Loading...
HomeMy WebLinkAboutAgenda - 10-20-1998 - 8fORANGE COUNTY BOARD OF COMMISSIONERS Action Agenda Item No. A-~ ACTION AGENDA ITEM ABSTRACT Meeting Date: October 20, 1998 SUBJECT: Consultant Approval; Design work for electrical connections to make two schools generator compatible utrHrc i MtNT: PURCHASING AND Public Hearing: No CENTRAL SERVICES Budget Amendment Reqd? NO H I I AGtiMENT(S): Proposal INFORMATION CONTACT: PAM JONES, ext. 2650 Telephone Number- Hillsborough 732-8181 Chapel Hill 967-9251 Mebane 227-2031 Durham 688-7331 PURPOSE: To consider approving a contract with Gary Sunderland for electrical system design work necessary to bid a project that makes two schools generator compatible. BACKGROUND: Experience with Hurricane Fran impressed upon County, School and Red Cross officials the need to have emergency electrical service provided for buildings designated as shelters. The group explored options ranging from equipping the facilities with generators to making them "generator ready". After considerable discussion among the County, Red Cross and both school systems, it was determined that Culbreth Middle School (Chapel Hill) and Stanford Middle School (Hillsborough) would be the two schools most appropriately designated as emergency shelters. These facilities are strategically located and have electrical systems that are compatible with the proposed generator work. The schools will be wired and a manual transfer switch installed such that a generator can be moved in and connected easily and quickly when needed. The Red Cross will provide the emergency generators for both facilities. The fee proposed by Sunderland is $8,000 (160 hours @ $50 per hour) and is based upon a scope of work that was prepared by the County's Electrical Inspector in collaboration with the Fire Marshal, Red Cross and representatives from both school systems. However, it should be noted that some issues have yet to be clarified, pending review of electrical plans to be submitted for the schools. Further refinement of the scope of work may result in a reduction in the fee, but will not result in an increase. The engineer will be responsible for designing both projects, preparing documents suitable for bidding and construction as well as inspections at both facilities as the work is on going. Funds for this work are available through the 1998-2008 Capital Investment Plan. Governing boards may exempt themselves from the State's policy of the RFP process for architectural and engineering services if the professional fee is less than $30,000. It is recommended that this exemption be invoked for this project for the following reasons: • The market in our area remains such that projects of this size do not generate sufficient interest to establish a pool of interested consultants. • This consultant will agree to turn around the project quickly so the schools can be made generator ready prior to the onset of potentially icy weather season. • The fee substantially falls below the $30,000 threshold required for soliciting and RFP. RECOMMENDATION: The Manager recommends that the Board approve the use of Gary Sunderland, to provide engineering services for referenced project at a not to exceed cost of $8,000; to exempt this project from the public policy of the state to solicit Requests for Proposals for engineering services; and to authorize the Chair to sign the resulting contract, contingent upon attorney and staff review. -~.~ n SUNDERLAND ENGINEERING 3 Cansuiting Engineers PO Bex 14524 {919) 477-,'031 RTP, NC 27709 September 22, 1998 Pam Jones Orange County Public Works Chapel Hill, NC 27278 Dear 11ds Jones, We are pleased to submit this proposal to you for engineering design services pertaining to the Emergency Shelter Generator projects located at 2 schools in Chapel Hili, NC. Included in this letter is an outline of the proposed design services, fee requirements and expected schedule. Sunderland Engineering will provide services to you to prepare the complete set of construction documents for the project based upon our agreed scope of work. Items included in services are all work required to complete the bid documents and specifications, including all field surveys, bid negotiation, shop drawing review, construction administration, and final closeout as required throughout the construction period of the project. -Sunderland Engineering will complete the work described above for a fixed fee of $B,OOQ.UO, plus reimbursable expenses. We assume that all building floor plans and electrical drawings will be - made available and that you will provide us with your standard front end specifications. We are prepared to begin work immediately and complete the drawings within 3 weeks, at which time a bid date can be set and the construction portion of the project can begin. Thank you for this opportunity and I look forward to continuing work with you on the project. Please call me with any questions ybu may have regarding the content of this proposal, I would be glad to provide further information. Sincerely, Gary L. Sunderland, PE j cc: file 1V181 ti I Bud-rn81.xls PROJECT FEE BUDGET ORANGE COUNTY PUBLIC WORKS EMERGENCY SHELTER GENERATOR PROJECT #M81 GARY SUNDERLAND, PE BUILDING TYPE COMMERCIAL BLDG AREA(SF} 25,000 EST $/SF ($60-$140) $4 $4 CONSTRUCTION VALUE $100,000 TOTAL FEE (6%-15%} 8.0% $8,~0 TOTAL MANHR ($50-$9C $50 160 SD DD CD BiD CA BUDGET BREAKDOWN 100% 45% 0% 25°l° 5°~6 25% ADMIN 5-10°~ 10% 16 7 0 4 1 4 ARCH 40-60% 0% 0 0 0 0 0 0 STRU 10-20% 0°r6 0 0 0 0 0 0 SITE 5-10% 0% 0 0 0 0 0 0 HVAC 15-30% 0°~ 0 0 0 0 0 0 PLUM 5-15% 0°~ 0 0 0 0 0 0 ELEC 10-20°,b 90% 144 65 0 36 7 36 TOTAL 100% 160 7Z 0 40 8 40 HC~JRLY BREAKDOWN FIELD INVESTIGATION PRELIMINARY DESIGN OWNER REVIEW FINAL DESIGN SPECIFICATIONS FINAL REVIEW BID PHASE CONSTRUCTION OBSERVATION AS BUILT DRAWINGS 1so 72 a 4o a 4a 32 32 8 16 16 8 8 32 8 FEE$ $800 $0 $0 $0 $0 $7, 200 $8,000 $a,aao 4 r Page 1