvs of Conditions Siandardfor: Orange County School DIS-hirt November 15 of each year This,. ill b,-- analyzed in the future years to deeternine. if it is an exemplary date. This date nzc�v sometimes occlir oon a iveekend (as it did in 2003) and j,v no a iypkal care for inember-ship census and recordation. An earlier date such as the -40"M d,,,:U.," n2eynbership n2ay be suggested in fie-Fure _year., so da.,fa can be araI-.vz-I?d earlier to assist in school CIP needs assessment. 5, Recommendation - .,Nlo change al this Recainnze-ndation - No cljajt,,-,e at this tim e time 21 section 1i 11. _A.,NNuAL UPDATE TO Sciiootcs ADEQUATE PGOLIC FAMITIESS' OR.D]Nr.k-CESYSTF.Nf Capital. Investment 'Plan (CIP) Responsible Ent ty fear Suggesting Ch ange -- The updating oaf this section wil I he con.duuicd by the Board of Co=tY, Corz-a-ms _],Gners: (BOCC) after review of the CLP ,-,=que.sf-s from the S.clioolDisLricts. Action r�zardin�ClPpro r,)rai-tis usual yoCCLI-,--.s 01"IrM2 Z7 bud ic lie, ing pjToccss, Ln the spring of ea-ch year. The de%,tilopmont of Lhe BOCC get Publ, -t. releas i! rne! he CIP consideiz. the conditions, rioted in, One SAPIFOTAC repot zed in CTP development year includii-liz LOS of service), capacity, and menibersh�p p rOj tL1.7`&_rj s. 2. Definitfoir —The process and resultant pro,,, to detenriine schoul needs andpro,,idle ffind-Ing for ne", school facilities thro,.,�-h a vanew of ruridiria mechandsTris, C, - - Z, 5 Standard for: Chapel Hill Carrboro Scbool District ","ot Applicable SCarr dand far: 4ran2e County School District Not Applikable Anajj}sjs,of E'Xistifig Conditions -Me Outlines a system Of i-niple-n-onLing the SAIRFO, including Issuing Ctm-ifiCa-Les OtfAdNuate Public Rhools (CAPS-,) to-,-ie)x developmern if capacity is available_-. Tht R_-ques s for CAPS will be evalual.ad ui.,:.ig ihe most recently'adopted. Capital Lavtst=.e-Ilt Plaza. The plan -nehides fluiding for CH('CS high School 13 (2007), fund ray recov—,nil-ion 04 CHCCS Elementary School elf) (20,09). and funding for OCAS Middle Schoal F..r3 (2&06). A,,iew Capital lnvestrn�_It Plan =s cl.-TT�ntivui- der dL-Nclopinen',for.aI o� !alpT_'ear pr PIO ju,7c 30, 200:5. Recainmendation — Not siul cct to staff review 22) Sec-60.77 11 1, Student Projection Nlethodology P,esponsible-Ef I tityforSuggesifug Chia se4,-don is reviexed and rem =,t ended 0Y the PIxi-n-Ins Directors, School Rt:prescniatives. Teo- cal Advisory Gc+mmitte yCalS tO (JC*kC;1131P11ff, total metumer-snip ai e cornomcu suuout. icvcL v La and Hi.h School) which take into historical membership to! Is ata spiac` time- (Nover iber 15) in -die school yeWr- Tlhcs�-!-Iethods are also knoxvnas:'rn.od-t1.,-:'- Stain fair far: Chapel Hi: l Carrboro School District Stwidardfor: Orange County Schoot District Prcscinhll the average or five, mod gis art bein g used: nameIV3. 5. and it) year C� I . . historylcohort survival methods, C,),-,rty PI anring DeParatnent Linear Wa,v- e xid Tischler Linear methods Attach -Pnent TI.B. I describes includes a description of each model. Analy,sis of Exist ijig Conditions Performance of the models, is monitored each year. The value of a projection model is in its I -t^ Us so Lhe pr-;�dkrion of'school level capacities at least th-rcc years in advance of capacity shot M atu,i: i Capital Investment Plan (CIP) updates can respond proactively with siting, design, and con-struntio.n. Attach ,111Qn..t11.B.2 shows the performanc-- ofFthe models for the 20,04-5 school year ftc)m the prior year projection (i.e., only a one year projection), A-Rer which, a surrmrlarY Of eacin mode,[ is provided. Recomwendation - No Change from above standard. I,- �21 Ai,achnitnt H-B. I (page 1 of 10) STUDENT MEMBERSHIP PROJECTION School District: Orange Year,,,I)ate Tssued: 11/2-2/04 Ye2r..'D.qtc Based: November i 57 2004-2005 Years Projected., 2006-2015 .!L Projection Type- Tischler Linear 1. Projection Mathematical F-onnula Description/ Straight Line Projection Characteristics., 2. Projection Formula: 7u.'a-z-'an, c ChaLge; b = Base Year, x & = Frpj ovtzd FoL Projewfion Years) ...... ..... 3. Projection. Historical gow-this rdlected hi projected .growth Assumptions: % Elernentaxy, Middle, -and High taken from SYF 200-5 andhe4d constant ib-Toughout projec'non. 4. Average Annual 1 A ',I te V., is hT a It 4,veftege. wwad g-,-nvk ywr; Grovvth Rate., S. Attachments: 6. Projection Performed; PI: Brian Carson Dtate., 1 L,224--4 7. Projection Reviewed: By: Date. 8. Projection Certified-, 9. Comments: -)4 At-m,-,hM= TLB, 1 S -DFNT N NIBERMIP PROJECTI TL I-Ei ON School District: -2munge Yeari'Date Issued-. I1_109'1" +i�= Yeari'Date Based: Ntovembc-r 15. Z004-2f)05 Years Projected-, 2"(K) 6 - 2 Ct 15 A Projerxion Type: I OC? Llin r Way I. Projection � 4a.fl,,Tnatical I,;,%—,rkxith Rc=nt variation among school levtls. Description/ Reflectinj prqg!.!sin& waves of mcmbership. Characteristics., I— Projection'Formula: aym + (311, — 15 (0) — EYN''I EYNI x %SL - ICY -NL,-SL e man6er bry schnal le�,d 3. PrOjtttiGn Base year gT.",Ih reflects Its -year 'Usumptions; Increaw in BY I of 5 r-e-II-XL$ d e2s-Cs in h0usir 9 4. Average Ann.1141 Growth Ra A p te: 5. Attachments: 6. Projertioti Performed: Br-* Brizzi Cap,,,On Date., 7. Projection. Reviewed: B N_I: Dare: 8. Projection Certified. comments': ,,W- p 25 Avtachmcnt 11.3.1 -STUDENTIMENTBERSHIP PROJEMON" School District: OMP-C County" YearjDate Issued: NoverZ-hur I 3' OOL-1 YeavDate Based: Novembcr 15,2004-2005 Years Projected: .2006-2015 ,V Projection Type: 3 Ywr Cohort 1. Projection Mathe=vzal f-Orr'-w-I ad= w—n-we-Z Lhc wvmse adv-wicramatrant zier De-scriptiont the p-evIOUS 10 -c=s f ca'"'I gradc level znd then uscs, mdh to no cal-cuLaw Characteristics: projected m= btr by sel-w-al lcvcl. An as surd Lin& pw-vel is based on binh rcco.-ds and `or hisWrlcal gmulh r4lm 2. Projection Formula; 3. Projection Assumes a 1% an-nnual E2�wfh rate for the kin dergar!gn -c level Assumptions: Assumes the same percentage of students in cacti Fade level graduare, to the next level cash near. 4,Av .rage Amnual Gro-with Rate: S. Attachmeuts: 6. ProjectinnPerformed: BY: ScTog9$*,Bcp-cdict, D= Date.- 11116, L) 004 7. Projection Reviewed: ny:L Date: S. Projectl*a Certified: STUDENT MEMBERS'RIP PR OJEETtON fpage 4 of 10) School District: - YeariDate Issued: Novmiber 1(,. 2004 YeariDate Based*. Noveinbcr IS, M14-2005 Years Projected., .2006-2015 A. Projection T)° e: 5 Ye ar Cohort ra a -ano-emen re w 1. Projection &�aj c*-�rqutes:he avc ge dN z t -t V� Description/ the pre%ious 10 years for c,:.,c11 grade level and then Wets each rata to Calculate CharacteristiCS: p-rojected Tncn. 1 crship by schwl lei vel. An ossuined kinder ganen .*n=-nbcrsMp is liased on bh-th rteor& and` br histor ical glowth r4cs. z. Projection Formula-. (oiber than rate. 3. Projection gzlk level. �A,ssumes the same Baentage of s-,ud--nts in each gradt fcvel zra&awc Assumptions; to the n---,t tev-.1 Caen tx-� 4. Mcrage Anatial 0.62% t4we: T'-"s i$,Sr, V"Oago smusirxe over anschow levels Ovafffft Y-'$-'T- Growth Rate., 5. . .......... 6 Projection Performed: Scrod; gs,Bene�dktDezn Date- I 7. Projection Reviewed: 13y: Date*. & Projection Cerfifled: At"I hmne= 11-Im! -STUI)ENT ME-NIMRSHI—Tv PROJECT ION (p ap 5 mi, I C�I School DLctrict-. Yr a V`Da t e Is.,, u v, d; November 16, 2004 Year"Date Based: Novctnbar 1. 5. 2004-2005 Years Projected: 2006-20 15 -2L Projrction']z-pe: I0 Ytar GO -hCTIL 1. Projection the overnot advanctment r-.-tc ovcr Description/ the "previous 10 years flor each grade-level and IhLn uses each mate,,ocakul.1te Cbiracteristics: projected nlemthmhip by school icy cl. A-n assumed 16ndergan= zmernbenhip is hased On binh rccords any historical growth rates. 2. Projettion FormuU.- fK 0.0 b K s7. G2: Mv, mk, enc 1: C-,,- r. CkO&I vev r G, it 1V,: LI Z.4 e "r n e Mk v ar grade *S On em ben, hig it -. 4 wwra!Z. e a d, vzrn c,� r,-,r -nae.. 3. Projection x-ugual g;",th rat ibr the kind. -z- sen =dz I 'I 3x n _t, As f Sm-dents in Cach fcvel s—,-dlulw to hie M-u le'vel each Vear. 4. Average -Annunl -,AYs il ewt avva-w? annual roe Ovef 0 01,vr ml Growth Rate: 5. Attachments: 6. Projection Performed: Benedict, Dzwj ate, D. 11/16 4 7. Projection Reviewed: Date: & Projection Certified.- 9. Comments: z S- SHIP PROJECTIQ_-N jpagt 6 of 10) .iTUI)E,',\-T �TKMBER school District: chavialviii — ca-r'a-x-o Yeari"Date Issued: l2i0912004 YearfDate Based Novembler 1.5. 2004-ZW5 Years Projected: 20,36-2015 ,X. Projection T�vpe. Her LincV, Tise 1. Projection N4,ujhema cal formula Description] straiot lim prqieclion Characteristics: 2. Projection Formula: 3. projectiou ,xs,sumptious: — (Wh Ic Bze, Fear. x Pop 0, a mw nroirudon years) Himriml % El Mcr, cotstw is -�--fleazd in pmi tak-ea t-om SYE ZC*4 wind hm-ld 4. Annual GrOAN'th Rate.-' .2.45% Note: zhiv & ari avcn�izo annu-d gmv2k ?W*e craT proitctiom finclud—.s., T Otai, -EtmeV id e, and 1414;77f) 6. Projection Performed- B�,!.- Brian CuMon 12,"09,1200-4, 7, Projection Revielvcd,* 13�' - Date: & Projection Certiflled-* 9. comment: �q T STUDENT NIE%MERSfIIP PROMcnax ls e, School, Dbarict: C'n app el Hill - Ca �ron:", Year,,,Date Issued: 1109,201 Ycar;'Dste Based: November i 5, Years Projected: 2006-2015 A. Projection T)�'pe: t Urea r Wav--- 1. Projection M "-eh wn�n)r Dewription! Reflec6unzz j:.wgn�ng wavcs of rneinhership. Characteristics: 2. Projettlou Formula; BY-M, + @Yl - I i(n')) - EYNI., EYM x '/'*SL - EN-NVSL �Byzlf = l3a gar 2`J #.Owh n-ev.Nnhip. By - bfue f$154 Yi=n SL Member hT xchew,,�i k-,"el I projettlext Basc year gz- ref O-v,=r A5sumptiong-. Lnqeasc ir BYI of5r: d.