HomeMy WebLinkAboutORD-2005-006 - Middle School #3 Orange County Schools Capital Project OrdinanceDRAFT Middle School #3 Orange County Schools Capital.Project Ordinance Be it ordained by the Orange County Board of County Commissioners that pursuant to Section 13.2 of Chapter 159 of the General Statutes of North Carolina, the following capital project is hereby adopted. Section 1. The project authorized provides funds for the Orange County Schools to obtain options to purchase property for and to design, construct, and equip a new middle school facility. Anticipated revenues for the project consist primarily of 2001 voter approved bond funds, with private placement financing as well. Section 2. The officers of the County are hereby directed to proceed with the project within the budget contained herein. Section 3. The following County revenue is anticipated to complete this project: roug 2003-04 FY 2004-05 roug 2004-05 Sales Tax $0 $0 $0 School Construction I m act Fees $0 $0 $0 Public School Building Funds $0 $0 $0 2001 Bonds $825,005 $17,674,995 $18,500,000 Private Placement Loa $0 $3,520,566 $3,520,566 Total County Funding $825,005 $21,195,561 $22,020,566 Section 4. The following amount is appropriated for this project: TI'YOllgl'1 FY X04 FY2~05 TI'Y'10l.lgf'1 ~ 2U0~05 Cor~t.iction $0 $15,909,999 $15,909,959 SiteAogtisitirn $77005 $0 $77005 an (Salsrnlhterials Tes(ing, $20,000 $o ~o,ooo ~ Deueloprrelt $~ ~,~,~ $~,~~ Fees Air.I~Eng~Desi ) $30,000 $1,085,000 $1,115,000 Nbuee~le ~ $0 $600,000 $600,000 Ted~r'idogy $0 X6,50,000 $650,000 on Cacti $0 $465,000 $465000 Q~Tirre Scat (bats Tdal $0 $82005 $0 $2't,195s,561 $0 $22,Q20,566 DRAFT Section 5. In addition, the Orange County Board of Education plans to appropriate the following .revenues to the project to cover construction costs. roug 2003-04 FY 2004-05 roug 2004-05 Sales Tax Refunds $0 $300,000 $300,000 NCDOT Grant $0 $50,000 $50,000 0 oar o Education Funding $0 $350,000 $350,000 Section 6. The cost to site and. construct Orange County Schools Middle School #3 totals $22,608,091. County 20 1 CS Middle School #3 Bond.Funds $825,005 $17,674,995 $18,500,000 Fund Bonds (to cover site development costs for West 10. Soccer Complex co-located at the Middle School #3 site $237,525 $0 $237,525 Orange County Private Placement Fundin $0 $3,520,566 $3,520,566 School Board Funds $0 $350,000 $350,000 o a oar o uca ion Funding $1,062,530 $21,545,561 $22,608,091 Section 7. This ordinance supersedes all previous Orange County Schools Middle School #3 capital project ordinances. Section 8. This capital project ordinance, originally adopted March 4, 2004, shall remain in effect through June 30, 2007. Adopted this 24~' day of January 2005. MEMORANDUM. T0: Board of County Commissioners John Link, County Manager FROM: Pam Jones, Purchasing and Central Services RE: Orange County Schools Middle School #3 Construction Cost Assessment DATE: January 21, 2005 As you may recall, OCS Middle School #3 was one of two schools for which Commissioners requested that Paul Thames and Pam Jones review plans and identify cost elements with significant cost increases. The review of the major construction elements for OCS Middle School #3 revealed. no appreciable deviations from expected construction cost escalation within major building construction elements, with the exception of items such as structural steel, steel reinforcing, metal roofing, concrete and other masonry, which has increased almost 50% over the past four years. Further, according to construction data provided or published by the NC Department of Public Instruction (NCDPI), school construction costs for calendar years 1996 through mid-2004, increased by an average of 35°Jo for all schools statewide. NCDPI data also indicate that much of this increase (approximately 19%) has occurred in the 2003 -mid-2004 interval. You will note that if the 35°Jo "inflation" factor were applied to the Orange County School standards square footage costs (created and adopted in 1996), the 2004 cost per square foot would calculate at $128.25 .per square foot. The square foot costs calculated from the bids received on December 7, 2004 would be approximately $132.45, approximately 3°Jo over the present value school standards. While the source of this 3°Jo over the standards present value cost was not readily apparent, it was noted that the standards include limited, if any, green building components. Green building adds value and has a payback for the long term; however, some elements have an identifiable up front cost in excess of traditional building methods. At a minimum, $80,000 of "green components" can be identified. in the 12/7/04 bid alternates through such things as solar water heating system and photovoltaic system. These items are recommended in the bid award amount and are calculated in the $132.45 square foot cost cited in the attachment. For your information, the attached spreadsheet compares construction standards cost, to the present value of the construction standards cost, as well as the preliminary cost projections provided by the architect in September 2003, the updated projections based on the final program of the school in September 2004 and the actual bids received on December 7, 2004. Orange County Middle School #3 Construction Cost Comparison to School Construction Standards Middle School #3 Capacity = 700 students Square Footage: 122,763 ._-_ -- ------ -------------i . -__ .-_ _ . _______-_ ~ . ~ -------- ------------- -~ 1996 School -------_.___ ----- Construction Standards (SCS) Present Value School Constr Standards __.. _-- - CI2Z 9/3/2003 Construction ~ Estimate C12Z 9/7/2004 Construction Estmate Construction Bids 12/07/2004 ____ _ _ ---- ------- - - - -- _ _ _ _ L - _ L .---- - __ Construction ________- Cost Per S uare Foot I ~____q ___ _ --- -- ._ _. - __-$95.00 .. - -- -___$128_25 _ -..__-..__$1 12_17 $132.49 $132.45 ------------------- _. .-_. Site Development ---------------- ---------__, . ------.-------- ----------- ------- as % of Construction Cost ----- ------ -- 10.00% 10.00% - , _ 12.00% 15.00% $16,259959 see note #1 below 15..3% (includes all site _ (see note #2 below) _ __ _ work, examples of which include: roads, including any required off site road improvemenfs, -__ _ parking lots, on-site water and sewer and all grading.) _ _ _ __ ___ _ ______ ___ Bids received on 12/7/04 totalled $18,273,846. However, they also include all sife d evelopment costs that were not incl uded _____ _ -_ ___ ___in fhe earliersitework bids received in the Fall 2004. The $16,259,959 consfruction cost, listed above, is the architect's ____ estimafe of fhe amount thaf should be allocated fo actual building consfruction. -__ _____ _______ ____-_ (2) Total site development costs incuding early grading package) total $2,723,132 or 16.7% of the construction cost. _ ___ ___ ____ The architect's preliminary estimafe of the soccer center's portion of fhe cost for shared facilifies is $237,525, which would reduce the dev e~enf costs to a~oximately 15.3% of the construction budget_ _________ __ ___ _- to ~ ~ ~ CORLEY REDF~OT ZACK INC. A R C H I T E,C T S ENGINEER 5 PLANNER S December 15, 2004 Dr. Shirley Carraway, Superintendent Orange County Schools 200 East King Street H1ILsbOI'OUgh, NC 27278 GLENN D. CDRLEY, AIA President, CEO ~~ Middle School #3 KENNETH E. REDFOOT, AIA Vicc President . West Ten' Road, Orange Co., NC MARKZACK,ACA Project #0310 vice President BID TABULATION MICHAEL 4 HAMMERSLEY, PE Prirtcipat Dear Dr. Carraway: - LAURENCE w. suNCH, wIw Associate ANDREW R. CRUICKSHANK, AIA Associate DAVID M. TAYLOR, AIA 'issoriate HARRY M.jENSEN Associate KENNETH E. SMITH Associate