Loading...
HomeMy WebLinkAboutORD-2005-005 - Middle School #3 Capital Project Ordinance 01-24-2005-6aORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: January 24, 2005 Action Agenda Item No. .a, SUBJECT: Appropriation of Funding for Orange County Schools (OCS) Middle School #3 DEPARTMENT: Manager /Budget PUBLIC HEARING: (Y /N) ' No ATTACHMENT(S): Proposed Resolution Proposed Capital Project Ordinance 1/21/05 Staff Memo re: Middle School #3 Construction Cost Assessment Excerpt from 1/24/05 OCS Board Agenda — Architect Letter re: Bid Tabulation Comparison of MS #3 Costs to School Construction Standards INFORMATION CONTACT: Rod Visser, ext 2308 Donna Dean, ext 2151 TELEPHONE NUMBERS: Hillsborough 732 -8181 Chapel Hill 968 -4501. Durham 688 -7331 Mebane 336- 227 -2031 PURPOSE: To consider a resolution and a revised capital project ordinance regarding appropriation of additional funds for construction of Orange County Schools (OCS) Middle School #3. BACKGROUND: In November 2001, Orange County voters approved bond referenda that included $18.5 million for the construction of a new middle school for the Orange County Schools system. In early 2004, the Orange County Commissioners and Orange County Board of Education approved a number of decisions and financial transactions that resulted in the acquisition of approximately 100 acres of property between West Ten Road and Interstate 40/85 that will serve as the site for the new middle school and a multi -field soccer center. The County has title to 34+ acres for the soccer center, and OCS has title to 66+ acres for the middle school. In October 2004, the County and OCS entered into an interlocal agreement that facilitated joint development of the 100+ acres. The agreement was intended to promote collaboration, sharing of facilities, and achievement of cost savings through economies of scale. For example, by agreeing to have pre - grading work done on both sites simultaneously through a contract administered by OCS, about a quarter of a million dollars in savings was realized. At the October 19, 2004 meeting, the BOCC determined that it would be beneficial for a work group comprised of County and OCS governing board representatives and staff to meet periodically to develop recommendations regarding outstanding issues related to the middle school and soccer center projects, including additional features (e.g. library space) that might be able to be incorporated into the project at a later time. The work group met on January 18, 2005 to discuss primarily issues related to the middle school project budget and bids that OCS 2 received in December 2004 for the construction of the middle school. The group agreed that it would address other outstanding issues in future meetings. The central consideration at present is that in order for the middle school to open as planned in August 2006, construction work must begin by mid - February 2005. Directly related to that project timetable is the need for the Orange County Board of Education to award construction bids and enter into appropriate contracts for the construction work. The Board of Education's agenda for their meeting on January 24 includes action on those items. The middle school project architects have noted since project inception that the $18.5 million in bond funding would likely be inadequate to cover the costs of constructing a middle school similar in size and scope to Smith, the most recently opened middle school in Orange County. OCS Middle School #3 has been designed largely as a prototype of Smith (with some differences) and is currently programmed at about 123,000 square feet, which is within the parameters established in the BOCC's middle school construction standards. The design is intended to incorporate a variety of aspects related to greenbuilding and smart growth initiatives. In Fall 2004, the project architect explained to the Board of Education that substantial increases in the market rates for steel, concrete, fuel, and other construction related commodities would likely be reflected in the construction bids. This prompted the Board of Education to request that the Board of Commissioners consider appropriating additional capital funding for the middle school project sufficient to preclude any further reductions to the contemplated 123,000 square foot design. The BOCC tasked County staff to conduct an independent assessment of factors affecting the school construction project costs. Their analysis and findings are provided in an attached narrative and associated spreadsheet, and will be explained by staff during the BOCC's January 24 meeting. In accordance with the BOCC's November 2000 "Policy on Planning and Funding School Capital Projects ", OCS is requesting that the Board adopt a revised capital project ordinance that would appropriate funds for the balance of the project. Under the policy, Middle School #3 qualifies as a Level 2 project, which is structured in four phases. The project is now at the Design and Construction Phase, which includes final design, facility construction and purchase of equipment, furnishings, technology, and one -time start up items. The remaining phase, the Final Accounting Phase, comes at project completion and provides a reconciliation of actual project expenditures with the approved project budget. As noted in the attached January 24, 2005 OCS agenda item, the Superintendent is recommending that the Board of Education award a total of multi -prime base bids