HomeMy WebLinkAboutAgenda - 09-15-1998 - 10bORANGE COUNTY
BOARD OF COMMISSIONERS 1.
ACTION AGENDA ITEM ABSTRACT
Meeting Date: September 15,1998
Action Agenda
Item # /p~~
SUBJECT: Proposed Bicycle Plan Component to the Transportation Element of the Comprehensive
Plan and Research on Innovative Non-Motorized Transportation Planning in North Carolina
Counties
DEPARTMENT: Planning & Inspections PUBLIC HEARING: Yes _X_No
BUDGET AMENDMENT REQUIRED: Yes _X No
SEPARATE ENCLOSURES: INFORMATION CONTACT: Slade McCalip
- Draft Bicycle Transportation Plan Extension 2595
- Non-Motorized Transportation Facilities
in NC Counties (without attachments) TELEPHONE NUMBERS:
Hillsborough - 732-8181
ATTACHMENTS: Durham - 688-7331
- 8/5/98 Draft Planning Board Minutes Mebane - 227-2031
Chapel Hill - 967-9251
PURPOSE: To review a draft Bicycle Transportation Plan for inclusion in the Transportation.
Element of the Comprehensive Plan. To review reseazch on Non-Motorized
Transportation Facilities in North Cazolina Counties.
BACKGROUND: The Bicycle Plan Component Task Force was appointed by the Orange County
Boazd of Commissioners on November 19, 1997 with the following specific
charge: To prepare a Bicycle Plan Component to the Transportation Element of
the Orange County Comprehensive Plan, including recommendations for
implementation, for all of Orange County outside of the municipal extra-
territorial planning jurisdictions and the transition areas of the Joint Planning
Land Use Plan. To perform research for presentation to the Orange County
Board of Commissioners on innovative bicycle and pedestrian connections
between subdivisions and other developments. The Bicycle Plan Component
should be based on the recommendations in the DCHC Regional Bicycle Plan and
the results of the 1995 Orange County Bicycle Suitability Study. Appointment to
the Task Force will expire with the Board of Commissioners decision on whether
or not to adopt the recommended Bicycle Plan Component.
The Bicycle Plan Component Task Force created the Draft Bicycle Transportation
Plan over a 6-month period. The Task Force provided their input as to what the
Goals of this plan should be and also which cycling routes aze the most important
to the cyclists of Orange County. Staff was then directed to develop a plan with
recommendations for implementing the goals and making improvements to the
priority routes. The Task Force endorsed the draft plan contained herein at their
June meeting.
2.
At the request of Commissioner Brown on November 19th BOCC meeting last
- -fall, research has been performed to determine what Orange County can do to
increase inter-connectivity between neighborhoods and nearby activities. The
research findings are summarized in the Non-Motorized Transportation
Facilities in North Carolina report. This report outlines the existing policy
conditions that influence pedestrian and bicycle facility planning, design,
construction and maintenance for counties in North Carolina. It also summarizes
results from a statewide survey on pedestrian and bicycle facilities in other North
Carolina counties and explores options and methods that Orange County may
employ to encourage accessibility and mobility on foot and by bicycle.
At their August 5th meeting the Planning Board accepted the draft plan and
forwarded it on the Commissioners with the following recommendations asmade
by the Bicycle Plan Component Task Force and modified by the Planning Board:
1) That a permanent and formal bicycle advisory committee be formed;
2) Dedicate part-time (the task force recommended full-time) staff support for the
advisory committee;
3) Update the 1974 Bikeways Act; and
4) That this task force remain together until after TIP project e-3606 is complete
($ 50,000 that the State has programmed for Orange County to develop a bicycle
suitability map).
RECOMMENDATION: The Administration recommends that the Board:
a) receive the Draft Bicycle Transportation Plan and Non-Motorized
Transportation Facilities Research Report,
b) review the draft Plan and provide comments to staff prior to presentation of the
Draft Plan at Public Hearing, and
c) schedule the Draft Plan for the November 23, 1998 Public Hearing.
_ - _ The Orange County Comprehensive Plan contains designations for some of the
existing State-maintained roads as arterials or collectors. Section IV-B-3-c-1 of
the Subdivision Regulations establishes minimum right-of--way widths for each
classification of road: 100 feet for arterials and 70 feet for collectors. If a
subdivision is proposed on a road designated in the Comprehensive Plan as
either arterial or collector, and the existing dedicated public right-of--way is 60
feet, then additional right-of--way is required whether the application is being
processed as a major or a minor subdivision.
