HomeMy WebLinkAboutAgenda - 09-21-2010 - 7b 1 ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: September 21, 2010 Action Agenda Item No. �� SUBJECT: Link Government Services Center Phase 2 Cost Estimate DEPARTMENT: Asset Management & PUBLIC HEARING: (Y/N) No Purchasing Services ATTACHMENT(S): Attachment A— Proposed Floor Plan INFORMATION CONTACT: Attachment B — Estimated Construction Pam Jones, 919-245-2652 and Development Costs Jeff Thompson, 919-245-2658 Attachment C — Schematic Design Probable Cost Estimate PURPOSE: To review estimated project costs as discussed on June 10, 2010; and authorize staff to proceed with formal Construction Document preparation and bidding of the project. BACKGROUND: On June 10, 2010, the Board of Commissioners reviewed revisions to the schematic design as requested during the initial plan presentation on May 11, 2010. As a result of this presentation, the Board requested formal cost estimates prior to authorizing the formal bid process. . Attachment A — "Proposed Floor Plan" was presented to the Board earlier this year. The Board • may recall that the scope of this project includes: - Permanent BOCC meeting chambers; - Major HVAC and lighting renovations to support the higher demands of the meeting spaces; - Major audio, video, and multi-media infrastructure to support audio and video broadcast media in support of the meeting spaces; and - Major restroom renovations. Attachment A provides the actual costs of the Link Phase 1 renovations (upper level) completed in the fatl of 2009 as well as projected costs for Phase 2 (Board meeting room). Attachment B — "Estimated Construction and Development Costs" details an independent cost estimate of Phase 2 hard construction costs developed by Cost Plus, a professional construction cost estimating firm engaged by the project Designer, Corley Redfoot Zack Architects (CRZ). The basis of this independent cost estimate is the schematic design prepared by the Designer presented to the Board earlier this year. Attachment C is the "Schematic Design Probable Cost Estimate". Based on recent experience with the construction market, County staff is optimistic that the hard construction costs for Phase 2 are higher than what the competitive bid market will yield. Staff does believe, however, that the estimate offers a reasonable benchmark on cost and provides reason to allow the Designer to complete construction drawings and proceed with the 2 competitive bid process. The overall projected sources and uses of funds illustrated in Attachment A warrants a competitive bid process to confirm the actual hard cost of construction. Staff has also reached an understanding with the NC State Energy Office to apply awarded Energy Efficiency and Conservation Block Grant (EECBG) funds to this project in order to construct a Geothermal heating and cooling system for Link Phase 2. Steps will need to be taken concurrent to the proposed bid process to formalize the grant transfer. This action, if and when completed, will result in a fully independent, highly efficient system designed to match the sustainable performance of the operating Justice Facility geothermal system. Staff is studying the feasibility of a larger community geothermal system that could ultimately �eplace the aging HVAC infrastructure systems supporting the Jail, Court Street Annex, the upper level of Link