HomeMy WebLinkAboutAgenda - 11-23-1998 - C3 (a)w II
~ .1
ORANGE COUNTY BOARD OF COMMISSIONERS
ORANGE COUNTY PLANNING BOARD
PUBLIC HEARING AGENDA ITEM ABSTRACT
Meeting Date: November 23. 1998
Action Agenda
Item # C 3 f a )
SUBJECT: ZONING ORDINANCE TEXT AMENDMENTS: CANE CREEK WATERSHED
OVERLAY DISTRICTS
DEPARTMENT:: PLANNING PUBLIC HEARING: a Yes No
BUDGET AMENDMENT REQUIRED: Yes X No
ATTACHMENT(S):
• Letter to property owners
• Executive Summary of staff report
• 10/29 Community Meeting Summary
• Staff Recommendation
• Proposed Amendments
INFORMATION CONTACT:
David Stencil, Eat 2590
Adhir Kackar, Eat 2589
TELEPHONE NUMBERS:
Hillsborough - 732-8181
Durham - 688-7331
Mebane -227-2031
Chapel Hill - 967-9251
PURPOSE: To receive citizen comment on proposed text amendments to the Orange County
Zoning Ordinance to implement new development standards for Cane Creek
watershed. These amendments are being heazd in conjunction with proposed
companion amendments to the Subdivision Regulations.
BACKGROUND: Changes aze proposed to Section 2.2 (Definitions) and Section 6.23 (Extra
Requirements for Watershed Protection Overlay Districts) of the Zoning
Ordinance to implement new watershed protection measures for Cane
Creek watershed. These changes, along with companion amendments to the
Subdivision Regulations, result from athree-yeaz study of Cane Creek Watershed
conducted by the Orange Water and Sewer Authority (OWASA), and subsequent
recommendations by the OWASA Boazd of Directors in October 1997.
The amendments to the Zoning Ordinance would offer two sets of development
standards for protecting water quality. The first option would change the
minimum lot size for new development in the watershed from two acres to five
acres, with a provision allowing up to five lots as small as two acres in size for all
lots of record. A second option is available for Flexible Development in Cane
• 1 ~ I)
Creek watershed. In this special option, new major subdivision development
could occur at the current two-acre lot density, but new proposed standards for the
County's Subdivision Regulations would change the amount of open space from
33% to 50%.
Specifically, the amendments to the Zoning Ordinance would alter a definition
and change the existing protected watershed (CANE-PW) and critical azea
(CANE-CA) overlay districts for Cane Creek. The changes to the definitions
section would reflect the special 50% open space standards for the Flexible
Development option in the watershed. The changes to the overlay districts would
apply a minimum lot size of five acres in the watershed, and allow for up to five
lots as small as two acres in size for lots of record as of January 1, 1999.
Staff presented an evaluation of the Cane Creek Watershed Study and OWASA
recommendations to the Board on October 20, identifying the above standards and
two other management options for further evaluation. A community meeting was
held on October 29 at Orange Grove Volunteer Fire Department in Cane Creek
watershed, and was attended by 25 persons (the meeting summary is attached).
Subsequently, on November 4, staff proposed taking only the OWASA-
recommended management option to public hearing. A memo regazding this
recommendation is attached.
RECOMMENDATION: Article 20 of the Zoning Ordinance requires that the Zoning Officer's
recommendation be presented to the Planning Boazd at the public hearing.
Zoning Officer Recommendation
Provided that the Planning Board and County Commissioners find in the
affirmative, the Zoning Officer recommends approval of the proposed text
amendments.
Administration Recommendation
The Administration recommends that the proposed amendments be referred to the
Planning Board for a recommendation to be returned no sooner than February 2,
1999.
ORANGE COUNTY PLANNING DEPARTMENT
306F REVERE ROAD
HILLSBOROUGH. NORTH CAROLINA 27278
`~..1 ~
~, •~
. ^
November 6, 1998
Dear Property Owner:
You have been identified as an owner of property within Cane Creek
watershed or within 500 feet of Cane Creek watershed. Please be advised that
a proposal to change the land development standards for Cane Creek
watershed (and its oveHay zoning districts of CANE-PW and CANE-CA) are
being considered. The new provisions would amend the Orange County Zoning
Ordinance and Orange County Subdivision Regulations to provide for a
different minimum lot size and different open space standards. Please find
attached a copy of the public hearing notice for additional information.
These proposed amendments will be presented at a public hearing before the
Orange County Board of Commissioners and Orange County Planning Board at
7:30 p.m. on Monday, November 23, 1998. The public hearing will be held
at the new Gordon Battle Courtroom in the annex of the "new" County
Courthouse in Hillsborough.