Every new lot created through subdivisions subject to the Orange County
Subdivision Regulations is required to meet the same set of standazds regazdless
of the size of the subdivision or whether the applicant is a professional
developer or a relative of the property owner. The U.S. Constitution guazantees
"equal protection under the law," which in the case of land use regulations
means consistently enforcing the same set of standazds for similaz types of
development projects. The application of specific standazds varies based only
RAFT on location reflecting differences ;n zoning districts, recreation service azeas,
Q etc. (One exception is the traffic impact study.)
Requiring larger building setbacks does not accomplish the public purpose set
forth in Section IV-B-3-c-1, i.e., public right-of-way dedication. Land use
buffers (30 feet and 75 feet wide) aze required adjacent to the right-of--way
collectors and arterials, but not as a substitute for the right-of-way dedication.
The purpose of the Subdivision Regulations includes "to insure adequate
planning of street systems." If additional right-of--way for arterials and
collectors is not dedicated with adjacent minor subdivision, the opportunity to
plan for upgrading those roads to accommodate increased traffic is lost. The
obvious result is future traffic congestion on roads that aze unsafe.
Dedications of additional road right-of--way aze treated in the same manner as
new public roads and stubouts. When the final plat is approved, the property
owner signs a certificate on the plat which in part makes the offer of public
dedication. Consequently, the County Manager signs another certificate on the
plat to accept the offer on behalf of the public. Using this procedure the public
right-of--way is held by Orange County on behalf of the public without
maintenance responsibility, insuring that it will be available when road
improvements aze needed and the State takes over maintenance of the additional
right-of-way.
AGENDA ITEM #12: REPORTS
a. Draft Bicycle Plan
Presentation by Slade McCalip.
This item is to review a draft Bicycle Transportation Plan for inclusion in the
Transportation Element of the Comprehensive Plan and to review reseazch on
Non-Motorized Transportation Facilities in North Cazolina Counties.
The Bicycle Plan Component Task Force was appointed by the Orange County
Boazd of Commissioners on November 19, 1997 with the following specific
chazge: To prepaze a Bicycle Plan Component to the Transportation Element of
the Orange County Comprehensive Plan, including recommendations for
3.
4.
implementation, for all of Orange County outside of the municipal extra-
_ territorial planning jurisdictions and the transition azeas of the Joint Planning
Area Land Use Plan. To perform research for presentation to the Orange
County Boazd of Commissioners on innovative bicycle and pedestrian
connections between subdivisions and other developments. The Bicycle Plan
Component should be based on the recommendations in the DCHC Regional
Bicycle Plan and the results of the 1995 Orange County Bicycle Suitability
Study. Appointment to the Task Force will expire with the Boazd of
Commissioners decision on whether or not to adopt the recommended Bicycle
Plan Component.
The Bicycle Plan Task Force created the Draft Bicycle Transportation Plan over
a 6-month period. The Task Force provided their input as to what the goals of
this plan should be and also which cycling routes aze the most important to the
cyclists of Orange County. Staff was then directed to develop a plan with
recommendations for implementing the goals and making improvements to the
priority routes. The Task Force endorsed the draft plan contained herein at their
June meeting.
At the request of Commissioner Brown at the November 19, 1997 meeting,
reseazch has been performed to determine what Orange County can do to
increase inter-connectivity between neighborhoods and neazby activities. The
reseazch findings are summarized in the Non-Motorized Transportation
Facilities in North Carolina report. This report outlines the existing policy
conditions that influence pedestrian and bicycle facility planning, design,
construction and maintenance for counties in North Cazolina. It also
summarizes results from a statewide survey on pedestrian and bicycle facilities
in other North Cazolina counties and explores options and methods that Orange
County may employ to encourage accessibility and mobility on foot and by
bicycle.
Planning Staff recommendation is: Receive the Draft Bicycle Transportation
Plan and Non-Motorized Transportation Facilities Reseazch Report. Review the
Plan and Report and provide comments to staff prior to presentation of the Draft
Plan and Report to the Commissioners. Recommend the Draft Plan and Report
to the Commissioners for their consideration.
Selkirk expressed appreciation for the comprehensive work done by McCalip
in providing such a huge amount of information for the Bicycle Committee. He
also expressed appreciation for the enthusiasm of the committee and recognized
Kelly Evenson noting she had attended every meeting of the committee.