and recommended alternates in the amount of $18,273,846. That amount, if approved, would bring the total estimated Middle School #3 project cost to $22,608,091. The BOCC has allocated the previously mentioned $18.5 million in general obligation bonds towards the project cost. OCS has also identified $350,000 of its own funds ($300,000 from sales tax reimbursements and $50,000 from the North Carolina Department of Transportation) to help pay for the project. The BOCC has previously appropriated, through the Soccer Superfund Capital Project Ordinance, $237,525 to pay for the County's share of the pre- grading /sitework being administered by OCS for the middle school and soccer center sites. With the $19,087,525 in earmarked funding noted immediately above, and the estimated total Middle School #3 project cost of $22,608,091, there remains a project budget gap of $3,520,566 for the Board of Commissioners to consider funding. Representatives of OCS and the architectural firm Corley Redfoot Zack will attend the January 24 BOCC meeting to address any questions about project design, bids, or overall costs. The Superintendent's response to the County Manager's inquiry about what other sources or capital project realignments might be considered to produce additional Middle School #3 project funding will be reviewed January 24. In December 2004, the Board of Commissioners indicated its intent to reallocate some or all of $12.8 million in anticipated debt for Chapel Hill - Carrboro Elementary School #10 to help address anticipated cost overruns for Middle School #3, CHCCS High School #3, County senior centers, or other projects. The main decision for the BOCC at this January 24 meeting is whether it wants to appropriate all or a portion of the $3,520,566 funding gap outlined above. The Board's decision on this matter directly affects the action that the Orange County Board of Education will take later in the evening on the middle school bid awards and contracts, as the amount they can approve for construction contracts depends on the amount of funding appropriated by the BOCC by capital project ordinance. The attached capital project ordinance contemplates approval by the BOCC of the entire additional amount of $3,520,566. However, the BOCC is under no obligation to appropriate that much, and the capital project ordinance can be revised at the BOCC meeting if necessary to reflect whatever additional amount of funding the BOCC approves. A number of outstanding issues remain to be resolved at some point in the future, but need not be resolved on January 24. For example, the work group plans to address at a future meeting ideas that have been generated regarding how to manage approximately 25 acres of OCS owned property that were not included in the school site footprint but which are in fact needed to meet impervious surface limitations under the existing project concept. County and school staffs will be exploring how conservation easements might be employed and will address with the work group any financial transactions, if any, that might be warranted in the future regarding these 25 acres. The work group recommends that the Board include in whatever additional appropriation it decides to make for the middle school project an amount that will cover the $271,000 difference between the $52000 initially budgeted for land acquisition and the $795,000 that was actually paid for 66+ acres. Also, it should be noted that the costs of providing water and sewer service to the school property line are NOT included in the middle school project budget. Utility extensions are being worked on by County staff in collaboration with the City of Mebane, and costs for these are to be addressed through bond, grant, or otherwise funded appropriations that the BOCC will address at a later date. Finally, OCS representatives noted during the recent work group meeting that the identified total project budget does not address all one -time start up costs or any ongoing startup costs for Middle School #3, nor does it consider decisions that OCS will need to make in the future about comparability of facilities between this new middle school and the two existing middle schools. FINANCIAL IMPACT: As described in the "Background" section of this abstract. It should be noted that any debt issuance must receive formal approval from the North Carolina Local Government Commission. Staff expects that alternative financing for additional costs for Middle School #3 will receive LGC approval when presented, as the additional debt involved remains within the County's self- imposed debt management parameters and would be issued in lieu of other debt on the BOCC- endorsed Debt Issuance Schedule, which has previously been shared with LGC staff. 