These proposed changes result from recommendations by the Orange Water
and Sewer Authority (OWASA) and subsequent consideration by Orange
County staff. The proposed amendments would make the following changes to
the Zoning Ordinance and Subdivision Regulations:
Rezone the existing Cane Creek watershed overlay zoning districts of
CANE-PW (protected watershed) and CANE-CA (critical area), and
amend the Flexible Development provisions of the Subdivision
Regulations, to provide for:
a) A five-acre minimum lot size* in the CANE-CA and CANE-PW districts
b) Existing tracts as of June 26, 1997 (or an alternative date to be set by the
Board of Commissioners) would be allowed up to five lots as small as two
acres in size, subject to site constraints; or
c) New major subdivision developments could be developed under a Creative
Open Space Design alternative, with SO% of the tract left in permanent
open space, with a minimum lot size of one-acre and an overall density of
ISM
15 ~;
one unit per two acres (the current minimum lot size in the Cane Creek
zoning overlay districts),
* -Please note that these proposed new standards would apply to new
development only.
You are invited to attend the November 23 public hearing and comment on
this proposal. Please note that changes may be made in these proposals as
part of the public hearing review and decision process. If you have any
questions or desire more information about this proposal, please contact our
office at 732-8181, 967-9251, 227-2031 or 688-7331 (extension 2589 or
2590).
Sincerely,
~.
R. Eugene Bell, AICP
Interim Planning Director
15;3
~~
\~r
fat
Orange County
Planning & Inspections Department
306F Revere Road Hillsborough, NC 27278
Telephone: (919) 732-8181
FAX (919) 644-3002
CANE CREEK WATERSHED STAFF REPORT
EXECUTIVE SUMMARY October 30,1998
The Orange Water and Sewer Authority (OWASA) report entitled "Final Recommendations for
Protecting the Cane Creek Water Supply" was referred to Planning staff to 1) evaluate the
watershed study, and 2) prepaze a staff report with applicable recommendations, prior to the
development of any proposed ordinance amendments.
Accordingly, this summer, planning staff members formed the Cane Creek Analysis Team
(CCAT) to evaluate the implications of the Cane Creek Reservoir Watershed Study and final
OWASA recommendations. Because of the cost and time required to quantify impacts, and the
unknown cost-effectiveness of such reseazch, assessment of the watershed study and OWASA
recommendations impacts was lazgely of a qualitative nature. At this point, staff are able to
provide preliminary recommendations to the Board of Commissioners. Following additional
input, staff will prepare a final recommendation for the November 23, 1998 public hearing.
Staff Analysis.
Preliminary analysis of the watershed study and OWASA recommendations reveals that ensuring
adequate and reliable long-term protection of the water quality of Cane Creek Reservoir
necessitates a reduction in the pattern, intensity and/or amount of future development activity in
the watershed. Such a reduction can only be accomplished with certainty through land use
controls that cause development to occur in either lazge-lot or cluster configurations. Based on
staff s analysis, there appear to be three watershed management options that would accomplish
the needed long-term water quality protection. Each offers potential benefits and drawbacks.
Option 1: Mandatory Flexible Development/Large Lot
Current two-acre zoning along with mandatory flexible development (33% open space)
outside of the watershed critical azea. In the critical area, five-acre lot zoning with up to
five lots as small as two acres for lots of record. OWASA 20-year plan for land acquisition
resulting in 1,266 acres.
Option 2: Creative Open-Space Development ("Open-Space " or "Cluster ")
Current two-acre zoning along with mandatory "Creative Open-Space Design" (50% open
space with one acre minimum lot size). Tributary detention ponds on Caterpillar Creek and
~~~
Anne Creek L~'aterclied `tn(f Report
Orange Count~~ Planning and Inspections Department
Watery Fork would be needed. OWASA would acquire 1377 acres of land (413 through
fee-simple and 964 through conservation easements).
Option 3: Large Lot /Creative Open Space Design (OWASA Recommended)
Rezone watershed to 5-acre lot zoning (with up to five two-acre lots for lots of record), or
"Creative Open Space Design" with 50% open-space and current two-acre zoning (1-acre
minimum lot size). Possible construction of tributary detention on Caterpillar or Tom's
Creek, depending on participation rate in cluster development and effective lot size of
developed lots. OWASA acquisition of 1266 acres of land.
All of the options are capable of protecting water quality to the same general level. Differences
lie in the certainty of water quality protection, the substantive variation in the ability of the
options to meet other non-water quality considerations, and perhaps in the economic feasibility
of each option. The benefits offered under each options are as varied as the differences.
Mandatory Flexible Development /Large Lot uses an existing, known program and may
provide greater developer flexibility in site design, since only 33% of the tract would be required
to remain in open space. Additionally, land acquisition by OWASA and the focus on non-
structural controls in the critical area adds to the certainty of protecting water quality -although
regional-scale structural controls in the rest of the watershed may offset any gain in certainty and
the downzoning in the critical azea would affect property owners.
