Loading...
HomeMy WebLinkAboutAgenda - 06-22-1998 - 8y1 ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: June 22, 1998 Action Agenda Item #_&y SUBJECT: MTK Development - Preliminary Plan ACTION BY: August 6, 1998 DEPARTMENT: Planning & Inspections PUBLIC HEARING: Yes X No BUDGET AMENDMENT REQUIRED: Yes X No ATTACHMENT(S): Resolution of Approval Application Vicinity Map Preliminary Plan Sketch of Potential Road Connections NCDOT Letter Private Road Justification Staff Evaluation of Private Road Justification Fiscal Impact Analysis 6/3/98 Planning Board Minutes INFORMATION CONTACT: Emily Cameron Extension 2580 TELEPHONE NUMBERS: Hillsborough -732-8181 Durham -688-7331 Mebane -227-2031 Chapel Hill -967-9251 PURPOSE: Consideration of the Preliminary Plan for MTK Development. BACKGROUND: The property is located in Eno Township on both sides of Yates Road (SR 1563) east of Palmers Grove Church Road (SR 1562) as shown on the attached vicinity map. The current zoning is Agricultural Residential (AR) and Lower Eno Protected Watershed. Adjacent land uses are residential. A 100 -foot AT &T right -of -way crosses the property running east -west near the southern end of the tract. AT &T anticipates reducing the right -of -way to 33 feet later this summer. The total acreage of the tract is 38.34 acres. The site centers around a stream valley created by an unnamed intermittent stream that flows north approximately one mile to the Eno River. Primary conservation areas include the stream and scattered slopes estimated to be over 25 percent. 2 The remainder of the site is considered secondary conservation area as woodland and/or slopes greater than 15 percent. The wooded portion of the site was damaged by Hurricane Fran and shows the effects of clean-up efforts. The plan for MTK Development follows the conservation option of flexible development as described in the Subdivision Regulations. The Preliminary Plan features 25 new residential lots that average 1.36 acres in size excluding right - of -way and 18.72 acres or 50% open space. The open space will be privately owned as part of the lots and will be reserved through restrictive covenants. The open space protects wooded land on moderate to steep slopes, the creek and the adjacent stream buffer, as well as buffers along the roads and the subdivision boundaries. The lots will have individual wells and septic systems and will access Yates Road from three proposed roads, except for lots 20 and 25 which will have direct access to Yates Road. Crown Court is proposed as a public road to be built and paved to NC Department of Transportation standards. A 50 -foot public right -of -way stub out is reserved between lots 12 and 13 at the end of Crown Court for a potential road connection in the event property to the south is subdivided in a manner that warrants additional access. Refer to the attached map for a schematic illustration of a possible future road network. During the Planning Board's review of the Concept Plan, several members expressed concerns regarding the safety of Yates Road due to the width of the travelway, its vertical and horizontal alignment, the absence of pavement markings, combined with the proposed additional traffic. There also was discussion of dangerous intersections on Highway 70 and how additional traffic might affect them. The minutes of the Planning Board's discussion of the Concept Plan were sent with the Preliminary Plan to the Department of Transportation with a request for comments. DOT responded with the attached letter stating that certain improvements have been requested such as additional pavement inside curves, striping, and posting the speed limit. Regarding intersections on US Highway 70, the DOT District Engineer advised that the sight distances are currently adequate; however, they will monitor the locations for potential problems. The intersection at Lawrence will be scheduled for signalization when funds are available. Chili Court and Ritz Way are proposed as private gravel roads, Class C and Class B respectively. The applicant's private road justification is included in the attachments followed by the Staff evaluation of the justification. The private roads are justified through open space protection, lower density than the maximum allowed, and the subdivision's location in a protected watershed. On June 3, the Planning Board voted unanimously to recommend approval of the Preliminary Plan for MTK Development according to the conditions contained in the attached Resolution of Approval. RECOMMENDATION: The Administration recommends approval of the Preliminary Plan for MTK Development with public and private roads according to the conservation option of flexible development and the conditions contained in the attached Resolution of Approval. RESOLUTION OF THE ORANGE COUNTY BOARD OF COUNTY COMMISSIONERS Date June 22, 1998 Name of Subdivision MTK Development Owner /Applicant MTK Development/Woods Brothers The Board of County Commissioners hereby approves MTK Development Preliminary Plat, dated March 31, 1998, and containing 25 lots, subject to the fulfillment of requirements specified herein. Crown Court shall be irrevocably dedicated to the general public and be constructed to standards of the North Carolina Department of Transportation. The approval of this resolution authorizes and directs the Orange County Manager to accept for Orange County and on behalf of the public generally, the offer of dedication of Crown Court. This acceptance by Orange County of the dedication to the general public of Crown Court shall be without maintenance responsibility. The road shall be maintained by the owner /applicant until such time as they are accepted for maintenance by the North Carolina Department of Transportation or some other governmental body. Before the Final Plat of MTK Development can be recorded: A. Sewage Disposal 1. Each residential lot shall contain an adequate area for sewage disposal and repair area, approved by the Orange County Division of Environmental Health. 2. Disclosure that the septic system location may restrict the size and location of improvements shall be included in a document describing development restrictions to be recorded concurrently with the Final Plat. The document shall also disclose that information regarding the tentative location of septic systems is available from the Orange County Health Department, Division of Environmental Health. B. Roads and Access 1. Crown Court shall be constructed to standards of the North Carolina Department of Transportation, within a 50 -foot right -of -way, and the construction shall be inspected and approved by NCDOT. M A letter of credit or escrow agreement or other security shall be submitted to secure construction of Crown Court to the standards of the North Carolina Department of Transportation. An estimate of the construction cost must be prepared by a certified/licensed engineer or grading contractor and submitted to the Planning and Inspections Department. The financial guarantee must reflect 110% of that estimate and be issued by an accredited financial institution licensed to do business in North Carolina. The document describing development restrictions to be recorded with the Final Plat shall state that the financial guarantee will not be released until the road construction has been inspected and approved by NCDOT. 