Loading...
HomeMy WebLinkAbout2006 NS Contract - Revision of Louis Berger Group Contract to Complete TDR Phase IIIORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: November 2, 2006 Action Agenda Item No. ~! - c~ SUBJECT• Contract Revision of Louis Berger Group Contract to Complete TDR Phase III DEPARTMENT: Planning and Inspections PUBLIC HEARING: (Y/N) No ATTACHMENTS: INFORMATION CONTACT: 1. Proposed Phase III (Program Design Craig Benedict, Planning Dir., 245-2592 and Implementation Plan) Scope of Glenn Bowles, Planner II, 245-2577 Services 2. Price Quote 3. Timeline PURPOSE: To authorize the negotiation of an addendum to a contract with The Louis Berger Group, Inc. and UNC-Charlotte Urban Institute to include Phase III of the Transfer of Development Rights (TDR) ordinance development. BACKGROUND: The BOCC selected the The Louis Berger Group /UNC-Charlotte Urban Institute team on December 14, 2004 to complete athree-phased TDR study. On March 1, 2005, the BOCC approved a contract to complete the first two phases (research and feasibility) of the study. The bid was accepted for three phases of the study, but only two phases were approved for funding. After receiving the draft TDR Feasibility Study on June 27, 2006, the BOCC authorized proceeding with the third phase (program design and ordinance development). Phase III includes: 1. Select Program Design Options: Detailed Economic Evaluation,-Four Meetings/Vllork Sessions, Working Group Meeting #1, Technical Report No. 1-TDR Program Design 2. Select Administrative Design Options: One Work Session-Administration, Working Group Meeting No. 2, Technical Memorandum No. 2 -Administrative Design Recommendations 3. Finalize Proposed TDR Implementation Plan: Two Work Sessions -Finalized Implementation Plan Review, County Commissioner Work Session, Technical Report No. 3 -Finalizing the TDR Program 4. Drafting TDR Program Ordinance Revisions: TDR Ordinance Template, Two Work Sessions -Ordinance Template Review, Work Session -County Commissioners, Technical Report No. 4 -TDR Ordinance Language 5. Prepare for TDR Implementation Plan Adoption: Working Group Meeting No. 3/Public meeting -TDR Program Review, Two Elected/Board Appointed Presentations, Preparation of Project Report 6. Build Public Awareness, Understanding and Seek Public Input: Working Group Meetings, Public meeting, Project Website, Newsletter/TDR Program Summary 7. Administration: Payment Arrangements (attached), Coordination, Contact information. 8. Timeline (see attached) The Louis Berger Group, Inc. /UNC-Charlotte Urban Institute team was also the low bidder for Phase III. Attached is the proposed scope of services for Phase III. FINANCIAL IMPACT: The approved 2006-07 Orange County budget, under non-departmental initiatives, includes funds for the Phase III TDR (Program Design and Ordinance Development). The budget monies for potential consultants for three separate planning studies were co- mingled into a total of $145,000, which has been partially used for the School Impact Fee Analysis. The Louis Berger Group /UNC-Charlotte Urban Institute team submitted a written bid to complete Phase III for $49,546.81. The revised Phase I and II TDR contract for $44,071 was paid from previous budget years and is now complete. This is separate from the Phase III bid. 2 RECOMMENDATION: The Manager recommends that the Board approve the negotiation of an addendum to the Louis Berger Group, Inc. contract to complete Phase III to not exceed $49, 546.81. Orange County Transfer of Development Rights Feasibility Study `3 Phase III Scope of Services (8.31.2006) Orange County Transfer of Development Rights (TDR) Proposed Phase III (Program Design and Implementation Plan) Statement of Purpose Orange County would like to implement the adopted TDR Plan and program administrative organization to support the adopted TDR program; apply for grants or other external programs for program support; and revise existing land development regulations according to specifications of the adopted TDR Plan. The following is a summary of the preliminary goals and objectives of this study; the actual work to be performed is described in the subsequent Task descriptions. TDR Goals ^ Preserve the farm economy ^ Protect drinking water resources ^ Preserve environmental and cultural resources ^ Preserve the character of rural Orange County ^ Avoid excess public costs to provide water, sewer, and education services TDR Objective Direct growth and development activities away from important natural and cultural resources by shifting growth and development activities to areas more able to accommodate such growth. Orange County Transfer of Development Rights Feasibility Study ~{-- Phase III