Loading...
HomeMy WebLinkAboutAgenda - 06-01-2010 - 4kORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: June 1, 2010 Action Agenda Item No.- K SUBJECT: General Engineering and Environmental Management Services Agreement for Solid Waste Management DEPARTMENT: Solid Waste Management PUBLIC HEARING: (Y /N) No ATTACHMENT(S): Agreement (Under Separate Cover) INFORMATION CONTACT: Gayle Wilson, Solid Waste Management Director, 968 -2885 Pam Jones, Asset Management & Purchasing Services Director, 245- 2650 PURPOSE: To approve an agreement for general engineering and environmental services for the Solid Waste Management Department with HDR Engineering, Inc. of the Carolinas for professional engineering services for three (3) years commencing on June 10, 2010. BACKGROUND: The Solid Waste Management Department has long maintained professional engineering and consulting services in support of the various environmental management projects, functions and facilities. The Department has utilized several different firms over the years to support the ongoing and recurring need for engineering and environmental consulting services to perform tasks beyond the limited capability of the Department. The work of the consultant includes anticipated permitting, monitoring and compliance issues and unplanned regulatory or other technical services as may arise. The Department anticipates that initial work contemplated under this agreement may include: • Design, permitting and construction management of the closure of the municipal waste landfill • Development of a post - closure plan • A compliance and operational audit of County waste management operations /facilities • Construction and Demolition landfill permit renewal and Phase II design and permitting Other services may include: • Development of a revised facility master plan for Eubanks Road • Preparing drawings, calculations, evaluations, estimates, assessments, etc. • Preparation of presentation material for public meetings including AutoCAD drawings, poster boards, renderings, etc. • Planning, financial and operations analysis • Convenience center/ recycling drop -off site improvements design • Interpretation of rules /legislation relating to county operations /facilities • Landfill gas management • Groundwater /leachate management • Gas and groundwater assessment and remediation • Materials handling and recovery • Alternative waste technologies The County issued a Request for Qualifications eight (8) proposals: • Golder Associates NC, Inc. • HDR Engineering, Inc. of the Carolinas • Richardson Smith Gardner & Associates • McGill Associates • Camp Dresser & McKee • Joyce Engineering, Inc. • Municipal Engineering Services Company • AECOM Technical Services, Inc. K ( #5162) on January 29, 2010 and received The proposals have been thoroughly reviewed and evaluated, references checked, and interviews conducted by the County's assessment team consisting of Solid Waste Management Department staff member Paul Spire, County Solid Waste Advisory Board (SWAB) Chair Jan Sassaman and Solid Waste Management Director Gayle Wilson. The firm selected for recommendation is HDR Engineering, Inc. of the Carolinas, with offices in Raleigh and Charlotte, North Carolina. HDR Engineering, Inc. was selected due to: • the depth and breadth of experience and technical expertise of the proposed project team • highly positive recommendations of current North Carolina clients • successful performance and experience of the firm with North Carolina regulators • demonstrated innovation and commitment to sustainable practices and principles • successful interview and thorough responses to assessment team inquiries FINANCIAL IMPACT: Sufficient funds to cover anticipated expenditures are available in the current 2009 -10 budget and requested in the 2010 -11 requested budget of the Solid Waste Enterprise Fund. The projected expenses for FY 2010 -11 are $75,000- 80,000. RECOMMENDATION(S): The Manager recommends that the Board approve the agreement with HDR Engineering, Inc. of the Carolinas for engineering services for the Solid Waste Management Department and authorize the Chair to sign the agreement. 3 [Departmental Use Only] Title: General Engineering and Environmental Management Services FY2010 NORTH CAROLINA CONSULTING SERVICES AGREEMENT -RFP- OVER $90,000 OR BOARD CONSULTANT ORANGE COUNTY This Agreement, made and entered into this day of June 10, 2010 (Effective Date), by and between Orange County, North Carolina a body politic and corporate of the State of North Carolina (hereinafter, the "County ") and HDR Engineering, Inc. of the Carolinas (hereinafter, the "Consultant "). WITNESSETH: That the County and Consultant, for the consideration herein named, do hereby agree as follows: ARTICLE 1 SCOPE OF WORK 1.1 Scope of Work 1.1.1 This Services Agreement ( "Agreement ") is for professional consulting services to be rendered by Consultant to County with respect to general solid waste engineering and environmental management services. 