2. Chili Court shall be constructed to Class C private road standards within a 50 -foot right -of -way. Ritz Way shall be constructed to Class B private road standards within a 50 -foot right -of -way. Chili Court and Ritz Way shall be inspected, and the construction certified in writing to the Orange County Planning Department by a North Carolina Professional Engineer, or a North Carolina Registered Land Surveyor. The location of the travelway within the platted private road right -of -way shall also be certified. •• A letter of credit, escrow agreement, or bond shall be submitted to secure construction and inspection of Chili Court to Class C private road standards and Ritz Way to Class B standards. An estimate of the construction and certification costs must be prepared by a certified/licensed engineer or grading contractor and submitted to the Planning and Inspections Department. The financial guarantee must reflect 110% of that estimate and be issued by an accredited financial institution licensed to do business in North Carolina. The document describing development restrictions to be recorded with the Final Plat shall state that the financial guarantee will not be released until the road construction has been certified by a North Carolina Professional Engineer or a North Carolina Registered Land Surveyor. 3. An erosion control plan for construction of the roads shall be submitted by the applicant for review and approval by the Orange County Erosion Control Division. 4. A Private Road Maintenance Agreement for Chili Court and Ritz Way shall be approved by the County Attorney. 5. A statement that further subdivision of any of the lots served by the private roads may require upgrade of the roads to a higher standard shall be included in a document describing development restrictions and requirements to be prepared by Planning Staff and recorded concurrently with the Final Plat. 6. The _intent for future extension of Crown Court shall be indicated on the Final Plat by the words "Subject to Future Extension." 7. Lots 21, 22, and 23 shall access only onto Chili Court. Lots 24, 26, 27, 28, and 29 shall access only onto Ritz Way. Lots 5 -19 shall access only onto Crown Court. These restrictions shall be stated in a document describing development restrictions and requirements to be prepared by Planning Staff and recorded concurrently with the Final Plat. Approved street name signs shall be erected at the intersection of streets as required in Section IV- B- 3 -c -12 of the Orange County Subdivision Regulations. Evidence shall be submitted by the applicant that the sign is in place or a copy of the receipt for purchase of the sign shall be submitted to the Planning Department. 9. The deed to Orange County for the 50 -foot public right -of -way stub out and the accompanying Release Deed shall be approved by the County Attorney. C. Land Use Buffers and Landscaping 1. Provisions for protection of existing trees as shown on the approved landscape plan shall be included in a document describing development restrictions and requirements to be prepared by Planning Staff and recorded concurrently with the Final Plat. D. Drainage Impervious surface data, pursuant to Article 6.23 of the Zoning Ordinance shall be included in a document describing development restrictions and requirements to be prepared by Planning Staff and recorded concurrently with the Final Plat. 2. Stream buffers shall be provided as shown on the Preliminary Plan. The width of the buffer shall be stated on the face of the plat. Development restrictions within the buffer shall be specified in a document describing development restrictions and requirements to be prepared by Planning Staff and recorded concurrently with the Final Plat. 3. Indicate a 15 -foot drainage easement on lot 17. Locate additional drainage easements as required following review and approval of the Erosion Control Plan. E. Parkland 1. Cash in the amount of $10,920 ($455 x 24 lots) shall be paid to Orange County as payment in lieu of parkland dedication. 0 F. Misceligneous The Final Plat shall contain a title block and vicinity map in accordance with Section V -D -2 and V -D -3 of the Orange County Subdivision Regulations. 2. The following natural and man-made site features shall be shown on the plat: (Include streams, rivers, ponds, lakes, swamps, marshes, sites in "Inventory", houses, barns, sheds, railroads, overhead utility lines, cemeteries) a. Creek on lots 14 -20, 22, 23 -25; and b. Pond on adjacent property. 3. The following easements shall be shown on the plat: a. AT &T right -of -way; and b. 15 -foot drainage easement on lot 17. 4. A setback of 40 feet shall be maintained as measured from the edge of right -of -way of all roads Side yards shall be a minimum of 20 feet, and rear yards a minimum of 20 feet. These setback requirements shall be stated on the plat, and in a document describing development restrictions and requirements to be prepared by Planning Staff and recorded concurrently with the Final Plat. G. Certifications A Certificate of Survey and Accuracy signed by a registered Land Surveyor shall be notarized on the face of the Final Plat. 2. A Certificate of Declaration and Maintenance in the form provided in Section V -D -6 -b of the Orange County Subdivision Regulations signed by the landowner and developer shall be on the face of the plat and included in a document describing development restrictions to be recorded concurrently with the Final Plat. 3. The Division of Environmental Health shall certify that each lot contains a suitable area for septic disposal. 4. The North Carolina Department of Transportation shall certify that Crown Court has been constructed to State standards or that construction plans have been approved. 