Scope of Services (8.31.2006) Scope of Services and Deliverables As noted below, the "Client" is Orange County, North Carolina and its staff; the "Consultant" is The Louis Berger Group, Inc. and the UNC-Charlotte Urban Institute. A. Select Program Design Options 1.Detailed Economic Evaluation. Conduct an in-depth economic valuation assessment on Receiving Area design options to include more detailed information on valuation on properties and tax assessment data. The Client will provide the Consultant with land pricing information in a parsed digital format to conduct this analysis. The purpose of this sub-Task is to determine if there is a real market to build of higher densities than currently allowed. in unincorporated areas of Orange County, and if TDR is expected to make a difference in that trend. 2.Four (4) Meetings/Work Sessions: Program Design. Conduct one, one-hour meeting with the Orange County Board of County Commissioners; and two, three-hour work sessions with key departmental staff (the first hour of the first session of which will include Planning Board members to familiarize them with the process and gain their input) to prioritize Program Design options based on TDR's interoperability with existing programs and initiatives, emphasizing the Lands Legacy Program and the Comprehensive Plan Update. The Consultant will conduct and facilitate these meetings; the Client will provide meeting space and support. One week prior to the meeting, the Consultant will provide an agenda to the Client and communicate refinements via telephone. The Client will distribute the agenda to participants in advance of the meeting. 3.Working Group Meeting # 1. The Client and Consultant will conduct one (1) Working Group meeting to provide input into the selection of Program Design options based on the results of sub-Tasks A.1 and A.2. The Client will provide summary minutes of this meeting and be responsible for coordinating meeting space and support. The Consultant will provide an agenda one (1) week in advance of the Working Group Meeting. 4.Technical Report No. 1: TDR Program Design. The Consultant will make recommendations in consultation with Planning Staff on the selection of a specific Program Design based on all of the above considerations. The Consultant will provide five copies of a Technical Report which will include a summary, detailed recommendations on a TDR Program for Orange County including a map or criteria set for identifying Sending and Receiving Areas, and appendices that address findings and discussions from staff and Working Group meetings. If appropriate and requested by the Client, a flowchart identifying the work flow of a typical TDR transaction will also be provided in this Technical Report. The Consultant will update the Orange County Transfer of Development Rights Feasibility Study S Phase 111 Scope of Services (8.31.2006) TDR web pages to include these materials and transmit the update to the Client for mounting to the Orange County website. B. Select Administrative Design Options l.One Work Session: Administration. The Consultant will facilitate one work session with key Orange County department staff to identify and quantify operating requirements and costs associated with Administrative Design options. The emphasis on this work session will be (1) refining the process flow based upon the Program Design from Task A; and (2) identifying necessary internal process changes, staffing requirements, and any technological or training gaps that exist. Regular TDR processes as well as periodic support requirements (e.g., performance monitoring and reporting) will be included in the Administration development. The Consultant will prepare a brief technical memorandum describing the recommended Administrative Design. 2.Working Group Meeting No. 2. The Consultant will facilitate one (1) Working Group meeting to provide input into the. selection of a recommended Administrative Design option based on the results of Task A and sub-Task B.l .The Client will provide meeting support including summary minutes, and distribute an agenda one week prior to the Working Group meeting. The Consultant will facilitate the meeting and prepare an agenda in cooperation with the Client in advance of the agenda distribution. 