Government Services Center, Government Services Annex, the District Attorney's office, and the Battle Courtroom. Should this study result in a future capital project recommendation for this proven, highly efficient and sustainable community system, the independent systems of the Justice Facility and the proposed Link Phase 2 could join this new infrastructure as a model for sustainable community infrastructure design and operation. Should the Board approve the Construction Design and Bid process for this project at this meeting, the project could be developed and constructed commensurate with the following timeline: TASK PROPOSED END BY BEGINNING DATE DATE BOCC Action:. Authorization to proceed with Construction Documents 9/21/10 9/21/10 and Biddin Process CRZ prepares documents suitable for bidding project and submits , 9/22/10 1 U/22l10 documents for re ulato a roval Demolition Phase 10/4/10 11/5/10 Phase 2 Bid Process 10/25/10 11/24/10 BOCC Action: Phase 2 Bid Award 12/14/10 12/14/10 Phase II Construction (est. 6 month duration) 1/24/11 7/29/11 FINANCIAL IMPACT: Funding is available for project components as follows: • Project #30035 - Link Center Upfit; approximately $587,000 o $425,000 of which will be funded via alternative financing approved by Board of Commissioners in April 2009; to be sold in 2011. • Project#30018 — HVAC Projects; $90,777 • Project#30019 —ADA Compliance; $83,942 • Project#30023 — Building Entry and Access Systems; $75,000 • EECBG Funds - $177,675 The funding noted above totals $1,014,394. RECOMMENDATION: The Manager recommends the Board review the estimated project costs as presented; and authorize staff to proceed with formal Construction Document preparation and bidding of the project. M Attachment B-Estfmated Construction&Development Costs . Link Government Services Center Renovation updated 9I312010 pro�ect code 30035 MUNIS�date 9/3/2010 Summary Budget Unk Cente�Upfit-#30035 $1,100,000 HVAC Projects-#30018 $90,777 ADA CompUance-#30019 $83,942 Bldg Entry/Access Systems-#30023 $75,000 EECBG Grent Transfer $177,675 v�rrt�mlEy nuranr�xed tay NG at�itEi�.anrr,�y 11fl!r.a,tn bo canl�rmad Total Funds Available 51,527,394 1 . Item ;` ::;: 7::: t. . : c. - Cost SubTotal.. r!Notes Phase 1 (Upper Level) ' Hard Costs: 246,392 � Deslgn and Teating Coats: 16,800 Recommended AddYl Owrer Coate: ' � 250,11b Phaae 1 SubWtal 513,307 Phase 2(Lower Level) DemoGtion 25,000 OC Sell Directed Work Team Candklate Estimated HaM CosP'`"' Nole Attachment B-'Enpineers Estlmate" 781,791 Less Com�enGonal HVAC Plant "PIaM'is defined as al components less distribul'an -60,000 Additbnel GSHP Plant Cost 725,000 871,791 , Design Costs: • Amh.Ergr 6ase Cantrect CRZ 61,300 P01002648 AddNbnal GHSP�eaipn Cost CRZ 12,500 Relmburseables 5,000 Included In P01002fi48 ' 78,800 Recommended Addt'I Owner Costa: • 2CP Fee 500 JT Budpet Smart CarcUCamere System ProNet 20,000 JT Budpet Low Vollage Wlring 5,000 JT Esilmale for wiring oulskie ol AV Cont2cl Fumishkgs Poced ard untlxad seaUng,tables,dals cheire,eppNences 40,000 JT Eelimale AppFances ' S,000 JT Eslimate g�0�98 1 O,D00 JT B�xlget MoWnp 3,500 JT Budpet Securiry(Burplar,Cemera) Budpel Nelson 2,500 JT Bud9et Additbnal Owner Cost CoM4gency Budpet OC 7,500 JT Budget Temp UtiANes,Materials Testinp Budget OC 4,500 JT BudBel ae,soo Total Encumbered Project Coet 1,56z,aea Budget Variance(vx�r�al�z�/shr.rtf�fl) deaa(3) •��•�� Percentage Varlance dena(�) ::�•°+ Notes: i. tr�cu,des 5x commgency(S3�,zz31. 