5. A Certificate of Approval signed by the Orange County Planning and Inspections Department. Signature of Applicant Clerk to the Board I, , accept the above listed conditions of subdivision approval, and acknowledge that each must be met prior to recordation of the final plat. Applicant Date APPLICATICI FOR PRELIMINARY PL . V APPROVAi L 11 MAJOR SUBDIVISION 8/93 ORANGE COUNTY U 1411 --�_L� DATE• - lQj PLEASE TYPE OR PRINT (INK ON(LLY,) SUBDIVISION NAMg: LOCATION: 7 -1 1 ° I I� ' J / � OWNER /DEVELOPER: 7o, pyt — �(\ I,c — I,C t R_�{ C,3 C_-> ADDRESS: TELEPHONE NO.: AGENT/CONTACT: P r-L TELEPHONE NO.'7 3Z -32r-t, n ^C, A. SUMMARY INFORMATION. Orange County Tax Map T 7� Block —' Lot(s) _E_ Township 6VIl o Zoning District(s): - 9�j Total Number of Acres: vr.3 Phases: Total Number of Lots: ��_ Average Lot Size: 1.5 Minimum Lot Size: Number/Typa of Structures: (existing) (proposed) S Lineal Feet in Streets: 2400 Acres in Open Space: 191-17- Water Supply: Public (specify) Community Individual Wastewater Disposal: Public (specify) Community j/ Individual School District: ,)e AIJGE COVATY Fire'District: General Land Uses in Area: Critical Areas: ✓ stream /drainagaways flood prone areas L -EA 0 - M watershed (specify) historic sites other (explain) Is the property to be subdivided currently under "farm use value taxation*? Yes_, No_ if "yes ", please contact the Orange County Tax Office. Subdivision of the property may require payment of deferred taxes under "farm use value taxation ". B. All plats must be submitted on sheet no smaller than one inch equals two- hundred feet 0" 2001 and no larger than one inch equals twenty feat 0" 20') and must contain the following' information: / subdivision name?' zoning of tract and adjacent name & address of owners) properties name & address of subdivider _� building setback lines by notation (if other than owner) or typical lot layout name of surveyor, engineer, location and width of existing and Cry landscape architect or architect, proposed easements (drainage, address, registration X and seal utilities, roads, etc.) (title) Pre"Insry Plan existing, proposed and adjoining scat*, north arrow rights -of -way including dimensions date (including revision dotes) and street names and stets road wtownship, tax map -block -lot numbers. Unaal feet of road 4J W references centerlines and approximate "1 O . Parent Parcel Identification 0 acreage of now street rights -of- dead book and page # of property / way • +�41 w to be subdrvided V �, existing and proposed utilities. E _ ' boundary described yvith bearings including typo, sizes, hydrants, and distances ] _ valves, manholes U 1O :� total ocreagi of the tract and yllj�- existing and proposed curbs, acreage of lots, including and gutters and culverts, including L,t v '"uding area within rights -of- sizes and grades _ z way location and width of alloys. C to control corner sidewalks, bike lanes, transit systems, and bus stops - r ' " (pleass� complete reverse side) . - I -�L, �s:• proposed lot lines v,(r__ 12 dimensions _? typicr 'oet - cross - sections ano ✓�/? j - lot & block numbers intersection details including phasing lines design end width of travelway and topogtaphy at tan foot (10) shoulders C intervals_ _ horizontal alignment and general water bodies, streams, floodway curve data (public roads) at and floodplaine �`.' <> centerline radius on all ro osed p p stream buffers streets U ✓ >'� location and size of parcels �?»` permanent features such as y E ,,� dedicated for public use, buildings, cemeteries, historic CD `►-+ Ocommon, recreational use or reserved in landmarks with purpose noted adjoining lot layout names of N impervious surface data (if located adjoining property owners. If � W in water supply watershed) subdivided, subdivision plat name, .: � vicinity map showing general plat book & page number, and CL CD location of subdivision with streets perimeter lot numbers. E �' o and roads identified by State road u MEE location and size of Iota of U'a number and name restricted development potential _U a) 'Na" t,10 landscaping and buffer and notation on plat regarding a o cu cc • / - requirements same U W township, corporate and extra- N,;< stormwater detention tird /or territorial planning jurisdiction lines retention sites and undioturbed which cross the property areas for infiltration purposes (if located in water supply watershed) C. OTHER SUBMITTAL REQUIREMENTS 1. Twenty -five (25) copies of the preliminary plat. 2. One full size copy of an Orange County Tax map (with tax parcels involved clearly marked in pencil). 3. Where municipal or OWASA sewer is not available, a copy of the Preliminary Plat indicating Health Department soils analysis approval /denial for each lot shown thereon. 4. Where a private road is proposed a written statement by the applicant or his/her authorized representative which sets forth the justification for a private road (see Section IV- 8-4 -d -1 of the Orange County Subdivision Regulations). 6. Auxiliary documents, In draft form, prepared in accordance with Seotion •' /L of. this Ordinance which assure completion and /or maintenance of improvements required by this Ordinance. Such documents may include, but not be limited to, a private road maintenance agreement, and articles of incorporation and restrictive covenants pertaining to a homeowner's sest.-niation. These documents may be required as necessary as evidence that the ordinance requirements are being met. ' r 4 70 • 15. Fee - $*".00 plus 45.00 per lot 0 fee for preliminary and final plat). ' 7. If the subdivision contains 10 lots or more the following information shall be submitted with the . application: e: Number of years to buildout. b. Number of houses to be built during each year to buildout. C. Average price of houses including lots for each year to buildout. _ I, the applicant,,hereby certify that the foredoing application is complete and accurate. „.. AP CANT'S SIGNATURE. OWNER'S SIGNATURE - DATE ► DATE ' .. -FEES: Am. o, u t t Oate Paid • � '� '' 9e. - � ', •Receipt / �Z� � � _ . OMIT TED- 18, 38 ,60,17,5aA,72,79,58C,4A,25( -,G, 248, �3 5), 27A,82, 488 MTK DEVELOPMENT W} Zoning: Agricultural Residential (AR) Lower Eno Protected Watershed 233 23 .2265 Applicant: Mike Woods for Woods Brothers 14 AC 14.56 AG Not to Scale 2068 J87 1157 4.1 / 2.08 — � 21 _ — / P /027E J � • 03 .156 AC � � �i6 e' 23 23 av, 21 �.� 231 9365 i 23E 340 i� .8268 2711 12.54 AC. r w•214AC• �� 11,59 AC. IAC. 12.16 AC, • ' -� 68 SA9/ Al 6C 33 �. FRANK IN /'� f • 18 1 90 8718 74 VIC - PA. 773 391 AC 2 r 0 3757 5 AC. 2n 0767 3.02 AC• ,+ I 97 27Y 4 ' , 8671 ' - 1. L 0682 2� �• L34A 3EE W" r 7405 4A 24 I 7513 . M 1.9492 7N 200 / .3379 2SM 2.93AC. , 1. 1 7317 — 3.69 DC �+ ` y3Q1NT • AC1, 2 .84 AC• gt tz 7382 , ,_ --e'— c J a 93k• 2 Ex .5. C 10.0425AC•- r 9032 t E7 •':/ ® 1n�2496 W19 25E 1.12A s .1 1 0 . • � 3 AG SAC. t, s ", ' t 25 9430 s 1 + 9864 '3754 t •D743 J . 5 AC + 1,27AC: . �1 1 3 5.0137 A C 293 S.OISOAC• LO "°' 19 30 1 i / u �j1 — 8372 % / , 2011 1 O `1 7 (: 1,� • 3381 ml 1 SD6 AG. � .