=mzes in howsizj Reflects buildout constraints. 4-. Average Annuut 1.-846 % Grawth Rate: ASGO, - CIO 15 PAY = Fi-'11'1-1�zmral, 'I'Af I S. Attschments: 6. Projection Performed: 'By: Brian Carson Date.- l2,"fJ'9!2CO4 77. Projection Reviewed: By.- But & Projection Certified: 9. Comments: !(J , STUDENT MENMERSHIP PROJECTION" School District: YeariDate Issued: Novcumbc 16, 21041 YearlDate Ha.,,ed: 'November 15, 2004-2()f)5 Years Projected: 2006-2015 A. Projection Type: 3� Y= Cohort I-Projection Nfachc=tfcaal fix� Cown;y—n c avvmge adva-mc--n- Est rave over Description/ the pmiowN TO y= s for esen ;md-- I-evel and thcm uSes each %0 czkZ-zt'c Characteristics: pivected.-nemImnship by se 1rml. An asiwmed kin-dergmmen is based on birth reconds, his!oncal gi-mA,,Ih r-,fcs. 2. Projection Fornratat ^-I K, = K, + (K. 0-0 1) a=(JG,,IggJflO b=g"Ja) r.-Own szhoal vc4r, C�Givr wadesmem5emkiz ra, m b=Ar*-Cz--d m 3. Projection Assume& a I% znnual cmN%,,fn we for the k indeqg=cn mdc cv- el. mu pions: Assumes the same percentage of students in each grade level gradaate- to die next level =h ycar. 4. -Aytralge Annual 01955S w avv3ge anwa rot C".'sragsa".' -Ove-- atemrt;n Grov� th Rare* 5.Attachmeats: 6. Projection Performed: ,By: Scroga., B=iedict, Dean Date; 1 I il 6J2,004 7- Pr _ ?rejection Re0ewed: BY: Dote: OJ S. Projection Certified. Oui�� STUDENT MENIBERS Ill ? PROJECTION' 'Chool District: Chipel HIKII - Cwmbc,-a Year/Date Issued: NovembeT 16. 20041 YeariDate Based: IN'ovember 15, 20014-20)5 Years Projected: A. Projection Type: 5 Year Cohn projettion MatItem, stkt-1 fromrjlz that con-74,trs, aie avcm- gre advanct-muza rzte ovzr g Descriptionl the prey 10 yews for c4ichpmde levidind then wescvwh rete -kocalculate Characteristir.s: projected mmbwrship kv ool level- An assumed kindcrgarren nncr;-,bczshjp is bw�d on birdh, .e�co-ds =& 'or his :ormc-Ld growth rav-s, 2. Proj"tion Formula: �_:Z (other lbrul &mpreq-ious grade lm'#dumnhig. mod ­vrelrent rate, 3. Projettlion Asssum�s a annu-J grcrwth rat -or the kindtrgamm gadl.- Ive,-eL AS-sumptionscl. Assurr;ts &,-- S p Y t ffstudtnas in each gmdt fv,:-c! grzaduazz to the me-vt kwit-n-h yzan 4. AveraggeAnnual N-',��, 4"J'a iavomge annual goo GroWb Rate: 5. Attach men tsv -. 6. Projection Perrormed: By: Skmgm- Rtne�c-t, Dean Date: I l.1 6-20041 7-Projection. Reviewed: Date.* Projection CmIrled: 9. Comments; TLDEN 31EMB' R151HP PROJECTION (pave 10 -of 1 School, District. Chapzi Hill - Year'itat issued. r °e r 6.20- = YeariDate used. Nmember IS. #tom% WS 'Fears Projected: 2006-2015 -k. Pcsrctt 1r car Ce$ at « s� a � �'€`t' � 4 •� L" a, i� srrt t the :� w i i�7--t t —b is v a d then s Caen Me xis Characteristics- by set-a-4 zmku-n=J kindergartn is based on birth rt or 3 "` x S i ii "ro b rates- 2. Proj"t on Formula: K f ff h 7i rf4 3. projection Assumes a I %a A, grey: h rate for the kindergasten grade level- Assumptions: a tions. Assumes the same gSamentag e of students in each grade Ivvei u to the nest level =h rear. 4. Average .finuuai a zm— 11siswl ve:awc 10:1=w we Growth Rte: 5. Attachents: 6. Profccdon Performed: 3vt Scrogy Bet: ict, beau �3ate 1 i 1 7. Projection Reviewed: BY: hate, S. Projection Certified. Orange County School Distrfet School 2004-2005 School Year (November 15,2004) H'rnmms High 4:-,aan-5 JQW irdjjdes hospita• sdiaaf 4 2- 3.A -t Orange County School District > School: Membership 2004-2005 School Year (November 15.2004) Statistical. Findings PROJECTION TYPE ABBREVIATIONS 10-Y RC HORT(10C) TISCHLER (T) 5-YEAR COHORT (5C) ORANGE COUNTY PLANNING (OCP) 3-YEAR COHORT (3C) Elementary School Level Projections were mixed (high and low) and between a loss of 42 and a gain of 47 students over the actual November 15, 2004 membership. The average projection was 15 students lower than actual membership. The membership actually increased by 71 members between November 14, 2003 and November 15, 2004. Middle School Level • I wo projections [Tischler and Orange County Planning (OCP)J were high and three were low (I OC, 5C, 3C). The average projection was 34 students higher than actual membership. The membership actually decreased by 78 members between Novarriber 14, 2003 and November 15, 2004. High School Level Four projections were low (between 1 and 101) and one (3C) was high. 7he average projection was 32 students low_ The membership actually increased by 17G members between November 14, 2003 and November 15, 2004. TOTAL The total of all school level projections were low and between 13 (O-CP and 3C representing the lowest) and 71 (1 CC, representing the highest) students.. T.' he Tischler (T) projection was high at a gain of 97 students. The average projected v�as a. 13 student decrease. The membership increased in total by 163 students, which is the sum of +71 at Elementary, —78 at Middle and +170 at High. Q :N0 Department of Public Instruction (NCDPI) projected 6.632, which is low (i.e. undercount) but within 34 students of the November 15, 2004 membership. Chapel bill / Carrbo:ro School District School Membership 2004-2005 School Year (November 15, 2004) 11114103 i 11115104 Change Wtween Actual I Projected Actual aotual Nov 2003- 2003-04 24N-05 1 2004-05 Nov 2004 . Elementary 469? 4695 +3 Mode I Prolection is T fa" H369 oCP 4505 H2-, D 10C 4876 H181 5C 4,80-:9 H204 3Ct08 i J 13 AVG!. 4910 11215 111 5,1200 2612 2560 -52 P 9p#Ion, m OCP., h210 2770 1 I 2-5-c-�s H38 5C 2$02 >2 3C 2535 P25 AVG 2675 1 H115 10634 1 man Model I:LIt5J2Q04 hl h T =0 H303 3422, J 492 1 I H2-72 iow159 h,312 816 Model prnfectl M S K "I 72 OCPf 3274 1 H93 3CI 3562 M40 AVG) 3497 H75 1 Totals Middle 2612 2560 Hicih 3 330 RA77 I 10634 1 man H means High L means low * excludes hospital school 36 > Model Jf- T 1U -77 H303 OCP I H2-72 iow159 h,312 816 11 nA17 H means High L means low * excludes hospital school 36 > > Chapel Hill/Carrboro School District School Membership 2004-2005 School Year (November 15,2004) Statistical Findings PROJECTION TYPE ABBRMA 77ONS I 10-YEAR COHORT (10C) TISCHLER (T) 5-YEAR COHORT (5C) ORANGE COUNTY PLANNING (OCP) 13-YEAR COHORT (3C) Elementary School Level All projections were high and betoveen 113 and 369 students over the actual November 15, 2004 enrollment. The membership actually increased by 3 members between November 14, 2003 and November 15, 2004, Middle School Level A projections were high and between 25 and 259 students over the actual November 15, 2004 enrollment. The membership actually decreased by 52 members between November 14, 2003 and November 15, 2004. High School Level • Four projections were high and between 93 and 172 and one ((MCP) was 10-W- The average projection was 75 students high. 0 The total membership actually increased by 92 members betvve.en November 14, 2003 and November 15,2004. TOTAL The total of all school level projections were high and beNveen 272 (0CP representing the lowest) and 800 (T representing the highest) students. The average projected was a 405 student increase. The membership increased in total students, which is the sum of +3 at Elementary, —52 at Middle, and +92 at High. • NC Department of Public Instruction (NCDP[) projected 10,933 (an increase of 299), which is high (i.e. overcount) but within 256 students of the actual November 15, 2004 membership. J CACCS&OCS St-'S' -SSP-d 37 0 C. Student Projecdons Ritspon—sible Eudi yfior Sj�gg"nfngq C-Iiange 01"MIS -'-�,�LIOTI Al-- bf 2 by tbo Planning Din:ctors School Reprtsp-ntadves, Tedinical Ad 4Q-(Iry Con,,miuf e. (SAPI-70TAC) and n�fcr-z to th-li- BOCC foramma I I repon --"LI:-A v"i 1 dist- bu�ed SA-pt-- Q Y %,n' ..ors ion- rvtievv nuad Corr =men: s to th�' 3C XX --70 czrun =6"n. D.- 1� v flim-Won — Tl�e zr--z of flivt �'_...j �v, N "d Te� zzd G - Ic-, (C hap--! `VCzmlm r-I School Mallet and fir: u- Ccpw -- P- Srandardfor.- ch.r PO It Cirrtioro School bi trict -�tandurdfon Orange County School District S -a 41 vreM e discuzst�d -,I TIRE t on N 1 ethcs !cOo vl:�) S . t-. Anachawnt U.C6 ,4nalysls of EvIsting C-011dilkins See AIIMIII-tm��znt I LC.5 ..c.1t f mu shoov cj"'nii- . n DUS, Fhhep L —i- _as :n&-c;Esv.,7 T,.'-n wzjTs of sty u—na ppojevc NtLis: note "hat the infon-tati . 011, eom2lnt-d in fbs T; D-ort nz�ja(,;s to exist 1'g 't: nd is txlt rt!Iatc-d w I T-L L I Les q-7 o -p-j.� I -(:: Afr-%: C-. aziY, zhzm,,Z��i rtlatcd to D"I 'esTa "FL an L7 T �_7 a oll co 3's ArAn IN' Chapel Hill Cairrboro School District Elementary T-nL- pre%:ious year (2001) ptecdon ror Novt4Tnber 2004 at this level was overestiniatcd by 215 7he.actual gro%vth was +3. years, this level was stems? Tily a I-Li-q rical base, of =--:asing ffimn HI to 77 to 141 studcn�,s a yezr; � iclh crQ�ated a Al,h. vvas c =yture� by dic -ianous inoxit-Is last -,z r to p7cxd�icz t��z need 6:r E` i a co rn �� 'u n j,,, n t' m 2 0" --t 6 2 CY) H! e wzvc r. th u- T�- 'I ztt I Y sz. ve'' rzzord WzS s-ath!"ically mtisk"ding ir-o its Hini-kod Vjr-I,!!Xt and was, rnmaw e, rnore -Ioii ver, Nf 02,75 szzudziui, 1-w hit-, icala age L :,rft cj,=mt yon ofely +3- The7,,.ffw foxe yL ver veragc, now pcnc�rnds the nr.-j�-d.s for Mcinuntary School �4'1 0 in � � sus at-t acce!erating 87A av Middle i-ezi (20,,3 3) proje-cticrn S Nov embs: jIrCG#4 �-,Ar ilr-ns ltvel was -1 -S to I., Fia �h-, --52 was. oonsisaem -,:,,ith The xas iecrc�,,—sing pn�zipi Lously ff; IM 214 To 6 7 'ain i, - flect fh' ,rcr.d. Ho%%,wer, ccr, nodels did e prier year's growth at the elm; mars s-ch -11 el as they prog;.