po Box 236s Chapel Hill, NC 27515-2368 222 Cloister Court Chapel Hill, NC 27514-2212 (919) 942-8586 Telephone (919) 929-4802 Fax In accordance with your request, I am sending you the certified bid tabulation for the above-referenced project. Bids for a single prime and for rnulti prime contracts were opened at 4:00 PM on December 7, 2004, at the School Board building in Hillsborough, NC. Listed below are the apparent low multi-prime bidders, based on their Base Bids and the Alternates which were reviewed and approved in our discussions with you and George McFarley, Jr., on December 14, 2004: A. General Construction: J. H. Allen ,Inc. 409 W. Central Avenue (27203) PO Drawer 2809 Asheboro, NC 27204 Base Bid: Alt. #3: Front entrance canopy Alt. #4: Photovoltaic system/power storage/- distribution system Alt. #5: Solar water heating system Alt. #15: Use specific brands for kitchen equipment Total Base Bid + accepted alternates: B. HVAC Contractor: Indicor 1217 Rail .Street {27407) PO Box 8794 Greensboro, NC 27419 Base Bid: Alt. #9: HVAC Equipment by Trane: Alt. #10: Boilers by Weil McClaim with Webster Burners: Alt. #11: HVAC Pumps by BBrG: Alt. #12: HVAC Control by Invensys supplied by Yamas: Total Base Bid + accepted Alternates: $13,445,000 108,000 5,300 9,700 (no chance $13,568,000 $ 1,849,000 $ ~ No change $ No change $ 8,000 $ 88,000 $ 1,945,000 r Dr. Shirley Carraway RE: Middle School #3 Bid Tabulation C. Electrical Contractor: Starr Electric Co., Inc. 6 Battleground Court Greensboro, NC 27408 Base Bid: Alt. #3: Front Entrance Canopy: Alt. #4: Photovoltaic system/power storage/distribution System Alt. #13: Security System by Ademco: Total Base Bid December 15, 2004 page 2 + accepted Alternates: D. Plumbing Contractor: ABL & Associates Plumbing, LLC 300 Hoke Street Raleigh, NC 27601 Base Bid: Alt. #5: Solaz Water Heating System: Alt. #3: Canopy Roof Leader: Total Base Bid + accepted Alternates: TOTAL MULTI-PRIME BASE BIDS AND RECOMMENDED ALTERNATES: Summary: General Construction: $13,568,000 HVAC: 1,945,000 Electrical: 1,654,400 Plumbing: 1,106,446 $18,273,846 $ 1,649,000 $ (8,600) $ 14,000 $ No chance $ 1,654,400 $ 1,050,899 $ 51,728 3 819 $ 1,106,446 $18,273,846 The above construction bids, added to the early sitework package contract (presently under construction) and the playing field and irrigation work (contract pending), equals $18,983,091. On September 9, 2004, we presented to the School Board an estimate of $18,826,700 for the same scope of work. The difference between the estimate and the actual bid is less than 1%, which confirms the timeliness .and accuracy of the estimate. Based on this information, we recommend moving forward with preparation of contracts for the new middle school for the Orange County Boazd of Education. . Please contact me if you have any questions or comments. Sincerel th d oot, AIA ice President KER:esw/0310-bid.rec cc George McFar~ey, Jr. ~~~ CORLEY REDFOOT ZACK we COI L RSDFOO'1' ZACR, arc. BID T71BUL~-TIOM MIDDLB SCSOOL #3 OranQa County Schools West Tea Aoad, OraaQa Couaty, DTC Pro3eot X0310 4200 PM, December 7, 2004 Bids as shoWU on the attached seven (7~ pages, opened at 4:00 PM, Deaember 7,, 2004, have been checked and validated and era hereby certified as correct. ~ .~'~w~~ $. , AIA, Vice Pr - !Q~ V ~~ CORL$Y R~DFOOT ZACK, ~. BID TABUL#TION L~DDLS SC8O0L ~3 Oraag~ Couaty Schools Nsst Tea Aoad, Orange Couaty, NC Project #0310 4x00 PM, December 7, 2004 SI~I6Lg PRDa; Sac Bid Add. NBB GENOtAI. CO6]'1'RAC'TOR Liaensa No . Bond Aac' d R®a' d BASS BID J. H. Allen, Inc. 3921 YES YES YES $18,283,000 Asheboro, NC Bordeaux Construction Co. 9266 YE3 YES YES $18,898 000 Durham, NC , Quate Industrial 8®rvice ao bid Durham, NC SINGLB PRZME Alt. 1 Alt. 2 Alt. 3 Alt. 4 Alt 5 - Solar GSNaRAI, CONTRACTOR Change Chaaga Metal Grant 8ntranca Photovoltaic . Mater Haatiag Pitched Roof Panels to Canopy Systa®/Po~rer Syste®s Roofing gIFB Storage k Material Distribution J. H. Allen, Inc. .