1.1.2 By executing this Agreement, the Consultant represents and agrees that Consultant is qualified to perform and fully capable of performing and providing the services required or necessary under this Agreement in a fully competent, professional and timely manner. 1.1.3 Time is of the essence with respect to this Agreement. 1.1.4 The services to be performed under this Agreement consist of General Services, as described and designated in Article 3 hereof. Compensation to the Consultant for General Services under this Agreement shall be as set forth herein. ARTICLE 2 RESPONSIBILITIES OF THE CONSULTANT 2.1 Services to be Provided. The Consultant shall provide the County with all services required in Article 3 to satisfactorily complete Projects within the time limitations set forth in conformance with authorized scopes of work and in accordance with the generally accepted professional standards of care. 2.2. Standard of Care 2.2.1 The Consultant shall exercise reasonable care and diligence in performing services under this Agreement in accordance with generally accepted standards of this type of Consultant practice throughout the United States and in accordance with applicable federal, state and local Revised April 2010 1 4 laws and regulations applicable to the performance of these services. Consultant is solely responsible for the professional quality, accuracy and timely completion and submission of all reports, drawings, specifications, plans, documents and services (hereinafter "Deliverables ") related to the General Services. 2.2.2 The Consultant shall be responsible for all errors or omissions, in the deliverables prepared by the Consultant. 2.2.3 The Consultant shall correct at no additional cost to the County any and all errors, omissions, discrepancies, ambiguities, mistakes or conflicts in any Deliverables prepared by the Consultant. 2.2.4 The Consultant shall assure that all Deliverables prepared by it hereunder are in accordance with applicable laws, statutes, and that any necessary or appropriate applications for approvals are submitted to federal, state and local governments or agencies in a timely manner so as not to delay the Project. 2.2.5 The Consultant shall not, except as otherwise provided for in this Agreement andJor pursuant to individual work orders (scopes of work negotiated and authorized prior to the commencement of each work task), subcontract the performance of any work under this Agreement to any sub - consultants not included in Consultants response to the County's January 2010 Request for Qualifications Number 5162 for General Engineering and Environmental Management Services ( "RQF ") , without prior written permission of the County. No permission for subcontracting shall create, between the County and the subcontractor, any contract or any other relationship. 2.2.6 Any and all employees of the Consultant engaged by the Consultant in the performance of any work or services required of the Consultant under this Agreement, shall be considered employees or agents of the Consultant only and not of the County, and any and all claims that may or might arise under any workers compensation or other law or contract on behalf of said employees while so engaged shall be the sole obligation and responsibility of the Consultant. 2.2.7 Consultant agrees that Consultant and its subcontractors, if any, shall be required to comply with all federal, state and local antidiscrimination laws, regulations and policies that relate to the performance of Consultant's services under this Agreement. 2.2.8 If activities related to the performance of this agreement require specific licenses, certifications, or related credentials Consultant represents that it andJor its employees, agents and subcontractors engaged in such activities possess such licenses, certifications, or credentials and that such licenses certifications, or credentials are current, active, and not in a state of suspension or revocation. ARTICLE 3 GENERAL SERVICES 3.1 General Services 3.1.1 The Consultant shall perform the services described herein, and as included in the RFQ which is fully incorporated and integrated herein by reference together with the Revised April 2010 A Consultant's Statement of Qualifications submitted in response to the RFQ ( "Consultant's Response ") as Attachment A. 3.1.2 Services will be performed by the Consultant in accordance with approved scopes of work negotiated and authorized prior to the commencement of each task. ARTICLE 4 DURATION OF SERVICES 4.1 Scheduling of Services 4.1.1 The Consultant shall schedule and perform his activities in a timely manner so as to meet the delivery requirements in an approved scope of work. 4.1.2 Should the County determine that the Consultant is behind schedule, it may require the Consultant to expedite and accelerate his efforts, including providing additional resources and working overtime, as necessary, to perform his services in accordance with the approved project schedule at no additional cost to the County. ARTICLE 