� r 31 6.632 ` ; I 8240 + 503e 5.01 AC. 04 1343 6810 O+ + • 2814 S C. 19.2 AC. 7714 �•'g\� 47a7'2,OSAC• 1 �� \J 8329 I J 33 5AC. II.SAC• _ MaYtA •ss•t 61 .9473 � 9 LJ Ar— PALMEtt 36 23" MvE RO SAC. , .4049 ® . (OAK RID ") 72 6.16 AC. 16.2040. SWIG E io1 I let.. a ; 409 10.1 fa /• ®3433 40 1Q8 AG MIS AC ++ .03m •1327 10.02AC. ��,• .•�t�) 1.66 _ —� ►Arts ttlwa 41E `�� AC- CyyC i `• 7M 4783 kT1 ' `b• 54 2AC. �;V-44 • �` `� Z06AC• L22AC. A 421 ! • Mtl O- `` { C. _- 9592 1 • .'� `\ • —.19 t AG 44 24.89 AC. A '1. IZ32 AC. 52 1 t AG 45 Abe, AC SCOrHA-rIC OF Fb!SSlBJ-Z FL)7L)ZE T x 6 �sso 14 a tI ITT 06 `-�� . / . ' ` 1Y '600 50 d" p 15611 .6 IL 'ool ,ll l ! �� �\ i` i%� �' /' 633' rove 6A 7761 70- 'ol .01 C:) 735; -Golf Co se ......... to 'fir r, STATE of NORTH CAROLINA DEPARTMENT OF TRANSPORTATION JAMES B. HUNT JR. GOVERNOR May 22, 1998 ORANGE COUNTY Emily Cameron Orange County Planning Dept. 306 F Revere Rd. Hillsborough, NC 27278 Subject: SR 1563 (Yates Rd.) - Comments and Response Dear Ms. Cameron: E. NORRIS TOLSON SECRETARY 15 I have investigated SR 1563 (Yates Rd.) at your request and from Planning Board comments. This road was paved 18 feet wide several years ago under our Secondary Road Improvement Plan. Right -of -way was acquired 50 and 60 feet wide. Curves were improved as much as possible where the property owners would dedicate the right -of -way. At this time, I have asked the Orange County maintenance forces to pave 2 - 3 feet on the inside of the curves and repair other failures in the pavement. Once the widening is completed, our Division Traffic Services will stripe the centerline and post the appropriate speed limit. There are no other improvements scheduled for Yates Road at this time. The sight distances at the intersection of US 70 and Lawrence Road and US 70 and Palmer's Grove Church Road are adequate for the present. NCDOT will monitor these locations to keep growth under control. The US 70 and Lawrence Road intersection is a candidate for signalization. This project will be programmed when the spot safety funds are made available. There are no plans for improvement to the intersection of Palmer's Grove Church Road and US 70 at this time. Thank you for your interest and help in addressing safety concerns in Orange County. Please feel free to call me at 336 -570 -6833 if you or your board have additional questions. TJD:kww cc J. W. Watkins, P.E. V. E. Barham C. N. Edwards, Jr. Sincerely,. V T. J. Dyer DISTRICT ENGIIVEER P. O. BOX 766, GRAHAM, NC 27253 -0766 PRIVATE ROAD JUSTIFICATIONt` 16 for - �'u;l2 -9.91 MTK Development Tax Map #5.20..26 PIN #9884 -56 -8240 This Private Road Justification is for two 50 foot proposed private drives located in the proposed subdivision for MTK Development located on Yates Road (SR 1563), addresses the criteria on pages 30a and 30b of the Orange County Subdivision Regulations (revised October 16, 1990). 2a. The private drive (Ritz Way) will be built to Class B standards according to Orange County Subdivision Regulations. This private road will be serving the proposed 5 lots. A perpetual Road Maintenance Agreement will be submitted with the final map and recorded at the Orange County Register of Deeds office upon final approval by the County Attorney. Also upon final approval, a road sign will be installed. 2b. The private drive (Chili Court) will be built to Class C standards according to Orange County Subdivision Regulations. This private road will be serving the proposed 3 lots. A perpetual Road Maintenance Agreement will be submitted with the final map and recorded at the Orange County Register of Deeds office upon final approval by the County Attorney. Also upon final approval, a road sign will be installed. 3. This property is wooded with mature hardwoods, pines and small hardwoods. There will be restrictive covenants prohibiting clear cutting of any lot. 4. Due to the length of the proposed private drives (Ritz Way and Chili Court) and the low density of this subdivision, Ritz Way and Chili Court would not be accepted by the North Carolina Department of Transportation for maintenance. 5. This subdivision is designed by the Flexible Development standards (conservation option). The current design has preserved 17.58 acres (47 %) of the total area of this tract in a conservation easement to protect wildlife corridors and mature hardwoods. 6. This property is located in the Upper Eno watershed; therefore, the private roads and larger lots will decrease the amount of impervious surface and minimize the amount of storm water runoff. 7. Restrictive covenants will be put on record prohibiting any further subdividing of this property. These covenants will also address the maintenance and protection of the conservation easements. ORANGE COUNTY PLANNING DEPARTMENT 17 306F REVERE ROAD HILLSBOROUGH, NORTH CAROLINA 27278 STAFF EVALUATION OF PRIVATE ROAD JUSTIFICATION SUBDIVISION: MTK Development -Preliminary Plan DATE: May 26, 1998 The standards contained in the Subdivision Regulations pertaining to public and private roads are listed below as amended 8/8/94. The Planning Staff comment regarding each is provided in italics. IV- B- 3 -d -1. Roads - Public roads are generally required in all subdivisions and will be required where it is found that: 1. The subdivision roads would be accepted by the State for maintenance if. a. They are built in a manner which satisfies the minimum State design and construction criteria for subdivision roads; and (If the roads were built according to State construction standards, it would create more disturbance than the proposed private roads and would impact a protected watershed.) b. They would satisfy other requirements for addition to the State maintenance system, including, but not limited to, the general density standard of at least two occupied residences for each one -tenth of a mile of subdivision road; or (The State's density requirement is 4 occupied residences for short cut de sacs. If the roads were built to State standards within a dedicated right -of -way, Chili Court would not be eligible for State maintenance. Ritz Way would be eligible for State maintenance when four [4] residences are constructed and occupied) 2. The subdivision roads extend existing roads which are public; or (Not applicable.) 