Loading...
HomeMy WebLinkAbout2006 NS Contract - Housing Rehabilitation Contract Awards (2)ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: May 4, 2006 Action Agenda Item No. ,5- -F SUBJECT• Housing Rehabilitation Contract Awards DEPARTMENT: Housing/Comm. Development PUBLIC HEARING: (Y/N) No ATTACHMENT(S): INFORMATION CONTACT: Bid Results; Work Specifications Tara L. Fikes, 245-2490 PURPOSE: To award two housing rehabilitation contracts for the County's CDBG Scattered Site Housing Rehabilitation Program. BACKGROUND: The Housing and Community Development Department solicited bids from qualified housing rehabilitation contractors participating in the County's Housing Rehabilitation Program for the general repair portion of the work specifications. Bids were also solicited from lead based paint abatement contractors for items containing lead based paint as required by federal regulation. The informal bidding process is governed by the North Carolina General Statues §143-131 and does not require a minimum number of bids. Additionally, present program procedures provide that. housing rehabilitation contracts be awarded to the lowest responsible bidder. Additionally, all contractors participating in the County's Rehabilitation Program are required to utilize current deconstruction and material recycling methods during the repair process. Sealed bids were solicited from participating contractors on January 27 and January 30, 2006. However, because no bids were submitted, bids were solicited for a second time on February 21 and February 23, 2006 with a bid opening on February 28, 2006 and March 2, 2006 respectively with two bids received for the general repair portion and the lead based paint portion of the work specifications for both dwelling units. Bid results are attached. FINANCIAL IMPACT: The CDBG Scattered Site Program provides grant funding for this repair program. RECOMMENDATION(S): The Manager recommends that the Board award the following housing rehabilitation contracts: Dwelling Unit Bid Amount Contractor 2712 Mill Creek Road, Mebane $26,980 Triple J Construction Company $12,046 RGO Enterprises LLC 8516 Union Grove Church Rd., CH $44,570 Triple J Construction Company $ 5,083 RGO Enterprises LLC RESULTS OF BID OPENING OWNER:_Mary Bradshaw ADDRESS: 2712 Mill Creek Rd. Mebane, NC 27302 PERCENTAGE OF BID OVER 4$ CHECK ONE: JOB BID X COMPANY 1. Triple J Construction 2. Diamond Builders 3. 4. 5. 6. BID OPENED BY: TIME OF BID OPENING: DATE OF BID OPENING: February 28, 2006 WITNESSED BY: Jim Hutcherson ****************************************************************** Lowest Acceptable Bid: $26,980 Negotiated Amount: N/A Contractor: Triple J Construction Co. NAME 1808 Pinecrest St. Burlington, NC 27215 ADDRESS 336-227-6125 TELEPHONE NUMBER CONIlKENTS Submitted by: Bid Approval Date _ Proceed Order Issued Jim Hutcherson Date 03-02-06 APPLICATION NUMBER: CDBG COST ESTIMATE: $25,875 UNDER COST ESTIMATE JOB NEGOTIATED David Saconn BID AMOUNT $26, 980 $36, 318 3:00 PM 2 3 RESULTS OF BID OPENING OWNER: Mary Bradshaw APPLICATION NUMBER: CDBG ADDRESS: _2712 Mill Creek Rd._ COST ESTIMATE:_$12,880 Mebane, NC 27302 PERCENTAGE OF BID OVER UNDER 6o COST ESTIMATE CHECK ONE: JOB BID X COMPANY 1. RGO Enterprises LLC_ 2. Eastern Environmental 3. 4. 5. 6. JOB NEGOTIATED BID OPENED BY: David Saconn TIME OF BID OPENING: 4:00 PM BID AMOUNT $12,046 $12,800 DATE OF BID OPENING: February 28, 2006 WITNESSED BY: Jim Hutcherson ****************************************************************** Lowest Acceptable Bid: $12,046 Negotiated Amount: N/A Contractor: RGO Enterprises, LLC NAME 114 Allen Creek Rd. Rougemont, NC 27572 ADDRESS 919-451-7989 TELEPHONE NUMBER COMN~NTS: Submitted by: David Saconn Bid Approval Date Proceed Order Issued Date 03-10-05 RESULTS OF BID OPENING OWNER:_Sheri Moore APPLICATION NUMBER: CDBG ADDRESS: 8516 Union Grove Ch Rd COST ESTII~TE:_$45,875 Chapel Hill, NC 27516 PERCENTAGE OF BID OVER UNDER 3% COST ESTIMATE CHECK ONE: JOB BID X COMPANY 1. Triple J Construction 2. Diamond Builders 3. 4. 5. 6. BID OPENED BY: Jim Hutcherson TIME OF BID OPENING: JOB NEGOTIATED 3:00 PM BID AMOUNT $44,570 $53, 143 DATE OF BID OPENING: March 2, 2006 WITNESSED BY: Sharkita Torain ****************************************************************** Lowest Acceptable Bid: $44,570 Negotiated Amount: N/A Contractor: Triple J Construction NAME 1808 Pinecrest St. Burlington, NC 27215 ADDRESS 336-227-6125 TELEPHONE NUMBER COMMENTS: Submitted by: Jim Hutcherson Bid Approval Date Proceed Order Issued Date 03-02-06 4 5 RESULTS OF BID OPENING OWNER: Sherri Moore APPLICATION NUMBER: CDBG ADDRESS: 8516 Union Grove Ch Rd._ COST ESTIMATE:_$5,500 Mebane, NC 27302 PERCENTAGE OF BID OVER UNDER 8o COST ESTIMATE CHECK. ONE: JOB BID X COMPANY 1. RGO Enterprises LLC_ 2. Eastern Environmental 3. 4. 5. 6. NAME 114 Allen Creek Rd. Rougemont, NC 27572 ADDRESS 919-451-7989 TELEPHONE NUMBER BID OPENED BY: TIME OF BID OPENING: Jim Hutcherson 3:00 PM DATE OF BID OPENING: March 2, 2006 WITNESSED BY: Sharkita Torain ****************************************************************** Lowest Acceptable Bid: $5,083 Negotiated Amount: N/A Contractor: RGO Enterprises, LLC COMN~NTS: Submitted by: Bid Approval Date _ Proceed Order Issued Jim Hutcherson $5,083 $5, 168 Date 03-02-06 JOB NEGOTIATED BID AMOUNT ORANGE COUNTY HOUSING REHABILITATION PROGRAM SPECIFICATIONS GENERAL CONSTRUCTION FOR Mary Bradshaw AT 2712 Mill Creek Road, Mebane DATE: 1/26/06 By: Jim Hutcherson Housing Rehabilitation Specialist NOTE TO CONTRACTOR CONTRACTOR SHOULD REFER TO THE BASIC SPECIFICATIONS, PROPERTY REHABILITATION STANDARDS, GENERAL CONDITIONS, NORTH CAROLINA BUILDING CODES MANUAL, AND ORANGE COUNTY MINIMUM HOUSING CODE DOCUMENTS. IT IS NOT THE INTENT OF THE WRITER TO DIRECT ANY CONTRACTOR TO A SPECIFIC SUPPLIER OF MATERIALS CALLED FOR IN THIS WORK WRITE-UP ONLY TO SPECIFY A TYPE THAT WOULD BE ACCEPTABLE TO THE HOMEOWNER AND ORANGE COUNTY HOUSING REHABILITATION PROGRAM. Name: Mary Bradshaw Page 2 of 12 Address: 2712 Mill Creek Road City: Mebane Phone #: 563-0958 Date: I. MAJOR SYSTEMS A. SUB-AREA CLEANUP & TERMITE REPORT/TREATMENT 1. Chemically treat entire perimeter of house for termite and pest control. Chemical treatment to be done by a licensed termite or pest control company. Contractor to provide owner with written proof and warranty of treatment. 2. Supply and install 6 mil plastic vapor barrier to entire sub-area of house so as to provide moisture protection. B. FOUNDATION 1. Repair one foundation vent in rear foundation wall to restore to proper working order. 