-rcss into the middle school y cohoris. According-! y, ffie pt' -viously note e d cica-,ntm- VTOWTh ill ulattd inrw coriti-nuned groy ,th al :-imz a-LiddIc s:,aaol level. Now, with MbCr 204 naloNt YnAdhe schOol aL4d t- C -t-3 at e-10=-,un�tary School f� --Ir with an av mr 51 now radwas vtar fc, -ht- pushz:z r -�;� n�ned --u SAM 05 to the War year MOIN fugh School y��, (20 03) pnjecHoa Or lfovymber 206,41 -,or fni-q PeN,,el was Overe, Unmg,�:d ��y 75 d 'i'h:r-- a,�.:rua I mem bersL, ip creasr % +9 2, but was rM t a5 as - h n:d i': t_t t-t Src7v,,-h was z2p;-:5z .able 04 a ralsivoly cons=nT 14&:;),,� ard 'I, S n , C- + T re 1F is -zate, n-a-FL-t so iuie pr- c�.od 1 anwh 67 nos o k , C ar, I and z;n�-��,di. v,,;wc-I-- is -17y unte casc ill ail alhTtZ !fVtS 79 santm X thaud—I ?YOWH544C gnivall at this 1WI& SCIVA 0101 is -,.vtngz arm- "-A 77 = '3 opon rn -rL--- nacm ',e-n ye=s- A-.,v- Hi�gih Schoz)] s in - i-05v no rc Cawn horizon nztds arc not-ed in thLt 1 O-yet-ur P, i , ',- : Orange County School District Elementa.l:f undc�-cs-=,,n-a-d b,,y 1-5 2"K yz— prrqjieztion, ..e.._ ��Z'n--A jmmli w4s -Q!. CIV57 sh: PzWous. - v, ars,, this le've-I :hzs ;-x7 zn once f�,,o7r, ASS to �5' zo -�-44 a yean TV; crNak a -S cncai -bas c Ornegadve gpmk wl-,ich was cap%mA liy *,he vario-us m.whemadcal mndc's ]12- v ar to p-mducc malfstic d moderat PT(�)C,603;3 th'm Nvere IeS5 th'all a clasroom c-p'nity louu- III we ChmgC COWUY SCM01 sp.,iVni. is more closely related to dcNVO-PTI1.-n1,,'ha-n a " 2tab:e nunjjbl�- Ornew 'H-Cantano School D[stHCL a S2 Adm. m ZemTh:1 �?d h"Yusinj- Stock Th, zmef-=75, dv.-�` iapm�fnz, ac�ro -, -tv �hou!d IN: mic o :T-7 -m, t ZS a W-Ln,.4 -.- :C S-12difTit" 4ro7vh a a a 7m: q U a i tc,, ' E7-- caliy haystd n:aftzmnaucii =Ws. Nnddle The prWous yew- (2003) pplachon 2004 Or this level was overesiimuted `>y 74 Htm& The actual mernborship dt!creased by 78. Over the previous I'lu ms" tne gro,4vuh VC YCL ,was ftm 23 to 1104 tot 40, s�-� Az .78 us j tnt�.o-;msLs:ert WiTh. t.110 Lr Pa le the negalve gTowth K 85) at the tsmo!-M 'Y icvu!�It� ---0:-Y2 as thty Progress NO th,,- --V-nL7-'!f 7Lzr A�Z�3,- ilg,� % Lht Prev- - 4 7mmm;Y gram,74 x-d zrnalric,��a:ztd in--o _ -ow conaiauM gorah att I 'Z,-z sc, -oal CL-roHm'Ienz, Lm"i tlh�- zz zz-'d Nov., WAtheNownbc N21,: 7 7 ar-Pj;2z6"m's ara Cons:tTv"azivz -xith in °-� N ti de projucttj year r '&ahte ncxi lt-m -y�am A.T.bauzz,)I th is ;!CI v,-, 40 V High School T?ie p7eviou.-s- year (.2003) projections for -Novemb-IrZof)" for this level undercstimated by I') s �dtra Vic actual membership inUea-s,-d by -1 4). oveT the proviotts three years. gro%vlh, w2s Led 1.3 3 V, "'s ma dcTate za a reIadvdY constaint 8 1, 7 5 and 59 Mo emb"Crihi? iller -5c, SO the PrL`f` ' i 04..-� id h 4 a a: Tic 1 14' DOI levcA is m i r ar Cri v,- thaug -�,-ear h iao cm L 17 F :.. m r-- projections. ig-e alone Of Ti' .flmving of me-wth vt T avem-14-z,--n ual illm� �-,e CF,-zm- in, the ncxz Tc7n yfars Recommendation - 4m,auisdes as noted in 3 above 411 J vvv veaeaaan• f °vJ..vw•.+ 3rd month 2nd nanth November 15, 2002 Elementary Compiled by: Orange County Budget Office 01/29/03 School Year YUUV -01 2UU1 U2 "LUU2 03 2003 -04 1004 -0ii' 2006-06 2006 -07 °cvvi -Oo 'ZuGow "a t0v9•iv 20 10,11 2x41 -i2 201i -i3 EO.', -i4 Actual 3,078 2,693 2,901 1,791 1,834 1,877 1923 1,969 2,017 2,066 10 Year Growth 1,641 1,560 1,541 Tischler 1 2 951 2,966 3,000 3;050 3,100 3 150 3,199 3,249 3,299 3,349 3,398 3,448 OC Planning 3,035 3,105 3,178 3,254 3,331 3,411 3,493 3,577 3,664 3,753 10 Year Growth 2 916 2,946 2,930 2 992 3,040 3,070 3;101 3 132 3,163 3195 3 227 5 Year Growth 2 889 2,896 2,870 2,921 2,966 2,995 3,025 3,056 3,086 3,117 3,148 3 Year Growth 2,890 2,892 2,854 2 892 2,925 2 955 21984 3,014 3 044 3 074 3,105 Avera a 2,922 2,954 2,962 3,017 3,067 3110 3154 3.199- 3,244, 3,290 3,336 Ca ac' -100% Level of Service 3,820 3,820 3,820 3,820 3,920 3 920 3,920 3,920 3,920. 3,920 3,920 3,920 3,920 3,920 105% Level of Service 4,011 4,011 4,011 4,011 4,116 4,116 4,116 4,116 4,116 1 4,116 4,1161 4,116 4,1161 4,116 Actual - % Level of Service 80.6% 75.7% 75.9% Avera e % Leve 74 2% Average - % Level of Service 76.5% 75.4% 75.6% 77.0% 8:2% 79.3% 80.5 0k 81.6%1 82.8% 83.9%1 85.1% AhnuAfStudegf Growth Reie (3) `•8b1'ti i.+' 1128% :' 0�4 %° 10T /° 0.2% 1.85 °h T:87% 0% 141% 1 d2°1e .' 1.41 %e 141Ye 142% additional 100 Middle seats available at hillsborough elementary - School Year 2000 -01 1 2001 -02 2002 -03 2003 -04 Actual 1 504 1,527 1,831 Tischler" 1 1,659 2004 -05 1,687 2005 -06 1,715 2006 -07 2007 -08 1,743 1,771 2008 -09 1,799 2009 -10 1,827 2010 -11 1,855 2011 -12 1,883 2012 -13 1,911 1 2013 -14 1,939 OC Planning 1,633 1670 1,709 1,749 1,791 1,834 1,877 1923 1,969 2,017 2,066 10 Year Growth 1,641 1,560 1,541 1,510 1,508 1,477 1,525 1,558 1 574 1,589 1,605 5 Year Growth 1,617 3 Year Growth 1,638 1,514 1,463 1,418 1,394 1,355 1,389 1,419 1,433 1,447 1,462 1,555 1,520 1,486 1,469 1,514 1 1,439 1,458 1,473 1,488 1,502 Average 1,638 Capacity - 100 %Level of Service 1,466 1,466 1,466 1,466 1,597 1,590 1,581 1 1,587 1,596 1,611 1,643 1,666 1,690 1 715 1,466 1,466 2,166 2,166 2,166 2,166 2,1661 2,166 2,166 2166 107% Level of Service 1,569 1,569 1,569 1,569 Actual - % Level of Service 102.6 °h 104.2% 111.3% 1,569 1,569 2,318 2, 2,318 2,318 2,318 1 2,318 2,318 2,318 Average - % Level of Service 111.7% 108.9% 108.4% 73.0% 73.3% 73. 74A% 75.8% 76.9% 78.0% 79.2% I Annual.Studenf:GrowthRate n s71r *a�1 k (3) " 1.5$ °%. w; 6, $�% 0.40% 2 47% -0:48% ` -0:53 °/a 0:34 ° /a 2518 2 518 2 518 2,518 110% Level of Se1670 Hfah (based on January 2003 revised timetable submitted by ocs, middle school s3 opens In fall 2006 with 700 additional seats School Year 2000 -01 2001 -02 2002 -0 3 2003 -04 2004 -05 2005-06 2006 -07 2007 -08 2008 -09 2009 -10 2010 -11 2011.12 2012 -13 2013 -14 Actual 1,672 1,753 1,828 Tischler" OCPlannin 1,859 1,906 1,891 1,922 1,953 1 985 2016 2,047 2,079 2110 21141 2,173 1,950 1,995 2,042 2,091 2,140 2,192 2,244 2,299 2,354 2,411 10 Year Growth 1,852 1,916 1,943 1,914 1,897 1,898 1,805 1,792 1,619 1,808 1,851 5 Year Growth 1,843 1,893 1,903 1,847 1,808 1,773 1,662 1,828 1,635 1,616 1,648 3 Year Growth Average MofService 1,882 1,868 1.982 1,926 2,025 1,993 1 977 1,960, 1,855 1,830 1,825 1.790 1,817, 1,958 1,950 1,952 1,957 1,912 1,915 1,938 1,942 1,980 Capacity -100% L 1,518 1 518 2,51 2,518 2,518 2,518 2,518 2,516 2 518 2 518 2518 2 518 2 518 2,518 110% Level of Se1670 1,670 2 0 2,770 2,770 2,770 2,770 2,770 2,770 2,770 2,770 2,770 2,770 2,770 Actual - % Level o110.1% 115.5% 2.6% Avera e % Leve 74 2% 78 5% 310 " /e 77 7% 1;6% 77.4% - 0:40% 77 5% i1 +09% 77 7% 75 9% 76 0% 76 9% 771 % 78 6% Annual:Studenf (3) ' A d% d 28% ; f 2 21 °1• Icecar noge nlgn opens wim i,uuu seats in ran 1uuz indicates first year that district surpasses Schools APFO recommended Level of Service 1'i It is important to note that this reflects the November 15, 2002 date of membership as outlined In by the Schools Adequate Public Facilities Ordinance. It does not include CHCCS students attending the Hospital School. 121 The Tischler.Model provides for the "Linear Method" of projections for both CHCCS and OCS. Original projections used in prior years projection models included the "Linear Extrapolation Method" for CHCCS. " Annual growth rate calculated using actual_ membership for years 2000 -01 through 2002 -03 and average membership for years 2003 -04 through 2013 -14 1s the s (Town or School District) designated member of the Orange County Planning and School Technical Advisory Committee ( OCPSTAC) I, , certify that the Student Membership Projections and Student Generation Rates identified in the chart above are the ones that the OCPSTAC has liscussed and agreed upon to be the official projections that will be used to compile Orange County's 2003.13 Capital Investment Plan (CIP) for the Chapel Hill - Carrboro City Schools and the Orange County ichools. (Date) N O n 0 b n r+ CHCCS Student Projections 3rd --T 2nd month November 15, 2002 nwnbmhip Elamantary Compiled by : Orange County Budget Office 01/29/03 School Year 2000 -01 2001 -02 002 -03 OWN 2004118 2008.08 2006 -07 2007 -08 12005-UV Ylltib -iU "'" [UtiO- 9'" 2v5ti -i'c" "cvii•iv' svia•ni Actual 4 444 Tischler OC Planning 10 Year Growth 5 Year Growth 3 Year Growth evel of Service 4.302 W-100%1 105% Level of Service 1 4,6171 4 474 4 302 4,6171 4,551 4,3021 4.5171 4 714 4 750 4 726 4 799 4 736 4 4 4,9219 5,1611 4 877 6 040 4 913 5 070 4 690 5 018 S 034 5 218 4 913 5 060 4 925 b 083 4,921 4.921 5.157 5,167 5 203 5 221 5143 6 413 6 193 23 5 521 5,797 5 368 5 387 5 309 5 621 5,362 405 19t, 5,521 797 8 b29 5 b07 5 382 5 677 5.418 488 5,521 1 5.7971. 5 892 6855 8 018 8181 8344 5 818 5 726 -5,80-5 5 818 5 415 5 489 5 524 6 579 5 734 8 792 5 849 5 908 5.470 6.625 5 580 6.636 5.6651 5,673, 5 781 844 1 5,621 5.621 b 521 5 521 6,797 6,797 579 5 797 8 001 6 835 5 967 5 682 5 928 5 521 5 797 Actual - % Level of Service 103.3% race - % Level of service U 104.0% . 105.8% v . . t41% _. 100.1%1 103.31% .. _ 8.. mgik �� 97.9 9.9. 't . 8..% . .9.4.8% gp � J 2% 02..8.