5 COMPENSATION 5.1 Compensation for General Services 5.1.1 Compensation for tasks authorized in Article 3 will be based on individual scopes of work, negotiated prior to the commencement of each task, and each work task shall be predicated on a "not -to- exceed" basis if not otherwise negotiated prior to the commencement of the task. 5.2 Payments 5.2.1 The Consultant shall submit regular invoices, using Standard Billing Rates (as provided in the RFQ, for work performed and shall be paid for completion of work performed during that period under the terms of this Agreement. The County shall make payment within thirty (30) days of receipt of an accurate invoice. ARTICLE 6 RESPONSIBILITIES OF THE COUNTY 6.1 Cooperation and Coordination 6.1.1 The County has designated the Solid Waste Management Department Director to act as the County's representative with respect to the Project and shall have the authority to render decisions within guidelines established by the County Manager and the County Board of Commissioners and shall be available during working hours as often as may be reasonably required to render decisions and to furnish information. 6.1.2 The County shall be solely responsible for determining whether Consultant has satisfactorily completed tasks associated with an approved scope of work. It is agreed that Revised April 2010 3 County shall not unreasonably withhold its determination of satisfactory completion of any Task. In the event, the amount of an invoice is disputed, County may withhold payment until the dispute is resolved by the parties. County may also withhold payment on an invoice until the satisfactory completion of a task by Consultant. 6.1.3 The County shall provide direction to the Consultant as to the specific services required and the schedule of delivery for tasks. The Consultant shall submit a written scope of work and estimated budget for approval prior to commencing work. ARTICLE 7 INSURANCE 7.1 General Requirements 7.1.1 The Consultant shall purchase and maintain and shall cause each of his Sub - consultants to purchase and maintain, during the period of performance of this Agreement, insurance for protection from claims under workers' or workmen's compensation acts; Comprehensive General Liability Insurance covering claims arising out of or relating to bodily injury, including bodily injury, sickness, disease or death of any of the Consultant's employees or any other person and to real and personal property including loss of use resulting thereof, Comprehensive Automobile Liability Insurance, including hired and non -owned vehicles, if any, covering personal injury or death, and property damage; and Professional Liability Insurance, covering personal injury, bodily injury and property damage and claims arising out of or related to the performance under this Agreement by the" Consultant or his agents, Consultants and employees. 7.1.2 The minimum insurance rating for any company insuring the Consultant shall be Best's A -. If the Consultant does not meet the insurance requirements, it is suggested that the County's Risk Manager be consulted prior to finalizing this Agreement. 7.2 Limits of Coverage 7.2.1 Minimum limits of insurance coverage shall be as follows: INSURANCE DESCRIPTION MINIMUM REQUIRED COVERAGE • Worker's Compensation Limits for Coverage A - Statutory State of N.C. Coverage B - Employers Liability $500,000 each accident and policy limit and disease each employee • Commercial General Liability $1,000,000 Each Occurrence; $2,000,000 Aggregate. • Automobile Liability Combined Single Limit $500,000 • Professional Liability $1,000,000 per claim with a $2,000,000 aggregate coverage. 7.2.2 All insurance policies (with the exception of Worker's Compensation and Professional Liability) required under this Agreement shall name the County as an additional Revised April 2010 4 II insured party. Evidence of such insurance shall be furnished to the County, together with evidence that each policy provides that the County shall receive not less than thirty (30) days prior written notice of any cancellation, non - renewal or reduction of coverage. 7.3 Indemnity 7.3.1 The Consultant agrees to indemnify and hold harmless the County from all loss, liability, claims or expense, including attorney's fees, arising out of or related to the Project and arising from bodily injury including death or property damage to any person or persons caused in whole or in part by the negligence or misconduct of the Consultant except to the extent same are caused by the negligence or willful misconduct of the County. It is the intent of this provision to require the Consultant to indemnify the County to the fullest extent permitted under North Carolina law. ARTICLE 8 AMENDMENTS TO THE AGREEMENT 8.1 Amendment to General Engineering Services Agreement 8.1.1 This Agreement may be amended or cancelled by mutual written agreement of the County and the Consultant. ARTICLE 9 TERMINATION 9.1 Termination for Convenience 9.1.1 Either the County or the Consultant may terminate this Agreement at any time with or without cause upon giving the other party twenty —one (21) calendar days prior written notice. 