Creative Open Space Design guarantees that 50% of all new major subdivisions will be open
space and may minimize land owner costs, since there would be no change in zoning. As a result
it offers significant resource protection benefits that transcend water quality and could also
preserve natural azeas and wildlife habitats, flora and fauna and cultural or archaeological
resources. It would, however, result in higher costs to OWASA customers due to needed
structural controls.
The Large Lot /Creative Open Space Design ("OWASA-Recommended") is a hybrid of two
options recommended by OWASA. It offers the most developer familiarity -using conventional
single-family lots without open space set-asides. The lower residential yield and density should
reduce the level of public services provided by the County to serve development, but also affects
landowner impacts. This option offers the highest certainty of protecting water quality, but the
exact level of certainty may depend on the level of participation in the "clustering" option.
Preliminary Staff Recommendation.
Having identified three alternatives for consideration, staff plans to use further research and
feedback from the Board and stakeholders to make a final recommendation for the November 23,
1998 public hearing. Regardless of the management options ultimately selected, staff feels that
implementation through amending existing Cane Creek watershed zoning districts and/or a
special section in the Flexible Development provisions for Cane Creek (please see page 31 of
staff report) would be the best approach. Finally, the OWASA recommendations on potential
"tradeoffs" to the watershed community were not evaluated herein, since they do not relate to
water quality.
Executive Summary 2
October 30, 1998
ISM
outiSP a!
~ ~~
yp
A
Orange County
Planning & Inspections Department
306F Revere Road Hillsborough, NC 27278
Telephone: (919) 732-8181
FAX (919) 644-3002
~~
fir!
~ ~~~
CANE CREEK WATERSHED COMMUNITY MEETING
MEETING SUMMARY November 09,1998
On October 29, 1998 the Orange County Planning Department held a community meeting at the
Orange Grove Volunteer Fire Department. The purpose of the meeting was to give planning staff
and watershed residents the opportunity to discuss development mangement options for the Cane
Creek watershed.
The meeting began promptly at 7:30 PM and was attended by 251 community members. Also in
attendance were representatives from the Orange County Water and Sewer Authority (OWASA)
and staff from the Orange County Planning Department (see Appendix A). David Stancil of the
Orange County Planning Department began by welcoming community .members, and discussing
with them the purpose and agenda of the evening's meeting. After the community indicated that
they approved of the meeting format, Mr. Stancil proceeded to a slideshow. The slideshow
outlined the three proposed watershed management options currently being considered by Orange
County to protect watershed water quality. After Mr. Stancil's presentation, Alan Rimer of
OWASA briefed community members about the role that OWASA will play in protecting
watershed water quality. Following Mr. Rimer's comments, the floor was opened up to
clarification questions from the community.
In general, community members asked for clarifications of OWASA's role in watershed
protection. Specifically, residents were interested in learning how much future land OWASA is
planning to acquire, the purpose of acquisition, and the methods that may be used for acquisition.
In response, to these inquiries Mr. Rimer indicated that:
• Land may be acquired for the construction of tributary impoundments on either/or both
Caterpillar Creek and Watery Fork;
• The need for impoundments will vary according to the management option selected, generally
options in which cluster development predominate will require tributary impoundment's;
• The exact amount of watershed land to be acquired by OWASA is yet to be determined;
• A variety of tools including fee-simple purchase and conservation easements may be employed
by OWASA, to acquire watershed properties.
~ Richard Norton, a Ph.D. candidate at UNC-CH Dept. of Ciry and Regional Planning atd Durham resident, atunded the meeting as an interested
observant and not as a community member. His attendance is not counted toward the number of persons in attettdance.
15t~
In response to citizen concern about the current level of build-out in the watershed, Ed Holland of
OWASA indicated that watershed buildout is between 5-10%. Stancil added that 78% of the
watershed is agricultural or forest.
Following the question and answer period, citizens formed three small groups to further discuss
the management proposals. All three groups were facilitated by staff from the Planning
Department. Following discussion, planning staff highlighted the comments expressed during the
small group session. The concerns of watershed residents are combined by topic and summarized
below.
Concerns about OWASA's treatment of watershed landowners and the distribution of the
cost and benefits of watershed protection.
• OWASA continues to come back and ask for more from watershed residents but does not give
anything positive to watershed residents. (Group 1)
• OWASA is interested in meeting their needs and not those of watershed residents. For instance
when they purchase land it is taken off the tax rolls, thereby removing any fiscal benefits for
watershed/county residents. (Group 1)
• The benefits of water quality protection are accrued to OWASA customers, while watershed
residents are bearing the costs, therefore why should we be concerned with protecting
reservoir water quality. (Groups 1,2)
• Regulation of the watershed robs people of the opportunity to develop their properties as they
wish, this is in contrast to Chapel Hill/Carrboro where people can develop as they wish.