2. Remove wood sill from existing crawlspace access door. Supply and install new treated wood sill under existing access door and new locking hasp with lock to restore to proper working order. NOTE: If further damage is discovered after existing sill is removed, the Owner, Contractor and Rehabilitation Specialist will meet to review the work, determine a course of action and, if necessary, a cost for any additional work. C. ROOF & GUTTER 1. Remove existing composition shingle roof cover to sheathing. Does not include rake trim, fascia and soffit (See Lead Remediation Specs). NOTE: After existing roof cover is removed, if further damage is discovered the Owner, Contractor and Rehabilitation Specialist will meet to review the work, determine a course of action and, if necessary, a cost for any additional work. Replace flashing including all chimney flashing, roof jacks, metal nosing, plumbing boots, metal drip edge, etc.. Paint all vents, 7 Name: Mary Bradshaw Address: 2712 Mill Creek Road City: Mebane Phone #: 563-0958 Date: Page 3 of 12 $ flashing, and other metal surfaces with "Rustoleum", or approved equal in color to blend with color of roof. Seal all penetrations through roof with waterproof material. Supply and install new 25 year (minimum) composition shingle roof cover over 15# felt, complete. Style and color to match existing as close as practical. Contractor to supply owner with written warranty for materials and labor. All work to code. 2. Supply and install new white pre-painted metal drip edge flashings, and new white pre-painted metal Ogee style gutters on house with at least one downspout for each gutter and one downspout for every 30' of gutter. Color to match existing as close as practical. Each grade level downspout from house shall have a splash block to divert water away from house. D. PLUMBING 1. Secure existing hose bib on rear exterior wall to restore to proper working order. E. ELECTRICAL 1. Properly disconnect and abandon existing electrical service. Supply and install new 200 AMP electrical service to house including new breaker panel, mast, weatherhead, and grounding, complete. Work shall be performed in an efficient, workmanlike manner so as to keep "down time" and temporary connections to a minimum. Includes new circuits, breakers and proper grounding, complete. Circuits and breakers to be clearly identified. 2. Separate and add circuits so as to alleviate overloaded circuits. HVAC, refrigerator, stove, microwave, washing machine, and water heater to be each on separate circuits. 3. Re-secure existing exterior light fixture at front door to restore to proper working order. Name: Mary Bradshaw Page 4 of 12 9 Address: 2712 Mill Creek Road City: Mebane Phone #: 563-0958 Date: 4. Re-secure existing exterior light fixture at rear door to restore to proper working order. ' 5. Supply and install new GFI outlet in Bathroom. 6. Supply and install new GFI outlet in Kitchen. 7. Supply and install new GFI outlet for washing machine. 8. Supply and install new arc fault interrupter circuits on Bedroom circuits. 9. Supply and install new electrical to accommodate installation of new "direct-wired" smoke detectors in Hall and each Bedroom. Supply and install new "direct-wire" smoke detectors, complete. 10. In crawlspace, properly disconnect existing water heater electrical service at splice. Supply and install new junction box and properly connect electrical to restore to proper working order, complete. 11. In crawlspace, remove existing abandoned electrical wire at pump equipment. 12. In crawlspace, supply and install wiring and outlet at furnace, complete. Name: Mary Bradshaw Page 5 of 12 ~ ~,m, Address: 2712 Mill Creek Road City: Mebane Phone #: 563-0958 Date: 13. In crawlspace, supply and install new electrical to accommodate installation of new propane gas pack HVAC system, complete. 14. Supply and install new electrical to accommodate three new light fixtures evenly distributed throughout crawlspace, including one switch control located in crawlspace within 3 l.f. of access door. Supply and install new fixtures, complete. 15. Supply and install new electrical in attic to accommodate one new light fixture adjacent to attic access, including one switch control located in attic within 3 l.f. of access door. Supply and install new fixture, complete. 16. In Kitchen, supply and install new electrical to accommodate installation of new range hood with exhaust fan vented to exterior. Supply and install new ducted range hood, complete. Duct to extend to exterior of house. 17. Replace missing switch cover plate in Kitchen. 18. Replace missing switch cover plate in Hall. 19. Remove existing broken outlet in Hall. Supply and install new outlet and cover plate, complete. 20. Remove existing ceiling light fixture in Kitchen. Supply and install new ceiling light fixture at same location, complete. Name: Mary Bradshaw Address: 2712 Mill Creek Road City: Mebane Phone #: 563-0958 Date: Page6of12 11 21. Remove existing ceiling light fixture in Bedroom #1 (left, front corner). Supply and install new ceiling light fixture at same location, complete. 22. Remove existing ceiling light fixture in Bedroom #2 (left, rear corner). Supply and install new ceiling light fixture at same location, complete. 23. Remove existing ceiling light fixture in Bedroom #3 (left, center). Supply and install new ceiling light fixture at same location, complete. 24. Remove existing ceiling light fixture in Hall. Supply and install new ceiling light fixture at same location, complete. F. MECHANICAL Properly disconnect supply and service lines to two existing heating systems; one in the crawlspace, and one in the Hall. Remove two existing heating„ systems, including abandoned ducting in crawlspace. Make adjustments to existing concrete block piers, to existing gas supply line, and to existing floor openings to accommodate installation of new split system propane gas pack HVAC system. Includes provide new opening in Bathroom floor to accommodate installation of new insulated flexible ducting. Supply and install new split system propane gas pack HVAC system, with minimum 12 SEER, including insulated flexible ducting to all rooms and all necessary service and supply lines, complete. Includes thermostat control located at appropriate location on wall in Hall. Includes concrete pad for condenser unit. Work shall be performed in an efficient, workmanlike manner so as to keep "down time" and temporary connections to a minimum. Name: Mary Bradshaw Page 7 of 12 ~ 2 Address: 2712 Mill Creek Road City: Mebane Phone #' 563-0958 Date: G. INSULATION & WEATHERIZATION 1. Supply and install blown-in insulation of R-30 value to entire attic of house, complete. H. EXTERIOR DOORS 1. Remove existing rear storm door for reinstallation. Remove existing rear door and door frame and prepare opening for installation of new pre-hung exterior door. Supply and install new pre-hung 9-light exterior door. Includes all hardware, keyed lockset and deadbolt, complete. Re-install existing storm door with pneumatic closure and security lock, complete. 2. Supply and install new vinyl-clad storm door on the front door, including pneumatic closure and security lock, complete. I. FLOOR COVERINGS 1. Throughout Living Room, Hall, and all three Bedrooms remove existing carpet and rug floor coverings, pad and tack strips. NOTE: After existing carpet and rug floor coverings are removed, if further damage is discovered the Owner, Contractor and Rehabilitation Specialist will meet to review the work, determine a course of action and, if necessary, a cost for any additional work. Supply. and install new fmish to existing hardwood floor, including all necessary sanding, buffing, staining and three (3) coats of clear finish,' complete. J. GENERAL REPAIRS 1. Remove approximately four (4) existing loose brick and loose mortar on front steps and landing. Supply and install approximately eight (8) new brick, new mortar where existing was removed, and new mortar where materials were missing. Restore steps and landing to proper working order. New materials and finishes to match existing as close as practical. Name: Mary Bradshaw Address: 2712 Mill Creek Road City: Mebane Phone #: 563-0958 Date: Page 8 of 12 13 2. Remove approximately four (4) existing loose brick and loose mortar on rear steps and landing. Supply and install approximately fifteen (15) new brick, new mortar where existing was removed, and new mortar where materials were missing. Restore steps and landing to proper working order. New materials and finishes to match existing as close as practical. 