3.Technical Memorandum No. 2: Administrative Design Recommendations. The Consultant will make recommendations and cost/resource estimates to the Planning Staff on Administrative Design of the Orange County TDR Program based on all of the above considerations, including a summary of all meetings that took place during Task B. The product of this Task will be to provide guidance to the Client on the optimum administrative design to fit the program design derived from Task A; the Client will be responsible for providing input and staffing/resource costs and implementing the recommendations. Five hard copies will be transmitted to Orange County staff for review along with a digital format copy; five final hard copies and digital format will be prepared based upon comments/corrections received by the Consultant within one (1) week after receipt. The Consultant will prepare an update to the TDR Program web pages that includes the final Technical Report and transmit the relevant HTML files to the Client for mounting to the Orange County website.. Orange County Transfer of Development Rights Feasibility Study (p Phase 111 Scope of Services (8.31.2006) C. Finalize Proposed TDR Implementation Plan 1.Two Work Sessions: Finalized Implementation Plan Review. The Consultant will conduct one (1) one-hour Planning Board and one (1) three-hour key Orange County departmental staff work session to (A) review the selected Program and Administrative Design option, (B) to recommend appropriate TDR Program Evaluation measures, and (C) to recommend atoll-out of the TDR Program to include approximate dates (month/year) and responsibilities. The staff and Planning Board sessions should be conducted in the same day. Draft materials will be provided by the Consultant and transmitted to the Client at least 10 working days prior to each work session for the Client to distribute to meeting attendees. 2.County Commission Work Session. The Consultant will facilitate one (1) County Commission work session to review the selected Program and Administrative Design options and the appropriate TDR Program Evaluation Measures. The Client will provide summary notes from this meeting relevant to .any modifications of any aspect of the TDR Program Design, Administrative Design, and Evaluation Measures. 3.Techriical Report No. 3: Finalizing the TDR Program. Th'e Consultant will conduct one (1) in-person meeting with the Orange County staff to finalize the TDR Program, Administrative Design, and Evaluation Measures for inclusion in TDR Implementation Plan. Based upon this discussion and previous Tasks and sub-Tasks, the Consultant will prepare a Technical Report that describes the TDR Program, Administration, and Evaluation Measures. Five hard copies will be transmitted to Orange County staff for review along with a digital format copy; five final hard copies and digital format will be prepared based upon comments/corrections received by the Consultant within one (1) week after receipt. The Consultant will prepare an update to the TDR Program web pages that includes the final Technical Report and transmit the relevant HTML files to the Client for mounting to the Orange County website. Orange County Transfer of Development Rights Feasibility Study ~ Phase 111 Scope of Services (8.31.2006) D. Draffing TDR Program Ordinance Revisions In order to implement the TDR Program, the Unified Development Ordinance will need to be modified to accommodate the recommendations from the previous Tasks. TDR Ordinance Template. The Consultant will draft a template for a proposed TDR ordinance that will identify key items to be covered in the TDR ordinance, and will reference sample ordinance language from other jurisdictions where relevant and will be designed to fit the Program and Administrative Design options and Evaluation measures selected in process steps A-C. Research on TDR ordinances used in other localities will be carried out to inform the creation of the Orange County TDR ordinance template. The Client will draft actual TDR ordinance language from the template prepared by the Consultant. The Client will also estimate associated staffing and other resource costs. 2. Two Work Sessions: Ordinance Template Review. The Client will conduct one (1) work session with the Planning Board and the Consultant will conduct one (1) 1.5-hour work session via telephone with key Orange County department staff to review the proposed TDR ordinance language. The Consultant will be responsible for preparing an agenda one week in advance of the departmental work session. 3. Work Session: County Commissioners. The Consultant will attend one (1) one-hour County Commission work session conducted by Client to review the proposed TDR ordinance language, staffing and other resource cost estimates. The Client will make refinements to these recommendations based on comments received. 