4 RECOMMENDATION(S): The Manager recommends that the Board adopt the accompanying resolution indicating the intent to provide additional funding for Orange County Schools Middle School #3 and adopt a revised Middle School #3 capital project ordinance that appropriates the level of additional funding approved by the Board. DRAFT 5 ORANGE COUNTY BOARD OF COMMISSIONERS A RESOLUTION OF INTENT TO APPROPRIATE ADDITIONAL FUNDS FOR CONSTRUCTION OF ORANGE COUNTY SCHOOLS MIDDLE SCHOOL #3 WHEREAS, the Orange County Board of Commissioners and Orange County Board of Education have agreed to collaborate in the development of a new middle school and a new multi -field soccer complex on approximately 100 acres of property located between West Ten Road and Interstate 40/85; and WHEREAS, the Orange County Board of Education has approved a design for the middle school that is based on a prototype of the Smith Middle School constructed several years ago in the Chapel Hill - Carrboro School system; and WHEREAS, at approximately 123,000 square feet, the planned size of Middle School #3 falls within the parameters established in the Board of Commissioners' 1996 adopted middle school construction standards; and WHEREAS, the current estimated total project cost for Middle School #3, based on construction bids received by the Orange County Board of Education in December 2004 is $22,608,091; and WHEREAS, earmarked County and OCS revenue for the project, including $18.5 million in voter - approved general obligation bonds, is $3,520,566 less than the currently estimated project cost; and WHEREAS, the Board of Commissioners in December 2004 indicated its intent to redirect (with subsequent replenishment) some or all of planned alternative financing debt of $12.8 million for Chapel Hill - Carrboro Elementary School #9 to address more pressing financial needs for OCS Middle School #3, CHCCS High School #3, County senior centers, or other projects; NOW, THEREFORE, BE IT RESOLVED THAT the Orange County Board of Commissioners does hereby indicate its intent to appropriate $ in additional funding for the construction of Middle School #3, with said appropriation to be incorporated in and executed by Board of Commissioner adoption of an updated capital project ordinance for Orange County Schools Middle School #3. This, the 24th day of January, 2005. DRAFT Middle School #3 Orange County Schools Capital Project Ordinance Be it ordained by the Orange County Board of County Commissioners that pursuant to Section 13.2 of Chapter 159 of the General Statutes of North Carolina, the following capital project is hereby adopted. Section 1. The project authorized provides funds for the Orange County Schools to obtain options to purchase property for and to design, construct, and equip a new middle school facility. Anticipated revenues for the project consist primarily of 2001 voter approved bond funds, with private placement financing as well. Section 2. The officers of the County are hereby directed to proceed with the project within the budget contained herein. Section 3. The following County revenue is anticipated to complete this project: Section 4. The following amount is appropriated for this project: roug 2003 -04 FY 2004 -05 roug 2004 -05 Sales Tax $0 $0 $0 School Construction Impact Fees $0 $0 $0 Public School Building Funds $0 $0 $0 2001 Bonds $825,005 $17,674,995 $18,500,000 Private Placement Loa $0 1 $3,520,566 1 $3,520,566 Total County Fundingl $825,005 1$21,195,561 1$22,020,5 66 Section 4. The following amount is appropriated for this project: • • Ili-1 I 11� • • [I • ►-'I •I • 'II '1 •IY ••'•I '1 •IY ••r `•• I • '1 //• '`I '1 11• - Now c� ` • • ��� • 'yCl 111 '1 1: 111 '1 111 =17-7-0 .• • a '� 1 '.:11 111 '.:11 111 :• 1, k • •• ''1 '...1 111 '.••1 111 1�1 �I • • I •a '!1 '1�•• 111 ' /�.• 111 - - � F. I I R • 9. Section 5. In addition, the Orange County Board of Education plans to appropriate the following revenues to the project to cover construction costs. Section 6. The cost to site and construct Orange County Schools Middle School #3 totals $22,608,091. County 2001 OCS Middle nrough FY 2003 -04 FY 2004 -05 I Hrougn 2004 -05 Sales Tax Refunds $0 $300,000 $300,000 NCDOT Grant $0 $50,000 $50,000 otal board otl Education Funding $0 $350,000 $350,000 Section 6. The cost to site and construct Orange County Schools Middle School #3 totals $22,608,091. County 2001 OCS Middle School #3 Bond funds $825,005 $17,674,995 $18,500,000 Fund Bonds (to cover site development costs for West 10 Soccer Complex co- located at the Middle School #3 site ) $237,525 $0 $237,525 Orange County Private Placement Funding $0 $3,520,566 $3,520,566 School Board Funds $0 $350,000 $350,000 Total oar o uca ion Funding $1,062,530 $21,545,561 $22,608,091 Section 7. This ordinance supersedes all previous Orange County Schools Middle School #3 capital project ordinances. Section 8. This capital project ordinance, originally adopted March 4, 2004, shall remain in effect through June 30, 2007. Adopted this 24th day of January 2005. MEMORANDUM 0 TO: Board of County Commissioners John Link, County Manager FROM: Pam Jones, Purchasing and Central Services RE: Orange County Schools Middle School #3 Construction Cost Assessment DATE: January 21, 2005 As you may recall, OCS Middle School #3 was one of two schools for which Commissioners requested that Paul Thames and Pam Jones review plans and identify cost elements with significant cost increases. The review of the major construction elements for OCS Middle School #3 revealed no appreciable deviations from expected construction cost escalation within major building construction elements, with the exception of items such as structural steel, steel reinforcing, metal roofing, concrete and other masonry, which has increased almost 50°70 over the past four years. Further, according to construction data provided or published by the NC Department of Public Instruction ( NCDPI), school construction costs for calendar years 1996 through mid -2004, increased by an average of 35% for all schools statewide. NCDPI data also indicate that much of this increase (approximately 1917o) has occurred in the 2003 - mid -2004 interval. You will note that if the 