McCalip stated that the plan has been sent out for informal review to the North
Carolina Bicycle Committee members, Dr. Gene Griner and Liz Rooks,
Carrboro, Chapel Hill, and Durham. McCalip continued that he would send the
plan to all surrounding jurisdictions, state-wide planning branch, all of the
bicycle planning authorities that he is awaze of and anyone else that the
Planning Board feels should review it.
Barrows noted that she was impressed with the amount of work that had been
done to complete the draft plan. She asked for clarification of some of Carmen
Borg's work regarding things that counties can and cannot do in North Cazolina
because of State laws. North Cazolina laws prohibit counties from making road
improvements but they are unclear about sidewalks and trails.
5.
_ _ _ McCalip responded that it is not clear. Durham County is requesting enabling
legislation authorizing the County of Durham to fund bikeways and trails. It is
very clear what municipalities can do. For counties, it does not specifically
mention pedestrian paths, bikeways and trails.
Selkirk noted that there were several places where roads were mentioned but
that sidewalks and bike paths were not specifically referenced. Several rules
and regulations were also mentioned.
Price asked the reality of the proposed bicycle transportation route, NC 86 as a
priority when it is a two-lane .road and no space for bicycles without grave
endangerment. McCalip responded that is the # 1 desired route of cyclists in
Orange County to be improved for transportation between Hillsborough, Chapel
Hill and Carrboro. We can't improve it on our own. It has to be done by the
State. The overall recommendations of the Bicycle Task Force is to include
some provisions for more bicycle funding in the State laws and Transportation
Improvement Program. At this time, there is only $3M for the entire state per
yeaz and that is not enough. Most of this goes to urban azeas.
Price continued what does the Planning Boazd need to do to make this become a
reality? McCalip responded that the Board could recommend that in the
legislative package for Orange County delegation to General Assembly to
include, as Durham County did, legislation for Orange County or across the
state for improvements such as these.
Selkirk asked that McCalip review the map of proposed routes explaining why
those routes were selected as the primary routes. M~Iip explained that this
plan is for bicycle transportation as opposed to bicycle recreation. He referred
to the profile of the cyclist in the agenda materials noting that the design cyclist
is usually someone who has a driver's license and knows how to operate a
vehicle on the road whether it be a caz or a bicycle. This cyclist is going to a
specific destination, usually to work and the intent of this plan is to address this
type of cyclist. The 1993 Regional Plan tried to address everyone at the same
time. It mixed child cyclists and novice adult cyclists with the advanced
cyclists. Most of the cyclists on the Task Force aze advanced cyclists. They are
comfortable operating in traffic except for the roads in our county because they
aze too narrow even for advanced cyclists to be able to navigate particulazly
when lazge equipment is on the road. The whole orientation of this plan is for
transportation and for recreational cyclists to get to those azeas providing for
recreation. Hopefully, there will be integration between this and the Master
Parks and Recreation Plan.
McCalip reviewed the schedule of meetings and what was studied and
determined at each meeting. He reviewed the primary and secondary routes
included in the plan and how they were determined.
Barrows asked for more information on what the Bicycle Committee has been
doing since creation in 1974 and why just 28 miles of bike lanes. McCalip
responded that most of what goes on in the state is in urban areas. Some states
have completely turned bicycle routes and lanes over to the municipalities to do
as they wish. In North Cazolina funds are available and our region has been
trying to dedicate STP DA funds to bicycling pedestrian paths but there have
been stumbling blocks with NCDOT because it is the only region that is trying
to do so.
6.
There was discussion about who should review and comment on the Draft Plan.
Selkirk asked for clarification of what should be done by the Planning Board to
move the plan forward and keep the process moving. McCalip responded
giving the recommendations of the Task Force from its fifth meeting as follows:
1. That a permanent and formal bicycle advisory committee be formed;
2. Dedicate staff to support the advisory committee;
3. Update the 1974 Bikeways Act;
4. That this task force remain together until after TIP project E3606 is
complete ($50,000.00 that the State has programmed for Orange
County to develop a bicycle suitability map).
McCalip noted that he had asked that the funding be held until the plan was
completed. The suitability analysis was done in 1995.
Strayhom and other Boazd members did not endorse a "full time" staff person to
support the Bike Advisory Committee. However, they did endorse part-time
support to the BAC.
It was the consensus of the Board that the specific recommendations of the Task
Force be included in the recommendation to the County Commissioners.
MOTION: Brooks moved to accept and forwazd the plan to the County Commissioners
with the recommendations of the Bicycle Task Force with part-time staff
support. Seconded by Price.
VOTE: Unanimous.
Meeting adjourned 10:35 p.m.
Prepared By
Approved By
Date