4. Technical Report No. 4: TDR Ordinance Language. The Client will prepare a Technical Report describing the final proposed TDR ordinance language, staffing and other implementation cost estimates based on an initial, detailed template provided by the Consultant. Five hard copies will be transmitted to Orange County staff for review along with a digital format copy; five final hard copies and digital format will be prepared based upon comments/corrections received by the Consultant within one (1) week after receipt. The Consultant will prepare an update to the TDR Program web pages that includes the final Technical Report and transmit the relevant HTML files to the Client for mounting to the Orange County website. Orange County Transfer of Development Rights Feasibility Study 8 Phase Ill Scope of Services (8.31.2006) E. Prepare for TDR Implementation Plan Adoption 1. Working Group Meeting No. 3/Public Meeting: TDR Program Review. The Consultant will conduct one (1) public work session with the Working Group to familiarize the public and property owners with the proposed TDR ordinance language; staffing and implementation cost estimates; the proposed Evaluation Measures; and to receive public feedback. The Client and Consultant will agree to a format for this meeting in advance of its being scheduled. The Consultant agrees to provide a minimum of three (3) staff to support and facilitate this meeting for period not to exceed 3.5 hours. The Client will distribute an agenda prepared by the Consultant at least one week in advance of the Work Group meeting and prepare summary minutes from this meeting. 2. Two Elected/Appointed Official Presentations. The Consultant will present public feedback findings at one (1) Planning Board meeting and one (1) meeting of the Orange County Board of Commissioners. The Consultant will revise TDR Plan, ordinance language, and implementation cost estimates as needed based on direction from the County Commission. 3. Preparation of Project Report. The Consultant will prepare five draft and five final copies plus one unbound original of a final Project Report. The Final Report will contain a complete set of recommendations on Program Design, Administrative Design, Ordinance Revisions, and Implementation Schedule. Appendices available on CD-ROM in each of the final reports will include materials generated from or received during the previous tasks. Orange County Transfer of Development Rights Feasibility Study q Phase 111 Scope of Services (8.31.2006) F. Build Public Awareness, Understanding, .and Seek Public input The Consultant will assist the Client with' developing and conducting a public awareness and education program about the TDR Program; make informational materials readily available through multiple outlets to reach as many residents and businesses as possible; provide multiple means for the public and property owners to give. feedback or ask questions; and continue responding to the Public and media throughout the process of developing the Plan and preparing to adopt the program. In all cases, unless specified otherwise in this Scope of Services or through a written agreement between the Client and Consultant, the meeting space, advertising, and production of summary minutes are the responsibility of the Client. Working Group Meetings. The Consultant will facilitate three (3) Working Group meetings as described in Tasks A., B., and E. in this Scope of Services. These Working Group meetings will be advertised by the Client and made open to the public and media. The Consultant will provide a one-page press release upon request to additionally support media involvement in the planning process. The Working Group should have representatives of those Orange County constituents that are directly affected by the TDR Program: large-lot property owners, real estate .professionals, and people residing/working in the proposed Receiving Areas. 2. Public Meeting (under Task E.1 ). The Consultant will facilitate one, three- hour public meeting, and will be responsible for generating handouts, boards (2), presentation(s), and any other materials needed for this meeting. The Client will be responsible for procuring meeting space and advertising the Public Meeting. The Consultant will prepare a summary of the Public Meeting within one (1) week after the Public Meeting for submittal to the Client. A minimum of three (3) staff from the Consultant will be present at the meeting site 30 minutes before the meeting begins until its completion. 3. Project Website. The Consultant will be responsible for updating the TDR Program Website and transmitting relevant HTML files to Orange County staff via FTP linkage a minimum of four (4) times during the course of this study, and a maximum of six (6) times during the course of this study. 