35% "inflation" factor were applied to the Orange County School standards square footage costs (created and adopted in 1996), the 2004 cost per square foot would calculate at $128.25 per square foot. The square foot costs calculated from the bids received on December 7, 2004 would be approximately $132.45, approximately 3% over the present value school standards. While the source of this 3% over the standards present value cost was not readily apparent, it was noted that the standards include limited, if any, green building components. Green building adds value and has a payback for the long term; however, some elements have an identifiable up front cost in excess of traditional building methods. At a minimum, $80,000 of "green components" can be identified in the 12/7/04 bid alternates through such things as solar water heating system and photovoltaic system. These items are recommended in the bid award amount and are calculated in the $132.45 square foot cost cited in the attachment. For your information, the attached spreadsheet compares construction standards cost, to the present value of the construction standards cost, as well as the preliminary cost projections provided by the architect in September 2003, the updated projections based on the final program of the school in September 2004 and the actual bids received on December 7, 2004. Orange County Middle School #3 Construction Cost Comparison to School Construction Standards Middle School #3 Capacity = 700 students Square Footage: 122,763 - - - - -- - - 1996 School Construction Standards (SCS) i $95.00 -- - - - -- - -- -- — - Present Value i School Constr. Standards -- -- $128.25 - - - - -- CRZ 9/3/2003 Construction Estimate -. _ - - - -- -- - - -- _ --- $112.17 12.00 %� CRZ 9/7/2004 Construction Bids 12/07/2004 $132.45 $16,259,959 note #1 bellow) 15..3% (see see note #2 below Construction Esimate - - - - -- - - - $132.49 I Construction Cost Per Square Foot - - - -- - - - - - - - - -- - -- as % of Construction Cost - -- L -- - - - - -- - -� - -- - - 10.00% Site Development (includes all site - - - 10.0.0% -- -- 15.00% - -- -- work, examples of which include roads, including any -- -� required off site road -- - -- - - improvements, -- - - -- - -- development costs - -- lo) - -- - - - - parking lots, on -site water and sewer and all grading.) ----------- - - - - -- - - -- - -- - - - - -- - - - - -- (Bids received on 1217104 totalled $18,273,846. However, they also include all site that were not included _ in the earlier sitework bids received in the Fall 2004. The $16,259,959 construction cost, listed above, is the architect's estimate of the amount that should be allocated to actual building construction. -- - - - -- - - - - - -------- � - - -- — - -- - - - -- -- -- (2) Total site development costs ( incuding early grading package) tofa/ $2, 723,132 or 16.7% of the construction cost. ------ - - - - -- -The architect's preliminary estimate of the soccer center's portion of the cost for shared facilities is $237,525, which would reduce the development costs to approximately ---------- -- 15.3% of the - -- - - -- - -- construction budget i - - - -- - - - - - -- i CORLEY IREDFOOT ZACKINC. ARCHITECTS • ENGINEERS • PLANNERS December 15, 2004 10 LAURENCE W. BUNCH, AIA Associate In accordance with your request, I am sending you the certified bid tabulation ANDREW R. CRUICKSHANK, AIA for the above - referenced project. Bids for a single prime and for multi prime Associate contracts were opened at 4:00 PM on December 7, 2004, at the School Board DAVID M. TAYLOR, AIA building in Hillsborough, NC. lssociate HARRY M. JENSEN Listed below are the apparent low multi -prime bidders, based on their Base Associate Bids and the Alternates which were reviewed and approved in our discussions KENNETH E. SMITH with you and George McFarley, Jr., on December 14, 2004: Associate A. General Construction: J. H. Allen , Inc. 409 W. Central Avenue (27203) PO Drawer 2809 Asheboro, NC 27204 Base Bid: $13,445,000 Alt. #3: Front entrance canopy 108,000 Alt. #4: Photovoltaic system /power storage/ - PO Box 2368 distribution system 5,300 Chapel Hill, NC 27515 -2368 Alt. #5: Solar water heating system 9,700 Alt. #15: Use specific brands for kitchen equipment no change) 222 Chapel Cloister Hill, coon Total Base Bid + accepted alternates: $13 568,000 Chapel Hill, NC 27514 -2212 p � B. HVAC Contractor: Indicor 1217 Rail Street (27407) PO Box 8794 Greensboro, NC 27419 Base Bid: $ 1,849,000 Alt. #9: HVAC Equipment by Trane: $ No change Alt. #10: Boilers by Weil McClaim with Webster Burners: $ No change Alt. #11: HVAC Pumps by B &G: $ 8,000 (919) 942 -8586 Telephone Alt. #12: HVAC Control by Invensys (919) 929 -4802 Fax supplied by Yamas: 88,000 Total Base Bid + accepted Alternates: $ 1,945,000 Dr. Shirley Carraway, Superintendent Orange County Schools 200 East King Street GLENN D. CORLEY, AIA Hillsborough, NC 27278 President, CEO KENNETH E. REDFOOT, AIA RE: Middle School #3 Vice President West Ten Road, Orange Co., NC MARK ZACK, AIA Project #0310 Vice President BID TABULATION MICHAEL L. HAMMERSLEX PE Principal Dear Dr. Carraway: 10 LAURENCE W. BUNCH, AIA Associate In accordance with your request, I am sending you the certified bid tabulation ANDREW R. CRUICKSHANK, AIA for the above - referenced project. Bids for a single prime and for multi prime Associate contracts were opened at 4:00 PM on December 7, 2004, at the School Board DAVID M. TAYLOR, AIA building in Hillsborough, NC. lssociate