3. The subdivision roads are part of a development which is located in an area designated as Urban or Transition on the Orange County Comprehensive Plan; or W-1 (Not applicable) 4. A proposed road is designated as an arterial or collector on an approved Thoroughfare Plan for a municipality or in the Orange County Comprehensive Plan; or (The roads are not designated as arterials or collectors) 5. The subdivision roads are part of a non - residential development consisting of office, retail, industrial, and similar businesses, each located on a separate lot. This provision shall only apply to that portion of a subdivision being developed for non- residential purposes. (Not applicable) However, private roads may be allowed in a subdivision where, in the judgment of the Planning Board and with the approval of the Board of County Commissioners, it is found that the nature and location of the subdivision with respect to other development and the Comprehensive Plan are such that a private road is justified. In determining whether to permit private roads in subdivisions, the following design features will be considered: 1. The location and design of the subdivision is such that it clearly preserves the rural character of the County through: a. The provision of lot sizes and building setback lines significantly greater than required by ordinance provisions. Compliance with this standard is assured in University Lake Watershed where a subdivision is required to provide a minimum lot size of five acres. Where the minimum required lot size is less than five acres, compliance is assured when each lot in the subdivision contains at least twice the minimum required lot size; and/or (The proposed subdivision is located in the Lower Eno Protected Watershed where the maximum density is one unit per 0.92 acre. The density proposed on the Preliminary Plan is one unit per 1.36 acres.) b. The retention and/or provision of landscaping and. use of clustering of dwelling units to screen the view of the subdivision from public roads and/or maintain a wooded or forested character, maintain scenic views, or preserve wildlife, botanical, historic, archaeological and/or recreation sites. (Most of the subdivision will not be visible from the public road The creek and wooded areas will be protected using restrictive covenants and dedicated open space.) 19 The preservation of site features which directly enhance the special or unique cultural, historical, archaeological, or biological characteristics of the immediate area. (No known unique features exist on the property. However, special and sensitive features such as the stream and steep slopes will be protected with permanent open space reserved with restrictive covenants) 2. The number, location and/or size of lots to be located in the subdivision are such that, even if constructed to State standards, the streets would not be accepted by the State for maintenance due to density or other State requirements; (If constructed to State standards, Chili Court would not be accepted for maintenance by the State. Ritz Way would be eligible for State maintenance when four [4] residences are constructed and occupied.) 3. Recreation and/or open space areas, including lands containing significant botanical, wildlife, historic and/or archaeological sites, are to be dedicated and/or preserved through restrictive covenants in amounts significantly greater than required by standards for recreation/open space dedication. (Recreation/open space dedication is voluntary at this location. The applicant has chosen to reserve a total of 18.72 acres or 50% of the subdivision as open space.) 4. Significantly larger than required stream buffers and lot sizes, and/or other design features are proposed as part of a subdivision to be located in a Protected Watershed as designated on the Orange County Comprehensive Plan to reduce the amount of impervious surface and cause infiltration of storm water runoff to prevent the pollution of water supply reservoirs. (This subdivision is located in the Lower Eno Protected Watershed The average lot size is 1.36 acres, 32% larger than the minimum. The proposed private roads will protect at least 28,300 square feet or 0.65 acre of wooded area in the right -of -wary that would be cleared and seeded if the roads were built to State standards.) 5. Topographic and environmental features, such as streams, steep slopes, or watersheds, that would be adversely affected by the use of roads constructed to State standards because of factors such as significant amounts of earthwork (cut and fill) that would contribute to increased runoff of stormwater and siltation. (Building the roads to State standards would require clearing and grading more area than with the proposed private roads A proposed public right -of -way must be cleared entirely of all trees and underbrush Trees and natural understory may remain in a private right- PAC of -way, provided there is adequate clearance for larger vehicles. Vegetation within a private road right -of way sometimes provides an area for immediate infiltration of runoff from the travelway, shoulders and ditches. Constructing the proposed roads to State standards would directly affect moderate slopes, a drainage way, and the Lower Eno Protected Watershed.) 6. The site is already developed to 100% of the capacity which could be achieved after approval of the subdivision and some or all of the non - conforming aspects of existing development on the site will be made more conforming as a result of the proposed subdivision, and all conforming aspects of the development will remain conforming. (Not applicable) 7. There is only one subdivision road proposed. Its length does not exceed 350 feet. It serves no more than five lots. Its grade does not exceed nine percent. The land being subdivided is not connected to or is part of another subdivision required to be served by public roads. In addition, the average lot size within the subdivision is at least 40,000 square feet. (Not applicable) EVALUATION SUMMARY: The proposed private roads are justified through lower density and protection of natural features through open space dedication. In addition, the subdivision is located in a protected watershed where disturbance should be minimized. Planning Staff recommends that Chili Court be approved as a Class C private road and Ritz Way be approved as a Class B private road. 5 21 FISCAL IMPACT ANALYSIS FOR MTK DEVELOPMENT RESIDENTIAL SERVICE STANDARD APPROACH Prepared by The Orange County Planning Department April, 1998 PROJECT DESCRIPTION MTK Development contains 25 buildable lots and is located in Eno Township. The lots are accessed by new public and private roads which will intersect with Yates Road. The current zoning is AR - Agricultural Residential. The average lot size is approximately 1.53 acres. Lots will be served by individual wells and septic systems. Project build -out is estimated at five years. Housing units will be constructed, beginning in 1998, with completion of the project scheduled for 2002. Units will