% 104.4% 7 }10.1d3.t. .1. {4 t�1f "0 tfi Uleldin Elernadary 09 opens In fall 2003 with addItIMI 619 JEWtrf #10 opens m 11.112006 with 600 addM.W seats School Year 2000 -01 2001 -02 12 002113 2003 -04 2004-05 2006-06 2006-07 2007 -08 2008 -09 2009.10 2010 -11 2011 -12 2012 -13 201344 Actual 'nschier OC tannin 10 Year Growth 6 Year Growth PGrowth e -100% Level of Service Level of Service 2 326 2108 2.2561 2,540 2 808 2 840 2 840 3.039 3 039 2 701 2 796 1 2 705 2774 2 673 2 85H 2 675 2 874 2 883 2 883 2 840 2 840 3,039 3,0391 2,8_ 2,8 2 714 2 757 2 719 2 840 3,0391 2 982 2 899 2 813 2 894 2 825 2 840 3,0391 3 076 2 956 2 883 2 991 1868 2 840 3,0391 3188 3 282 3 365 3448 3542 3 835 3 007 2 985 3194 3 033 2 840 3,039 3 079 3101 3 382 3158 2 840 3,039 3152 3 283 3 591 3 324 2 840 3,0391 3 226 3 288 3 295 3 328 3 827 3 864 3 357 3 391 2 3,0391 3 039 3 372 3 382 3 700 3 425 3 039 Actual - % Level of Service 110.3% 69.4% Avera e - % Level of Service L pp 94.6% 95.5%1 98.0%1 101.5%1 104.0%1 yy �g y�pfr...inh 1[r t �ca7Y T_ .. t rA, turf i- n , }�'� .. 'y S SJ ✓.4 a i:,G'si�i" -r1 PRO „ti�ua �(aiYa9 aPV Wrii ;E rrSa i § ay"� i kE `-iF N' P5 t�»7 ...�, ..... .}mil+ v. .:� 108.4%1 112.6%1 117.5%1 119A%j 1213% 123 2% 3 .- jS.Fn y^ .: ?! ���q9V' 1 9n��k 7 "48/e .:'S{ g4� S- .i5��'r�.t+1�} =5. ,za�;.,?` $ .. bfil..%.. tai It is important to note that this reflects the November 16, 2002 date of membership as outlined in by the Schools Adequate Public Facilities Ordinance. It does not Include CHCCS students attending the Hospital School. rll The Tlschler Model provides for the "Linear Method" of projections for both CHCCS and OCS. Original projections used In prior years projection models included the "Linear Extrapolation Method" for CHCCS. tar Annual arowth rate calculated for veers 2000 -01 through 2002 -03 and w As the 's (Town or School District) designated member of the Orange County Planning and School Technical Advisory Committee ( OCPSTAC) I, certify that the Student Membership Projections and Student Generation Rates identified in the chart above are the ones that the OCPSTAC has discussed and agreed upon to be the official projections that will be used to compile Orange County's 2003 -13 Capital Investment Plan (CIP) for the Chapel Hill- Carrboro City Schools and the Orange County O � O IQ tD b n N UU5 Student Projections (No reduction in class size for grades K thru 2) 1'' Elementary Scholl Year Actual 2000 -01 2001 -0Z 2002 -0J 2003 -04 2004 -05 1 2005 -06 2008 -07 1 2007 -06 2008 -09 1 2009 -10 2010 -11 2011.12 HP 2012.13 2013.14 1 871 3 076 2 893 2 901 2946 Taschler OC Planning1956 Taschler r 2,000 2 038 2,075 1 2.113 2,151 Taschler 1 771 1 804 1 838 1 871 3,063 1 3.121 3180 1 3.239 3,298 1 3.356 3 415 3,4T4 3,533 3,591 OC Plannina 10 Year Growth 1 736 1 784 1 833 1 870 3.007 3.064 3 122 3.181 3.257 1 3,335 3 415 3,614 3,615 3,719 5 Year Growth 1 614 1 630 1 6 Year Growth 2 010 1 916 2 981 2 963 3 035 3.088 3.148 1 3,180 3 211 3,243 3,276 3,309 3 Year Growth 1 3 Year Growth 2.067 2.051 2 974 2 960 3 018 3,001 3.116 1 3.147 3,1178 3210 3,242 3,276 1ie19 a a? V, I i t, 6 1_l lstm} r ar t "M,e r F +a} r+ + v lanmpuR�r npn 1 150 AnMral Chanpe Fn fase (De" crease tl Ab9tal & 9J etedw���uu�� 1 +f , r: rs W yy a ' , q 4 V { •. t ... . [ r � :,, i. 2 980 2 955 3 018 3.060 3.107 1 3,138 3169 3.201 3,233 3.265 ,... AnhWlGliapp6� .lndreasa,(t)9chase InAcltial +P ected't +'.' I +* + #,. j4uu ,?>til.K+d nirkjl.. i" .3 00V, v3'11117 "; a'07 Fy .s.'J''. 28' r ¢ 185'. + t a- a ? a 278 ?•;`ri 1J a26 : ^' 3 3801 'r'I '452' ,,4 T r� r, } ?j y t 7 :�: „'. i) e'•ur. rsi +' :a P D -SiVy: t{ .L 'fv. fr ? 4.. 4 %1 3'9., ,r� �Ia:• 4 4x,:, 3 beYS i �,t',..� yr o."{j?k1r , +rfi�i21 1 ?�;; h? "4: $fit LL + 2,510 Ca c -100X Level Of 3 Ice 1.465 pt �. '10, !..1 a s 4GM.: i4 .#. ?'1$:rc, 48 "4 us1 a i ri lay" y. wt 81 a n. ,11r s Ca act - 100% Level of Service 3 820 3 820 a 820 3 920 3 920 3.920. 3 920 3,920 3,920 3 920 3 920 3-929 3,920 3,920 Number of Students Actual and Projected, Over Under 100% LOS 42 927 919 975 919 909 848 94 735 889 642 2,316 2,318 2,310 105% Level of Service 4,011 4,011 4,011 4,1101 4,116 4,116 4116 4116 4,116 4,116 4,116 592 4,116 540 4118 488 4,116 Number of Students, Actual and Projected. Over (Under) 105% LOS 933 11.1181 1 110 0,11 1 1,115 1,105 (1 990 (931 )1 (885 838 084 638 605 Actual - % Level of Service 00.8% 75.7% 75.9% 76.1 % 104.2% 111.31e 114.0% .042), Avers e - % Level of Service llIlllllM83,6% 88 38 884 Anna e - % Level Service 81.3% 81.9%1 Avere e - % Level of Service 63 0% 76.6% 70.8% 78.4% 79.7% 81.3% 82.4% 76.5% 84 9% 86.2% 87.5% nua u r _ a :r, at 1 %: o :'Y810 % +v" °028% c,; °"11S2Yo 1,90% , 70[37% ' ^2:11% 1:66. ":' ' 1:90% pp. a, .1.44 %'',;,; 1.55% r1: 1 O '':',!::1ai4 OCS Student Projections (No reduction in class size for grades K thru 2) (1� Middle School Year Actual 2000 -01 1 2001 -02 1 2002 -03 1 2003 04 2004 -05 2005 -06 2008 -07 2007 -08 2005 -09 2009 -10 201041 2011-12 201243 201!34 1 672 1 763 1604 1 627 1,831 1 871 Taschler OC Planning1956 Taschler r 2,000 2 038 2,075 1 2.113 2,151 1 738 1 771 1 804 1 838 1 871 7 904 1 938 1971 2 004 2 OC Plannin 10 Year Growth 2 297 2,345 2,394 2,444 1 736 1 784 1 833 1 870 7 907 1 945 1984 2 024 2 1 569 1 536 1 534 1 472 7 530 1 569 1 614 1 630 1 6 Year Growth 2 010 1 916 1902 1,896 1,883 1 565 1 524 1 624 1 460 1 512 1 642 1 682 - 1 698 1 3 Year Growth 2.067 2.051 2,102 IJ 1 N' nn` e 6 r�q v, I, Sir, , twin ,, M,ry'p 7 672 x'1643' 7 541 t5J8C 1 557 1658'•' 7 494 1633f:'t+ 1 543 1 570 .1713'' "....17,51 1 603 1 619 '.1'775 1 150 AnMral Chanpe Fn fase (De" crease tl Ab9tal & 9J etedw���uu�� 1 +f , r: rs W yy a ' , q 4 V { •. t ... . [ r � :,, i. e�r v i + t.iY f r ♦r. .� ty��.F.€ M .:4 # I RI P Cj{ #. 3S 0 „ W2 Capacity •100 %Level of Service 1,510 1,518 2518. 2518 2,518 : r 2,518 2,518 3b7Y " 138 2,510 Ca c -100X Level Of 3 Ice 1.465 1.465 1,466 1 68 1,455 1466 2166 . 2168 . 2168 2,166 2,166 2,166 2,160 2,166 Number of Students Actual and ProlecIed, Over (Under) 100% LOS 38 61 165 205 161 1T7 528 510 533 487 453 415 391 110% Level of Service 10T% Level of Service 1,509 1,509 1,569 1,569 1,569 1,569 2,318 2,318 2,316 2,318 2,310 2,316 2.316. 388 2.310 Number Of Students, Actual and Projected, Over Under 110% LOS 2 83 942 883 745 08 701 Number of Students Actual and Projected. Over nder 107% LOS 65 42 62 102 1 59 1 74 880 862 084 638 605 567 543 518) Actual - % Level of Service 102.8% 104.2% 111.31e 114.0% 632 Avers e - % Level of Service 80.4% 81.9% 82.1% 82.2% 82.7g% 81.3% 81.9%1 Avere e - % Level of Service 63 0% 84.9% _._ r.e-TR A:if:. q iwys tK! : n 111.0%1 112.0%1___ 76.6%1 76.5% 75.4%1 77.6% 79.1%1 80.8% 81 9% 1 83.1% nua u e , • . roux ,.R: . k, I u # .v „,:•> r x " 1:58% 8181 „ ^' .50 . ztoowle 12.22% It4o /.I OCS Student Projections (No reduction in class size for grades K thru 2) High School Year 1 2000 -01 1 2001 -02 1 2002 -03 12003 -04 2004 -05 2005 -06 2008 -07 2007 -08 2008 09 1200940 201041 201142 201243 701344 Actual 1 672 1 763 1 828 1 887 Taschler OC Planning1956 1 962 2,000 2 038 2,075 1 2.113 2,151 2,108 2,220 2,264 2,301 10 Year Growth 2,008 2,003 2,119 2176 2,236 2 297 2,345 2,394 2,444 6 Year Growth 2 048 2,040 1,997 1,967 1 968 1.867 1 857 1,056 1,652 1,909 2 056 2,082 2,057 2,024 2 010 1 916 1902 1,896 1,883 1,935 3 Year Growth 2 101 2.181 2.187 2.165 2154 2.060 2.062 2.067 2.051 2,102 IJ 1 N' nn` e 6 r�q v, I, Sir, , twin ,, M,ry'p 4s 420211 r 2082= rt 2058 ' x2070 2082 ?' 7047 „+ 20611 '" 207 X200 C °2.13b: ArtpWl;l:Mhpe +hicrNS,010faPN e) HWI EP,.roeebtl '1 .:. fi, t::rx.ild�u•.tn.:ryvx,,F7�FPEryry,�',. a ;:..ez " ,.:.. F;I W+!' �F N: jag:� 1y". rY�♦},r i a� bliprl'4',�':M,.,I'J' 'j't/},,., ,.. ': ryr [ "):. K:!Y!. 'i:ll�k rr lla� ,♦... �. F. }. 'J' I^ K+ hi a .� >� :.:.: ,r+ y,d.�- - +•,. • a ...:k. : ,. ,... :.� .. ,.,,.. _.... irti 1 N Yi;y } '�1i4 .j( ♦Y7 �' N.. {. t1 :L Tt .1..1:: _• ,F I�� ,:, .. 1 . F:. ..S,. 1 .f:: P"11r5 ,�'iVl�y 1, SIRS12s. "i 314 _ .: t A. , „38" !c? 6,asrcalrT 1 RI P Cj{ #. 3S 0 „ Capacity •100 %Level of Service 1,510 1,518 2518. 2518 2,518 2,518 2,518 2518 2,518 2,518 2,518 2,510 2,518 2,518 Number of Students Actual and Projected, Over Under 100% LOS 154 235 890 831 493 438 450 448 438 110% Level of Service 1,070 1,670 2,770 2 T70 2,770 2,770 2,770 2770 2,T70 471 2,770 457 2,770 440 2.T70 429 2 770 380 2,7T0 Number Of Students, Actual and Projected, Over Under 110% LOS 2 83 942 883 745 08 701 700 685 23 700 892 881 Actual - % Level of Service 110.1%1 115.5% 72.6% 74.9% 632 Avers e - % Level of Service 80.4% 81.9% 82.1% 82.2% 82.7g% 81.3% 81.9%1 82 6% 63 0% 84.9% _._ r.e-TR A:if:. q iwys tK! : n .. 7 9% , '0305 5%.:...�1h 85ti t ur1D18 ---F7 "• ;J ? 2s78y. Indicates first year that district surpasses Schools APFO recommended Level of Service aiIt is Important to note that this reflects the November 14, 2003 date of membership as outlined in by the Schools Adequate Public Facilities Ordinance. It does not Include CHCCS students attending the Hospital The Taschler Model provides for the "Linear Method" of projections for both CHCCS and OCS. Original projections used in prior years projection models included the "Linear Extrapolation Method" for CHCCS. pI Annual growth rate calculated using actual membership for years 2000 01 through 2003-04 and average membership for years 2003-04 through 2013 -14. Na O n b n W CHCCS Student Projections (No reduction in class size for grades K thru 2) (1) Elementary School Year 2000 -01 12001 -02 2002 -03 2403 -04 2004 -05 2005 -06 2008 -07 2007 -08 2008 -09 2009.10 2010 -11 2011 -12 2012 -13 2073 -14 Actual 4 444 4 474 4 651 4 892 3 728 3 867 3,989 4,121 4.2531 4.385 Tlschler 4849 4,780 Tiec ter 2819 2 922 3 026 3129 5 084 6.2491 6 435 6.621 5.607 5.993 8178 8384 6 650 6,736 OC planning 46 2 770 2 835 2,895 2,951 4905 5.01121 6.213 6.359 5.499 6.600 6 778 b 827 6 911 6 993 10 Year Growth 4,219 2 598 2 611 2,729 2,818 4 8T8 5.0361 6.157 5,310 5.3T2 6.420 6 480 6 635 6 690 6 846 5 Year Growth 548 2 602 626 2,746 2,830 4 899 6 086 5,235 5 411 5,483 6.638 6693 6 849 5 706 5 762 3 Year Growth 119.8% 2,585 2,574 2.666 2,689 4606 4.916 5.008 5,127 5160 5.217 B 89 6322 5.376 5,429 0.ri t'lY7 JM'yr #a;E$' 4w "Willy :. 