Loading...
HomeMy WebLinkAbout2006 S Purchasing - Design Work for Homestead Center Sewer Connection3 - 1 , ~ ~ORLEY REDF~OT ZACK ~. ' ARCHITECTS ENGINEERS PLANNER S GLENN D. CORLEY, AIA President, CEO KENNETH E. REDFOOT, AIA Vice President MARK ZACK, AIA Vice President MICHAEL L. HAMMERSLEY, PE Principal LAURENCfi W. BUNCH, AIA Associate ANDREW R. CRUICKSHANK,AL4 Associate CHARLENE E. HANLEY, AIA Associate DAVID M. TAYLOR, ALA ASSOCtate HARRY M. JENSEN Associate KENNETH E. SMITH Associate PO Sox 2368 Chapel Hill, NC 27515-2368 222 Cloister Court Chapel Hill, NC 27514-2212 ~~ YEARS 11 (919) 401-8586 Telephone (919) 493-7306 Fax www. cozleyzedfootzack. com May 12, 2006 Mr. Rod Visser Orange County Planning Department PO Box 8181 Hillsborough, NC 27278 RE: Homestead Community Center Sanitary Sewer Extension Lake Hogan Farm Road, Chapel Hill, NC Dear Mr. Visser: Corley Redfoot Zack, Inc., is pleased to provide a fee proposal for the Civil Engineering design services to complete the design and installation of approximately 500 LF of 8" sanitary sewer for the Homestead Community Center in Chapel Hill. This sanitary sewer system will be designed in accordance with the Orange Water & Sewer Authority Standards and Specifications. These design services assume that the electronic survey and layout provided on 5/10/06 are compatible with our Autocadd system and that no changes in the proposed location are needed. The design fee for all services will not exceed $10,000. A breakdown of the fee proposal is attached for your use. We appreciate the opportunity to work on this important project. Sincerely, PE MI..H:esw Homestead Community Center Saxutary Sewer Extension Lake Hogan Farm Road, Chapel Hill, NC Breakdown of Proposed Fee for Professional Civil Engineering Design Services: Design Services: PIan/Profile Sheet General Notes and Details OWASA approval NCDOT Encroachment Perxnit Project Administration/Meetings Subtotal: $ 7,000 Construction Services: Pre-construction and Pre bid Meetings Construction Administration OWASA As-builts Subtotal: 3,000 Not-to-Exceed Total: $1x,000 'This proposal does not include costs #or the following: Surveying Geotechnical Services OWASA Construction and review fees Legal fees Advertisement and formal bidding process 0613-pro ~~~ ~ ~ ~ CORLEY REDFOOT ZACK ~Nc 5/1?J06