consist of detached single - family homes, and the applicant estimates the average sales price to be $179,583, including the lot. METHODOLOGY Fiscal impact analysis is a projection of the direct, current, public costs and revenues associated with residential and non residential growth in the jurisdiction in which the growth is taking place. Fiscal impact analysis considers only direct impact in that it projects only the primary costs that will be incurred and the immediate revenues that will be generated. It calculates the financial effect of a planned development or new subdivision by considering the current costs and revenues such a development would generate if it were completed and occupied today. Fiscal impact analysis does not consider the private costs of public action. It is concerned only with public (governmental) costs and revenues. The method used in preparing the fiscal impact analysis is the Service Standard Approach. While only gross expenditures by service category are derived from the Per Capita Method, the Service Standard method determines the total number of additional employees by service function that will be required as a result of growth. This method employs average county government costs per person, average school costs per pupil, an employee to population ratio, and average operating expenses per employee for each service category and school district. The number of new employees are projected and multiplied times the average operating expenses (includes personnel, operating and capital costs) per employee. These average costs are then weighed against per capita and per pupil revenues to project the total net fiscal impact of the development. M RESIDENTIAL FISCAL IMPACT TEMPLATE: SERVICE STANDARD METHOD Bureau of Economic & Business Research - University of Florida Modified 4115197 - Orange County, NC Planning Department SECTION 1 - PROJECT DATA: ENTER THE FOLLOWING DATA FOR EACH PROJECT. 23 CONSTRUCTION PERIOD: Beginning Year _ - 4 19' Ending Year _ 20( Inflago-n-6 te. 2.50 CHARACTERISTICS OF HOUSEHOLDS: Persons/House ENTER "1" BESIDE APPLICABLE SCHOOL DISTRICT Children/House: ENTER "1" BESIDE APPLICABLE SCHOOL DISTRICT BELOW. 0.- % Non - Elderly ` '' 0� .. _ _ ,.. ..: _ HOME SALES DATA: School District: School Attendance: .. >.'-64% Average Distribution Number of Sales Price of Units Year Homes (S) by Year 6 162,500 h ` r 20.00°/ .. �_ ..w 1999 5 170,625 20.000/ 2000 5 179,15 o 2001 5 188,114 20.000/ '2002 ''' '" �Y . # 5 t 197,520 : "' 2003 0.00% .,.. �.....�- ., ZOO4 _. „- a O a " ' -; mr w.. ..:. —•.. t 0.000/( .,,.,a� t ... 2005 0 0 0.000% - '•.2.. .... ... : O..ras.'a... 0 ..+a: k...':« _._' wp....ti..,....% . .s+} . ..w+i . ..+......_.. t Et.f . _ f. 1 ► . . r.- ��r' -.. .... 0.000/0 i+ _,yam 2007 0 0 0.00% SCHOOL DISTRICT DATA: ENTER "1" IN ( ) BESIDE SCHOOL DISTRICT IN WHICH PROJECT IS TO BE LOCATED TO GENERATE STUDENT DISTRIBUTION BY SCHOOL TYPE. School District: School Attendance: .. >.'-64% Middle School 17% - ^19% pe ro r Cha I Hill- Carrbo SECTION 2 - LOCAL GOVERNMENT AND SCHOOL DISTRICT DATA COUNTY POPULATION: JLATION: 24 1996- 1058 ;,-568 COUNTY EMPLOYMENT: POSITIONS PER CAPITA -General Govemment- -108.60 0.001 Public Safety 142.95 0.001 Public -77- 77 7— 6— 0 �7 .0.000! Human Services 264.07 0.002! -Education (School District) "- 33 055' ...70.007, I SCHOOL DISTRICT EMPLOYMENT: POSITIONS PER STUDENT ". Total w,0.144C COUNTY PER CAPITA REVENUES REVENUES PER CAPITA s- p_ert� Taxes ther Than �m 4653250 U.25 43.94 7274334 1-1- Public Wo Fks'. -7-7 -1 =7 - 7- Intergovernmental 9007481 85.06 Service Charges 33 055' Education 750000 (Recurring Capital) 7. Non-Departmental 3163481 29.87 Miscellaneous 1738939 16.42 COUNTY PER CAPITA EXPENDITURES EXPENDITURE PER CAPITA General Government -e U.25 Public Safety 7274334 68.69 Public Wo Fks'. -7-7 -1 =7 - 7- Human Services 17112641 161.60 Education 750000 (Recurring Capital) 7. Non-Departmental 3163481 29.87 COUNTY PER EMPLOYEE EXPENDITURE EXPENDITURE PER EMPLOYEE 62654.06 6804231 General, Govemrnent Public Safety 7274334 50887.26 7�7�'57433 77- -Public , - - .2PIC50 .80. Human Services 17112641 64803.43 - r� I -, " --'-! [DUUUU taucaDon (Kecumng uapitai) f7 U I V3.131 SCHOOL DISTRICT PER STUDENT EXPENDITURES EXPENDITURE PER STUDENT y, Gqvemmen!���,;.' L7- *ss ,TU,00, School District 0 000 12� - : ' 3789.29 � 4 SCHOOL DISTRICT PER EMPLOYEE EXPENDITURES EXPENDITURE PER EMPLOYEE Con -KC- �O:Crri!j�en 92����g School District 0 0.00 Stat ,. RV :K7 -263114"99 TAX DATA: ENTER APPLICABLE ASSESSMENT RATIO AND ELDERLY EXEMPTION: School District Tax Rate 0.0000 Per $100 Assessed Valuation rr Elderly Exemption 1 $11,000 Where Applicable SECTION 3 - DEMOGRAPHIC PROJECTIONS BASED ON PROJECT DATA YEAR HOUSING UNITS POPULATION SCHOOL CHILDREN Elementary Middle High School TOTAL 'OUNTY GOVERNMENT 1DDITIONAL EMPLOYEES General Government Public Safety Public Works Human Services OTAL CHOOL DISTRICT DDITIONAL EMPLOYEES 25 r t 1998} 1999 """ =2000` 2001 s _ 2C +" f 25 ,j 62) 62 �, y',62: 62 tip. 4 Y 62 12 t 25 49 E �'. �- ^'i' ,... •a.: t _ fir* .' �,�.,f.t _. � - a 1 2 3' 4 tf . 2 2 j2, 2�,���� ` 4 2 :r 2 3 u i[[ f � .I 7 �� 4SI L. 7 .+ w t�we��t Vii' ~�aa` i+t..•sr.: +w..s.rtv • � ter' Y 4i r ...,.,ice ' �+✓ � ♦ Y s „�. �..'' s ,y a _ 0.01, 0.03 � `` � $- 0 041 0.05,* 0.0 0.02, ; ' .05 ,< ) '� ro 0.03 0.05 0.07 d 0.01 F r ; 0.01 0.01 .;: x,� 0.0Z 0.02 ; #:° .0.0; 003j 0.06,x" ` "009 r 1 0.12 .. 0 074 0.13 "0 20 ��, 0.26 )� 03' }: 0.33 , .0` 0.33 x'0:33 0.19'" 0 29 0.38 0.41 YEAR s. r HOUSING UNITS POPULATION SCHOOL CHILDREN Elementary Middle High School TOTAL COUNTY GOVERNMENT ADDITIONAL EMPLOYEES General Government Public Safety Public Works Human Services rOTAL SCHOOL DISTRICT %DDITIONAL EMPLOYEES 2004 2006 i25-4 25 .25 25 +" f 25 ,j 62) 62 �, y',62: 62 tip. 4 Y 62 j . 2 2 j2, 2�,���� ` 4 2 ).O6 0.06 0.06' 0.063 "}1 <�I , 0.06 ro 0.08 a oa 0.08 0 os 1.0 0.03 .0 0.03-' 0.03 1 0.15. _0:,15 0.15'.. ti. , . ,0.11 5 0.33 , .0` 0.33 x'0:33 0.48 ` T .. AW 0.48 2:. SECTION 4 - PROJECTED FISCAL IMPACT OF PROJECT ON COUNTY GOVERNMENT YEAR '= - 1998 1999 - �i ;4.200% 2001 _ 20 TAX BASE ($1000) 813 1686 ,. -Ab § 2624 3630 " 47C REVENUES ($) IV Property Tax ��C° 6590 ' 13675 ` 21282: 29443 3819 Other Taxes .543- 1112 - j ; 17101 2338 299, Intergovernmental Y ::may .1050 , 2153 3311 ! 4525 579(' Service Charges 9 4w�, ,1° •395 ' 810 ' ' 1:1245 1702 - 2181 Miscellaneous _ z_ a - •}•203 416 �� T f�` 639 ! 874 111 TOTAL ($) 8781 18166 28188 i 38881 50282 EXPENDITURES ($) General Government 794 ; 1627 "'2501 1 3418 i 4379 Public Safety =848 1739 2674. 3654 4682 Public Works >_ 335 a 687 p - 10 561 1443 Human Services F """1996 4091 6290 8597 ,1848 P tf 1 .y r 11014 Education + t b.:N � 3028. 