(Group 1)
• Development regulations will restrict who can live in the watershed. (Group 1)
Concerns about the performance of watershed management options
• Ponds will help reduce runoff, but will OWASA be constructing them? (Group 1)
• How stagnant and smelly will the water in the ponds be? (Group 1)
• If we develop using cluster in the watershed new developments will not be served by sewer,
this could have an adverse effect on groundwater. (Group 1)
• What is the difference in property value/acre under the conventional approach vs. the cluster
approach. Is the yield higher in one? (Group 3)
Community Preferences and Suggestions
• OWASA's recommendations are more preferable given that they have the least impact on
existing dwellings. (Group 1)
• If OWASA chooses to acquire land then residents should receive some type of benefit, such as
long-term family ownership. (Group 1)
• Mandatory flexible development maybe a more acceptable watershed protection option, given
that the watershed is not near 25 % build-out, and since mandatory flexible permits
continuation of current development patterns. This will allow a higher lot yield in the critical
area than in the protected area. (Group 1)
I S '?
• Watershed residents do not obtain their water from OWASA, therefore the costs of watershed
protection should be borne by the beneficiaries: OWASA customers. (Group 1)
• To ensure that OWASA customers bear some portion of the burden, a $.O1/100 gallon
surcharge should be instituted to generate money for watershed land acquisition. (Group 3)
• OWASA should not acquire watershed land for the purposes of constructing detention facilities
through condemnation. (Group 3)
• The rights of individual property owners should be kept in mind during the decision-making
process. (Group 3)
• OWASA should buy land that is closer to the reservoir and sell off properties that aze further
away. (Group 3)
• Free market exchange should govern the process of land acquisition. (Group 3)
Additional concerns and comments
• Residents didn't want the Cane Creek Reservoir in the first place and felt harassed by OWASA
during the creation of the reservoir. (Group 1)
• People move out here to get away from development (Group 1)
• Is OWASA concerned with water conservation? (Group 1)
• The decision to change watershed regulations has already been made and represents the
continuation of OWASA power. (Group 2)
• Our property is our retirement. (Group 3)
The meeting adjourned at 8:45. As residents exited the building, they were given the opportunity
to vote for one of the three management options. Of the 21 residents who voted, five indicated a
preference for the OWASA recommended option (5/2 acre zoning), the remainder indicated a
preference for neither of the three management options under consideration.
155
Appendix A: Persons in Attendance: Cane Creek Community Mtg.
Name Address
Jce M. Kenyon 6201 Orange Grove Rd. Hillsborough, NC 27278
Ronnie Kirl 6016 Orange Grove Rd. Hillsborough, NC 27278
Tommy Holmes 4311 Bradshaw Quarry Rd. Efland, NC 27243
Gregg Hemmen 6901 Orange Grove Rd. Hillsborough, NC 27278
David Perry 6520 Buckhorn Rd Hillsborough, NC 27278
Scott Hudson 6601 Buckhorn Rd Hillsborough, NC 27278
Edwazd Johnson 6000 Buckhorn Rd Hillsborough, NC 27278
Frances Cates 422 Overland Dr Chapel Hill, NC 27514
Felton Johnson 6505 Orange Grove Rd. Hillsborough, NC 27278
C.M. Kirk 6200 Orange Grove Rd. Hillsborough, NC 27278
Don Cheek 7504 Orange Grove Rd. Hillsborough, NC 27278
Chazles Miller 7416 Orange Grove Rd. Hillsborough, NC 27278
William F & Catherine Jernigan 7727 Orange Grove Rd. Hillsborough, NC 27278
Kenneth Kirk 6108 Orange Grove Rd. Hillsborough, NC 27278
Ben Nichols 6641 Orange Grove Rd. Hillsborough, NC 27278
Allan & Christine Green 5604 Dairyland Rd. Hillsborough, NC 27278
David Hinkle 8802 Partridge Run Chapel Hill, NC 27516
Patrick Mulkey 8702 Stanford Rd. Chapel Hill, NC 27516
Matthew Arnsberger PO Box 674 Carrboro, NC 27510
Quentin & Evelyn Patterson 4827 Orange Grove Rd. Hillsborough, NC 27278
Donald Cox 7010 Thunder Mtn Efland, NC 27243
Chazles Snipes 5200 Dairyland Rd. Hillsborough, NC 27278
Richazd Norton 323 Brandermill Rd. Durham, NC 27773
OWASA Representatives
Ed Kerwin 400 Jones Ferry Rd. Carrboro, NC 27510
Ed Holland 400 Jones Ferry Rd. Carrboro, NC 27510
Alan E. Rimer 519 Hooper Lane Chapel Hill, NC 27514
Barry Jacobs 2201Moorefields Rd. Hillsborough, NC 27278
Planning Staff
David Stancil 306 F Revere Rd Hillsborough, NC 27278
Gene Bell 306 F Revere Rd Hillsborough, NC 27278
Adhir Kackar 306 F Revere Rd Hillsborough, NC 27278
15' w
Memorandum
To: John Link, County Manager
From: Planning Staff
Date: November 16, 1998
Subject: Cane Creek Watershed Recommendation
On October 20, the Planning staff presented a staff report on the Cane
Creek Watershed Study and subsequent recommendations for
protecting water quality by the OWASA Board of Directors. Staff would
like to take this opportunity to provide a recommended development
management option for Cane Creek watershed.