3. Supply and install new wood railing and handrail of 2 x 4 treated material on front steps and landing. New materials and finishes to match existing as close as practical. All work to code. 4. At rear porch, make corrections to existing railing to meet code, complete. New materials and fmishes to match existing as close as practical. 5. Where existing heating unit was removed in Hall, repair floor, wall and ceiling to match existing as close as practical. 6. Supply and install new address numbers on exterior of house near front door. K. SITE IMPROVEMENTS 1. Properly prepare existing concrete landing at bottom of rear steps for installation of new concrete topping slab. Supply and install new concrete topping slab of equal length and width of existing slab, to fill to top of existing first brick step and slope uniformly away from existing steps and house to provide proper drainage. Includes broom finish to provide slip- resistant surface. Name: Mary Bradshaw Address: 2712 Mill Creek Road City: Mebane Phone #: 563-0958 Date: II. KITCHEN Page 9 of 12 1 4 1. In Kitchen, repair existing damaged wall behind washing machine to restore to proper working order. New materials and finishes to match existing as close as is practical. Includes provide latex semi-gloss painted finish, complete. III. HALL BATHROOM 1. Remove existing vanity and toilet for re-installation. Remove existing floor covering and underlayment to subfloor. NOTE: If further damage is discovered after existing floor covering and underlayment are removed, the Owner, Contractor and Rehabilitation Specialist will meet to review the work, determine a course of action and, if necessary, a cost for any additional work. Work shall be performed in an efficient, workmanlike manner so as to keep - "down time". and temporary connections to a minimum. Temporary connections for toilet shall be provided for overnight accommodations until work is complete. 2. Clean all existing the in shower surround and wainscoting. Remove existing loose grout. Replace approximately six (6) missing tiles, re- install existing loose tiles. Install new grout where existing was removed and restore .all the to proper working order. New materials to match existing as close as is practical. 3. Prepare existing subfloor for installation of new luaun plywood underlayment. Supply and install new 1/a" luaun underlayment with a smooth top surface, and prepare for installation of new vinyl floor cover. Supply and install new vinyl floor cover and vinyl base per Owner selection. Includes new metal transition strip at door and caulking all seams at base, complete. 4. Remove existing tub/shower plumbing faucet and showerhead. Make repairs to accommodate tub/shower faucet and showerhead. Supply and install new faucet and showerhead and restore to proper working order. Access to be gained through adjacent closet wall. Repair closet wall to restore to proper working order. New materials to match existing as close as is practical. Name: Mary Bradshaw Address: 2712 Mill Creek Road City: Mebane Phone #: 563-0958 Date: Page 10 of 12 15 5. Remove existing angle stop, shutoff valve, escutcheon ring, and anchor bolts for toilet. Supply and install new angle stop, shutoff valve, escutcheon ring, riser, and anchor bolts to restore to proper working order. Reinstall existing toilet at same location, complete. 6. Remove existing angle stop, shutoff valve, escutcheon ring, riser and faucet for sink. Supply and install new angle stop, shutoff valve, escutcheon ring, riser and faucet for sink to restore to proper working order. Reinstall existing vanity and sink at same location, complete. 7. Remove existing interior door, frame, jamb and trim. Supply and install new door, frame, jamb and trim to match existing as close as is practical, including hardware and doorknob, complete. New materials to match existing as close as is practical. 8. Fully prepare painted surfaces, including walls, ceiling and trim, ready to receive new paint. Includes patch and repair of sheet-rock holes and surface cracks. Paint walls, ceilings and trim with interior latex enamel semi-gloss finish paint and restore to proper working order. New materials to match existing as close as practical. 9. Supply and install new grab bars in tub/shower and at toilet properly anchored in solid substrate. Locations to be designated by owner as close as proper anchoring will allow. IV. BEDROOM #1 (Left, front corner) 1. Remove existing interior door, frame, jamb and trim. Supply and install new door, frame, jamb and trim to match existing as close as is practical, including hardware and doorknob, complete. New materials to match existing as close as is practical. Name: Mary Bradshaw Page 11 of 12 ~ 6 Address: 2712 Mill Creek Road City: Mebane Phone #: 563-0958 Date: V. BEDROOM #2 (Left, rear corner) 1. Replace missing strike plate on Bedroom door and restore door to proper working order. New materials to match existing as close as is practical. 2. Replace missing door handle on closet door and restore door to proper working order. New materials to match existing as close as is practical. VI. BEDROOM #3 (Left, center) 1. Remove existing interior door, frame, jamb and trim. Supply and install new door, frame, jamb and trim to match existing as close as is practical, _ including hardware and doorknob, complete. New materials to match existing as close as is practical. TOTAL PRICE $ 17 48' N BEDROOM BEDROOM KITCHEN 11'4" x 9'0" 1 1'4" x 8'4" 9'2" x 11'6" HALL DEN 11'6" x 20'6" BEDROOM LIVING 10'0" x 11'6" 17'10" x 11'6" BATHROOM 6'6" x 5'0" 48' LIVING AREA 1200 sq ft N MARY BRADSHAW 18 MEMORANDUM TO: Housing Rehabilitation Contractors FROM: Orange County Housing and Community Development DATE: February 9, 2006 RE: 2712 Mill Creek Road, Mebane -Mary Bradshaw Work Writeup -Addendum 1 Listed below are changes to the General Construction work wrietup and bid package dated 1/26/06 for the referenced project. All other conditions and descriptions remain the same. Please be reminded that bids will be opened and read aloud on February 21, 2006 at 3:OOP.M. in the Housing and Community Development Department office at 300 W. Tryon Street, Hillsborough, N.C. 27278. The changes are as follows: E F ELECTRTICAL 14. Delete: Delete this entire item. 16. Add: Includes supply and install new range wall cabinet, to match existing as close as practical. MECHANICAL 1. Delete: Delete "gas pack" from the description. Change: SEER is 13 (not 12). II. KITCHEN 1. Add: Includes supply and install new recessed washing machine plumbing hookup box mounted in the wall at existing location. 19 V. BEDROOM #2 (Left, rear corner) Delete: Delete this entire description. Add: Remove existing Bedroom door, frame, jamb and trim. Supply and install new door, frame, jamb and trim, including hardware. and doorknob, complete. New materials to match existing as close as practical. 