2 "$75 7.a'3 11-02; $1 ^.',1r5Iv2`$ K ?G':3' 4941:,. Q, 0 4 , Bit q: )7 rC ;F. 7F.. 5 .- 6 6 .. aiqualgc, -rnye ... w+at o r 9) in +xe . I `Arrejac�trd"a � rt 1?r a yy,, V ky +r ' R, '.. {a I If�`•`"a^. ��a ,. a rat :c l :7` ` -,'�; %`12167. (jq,%1 0' a I d t ..b 6 4 I (1... r 9'� m ,..rfi.� �{ .. .92 , y t f, . 3 Ca cl -100% Level of Service LOS 4,302 4,302 4,302 4.921 4,921 4,921 5,521 5.521 5.521 5,521 5,521 5,521 5,521 5,521 Number of Students Actual and Projected, Over nder 100% LOS 142 172 249 229 17 149 311 155 58 35 127 218 305 392 Capacity -105% Level of Service LOS 4,517 4,51T 4,51T S 187 8167 5. 67 5,797 5,79T 5 79T 5,797 5,T97 5,T97 5,79T S T97 Number Of Students Actual and Projected, Over Under 105% LOS 73 43 34 475 257 97 587 431 332 241 149 58 29 1711 Actual - % Level of Service 103.3% 104.0% 105.6% Avers e - % Level of Service W t.... , ! s zy =;y , a ,:.: ^„ :.9,, x , . r "� a , .�. r!rg9120% .. n.e -' "278_; anrw,0::6% ,?'," 2:40Yr �' >7, %'u- +r..£57 -7:' ?^, t .60 �'i``.'�44,0511i �4 ?'�-8 33% •r;,� 384 -r ;r 1.79 . 5. Avers - % Level of Service 95.3% 99.8% 103.0% 94.4% 9T.2% 99.0% 100.6% 102.3% 104.0% 106.6% 107.1% nW : u e r1rU a .gqs fiV n r rn -r:F a m ? i, 388 r ,rrs s72.. to- r3:7 .. „4: 5% m w^ 5 ' t : 5 k %�ss2i99 uro,r 1 8% ;,.., 187... ^r1 ° 3% ,. wp CHCCS Student Projections (No reduction in class size for grades K thru 2) (1) Middle School Year 2000 -01 2001 -02 2002 -03 11 2003 -04 2004 -05 2005 -08 .2008 -0T 007 -08 2006 -09 2009.10 2010 -11 2071 -12 2012 -13 2013 -14 Actual 2 328 2 540 2806 2 812 2983 3182 3330 3 684 3 728 3 867 3,989 4,121 4.2531 4.385 Tlschler 4849 4,780 OC Planning 10 Year Growth 2819 2 922 3 026 3129 3 233 3 336 3.439 3.643 3.640 3.7501 OC Planning $96 182 98 46 2 770 2 835 2,895 2,951 3,003 3.076 3.147 3.220 3.294 3.368 10 Year Growth 3,339 3,339 4 I9 4,219 2 598 2 611 2,729 2,818 2,987 3,129 3,299 3,352 3,36e 3,420 b Year Growth tell 159 292 548 2 602 626 2,746 2,830 2,979 3,090 3 236 3 277 3 310 3343 3 Year Gr(rMh 97.8% '104.2%J 109.7% 115.2% 119.8% 2,585 2,574 2.666 2,689 2.799 2.871 2,976 2 992 3 022 3 052 AVa • ;e;.:y 1 , t Nhwoy r! 4 . ":rPf i,r n r I ;•n r fr.: 2 "$75 7.a'3 11-02; $1 ^.',1r5Iv2`$ K ?G':3' S , 33tt�� S, h Chan a i n Nraa' ; $OYBfi I 1 rP Ototl t1w! �<r g t rf ! .. t *�'F k d n' �J .. . s f ' +& .f "•wt� ,. k Y PY a n c ar �';< ,,.: ryry 2 r sMr.sa,� Mahibiffr 1' r it Sd? r . ,= y ' d $. tt9r 4�e1 9f rt 1?r a b� 15, r l :7` Y.A1 ;I:. u, Ca cl - 100 %Level of Servlca . 2,106 2,849 2,840 2,840 2,540 Z840 2 840 2 640 2,840 2.840 2.840 2.840 2.840 2.040 Number Of Students Actualond Projected, Over Under 100% LOS 218 300 232 228 185 127 30.. 43 160 280 1 379 437 1 492 547 107 %Laval of Service 2,250 3_039 3,039 3,039 3,039 3,039 3 039 3 039 3,039 3.039 3.039 3 039 3.0 9 3 039 Number of Students Actual and Pro acted Over Under 10T% LOS 1 70 498 431 427 364 325 228 155 39 81 180 236 293 348 Actual - % Level of Service 110.3% 89.4% 91.8% 92.0% 94.2% 96,6% 1 99.0%1 101.5% 105.6% 109.2% 113.4% 115.4% 117.3% 119.2% Avers e - % Level of Service W t.... , ! s zy =;y , a ,:.: ^„ :.9,, x , . r "� a , .�. r!rg9120% .. n.e -' "278_; anrw,0::6% ,?'," 2:40Yr �' >7, %'u- +r..£57 -7:' ?^, t .60 �'i``.'�44,0511i �4 ?'�-8 33% •r;,� 384 -r ;r 1.79 . 5. CHCCS Student Projections (No reduction in class size for grades K thru 2) High School Year 2000 -01 200.1 -02 2002 -03 2003 -04 2004 -05 2005-08 2006 -07 2007 -08 2006 -09 2009 -10 2010.11 2011.12 2012 -13 2013 -14 Actual Tfsdhler h 2 810 2983 3182 3330 3 684 3 728 3 867 3,989 4,121 4.2531 4.385 4.517 4849 4,780 OC Planning 10 Year Growth ! ,,i , _ tk�r:;aE4 a . ; +.e.i�. 1' �$, � r , {, F,'�; {l1>i'� 3,035 3,035 3,935 3 274 3 352 3 426 3 515 3 B47 3 645 3 641 3 704 3 717 3,562 3 724 3.718 31!tPR Y73 i� : t' ., h?i6, B- k .£ . d °$ 'Sf s `g3p4e x; \1�9$*7Z,n:,�, :r ; lY r S i,r a ' , ., Y 4 . w J' 3 035 3,035 3,035 3,836 3,494 3,567 3.6101 3,674 3 731 3 016 3 SW 3,690 3,730 3.8291 3.936 4,145 4 326 4 466 3,762 3,796 3.886 3.999 4,235 4 453 4,621 3,752 3.747 3,780 3.843 3.989 4 103 :4. I 1 3dhr"11 99 03 N z' . + i:37. tl, .: .�rs�3'7:9 � P , r,Y, 24r I''42 u 3,835. 3,835 3,835 3,835 3,835 3,835 3,935 6 Year Growfh 3 Year Growth tH, , : L $ ;i§ w -,irj, r ;t:;. _ { ?.4P. ; * , ,tl,w.a.., ; ,., ",p w 'ri }".�iF . 1 P! n 14 �g h .sac ® 46 . x ; Y !, � . N.lVia �h ifib �s. l *x ah t ytx'r ? , ',i' { � ir.r ,. X. 1 1. ,,, ( E'✓, . + , §, : r Itt`qr„� ., s "r : '. . r* '1 . ,r'r �w Capacity -100% Level of Service Number of Students Actual and P acted Over Under 100% LOS 220 T2 127 295 462 $96 182 98 46 38 132 288 434 555 110% Level of Service 3,339 3,339 3,339 3 339 3,339 3,339 4 I9 4,219 4.2191 4.2191 4,219 4,219 4,219 4,219 Number of Students Actual and Pro led Over (Under) 110% LOS 524 378 177 ) tell 159 292 548 481 428 346 251 95 51 171 Actual - % Level of Service Avers e - % Level of Service 1 92.8%1 97.8% '104.2%J 109.7% 115.2% 119.8% M,8% 97.5% 9 S%1 101.0% 1M034%1 107.5%1 111.3%1 114.6% ....... d ... .. r trrv.�,/t"d7`•'r.•;�r+•v, rr Irr4., azn ar x.'ta w� f?T ? TTIPM WitnW..' Indicates nrst year that district surpasses Schools APFO recommended Level of Service uh It is Important to note that this reflects the November 14, 2003 dale of membership as outlined In by the Schools Adequate Public Facilities Ordinance. It does not Include CHCCS students attending the Hospital ur The Tiechler Model provides for the "Linear Method" of projections for both CHCCS and OCS. Original projections used in prior years projection models Included the "Linear Extrapolation Method" for CHCCS. tah Annual growth rate calculated using actual membership for years 2000 -01 through 2003-04 and average membership for years 2003-04 through 2013.14. O CD ki n Elementary nit Compiled by: Orange County Budpt Office School Year 2000 -01 2001 -02 2002 -03 2003 04 2004 -05 2005 -06 2006 -07 2007 -08 2008 -09 1200940 2010 -11 2011 -12 2012 -13 2013.14 2014 -15 Actual 3,078 2 893 2 901 2 946 3 018 Tischier 3.078 3.140 3,202 3,264 3,326 3387 3,449 3.51 J 3 573 3,635 OC Plannina 3,061 3,158 3,231 3,314 3,400 3 473 3,649 3,628 3,692 3,758 10 Year Growth 5 Year Growth 30`14 3,004 3,093 3,069 3,188 3,149 3,247 3,312 3 347 3,379 3,412 3,447 3,481 3,195 3,247 3 280 3,313 3,346 3,379 3,413 3 Year Growth 3 038 3.137 3,236 3.296 3.364 3.388 3.421 3.450 3.490 3.626, , ..,. Vo 9's r4-,� -.. � ` �6?+i: , • ,Capacity -100% Level of Service a a4iw8� 3,820 4,820 3,820 3 820 3 820 3 920 9'ist 3,920 a' his: 3 r sa "43 9 'a` 73,, 1a ✓ r< °4' f i °at(, `3`6:6 e . s b6s 3,920 3,920 .e 1 2166 2165 2166 2188 3,920 3,920 3,920 3`920 3,020 3,920. Number of Students, Actual and Projected, Over Under 100% LOS 42 927 919 876 3 620 877 01 19 6 592 545 498 449 404 358 108% Level of Service 4,011 41,0111 , : 4,011 4 011 4 011 . ,.4116 471'Fk 4,116 ..:4116 4116. 4,116 41.16 4,110 4,116 4116 Number of Students Actual and Projected, Over Under 106% LAS 933 1118 1110 1 066 (4.011) 1 073 997 915 '' 853 788 41 1 (6941 16461 600 554 Actual - % Level of Service evel of Service Avers %M 80.6% 75.7% 75.9% 77.1 % 79.0% 77.8% 79.8% 81. 83.2% 84.9% 86.1%1 87.3% 88.5% 89.7% 90.9% Annwint rbtiViH;,Bta'O " a - :.8:01 %x:;028 " °.152% `''' "2A1 OAO %'" 251 % ":" 2,62% '" "194% `- ;''1.97% '= '1A2Y. ' "1 :40Y: 149% :` 1131% "1: 1% laddmanl 1bo JIM SEWS et HafbOleugn BMWtary OCS Student Projections (No reduction in class size for grades K thru 3) (1) Middle School Year 2000 -01 2001 -02 2002 -03 2003 -04 2004 -05 2005 -06 2006 -07 2007 -08 2008 -09 2009.10 2010.11 2011.12 2012.13 2013 -14 2014 -18 Actual 1,604 1,527 1 631 1,671 1,693 �hW al 1 626 1,656 1,091 1,724 1,756 1,789 1 622 1 655 1887 1 920 OC Planning 1,619 1,645 1,679 1,108 1,737 1,782 1 829 1 877 1,927 1,978 10 Year Growth 1 598 1,567 1,549 1,504 1,637 1,616 1 683 1713 1,730 1,747 5 Year Growth 1 601 1,571 1,550 1,606 1,538 1,604 1 835 1 872 1,689 1,706 3 Year Growth 1 624 1.612 1.622 1.602 1.667 1.767 1 804 1 849 1.668 1 887 66 7. e'.,�. , �sby - ,,• : - • , . �: , : � -: " . Capacity " 100% Level of Service ; 61 {g:.�;• 1 66 1 466 1,468 1,468 1 486 1 68 c : a i 's M, `� {> ,: • `• , � '!'9 .e 1 2166 2165 2166 2188 2166 2166 2166 2166 2,166 Number of Students Actual'and Projected, Over Under 100Y. LOS 38 61 155 206 (1,466) 148 555 a 557 519 456 415 373 346 318 107% level of Service 1 569 1 569 . ' -,1,569 1 589 1 589 ' 1 669 2 318 .2310 2.318 2 318 2 318 2 318 2 318 2 318 2,318 Number of Students, Actual and Projected, Over der 107% LOS 85 42 . 02 102 (1.5691 4S 707 599 1 09 871 1 (6081 567 524 487 470 Actual - % Level of Service 102.6% 104.2% 111.3% 114.0% 108.7% . . . . Y , % -014% 41% Avers e - %Level o(Service 110.1 % 74.4% 74.7% 74.3% .0% 78.9% 80.8% 82.8% 84.0% 85.3% MnuahBWdentGrowth to (3) ' " ^ :' %1,53% 7 ' '8:81% "' ' "+7:67% 1;29% 0 58% ,3 ? 