6207 ,.�,.y +,.,,x,N±f�g`rt' .� 9543A 13042` y SlM7.i�•a"".c+1rr +ir !MCV t [An.•1 16710 4�s, ,. Non - Departmental �'`� 369., 756 1163 1589 Y .2036 TOTAL ($)w- 7369 15107 = 23227 b 31743 "' ' (y *'� "p" 40671 , NET FISCAL IMPACT 1412 ! 3060 �S11 *4961 ; 7138 * 4 k , 4'961'1 ($)=' ,' �+,. ,, .. YEAR ':2003: 2004 ; s 2005; 2006 2007 �. TAX BASE ($1000) 4947 .�`"`; 5070 5197 5327 REVENUES vw►'L F9� y V n v���i i At - �y,,,. .f r. Property Tax f 39144:' 40123 41126 42154 8 Other Taxes 3147 3225 3306 ;�� 3389 5"9.' 43 Intergovernmental 6091 r.hy +"yin � � a 7 l' ,6c 2:- .4,. 3...A 6399 ,A, .'. r , . ; ".'.r + , r r a ,Y. ` 65.5., 9 o �w225 2291 2348 2467Service Charges to 16 Miscellaneous 1176"x"1205 1235 = ��+c*x•T, 1266 + rT. �J6890 TOTAL ($)� =51539 ; 52828 x54'149` 55502 i «��« EXPENDITURES General Government 448 4601 4716' 4834 4955: Public Safety .479 • 4919 '5042 5168 Public Works 1895 1942 E-1 - 199 2040 2091 Human Services 1 290 115721861 12158: ;.12462 ..• Education 17128 175567995:: 18445:. 18906 Non - Departmental 2Ci8T ' 2248 r r 2304! 2139 2193 .'Y TOTAL (i) 41688 42730 i 43798 44893 '46015. VET FISCAL IMPACT ($) 985 10098 10350, 10609 , ;;, 10874• 27 SECTION 5 - PROJECTED FISCAL IMPACT OF PROJECT ON SCHOOL DISTRICT YEAR 1998 1999 r -, -2000 2001 20 REVENUES (S) .� _.Y :.•jai: - County 3028 6207 9543. 13042 1671. School District 0 0 p 0 State 6252 12817 19707 26932 3450' TOTAL ($) 9280: 19024 29250 39975 ' ' 51217 EXPENDITURES County 3028: 6207 9543 13042 - 16710 School District 0, p p p p State 6252 12817 19707,; 26932 34507 TOTAL ($) 9280 19024 :- 29250 39975 51217 NET FISCAL IMPACT ($) 0 0 0 0 0 YEAR 2003: 2004 ...... 2005 2006 �- 2007 REVENUES County 17128 17556 ` -17995 18445 School District 0 ;� 0 �,. n4 0 0 State 35370: 36254 X37160: 38089 39042 TOTAL ($) 52498 ' 53810 :,55156 ' 56534 57948 EXPENDITURES ($) County 17128': 17556 17995 t 18445 18906 School District O i 0 =.:. :_ p p _ 0 State 35370 36254 37160:; 38089 - 39042 TOTAL ($) O...il' � �,� '52498'-' "•'W..+��wY'�i✓S' -..� 53810 55156,+ 56534 - a 4 z. .e.rK.. 57948 E NET FISCAL IMPACT ($) 0! 0 0; 0 0 SECTION 6 - SUMMARY OF PROJECTED DEMOGRAPHIC /FISCAL IMPACTS 2005' 28 YEAR 1998 1999 Y ; X2000' 2001 20 ` HOUSING UNITS 17. 10 15 20 2 POPULATION F 12 25 49 2 6 SCHOOL CHILDREN -,� - 4947 ^' _ 5070 44893 - 46015 Elementary 1 2 3 4 10098 � Middle - 0 56534 ': ' ' 57948 0 k '� _ _ 0 High School 0 1014281 103963 1 0609 :, 10874 TOTAL 2 3 5 7 I COUNTY EMPLOYEES 0.07 0.13 0.20 0.26 0.3 SCHOOL EMPLOYEES 0.10 0.19 0.29 0.38 0.4 TAX BASE ($1000) 813 ' 1686 2624 ; 3630 - 470> COUNTY BUDGET ($) i Revenues 8781 18166 28188; 38881 50282 Expenditures 7369 15107 232271 31743 40671 BALANCE 1412' 3060 49611, 7138 9611 SCHOOL DISTRICT BUDGET ($) Revenues 9280 19024 29250° 39975 51217 Expenditures 9280: 19024 r 29250 ; 39975 51217 BALANCE 0 0 0 0 0 COMBINED BUDGETS Revenues 18061 37191 - -57438 78856 101500 Expenditures 16649 :: 34131 > 52476 71718 91888 BALANCE 1412 306 .0 4961 7138 ` 9611 YEAR HOUSING UNITS POPULATION SCHOOL CHILDREN Elementary Middle High School TOTAL COUNTY EMPLOYEES SCHOOL EMPLOYEES 'TAX BASE ($1000) COUNTY BUDGET ($) Revenues Expenditures BALANCE SCHOOL DISTRICT BUDGET ($) Revenues Expenditures BALANCE COMBINED BUDGETS ($) Revenues Expenditures 3ALANCE 2003 25 62 . 1 2 0.33 ' 0.48. 4826 i 51539 41688 M R R -.: it �N4.• � •...J 52498 0 �t 1 '104037 - 94186 9852.1 2004 2005' 25 25' 62 62 5 5 5 17. 1 1i 2 2; 8 8 0.33 0.33; 0.48 0.48; 4947 ^' _ 5070 44893 - 46015 10609 874 52828 '' „54149 42730 .: d„ . ,43798 10098 � � ,��:, 10350 53810 . . '��' *` 55156. 53810 _, *'� 55156 'j 62 62 5 5 1 1 106638 1�09304� 96540 8 10098 <<_10350 2006 2007 25 25 62 62 5 5 1 1 2 2 8 8 0.33 0.33 0.48 ..: 0.48 5197 5327 55502 :.. _;:: 56890 44893 - 46015 10609 874 9: , 56534 y ' ' ' _' ' `57948 56534 ': ' ' 57948 0 k '� _ _ 0 112037' 114838 1014281 103963 1 0609 :, 10874 ` SECTION 7 - SUMMARY OF PROJECTED PUBLIC SCHOOL CAPACITY IMPACTS 29 SCHOOL DISTRICT DATA: School District: School Attendance: Orange CountyY,! ., - -wiE=i z-a : -YES :4 :: ; ElementarySchool - ,1.. �. �. - -- -- _._....,r.._ - 3' - - - .,,�--- - -�. -. may. :<<64 Middle School 17 Chapel Hill- Carrboro = ( "NO . ') >: r--High School 19 YEAR SCHOOL CHILDREN Elementary Middle High School TOTAL 1998 1999 2000 2001 2 3y CURRENT ENROLLMENT - ALL SCHOOLS Elementary..: _ YEAR 2003 3 5 , .y SCHOOL CHILDREN 1522 1520 Middle 1240 High School 1457 :-- 21 2 3y CURRENT ENROLLMENT - ALL SCHOOLS Elementary..: _ YEAR 2003 3 5 , .y 20C 4 _ f T SCHOOL CAPACITIES - ALL SCHOOLS CURRENT ENROLLMENT - ALL SCHOOLS Elementary..: _ YEAR 2003 2004 2005 2006 200' SCHOOL CHILDREN 1522 1520 Middle 1240 High School 1457 Elementary 5 . 5= 5 5 5 5 .:.r' �f Middle ��. 1. 1 �1I ;1 High School f 2 2 t .2; ,�� 2 � .y 2 K �� TOTAL f .+ �.. 8 .! 8 8 ,, 8 SCHOOL CAPACITIES - ALL SCHOOLS CURRENT ENROLLMENT - ALL SCHOOLS Elementary..: _ -3328 Elementary ,+' "2 822 Middle High School . " '..:.., .. ,. 1522 1520 Middle 1240 High School 1457 TOTAL 6370 TOTAL 5519 YEAR PROJECTED ENROLLMENT Elementary Middle High School TOTAL YEAR PROJECTED ENROLLMENT Elementary i Middle High School TOTAL 1998 2003 1999 2000 2001 2002 2824 2826 4 2827' 1241 " 1241 1241 s `„ 1241 .1458 1451458 8 459 5524; 5526 �+� 5522 ,,: 5527 2004 2005 2006 2007 <w"� °• 2827 2827 2827 . "� "-. 2827 1241 1241 1241 .u: 1241' 1459 1459 1459 1459` 5527 : 5527' 5527 M M I ff U The current zoning is Rural Buffer and University Lake Protected Watershed. Formerly the property was located entirely in Chatham County until 1990 or 1991 when Orange and Chatham Counties agreed on the location of the county line. At this location, the boundary moved south approximately 240 feet. The 5 -acre portion of the proposed subdivision in Orange County involves part of two lots and the subdivision entrance on Booth Road. A major subdivision application is required because a new public road is being dedicated. At least nineteen other new lots in Price Creek Estates have received approval from Chatham County. Much of the acreage slopes to the west draining into the East Branch of Price Creek which flows north approximately one mile and empties into University Lake. The lots will be served by individual wells and septic systems. Letters from NCDOT explain how construction of the proposed road and future maintenance will be reviewed and implemented, given that Chatham and Orange Counties are in different DOT districts. The letters are attachments to these minutes on pages The Planning Staff recommends approval of the Concept Plan for Price Creek Estates with a public road built to State standards and one condition of approval: 1. Choose a road name that does not