The October 20 staff report identified three management options that
were recommended for further evaluation:
1. Mandatory Flexible Development (with Large-Lot Zoning in the
critical areal);
2. Creative Open Space Design, and
3. Large-Lot Zoning/Creative Open Space (the OWASA-
recommended approach).
As mentioned in the staff report, staff indicated that the options would
be discussed at a community meeting in the watershed. These three
options were presented to 25 citizens at a community meeting at
Orange Grove Volunteer Fire Department on October 29, 1998. In
addition, staff was to complete its research on these options and make
a single recommendation by the time of the public hearing on
November 23.
As you may recall, the primary downside to the Mandatory Flexible
Development and Creative Open Space options (#1 and #2) was
whether these options could protect water quality given their use of
cluster development (and the apparent requirements for using
structural impoundments to do so).
Staff completed its research into this issue in late-October. We have
been unable to find any examples of communities that have used
cluster development solely for water quality protection, with or without
relying on structural controls (detention basins) or very large-lot base
. ~ "1 I
zoning. As such, we have found no evidence to counter the findings of
the Cane Creek Watershed Study -that options #1 and #2 above will
not protect water quality to the same level of certainty as the OWASA-
recommended approach (#3) of large-lot zoning /creative open space
design.
In conducting the research, staff contacted planning jurisdictions that
had been identified in the American Water Works Association (AWWA)
publication "Effective Watershed Management for Surface Water
Supplies" as currently employing or considering employment of cluster
development for water quality purposes. Based on the AWWA report
the following planning departments and agencies were contacted:
Fairfax County (VA) Planning, Prince William County (VA) Planning,
Loudoun County (VA) Planning and the Northern Virginia District
Planning Commission. All of these planning entities hold responsibility
for protecting the water quality of the Occcoquan River basin.
Discussions with the identified planning departments & agencies
revealed that: 1) Fairfax and Prince William Counties permit rural
cluster development, but do so for reasons other than water quality
protection, and 2) both counties have a lower underlying density than
is currently, or anticipated to be, in place in the Cane Creek
watershed. As a result of this lower density, the need for alternative or
off-site wastewater systems necessitated under cluster development
options is eliminated. In addition, staff conducted an Internet-based
literature search to locate other municipalities or counties which
employed cluster development. None were found.
Given this, staff recommended on November 4 that, to simplify
matters for the public hearing, only option #3 (OWASA-recommended)
be taken to the November 23 public hearing.
Amendments to the Zoning Ordinance and Subdivision Regulations
have been drafted to implement this management option. The
amendments to the Zoning Ordinance will alter the definition of
Flexible Development to allow for 50% open space in Cane Creek
watershed, and to provide for afive-acre minimum lot size, with up to
five lots as small as two acres in size. The amendments to the
Subdivision Regulations would amend the open space standards to
provide for 50% open space in Cane Creek, and to clarify other
sections that specified 33% only. The draft amendment to the Zoning
Ordinance recommends one modification to the OWASA package -that
the effective date for lots of record (the "up to five lots as small as two
acres" test) be set at 7anuary i, 1999, rather than the proposed date
~c~~
of June 26, 1997. This would be
watershed overlay zoning district
effective date of January 1, 1994.
Recommendation
in keeping with the last round of
changes in 1993-94, which set an
The Planning staff recommends that the County approve the ordinance
and subdivision regulation text amendments implementing
management option #3 (the OWASA-recommended option). Our
reasons for this recommendation are as follows:
1. Our completed research on the use of cluster for water quality
protection has not yielded any other programs that use cluster
development for water quality protection, with or without using
structural controls (detention ponds and basins) or large-lot base
zoning.
2. In the Cane Creek Watershed Study, the other two options did not
protect water quality to the same degree of certainty as the
OWASA-recommended approach. Staff has not determined any
mitigating factors that alters this finding.
