Loading...
HomeMy WebLinkAboutAgenda - 10-20-1998 - 10a1 ORANGE COUNTY BOARD OF COMMISSIONERS AGENDA ITEM ABSTRACT Meeting Date: October 20.1998 Action Agenda Item # /0-a SUBJECT: CANE CREEK WATERSHED STAFF REPORT DEPARTMENT: PLAlY1~tING BUDGET `AMENDMENT REQUIRED: '" Yes ` X No ATTACHMENT(S): INFORMATION CONTACT: Gene Bell, Extension 2592 • Staff report (previously provided under separate cover) David Stancil, Extension 2590 TELEPHONE NUMBERS: Hillsborough - 732-8181 Durham - 688-7331 Mebane - 227-2031 Chapel Hill - 467-9251 PURPOSE: To receive a report on recommendations for protecting Cane Creek watershed. BACKGROUND: In October 1997, the OWASA Board of Directors adopted their "Final Recommendations for Protecting Cane Creek Watershed." These recommendations were the culmination of three years of study of Cane Creek, including a technical study conducted by a consultant, and deliberations by an appointed Cane Creek Watershed Advisory Committee. The OWASA report recommends changes to County ordinances to implement special land use measures to protect the quality of drinking water from the reservoir. In conjunction with this effort, a number of comments have addressed the OWASA recommendations. Specifically, the Bingham TAC has prepared an issue paper that lays out an alternative approach for protecting water quality, along with other recommendations for community concerns. Staff has prepared a report that summarizes the work and findings of OWASA on Cane Creek, reviews the other comments and suggestions received, and evaluates the recommendations against the County's goals, policies and plans, with special emphasis on the implications for County plans and ordinances. 2 To summarize, the staff report concludes that there are three basic approaches that appear most feasible for managing protection of water quality in Cane Creek, all of which will protect water quality to a similar level -but which offer differences in levels of certainty and/or differing implications for County plans and policies. This report is being presented at this time to outline the different ideas and approaches, and request feedback in the development of a final staff report. The Commissioners goal calls for a community meeting to be conducted in late- October in the watershed, with specific ordinance amendments and a recommendation to be heard at the November 23 public hearing. RECOMMENDATION: Receive as information. Staff will use feedback from the Board to refine the staff report, before conducting the community meeting and preparing a recommendation for the Board at the November public hearing. Cane Creek W Staff Report o..~en cwmy mains onP.un<~. I°2°ve Current Wate d Protection • County focus onnon- • 6%im 'ous surface structural protection • Stream bu • Class WS-II watershed • 1 % maximum o • Changes adopted 1994 watershed can be on- • Two-acre lots residential throughout watershed or°'sn Cmmy PWvung Dev~Ons+s 102696 OWASA Re mendations • Rezone watershed to 5-acre inimum • Allow up to 5 2-acre lots for exis ' act: • Allow open space development, with 0°0 open space and one house per 2-Ac de it} • Tributary detention ponds may be neede • Pursue zoning in Alamance portion • Discuss TDR possibilities °"^sn cwmr P6nms u.v.mw 16269a Cane C?e~k Facts • Reservoir may meet demand to 2030 ~ • 20,227 acres • 90%ofwatershed in Orange County • 78% of watershed is forest or agricultural Ornse Cwnry PWnip °ev~d 102098 Cane Creek 17~a~rshed Study • Current water quality is good, of pristine • Long-term conversion of forest land agriculture and residential will threate water quality • Eight management options modeled and evaluated OmM CwmY Phmiiy Prv~ 1°20198 Staff Evalua~P~l of Options • Watershed lots bigger than ex d... • ...but area growing faster than exp to • Analysis focused on scoping options County watershed protection policy • Site-specific design application • Other possible options evaluated • Identification of three primary options a.nn cWnry Phmi08 °nn~mrn 1a269s 1 1. Man ory Flexible Develop nt Stren hs Weakne • Uses existing, known • Must ensu program riparian aze e ' • Lower open space Protected open ace may offer more design • Requires tributary flexibility impoundments (watershed study) • OWASAIand acquisition program • Unknowns of cluster for water quality a,os. roomy erd:a oov.aMa ioao9a 3. OWASA-Recommended Stren hs Weakne • Highest certainty of • Could redu protection? • Two development • Open space not options guazanteed • Fewer lots could = • If cluster option reduced public service utilized,couldr~ needs impoundments o..o~ cwmy n.ooms n.p.m~os ~onoroe Plan of A1st~on (conc> • November 23 public hearing • January 1999 (tent.) -Planning • Feb.1999 (tent.) - Boazd of a.es~ croon rVm:oa oeo.m.m in~xwga 2. Creative Op (Cluster, Open Stren hs • Guarantees higher open space protection • Combines resource protection and water quality protection • OWASA land acquisition program o.en coon w~~os wv.uom Plan Space Design • Must ensu riparian aze a in protected open ace • Requires tributary impoundments (watershed study) • Unknowns of cluster for water quality ~oaoroe • Receive feedback from • Hold community meeting to explain discuss recommended approach • Property owners notified by mail of o..~s• cmmn ermune wr.eo~m ~orsase 2