Loading...
HomeMy WebLinkAboutAgenda - 10-06-1998 - 8hORANGE COUNTY BOARD OF COMMISSIONERS Action Agenda Item No. a -h ACTION AGENDA ITEM ABSTRACT Meeting Date: October 6, 1998 SUBJECT: Housing Rehabilitation Contract Award DEPARTMENT: Housing and Community Development PUBLIC HEARING: (Y/1) BUDGET AMENDMENT: (Y/1S) ATTACHMENT(S): INFORMATION CONTACT: Bid Results Tara L. Fikes Work Specifications TELEPHONE NUMBERS: - - ext. 2490 Hillsborough 732 -8181 Chapel Hill 968 -4501 Durham 688 -7331 Mebane 227 -2031 PURPOSE: To award three housing rehabilitation contracts for the CDBG Housing Rehabilitation Program. BACKGROUND: The Housing and Community Development Department solicited bids from qualified housing rehabilitation contractors participating in the County's Housing Rehabilitation Program. For the English property, sealed bids were solicited from participating contractors on August 25, 1998 and extended to September 8, 1998. The informal bidding process is governed by the North Carolina General Statues §143 -131 and does not require a minimum number of bids. Bid results are attached. Present program procedures provide that housing rehabilitation contracts be awarded to the lowest responsible bidder. In the case of the Cates properties, a bid of $32,000 was awarded to MDH Construction Company on June 22, 1998, however, since that time the contractor has indicated that due to delays with other jobs, he will not be able to complete this job this year. Thus, in the interest of timely program implementation, news bids were solicited for the two Cates properties. RECOMMENDATION(S): The Manager recommends awarding t Dwelling Unit Torain — 664 Oak St. Cates — 605 Lipscomb Grove Ch. Rd. Cates — 519 Lipscomb Grove Ch. Rd. he following housing rehabilitation contracts: Bid Amount Contractor $39,340 CFW Construction Co. $37,800 Thames Construction Co. $35,800 Thames Construction Co. RESULTS OF BID OPENING OWNER: Torain APPLICATION NUMBER: ADDRESS: 664 Oak Street COST ESTIMATE:_$36,857 Hillsborough, NC PERCENTAGE OF BID OVER 7� CHECK ONE:JOB BID x COMPANY 1. CFW Construction Co. 2. Thames Construction Co. 3. 4. 5. 6. UNDER COST ESTIMATE JOB NEGOTIATED BID AMOUNT $39,340 $39,800 BID OPENED BY: Jim Axelrod TIME OF BID OPENING: 1:00 PM DATE OF BID OPENING: September 8, 1998 WITNESSED BY: Donna Galloway Lowest Acceptable Bid: $39,340 Negotiated Amount: Contractor: CFW Construction Company NAME P.O. Box 27466, Raleigh, NC 27611 -7466 ADDRESS (919)834 -6087 TELEPHONE NUMBER COMMENTS: Submitted by: Tara L. Fikes Bid Approval Date Proceed Order Issued Date-09-23-98 2 r i RESULTS OF BID OPENING OWNER: Cates, D. APPLICATION NUMBER: ADDRESS: 605 Lipscomb Grove Ch. Rd.—COST ESTIMATE:_$36,857_ Durham, NC PERCENTAGE OF BID OVER 3% UNDER COST ESTIMATE CHECK ONE:JOB BID —x— JOB NEGOTIATED COMPANY BID AMOUNT 1. CFW Construction Co. $38,500_ 2. Thames Construction Co. $37,800 3. 4. S. 6. BID OPENED BY: Jim Axelrod TIME OF BID OPENING: 1:00 PM DATE OF BID OPENING: September 8, 1998 WITNESSED BY: Donna Galloway Lowest Acceptable Bid: $37,800 Negotiated Amount: Contractor: Thames Construction Company NAME 834 Junction Road, Durham, NC 27703 ADDRESS (919) 688 -6815 TELEPHONE NUMBER COMMENTS: Submitted by: Tara L. Fikes Bid Approval Date Proceed Order Issued Date-09-23-98 3 4 RESULTS OF BID OPENING OWNER: Cates, C. APPLICATION NUMBER: 7 ADDRESS: 519 Lipscomb Grove Ch. Rd._ COST ESTIMATE: $36,857 Durham, NC PERCENTAGE OF BID OVER 3% UNDER COST ESTIMATE CHECK ONE:JOB BID x JOB NEGOTIATED COMPANY 1. CFW Construction Co. 2. Thames Construction Co. 3. 4. 5. 6. BID AMOUNT $38,500 $35,800 BID OPENED BY: Jim Axelrod TIME OF BID OPENING: 1:00 PM DATE OF BID OPENING: September 8, 1998 WITNESSED BY: Donna Galloway Lowest Acceptable Bid: $35,800 Negotiated Amount: Contractor: Thames Construction Company NAME 834 Junction Road, Durham, NC 27703 ADDRESS (919) 688 -6815 TELEPHONE NUMBER COMMENTS: Submitted by: Bid Approval Date _ Proceed Order Issued Tara L. Fikes Date-09-23-98 r � � � � �z �4 Louvred Roof Vents � , RIGHT i � I---t-1 ___ , I _._ i , ,-- LE�T �LS D�tE �t� JOB N0. � N °R""�" F.L. Wr�ght June E l P V Q -t I 0 n c� LwECKED F,L. Wr�ght June �` N`' E�. F.L, Wr�ght June S�� �„ _ �, wTE JunP 4 00 � � 1/2" Sheath�ng FF & Mold�ng as des�red 2"x4" stua' 1/2' subfloor w/ 5/8' f�nish floor lo' �.C. � 2"x10" Jo�sts-lZ" O.C, 2'x4" Sole Plnte �tG�S C� lnsulat�on R-19 C"x10" Header 2"x8" Press. 1r. Plote Waterproof 8°x16" �ound. Vent Foundn��o� 8Fx16" Conc. Block �" d�ar� perf, p;pe � 18"x8" Conc, �oot+nq w/SZOne � � �-..--- 2-3/8" Rebar Use 16' Rafters I F�bergtass . Sh�ngles -� :5n Felt � . i 2"x8" Jo�sts �� 2"x8" Rnfters . ' 24° O.C. j � �4' p.C. x lnsulntion � ' � 9" R-30 __ _.__ 1"x6" Fasc�a — I - c-2"'x4'� i op Piate V�nyl Vented Soff�t-t �- 1/2' Sheetrock V�nyl S over S S�d�ng Wall Insulat�on R-19 APPROVAlS � DATE TITL"t• JOB NG. V °w�" F.L. Wr�ght June W Q l l S e � � I � n `""�° F.L. Wr�ght June °'V;. "o. ENdt� F.L. Wr�ght June � NTS °ATE June 3 -- _ � v� � � z9' - 8' - , 1S'XB` CO�C• Foot�ng - Cont�nuous Pour � 24"x24°x8" Concrete Doubte Jo�sts Foot�ng CTyp> -] under Part�t�ons r � � aaa z4•X ; , ' 36' Access � Door for 3 - 2`x10° G�rder n' Crnwl Space 16'x16" Masonry P�ers w/ 2'x2" Ledqer 16"x8' Found �Typ�cal) VentCTyp> Terr��te Treat So�l �rx10' Joists e 16' �.G CTyp) K � � i � � i � � �,� .��. p1N"" F.L. Wr�ght June � ounclat� on Plan `'"�D F.L. Wr�gh June °M�2 °�"` F.L. Wr�gh ;June � 1' = 6' �� June . _