4. Newsletter/TDR Program Summary. The Consultant will create 75 full-color copies of one brochure describing the TDR Program, as well as provide the Client with a digital copy and one additional hard copy suitable for reproduction. This newsletter will also be available on the Project Website. Orange County Transfer of Development Rights Feasibility Study Phase III Scope of Services (8.31.2006) G. Administration 1. Payment. The Client will be responsible for processing payment to the Consultant at the completion of each Task (A-F) as described herein, according to the following schedule of payment: Task A: 30% Task B: 40% Task C: 60% Task D: 80% Task E: 100% 2. Coordination. The Client and Consultant will coordinate on a regular, pre- approved schedule no less than every two (2) weeks from the Notice to Proceed being received by the Consultant until project completion. If agreed to by both Client and Consultant in advance, the bi-weekly meeting can be cancelled or rescheduled. The Consultant will initiate each meeting by teleconference or by providing acall-in number in advance. 3. Contacts: The contacts for Client and Consultant are as follows, unless otherwise notified by the Client or agreed to by the Client/Consultant: ORANGE COUNTY STAFF: Craig N. Benedict, AICP, Planner II Orange County Planning Dept. 306E Revere Road Hillsborough, NC 27278 (919) 245-2575 cbenedict@co.orange.nc.us CONSULTANT: J. Scott Lane, AICP, GISP The Louis Berger Group, Inc. 1513 Walnut Street, Suite 250 Cary, North Carolina 919.467.3885x 14 slane@louisberger.com ~~ Orange County Transfer of Development Rights Feasibility Study Phase III Scope of Services (8.31.2006) Consultant Servlcea Coat ~stl7nate Spreadsheet Oranfle County 7ranafer of D evelopment Rlphts • Phase II I: Implement atlon Tha Louls Berger Oroup, Inc. 6.31.2pO6 ~~Y Phase III. A Phrase III, 0 Phrase III. C Phrase III. D Phrase IIL E Tolal Haur ~ Ra P+hr ° Lo•Pwject Manager tLBVI LBU 30.0 56.0 3. D 10.0 ~2 U 170A 7ul llb 1.~d2 f5 4Si iiU Co-Protect Manager (UNCC) Pl UNCC SS n 14.0 3l U 4a,U ~.U 183.0 . 532.92 , . 56 024 36 anner Real Estate Specialist LBG LDG ?QU ~. U 68 U 0 0 61.0 O G i2U 48 U 260.0 522.60 , . 56,328.00 Pdnclpal Planner UNCC 76.0 . 19 U 117.0 0.0 18 0 QO 28 U 12.0 170 0 S18.t5 5217.60 GraduateAsslstmrt UNCC 1 . 79 0 524.48 54,161.110 TOTAL HOURS 250 ~ 154.0 ! 15b U + i 14.0 140 ~ t . 89d.0 515.00 51,165.D0 DIRECT LABOR LBG $2,762.20 ¢3,785.28 ¢2,427.76 ~ $912.80 ~ f2,111.3G ( $11 999 40 DIRECT LABOR UNCC $4,376.08 ¢1,350.72 ¢1,693.04 € $2,283.92 ¢1,66720 1 , . ¢71 370 96 TOTAL DIRECT LABOR ALL AGENCIES $7,13828 ¢5,136.00 ( $4,120.80 E ~ $3,196.72 $3,778.56 ~ , . $23,370.36 LBG Direct Ex en rasa<_ Phase III. A Phase IIL D Phase III, C Phase III. D Phase IIL E T~ ~T:.L Reprodedlon Black &WhiteCopiea (pages, at 50.04/page) 2U0 17UC 1~?7 1i-Q M_~0 1 200 546 00 CokrCoplas (Pages, at 50.50/page) 8 8 E 5 16 , 46 . E-Sevres Maps (maps, at 52.50/map) 8 4 4 8 5 524.00 Trnval 32 580,E L~9N+9 (days, at 561.50/day) Meals (days, at S28lday) ~ 0 ~ ~ M+~+~ (0.375/mile) i 1G i ~~ 1 Ci-J 5 1 5140.00 ,8~ 8675.00 TOTAL LBG DIRECT EXPENSES ~i $361.00 $22A0 € $351.00 ~ ~ $32.00 ~ E I $208.50 € I ¢9GT.UD (UNCC Expenses fincl overhead ratel #irips 4 1 1 1 1 mileage (250 miftrip Q 5.375/mi plus 0 S 528.75 S 132.19 S 132.19 S 132.19 5 132.19 8 1 057 5 meals (at state per diem rates plus 0 S 120.20 S 13.40 S 13.40 S 22 21 5 44 42 , . 0 maps (at 1.77/map plus OH) 5 19.97 S 9.96 S 9.98 . 5 19.97 . S 19.97 S S 213.62 79 8 copies (at 5.05/page plus OH l>Ir~ S 63.45 S 5.00 S 10.00 S 109.28 S 10 00 S . 6 197 total ex erases S 732.37 S 160.57 S 165.57 S 263.64 . S 206.57 5 .73 1 548.70 Summary Feo Lest DIRLf:T LA64R (LBbI $ 11,9x5.40 OVERHEAD RATE (LBG) 137.x% 516,439.16 FIXED FEE (LBG) 9.0% 52,559.47 UIRECT LABOR (UNCC) 511,370.96 OVERHEAD RATE (UNCC) 41.00°k 54,662.09 TOTAL LABOR ¢47,031.10 DIRECT EXPENSES ¢2,515.70 tUTAL +rUS f >,d9,54ti.81 Page 12 Transfer of Development Rights Time Table Week starting November 6 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 November December January February March April May Scope of Services and Contract Addenda Approval - Direction/Approval of TDR Goals and Objective - Approval to Create the TDR Work Group - Appoint/Reappoint TDR Work Group Refining Existing Public Engagement Plan Sending Areas Public Education and Outreach Program Design Options Development Receiving Areas Public Education and Outreach In-depth Real Estate Market Analysis Program Design Options Development Small Area Plan Development Program Evaluation Metrics Administrative Support Development TDR Implementation Plan Ordinance Language Development Implementation Plan and Ordinance Approval T Work Sessions with Staff and Planning Board '> Technical Report or Memorandum Issued BOCC Joint Quarterly Public Hearing':: ~;. D BOCC Regular Meeting BOCC Work Session DR Work Group Meeting ;7 ,` 5;: 7 $. 8 .!,