2 Does not include opereble well partitbn($22,848�,nar ihced seats(526,320).Both recammended to be prked as alternates within bid process. 3. Includes$150,000 budget for AV systems. C1'i � ��.�cl�l.�[�iu►"r � s 1 , COST PL US " Scltenratic Desigrr Probable Cost Esti�lnfe �i-++-I--f-+-i-+-I--I-i- PROJF�C7':John 14L Link 3r.GovE.Services Bidg. 10S Wali 5tree�,Suitel0-B LACATIO1V:liillsborough,NC Clemson:SC 29631 03•August-2016 OWPIETi:U.S.Government Tet.:864l653-6320-h�'ax:864/653-3340 Estimator:R Roark ARCI3ITECT:Cortey Redfoot Zactc,Inc. E-Mnil.•CPest/ntalixg�af40l.cnnt ProJecf No:37-90 RenovaterlArerc $,444 SF PRaeASLE CoNS'tRUCTtON CoS'f SUMMARY roTa�.cosr cosr 1 sF %OF COST 02 SITE 1NORK $20,000 $2.37 2.56°6 02 SEIECTIVE DEMOLtTIOtd $0 $fl,�p ' O.pdy�, 03 C4NCRETE $2,030 $0,24 0.26% O6 WOOD&PLASTICS $62,563 $7.41 8.00°,fo 07 MOISTURE&THERMAL PROTECTION $2,318 $0.27 0.30% 08 DOORS AND WINU4WS $16,d01 $1.89 2,05°6 49 FINISHES $Sb,598 $11,32 l2.23% 10 SPECIALTIES $1D,074. $7.19 1.2996 11 EQUIPMENT ' $150,OOU $17,76 19.99°�b 92 FURNlSNlPlGS $p �p,qp p,pp�, 15 PLUMBING $48,000 �5.68 6.14% + 15 F1RE PRO'FECTION $0 $p,pp p,pp�/, 15 HVAC ' - $tW�000 $1t.84 'f2.79°k 16 ELECTRICAL SYS7EMS $145,000 $47.i7 18.53� suerorac $6bi,b64 . $77.17 83.3B% MARK-UPS -Safes Tax $t,562 $0.19 0,20°k -Labor Burden $1,733 $0.21 0.22� -Genera!Requh�emenls $32,744 $3.88 4,19°.6 -Overhead&ProRt $45,842 $5.43 5,86% -Bonding&insurance �11002 $1.30 1,41� SUBTOTAL $744,467 $88.17 95,249b +Design Contlngen 59'0 • $37,223 $4.41 4.7696 TOTAL ES7IMATED PROBABL�CONSTRUCTION COST $781,691 $92,57 90Q.00% AI..7ERNAi'ES: A•1: Operabfe Wail Par�tlon Add...... $22,848 A•2: Fixed Seats Add..,,.. $26,320 7 .. . - . Y.{ � , 2 02 StTE WORK MATERIAL LABOR SUBCONTRACT TOTALCOS Hem DescripGorr Quantity u!m uJc To.t�i.: :�:u!c Total ulc Toial Water Line Work 1 LS -. 24,000.00 20,004 $20,OOQ SUBTOTAL•SITE WORK $O SO $20,(100 $20,000 02 SELECTIVE DEMOL1TtON • MAT�JiIAI. LABOR SUBCONTRACT TOTAL COST Item Descri Uon QuanGfy u!m uk Total ulc Total u!c Total Demolillon&Matadal Removal ey Others 0 0 0 0 5UBT�TAL-5El.ECTIVE DEMOLITION $0 $0 $Q $Q 03 CONCRETE MAT6RfAL LABOR SUBCONTRACT T07ALCOST Ifem Descdption QuanUty u!m ulc Toi� u/c Total u/c Total Patch!Infiq Floor Slab 280 SF 0 0 725 2,030 2,030 suarorn�.•coNC� 0 0 2,030 $2,030 os woo�s Pr.nsncs MATERIAL LABOR SUBCONTRACT TOTALCOST Item Descdptbn Qu�tity ulm uk Total u/c Total u/c Total 7reated Blockfng 923 BF 0.85 784 0.85 784 0 1,5fi8 Casew+ork: -base cab(nefs 40 LF 0 ' 0 190 7,600 7,600 -wail c�inals 40 LF 0 0 125 6,000 5,d0� , Archifecfural woodwork 9 Ls o 0 26,OOO . 26,OOa 26,000 Wood Trim: -wood base 668 LF 0 0 3.80 2,536 2,538 -chalC ral! 418 LF 0 0 3.50 1,463 1,463 -woodwalnscot ' 1,672 SF 0 0 8.25 13,794 13,794 -crown ma�id[ng 418 LF 0 0 4.80 2,006 2,006 Wood Handraif/Bradcets 18 LF 0 0 18 324 324 Rouqh Frarrdng @ P[a�orm 240 SF 0 0 8 i,920 1,920 Rough Hardware 1 LS 350 350 0 0 350 SUBTOTAL•WOOD&pLASTICS 4,134 784 $60,64b $62,563 O7 MOESTURE&7HERMAL PR07ECTION MATERIAL LABOR SUBCONTRACT TOTALCOST Item Qescription Quantity u!rn u!a To(af uJc Total u(c Tofal Insulat{on, 0 0 -sound batf,4" 3,936 5F fl 0 �,5U 1,968 1,968 Caulking&Sealanls i l.S 0 0 350 350 350 SUBTOTAL-N}OtSTURE&FH�tMAL PROTECTiON 0 0 $2,318 $2,318 8 3 08 