HARRY M. JENSEN Listed below are the apparent low multi -prime bidders, based on their Base Associate Bids and the Alternates which were reviewed and approved in our discussions KENNETH E. SMITH with you and George McFarley, Jr., on December 14, 2004: Associate A. General Construction: J. H. Allen , Inc. 409 W. Central Avenue (27203) PO Drawer 2809 Asheboro, NC 27204 Base Bid: $13,445,000 Alt. #3: Front entrance canopy 108,000 Alt. #4: Photovoltaic system /power storage/ - PO Box 2368 distribution system 5,300 Chapel Hill, NC 27515 -2368 Alt. #5: Solar water heating system 9,700 Alt. #15: Use specific brands for kitchen equipment no change) 222 Chapel Cloister Hill, coon Total Base Bid + accepted alternates: $13 568,000 Chapel Hill, NC 27514 -2212 p � B. HVAC Contractor: Indicor 1217 Rail Street (27407) PO Box 8794 Greensboro, NC 27419 Base Bid: $ 1,849,000 Alt. #9: HVAC Equipment by Trane: $ No change Alt. #10: Boilers by Weil McClaim with Webster Burners: $ No change Alt. #11: HVAC Pumps by B &G: $ 8,000 (919) 942 -8586 Telephone Alt. #12: HVAC Control by Invensys (919) 929 -4802 Fax supplied by Yamas: 88,000 Total Base Bid + accepted Alternates: $ 1,945,000 Dr. Shirley Carraway RE: Middle School #3 Bid Tabulation December 15, 2004 page 2 C. Electrical Contractor: Starr Electric Co., Inc. 6 Battleground Court Greensboro, NC 27408 Base Bid: $ 1,649,000 Alt. #3: Front Entrance Canopy: $ (8,600) Alt. #4: Photovoltaic system /power storage/ distribution System $ 14,000 Alt. #13: Security System by Ademco: $ No change Total Base Bid + accepted Alternates: $ 1,654,400 D. Plumbing Contractor: ABL & Associates Plumbing, LLC 300 Hoke Street Raleigh, NC 27601 Base Bid: $ 1,050,899 Alt. #5: Solar Water Heating System: $ 51,728 Alt. #3: Canopy Roof Leader: 3,819 Total Base Bid + accepted Alternates: $ 1,106,446 TOTAL MULTI -PRIME BASE BIDS AND RECOMMENDED ALTERNATES: $18,273,846 Summary: General Construction: $13,568,000 HVAC: 1,945,000 Electrical: 1,654,400 Plumbing: 1,106,446 $18,273,846 The above construction bids, added to the early sitework package contract (presently under construction) and the playing field and irrigation work (contract pending), equals $18,983,091. On September 9, 2004, we presented to the School Board an estimate of $18,826,700 for the same scope of work. The difference between the estimate and the actual bid is less than 1 %, which confirms the timeliness and accuracy of the estimate. Based on this information, we recommend moving forward with preparation of contracts for the new middle school for the Orange County Board of Education. Please contact me if you have any questions or comments. Sincerel , e th ed oot, AIA ice President KER:esw /0310- bid.rec CC. George McFarky, Jr. IIICORLEY REDFOOT ZACK,.,. COl L R$DFOO'T ZAC1C, tee. . HID TABULATION MIDDLE SCHOOL #3 Orange County Schools West Ten Road, Orange County, MC Project #0310 4:00 PM, December 7, 2004 Bids as shown on the attached seven (7) pages, opened at 4:00 PM, December 7., 2004, have been checked and validated and are hereby certified as correct. a CORLRY RRDFOOT ZACK, .. BID TABULATION MIDDLE SCHOOL #3 Orange County Schools West Ten Road, Orange County, NC Project 50310 400 PM, December 7, 2004 SINGLE PRaZ Alt. 6 Alt. 7 Alt. 8 5% Bid Add. NOR Rainwater Parking Lot Sarnifil PVC GENiRAL CONTRACTOR Boilers by License No. Bond Recd Recd BASE BID J. H. Allen, Inc. 3921 YES TES YES $18,283,000 Asheboro, HC Burners System J. H. Allen, Inc. $839,000 Bordeaux Construction Co. $113,000 9266 $6,400 YES YES YES $117,000 $18,898,000 Durham, NC Quate Industrial Service Quate Industrial Service no bid Durham, NC SINGLE PRIM Alt. 1 Alt. 2 Alt. 3 Alt. 4 Alt. 5 - Solar G8NISRAL CONTRACTOR Change Change Metal Front Rntrance Photovoltaic Water Heating Pitched Roof Panels to Canopy System/Power Syste®s Roofing RIFS Storage & Material Distribution J. H. Allen, Inc. ($164,500) ($127,000) $112,200 $20,000 $63,700 Bordeaux Const. Co. ($164,000) ($140,000) $ 92,750 $ 2,500 $ 3,600 Quate Industrial Service SINGLE PRIME Alt. 6 Alt. 7 Alt. 8 Alt. 9 - RVAC Alt. 10 - GENBtAI. CONTRACTOR Rainwater Parking Lot Sarnifil PVC equipment by Boilers by Collection/ Lighting membrane Trans Weil McClain Non - potable Roofing System with Webster Water Distrib Burners System J. H. Allen, Inc. $839,000 $234,000 $113,000 no change $6,400 Bordeaux Construction Co. $865,300 $199,800 $117,000 no change no change Quate Industrial Service `1 V _ Page 1 of 7 Mid School #3 Sint' -e Prime General Bid, page 2 SINGM.S PRIM Alt. 11 - Alt. 12 - Alt. 13 - Alt. 14 - Alt. 15 - G� cowntACTOR HVAC Pumps by HVAC Security Alternate Use specific Bab Controls by System by Brick brands for Invensys Ademco Masonry Units kitchen supplied by equipment Taman J. H. Allen, Inc. $5,300 $82,000 no change $245,000 no change Bordeaux Const. Co. $8,600 $96.,800 no change 1 $251,000 no change Quate Industrial Service Page 2 of 7 CORLEY R$DFOOT ZACK, .. BID TABULATION MIDDLE SCHOOL $3 Orange County Schools West Ten Road, Orange County, NC .Project #0310 400 PM, December 7, 2004 MULTI -PR336 Alt. 6 Alt. 8 Alt. 14 5% Bid Add. �$ Rainwater GENERAL. CONTRACTOR Use Alternate License No. Goad Recd Recd BASS BID J. H. Allen, Inc. Asheboro, NC 3921 Nom- potable yes yes yes $13,445,000 Bordeaux Construction Co., Inc. Durham, NC Water Distrib 9266 yes you yes $13,886,000 Quate Industrial Service no bid J. H. Allen, Inc. ($ 7,500) $113,000 $245,000 Durham, NC Bordeaux Count. Co. ($25,000) $117,000 $251,000 no change