2. Delete: Delete this entire item. H:\HousingRehab\County\Bradshaw\GeneralConstruction\Addenduml .2-9-Ob.doc 20 MEMORANDUM TO: Housing Rehabilitation Contractors FROM: Orange County Housing and Community Development DATE: February 9, 2006 RE: 2712 Mill Creek Road, Mebane -Mary Bradshaw Work Writeup -Addendum Z Listed below are changes to the General Construction work wrietup and bid package dated 1/26/06 for the referenced project. All other conditions and descriptions remain the same. Please be reminded that bids will be opened and read aloud on February 21, 2006 at 3:OOP.M. in the Housing and Community Development Department office at 300 W. Tryon Street, Hillsborough, N.C. 27278. The. changes are as follows: I. FLOOR COVERINGS 1. Change: Carpet only needs to be removed in the Living Room, Bedroom #1 (left, front comer) and Bedroom #2 (left, rear corner). Add: Includes remove existing shoe molding from existing hardwood floor for. refinishing process. Includes supply and install new shoe molding at same locations, stained and finished to match existing as close as practical. H:\HousingRehab\County\Bradshaw\GeneralConstruction\Addenduml.2-9-06.doc 21 ORANGE COUNTY HOUSING REHABILITATION PROGRAM SPECIFICATIONS LEAD REMEDIATION FOR Mary Bradshaw AT 2712 Mill Creek Road, Mebane DATE: 1/26/06 By: Jim Hutcherson Housing Rehabilitation Specialist NOTE TO CONTRACTOR CONTRACTOR SHOULD REFER TO THE BASIC SPECIFICATIONS, PROPERTY REHABILITATION STANDARDS, GENERAL CONDITIONS, NORTH CAROLINA BUILDING CODES MANUAL, AND ORANGE COUNTY MINIMUM HOUSING CODE DOCUMENTS. IT IS NOT THE INTENT OF THE WRITER TO DIRECT ANY CONTRACTOR TO A SPECIFIC SUPPLIER OF MATERIALS CALLED FOR IN THIS WORK WRITE-UP ONLY TO SPECIFY A TYPE THAT WOULD BE ACCEPTABLE TO THE HOMEOWNER AND ORANGE COUNTY HOUSING REHABILITATION PROGRAM. Name: Mary Bradshaw Address: 2712 Mill Creek Road City: Mebane Phone #: 563-0958 Date: Page 2 of 6 22 This set of work specifications outlines work items that were found to contain lead in concentrations above acceptable levels as set in the U. S. Department of Housing and Urban Development (HUD) standards. It is recommended that any lead hazard remediation work be conducted by workers who are certified by the state to perform lead abatement work. Lead hazard remediation work must be preformed in compliance with the regulations issued by the Secretary of Housing and Urban Development set forth in 24 CFR Part 35, et al and all applicable rules and any others issued thereunder, and all applicable Federal, State and local rules and regulations, regarding notification, evaluation and reduction of lead-based paint hazards in residential structures undergoing Federally-assisted construction or rehabilitation and require the elimination of lead-based paint hazards. Every contractor or subcontractor, including painting, pursuant to which such Federally-assisted construction or rehabilitation is performed, shall include appropriate provisions complying with requirements for notification, evaluation and reduction of lead-based paint hazards. The contractor shall be allowed to include in the cost of the project the allowable fee for one (1) complete clearance inspection of the remediation work performed. The cost of any additional clearance inspections which may be necessary will be born directly by the contractor. Contractor must submit a copy of training certification with their bid. Name: Mary Bradshaw Address: 2712 Mill Creek Road City: Mebane Phone #: 563-0958 Date: Page 3 of 6 2 3 Note: Prior to conducting Lead-Based Paint Abatement activities, all personnel associated with the project should review and fully understand the requirements of ALL applicable local, state, and federal regulations that may apply to the worksite. I. WORKSITE PREPARATION A. GROUND CONTAINMENT 1. Before exterior construction, construct a work site perimeter curb of 2x4 timbers ten (10) feet from the house exterior. Create an outer barrier of flags and/or plastic tape three (3) feet on center and twenty (20) feet from the worksite. Post proper signage in the work area. All warning signs must remain posted until clearance is passed. 2. During the period of work on all exterior components attach one layer of 6-mil polyethylene to the building exterior with furring strips, extending the (10) feet past the work site. Wrap the plastic under the perimeter 2x4's. Change the plastic daily. B. CLEARANCE E~:AMINATION 1. After completion of all work that disturbed LBP and any other lead hazard reduction activities, a qualified person shall perform a clearance examination. Work disturbing lead-based paint is not considered complete until clearance is achieved. C. PRE-CLEAN 1. Pre-clean the interior of the unit in all areas that Lead Paint was disturbed. HEPA vacuum all horizontal surfaces, to include all floors, windowsills, troughs, baseboards and casing. Name: Mary Bradshaw Page 4 of 6 Address: 2712 Mill Creek Road 24 City: Mebane Phone #: 563-0958 Date: II. ABATEMENT WORK A. ROOF TRIM, SOFFIT & GUTTER/DOWNSPOUTS 1. Remove gutters and downspouts from house. Replace damaged material on rake trim, fascia and soffit throughout exterior of house. NOTE: After removal work is complete, if further damage is discovered the Owner, Contractor and Rehabilitation Specialist will meet to review the work, determine a course of action and, if necessary, a cost for any additional work. Wrap rake trim, fascia and soffit throughout exterior of house with Tyvek. Supply and install new pre-finished white aluminum coil stock over rake trim, fascia and soffit throughout exterior of house. Materials, style and color to match . existing as close as practical. Contractor to supply owner with written warranty for materials and labor. B. EXTERIOR DOORS 1. Remove existing front storm door. Remove existing front door including frame and threshold. Make repairs to accommodate installation of new exterior pre-hung front door. Supply and install new exterior pre-hung front door, including all necessary hardware, keyed door knob, deadbolt lock and peephole, complete. New material to match existing as close as practical. C. WINDOWS & SCREENS 1. Remove existing windows and frames at eleven (11) locations. Make repairs to accommodate installation of new vinyl replacement window inserts. Supply and install new double-hung, dual-pane vinyl replacement window inserts with locks and full screen. Where original exterior frame, trim and sill are exposed, supply and install white pre- finished aluminum coil stock to cover exposed components, including wood spacers on existing wood trim to create uniform surfaces. Sizes and styles to match existing as close as practical. Name: Mary Bradshaw Page 5 of 6 2 5 Address: 2712 Mill Creek Road City: Mebane Phone #: 563-0958 Date: D. EXTERIOR SIDING Remove existing gable vents on both exterior gables of house. NOTE: After removal work is complete, if further damage is discovered the Owner, Contractor and Rehabilitation Specialist will meet to review the work, determine a course of action and, if necessary, a cost for any additional work. Wrap existing wood trim with Tyvek. Supply and install new gable vents at existing locations. Supply and install new pre-finished white aluminum coil stock over existing wood trim, including proper transition to new gable vents, adjacent new coil stock and existing brick siding. Style and color to match existing as close as practical. Contractor to supply owner with written warranty for materials and labor. TOTAL PRICE $ l~cz ~ ~, fo oar, to 26 a8' in N BEDROOM BEDROOM KITCHEN 11'4" x 9'0" 11'4" x 8'4" 9'2" x 11'6" HALL DEN 11'6" x 20'6" BEDROOM LIVING 10'0" x 11'6" 17'10" x 11'6" BATHROOM 6'6" x 5'0" LlViNr,AREA ~ 120v8sq ft in N MARY BRADSHAW 27 MEMORANDUM TO: Housing Rehabilitation Contractors FROM: Orange County Housing and Community Development DATE: February 7, 2006 RE: 2712 Mill Creek Road, Mebane -Mary Bradshaw Work Writeup -Addendum 1 Listed below are changes to the Lead Remediation work wrietup and bid package dated 1/26/06 for the referenced project. All other conditions and descriptions remain the