9.2 Compensation After Termination 9.2.1 In the event of termination, the Consultant shall be paid that portion of the fees and expenses that it has earned to the date of termination, less any costs or expenses incurred or anticipated to be incurred by the County due to errors or omissions of the Consultant. 9.2.2 Should this Agreement be terminated, the Consultant shall deliver to the County within seven (7) days, at no additional cost, all Deliverables including any electronic data or files relating to the Project. 9.3 Waiver 9.3.1 The payment of any sums by the County under this Agreement or the failure of the County to require compliance by the Consultant with any provisions of this Agreement or the waiver by the County of any breach of this Agreement shall not constitute a waiver of any claim for damages by the County for any breach of this Agreement or a waiver of any other required compliance with this Agreement. ARTICLE 10 ADDITIONAL PROVISIONS Revised April 2010 5 10.1 Relationship of Parties 10.1.1 Consultant is an independent contractor of the County. Neither Consultant nor any employee of the Consultant shall be deemed an officer, employee or agent of the County. Consultant's personnel shall not be employees of, or have any contractual relationship with the County. 10.2 Limitation and Assignment 10.2.1 The County and the Consultant each bind themselves, their successors, assigns and legal representatives to the terms of this Agreement. Neither the County nor the Consultant shall assign or transfer its interest in this Agreement without the written consent of the other. 10.3 Governing Law 10.3.1 This Agreement and the duties, responsibilities, obligations and rights of respective parties hereunder shall be governed by the laws of the State of North Carolina. 10.4 Dispute Resolution 10.4.1 Any and all suits or actions to enforce, interpret or seek damages with respect to any provision of, or the performance or non - performance of, this Agreement shall be brought in the General Court of Justice of North Carolina sitting in Orange County, North Carolina and it is agreed by the parties that no other court shall have jurisdiction or venue with respect to such suits or actions. The Parties may agree to nonbinding mediation of any dispute prior to the bringing of such suit or action. 10.5 ' Extent of Agreement 10.5.1 This Agreement, together with the attached RFQ and Consultant's Response , all of which constitute the Contract Documents, represents the entire and integrated agreement between the County and the Consultant and supersedes all prior negotiations, representations or agreements, either written or oral. In the event of a conflict among the terms of the Contract Documents, the priority of documents shall be This Agreement, the RFQ, and the Consultant's Response. This Agreement may be amended only by written instrument signed by both parties. Modifications may be evidenced by facsimile signatures. 10.6 Severability 10.6.1 If any provision of this Agreement is held as a matter of law to be unenforceable, the remainder of this Agreement shall be valid and binding upon the Parties. 10.7 Ownership of Deliverables 10.7.1 All Deliverables, together with all supporting materials, source documentation, data collected, field notes, and working drafts, developed in the performance of this Agreement shall become the property of the County and may be used on any other project without additional compensation to the Consultant. The use of the Deliverables by the County or by any person or Revised April 2010 6 E entity for any purpose other than the Project as set forth in this Agreement shall be at the full risk of the County. 10.8 Non - Appropriation 10.8.1 Consultant acknowledges that County is a governmental entity, and the validity of this Agreement is based upon the availability of public funding under the authority of its statutory mandate. In the event that public funds are unavailable and not appropriated for the performance of County's obligations under this Agreement, then this Agreement shall automatically expire without penalty to County immediately upon written notice to Consultant of the unavailability and non - appropriation of public funds. It is expressly agreed that County shall not activate this non - appropriation provision for its convenience or to circumvent the requirements of this Agreement, but only as an emergency fiscal measure during a substantial fiscal crisis. In the event of a change in the County's statutory authority, mandate and/or mandated functions, by state and/or federal legislative or regulatory action, which adversely affects County's authority to continue its obligations under this Agreement, then this Agreement shall automatically terminate without penalty to County upon written notice to Consultant of such limitation or change in County's legal authority. 