SINGLE PR33M GZNZRAL CONTRACTOR Alt. 1 Change Pitched Roof Roofing Material Alt. 2 Change Metal Panels to zits Alt. 3 Front Entrance Canopy Alt. 4 Photovoltaic' System /Poorer Storage L Distribution Alt. 5 - Solar Water Heating Systems J. H. Allen, Inc. ($164,500) ($127,000) $108,000 $5,300 $9,700 Bordeaux Count. Co. ($164,000) ($140,000) $ 89,000 $2,500 $3,600 Quate Industrial Service MULTX -PRIME Alt. 6 Alt. 8 Alt. 14 Alt. 15 - GUS99RAL CONTRACTOR Rainwater Sarnifil PVC Use Alternate Use specific Collection/ membrane Brick Masonry brands for Nom- potable Roofing Units kitchen Water Distrib system equipment System J. H. Allen, Inc. ($ 7,500) $113,000 $245,000 no change Bordeaux Count. Co. ($25,000) $117,000 $251,000 no change Quate Industrial Service V ! Page 3 of 7 CO. r Riwrom 'LACK, .. BID TABUL7►TION MIDDLE SCHOOL $3 Orange County Schools West Ten Road, Orange County, NC Project #0310 4 :00 PM, December 7, 2004 MULTI -PAINS 5% Bid Add. Mw RVAC CONTRACTOR License No. Bond Recd Rec.d BASE BID Baker Mechanical, Inc. no bid Wilson, NC Comfort Engineers 9342 yes yes yes $1,990,500 Durham, NC Harrelson Mech. Contractors 18936 yes yes you $2,094,335 Wilmington, NC Indicor 6449 yes yes yes $1,849,000 Greensboro, NC Logan Mechanical no bid Winston- Salem, NC Mechworks Mech. Contractors 11295 yes yes you $2,266,420 Beaufort, NC Markley Mechanical Associates 18056 you yes yes $2,000,000 Selma, HC Quality Mechanical Contractors no bid Burlington, NC Southern Piping Co. 7422 yes yes yes $1,963,000 Raleigh, NC PI Mechanical (did not request CD,S) 07066 yes yes yes $2,155,000 Greensboro, NC Page 4 of 7 Middle School #3 Multi -Prime HVAC Contractor, page 2 MOLTI -PRIME RVAC CONTRACTOR Alt. 9 RVAC Squi.pment by Trans Alt. 10 Boilers by Mail Mcclaim with Webster Burners Alt. 11 - RVAC Pumps by B&C Alta 12 - RVAC Controls by Invensys, Supplied by Mamas Baker Mechanical, Inc. Comfort Engineers no change $4,000 no change $52,7.00 Harrelson Mach. Contractors no change $3,,668 no change $66,286 Indicor no change no change $8,000 $88,000 Logan Mechanical Mechworks Mach. Contractors no change no change no change $76,500 Markley Mechanical Associates no change no change no change no change Quality Mechanical Contractors Southern Piping Co. no change $6,000 $5,000 $7"5,000 PI Mechanical (did not request CD's) no change no change no change no change J Page 5 of 7 Co. x Rzwom ZAcr -, .. BID TABULATION MIDDLE SCBOOL 83 Orange County Schools West Ten Road, Orange County, NC Project #0310 4 :00 PM, December 7, 1004 MULTI -PRXM 5% Bid Add. 148E ELECTRICAL C01CMILCTOR License No. Bond Rec d Rec d BASE BID McGeever & Associates, Inc. No bid Clayton, NC Starr Electric Co., Inc.; NC4 -U yes yes yes $1,649,000 Greensboro, NC Triangle Electrical Services no bid Chapel Hill, NC Vaughan Electric Co., Inc. 14 -U yes yes you $2,960,900 Durham, MC Watson Electrical Construction Co. 113 -U yes yes yes $1,792,000 Burlington, NC MULTI -PRIME Alt. 3 - Alt. 4 - Alt. 6 - Alt. 7 - Alt. 13 - ELECTRICAL CONTRACTOR Front Photowltaic Rainwater Parking Lot Security Entrance System and Collection and Lighting System by Canopy Power Non- potable Ademco storage and Water distribution distribution system McGeever & Associates, Inc. Starr Electric Co., Inc. ($8,600) $14,000 $1,200 $120,000 no change Triangle Electrical Services Vaughan Electric Co. $4,000 -0- $50,000 $175,770 $95,000 Watson Electrical Construction ($6,000) $30,000 $ 500 $185,000 no change Page 6 of 7 CO=Y REDFOOT ZACK, nw. BID TABULATION MIDDLE SCHOOL 63 Orange County Schools Nest Ten Road, Orange County, NC Project #0310 4 :00 PM, December 7, 2004 MTLTI -HRXNZ 5% Bid Add. MBE PLUMBING CONTRACTOR License No. Bond Recd Rec'd BASS BID ABL & Associates 19909 yes yes yes $1,050,899 Raleigh, NC Brown Brothers Plumbing & Heating 282 yes yes yes $1,180,000 Durham, NC Quality Mechanical Contractors 12381 yes yes yes $1,200,000 Burlington, NC Sparrow & Sons, Inc. 4403- yes yes 3 of 5 $ 765,000 Carrboro, NC MJLTI-PRX= Alt. 5 - Alt. 6 - Alt. 3 - PLUMBING COWIMACTOR Solar Water Rainwater Canopy Roof Heating Collection Leader System and Non- (Noted on potable drawings only) Water Distribution System ABL & Associates $51,728 $796,000 $3,619 Brown Brothers Plumbing $36,200 $815,900 $2,500 Quality Mechanical Contractors $35,000 $549,000 Sparrow & Sons, Inc. $12,000 $598,000 page 7 of 7 Comparison of Orange County Schools Middle School #3 Project Costs to Commissioner Adopted Elementary School Construction Standards Construction Cost Student Capacity Square Footage Square Feet per Student Approved School Construction Standards Estimated Costs for OCS Middle School #3 (per bid received by OCS BOE 12/15/04) 700 132,192 188.8 $12,558,240 700 122,763 175.4 $16,259,959 Cost Per Square Foot $ 95 $ 132 Site Acquisition including all acquisition related costs such as surveys and professional fees. $550,000 $795,000 Number of Acres: 22 67 Cost Per Acre: $25,000 $11,866 Site Development $1,255,824 $2,723,132 % of Construction Cost 10.0% 16.7% Fees $1,381,406 $1,115,000 % of Construction Costs and Site Development 10.0% 5.9% Moveable Equipment $627,912 $600,000 % of Construction Cost 5.0% 3.7% Technology (includes cabling and equipment for voice, video and data distribution systems ) $1,090,584 $650,000 Cost per square foot $8.25 $5.29 Construction Contingency $690,703 $465,000 Development 5.0% 2.9% Start-Up Costs Jon Personnel One time start-up costs $350,000 $0 % of Construction Cost 0.0% Total Total Cost Per Square Foot Capital Cost per Student Capacity (capacity as set by construction standards report) $ $18,504,670 139.98 $ $22,608,091 184.16 $ 26,435.24 $ 32,297.27 total cost of land including portion to be used for West 10 Soccer complex This reflects total cost of site development and does not account for the anticipated site development costs that would be shared between the County and the school district. The anticipated net cost of site development totals $2,485,607. 