3. Option #2 (Creative Open Space) is not a true alternative, as it
could be done through the OWASA-recommended approach.
4. In addition to the lack of supporting data for options #1 and #2 for
water quality certainty, there was also no support for these two
options at the October 29 community information meeting.
i. The October 20 staff report failed to note that Option #1 (Mandatory Flexible Development) also
included large-lot zoning in the critical area.
2. At the community meeting, participants were asked to participate in a straw poll of the three options at
the close of the meeting. Four persons supported Option #3 (OWASA), while the remainder supported
none of the above. No one voted for Options #1 and #2.
~~
~ ~..
Proposed Amendments to Zoning Ordinance ~ ~ ;i
(changes shown in bold underline)
*6.23 EXTRA REQUIREMENTS FOR WATERSHED PROTECTION OVERLAY DISTRICTS
* Amended
1/1/94
Pursuant to requirements of North Carolina General Statute 143-214.5 (Chapter 143, Article 21), thirteen
(13) Watershed Protection Overlay Districts, as described in Article 4.2.27 of this Ordinance, have been
established for lands within the watersheds of existing or potential drinking water rivers and reservoirs.
These districts overlay other zoning districts established in this Ordinance and delineated on the Orange
County Zoning Atlas. Wherever standazds of the underlying zoning district differ from the watershed
overlay standards, the more restrictive provisions shall apply.
6.23.1 LAND USE RESTRICTIONS
6.23.2 RESIDENTIAL DENSITY
Maximum residential density shall be as indicated in the Table below, or as required by the underlying
zoning district, whichever is less.
*Amended
1-17-95
DISTRICT MAXIMUM DENSITY
UN1V-CA 1 du/five acres.
UNIV-PW
Lots of record existing on October 2, 1989 may contain up to, but no
more than, five lots with a density of one du/two acres. Contiguous lots
of record existing on October 2, 1989 may be combined into one pazcel
for development. The number oftwo-acre lots and the total .number of
lots in the combined pazcel cannot exceed the sum of the number of
lots which could be created from each lot of record.
~ :~ ,~
DISTRICT MAXIMUM DENSITY
CANE-CA
CANE-PW , a., ~ ,,
1 du/ five acres
Lots of record existing
on January 1, 1999 may contain ua to, but no
_
more than, five lots as small as two acres in size. Contiguous lots
of record existing on Januarv 1,1999 may be combined into one parcel
for development. The number of two-acre lots and the total number of
lots in the combined parcel cannot exceed the sum of the number of lots
which could be created from each lot of record;
OR
In Flexible Development subdivisions, an overall density of one du/two
acres is permitted provided at least 50% of the land within the subdivision
s_set aside as open space (see Section IV.B.10 of the Subdivision
Regulations)
U-ENO-CA 1 du / 2 acres
LITTLE-PW
HYCO-PW 1 du/ 40,000 square feet (.92 acre)
FLAT-PW
U-ENO-PW Maximum density is as permitted in the underlying zoning district.
L-ENO-PW
HAW-PW Structural BMPs are required in some cases where density exceeds 1 dwelling
JORDAN-PW unit per acre. Refer to Article 6.23.3c1.
BACK-PW
6.23.3 STORMWATER INFILTRATION AND DETENTION
Amended 1 /4/94
Non-Residential Development
DISTRICT IMPERVIOUS SURFACE/DETENTION POND
REQUIREMENTS
(NON-RESIDENTIAL)
UNIV-CA Same as Residential (See previous Table)
UNIV-PW
. DISTRICT IMPERVIOUS SURFACE/DETENTION POND
REQUIREMENTS
(NON-RESIDENTIAL)
CANE-CA
5-acre minimum lot size. with potential of up to five lots as
small as two acres for lots of record 1/1/99•
AND
6% impervious surface limit.
BMPs cannot be used to satisfy watershed requirements.
CANE-PW
5-acre minimum lot size with potential of up to five lots as
small as two acres for lots of record 1/1/99•
AND
50%ISR for all fire stations and solid waste collection centers;
AND
12%ISR for all other non-residential uses;
AND
on-site infiltration of the first inch of stormwater runoff;
AND
a limit of 1.0% of the watershed for non-residential use (139
acres in CANE-PW ).
BMPs cannot be used to satisfy watershed requirements.
U-ENO-CA 2-acre minimum lot size
AND
6% impervious surface limit
BMPs cannot be used to satis watershed re uirements.
I~
1 vi
DISTRICT IMPERVIOUS SURFACE/DETENTION POND
REQUIREMENTS
(NON-RESIDENTIAL)
LITTLE-PW 2-acre minimum lot size
AND
50%ISR for all fire stations and solid waste collection centers;
AND
12%ISR for all other non-residential uses;
AND
on-site infiltration of the first inch of stormwater runoff;
AND
a limit of 1.0% of the watershed for non-residential use (403
acres in LITTLE-PW ).
