LANDFILL RESERVE FUND FOR EQUIPMENT REPLACEMENT
This fund was established to fund replacement of major equipment without the incurrance
of debt. The funds required are based upon an equipment replacement schedule which
indentifies needs through the fiscal year 2004-05. Items considered for funding from this
reserve costs $20,000 or above. Examples of some of the equipment items are as follows:
1997-98 appropriation includes -
Catapillar $350,000
Wheel Loader 93,844
frontloading refuse truck 142,329
Future items include Dozers, backhoes, various types of trucks, compactors etc.
2/2/97
LANDFILL FUND -RESERVE FOR EQUIPMENT REPLACEMENT
YEAR CONTRIBUTION OUTLAY RESIDUAL.
97-98 Est. 97-98 Est.
88-89 50,000 50,000
89-90 109,300 159,300
90-91 273,819 433,119
91-92 350,415 783,534
92-93**'` 242,411 215,545 810,400
93-94 0 234,500 575,900
94-95 175,000 252,000 498,900
95-96 216,000 317,000 397,900
96-97 275,000 255,504 417,396
97-98 385,000 601,000 201,396
98-99 475,000 305,000 371,396
99-00 50,000 0 921,396
00-01 550,000 609,000 862,396
01-02 550,Op0 504,000 908,396
02-03 550,000 506,000 952,396
03-04 550,000 509,500 992,896
04-05 550,000 364,000 1,178,896
TOTAL* $5,851,945 $4,673,049
* TOTALS are for the life of the fund which began in FY 1988/89
Note: Replacement schedule assumes the continuation of landfill operations beyond 2004/05.
t~
~n
i
LANDFILL RESERVE FUND FOR EUBANKS CONSTRUCTION
This fund was established to accumulate funds for payment of the costs of developing
additional cells at the current landfill site. This eliminates the incurrence of dept for these
major undertakings. Items included on the chart:
94-95 - $3,038,500 represents payments for the first 2 cells
97-98 - $1,550,000 current cell development (bids to be received Dec)
00-O1 - $1,610,000 last cell development
03-04 - $ 680,000 Closure Costs
2/6/97
SEE ATTACHED
LANDFILL FUND -RESERVE FOR EUBANKS CONSTRUCTION
g--~
YEAR CONTRtBUTfON TO RESERVES**"` OUTLAY*** RESIDUAL
96-97 Estimate 97-98 Rev. Est. 96-97 Estimate 97-98 Rev. Est.
88-89 1.00,000 ---- 100,000
89-90 300,000 ---- 400,000
90-91 250,000 ---- 650,000
91-92 550,000 ---- 1,200,000
92-93 650,000 ---- 1,850,000
93-94 567,000 0 .2,417,000
94-95 835,000 3,038,500 213,500
95-96 855,000 0 1,068,500
96-97 670,000 670,000 272,000 1,466,500
97-98 680,000 400,000 1,990,000 1,550,000 316,500
98-99 690,000 420,000 0 0 736,500
99-00 690,000 440,000 0 0 1,176,500
00-01 690,000 440,000 2,220,000 1,610,000 6,500
01-02 ~ 225,000 225,000 0 0 231,500
02-03 225,000 225,000 0 0 456,500
03-04 225,000 225,000 680,000 680,000 1,500
04-05 0 0 0 0 1,500
TOTAL"* $7,152,000 $7,150,500
k'
"TOTAL amounts for the life of the reserve begun in FY 1988-89
"" 1997-98 revised estimates reflect an estimated cost savings for landfill cell construction based upon rnosl recer~t
engineering cost estimates and use of landfill staff and equipment for portions of construction project
~.
LANDFILL RESERVE FOR ACQUISITIONS AND CONSTRUCTION
The fund is established to accumulate funds to assist with the acquisition of land and
construction related to future landfill sites. The activity (outlays) in this fund were for the
following purposes. -
95-96 - Purchase of Neville and Johnson tracts. $202,450
97-98 - Purchase of Wilson property and engineering services related to site
search. $214,300.
Significant increases in contributions to this fund begin in the year 2001-02. This is due to
an equal amount of reduced contributions in the Eubanks Construction Reserve
2/6/97
SEE ATTAC~D
LANDFILL FUND -RESERVE FOR ACQUISITIONS & CONSTRUCTION
YEAR CONTRIBUTION TO RESERVES OUTLAY RESIDUAL
96-97 Estimate 97-98 Revised Estimate
89-90 100,000 0 100,000
90.91 110,000 0 210,000
g 1.92 110,000 . ~ 0 320,000
92.93 130,000 _ 0 450,000
93.94 110,000. 0 560,000
94-95 135,000 _ 0 695,000
95-96** 160,000 202,450 652,550
96.97 185,000 _
0 837,550
97-98*** 210,000 210,000 _
214,300 833,250
98-gg 235,000 235,000 _
0 1,068,250
99-00 260,000 260,000 _
0 1,328,250
00-01 285,000 285,000 _
0 1,613,250
01-02 700,000 500,000 0 2,113,250
02-03 700,000 500,000 0 2,613,250
03-04 700,000 500,000 0 3,113,250
04-05 925,000 725,000 0 3,838,250
TOTAL* $4,255,000 $416,750
* TOl'AL amounts for the life of the reserve begun in FY 19f39-90
" 1995-96 outlay for purchase of Neville tract and Johnson tract
`*"1997-9d outlay for purchase of Wilson property and professional services related to landfill site search
""" Note that contribution increases substantially in 2001-02 due to an equal reduction in contribution to reserves
for Fuhanks construction. ,~