0 �5 Chair Carey said that there is also an Orange County Disability Awareness Council that the County supports. Commissioner Halkiotis asked that all leased properties be included in the handicapped accessibility component. A motion was made by Commissioner Gordon, seconded by Commissioner`Foushee to accept the final Report on Functions and Responsibilities of the Human Rights and Relations Department and amend the County's Classification and Pay Plan to add the new class of LEP (Limited English Proficiency) Coordinator at salary grade 17 effective February 1, 2005. VOTE: UNANIMOUS 6 Resolutions or Proclamations a. Middle School #3 Capital Proiect Ordinance The Board considered a resolution and a revised capital project ordinance regarding appropriation of additional funds for construction of Orange County Schools (OCS) Middle School #3. John Link said that in November 2001, the voters of Orange County approved in the school bond $18.5 million for constructing a new middle school for the Orange County school system. This $18.5 million, at that point, was the amount that had been specified in the construction standards adopted several years ago. Since that time, a site has been located', approximately 100 acres between West Ten Road and 1- 4011 -85. The school system and the County Commissioners and staff have been working on developing the total area so that, as the school is planned and built, there will also be work on multiple soccer fields in the same area. The school system and the County Commissioners have entered into an inter -local agreement. He said that this item is related to the outcome of the bids that were received in December by the school board. The action is to ask the Board to consider appropriating as much as $3.5 million in additional funds toward this project, based on the costs of steel, concrete, etc. There is also a letter from Superintendent Carraway (peach colored) indicating that the school system has identified $350,000 of their revenue to address this shortfall This is in response to a letter sent by him to both superintendents in September asking them to identify sources of revenue to help in the overruns of this project and High School #3 in the Chapel Hill - Carrboro City school' system. Rod Visser said that this is an urgent issue because the middle school is slated to open in August 2006. The project architects have indicated to the school board that in order to keep this project on track, it is important to begin construction by mid— February. The school board has this item on its agenda tonight. In December, the Board indicated that it intended to reallocate some or perhaps all of the $12.8 million that is currently earmarked in the County's plan for CHCCS Elementary #10 to address some of the anticipated cost overruns for this project and the CHCCS High School #3 project and perhaps the senior centers. Funds to build Elementary school #10 will be allocated at a later date. This action is to specifically follow up on this indication of intent in December. Rod Visser pointed out that in October the Board asked that a work group be put together, comprised of County and school representatives, that could examine ongoing issues related to the joint relationship between the middle school project and the adjacent County soccer complex. Chair Carey is serving on this work group along with other staff members, Chair Libby Hough, Superintendent Carraway, and other school staff members. The group met last week to talk about budgetary considerations. There is some work to be done on potential additional joint savings through economies of scale. Also, County staff conducted an assessment of the cost overruns for this project and for High School #3, and it is summarized in the abstract. property. He thinks the issue of clear cutting along the interstate is having some consequences all around. Commissioner Foushee said that she is in support of the recommendation, but she wants to be clear that the $3.5 million does include the $271,000 difference in the land acquisition. It was answered yes, it is included. She asked about the startup costs that are not included. Executive Director for Auxiliary Services for Orange County Schools George McFarley said that some of the one-time startup costs would be borne by the school district's fund balance. Commissioner Foushee said that the OCS fund balance is considerably reduced from last year and she cautioned the school board not to leave these requests out of the budget because the County Commissioners understand that the school system has spent down its fund balance. She asked when the County Commissioners might expect a status on the policy as it relates to smart growth. She said that the idea of smart growth principles has been a nebulous subject. John Link said that he proposes giving the history of discussion on this subject. He thinks there is a framework of such a policy in writing. He will bring this forward. Chair Carey said that they have a good framework and this item