10.9 Notices 10.9.1 Any notice required by this Agreement shall be in writing and delivered by certified or registered mail, return receipt requested to the following: Orange County Solid Waste Department HDR Engineering, Inc. of the Carolinas Attention: Gayle Wilson Attention: Robert Rella P.O. Box 17177 440 South Church Street, Suite 1000 Chapel Hill, NC 27516 Charlotte, NC 28202 -1919 10.10 Term of Agreement 10.11 The Effective Date of this Agreement shall be June 10, 2010. 10.12 The term of this Agreement is three (3) years, commencing on the Effective Date. At the time of the Agreement's expiration, the County and the Consultant may renew said Agreement for a term of two (2) additional two -year periods. Revised April 2010 7 10 IN WITNESS WHEREOF, the Parties, by and through their authorized agents, have hereunder set their hands and seal, all as of the day and year first above written. COUNTY: Orange County Valerie Foushee, Chair Board of County Commissioners Attest: Donna Baker, Clerk to the Board [SEAL] CONSULTANT: HDR Engineering, Inc. of the Carolinas Federal Tax ID Number: 56- 0511218 This instrument has been approved as to technical content. Gayle Wilson, Department Director L. Kevin Mosteller Senior Vice President This instrument has been pre- audited in the manner required by the Local Government Budget and Fiscal Control Act. Clarence G. Grier, Office of the Finance Director This instrument has been approved as to form and legal sufficiency. John L. Roberts, Office of the County Attorney Revised April 2010 8 February 25, 2010 Ms. Pamela K. Jones, Director Asset Management and Purchasing Services Orange County 131 W. Margaret Lane, Suite 301 P.O. Box 8181 Hillsborough, NC 27278 SUBJECT: Request for Qualifications No. 5162 Orange County General Engineering and Environmental Management Services Dear Ms. Jones and Selection Committee: HDR Engineering, Inc. of the Carolinas (HDR) would like to thank you for the opportunity to present our Statement of Qualifications for General and Environmental Management Services related to Orange County's (County) solid waste program. We have enjoyed our past working relationship with County staff on the development of state -wide solid waste regulations through the NCSWANA Chapter's Policy and Technical Committees. Our submittal outlines our firm's local and national experience and reputation as a leader and innovator in the planning, design, and implementation of solid waste projects. HDR's national resources, coupled with our east coast solid waste design team located in Charlotte and Raleigh, provides Orange County with a comprehensive project team widely respected in the industry. We have further enhanced our team with the addition of Resource Recycling Systems, Inc. (RRS) as a subconsultant. In summary, HDR offers three key benefits to the County: • Capability. Engineering News - Record ranked HDR #2 in Solid Waste for 2009. We are an experienced national firm with an outstanding, local, qualified team. Locally, our team has maintained a strong presence and involvement in the local chapter of the Solid Waste Association of North America (SWANA) to maintain a heightened awareness of regulatory requirements and technological advancements to better serve our clients. HDR remains one of very few firms that continue to grow in the solid waste consulting industry. • Sustainable Solutions. HDR's commitment to sustainability goes beyond the internal choices we make everyday. Innovation through sustainable practices and design is also part of our commitment to sustainability. The goal of sustainable design in the built environment is to move the bar higher. A good definition of sustainability is the act of balancing the environmental, social, and economic needs (the "triple bottom line ") of the built and natural environments for present and future generations. These principles can be applied to every type of project, including the design of landfills and other waste facilities. Landfills can be environmental stewards by minimizing their impact on the environment. HDR has available an evaluation tool that can help maximize the County's "triple bottom line." It is referred to as Sustainable Return on Investment (SRO[). This evaluation tool can help identify the impacts of different options that go beyond costs. SRO1 monetizes the non -cash social and environmental costs and benefits in order to measure the triple bottom line of a project. ■ Cost - Effective Planning and Design. As a recognized leader in solid waste facility planning, design, and construction, HDRis uniquely qualified to support Orange County with its solid waste projects. Based on our significant involvement with successful solid waste management facilities, and our unequaled knowledge of operations and capital costs, we can quickly identify and recommend proven solutions to issues that will arise 3733 Nea*nal Drive i'hor a (919) 785 118 HDR Engineering, Inc. ottheCarolinas Wte707 Far, (919)785.1167 Raleigh. NG 27612.4815 wywh Jr(trc.com 13 Ms. