HomeMy WebLinkAboutAgenda - 03-17-1998 - 9cORANGE COUNTY
BOARD OF COMMISSIONERS
ACTION AGENDA ITEM ABSTRACT
Meeting Date: March 17, 1998
1
Action Agenda
Item
SUBJECT: ADVERTISEMENT FOR JOINT PLANNING PUBLIC HEARING - April 8,1998
DEPARTMENT: PLANNING PUBLIC HEARING: Yes _x—No
BUDGET AMENDMENT REQUIRED: Yes _x No
ATTACHMENT(S):
- Proposed Notice of Public Hearing
- Executive Summary of Carrboro Proposals
- Proposed Amendment on Development Moratoria
- Inna Deng Amendment Application
- Executive Summary of Chapel Hill Proposal
INFORMATION CONTACT: Gene Bell
TELEPHONE NUMBERS:
Hillsborough
-732-8181
Durham
-688-7331
Mebane
-227-2031
Chapel Hill
-967-9251
Extension 2589
PURPOSE: To consider the legal notice for the Joint Planning Area (JPA) Public Hearing scheduled
for April 8, 1998.
BACKGROUND: The Joint Planning Agreement requires that Orange County and the Towns of Chapel Hill
and Carrboro conduct a Joint Public Hearing when amendments to the JPA Land Use
Plan, JPA Land Use Map, or JPA Agreement are proposed. Past practice has been to
schedule two JPA hearings per year, one in the spring and the other in the fall.
On March 4, 1998, Planning Staff presented a report on items proposed for the April 8
JPA Public Hearing. Board guidance in scheduling was requested due to the number, as
well as the complexity of some of the items. In presenting the report, Planning Staff
incorrectly interpreted the intent of the Chapel Hill Town Council with regard to the
Chapel Hill Northwest Small Area Plan. Staff reported that "...it is recommended that
consideration of the Northwest Small Area Plan go forward and that no action be taken
on those parts of the plan which pertain to the Greene Tract." This was a
recommendation to the Council by the Landfill Owners Group. The Chapel Town
Council has not taken a position on the recommendation. The Council asked that the
Northwest Small Area Plan be considered with the Carrboro Small Area Plan. This
approach would allow public comment on recommendations for the Greene Tract as well
as other features of the plans.
2
The next JPA public hearing is scheduled for Wednesday, April 8, 1998. The following
items (all of which require the approval of the governing boards of Orange County,
Chapel Hill, and Carrboro) are proposed for consideration at the public hearing:
DEVELOPMENT MORATORIA
This request is to amend the Joint Planning Agreement by adding Sections 23C
and 2AC to provide for the adoption of temporary moratoria to preserve the
status quo while developing implementing ordinances for adopted plans or during
consideration of new plans and ordinances.
%311
This request is to amend the Joint Planning Area Land Use Plan and Map to
incorporate JPA -2 -98 - Facilitated Small Area Plan for Carrboro's Northern
Study Area. The amendment also removes text and map references to the
division of Carrboro's Transition Area into Transition Area I and II.
2. This request is to amend Sections 1.2, 2.1 and 2.6E of the Joint Planning
Agreement to delete reference to the division of Carrboro's Transition Area into
Transition Area I and II and provide a process to allow Carrboro to approve a
floating conditional use district under the ordinance administration provisions of
the Joint Planning Agreement.
TOWN OF CHAPEL HILL
This request is to amend the Joint Planning Area Land Use Plan and Map to
incorporate JPA -3 -98 - Chapel Hill Northwest Small Area Plan.
CITIZEN INITIATED REQUEST
1. This request by Ms. Inna Deng - JPA -1 -98 - is to amend the Joint Planning Area
Land Use Plan and Map by expanding the Chapel Hill Transition plan category to
include two tracts she owns on the north side of Eubanks Road. The tracts are
referenced as lots 27 and 27E, Tax Map 18, Chapel Hill Township and contain
8.08 and 3.62 acres respectively. They are located in a small rectangular segment
of the Rural Buffer category bordered to the north and west by the Blackwood
Division of Duke Forest and to the east and south by Chapel Hill Transition. The
area contains approximately 57 acres and is composed of 10 properties. Joint staff
review of the request recommends consideration of the entire area for inclusion in
Chapel Hill Transition as proposed in the DRAFT Chapel Hill Northwest Small
Area Plan.
RECOMMENDATION: The Administration recommends approval of the attached advertisement for the
JPA Public Hearing on April 8, 1998.
3
NOTICE OF PUBLIC HEARING
ORANGE COUNTY BOARD OF COMMISSIONERS
CHAPEL HILL TOWN COUNCIL
CARRBORO BOARD OF ALDERMEN
A public hearing will be held at the new Southern Human Services Center, 2501 Homestead
Road, Chapel Hill, North Carolina, on Wednesday, April 8, 1998 at 7:30 p.m. for the purpose of
giving all interested citizens an opportunity to speak for or against proposed amendments to the
JOINT PLANNING AGREEMENT AND JOINT PLANNING AREA LAND USE PLAN AND
MAP. All amendments require the approval of the governing boards of Orange County, Chapel
Hill, and Carrboro. Proposed amendments include:
DEVELOPMENT MORATORIA
This request is to amend the Joint Planning Agreement by adding Sections 2.3C and
2AC to provide for the adoption of temporary moratoria to preserve the status quo while
developing implementing ordinances for adopted plans or during consideration of new
plans and ordinances.
1. This request is to amend the Joint Planning Area Land Use Plan and Map to incorporate
JPA -2 -98 - Facilitated Small Area Plan for Carrboro's Northern Study Area. The
amendment also removes text and map references to the division of Carrboro's
Transition Area into Transition Area I and II.
2. This request is to amend Sections 1.2, 2.1 and 2.6E of the Joint Planning Agreement to
delete reference to the division of Carrboro's Transition Area into Transition Area I and
II and provide a process to allow Carrboro to approve a floating conditional use district
under the ordinance administration provisions of the Joint Planning Agreement.
TOWN OF CHAPEL HILL
1. This request is to amend the Joint Planning Area Land Use Plan and Map to incorporate
JPA -3 -98 - Chapel Hill Northwest Small Area Plan.
CITIZEN INITIATED REQUEST
1. This request by Ms. Inna Deng - JPA -1 -98 - is to amend the Joint Planning Area Land
Use Plan and Map by expanding the Chapel Hill Transition plan category to include
two tracts she owns on the north side of Eubanks Road. The tracts are referenced as lots
27 and 27E, Tax Map 18, Chapel Hill Township and contain 8.08 and 3.62 acres
respectively. They are located in a small rectangular segment of the Rural Buffer
category bordered to the north and west by the Blackwood Division of Duke Forest and
to the east and south by Chapel Hill Transition. The area contains approximately 57
acres and is composed of 10 properties. Joint staff review of the request recommends
consideration of the entire area for inclusion in Chapel Hill Transition as proposed in the
DRAFT Chapel Hill Northwest Small Area Plan.
The specific text amendments proposed as described in this notice are available for public
inspection at the Orange County Planning Department.
All interested citizens are invited to attend this hearing and be heard. Public comment will be
received during the public hearing. Following the close of the public hearing, only evidence
received in writing by the date of the Orange County Planning Board meeting following the
public hearing will be considered by the Board of Commissioners for decision. Changes may be
made in the advertised proposals which reflect debate, objections and discussion at the hearing.
Questions regarding the proposals may be directed to the Orange County Planning Department
located in the Planning and Agricultural Center, 306F Revere Road, Hillsborough, North
Carolina. Office hours are from 8:00 a.m. to 5:00 p.m. Monday through Friday. Phone inquiries
should be directed to 732 -8181 (Hillsborough), 688 -7331 (Durham), 967 -9251 (Chapel Hill
/ Carrboro) or 227 -2031 (Mebane /Graham). Please ask for extension 2575 or 2585. You will be
directed to a staff member who will answer your questions.
Specific questions regarding the Carrboro proposals should be directed to the Carrboro Planning
Department located in the Carrboro Town Hall, 301 West Main Street, Carrboro, North
Carolina. Office hours are from 8:30 a.m. to 5:00 p.m. Monday through Friday. Phone inquiries
should be directed to 968 -7713.
Specific questions regarding the Chapel Hill proposals should be directed to the Chapel Hill
Planning Department located in the Chapel Hill Municipal Building, 306 North Columbia
Street, Chapel Hill, North Carolina. Office hours are from 8:30 a.m. to 5:00 p.m. Monday
through Friday. Phone inquiries should be directed to 968 -2728.
R. Eugene Bell, Acting Planning Director
PUBLISH: Chapel Hill Herald
March 26, 1998
April 2, 1998
4
5xseu7qv$ s70M,4n
Facilitated Small Area Plan
for
Carrboro's Northern Study Area
FINAL DRAFT
Implementation Strategy
Maas aceo&d 4 ae V"ue 4 r46�
An w t 19. 1997
Suaw" ;DwAawd 4 the 6=14w
25, iffy
EXECUTIVE SUMMARY
Northern Study Area Facilitated Small Area Plan and Implementation Strategy
Background
In February 1992, the Board of Aldermen for the Town of Carrboro determined that a
comprehensive planning effort was needed for those areas of the town's jurisdiction which are
expected to receive the bulk of any growth and development occurring in the coming years.
Under population projections at the time, this growth was expected to include nearly 12,000 new
residents by the year 2010, and associated civic, business, and commercial ventures. Due to
environmental constraints associated with the protection of the University Lake water supply to
the south and west of Carrboro, growth was expected to occur primarily to the north and east of
the town, areas where public water and sewer service could be extended.
The projected growth areas include property located along the northeastern border of
Carrboro and Chapel Hill, most of which was within the Town's Extraterritorial Jurisdiction, and
the areas designated Transition Areas One and Two by the 1987 Joint Planning Agreement. The
bulk of this area was located outside of the city limits, but within the Town's planning
jurisdiction, and was termed
Town of Canboro
and Planning Jurisdiction
Showing limits of Northern Study Are
FobnMr 10612"
PfnWeC DqP-. RAW
the Northern Study Area
(NSA).
It was decided that this
planning effort would take the
form of a small area plan and
that a group of citizens which
included residents, property -
and business- owners from
within the town and study area,
would participate in the
process.
By late 1993, the
planning process was
underway, with Town staff
providing support to the 31-
member Small Area Plan Work
Group. In February 1996, a
public hearing on the Small
Area Plan for Carrboro's
Northern Study Area -
Proposed Draft for
Presentation was held. Due to
the issues raised during the
hearing, the Board of
Aldermen proposed that a
facilitated planning conference
be held, at which a consensus
plan would be developed. A
Facilitated Small Area Plan and Implementation Strategy - Executive Summary Page 1
Steering Committee made up of elected officials and residents of the study area was established
to plan the workshop.
The planning conference took place on two Saturdays, approximately one month apart,
in the Spring of 1997, with staff of the Orange County Dispute Settlement Center serving as
facilitators and Randall Arendt of the Natural Lands Trust providing professional planning
assistance. As the plan primarily affected development in the unincorporated portions of
Carrboro's planning jurisdiction, funds for the conference were provided by all three parties to
the Joint Planning Agreement, Carrboro, Chapel Hill and Orange County. Approximately 150
citizens participated in the process. The original plan was revised in accordance with the
consensus of the participants and the Facilitated Small Area Plan for Carrboro's Northern Study
Area FINAL DRAFT was presented to, and accepted by, the Board of Aldermen on August 12,
1997.
Plan Elements
During the nearly five years of planning for development in the Northern Study Area
through the year 2010, careful attention was paid to balancing the interests of the landowners in
the NSA with the interests of all Carrboro's citizens. Population estimates prepared by the
Office of State Planning during the course of the five -year planning process reveal that
Carrboro's municipal population had grown from 12,786 to 14, 652, a growth rate of 3.6 percent
per year.
TOWN OF CARRBORO, NORTH CAROLINA
1960 - 2010 POPULATION AND PROJECTIONS
1,997 5,058 8,118 12,136 12,786 13,048 14,652 16,874 23,917
Sources: 1960 - 1990, US Census/NC Department of Administration
1992 - 2010 Town of Carrboro Planning Department/State of North Carolina, Office of State Planning
The management of all new development associated with approximately 9,300 new
residents is to parallel both the preservation and protection of natural, social, aesthetic, and
economic characteristics of the northern study area, and the support of Carrboro's small -town
character, as well as the enhancement of quality of life for all.
The resulting plan proposes to cluster a bulk of the new residential development by
encouraging village -scale development, conservation of natural and environmentally sensitive
areas, allows density bonuses for affordable housing meeting certain development criteria, and
sanctions neighborhood- and community -scale commercial centers. The overall target density
for the northern Study Area is approximately the same as the current density of the town: 2.1
dwelling units per acre. The target densities for mixed use areas is approximately five dwelling
units per acre. These development management options have been selected in order to minimize
the negative impacts of new development on environmental quality, transportation, taxation, and
existing neighborhoods. These elements should discourage a sprawled pattern of monotonous
development, preserve Carrboro's unique, small town character, and allow the creation of new,
neighborhood -scale communities which can be connected to existing and new areas via a
network of open space corridors. Ten goals and supporting objectives were established by the
planning process for the Northern Study Area. The goals are noted below.
Facilitated Small Area Plan and Implementation Strategy - Executive Summary Page 2
1. Patterns ofgrowth which minimize negative impacts and maximize positive impacts on the
community.
2. Patterns of growth which allow for the efficient provision of town services
3. Conservation of natural and environmentally sensitive areas, and the protection of
environmental quality.
4. A variety of housing types and price levels.
S. A variety of transportation routes, which allow for bus, automobile, bicycle, and pedestrian
modes of transportation.
6 Adequate provision ofpublicly accessible parks and recreation facilities.
7. Continuation of Carrboro 's small -town character and preservation of its existing
neighborhoods.
8. A pedestrian -scale
community.
9. Continuation of the
character and natural
beauty of the study area
10. Encourage active farmland
preservation.
Governmental Coordination
and Action Required
The town's planning
jurisdiction over much of the
study area was established by
the 1987 Joint Planning
Agreement between Carrboro,
Chapel Hill and Orange
County. The agreement is
linked to the Joint Planning
Area Land Use Plan, adopted
in 1987. The terms of this
agreement require joint
approval by all three
governments for any changes
to the plan or agreement, joint
approval by Orange County
and Carrboro of all rezoning
RECOMMENDED
SMALL AREA PLAN
within the transition areas, and allow objections by Orange County to any land use ordinance
amendments to disallow any proposed changes
M
Facilitated Small Area Plan and Implementation Strategy - Executive Summary Page 3
0
Implementation
An Ordinance Drafting Committee was established by the Board of Aldermen on
September 16, 1997 to develop regulations which would implement the plan. Recognizing the
uncertainty which might have been created as to the effect of revisions to the land use ordinance
on any pending development applications, a six -month moratorium on the review of Special and
Conditional Use Permit applications was placed on the Northern Study Area. Between
November, 1997 and May, 1998, the moratorium will prevent the review of development
applications which might be rendered obsolete by any ordinance amendments, as well as
preserve the status quo of major tracts of land located within the Northern Study Area.
Now in its fifth month of work, the drafting committee has submitted joint planning
amendments to the Board of Aldermen and Orange County staff for review, and has identified
regulatory changes which are needed to support the key elements of the plan. Amendments to
the Town of Carrboro Land Use Ordinance and supporting design standards have not yet been
completed. Implementation of the NSA plan requires changes in each of the three categories of
governmental action noted in the previous section.
The JPA Agreement must be amended to eliminate the one- unit - per -acre cap on density
within the transition area, and to allow the Carrboro Board of Aldermen to establish
the floating traditional neighborhood and office /assembly districts without requiring
joint action by Orange County. This amendment is scheduled for review by all three
governing boards at a public hearing on April 8. At this same meeting, the Joint
Planning Area Land Use Plan needs to be amended to adopt by references the NSA
plan and to delete the language that caps the density.
Amendments to the Town of Carrboro Land Use Ordinance must be adopted by the
Board of Aldermen, without objection by the Orange County Board of Commissioners.
A draft of the ordinance changes has been prepared and will be submitted as
background material for review at the JPA public hearing in April. The new ordinance
provisions generally include the following: residential development based on net
density; additional open space provisions regarding the conservation of scenic
viewsheds, historic and cultural features, tree -lined corridors, and prime agricultural
soils; a traditional neighborhood village district; an office /assembly district; incentives
for the development of affordable housing; development performance standards; and
design guidelines for affordable housing and the village district. These provisions may
be applicable to other areas in Carrboro's planning jurisdiction
• The official zoning map applicable to Carrboro's transition area will be amended to
reflect the base zoning determined for the area. This may occur in conjunction with
the JPA amendments in April, or may take place at a later date during a joint meeting
between the Board of Aldermen and the Orange County Board of Commissioners. The
rezoning must follow, or occur concurrently with, the land use ordinance amendments.
Joint Public Hearing
Resolutions addressing two of these steps have been prepared and forwarded to Orange
County for review. A joint meeting of all three governing bodies has been scheduled for April 8,
1998. The resolutions are presented on the following pages.
Facilitated Small Area Plan and Implementation Strategy - Executive Summary Page 4
e
10
Resolutions Requiring Action by Orange County, Chapel Hill and Carrboro
Joint Planning Area Agreement Amendment
JOINT PLANNING AGREEMENT AMENDMENT
Whereas, Orange County. the Town of Chapel Hill, and the Town of Carrboro entered into a
Joint Planning Agreement, dated September 22. 1987, as amended April 2. 1990; and
WHEREAS, A Small Area Plan that provides a framework for the future use of land within
Carrboro's northern growth area was accepted by the Carrboro Board of Aldermen on August
19,1997; and
WHEREAS, the Small Area Plan was the product of a four year planning process that involved
numerous public officials, planners, and residents of the affected area culminating in a two -day
facilitated workshop sponsored by Orange County, Chapel Hill, and Carrboro, and
WHEREAS, the geographic area covered by the Small Area Plan includes Carrboro's Transition
Area as identified in the Joint Planning Agreement; and
WHEREAS, implementation of the recommendations contained in the Small Area Plan requires
certain amendments to the Joint Planning Agreement;
NOW, THEREFORE, the Joint Planning Agreement is hereby amended as follows:
1. Section 1.2 (Definitions) of the Agreement is amended by deleting from subsection H
( "Transition Area ") everything after the first three sentences. (The deleted language divides
Carrboro's Transition Area into Transition Area I and Transition Area 11 and prohibits the density of
Transition Area II from exceeding one unit per acre until at least 75% of the area within Transition
Area I meets certain developmental thresholds).
2. Section 2.1 (Standards Within the Transition Area) of the Agreement is amended by
deleting the last sentence of paragraph B, which provides -. "Transition Area II shall have density
limited pursuant to Section 1.2H."
3. Subsection 2.6E of the Agreement is amended by rewriting the second sentence and
by adding a new third sentence to read as follows- "With respect to property that is located within
the CJDA Transition area, changes in zoning classifications, other than changes to the "floating"
conditional use districts designed to implement the recommendations of the "Facilitated Small Area
Plan for Carrboro's Northern Study Area (i.e. changes to Carrboro's Traditional Neighborhood
conditional use district or Office /Assembly conditional use district) may not be made unless and until
an ordinance approving such zoning map amendment has been approved both by Orange County and
Carrboro following a joint public hearing by the two governing bodies. Changes to the foregoing
conditional use districts within the CJDA Transition area may be approved by Carrboro without
Orange County's concurrence. but subject to the provisions of Section 2.3 of this Agreement
regarding permit administration."
THIS AMENDMENT TO THE JOINT PLANNING AGREEMENT is entered into
this day of 1998.
Joint Planning Area Land Use Plan Amendment
A RESOLUTION AMENDING THE JOINT PLANNING AREA LAND USE PLAN
WHEREAS, Orange County, the Town of Chapel Hill, and the Town of Carrboro entered into a
Joint Planning Agreement, dated September 22, 1987. as amended April 2, 1990, and
Facilitated Small Area Plan and Implementation Strategy -,Executive Summary Page 5
11
WHEREAS, pursuant to the Joint Planning Agreement, a Joint Planning Area Land Use Plan was
adopted on October 13. 1986 by all parties to the Joint Planning Agreement, and has since been
amended on several occasions; and
WHEREAS, A Small Area Plan that provides a framework for the future use of land within
Carrboro's northern growth area was accepted by the Carrboro Board of Aldermen on August 19,
1997, and
WHEREAS, the Small Area Plan was the product of a four yew planning process that involved
numerous public officials, planners, and residents of the affected area, culminating in a two -day
facilitated workshop sponsored by Orange County, Chapel Hill, and Carrboro; and
WHEREAS, the geographic area covered by the Small Area Plan includes Carrboro's Transition
Area as identified in the Joint Planning Agreement, which area is also covered by the Joint Planning
Area Land Use Plan; and
WHEREAS, implementation of the recommendations contained in the Small Area Plan requires
certain amendments to the Joint Planning Area Land Use Plan;
NOW THEREFORE, THE (ORANGE COUNTY BOARD OF COMMISSIONERS] [CHAPEL HILL
TOWN COUNCIL] [CARRBORO BOARD OF ALDERMEN] HEREBY RESOLVES THAT THE JOINT
PLANNING AGREEMENT BE AMENDED AS FOLLOWS:
1. Section VII of the Plan ( "Overview of Implementation Strategies ") is amended on
page 91 by adding under the heading "Coordination with other Plans" a second paragraph to read as
follows: "Without limiting the generality of the foregoing, the "Facilitated Small Area Plan for
Carrboro's Northern Study Area," accepted by the Carrboro Board of Aldermen on August 19. 1997, is
specifically incorporated by reference into this Plan and supersedes any provisions of this Plan that are
inconsistent with the Small Area Plan with respect to the CJDA Transition area. ".
2. Section V of the Plan ( "Joint Planning Operating Principles ") is amended on page 59
by deleting the entire first paragraph at the top of the page, which begins with "The portion of the
Transition Area...." and includes numbered subparagraphs 1 through 5. (The deleted language divides
Carrboro's Transition Area into Transition Area I and Transition Area 11 and prohibits the density of
Transition Area 11 from exceeding one unit per acre until at least 75% of the area within Transition
Area I meets certain developmental thresholds).
3. Section VI of the Plan ("Future Land Use - Joint Planning Area ") is amended on page 71 by
deleting from the first paragraph under the heading "Transition Areas" everything after the first two
sentences. (The deleted language references and describes -the division of Carrboro's Transition Area
into Transition Area I and Transition II as described above).
This resolution shall become effective upon adoption by the governing bodies of Orange
County, Chapel Hill, and Carrboro.
Draft Zoning May Amendment Resolution - Requires Action by Orange
County and Carrboro
AN ORDINANCE AMENDING THE OFFICIAL ZONING MAP APPLICABLE TO THE
TOWN OF CARRBORO'S TRANSITION AREA
WHEREAS, Orange County, the Town of Chapel Hill, and the Town of Carrboro entered into a
Joint Planning Agreement dated September 22, 1987, as amended April 2,1990; and
WHEREAS, pursuant to the Joint Planning Agreement, Carrboro prepared and Orange County
adopted a Zoning Map for the Carrboro Transition Area; and
Facilitated Small Area Plan and Implementation Strategy - Executive Summary Page 6
12
WHEREAS, under the Joint Planning Agreement, changes in zoning classifications that affect
properties within the Carrboro Transition Area must be approved by both Carrboro and Orange
County following a joint public hearing held by the two governing bodies; and
WHEREAS, A Small Area Plan that provides a framework for the future use of land within
Carrboro's northern growth area was accepted by the Carrboro Board of Aldermen on August 19,
1997; and
WHEREAS, the Small Area Plan was the product of a four year planning process that involved
numerous public officials, planners, and residents of the affected area, culminating in a two -day
facilitated workshop sponsored by Orange County, Chapel Hill, and Carrboro; and
WHEREAS, the geographic area covered by the Small Area Plan includes Carrboro's Transition
Area as identified in the Joint Planning Agreement, which area is also covered by the Joint Planning
Area Land Use Plan; and
WHEREAS, The Small Area Plan was incorporated into the Joint Planning Area Land Use Plan
by the joint action of Orange County, Chapel Hill, and Carrboro; and
WHEREAS, implementation of the recommendations contained in the Small Area Plan requires
certain amendments to the Zoning Map applicable to properties within the Carrboro Transition Area;
NOW THEREFORE, THE [ORANGE COUNTY BOARD OF COMMISSIONERS] [CARRBORO
BOARD OF ALDERMEN] ORDAINS:
Section 1. The Zoning Map applicable to properties within the Carrboro Transition Area as
shown on Exhibit A, is hereby adopted by reference and supersedes the previous Zoning Map
applicable to such properties, as shown on Exhibit B. All properties whose zoning classifications are
changed by the adoption of Exhibit A are listed on Exhibit C, which identifies such properties and
lists the previous and the new zoning classifications.
Section 2. All provisions of any ordinance in conflict with this ordinance are repealed.
Section 3. This ordinance shall become effective upon adoption.
Facilitated Small Area Plan and Implementation Strategy - Executive Summary Page 7
{
13
AN ORDINANCE AMENDING THE JOINT
PLANNING AGREEMENT PERTAINING TO
DEVELOPMENT MORATORIA
ARTICLE 2 ADOPTION, ADMINISTRATION AND AMENDMENT OF
STANDARDS
2.3 Permit Administration within the Transition Area
C. From time to time the Town of Carrboro or the Town of
Chapel Hill may determine that a development moratorium
is appropriate in order to address exigent
circumstances, the results of a study of density
designations, plan classifications or other matters
prescribed by the adopted Joint Planning Area Land Use
Plan, the Joint Planning Area Land Use Map or any of
the land use ordinances of the Town of Chapel Hill or
the Town of Carrboro, or for some other legally valid
purpose. To preserve the status quo pending the
consideration of a land use ordinance amendment
designed to address the reason for a moratorium, the
Town of Carrboro or the Town of Chapel Hill may propose
the adoption of a development moratorium pending
consideration of the ordinance amendment. Any such
moratorium must be adopted by the Town of Carrboro or
the Town of Chapel Hill in the same manner as an
amendment to the applicable jurisdiction's development
regulations as contained in its land use ordinance(s).
Further, 1) with respect to -the - CJDA, _ any proposed-- _ -
moratorium shall not be effective until adopted by the
14
Town of Carrboro and approved by Orange County and, 2)
with respect to the CHJDA, any proposed moratorium
shall not be effective until adopted by the Town of
Chapel Hill and approved by Orange County. Any such
adopted and approved moratorium shall initially be no
more than six months in duration and may be extended
one time for no more than six months for the reasons
and following the procedures prescribed here. Nothing
described herein shall be construed to indicate that
any particular party has determined that a moratorium
is warranted in any particular-case.
2.4 Permit Administration within the Rural Buffer
C. From time to time Orange County may determine that a
development moratorium is appropriate in order to
address exigent circumstances, the results of a study
of density designations, plan classifications or other
matters prescribed by the adopted Joint Planning Area
Land Use Plan, the Joint Planning Area Land Use Map or
any of the land use ordinances of Orange County, or for
some other legally valid purpose. To preserve the
status quo pending the consideration of a land use
ordinance amendment designed to address the reason for
the moratorium, Orange County may adopt a development
moratorium pending consideration of the ordinance
amendment._ Any such moratorium must be adopted in the
_
same manner as an amendment to Orange County , s
A
development regulations as contained 15
g d i n its land use
ordinance(s). Any such adopted moratorium shall
initially be no more than six months in duration and
may be extended one time for no more than six months
for the reasons and following the procedures prescribed
here. Nothing described herein shall be construed to
indicate that Orange County has determined that a
moratorium is warranted in any particular case.
The Joint Planning Agreement is amended effective
the amendment contained in this ordinance having been approved by
the Town of Carrboro and the Town of Chapel Hill and this
ordinance having been adopted.by Orange County on the effective
date.
lsg -11
morator.doc
ORANGE COUNTY PLANNING DEPARTMENT
306F REVERE ROAD
HILLSBOROUGH, NORTH CAROLINA 27278
v�
v
LAND USE PLAN AMENDMENT
APPLICATION
All persons requesting an amendment to the Land Use Plan of Orange
County are required to complete the following application as completely
as possible:
OFFICE USE ONLY
REQUEST SPA - I - CIS
DATE RECEIVED: 4;a�PM
STAFF PERSON(S) RESPONSIBLE:
GENERAL DATA:
Property Owner(s) Name: Inner, Deng
Mailing Address: 4646 Grindingstone Dr. Raleigh NC 27604
Phone: ( Home) 95)--0375 ( Work) 876 -7541 961 -3131
Agent(s) Name: _Inna Dena of International Real Estate, Inc.
Mailing Address: 1300 -C Millbrook Rd. Raleigh NC 27609
Phone: 919- 876 -751L1 961 -3131
SPECIFIC DATA:
Tax Reference: Township 7 Tax Map_
(Lot 27F is under contract, I will reauest the
Public /Private Road Name: Eubanks
Lot 27 - .0 acres
Lot Size: Acreage Lot 27E - 4.1 Acu Square Footage
L.o 2 7 - 23x3 Lot a4.S-4 t-
Lot Frontage 1d 2; F - ! q-6 . b - Lot Depth I-0-WE-1164.9-?k
Current Plan Category Designation(s): General
18 Block Lot 279 27E
same plan amendment once
accuisition is complete)
Activity Node
Watershed
16
Joint Planning Area Rural Buffer - - _ - --
7-- - - -
n
REQUEST ALUP- - 17
SPECIFIC DATA (continued):
Describe Land Uses in the General Area: Currently_ vacant land, landfill
to the east and Duke Forest to the north & west. MUOI - 1 on the
east of the land-fill 1 onP Eubank Rte
On Adjacent Parcels of Land: Duke Forest & Landfill & Landfil
future trucking plant ( ?)
REQUEST:
Land Use Plan Category Designation(s) Requested: Change to Chanel Hill tr?nsi-
ion area.
Type of Amendment: Primary Secondary - X
This application should be submitted with the following materials:
X Fully dimensioned tax map on which is highlighted the parcel,
or portion thereof, in question.
X Legal description of the parcel, or portion thereof.
X Letter of request to include:
o the tax reference, general location and owner of the
parcel
o the current and requested land use plan category
designation(s)
o a narrative stating the manner in which the proposed
amendment will carry -out the intent and purpose of the
adopted comprehensive plan or part thereof
o a statement of any other circumstances, factors and
reasons which the applicant offers in support of the
proposed amendment
o statement of the changed or changing conditions in the
area, or in the County generally, which make the proposed
amendment reasonably necessary.
I (We), the undersigned,-certify that all-statements furnished in this -
application are true and to the best of my (our) knowledge and that the
application as submitted is complete.
- - - - - -- - - - -- - - - - --
NAME OF APPLICANT IGNATUR.E OF AP ICANT(S)
DATE -
00
u
18
0669
IA 22 52 AC
tlII�L�C� ^i ?�u�
I
o0�--
!i
1 B 1 1
' 1
� It
64221 Rp ►7 27 i
27 S_ _-
I �2.76At.I EUbANK
9086
1143
.08 AC • I^ 7E I �
27F / % 27C i 2911
23 w
i
8770
27G 27H I Q
3349 -
9249 222 4 05 1
AC. AC -
2.0 29S 6 AC. 6 A C
1
SAC. 1
A 4A
L4 _ 1 2889
I1 I
2 I j 26 ssal
34'AC.I :.3 AC _ 1 21.61AC.
- owa I i r , 2 zl Isz9 • /
I 2447 MAC
23 _._��__ 2W
-- 33 AC I� 43 AC 3. 1to AC
_._ - -•- _ -1 , 3241 I sHe
i I 1 3 AC.
- -. •_ —! - W
bA
- -- -- ChI �;�I ic�o �T,X �g
LEGAL DESCRIPTION FOR LOT 27
BEGINNING AT AN IRON STAKE ON THE NORTH RIGHT OF WAY LINE OF EUBANKS RD.
(S.R. 1727) AT THE SOUTHEAST CORNER OF DUKE UNIVERSITY AND SAID IRON STAKE
BEING THE SOUTHWEST CORNER OF TRACT ONE AS SHOWN ON PLAT ENTITLED
"PROPERTY OF WOODROW W. SELLERS" WHICH PLAT IS RECORD IN PLAT BOOK 53 PAGE
187, ORANGE COUNTY REGISTRY;
RUNNING THENCE LONG AND WITH THE EAST AND SOUTH LINES OF DUKE UNIVERSITY
NORTH 03 - 28'40" EAST 1124.54 FEET TO AN EXISTING CONCRETE MONUMENT AND
SOUTH 87 - 44'52" EAST 360.94 FEET TO AN EXISTING IRON STAKE AT THE NORTHWEST
CORNER OF DORIS FARMER ETAL;
RUNNING THENCE ALONG AND WITH THE WEST LINE OF DORIS FARMER ETAL SOUTH 09 -
39'45 " WEST 113.69 FEET TO AN IRON STAKE IN THE NORTH RIGHT OF WAY LINE OF
EUBANKS RD;
RUNNING THENCE WITH THE NORTH RIGHT OF WAY LINE OF EUBANKS ROAD ALONG A
CURVE TO THE RIGHT HAVING A RADIUS OF 998.99 FEET, AN ARC LENGTH OF 6.33 FEET
(CHORD BEARING SOUTH 87 - 34'22" WEST, CHORD DISTANCE 6.33 FEET) TO AN IRON
STAKE.
THENCE CONTINUING ALONG AND WITH THE NORTH RIGHT OF WAY LINE OF EUBANKS
ROAD SOUTH 87 - 52'26" WEST 235.54 FEET TO AN IRON STAKE THE PLACE AND POINT OF
BEGINNING AND BEING ALL OF TRACT ONE EXCLUSIVE OF THE RIGHT WAY OF EUBANKS
ROAD AND CONTAINING 7.69 ACRES MORE OR LESS ACCORDING TO PLAT AND SURVEY
ENTITLED "PROPERTY OF WOODROW W. SELLERS" PREPARED BY GEORGE C. LOVE, JR.
RL.S. L-655, JOB NO. 21898, DATED SEPTEMBER 21ST, 1987 AND LAST REVISED 6- 22-88,
RECORDED IN PLAT BOOK 53 PAGE 187, ORANGE COUNTY REGISTRY, TO WHICH PLAT
REFERENCE IS HEREBY MADE FOR A MORE PARTICULAR DESCRIPTION OF SAME.
19
-_: °`EXHIBIT A"
EGINNING at an existing iron pipe on the southern Duke University property line and being the
:)rthwest corner of that certain parcel conveyed to the Town of Chapel Hill, Orange County and
Carrboro and recorded in Deed Book 1465, Page 349, Orange County Registry to which there
exists an unrecorded plat on file with the Chapel Hill Engineering Department, and being a part of
the Johnson property (Deed Book 338, Page 213). Running thence from said point of beginning
running with the Town of Chapel Hill, Orange County and Town of Carrboro line South 04
degrees 14' 38" East 1017.27' to an existing iron pipe; running thence along the same line South
04 degrees 14' 38" East 33.75' to a calculated corner in the middle of the 60' right of way in
Eubanks Road, said calculated corner being located S 55 degrees 10' 33" West 778.76 from an
North Carolina Department of Transportation Right of Way Monument; running thence South 65
degrees 14'04" West 156.68' to a calculated corner in the middle of the 60' right of way in
Eubanks Road; running thence North 04 degrees 11'25" West 31.15' to an iron set; running
thence along the same line with the eastern line of Doris Farmer et al. (Deed Book 338, Page
;213) North 04 degrees 11' 25" West 1073.77' to an Existing iron pipe on the Duke University
southern property line; running thence North 85 degrees 21' 15" East 145.70' along the Duke
University line to the point and place of BEGINNING, containing 3.62 acres, more or less, all as
shown on an unrecorded plat dated January 10, 1997 and prepared by Freehold Land Surveys,
Inc., Job No. 17270, titled Property of Inna Zang Johnson.
20
21
LETTER OF REQUEST
Re: Chapel Hill Township - map 18 lot 27 & 27E
The current land use is rural buffer. I am requesting to change it to Chapel Hill transition area The
reason for this is that the area is in transition for rural type area to a commercial type of transition. Again
I am requesting to be in the "Chapel Hill transition area" as the land along Eubanks Road on the other
side of landfill. This area is right next to the current Chapel Hill transition area.
Lot 27and 27E on Eubanks Road, which is located near Hwy. 40, should be put into higher and better use
instead of remaining in a rural buffer zoning. In addition, one of the biggest Harris Teeters is currently
being built on the comer of Eubanks Road. There is an industrial park on the east side of the landfill,
which is along Eubanks Road. My request is ■consistent with the zoning on the east side of landfill,
which I think as a real estate broker, will be the best use of this area.
Irma Deng of International Real Estate, Inc.
1300 -C Millbrook RD. Raleigh NC 27609
919- 876 -7541 or 961 -3431
MCH
22
TOWN OF CHAPEL. HILL
SMALL AREA PLAN
NORTHWEST AREA
EXECUTIVE SUMMARY
EXCERPTS FROM:
T
DRAFT PLAN
SEPTEMBER 11, 1995
Summary
Where We Are
The Chapel Hill Town Council has created an
Urban Services Boundary around Chapel Hill.
The area within that boundary is proposed to be
eventually developed to urban densities. This
land is now, for the most part, largely
undeveloped. Through this Small Area Planning
Process, the Town seeks to address the question of
how the land in the northwest portion of Chapel
Hill could best be developed.
Where We Want To Go
The Small Area Plan for the Northwest Area
presents a plan for the preservation and
development of the land generally south of
Interstate 40, including the land north of Weaver
Dairy Road, the land west of Airport Road (N.C.
86), and the land north of the University of North
Carolina's Horace Williams tract and Homestead
Road.
This Plan represents an integral part of the Town's
Comprehensive Planning process. This Small Area
Plan is intended to provide a more detailed land
use plan for the relatively undeveloped northwest
area, which is a part of the Town's projected
urban services area. By reflecting on the
environmental constraints and special
characteristics of the Northwest Area, and by
making an effort to incorporate changing
conditions in this area, it is the intention of this
plan to provide a long range vision for
development in this area that will maintain the
essential values of the Town of Chapel Hill.
The recommended plan incorporates the following
"building blocks" as part of the long range vision
for the Northwest Area:
• Protection of Existing Neighborhoods
• Affordable Housing
• Open Space
• Geeenways
• Village Pattern
• Employment Campus
• Transportation Corridor
The protection of existing residential
neighborhoods is a primary objective of the
recommended Northwest Area Plan.
The Plan proposes a Village Pattern of
development along the rail line corridor, primarily
located on the Greene tract. The plan assumes
that the Greene tract will be developed and will
not be used as a landfill. Generally decreasing
residential densities are proposed as distance from
the village center increases. The Plan also
proposes that a portion of the Greene tract could
be used for affordable housing.
The Village Pattern is an alternative to traditional
subdivision development. The village is intended
to create a pedestrian - friendly environment that
will provide residents with easy access to a village
center that will have neighborhood stores and a
central transit stop. The opportunity also exists to
develop a transportation corridor in coordination
with the rail line corridor. Such a transportation
corridor could be used as a pedestrian/bikeway,
busway, or light rail transit corridor.
The plan also supports the Town's Comprehensive
Planning goals of encouraging local economy by
recommending an Employment Campus along
Eubanks Road, near the Interstate 40 and N.C. 86
interchange. This Employment Campus would be
intended to serve as a place of employment rather
than as a shopping area.
The Plan also proposes a new large Community
Park in the northwest corner of the Greene tract.
A network of proposed greenways along perennial
stream corridors would connect dedicated open
space in the village area with surrounding
residential areas and parks.
A system of local and collector streets are
proposed to provide additional access to parcels
located in the interior of the Northwest Area. The
Plan also proposes aligning roads to avoid
dangerous intersections in close proximity to the
rail line corridor. N.C. 86, Eubanks Road,
Homestead Road, and Rogers Road are proposed
to remain as they are and serve as collector roads.
Northwest Small Area Plan Page 1
23
How To Get There The Process 24
The "Recommended Strategies" Section of the
Plan presents a number of ideas on how to make
the Plan a reality. Zoning the land for the
proposed uses and densities is a major strategy.
Conditional Use Zoning is proposed for the
village. Also, a new zoning category is
recommended for the Employment Campus area.
Adopting Design Guidelines and using the Town's
Development Review process to encourage well -
designed uses and to ensure protection of
environmentally sensitive areas is another key
implementation strategy.
It is also recommended that neighborhood
conservation programs be developed for low and
moderate income areas, while also considering
assisting developers of low- income housing with
extensions of public water and sewer lines.
A feasibility study of the Transportation Corridor
concept is suggested, to determine the short-term
and long -term feasibility of using the rail line
corridor.
Finally, a spirit of cooperation and collaboration
is recommended with the University of North
Carolina at Chapel Hill, Duke University, the
Town of Carrboro, and Orange County, in an
effort to best incorporate mutual interests in the
Northwest Area.
I
On January 25, 1993, the Town Council
established the Northwest Small Area Plan Work
Group and charged it with developing a Small
Area Plan for the Council's consideration. The
Northwest Small Area is the second area for
which the Council has requested a small area
plan. The Southern Small Area Plan was adopted
in June 1992.
The Work Group met and deliberated monthly
from May 1993 to December 1994. During this
time, the Work Group held three neighborhood
meetings designed to give the public information
and to hear ideas and reactions. These meetings
were held on September 21, 1993, February 22,
1994, and on October 6, 1994.
The Work Group also coordinated with the Town
of Carrboro's Small Area Plan Work Group, that
was simultaneously conducting a similar small
area planning process. The Carrboro Small Area
Plan Work Group has been planning for
Carrboro's northern planning jurisdiction, an area
that is adjacent to the western boundary of Chapel
Hill's northwest small area.
The two Small Area Plan Work Groups held joint
meetings in January and October of 1994, and
had ongoing liaisons that worked to keep each
Work Group informed of the other's progress.
The interaction of these two Work Groups was an
integral part of the planning process.
Page 2 Northwest Small Area Plan
The Plan
Overview
This report has examined the environmental
conditions of the study area, established goals and
objectives for the area, and identified several
building blocks for various land use patterns that
could be used in the Northwest Area. Building on
these criteria, this section presents a long -range
plan for the Northwest Area.
In formulating the plan, the Work Group also
considered three alternative plans for the area (see
Appendix). The consideration of all four of these
plans produced the final recommended plan.
The recommended plan combines all of the
planning concept "building blocks ": Protection of
Existing Neighborhoods, Affordable Housing,
Open Space, Greenways, the Village Pattern, the
Employment Campus, and the option of a
Transportation Corridor.
The Recommended Plan
One of the first steps in formulating a plan was
the protection of existing residential
neighborhoods. In particular, the plan seeks to
protect the Northwood neighborhood and the
Rogers Road and Billabong Lane areas.
Based on the fact that the northwest area contains
some of the little land left in Chapel Hill that is
suitable for office, commercial or retail use, and
considering that the area has easy access to an
interstate interchange, an Employment Campus is
shown along Eubanks Road and Millhouse Road.
The Employment Campus is intended to support
the Town's Comprehensive Plan Goal of
encouraging a local economy characterized by
varied scale and types of educational, research,
professional, commercial and service activities.
In particular, the Comprehensive Plan suggests a
local economy including 1) office, institutional,
and commercial employers of small to medium
scale, located in conveniently accessible centers
and areas efficiently serviced by public utilities,
services, and transit, avoiding strip development,
and 2) small -scale professional, commercial and
service employers in low- intensity developments
designed to minimize conflicts with adjacent
residential development.
The development of an Employment Campus in
this area also supports the Comprehensive Plan's
Economic Goals of promoting employment in
areas central to major transportation systems, with
surrounding higher - intensity residential uses. In
particular, the Comprehensive Plan supports such
a mix of uses in the N.C. 86 and Interstate 40
area.
This Employment Campus land use represents a
new category that would be primarily
characterized by small -scale flex -space and office
uses appropriate to the area. In particular, the
Campus would serve as a destination that would
attract employees for the duration of the work
day.
This new land use will require a new zoning
category that will promote well- designed,
functional places of employment. Some
secondary uses that may be considered as part of
the "employment campus" concept are service -
oriented uses, research and development uses,
and medical facilities.
In keeping with the Town's adopted
Comprehensive Plan Goals, the plan reflects the
Town's existing mixed use land use on the land
east of N.C. 86 and north of Weaver Dairy Road.
Mixed Use zoning calls for a mix of commercial,
office, and residential in this area.
Based on the large amount of commercial square
footage (259,200 s.f.) that has been approved as
part of the Chapel Hill North development, the
proximity of existing residential neighborhoods,
and in support of the Town's Entranceway
Protection Goals, the plan reflects an Office -
Institutional land use for the lots at the southeast
intersection of N.C. 86 and Weaver Dairy Road.
Northwest Small Area Plan Page 35
25
A Village Pattern of development is shown along
the rail line, south of the Northwood subdivision.
The village pattern is primarily located on the
Greene tract.
The Village Pattern consists of mostly residential
uses: single family detached houses, townhouses,
and apartments. The Village has an office and
commercial area within easy walking distance of
the residences. Active and passive recreation
areas are proposed through various dedicated
open space areas, and a network of greenways
would preserve perennial stream corridors and
provide access to the Town's future Northwest
Community Park.
An interconnected grid street system is proposed,
which would disperse traffic and promote a
pedestrian - friendly environment. The opportunity
also exists to utilize the adjacent rail line as a
transportation corridor.
27
A transportation corridor developed in
coordination with the rail line could be used as a
pedestrian/bikeway, busway, guided busway, or
light rail transit access to other parts of the Town
including the Northern Park and Ride Lot on
Eubanks Road, the Employment Campus area
along Eubanks Road, Chapel Hill High School,
Seawell Elementary School, the University's
Horace Williams tract, Downtown Chapel Hill,
and possibly the University's main campus.
A new large Community Park (approximately 50
acres) is shown in the northwest quadrant of the
village pattern. The park is located in this
quadrant based on the'natural physical boundaries
of the area. This park will help meet the future
recreational needs of residents. The park will also
help to preserve existing neighborhoods by
buffering them from future development. Finally,
the park will buffer future development from the
southern portion of the existing landfill.
The perennial stream corridors are shown as
potential greenways that could provide a network
connecting the village area with surrounding
residential areas. In particular, it is recommended
that a greenway be established that would
connect the Town's Northern Community Park
(along N.C. 86) to the new Community Park (on
the northwest side of the village pattern). Various
open spaces in the village area would also be
incorporated into the greenway network.
Elsewhere in the area, residential development is
shown, with density generally decreasing as
distance from the village center increases.
Residential densities to the north and west, vary
from one to two units per acre. Residential areas
east of the rail line and west of N.C. 86 show a
density of 4 units per acre.
The easternmost portion of the study area, on the
north side of Weaver Dairy Road, is shown with
a density of four to six units per acre. The land
between the village and the University's Horace
Williams Property shows a density of four or six
units per acre, reflecting projected future
development on the Horace Williams tract.
Northwest Small Area Plan - Page 37
LEGEND
111111111
TRANSPORTATION CORRIDOR
� �
VILLAGE CENTER
O
TRANSPORTATION CORRIDOR
ACCESS POINTS
10 DWELLING UNITS PER ACRE
6 DWELLING UNITS PER ACRE
4 DWELLING UNITS PER ACRE
2 DWELLING UNITS PER ACRE
1 DWELLING UNIT PER ACRE/
EMPLOYMENT CAMPUS
MIXED USE
OFFICE I INSTITUTIONAL
TO BE PRESERVED
®AREAS
GREENE PARK
27
A transportation corridor developed in
coordination with the rail line could be used as a
pedestrian/bikeway, busway, guided busway, or
light rail transit access to other parts of the Town
including the Northern Park and Ride Lot on
Eubanks Road, the Employment Campus area
along Eubanks Road, Chapel Hill High School,
Seawell Elementary School, the University's
Horace Williams tract, Downtown Chapel Hill,
and possibly the University's main campus.
A new large Community Park (approximately 50
acres) is shown in the northwest quadrant of the
village pattern. The park is located in this
quadrant based on the'natural physical boundaries
of the area. This park will help meet the future
recreational needs of residents. The park will also
help to preserve existing neighborhoods by
buffering them from future development. Finally,
the park will buffer future development from the
southern portion of the existing landfill.
The perennial stream corridors are shown as
potential greenways that could provide a network
connecting the village area with surrounding
residential areas. In particular, it is recommended
that a greenway be established that would
connect the Town's Northern Community Park
(along N.C. 86) to the new Community Park (on
the northwest side of the village pattern). Various
open spaces in the village area would also be
incorporated into the greenway network.
Elsewhere in the area, residential development is
shown, with density generally decreasing as
distance from the village center increases.
Residential densities to the north and west, vary
from one to two units per acre. Residential areas
east of the rail line and west of N.C. 86 show a
density of 4 units per acre.
The easternmost portion of the study area, on the
north side of Weaver Dairy Road, is shown with
a density of four to six units per acre. The land
between the village and the University's Horace
Williams Property shows a density of four or six
units per acre, reflecting projected future
development on the Horace Williams tract.
Northwest Small Area Plan - Page 37