same. Please be reminded that bids will be opened and read aloud on February 21, 2006 at 3:OOP.M. in the Housing and Community Development Department office at 300 W. Tryon Street, Hillsborough, N.C. 27278. The changes are as follows: D. EXTERIOR SIDING 1. Change description to read as follows: Replace damaged material on both exterior gable vents of house. NOTE: After removal work is complete, if further damage is discovered the Owner, Contractor and Rehabilitation Specialist will meet to review the work, determine a course of action and, if necessary, a cost for any additional work. Wrap existing wood trim with Tyvek. Supply and install new vinyl vented soffit material, with all associated j-channel and fitting components, over both existing gable vents in a horizontal orientation. Supply and install new pre-finished white aluminum coil stock over remaining existing wood trim, including proper transition to new gable vents, adjacent new coil stock and existing brick siding. Style and color to match existing as close as practical. Contractor to supply owner with written warranty for materials and labor. H:\HousingRehab\County\Bradshaw\LeadW orldAddendum 1.2-7-O6.doc is ORANGE COUNTY HOUSING REHABILITATION PROGRAM SPECIFICATIONS GENERAL CONSTRUCTION FOR Sheri Moore AT 8516 Union Grove Church Road, Chapel Hill DATE: 1 /24/06 By: Jim Hutcherson Housing Rehabilitation Specialist NOTE TO CONTRACTOR CONTRACTOR SHOULD REFER TO THE BASIC SPECIFICATIONS, PROPERTY REHABILITATION STANDARDS, GENERAL CONDITIONS, NORTH CAROLINA BUII.DING CODES MANUAL, AND ORANGE COUNTY 1~2II~1IMCJM HOUSING CODE DOCUMENTS. IT IS NOT THE INTENT OF THE WRITER TO DIRECT ANY CONTRACTOR TO A SPECIFIC SUPPLIER OF MATERIALS CALLED FOR IN THIS WORK WRITE-UP ONLY TO SPECIFY A TYPE THAT WOULD BE ACCEPTABLE TO THE HOMEOWNER AND ORANGE COUNTY HOUSING REHABILITATION PROGRAM. Name: Sheri. Moore _ ~ Page 2 of 14 2 9 Address: 8516 Union Grove Church Road City: Chapel Hill Phone #: 933-4087 Date: I. MAJOR SYSTEMS A. FLOOR FRAMING 1. In Living Room, remove carpet and hardwood floor cover from entire room. Remove subfloor to perimeter walls of room to expose existing floor framing. NOTE: After existing framing is exposed and before. any further work is performed, the Owner, Contractor and Rehabilitation Specialist will meet to review the work, determine if further damage exists, determine a course of action and, if necessary, a cost for any additional work. Remove five (5) deteriorated floor joists extending from front wall to intermediary wood girder. At mid-span of joists, supply and install new drop girder properly anchored and supported by screw jacks set on concrete pads and tied in to existing structure. Supply and install five (5) new joists properly anchored and supported to drop girder, tied in to existing structure, including blocking. New girder and joists to be treated wood. Supply and install new subfloor over new joists with top of subfloor to match existing. Supply and install new hardwood floor cover over subfloor with top of floor cover to match existing. Finish hardwood floor with stain and 3 coats of clear finish to match existing as close as practical. Includes new baseboard and shoe mold. Floor reconstruction work and any necessary disconnection of existing plumbing, electrical or other utilities shall be performed in an efficient, workmanlike manner so as to keep "down time" and temporary connections to a minimum. Price indicated does not include interior and exterior cosmetic repairs, patching cracks, painting, adjusting doors and windows, repair of siding, plumbing or electrical. New materials and finishes to match existing as close as practical. All work to code. 2. Replace one (1) damaged foundation vent in rear foundation wall of house, complete. New materials and finishes to match existing as close as practical. B. ROOF & GUTTER 1. Remove existing composition shingle roof cover to sheathing on house, front .porch and right side porch. NOTE: After existing roof cover is removed, if further damage is discovered the Owner, Contractor and Rehabilitation Specialist will meet to review the work, determine a course of action and, if necessary, a cost for any additional work. Replace Name: Address: City: Phone #: Date: Sheri Moore 8516 Union Grove Church Road Chapel Hill 933-4087 Page 3 of 14 3 0 flashing, roof jacks, metal nosing, plumbing boots, metal drip edge, etc.. All metal edge flashing, nosing and drip edge to be pre-finished white material. Supply and install new 25 year (minimum) composition shingle roof cover over 15# felt on house, front porch and side porch, complete. Includes shingle-type ridge ventilation system. Seal all penetrations through roof with waterproof material. Shingles at porch roofs to have 4" reveal. Style and color to match existing as close as practical. Contractor to supply owner with written warranty for materials and labor. New materials to match existing as close as practical. All work to code. 2. Supply and install new white pre-painted galvanized metal drip edge flashings, new white pre-painted. seamless Ogee style gutters on house, porch and carport with at least one downspout for each gutter and one downspout for every 30' of gutter. Color to match existing as close as practical. Each grade level downspout from house shall have a splashblock directing water away from the house. C. PLUMBING 1. In crawlspace where existing sewer line is leaking under Bathroom, clear effluent from area. Repair existing leaking sewer line to restore to proper working orde3~. Materials to match existing as close as is practical. Work shall be performed in an efficient, workmanlike manner so as to keep "down time" and temporary connections to a minimum. All work to code. 2. In Kitchen, remove existing water heater. Supply and install new insulated "table top" 40 gallon water heater at same location, including P!T valve, overflow pipe to exterior, complete. Work shall be performed in an efficient, workmanlike manner so as to keep "down time" and temporary connections to a minimum. All work to code. 3. In Kitchen, repair existing hot water line that is leaking inside of the sink cabinet. New materials to match existing as close as practical. Work shall be performed in an efficient, workmanlike manner so as to keep "down time" and temporary connections to a minimum. All work to code. 31 Name: Sheri Moore Page 4 of 14 Address: 8516 Union Grove Church Road City: Chapel Hill Phone #: 933-4087 Date: 4. In Kitchen, remove existing cold water line from sink to entry to Kitchen. Supply and install new materials to restore cold water line to proper working order. New materials to match existing as close as practical. Work shall be performed in an efficient, workmanlike manner so as to keep "down time" and temporary connections to a minimum. All work to code. 5. Remove existing Kitchen sink, faucet, p-trap assembly, supply, lines and shut-off valves. Supply and install new shut-off valves, p-trap assemble, double bowl stainless steel sink, and single-handle control faucet, complete. Work shall be performed in an efficient, workmanlike manner so as to keep "down time" and temporary connections to a minimum. All work to-code. 6. Run "snake" through Kitchen and Bathroom drain lines to clear lines and provide proper drain flow to septic system. 