3.83% . °-2:37% , `, 2A3Y6 " 1'151% :. ;1151% middle sdWW t:3 Opens h fall 2006 with 700 MOWN seats OCS Student Projections (No reduction in class size for grades K thru 3) "1 High School Year 2000 -01 2001 -02 2002 -03 2003 -04 2004 -05 2008 -06 2006 -07 2007 -08 2008 -09 2009.10 2010.11 2011.12 201243 2013 -14 2014 -15 Actual 1,872 1,763 1828 1887 2057 Tischler (21 2,099 2,141 2,184 2,226 2,268 2,310 2,352 2,395 2,437 2,479 OC Planning 2102 2,138 2,175 2,214 2,254 2,296 2,338 2,382 2,442 2,505 10 Year Growth 2,115 2,063 2,010 2,015 1,939 1,891 1,923 1,897 1,071 2,047 5 Year Growth 2,129 2,122 2,088 2,088 2,017 1,973 1,996 1,970 2,030 2,094 3 Year Growth 2165 2,214 2.216 2.25T 2.206 2.201 2259 2.269 2.372 2.463, i 9ii V Capacity "100 %Level of Service e:' Gr 56 O r 1,518 1 18 2 2518 2518 2518 11 n_ 2,518 ma i 2,518 b 2518 ;' 1 'I'I 2,518 _ b4� 2,516 "� i5 2,518 �e � .bbl 2518 "2 b6 >,tts• 2 2,518 2,518 Number of Students Actual and Projected, Over (Under) 100% LOS 154 235 890 631 (2,518) 396 382 383 358 381 384 344 335 288 200 110% Level of Service 1.670 1 2 770 2,770 2,770 2,770 2,770 2,770 2770 2,770 2,770 2,770. 2 770 2 T70 2,7T0 Number of Students Actual and Projected, Over (Under), 110% LOS 2 83 942 883 2 770 6411 834 836 810 833) 638 596 (58 51a (452) Actual - % Level of Service Average - % Level of Service 11 115.5% 72.8% 74.9% 81.7% 84.3% 84.8% 84.6% 85.8% 84.9% 84.8% 86.3% 88.7% 89.4% 92.0% Annual StudentOrowthlNats (3 ) . . . . Y , % -014% 41% 2,99 %' Cedar Rfte High opens wish 1,000 scats In fail 2002 - _ indicates first year that district surpasses Schools APFO recommended Level of Service t9 H Is Important to note that this reflects the November 15, 2004 date of membership as outlined In by the Schools Adequate Public Facilities Ordinance. It does not include CHCCS students attending the Hospital School. at The Tischler Model provides for the "Linear Method" of projections for both CHCCS and OCS. Original projections used in prior years projection models included the "Linear Extrapolation Method" for CHCCS. r:t Annual growth rate calculated using actual membership for years 2000 -01 through 2003 -04 and average membership for years 2003 -04 through 201415. P 0 CD 0 —muent Projections class size for grades •ago 109.796 oa 792 °039 4 79 ret4' 703 3 835 t0 ft is important to note t 12,896 242 4 78 57 W rho Tschler '� ZB ° w 588 4 279 39 that this reflects �i 2y. 548 4 18 rot Annual Model Provides for f oa Novemyer 75, httlr "5.3:7Ye ;2a6y; t 18.396 178.O9y 4 79 A. growdllratecalculatedusingactua lM-11 e�i f R► °°Coons forboBjCHhiPasoutlined nbsPastsearthattlisttictsurpa�oSchools i18y� 1:dzy 1;98 :,p, 4ie 97,386 98,795 3q4 P or years 2000 -01 Ouough 2 US and OCS, Ort9fnal PS�� s Adequate public APFO emended Lev,! of h �hooi s 7 4i'Y. 37� 7f 3-04 and ns used in bite FaclQtfes Ordin SeNlca er s to 2oD7 wRh 800 ye >.0 ,� It d average'mhersh!P for years 2 03-04 through 201 Models included the t k UdEe.�cCHCCS students atte °dd nel s �aPolation Method" for od the HOVUM School Orano Conk, $udg,t Office 11/2904 J rY :-Crior, H A Student Growth Rate 1. Re-yansible EaaWyforSu ggestingo Change - The updating ofthis section will be cionduc-Led by the Planning Directors, School Representatives, Teclulical Advisory Comji-iiitee (SAPFOTAC) cacti year and refcrred to the BOCC, for annual report ccr' ;.5cafion. ?r�, Fections will be distributed to S_APF0 partners for rep and con, I me.nts to 7[,,L,,- poCC -,-Tior to certification. 24 Defthlifion - The amival perecirtage growih rate calculated fron i tlic. projections n sulthrg from the averag ge of the, Eve irodels nzFTestnted by 10 Yearnumerical membership profections by school level for each -i school district. T-IiS does not represent the V year gokAlth rate that May be pOvii LiVe or n eg 7e but rather the -a -e age of the FZ u I a gnmvv�h rates c) ver ten (10) years. 3. Slandardfor. Standard for: Cha,pel'HW Carrboro School District Orange County School District See Aqtachment IT.D.3 See Attaclunent JI.D.3 A A nalysis of Exivh,�q Conditions 411:4ty-vis of Ex isting Conditions Th riern-bership figures and pee -ceritagc- T-he irkombers'hip figures and percentag.- go-,vt1i on the attachnients-shenw _­ovwth (in the aittaclunents -;-,,low coni:nued c r t o.u.inued growth at each school Bezel .7,owtla, at each school level within the within the system. AvL4.-Laac Annual Growth Rate over 'Len years: Avera ge Annual Cinmth Rate ov-,r zen ycarss- P-,IJ:tnjz7,.`�i,,-c,!c: 2004 2005 Ve_° Pro'cokm -made; 2004 i 00:5 2.3_4% 1.79 a 1.54% 2.63% 1.9 1 % NfiddTe - 0.79% 1.51(0��& -., --; 1.2 1 L 5. Recommendation Recominen.d[ttion Use siatistics as no' ;ed I - ics as not Use stt at',st* note E. Student / HouSing Generation Rate I'llmilot -WorfAv jukuj DIWH kilmol!) ptotouy'llo wmmj qj offlINXINall pootiptiold 61t)00,) 0311VIO - su011OOfOAd ju9pnjS ojoqjjeo/lll" lode4:) I-- VP voo"Ooz SUOROOfOld 4uapnjS 4unot) oftwo a, Vt Orange County Student Projections 2003-2004 WWI(, School I 3.L30 3 87 3 e!t ij 44% % 1,16Y4 lAl*. G IN Nm*x., t NAA(fobvi Orange County lllmmiog wid fw4w0jws lkpostiont hwaacm of AnimAl Ovwlh How fiomi Awroges- laimmy, 900,1 Orange County Student Projections middlo Chapel Hill/Carrboro, Student Projections (wit WrACaw(Jdwt4 W4100,600VINVI—W ON KQ"twvf I i'll9m llrunT alld lowpoe,14AAMP59fitKIllt yj S tf-on H I r--. Student / Hou-sing Generation Rate RespomsibleEndijifor Suggesting Chimge-'flhe updating of this sectlonx ill lie conducted by Planning School Rep-resentatives, Technical Ad sorry Co.-inurnittee (SAPFOTAC) aiidrefc�rrrtd to the 'BOCC for cznification. Projections will be distributed to SAPFO for review and comments to thcBROICC prior to certification. D efin WaFt - A p J ected number o f that are generated from txvo di fft�re .rent i- �,� 703 Y of housing. "single-family" an.d "ot1&'. Sin glle-fami . Iv also includes. doulble-vid- Or greater manufactured and modular hornes. 4'Otheeincludes multifamily and !;ingle- vvide mobile homes. The standards, xeT-e- created during the Tischler and Assoc iazes School Impact Fee Report of Febr=ry _200 1. 4tandard for: Chapel Hill Carrboro S.ehaol District See Attachment II.E.1 xist Afza�vsls of E. htq Conditions Standardfar. Orange County School Disti•ict See. Attachment H.E. I Tht-, stzff conim.ittee (S APFOTAC) is u3e%eelopina a program to independ=tly cz-.� _-Wate student gen aration rates using GIS and School n.-porting systems. This priogzram will tale a flleiv yea-Ts to develop. Also, note that students are cLL-rat� from rew'�.Raotzsin as well as &orn txistisa;- houslnU 9 whe;r,t nt%v faTri.illes have moved in. The CAPS systern estimates nevv develo:)rne-rit impacts and associated student s enizration bul it is hirportmit to understand. that sru -nt. increazes area composite of both oft -s fzciom This effect can be dramatic and can ereatl)rbetvreen areas and districts 'xhttre eitb�r new housing is dmuinant orae'viv ra-mill-les --nove Into a large inventiory of ex-is[ing housLng stock. 52 zendaiian — No change Genemanion Ra s (20-FA o imta! all cm, sic mi-es a re devel p and, VI Tischler Student Generation. Rates Orange County Schools Elementary Middle High A1.1 Grades shig!e4l"am.fiv 0.150 0.075 0.084 0.309 b e. 0.033 0..030 0.147 ,&-m nbusing_6pes 0.140 0.068 0.076 0.28-4 Chapel WHI-Carib oro SC ol - ---------- Elementary Middle High All rades SIngle-Fam.i1v 0.1.68 0.095 0.123 0.386 Other 0,094 00042 Ow 43 0,179 All Ftp-!l � g G. 1.")" 4 0.070 0.086 0.290 -q SOIL!": hrpwt RCIx"I I -Y Iv)r secri"-On+ 19 HL F.I.GN'N'CILAR'I'Ok:�*-SC'ffOOLsADEQt Al-F- PUBLIC FAcm;-M-F':,S ORDINTANCE PROCESS Abstimrt: The Schools Adequate Public Facilinks Ordiiiance process has two distinct A. Capital Investment Plan (CI) (Process 1) Timcf-Crame: ln';Kovoniher of each year, Stu&--nt Nfe-nbership and Building Capacily is -,ransmi-,t frorn the school districts to t]iL- 0-ange County Board of Commissioners for couside-ration and approval and used in tie follo-wing years CFI' (e- g- November 15, 2004 nu -nbms used to devetop a CLP to be considered for adoption in Jane, 2005). Proicess Frameivork I SAPFOTAC projects future snadent membership from historical data, clum-,;rnt membership and hypothetical -groMilh Wkcs from established niethodoloi2;es. 2. Scbool Districts and BOCC compare projections to existing capacity and r0J Z:7 proposed Capital Investment PIL-I SAPFOTAC f onvards data and prk33-ections to all Schools APFO pamiers- 3 A i School Districts, develop Canita], lnvcZJnenzt PlanN eeds Assessment dziring tills process 5. The Capital Inv-cstment Plan iv-or sessions wid Public. Hearings are. conducted by the BOCC in the spring ofeach year. 0 1 6. The adoption ()f CTP that sets londi nior-,Rys and tim.efran-,te for school construction (firture capacity) by BOCC- try fi 114 School Adequate Public Facilities Ordinance Process. 1, - Ca ital (UP1 Projection Metbod (His on A N4.embersh-pt PILLS HYFOLIACtical 1' 41,C u W Approval (Waposed New- (.',,,(rv!-1.rucfi--x1 Atldcg] hy nornber !-ket ual.Ndlustments ,Cummit. Y c ,.jr Actul [Uptaws Pas L e-ar Man bers, hip, Pr�-Jecdon) CAPS System 2 i ficate 0 f OWN) R I IWATiad is a PrOWL Of mJJG:i,%: �Iawralzd lymn; (L) INVaAdn"Onmud Topzd har. Mierc a!w u5u;an is buill, kvith ne-w finuai appmvud holsog jawkwaml; On Q Am W WiL ho u." TEu My ; m I o �'!.: x, CA I � S *>y ac I I I (j.t., " ut-1 i I I'M* s pt C-idsk, CL ti 114:J vi:� iol k -.