($164,500) ($127,000) $112,200 $20,000 $63,700 Bordeaux Const. Co. ($164,000) ($140,000) $ 92,750 $ 2,500 $ 3,600 Quate Industrial Service SINGLa PAIROZ Alt. 6 Alt. 7 Alt. 8 Alt. 9 - BVAC Alt 10 - OSN~71L COD]TR]-CTOR RainMater Parking Lot Sarnifil PVC aquipsent by . Boilers by Collection/ Lighting me®braae Trace Neil 1[aClaim Non-Dotable Roofing Systems Mith Nebster Natar Distrib Huraers Systaom J. H. Allen, Ina. $839,000 $234,000 '$113,000 no change $6,400 Bordeaux Construction Co. $865,300 $199,800 $117,000. no change no change Quate Industrial Service -_._ W Page 1 of 7 Mid Sehoal #3 Siuy_~ Prima General Bid, pays 2 82biGLB B1lIl~ ]11t . 11 - ult . 11 - ]llt . 13 - 111t . 14 - Alt . 15 - ~1-L CODITRACTOR BY3-C Bumps by HV71C Saeuxity !-lteraate IIsa specific " Sidi ~ Controls by Systs~ by Brick breads for Invensys 71damCO Masonry waits ]sitchea supplied by equipment " lamas J. K. All®n, Iae. $5,300 $82,000 ao change $245,000 no change Bordeaux Const. Co. $8,800 $96,800 no change $251,000 no change Quate Industrial Service _._. "~ Page Z of 7 COxL$Y REn~oar ZACR, ~. SID TAHUI.ATIOAt DSIDDLS SC8O0L ~3 Orange Cauaty Schools olest Ten Road, Orange County, NC .Project #0310 4s00 PM, December 7, 1004 ~IOLTI-PRI1O; ~ 5~ Sid Add. ~8 GENERAL COU1'PR7I~CTOR License No . Bond Rac • d Rac • d S118E BID J. H. Allan, Inc. 3911 yes yes yes $13,445,000 Asheboro, NC Bordeaux Coastruction Co., Inc. 9166 yes: yes yes $13,886,000 Durham, NC Quote Industrial Service. no bid -Durham, NC SI~iGLE pAZNa Alt. 1 Alt. Z Alt. 3 Alt. 4 Alt. 5 - Solar GENaRAL CODT1'RACTOR Change Cbaage l[etal Front $atraace Photovoltaic tRatar Heatiag Pitched Roo! Panels to Canopy Syste~/Power Systa®s Roofing EI1r8 StoraQa ie R:aterial Distzibution J. H. Allan, Inc. ($164,500) ($117,000) $108,000 $5,300 $9,700 Bordeaux Const. Co. ($164,000) ($140,000) $ 89,000 $x,500 $3,600 Quota Industrial Service Is[JI1PI-PAIROt Alt . 6 Alt . 8 711t . 14 Alt . 15 - G~RAL COE1'1'RACTOR Raiaxater Sarailil PVC Use Altspraata Use specilia Collection/ messbraae Sriak.Masoary breads £or Nob-potable Roofing Uaits kitchen outer Distrib systesa equipsssesnt System J. K. Allen, Inc. ($ 7,500) $113,000 $145,000 no change Sordesux Const. Co. ($15,000) $117,000 $151,000 no change Quote Industrial Service Page 3 0! 7 CO. Y RSDFOOT 'ZACiC, ~. BID TABUIdITION MIDDLE SCSOOL ~3 . OraaQa County Schools West Tan Road, Orange County, NC Project X0310 4;00 PM, December 7, 2004 ldVLTI-PAINS 5~ Bfd Add. DaBE HV]1C C0~7TRA(.'TOR License No . Bond Rea' d Rea . d Bi18E BID Baker Mechanical, Inc. no bid .Wilson, NC Comfort Sn~ineers Durham, NC 9342 yea yes yes $1,990,500 Harrelson Mach. Contractors Wilmington, NC 18936 yes yes y®a $2,094,335 Indicor Greensboro, NC 6449 yes yes yes $1,849,000 LoDan Mechanical no bid Winston-Salem, NC Meahworks Mech. Contractors Beautortr NC 11295 yes yea yea $2,266,420 Markley Mechanical Associates Selma, NC 18056 yes yes yes $2,_000,000 Quality Mechanical Contractors no bid Burlington, NC Southern Piping Co. Raleigh, NC 7421 yes yes yea $1,963,000 PI Meohaaiaal (did not request CD'S) Greensboro, NC 07066 yea yes ~ yea $2,155,000 -~ ~~ Page 4 of 7 Mi.ddla 3ahool #3 Multi-Prime HVAC Contractor, page 2 MOT.TI-PRIME BvAC CODITRACTOR • Alt . 9 SVAC Equipmaent by Trans 711t . 10 Boilers by wail licclaim with Mabstar Burners Alt . 11 - 8V]1C .Pins by BiG Alt . 