7. Re-attach and secure existing plumbing vent pipe on rear exterior wall. Extend all existing plumbing vents to above the roof to provide proper ventilation. D. ELECTRICAL Properly disconnect and abandon existing electrical service. Supply and install new 200 AMP electrical service to house including new breaker panel, mast, weatherhead, and grounding, complete. Work shall be performed in an efficient, workmanlike manner so as to keep "down time" and temporary connections to a minimum. Includes new circuits, breakers and proper grounding, complete. Circuits and breakers to be clearly identified. Newly installed junction boxes in attic and underfloor shall be located so they are not covered by insulation. All work to code. Name: Sheri Moore Page 5 of 14 Address: 8516 Union Grove Church Road 3 2 City: Chapel Hill Phone #: 933-4087 Date: 2~. Separate and add circuits to alleviate overloaded circuits on electrical system. HVAC,stove, water heater, washing machine and microwave to be each on separate circuits. 3. Remove existing outlets throughout interior of house. Supply and install new outlets at same locations, complete. 4. Remove existing switches throughout interior of house. Supply and install new outlets at same locations, .complete. 5. Supply and install new GFI outlet in Bathroom. $ 6. Supply and install two (2) new GFI outlets in Kitchen. $ 7. Supply and install arc fault interrupter circuits on Bedroom circuits. $ 8. Supply and install new electrical to accommodate installation of new "direct-wired" smoke detectors in Hall and each Bedroom. Supply and install new "direct-wire" smoke detectors, complete. 9. Supply and install new electrical in attic to accommodate one new light fixture adjacent to attic access, including one switch control located in crawlspace within 3 l.f. of access door. and supply and install fixtures, complete. 10. Supply and install new electrical in attic to accommodate installation of new HVAC system, complete. Name: Sheri Moore Page 6 of 14 3 3 Address: 8516 Union Grove Church Road City: ~ Chapel Hill Phone #: 933-4087 Date: 11. Supply and install new outlet in attic adjacent to new heating unit. 12. Supply and install new electrical to accommodate installation of new range hood. Supply and install new ducted range hood, ducted to the exterior, complete. 13. Remove existing exterior light fixture on front porch. Supply and install new exterior light fixture at same location, complete. New fixture to match existing as close as practical. 14. Remove existing exterior light fixture on right side porch. Supply and install new exterior light fixture at same location, complete. New fixture to match existing as close as practical. E. MECHANICAL 1. Remove existing heating system. Supply and install new split system, natural gas HVAC system, minimum 13 SEER, with insulated ductwork to each room of the house. Heating unit to be installed in attic. Includes all necessary gas, mechanical and electrical connections, all venting, new thermostat control, and concrete pad for condenser unit, complete. F. WINDOWS & SCREENS 1. Remove windows and frames at eight (8) locations to accommodate installation of new vinyl replacement window inserts. Supply and install new double-hung, dual-pane vinyl replacement window inserts with full screen, complete. New windows to match new window in Bathroom. Name: Sheri Moore Page 7 of 14 3 4 Address: 8516 Union Grove Church Road City: Chapel Hill Phone #: 933-4087 Date: G. INSULATION & WEATHERIZATION 1. Supply and install blown-in insulation of R-30 value to entire attic, complete. H. INTERIOR PAINTING 1. Fully prepare all interior ceiling, wall, door and trim surfaces to receive new paint. Includes prime new crown molding, prime new sheetrock, and prime any new or "raw" materials. Paint crown molding, trim, door casing and doors with interior semi-gloss latex enamel. Paint Kitchen and Bathroom walls and ceilings with interior semi-gloss latex enamel. Paint all other walls and ceilings with interior flat latex. Restore all surfaces to proper working order. Finish paint shall provide sufficient coverage to prevent previous colors from showing through. Color to match existing as close as practical. Protect glass, floor covering, vegetation and personal possessions with appropriate temporary coverings and enclosures. I. GENERAL REPAIRS Remove existing block chimney to below roof line and properly cap-off remaining top. Supply and install replacement roof sheathing to accommodate installation of new roof cover. New materials to match existing as close as is practical. 2. Remove approximately 74 l.f. of soffit. from front and rear of house. NOTE: A$er soffit materials are removed, if further damage is discovered the Owner, Contractor and Rehabilitation Specialist will meet to review the work, determine a course of action and, if necessary, a cost for any . additional work. Prepare soffit areas for installation of new vinyl vented soffit. Supply and install new vinyl vented soffit and to restore to proper working order. New materials and finishes to match existing as close as practical. Name: Sheri Moore Page 8 of 14 3 5 Address: 8516 Union Grove Church Road City: Chapel Hill - Phone #: 933-4087 Date: 3. Remove approxunately 4 l.f. of damaged trim and fascia on left front corner of house. NOTE: After trim and fascia materials are removed, if further damage is discovered the Owner, Contractor and Rehabilitation Specialist will meet to review the work, determine a course of action and, if necessary, a cost for any additional work. Supply and install new fascia and trim to restore to proper working order. New materials to be primed on all sides. New materials and finishes to match existing as close as practical. 4. Remove approximately 4 l.f. of damaged trim and fascia on left rear corner of house. NOTE: After trim and fascia materials are removed, if further damage is discovered the Owner, Contractor and Rehabilitation Specialist will meet to review the work, determine a course of action and, if necessary, a cost for any additional work. Supply and install new fascia and trim to restore to proper working order. New materials to be primed on all sides. New materials and finishes to match existing as close as practical. 5. Remove approximately 8 l.f. of damaged fascia on rear of house. NOTE: After fascia materials are removed, if further damage is discovered the Owner, Contractor and Rehabilitation Specialist will meet to review the work, determine a course of action and, if necessary, a cost for any additional work. Supply and install new fascia to restore to proper working order. New materials to be primed on all sides. New materials and finishes to match existing as close as practical. 6. Supply and install new pre-finished white aluminum coil stock over all rake trim, eaves, and fascia on house and porches. Includes side panels of porches. Materials, style and color to match existing as close as practical. Contractor to supply owner with written warranty for materials and labor. 7. Remove two (2) existing gable vents and prepare areas for installation of new vents. Supply and install new pre-finished vinyl gable vents at same locations. Supply and install new plywood substrate over existing siding to support new vinyl siding. Supply and install new white vinyl siding Name: Sheri Moore Page 9 of 14 3 6 Address: 8516 Union Grove Church Road City: Chapel Hill Phone #: 933-4087 Date: over new substrate on two gables of house, including proper transition to new gable vents and to existing block walls, complete. Materials, style and color to match existing as close as practical. Contractor to supply owner with written warranty for materials and labor. 