DOORS&WlNDOWS ,' NfAtERIAL LABOR SUBCONTRACT 70TAI.COST Item DescripUai Quantlfy ulm Wc 7ota! ulc Tolal u/c Total Doors: p -SCW(filushy 14 EA 180 2,520 50 700 U 3,220 -SCWD(wlvlew) 5 EA 225 1,125 5U 250 0 i,375 Frames: -single 15 EA 112 1,680 35 525 0 2,205 � -double 2 EA 128 256 40 80 0 336 Do�Hardware 1 LS �6,555 G�565 1,140 1,140 0 7�695 lntedorWindows:3l6x4l0 3 EA 6 0 390 1,170 1,170 SUSTOTAL.DOORS$wINDOws 12,136 2,695 $1,170 $16,001 08 FINISHES • MATERIAL IABAR SUSCONI'RACT TOTA!COST Ifem Descdption QuanU u!m uk Total u/c Tofal u1c Total Floors: . -v.c,t. 770 SF 0 0 2.85 2,195 2,195 -carpet 6S2 SY 0 0 2D 13,640 13,640 -ceramiclle 512 SF 0 0 10.50 5,376 5,376 -seale� 74 SF p 0 0.50 37 37 -protecf exisUng floodng 894 SF 0 � 0 ' 0.35 285 285 -added#ife @ bbby floa 134 SF 0 0 98.50 2,479 2,479 Base: 0 0 � -resiltent 478 LF 0 0 1,35 643 643 -cerarr�cilte 194 LF 0 0 7.50 1,455 1,456 Interior Walls: -3 518°metal sfud walfs 4,920 5F 0 0 2.18 10,726 10,726 -5/8'GWB 9,432 SF 0 0 1.42 13,393 13,393 . -c:eram�CwallHle 20Q S� 0 0 7,50 1,600 1,500 Cell(nqs: -ACT(2'x 2� 5,656 5F 0 0 2,85 16,120 16,120 ' -GWB 1,092 SF 0 0 3.40 3,713 3,793 Sofflll Bulkheads 1,696 SF 0 0 6.35 10,770 10,770 � PafnUng!Wall Cover#nq: 0 0 -patnt walls 10,fi20 SF 0 0 0.60 6,3'72 6,372 -vinyl wal!covering 2,508 SF D 0 1.44 3,612 3,692 -ceifings t so8its 2,788 SF 0 0 0.70 9,952 1,952 -doorsJNrames 99 EA 0 0 70 1,330 1,334 SUBTOTAL•FINISHES 0 0 $95,598 $95,598 9 4 10 SPECIALTlE3 MA7ERlAL LABOR SUBCBNTRACT TOFAL COF Item Descriptfon Quantity u/m ufc Totat ulc Toial ulc Tofal Talei Partltions; -standard 4 EA 770 3,080 50 200 0 3,284 -handicap 2 EA 830 1,660 75 150 p �g�� Toilet Accessodes• -grab bars,36' 3 EA 48 144 12 36 0 igp -9rab bars,42' 3 EA 54 162 35 45 0 207 -toilet tlssue cAsp, 7 EA 30 210 t� 70 p 280 `��d� 2 EA 425 850 75 95p 0 q.ppp -mlrrar 5 EA 195 725 15 75 0 800 -soap dfspenser(wall mEd.� eyOwner 0 0 0 0 -s�itarynapklnvendor 1 EA 98b 185 25 26 U 210 -s�itary napkfn dlsposal 4 EA 65 260 15 60 0 320 -mop/broom holder i EA i 20 120 15 15 0 135 Fue Extingulsher wl Cabinet . 3 EA 235 705 15 45 0 750 Vlsua(pfsplay eoards; By Owner � Operable Wall Partitton (40'x t0'AIt.A.9 q p � Q (nlerlorSigna,ge 1 LS 950 950 152 152 0 1,902 SUBTOTAI.•SPECIAL'fIES 9,051 i,023 $0 $10,074 f1 EQUIPMENI' _ � MATERIAL LABOR S116CONTRACE' TOTAL CO Itern Description quaniity ulm u/c Toi� u/c Toial uk Total • NV Equipmeni&InfragUucture 9 LS 0 0 150,000 950,000 9 Sp,pp� � SUBTOTAL•EQWPMENT 0 0 150,000 $'I$p,q� 12 FURNISHINGS - MATERIAL LABOR SUBCONTRACT TOTAI.COST Item Descdption Quantily ulm ulc Total u/c Total ulc Total Window Blinds Exfstfng p 0 d Q Loose FumiWre By Owne� 0 0 0 0 Flxed Seats Alt.A•2 0 0 0 0 SUBTOTAL-FURNISHINGS p 4 � � 15PL1lMBIN6 1 LS D U 48,006 48,000 gqg,ppp I 15 FIRE PROTEC710N N l.C 0 U 0 $Q 15 H.V.A.C. 1 L5 D 0 100,000 100,OOQ �1pp,ppp te EI.ECTRtCAl,sYSTFA45 1 LS 0 D 145,000 945,000 $145,000 10 5 susror�t gz2,s21 &t,�o2 �sza,7s1 �1,�ea Sales Ta�c 7.096 $9,562 $9�5fi2 t.abor Burden 38,5°,5 �1,733 $�,733 SU9TOTAL � $�q ggp General RequlremenEs 5,0% $32,744 $32,744 SUBTOTAL $887,524 Overhead 8 Proflt 7.00% �q5,g42 $45�842 SUBTOTAL �73g q� Payment&PerFormance Bond t25% $9,166 #9,168 Builders'Wsk(nsurance 025% 31,834 51,634 SUB70TAL $744,467 +Deslgn Contirtgency 5.00� $37,223 $37,�3 TOTAL ESTIMATED PROSABLE CONSTRUCTION COST $781,691 , unifcost 592.67 persq,ft,