12 - SVAC Controls by Invensys, Suippiiad bar 7[amas Baker Mechanical, Inc. Comfort BnQineers' no chanpre $4,000 no change $51,700 Harrelson Meeh. Contractors no change ~ $3.,668 no change $66,286 Indicor• no change no change $8,000 $88,000 Logan Mechanical Machworks mech. Contractors no change no change no change $76,500 Markley Mechanical Associates no ehanQa no change no change no change Quality Mechanical Contractors Southern Piping Co. no change $6,000 $5,.000 $75,000 P= Machasiical (did not request CDs) no change no change no ohange no change J Page 5 of 7 CO. Y RSDFOOT ZAC'1C, n~c. STD TABUL7-TIODi 1QDDL~ SC800L ~3 Ozange Conaty Schools West Tan Broad, Orange Couaty, ~iC Pro~act X0310 4100 PM, December 7, 2004 IdLTLTi-PRZ1[6 5~i Hid Add. MBE SLI~CTRICAL CONTRACTOR License No. Hoed RaC'd RAC•d 871SE BID McGeever & Associates, Inc. No bid Clayton, NC Starr Electric Co., Inc.; NC4-U yes yes yes .$1,649,000 areansboro, NC Triangle Electrical Services no bid' Chapel Hill, NC vaughaa Elactria Co., Inc. 14-V yes yes yes $2,9 60,900 Durham, NC . Watson 8lectriaal Construction Co. 213-U yes yes yes $1 792 000 Burlington, NC , , MULTI-PRIERS Alt. 3 - Alt. 4 - Alt. 6 - Alt. T - Alt l3 - BLSCTRICAL CODTPRIICTOR 1~'roant photovoltaic Rain~rater Perking Lot . Security Eatraace Syatemn and Collection cad Lighting System by Canopy Poe"er Dloa-potable Adem~co storage and Water distribution distribution ' systevn Mc6eevar ~ Associates, Inc. Starr Elactria Co., Inc. ($8,600) $14,000 ~ $2,200 $220,000 no change Triangle Electrical Services Vaughan Elactria Co. $4,000 -0- $50,000 $175,770 $95,000 Watson Electrical Coastruction ($6,000) $30,000 $ 500 $185,000 no change .`.~ Page 6 of 7 ~,ORLSY RSDFOO"P "ACK. ~. BID T71HVL7-TIOIQ 1QDDLl! SCHOOL ~3 • - Orange County Schools • Mest Ten. Road. Osage County, DiC Project X0310 4s00 PM, December 7, 2004 MULTI-pRlf~ 5~1i Bid Add. MBE PLU!®IMG COD]'t'RACTOA License Dio. Hand Rea' d Rec' d HASB HID AHL & Associates 19909 yes yes yes $1,050,899 Raleigh, NC Brown Brothers Plumbing & Heating 181 yes yes yes $1,180,0.00 Durham, NC Quality Mechanical Contractors 12381 yes yes yea $1,100,000 BurllnQton, NC Sparraw & Sons, Inc. 4403- yas yes 3 of 5 $ 765,000 Carrboro, NC~ , MULTI-PRDIDZ Alt . 5 - Alt . 6 - Alt . 3 - PLUMBIDn3 CODiTRAC'1'OR Solar Mater Raiavatar Caaapy Roof Heating Collactioa Leader s]fst~ and Dion- (Dioted on potable dranings only) Mater Distribution Systaaa ABL i'. Associates $51,718 $796,000 $3,819 Brown Brothers Plumbing $36,100 $815,900 $2,500 Quality Mechanical Contractors $35,000 $549,000 Sparrow & Sons, Inc. $11,000 $598,000 page 7 of 7 .~ Comparison of Orange County Schools Middle School #3 Project Costs to Commissioner Adopted Elementary School Construction Standards Approved School Construction Standards Estimated Costs for OCS Middle School #3 (per bid received by OCS BOE 12115/04) onstruction Cost Student Capacity Square Footage Square Feet per Student 700 132,192 188.8 12,558,240 700 122,763 175.4 16,259,959 Cost Per S uare Foot $ 95 $ 132 Site Ac uisition including all acquisition related costs such as surveys and professional fees. $550,000 $795,000 Number of Acres: 22 67 Cost Per Acre: $25,000 $11,866 Site Develo ment $1,255,824 $2,723,132 of Construction Cost 10.0% 16.7% Fees $1,381,406 $1,115,000 of Construction Costs and Site Develo ment 10.0% 5.9% Moveable E ui ment $627,912 $600,000 of Construction Cost 5.0% 3.7% Technolo (includes cabling and equipment for voice, video and data distribution systems $1,090,584 $650 000 Cost er s uare foot $8.25 $5.29 Construction Contin enc $690,703 $465,000 Developmen 5.0% 2.9% Start-U Costs Jon Personnel One time start-u costs $350,000 $0 of Construction Cost 0,0°/, Total Total Cost Per Square Foot $ x18,504,670 139.98 $ $22,608,091 184.16 Capital Cost per Student Capacity (capacity as set by construction standards report) $ 26,435.24 $ 32,297.27 total cost of land Including portion to be used for West 10 Soccer rnmplex This reFlects total cost of site development and does not account for the antcipated site development vests that would be sham between the County and the school district. The anticipated net vest of site development totals $2,485,607. 