BMPs cannot be used to satis watershed re uirements.
U-ENO-PW 70%ISR in Commercial and/or Industrial Nodes as designated in
BACK-PW the Land Use Element of the Comprehensive Plan (high-density
option) with structural BMPs if ISR > 12%;
AND
50%ISR for all fire stations and solid waste collection centers
outside of Commercial and\or Industrial Nodes as designated in
the Land Use Element of the Comprehensive Plan, with structural
BMPs if ISR > 12% ;
AND
12%ISR for all other non-residential uses outside of Commercial
and\or Industrial Nodes as designated in the Land Use Element of
the Comprehensive Plan (BMPs cannot be used to satisfy
watershed requirements);
AND
on-site infiltration of the first inch of stormwater runoff;
AND
a limit of 1,151 acres of non-residential use throughout U-ENO-
PW (5.0%) and 163 acres throughout BACK-PW (1%).
HYCO-PW 50%ISR for all fire stations and solid waste collection centers;
FLAT-PW AND
12%ISR for all other non-residential uses;
AND
on-site infiltration of the first inch of stormwater runoff;
AND
a limit of 1% of the watershed for non-residential use (37 acres in
HYCO-PW, 66 acres in FLAT-PW).
BMPs cannot be used to satisfy watershed requirements.
` DISTRICT IMPERVIOUS SURFACE/DETENTION POND
REQUIREMENTS
(NON-RESIDENTIAL)
L-ENO-PW 70% impervious surface, with structural BMPs required when
impervious surface exceeds:
24% (w/ curb and gutter); or
36% (w/o curb and gutter).
HAW-PW 24% impervious surface limit.
JORDAN-PW
BMPs cannot be used to satisfy watershed requirements.
6.23.4 OPERATION AND MAINTENANCE OF STRUCTURAL BMPs (DETENTION PONDS)
6.23.5 PLACEMENT OF STREETS, DRIVEWAYS AND BUILDINGS
6.23.6 UNDISTURBED AREA
6.23.7 STREAM BUFFERS
6.23.8 WATER SUPPLY/SEWAGE DISPOSAL FACILITIES
*Amended
1-17-95
7-1-96
DISTRICT WATER SUPPLY/SEWAGE DISPOSAL
UNIV-CA Water supply and sewage treatment systems shall be limited to
UNIV-PW individual wells and on-site septic tanks systems or individual
C' A ATl; DII7
~T
rAi.rt; nA
~raTa-~rz
T TT T L'A~~
on-site alternative disposal system , ,
j~Tnt «..1.e.7 /!'' A ATZ: DII11 .,«,i !`«:+:....1 A ..~.. /!` A ATL' !"' A \ ,a ~l.
\ 7 ° par ~
All Watershed Overlay
Districts No new treatment system will be permitted where effluent
disposal occurs on a sepazate lot from the source of wastewater
generation; provided, however, off-site systems shall be
permitted in all Watershed Overlay Districts except the
University Lake Protected Watershed (UNIV-PW) and Critical
Area (iJNIV-CA) when located in a Flexible Development
subdivision approved in accordance with Section IV-10-B of the
Orange County Subdivision Regulations.
UNIV-CA New septic tanks and their nitrification fields shall be located
outside of any stream buffers, or 300 feet from a reservoir or
perennial or intermittent stream as shown on the USGS
Quadrangle maps, whichever is further.
1 cj ~
~ :~ ~
DISTRICT WATER SUPPLY/SEWAGE DISPOSAL
CANE-CA New septic tanks, pump tanks and their appurtenances shall be
U-ENO-CA located outside of any stream buffers and at least 100 feet from a
perennial or intermittent stream as shown on the USGS
Quadrangle maps, and at least 150 feet from a reservoir.
New nitrification fields shall be located outside of any stream
buffers and at least 100 feet from a perennial or intermittent
stream as shown on the USGS Quadrangle maps, and at least 300
feet from a reservoir.
CANE-PW Water suaaly and sewage treatment systems shall be limited
CANE-CA to individual wells and septic tanks or individual on-site
U-ENO-CA alternative disposal systems; provided however, off-site
systems shall be permitted when located in a Flexible
DeveloQment subdivision approved in accordance with
Section IV-10-B of the Orange County Subdivision
Regulations.
UNIV-PW New septic tanks and their nitrification fields shall be located
CANE-PW outside of any stream buffers and at least 100 feet from a
U-ENO-PW perennial or intermittent stream as shown on the USGS
HYCO-PW Quadrangle maps.