--i IVA(: I I I �,) a I J a rece i vc', d I to I to : �,-, (.Ill' Prm- I { ".'I1} i ► k-7, tl ',v "XUA Ilk' i �j (M i! � ci id mr 15 of Moc x4n; 0 2 yy m! IN Dew ;V, wl N r u hyl lr"�Wu;II ill 'a � uiliu ye :I r I it to (-- ('111. Serfirm ill B. Schools Adequate Public Facilities Ordinance Certificate of Adequate. Public Schools (CAPS) Update (Process 2) Timef-a=--e: The CAPS System is undatad approximately Novcmber 15 of e=h year when tlhe school districts report actual membership and capacitY, whether it is C E. ainations of changes -in capaci-c associated or prior joint action' agreezuent. -. ,nlacti -n'detcrm o due to St} to rL-,I'es or offiex non-construction related itorns are anticipated to be dune prior to the � oveinber 15 capacity and membership nzporfiung date. This update may reflect the Board Of Courycy C:ommnssioncrs action on the earlier -year Capital ki-%restment Plan (CIP) as it affects b I ncili7ie3 capaciny and addition of new achial fall Schools Adequat�� Pu lic Fa - Orduna-alce Certificate Of Adequate Public _5c tools (CAPS) stays in effect until the following year ;z Novernber 15, 2004 to Novettnber 14, 2005). d - Cd for a cermin 3,ear. As the CAPS sN updated, is originally logg , ystenj is up 4 ated, each CAPS projection year is 'absorbed' by the aettual estilmattc o-fa given year. Later year CAPS project'cns of the same development rmnain in fhz fuzura year CAPS system accorc,.Ir-�-,Jv. For exanuinlc% ii[a. 50-lot subdivision is issued a CAPS, 15 Tots maybe assigned to "Year 1."' !0110tS to 1. 1 Year 2F11, 10 lois, to "Yeax 3," 10 lots to "Year -4-- and 5 lots to "Near 5." 'When "Ycar I " Is uvdatcL tlnW students generated From the 15 lo -;s are absorbed by the actual estimate. The s- added to the z�ucient--, g =enerated in "Years 2. 3, 4, anti 5" are held M the CAPS system wid ap. propna7te year when the CAPS systen, is updaaied. Pjeas,- -10ti-effiat the M?o processes (CIP and CAPS) are on separate but parallel tracks, Howv-ver, the CT dots create a croSso ver 0 r caPac ity inforn:i atioia b erw ee7a t 11 e two processes. For tjjt Schools APF0 systern, for both school c115tmts that will be established I im' qi-ate ! cercif-led each year in November and is based o.-II prior year created and J or planned CIP cantacf,,V avid current school year membership. The SAPFOTAC report including ne,�vcurrent year I � 1 -1 - z I tj-L-zn-,� —rship -.nd projectiou.s are to be used for up-comins. CAP devclopment as noted in f1me ss Serrion fil CIP Process 1 (T'OT CTP2,005 -, 2,015) -Nover iber 2004 -- June 2005 (using '2004 SAPFOTkC Report) SchoGIs APFO CAPS Process I-.. (.fbr Se,,ioojs.AP'FO System 2004 — 20,05) 'November 2004 - November 20,C15 .;8 +Vecfiojl fit School Adequate Public Facilities Ordinance Process 2 - Cerfifica te of I Aye guate Public Schools (CAPSI Allocation 2005 CAPS system. is efTectiva November 15,, 2004 throug),,i November 14, 2005. The system is -updated with new membership, CIP capacity changes, and any other BOCC/School District joint action approved - prior to N -nation is received within 5 days of November 15 . proved capacity ovember 15, 2004, This infGn and posted. witt-fln the next 15 days. This CAPS system recalibration is retroactive to November 15, 2004, CAPS Allocation System 1. (,*ortiried C'alxacity 2 LOS Capacity 3. Adtial maubmillip 4. Ycar Start Availal)le Capacity 5. 0jigoing Cumat Avail.nble Capacity (includes available c&tpacity CAPS dcvelopmexit by Year) 0. CAPS apprmed dcvelopment a. Total uaWs b, singic Familyl c. Other 11oushig CAPS System AC ->O - Issue CAPS AC<O - Defer CAPS to later date 'S(tilleal, Geaera(iolt Rates from CAPS W11%ing type create fulure incinbership c-*Aimare III q op # , , PImse note that this CAPS utembet-ship ftit -c y is dill,cre"t (hon lite I ljt, (uqq based oil historical dato alld projcolioo titodels usixf iii the ("ll' promss 1. Thisesslimate only captows 11mv devr1opment Impaol, Which is Lite component that IWSAPFO can rogalkile, 2A(.,- AvaihibIc Capocity developuleat iseill-eved itilo line Nystwl. 8(,, - cc-tilled School Level capocity ADM -Avaragc E)aily ht to ND - New Developmew, NCB] means rirst approwd. CAPS apprond developitictit S-ern�ml FF IV, ADDITIONAL ATTACHMENTS The attachrncaits are additional inforniatim r--1,-A-ant to the SAPFOTAC report_ Attaches z-m It J is the BOCC AlIevda Abstract (sans aSledAttaclurnents) for the De-cf,-mbe—r 14, 20 1_BOCC mccar.- ar";0"icy 1he November 15, 200-4 ai;tuall mem bc,-ship and capacity numbers for both school . vVere an roved. Other issues rt-lalod to the SMPFO were also discussed at the m=tizigg, as addressed Ln the van OUS por-Lion,o-fthe aiftached abstract. 60 ORAINGE COUM'Y BOARD OF C01VAISSIONERS AC71ON AGENDA ITEM ABSTRACT Meefln,g Date: December 114, 2004 A tac znt I I ge I of`"{ * # 1 * - 4 ft� UNPIN SUBJF-CT-. 10�Year Student Membership Projections and Schools Adequate Public Facilities Ordinance (SXPFO) Implications DEPARTMENT: Mariag-r/Bu a.fJPI.-.,-inL-ir!' PUBUC HEARING: (YIN) No Attorney ATITACHMENT(SI: S Membership GapaQity Calcul.-dark and thaw Request Forms WFORMATION CONTACT: tip Year S-*-.Lqdert Menribership Projectiar, Rod Visser. e)d 23M lab'ES111GTaphs Donna Dean, eat 2151 CGI241CA1 Managar Ma m- o re; New School Cr4g 3enedict, ext 2592 Projects Geof Gledhill, 73Z2190- 11123,;04 Attorney Letter on K-3 Class Size TELEPHONE NUMBERS: cha-d - County's • Annual Debt ServiCe Hillsborough 732.8181 Projectilons Chapel Hill 968-4601 Durham 6SB-7331. fillebane 336-227-2031 PURPOSE: To consilder apprwrJof Nvie—ember 15.2004 actual membership and capatity ,00."S SIVI ChZar-4 .Y Sch Count La City Schools-, I aceive 0- year proje-aMms developed t =41h zweed-upon mode4s; anti to; mnsIdar a 3 =-Tic4i V, currently programniej de.A isvian-ca- to address anticiVated cost ove-mirz In various c1Jmf school and Cmnry BACKGROUND: [n 2OD3, the County, the two school systemns, and the Toyms of, Carrboro, Chapel HUN, and Hillsborough entered Into mutual agre-emants that orsated a syetern of &hDols Adequate Public Facilities ordinances. SAPFO was designed to ensure that new growth vv thin 'he County's two school districts orcurs, at a lace that allows Orange County and. the school districts to provide adequate school faciVues to serve the children who will be living within new res snval developments. SAPFO Machinery un -9 -f Coty 0 0 jai at th - Board a frtean days, after reoe&ingtha n, e om. the School Dist -. B04 5 -103� Theattualstuidiant mares zhlp '5-7,jres as of November 15 ea �� are run thtough five separate student 'ecfiDj-t models by a. Techn.1;--i Advisory Coz-arnittee (SAPFOTAG) of mamte7snTp proji representalives of, the Crounty, Towns, and sciiool sterns. The average. of the five mode'is becomes the basis for programming the construction of additional school space to Attachmnelt (.pagve 2 of -1) accommodate forecast, growth in student mqm�ership. T he membership numbers reflect an aG,.gal student count as defined in the MOU. The capacity that is noted, Is from last years SAPFCT AC certification. The SAPFOTAC analytical work would normally take place in the January - February Idmeframe, but was accelerated for 2004-05 at the request of the 80GQ because: the results of the SAPFOTAC analysis of updated student membership projeetions, Will have a sTgni-ficant impact on major capital funding decisions that the BOCC will need to make in the very near future. SAPFOT AC is tasked to produce an annual report for the governing boards: of each SAPFO partner. The full annual SAPFOTAC report will be completed in early 2005. Building Capacity There has been extensive discussion among the governing boards and staff of the CoLmty and school systems throughout 2004 regarding the certij-:-c ion of individual school building capacifties. The State of North Carolina has Jalkan urillateral action during the past tso years, to dictate to local school administrative units that the average class size throughout a school district for grades K-3 must be reduced to I teacher for every 21 students. As the BOCC has rioted, this has in. effect created an told coded mandate for county governments to provide additional school space with no time to plan for the funding and construction of new space. --oliowing dis F cussion on the subject at a November 2004 work session, the County Attorney, examined the requirements for reduced class size and the possible sanctions or other ramifications that might face any school system that is unable to comply with the average crass size manda-leS. The accompanying letter frGin,"he Attorney outlines the results of his research. As provided for in the SAPFO Section 1.b "-..'bUJldi,-1g capacity' will be determined— by a joint action of the School Board and the BOCC.- Ther ' efore, until there is a 'joint action' agreeing to the impact, of now State rules for classroom size in grades K-3, the existing capacity levels are being . used for capaolty/membership projection comparisons. Implications of' Updated Ten Year Student Membership Projections SAPFO provides that the County must provilde funding and a school system must construct new school space so that the Level of Service (LOS) for elementary school space vAl not exce-ad 105% of capacity across an entire school district- The updated ten-year student ma:rnbarship proi-ctions prepared by SAPFOTAC and rafleGted on the a=mpa.nylng:charts Indicate that, absent the creation of new seats, the 10511/o level of service would be exceed-aid at the elp-maritrary level in the Chapel Hill-Carrboro City Schools for academic year 209-10. Accordingly, adherence to SAPFO provisions will require that now permanent elementary school space be avalfable for the beginning: of that school year. The needed opening date has shifted back three, years compared to the 20007 opening contemplated in last year's student membership projections. aloMing growth produced only minor enrollment increases at the elementary level in the Chapel Hill-Carrbo.ro Schools during the current school year. GHCCS Middle School #5 Is projected to be neaded in 2013-2014. 