may need to be deferred as one of the substantive items of the school collaboration group. He said that it is much broader than schools. Commissioner Halkiotis said that the County Commissioners have talked about this issue. He would like to see some real life examples of each smart growth principle and how they have impacted schools today. He would like some feedback from both school systems on how many children ride buses, how many come with parents, and how many walk. Commissioner Gordon said that she wanted to reiterate that she thinks the County should build the middle school, the high school, and the senior center right and they should be funded. She is in favor of moving forward with the amount for the middle school, but she has questions about some of the line items. She made reference to page 20 and asked what the site development costs include. Ken Redfoot said that in the $2,723,132, this includes all of the work that is required beyond the early site work package. Off-site work would include the road improvements along West Ton Road and on-site work would include utility work for water and sewer as well as all of the driveways, parking lots, ball fields, irrigation, and sidewalks. The baseball field, the softball field, a track, a practice field, and an athletic field are also incorporated. This would not include off-site water and sewer. Commissioner Gordon asked about the site acquisition and Rod Visser said that the $795,000 represents the cost of the entire property. The 66 acres was $775,000 and $20,000 was for associated and professional fees. The cost of the Euliss property that the County acquired for use of the soccer complex was a The over $500,000 in addition to this. The cost of the Euliss property is not included in this capital project. Commissioner Gordon asked when they would get the information back on the additional items. She said that there are a number of outstanding issues that need to be resolved. Chair Carey said that they will get this information back as soon as possible. Commissioner Gordon asked when they would break ground and Ken Redfoot said that they have started the early site work package. They are ready to get started with the rest as soon as everything is approved. Commissioner Jacobs asked about Mebane's policy on the possibility of getting reimbursed to extend water and sewer lines and a future tap-on. Paul Thames said that it is Mebane's policy that there is no reimbursement. He thinks that Hillsborough is the only one around that has a reimbursement policy. Commissioner Halkiotis asked that a request be put in writing for Mebane. A motion was made by Commissioner Halkiotis, seconded by Commissioner Gordon to adopt the accompanying resolution indicating the intent to provide additional funding for Orange County Schools Middle School #3, and adopt a revised Middle School #3 capital project ordinance that appropriates the level of additional funding approved by the Board. A RESOLUTION OF INTENT TO APPROPRIATE ADDITIONAL FUNDS FOR CONSTRUCTION OF ORANGE COUNTY SCHOOLS MIDDLE SCHOOL #3 WHEREAS, the Orange County Board of Commissioners and Orange County Board of Education have agreed to collaborate in the development of a new middle school and a new multi -field soccer complex on approximately 100 acres of property located between West Ten Road and Interstate 40/85; and WHEREAS, the Orange County Board of Education has approved;;a design for the middle school that is based on a prototype of the Smith Middle School constructed several years ago: in the Chapel Hill- Carrboro School system; and WHEREAS, at approximately 123,000 square feet, the planned size of Middle School #3 falls within the parameters established in the Board of Commissioners' 1996 adopted middle school construction standards; and WHEREAS, the current estimated stotal project cost for Middle School #3, based on construction bids received - by the Orange County Board of Education in December 2004 is $22,608,091 and WHEREAS, earmarked County and OCS revenue for the project, including $18.5 million in voter - approved; general obligation bonds, is $3;520,566 less than the currently estimated project cost; and WHEREAS, the Board of Commissioners in December 2004 indicated its intent to redirect (with' subsequent replenishment) some or all of planned alternative financing debt of $12.8 million for Chapel Hill- Carrboro Elementary School #10 to address more pressing financial needs for OCS Middle School #3, CHCCS High School #3, County senior centers, or other projects; NOW, THEREFORE, BE IT RESOLVED THAT the Orange County Board of Commissioners does hereby indicate its intent to appropriate $3,520,566 in additional funding for the construction of Middle School #3, with said appropriation to be incorporated in and executed by Board of Commissioner adoption of an updated capital project ordinance for Orange County Schools Middle School #3. This, the 2e day of January, 2005, . VOTE: UNANIMOUS` b. Human Relations Month' The Board considered a proclamation recognizing the month of February as Human Relations Month and authorizing the Chair to sign. Milan Pham introduced Damon Seils, Vice -Chair of the Human Relations Commission. Damon Sails said that the kickoff event is February 6"' and will include a performance by the Women's Prison Reparatory Company. This is the only company of its kind in the country that does these kinds of performances outside of prison walls. The event is at 3 :00 p.m. at the