LITTLE-PW
BACK-PW
HAW-PW
JORDAN-PW
L-ENO-PW
FLAT-PW
6.23.9 CLUSTERING
DISTRICT CLUSTERING REQUIREMENTS
UNIV-CA Clustering of residential lots is permitted in accordance with Section IV-B-9
UNIV-PW of the Orange County Subdivision Regulations, with the additional provision
that each lot contains a minimum of one acre.
All Other Clustering of residential lots is permitted in accordance with Section IV-B-10
Overlay of the Orange County Subdivision Regulations.
Districts
6.23.10 APPLICABILITY
*Amended
1-17-95
a) Existing Development
19' ~
For the purpose of determining compliance with or applicability of Article 6.23 of this
Ordinance, existing development is defined as a residential or non-residential structure which
1) was constructed prior to January 1, 1994 (January 1. 1999 in the CANE-CA and
CANE-PW districts); or
2) was constructed in accordance with a valid building permit issued prior to January 1,
1994 (January 1.1999 in the CANE-CA and CANE-PW districts); or
3) was included as part of a Site Specific Development Plan approved by the Board of
Commissioners prior to January 1, 1994 (January 1. 1999 in the CANE-CA and
CANE-PW districts); or
4) had otherwise established a vested right under North Cazolina Zoning law prior to
January 1, 1994 (January 1.1999 in the CANE-CA and CANE-PW districts)
Existing development is hereby deemed to be conforming with respect to requirements of Article
6.23 of this Ordinance.
ij ~.,
b) Redevelopment
The rebuilding or replacement of residential or nonresidential structures which are defined as
existing development according to Article 6.23.11 a is allowed, provided that the rebuilding or
replacement does not result in an increase in the amount of impervious surface, and does not
encroach any farther into stream buffers or setbacks from reservoirs than the previous
development. A structure which is rebuilt or replaced in accordance with these provisions is
deemed conforming with respect to setbacks from streams and reservoirs required by Articles
6.23.7 and 6.23.8 if this Ordinance.
c) Existing Lots
An existing lot, for the purpose of determining compliance with Article 6.23, is defined as a lot
which was created prior to January 1, 1994, or a lot within the Cane Creek watershed (CANE-
CA or CANE-PW districts) which was created grior to January 1,1999.
Stream buffers as required by Article 6.23.7, and setbacks for septic systems as required by
Article 6.23.8 may be reduced to the extent necessary to allow development of the lot, provided
that all of the following criteria are met:
1. The septic system is sized to serve no more than four bedrooms; and
2. The septic tank, drainfield and repair area (where required) can be accommodated on
20,000 squaze feet of area or less; and
3. The Orange County Planning Staff, in consultation with Orange County Environmental
Health and/or the Orange County Engineer has determined that encroachment of the
structure into the stream buffer and/or encroachment, of the septic system or repair azea
into the stream buffer or reservoir setback is necessary in order to provide adequate area
for septic disposal and repair while maintaining required separations between wells,
septic systems, structures and property lines; and
4. The Orange County Planning Staff, in consultation with Orange County Environmental
Health and/or the Orange County Engineer, has determined that the relative locations of
the well, septic system and structure maximize the amount of watershed protection that
can be achieved while allowing development of the lot. Generally, an exception to
setbacks for repair area is preferable to an exception for the initial septic system, and
encroachment of structures or gravity septic systems into the setback is preferable to the
installation of a septic system pump.
5. The amount of encroachment into the stream or reservoir buffer is the minimum amount
which can be obtained while meeting the above criteria.
()
ti
Section 22 Definitions
Amended Flexible Development - A subdivision in which greater flexibility and design
7-1-96 creativity is encouraged and allowed to preserve agricultural and forestry lands, natural and
cultural features, and rural community chazacter that might otherwise be lost through
development approaches. At lease one-third (33%) of the land within a Flexible Development
subdivision must be set aside as open space, •-~ . A Ereater percentage of open space maY
be required based on the density requirements in certain overlay zoning districts In Cane
Creek watershed at least 50% of the land within a Flexible Develo went subdivision must
be set aside as oven space. In order to meet open space requirements open space may be
preserved through:
(a) An "estate lot" approach where all land is subdivided into lots four (4) acres or greater in
size, building limits (50%) aze established for each lot, and the land azea outside such limits
is preserved as open space; or
(b) a "conservation" approach where all land is subdivided into lots, and open space is preserved
through the use of conservation easements applied to portions of individual lots; or
(c) A "cluster" approach where lot sizes aze reduced and the land saved through such reductions
is preserved as open space; or
(d) A "village" or modified cluster approach where dwelling units aze clustered azound a village
green and supporting shops, and the village is surrounded by open space; or
(e) Some combination of the above.
~~ • ,
~~~