8. Remove loose mortaz and debris from concrete block steps to front porch. NOTE: After loose mortar and debris are removed, if further damage is discovered the Owner, Contractor and Rehabilitation Specialist will meet to review the work, determine a course of action and, if necessary, a cost for any additional work. Supply and install new mortar material to repair gaps and restore existing steps top proper working order. New materials and finishes to match existing as close as practical. 9. Remove existing crown molding from walls/ceilings throughout house. Prepare existing ceiling and ceiling tiles to provide uniform surface for installation of new sheetrock overlay. Supply and install new %2" sheetrock at all ceilings through interior of house, including tape and texture, complete. Supply and install new paint-grade crown molding throughout, complete. New materials and finishes to match existing as close as is practical. 10. Remove existing access door panel and framing in rear foundation wall'to accommodate installation of new access door. Supply and install new framing and new access door framed and cross-braced with 2 x 4 treated lumber and 3/a" plywood. face, galvanized metal hinges, locking hasp and lock, complete. - $ 11. Remove five (5) existing interior door panels and prepare existing door frame, jamb and trim for installation of new door panels. Supply and install new flush-panel paint-grade door panels at same locations, including all hardware, privacy locksets, door knobs, complete. New materials to match existing as close as practical. Name: Sheri Moore Address: 8516 Union Grove Church Road City: Chapel Hill Phone #: 933-408.7 Date: Page 10 of 14 3 ~ 12. In Hall, remove, existing disappearing attic access stairs. Repair existing framing to accommodate installation of new unit. Supply and install new disappearing attic access stair unit, similar to existing, including all necessary trim, complete. 13. Supply and install new address numbers on exterior of house near front door. J. SUB-AREA CLEANUP & TERMITE REPORT/TREATMENT 1. Provide pest control inspection report and chemically treat entire perimeter of house for termite and pest control. Chemical treatment to be done by a licensed termite or pest control company. Contractor to provide owner with written proof and warranty of treatment. K. SITE IlVIPROVEMENTS 1. T.n front yard at left comer of house, trim existing shrub away from house. 2. Remove two dump truck loads of owner-designated articles anti debris from exterior grounds of property. II. KITCHEN 1. Prepare existing Kitchen floor for installation of new luaun plywood underlayment. Supply and install new 1/a" luaun underlayment with a smooth top surface; and prepaze for installation of new vinyl floor cover. Supply and install new vinyl floor cover per Owner selection. Includes new baseboazd and shoe mold, caulking all seams at baseboard and shoe mold, new metal .transition strips, complete. All new materials to match existing as close as practical. 38 Name: Sheri Moore Page 11 of 14 Address: 8516 Union Grove Church Road City: Chapel Hill Phone #: 933-4087 Date: 2. Remove existing damaged cabinet floor of sink cabinet and make repairs to accommodate installation of new plywood floor. Supply and install new 3/a" plywood floor for cabinet, including seal all penetrations and seams. Prime new material and provide latex semi-gloss painted finish, complete. 3. Remove existing countertop from base cabinets. NOTE: After countertop is removed, if further damage is discovered the Owner, Contractor and Rehabilitation Specialist will meet to review the work, deternne a course of action and, if necessary, a cost for any additional work. Restore walls and base cabinets to match existing as close as is practical and accommodate installation of new formica countertop. Supply and install new formica countertop with backsplash, bullnose; and end caps, complete. 4. In existing base cabinets, remove shelves. In base cabinets, repair cabinets and shelf supports to accommodate installation of new pre-finished shelving. On base and wall cabinets, remove hinges, door and drawer pulls, and repair doors and drawers to operate properly. Clean cabinets to be ready for painting. Prime all new or "raw" surfaces of cabinets and supply and install new latex enamel finish paint to outer surfaces of existing base and wall cabinets. Supply and install new pre-finished shelves in base cabinets. Supply and install new hinges, door and drawer pulls. Restore all existing cabinets to proper working order. New materials, styles and color to match existing as close as practical. III. HALL BATHROOM 1. Remove existing vanity, toilet, medicine cabinet, light fixture, toilet paper holder, towel bars, tub/shower surrounds to bare studs, and tub. Remove existing floor covering and underlayment to subfloor. Remove all wall coverings and sheetrock from walls down to existing framing, and all ceiling coverings and sheetrock from ceiling down to existing framing. NOTE: After these items are removed, if further damage is discovered the Owner, Contractor and Rehabilitation Specialist will meet to review the work, determine a course of action and, if necessary, a cost for any additional work. At shower surround, supply and install new solid wood backing for grab bars. At tub/shower, replace existing plumbing to Name: Sheri Moore Page 12 of 14 Address: 8516 Union Grove Church Road City: ,Chapel Hill Phone #: 933-4087 Date: accommodate new single-handle tub/shower faucet control and to restore to proper working order. Supply and install new white porcelain-on-steel tub. Size of new tub to match existing as close as standard sizing will allow. Includes supply and install new finish tub/shower plumbing fixtures. 2. Supply and install new %2" moisture resistant sheetrock on walls and ceiling, including shower surround walls, complete. New surfaces to match existing as close as are practical. All work to be properly sealed so as to prevent water and moisture leakage. 3. Supply and install new standard grade sectional fiberglass shower surround walls to minimum 6' above subfloor set in mastic with soap dish, shampoo holder, and jamb and sill at window.. All work to be properly sealed so as to prevent water and moisture leakage. 39 4. Supply and install new tempered obscure glass shower enclosure, complete. All work to be properly sealed so as to prevent water and moisture leakage. 5. Supply and install two new grab bars in shower at locations by owner. All work to be properly sealed so as to prevent water leakage. Styles and colors by owner. 6. Supply and install new underlayment with a smooth top surface, and prepare for installation of new vinyl floor cover. Supply and install new vinyl floor cover per Owner selection, complete. Includes new baseboazd and shoe mold, caulking all seams at baseboard and shoe mold, new metal transition strip to Hall, complete. All new materials to match existing as close as practical. 7. Supply and install new vanity and new cultured marble vanity top with integral sink. Color of vanity top cultured marble to match color of shower surround as close as practical. Replace existing angle-stop, shutoff 40 Name: Sheri Moore Page 13 of 14 Address: 8516 Union Grove Church Road City: Chapel Hill Phone #: -933-4087 Date: valve, riser and escutcheons. Supply and install new sink faucet, complete. New materials to match existing.as close as practical. 8. Replace existing angle stop, shutoff valve, riser and escutcheon. Supply and install new toilet, including new wax ring and anchor bolts, complete. New materials to match existing as close as practical. 