7.~ I -a ~-~-vvs ~-- Chair Carey said that there is also an Orange County Disability Awareness Council that. the County supports. Commissioner Halkotis asked that all leased properties be included. in the handicapped accessib ity component. A motion was,made by Commissioner Gordon, seconded by Commissioner Foushee to accept the final Report on Functions and Responsibilities of the Human Rights and Relations Department and amend the County's.Classification and Pay Plan to addthe new class of LEP (Limited English Proficiency) Coordinator at salary grade 17 effective February 4, 2005. DOTE: UNANIMOUS 6. Resolutions or Proclamation a. Middle School #3 Capital Protect Ordinance The Board considered a .resolution and a revised capital project ordinance regarding appropriation of additional funds-:for construction of Orange County. Schools (OCS) Middle School #3. John Link said that in November 2001, the voters of Orange County approved.. in the school bond-$18.5 million for constructing a new middle school for the fJrange County school system.. This `$18.5 million, at that point, was the amount that had been specified in the construction standards adopted several years ago. Since that time, a site has been located,. approximately 1.00 acres: between West- Ten Road and I-40/1-85. The school system and the County Commissioners and staff have been working on developing the-total area so that, as the school is planned and built, there will also be work on multiple soccer fields in the same area. The school system and the County Commissioners have entered into an inter-local agreement. He said that this item is related to the outcorne of the bids that-were received in December by the school board. Thee. action is to ask the Board to consider appropriating as much as $3.5 million in additional funds toward this project, based on the costs of steel, concrete, etc. There. is also a letter from Superintendent Carraway (peach colored) indicating that the school system has identified $350,000 of their revenue to address this shortfall. -This is in response to a letter sent by him to both superintendents in September asking them to identify sources of revenue to help in the overruns _of Phis project and. High School #3 in the Chapel Hill-Carrboro City school system.. Rod Visser said that this is-an urgent issue because the middle school is slated to-.open in August 2006:: The project architects have indicated to the schoo board that in order to keep this.. project on track, it is important to begin construction bymid-February. The: school board has this item on its agenda tonight. In :December, the Board indicated that it intended to reallocate some or perhaps all of the $12.8 million that is-currently earmarked in the County's plan for CHCCS Elementary#10 to address some of the anticipated cost overruns for this project and the CHCCS High School #3 project and perhaps the senior centers: Funds to build Elementary school #10 will be allocated at a later date. This. action is to specifically fol ow upon this indication of intent in December. Rod Visser pointed out thatin October the Board asked that a work group: be put together, comprised: of County and' chool representatives; that coald examine ongoing issues related to the joint relationship between the middle school project and the adjacent County soccer complex. Chair Carey is serving on this work group along with other staff members...,. Chair Libby Hough, Superintendent Carraway, and other school toff members. The .,group mete. last week to talk about budgetary considerations. There is some work to be done on .;potential additional joint savings through economies of scale. Also, County`staff conducted an assessment of the cost overruns for this project and for High School #3, and it is summarized in the abstract: .