800 new seats w1ft become sivallable virith the anticipated opening of CHCCS High School #3 in August 2007. Bused on the updated student membership projections, there is no other ad. Mona[ high school space needed within the ten-year planning period. 62 AU ac linicirt _,N". I (paggo _3 of 4) The Orange County School student membership pr):q-actlons reflect no ui I req rem t en at this time for addifional school seats during the ten-year pTanning horizon, beyond the construction of Middle School #3 that is in progress, and slated for opening in August 2006. Other Observations Recently. the Board asked County staff to furl eat estimiates by both school systems' architects regarding likely shortfalls in the established budgets for (ACS Middle School .43 and CHCCS High School #3. Both school systems have been advised that higher prices for steel, concrete, and fuel, among other factors-, make it very likely that construction bids Will significandy exceed the project allocations for construction. County staff have been working with the school staffs and architects and plan to bring responses on January 24 to the BOCC-requested analysis about factors affecting the anticipated cost overruns for the two new schoo I projects The Manager has explained during the past several months that the County faces significant constraints, under its oven policies, regarding the issuance of debt beyond that already programmed in the County's debt issuance schedule. That fact was reviewed in detail during several Board work sessions this fall. The accompanying chart depicts the County's anticipated annual debt capacity over the next ten years, with very little latitude to assume any non-programmed debt through FY 2007-08. Estimates of potential cost overruns just for the two riew school proj4cts have been in the range of $6 million to $7million. The Manager has made it dear that he Will not recommend that the County issue additional debt to address additional funding requested by both school systems for the now school projects, beyond that already programmed, until the County regains additional debt issuance flexibility beginning with FY idoa-og. • In view of that, the Manager transmitted a September 24, 2004 memo to both Superintendents soliciting ideas about how the anticipated cost overruns for the respective na,& school projects might be addressed through reallocation of resources available to the school systems through their ClPs and other revenue streams. • To this point, there have been no expressed written alternatives to the Manager's proposal that a portion of the planned issuance of $12.8 million in debt. for CHCCS Elementary School 910 be shifted to address anticipated cost overruns for the bmo school projects and other County capital projects that are in develop me nt . • In the absence of Viable alternatives and with the SAPFO-calculated postponement in the need, for the opening of CHCCS Elementary School #10 until the 2009-10 academic year, tote Manager recommends that the BOCC indicate its intention now to redirect some portion of debt planned for Elementary #10 to address other-, more urgent capital funding needs. • The adapted, 2004-14 Capital Investment Plan (CIP) would be amended to reflect the need forfunds to construct CHCCS Elementary #10 with a revised opening date of August 2009. • The Superintendent reports that the project archit wc:s have advised her that oonstruction. on OCS Middle School 0 must begin by mid-February 2005 to keep the project on track for an August 2006 opening. Accordingly, the Orange County Board of Education will likely consider awarding the construction bid and approving associated contracts at their scheduled meeting on January 24, 2005. • BOCC action to reallocate specific arnounts of planned debt to provide appropriate revised capital project budgets would be scheduled no sooner than the next BOCC regular meeting on January 24, 2005. That action could take the form of endorsement of specific project budget amounts and/or the adoption, of updated oapital project ordinances. • The existing interlocal agreement between Orange County and CHCCS establishing the project budget for High School 43 at $27..8 million plus $1.9 million for "smart growth" 63 in";�,3atvss w ' 4fd have -10 ba re�5tjsad to w1hatever acticil the BOCC May to i3 etrLiSt t Counyis, ffundLag all ocatedto the pro Ibe 3---ard bas indicated itts intention to • - ss at the January 22, 2005 annual pIM-nning re,4reat the 'etive Ucational .le irnpjica�ions of vario a schooke' d initi es -such such as Ed: ate Exceltence, Efficiency, and Goflaboration - in: the larger context of measures the Board aniay consider to promote greater funding equity between the two school systerins in the futon. RMANCIALIMPIACT: Precise financial impacts cannot be determined. but possible Changes 9141.1 r projected building capacity and projacted gTovr�i In stud-ant ra-emb ,,,h,i P for the next ILP-1 YSWS Of Tid-7 unpacts an fWur operating and cspz� &udg ea-sured in the tans: n-0 -s off I S RECOMMIENDAT I`ON(S). The Adnam"ieust-Sn re-=- mtrnend, -,mot the acrid: Appprnova the No-.,,ernber 115. 2004, actual rnsmb5Tsh[.P numbers., Racenve the information about 10 -yeah student projection averages-, M Approve the building capacity figures based on the individual school building ca.parity numbers for both school systems at the fuels certified for 2003 -04- * Indicate the Commissioners' intention to reallocate, as necessary and appropriate,. p i funding tiom the previously Planned issuance of $12.8 million in debt for CHGCS c J.a.mentaiy So hoot #10 to address oast ovemuns for CHCGS High, Sclioal 93, OCS ,Md6e School #3, and other pr;oriby County capit-ei praiects as determirted by the SO CC; aire-=. staff 410 revise the 2004 -1 4' 4C, IP: Io �Iorid-ud-= a fundiqg. plan thatwou,-Ij p roVida for the crtstnj-��-On of OriccS Elaimarftary-MIG akmg a timmina conslstentvWvh the need fb;, Via, s CI spaca as id�entiftd in the Fjpr-,,a'--d SAPFO —tan-year student rmarn-�Fersi,.:R (i.e opening for the 200,95-10 acadfeWic yasrX o R �0- Oeas.-d 14::51 9. Items for Decision -- Reqular Agenda 9a, a. Schools Adequate Public Facilities Ordinance (SAPFO) — Approval of Annual Certifications The Board considered a review of the Annual Report from the Schools Adequate Public Facilities Ordinance Technical Advisory Committee (SAPFOTAC); and provided appropriate direction to the Manager and staff. John Link said that, as part of the provisions of the memorandum of understanding by the County, the school systems, and other municipalities, the Schools Adequate Public Facilities Ordinance Technical Advisory Committee has the responsibility each year of developing a report that outlines changes in actual membership capacity, student projections, and their collective impact on future issuances of certificates of adequate public schools (CAPS). He pointed out that their recommendation is to continue with the K -3 class size of 23 students to one teacher, knowing that the General Assembly made a decision to reduce the number of students to 21 students to one teacher, without any additional funding, provided to the County. Rod Visser said that, regarding the capacity situation, there is going to be a need for a group to meet and try to resolve before next November how capacity should be determined. The documents are based on the 23:1 ratio in K -3. He pointed out the major points in the report. Commissioner Halkiotis asked for the review from Geof Gledhill, which highlighted the issue of unfunded mandates from the State. He thinks it is outrageous that the Governor made this unilateral decision. Commissioner Gordon said that it is important to address the General Assembly's class size reductions at some point since determination of capacity at the state - mandated class size of 2 1: 1 does make a difference. The change will especially affect the CHCCS elementary schools since they are more crowded than the OCS elementary schools. Also, she asked that the charts be run for 2004 -2005 on pages 46, 47, and 51. Commissioner Jacobs thinks that they need to look at the issue of how to address this class size mandate. Chair Carey said that at some point he will ask the staff to run these same numbers for one school system in this County and Commissioner Halkiotis seconded this. Rod Visser said that there is a requirement in the MOU that this report gets referred to each partner for comments. This is the next step. A motion was made by Commissioner Gordon, seconded by Commissioner Jacobs to approve the Annual Report from the Schools Adequate Public Facilities Ordinance Technical Advisory Committee (SAPFOTAC); and to transmit this document with comments to the other governing bodies. Commissioner Jacobs added that the County Commissioners' comments made also be transmitted, including that the Governor's budget includes taking some of the existing school construction money and re- appropriating it for other uses. VOTE: UNANIMOUS 16