9. Supply and install new wall-mount light fixture above vanity, complete. New materials to match existing as close as practical. 10. Supply and install new surface-mount medicine cabinet above vanity, toilet paper holder and towel bar, complete. New materials to match existing as close as practical. TOTAL PRICE _ $ ~~~e. itf a~rl~{ 41 34' N BEDROOM BATHROOM KITCHEN i 10'4" x 10'2" 6'2" x 6'2" • 15'6" x 10'4" HALL BEDROOM BEDROOM LIVING ROOM 10'4" x 12'4" 9'0" x 12'4" 12"6" x 16'0" ~~ _~ SHERI MOORE co N L1ViNG AREA 952 sq ft 42 MEMORANDUM TO: Housing Rehabilitation Contractors FROM: Orange County Housing and Community Development DATE: February 16, 2006 RE: 8516 Union Grove Church Road, Chapel Hill -Sheri Moore Work Writeup, -Addendum 1 Listed below are changes to the General Construction work wrietup and bid package dated 1/24/06 for the referenced project. All 'other conditions and descriptions remain the same. Please be reminded that bids will be opened and read aloud on February 23, 2006 at 3:OOP.M. in the Housing and Community Development Department office at 300 W. Tryon Street, Hillsborough, N.C. 27278. The changes are as follows: G. INSULATION & WEATHERSTRIPPING 1. Add: .Includes baffles to contain insulation in each rafter bay. adjacent to exterior vented soffit. H:\HousingRehab\Counry\Bradshaw\GeneralConstruction\Addenduml.2-9-06.doc 43 ORANGE COUNTY HOUSING REHABILITATION PROGRAM SPECIFICATIONS LEAD REMEDIATION FOR Sheri Moore AT 8516 Union Grove Church Road, Chapel Hill DATE: 1/24/06 By: Jim Hutcherson Housing Rehabilitation Specialist NOTE TO CONTRACTOR CONTRACTOR SHOULD REFER TO THE BASIC SPECIFICATIONS, PROPERTY REHABILITATION STANDARDS, GENERAL CONDITIONS, NORTH CAROLINA BUILDING CODES MANUAL, AND ORANGE COUNTY MINIMUM HOUSING CODE DOCUMENTS. IT IS NOT THE INTENT OF THE WRITER TO DIlZECT ANY CONTRACTOR TO A SPECIFIC SUPPLIER OF MATERIALS CALLED FOR IN THIS WORK WRITE-UP ONLY TO SPECIFY A TYPE THAT WOULD BE ACCEPTABLE TO THE HOMEOWNER AND ORANGE COUNTY HOUSING REHABILITATION PROGRAM. Name: Sheri Moore Page 2 of 5 4 4 Address: 8516 Union Grove Church Road City: Chapel Hill Phone #: 933-4087 Date: This set of work specifications outlines work items that were found to contain -lead in concentrations above acceptable levels as set in the U. S. Department of Housing and Urban Development (HUD) standards. It is recommended that any lead hazard remediation work be conducted by workers who are certified by the state to perform lead abatement work. Lead hazard remediation work must be preformed in compliance with the regulations issued by the Secretary of Housing and Urban Development set forth in 24 CFR Part 35, et al and all applicable rules and any others issued thereunder, and all applicable Federal, State and .local rules and regulations, regarding notification, evaluation and reduction of lead-based paint hazards in .residential structures undergoing Federally-assisted construction or rehabilitation and require the elimination of lead-based paint hazards. Every contractor or subcontractor, including painting, pursuant to which such Federally-assisted construction or rehabilitation is performed, shall include appropriate provisions complying with requirements for notification, evaluation and reduction of lead-based paint hazards. The contractor~shall be allowed to include in the cost of the project the allowable fee for one (1) complete clearance inspection of the remediation work performed. The cost of any additional clearance inspections .which may be necessary will be born directly by the contractor. Contractor must submit a copy of training certification with their bid. Name: Sheri Moore Page 3 of 5 Address: 8516 Union Grove Church Road City: Chapel Hill Phone #: 933-4087 Date: Note: Prior to conducting Lead-Based Paint Abatement activities, all personnel associated with the project. should review and fully understand the requirements of ALL applicable local, state, and federal regulations that may apply to the worksite. I. WORKSITE PREPARATION A. GROUND CONTAINMENT 1. Before exterior construction, construct a work site perimeter curb of 2x4 timbers ten (10) feet from the house exterior. Create an outer barrier of flags and/or plastic tape three (3) feet on center and twenty (20) feet from the worksite. Post proper signage in the work area. All warning signs must remain posted until cleazance is passed. 45 2. During the period of work on all exterior components attach one layer of 6-mil polyethylene to the building- exterior with furring strips, extending the (10) feet past the work site. Wrap the plastic under the perimeter 2x4's. Change the plastic daily. B. CLEARANCE E~i;AMINATION 1. After completion of all work that disturbed LBP and any other lead hazard reduction activities, a qualified person shall perform a clearance examination.. Work disturbing lead-based paint is not considered complete until clearance is achieved. C. PRE-CLEAN 1. Pre-clean the interior of the unit in all areas that Lead Paint was disturbed. HEPA vacuum all horizontal surfaces, to include all floors, windowsills, troughs, baseboards and casing. Name: Sheri Moore Page 4 of 5 4 6 Address: 8516 Union Grove Church Road City: Chapel Hill Phone #: 933-4087 Date: II. ABATEMENT WORK A. EXTERIOR DOORS 1. Remove existing front storm door and front door includiung frame, and trim. Supply and install new exterior, pre-hung, metal-clad, six-panel front door, including all hardware, keyed entry door knob, deadbolt, peep hole, and trim, complete. Supply and install new vinyl-clad storm door, including all hardware, pneumatic closure, lockable entry latch, complete. New trim to match existing as close as practical. 2. Remove existing rear storm door and rear door including frame, and trim. Supply and install new exterior, pre-hung, metal-clad, nine-light door, including all hardware, keyed entry door knob, deadbolt, and . trim, complete. Supply and install new vinyl-clad storm door, including all hardware, pneumatic closure, lockable entry latch, complete. New trim to match existing as close as practical. B. WINDOWS & SCREENS 1. Remove existing Bathroom windows and frames to accommodate installation of new vinyl replacement window insert. Supply and install new double-hung, dual-pane vinyl replacement window insert with full screen. Sizes to match existing as close as practical. C. INTERIOR WORK 1. In Bathroom, remove existing chair rail trim material. 2. In Kitchen, remove existing baseboard throughout entire room. TOTAL PRICE $ Pq~ S ~-.s" 47 34' co N BEDROOM BATHROOM KITCHEN ~ 10'4" x 10'2" 6'2" x 8'2" 15'6" x 10'4" HALL ~- BEDROOM BEDROOM LIVING ROOM 10'4" x 12'4" 9'0" x 12'4" 12"6" x 16'0" 34' SHERI MOORS N LIVING AREA 952 sq ft 48 MEMORANDUM TO: Housing Rehabilitation Contractors FROM: Orange County Housing and Community Development DATE: February 16, 2006 RE: 8516 Union Grove Church Road, Chapel Hill -Sheri Moore Work Writeup -Addendum 1 Listed below are changes to the Lead Remediation work wrietup and bid package dated 1/24/06 for the referenced project. All other conditions and descriptions remain the same. Please be reminded that bids will be opened and read aloud on February 23, 2006 at 3:OOP-.M. in the Housing and Community Development Department office at 300 W. Tryon Street, Hillsborough, N.C. 27278. The changes are as follows: A. EXTERIOR DOORS Add: Includes prep, prime and finish paint new front door. 2. Add: Includes prep, prime and finish paint new rear door. H:\HousingRehab\County\Moore\Addendum 1.2-16-O6.doc