duplicate other road names in Orange County. Searles asked about the differences in Chatham County's regulations that this Board needed to be aware of Applicant, Warren Mitchell, responded that the Chatham County has a one -acre minimum lot size. These lots average over two acres because of the availability of perc sites. Price asked about emergency services. Cameron responded that correspondence with EMS indicated that the 911 system is such that when a call comes in the location is indicated and the call is routed to the proper agency. MOTION: Price moved approval as recommended by the Planning Staff. Seconded by Hoecke. VOTE: Unanimous. b. Preliminary Plans (1) MTK Development (Eno Township - 25 Lots) Presentation by Emily Cameron. The property is located in Eno Township on both sides of Yates Road (SR 1563) east of Palmers Grove Church Road (SR 1562). The current zoning is Agricultural Residential (AR) and Lower Eno Protected Watershed. Adjacent land uses are residential. A 100 -foot AT&T right -of -way crosses 0 MInA TU 31 the property running east -west near the southern end of the tract. AT &T anticipates reducing the right -of -way to 33 feet later this summer. The total acreage of the tract is 38.34 acres. The site centers around a stream valley created by an unnamed intermittent stream that flows north approximately one mile to the Eno River. Primary conservation areas include the stream and scattered slopes estimated to be over 25 percent. The remainder of the site is considered secondary conservation area as woodland and/or major slopes greater than 15 percent. The wooded portion of the site was damaged by Hurricane Fran and shows the effects of clean- up efforts. The Preliminary Plan is almost identical to the Concept Plan approved by the Planning Board in January. Following Health Department review, two (2) lots were added with direct access to Yates Road. The current plan includes 25 new residential lots that average 1.36 acres in size excluding right -of -way. The plan for MTK Development follows the conservation option of flexible development as described in the Subdivision Regulations. The Preliminary Plan features 18.72 acres or 50% open space. The open space will be privately owned as part of the lots and will be reserved through restrictive covenants. The open space protects wooded land on moderate to steep slopes, the creek and the adjacent stream buffer, as well as buffers along the roads and the subdivision boundaries. The lots will have individual wells and septic systems and will access Yates Road from three proposed roads, except for lots 20 and 25. The two lots that were added after the Concept Plan review are proposed to have direct access to Yates Road. Crown Court is proposed as a public road to be built and paved to NC Department of Transportation standards. A 50 -foot public right -of -way stubout is reserved between lots 12 and 13 at the end of Crown Court for a potential road connection in the event property to the south is subdivided in a manner that warrants additional access. A map is attached (on page of these minutes) for a schematic illustration of a possible future road network. During the Planning Board's review of the Concept Plan, several members expressed concerns regarding the safety of Yates Road due to the width of the travelway, its vertical and horizontal alignment, the absence of pavement markings, combined with the proposed additional traffic. There also was discussion of dangerous intersections on Highway 70 and how additional traffic might affect them. The minutes of the Planning Board's discussion of the Concept Plan were sent with the Preliminary Plan to the Department of Transportation with a request for comments. DOT responded with a letter (an attachment to these minutes on page ), stating that certain improvements have been requested such as additional pavement inside curves, striping, and posting the speed limit. Regarding intersections on US Highway 70, the DOT District Engineer advised that the sight distances are currently adequate; however, they will q n 32 monitor the locations for potential problems. The intersection at Lawrence Road will be scheduled for signalization when funds are available. Chili Court and Ritz Way are proposed as private gravel roads, Class C and Class B respectively. The applicant's private road justification and the Staff evaluation are attachments to these minutes on pages . The private roads are justified through open space protection, lower density than the maximum allowed, and the subdivision's location in a protected watershed. The Planning Staff recommends approval of the Preliminary Plan for MTK Development with public and private roads according to the conservation option of flexible development and the conditions contained in the Resolution of Approval (an attachment to these minutes on pages ). Barrows asked about access for the new lots 24 and 25. Cameron responded that lot 24 will access Ritz Way and lot 25 will access Yates Road. Cameron continued that only lots 20 and 25 will access Yates Road. Barrows continued, asking about item #5 in the Resolution of Approval which states that further subdivision may require upgrade of roads. She noted that part of the justification for private roads was larger lots and the applicant had indicated that there would be no further subdivision. Cameron stated that with this on record, anyone looking at the recorded plat would know that further subdivision would require road upgrades. Price stated that she felt including the statement would help to ensure it remains as a private road. She felt without this statement in the Resolution, the opportunity may be there for further subdivision. Brooks asked if the statement of no further subdivision would be included in the covenants and Cameron agreed that it would. Allison asked if there are any issues related to siting a building because of the AT &T 100 -foot right -of -way which may be reduced by AT &T later this year to 33 feet. Cameron responded that AT &T had indicated that later this summer the right -of -way will be reduced to 33 -feet. She continued that building and septic setbacks can be met with the 100 -foot right -of -way; building on this lot is not contingent upon the reduction of the right -of -way. Brooks asked the open space. Cameron responded that it is being called conservation area and includes stream buffers and setbacks. Selkirk asked if there was a flowing stream or a wet weather stream. The response was that it is flowing. MOTION: Searles moved approval as recommended by the Planning Staff. Seconded by Selkirk. VOTE: Unanimous. (2) Charles Woods Subdivision, Phases 3 and 4 (Eno Township - 20 Lots)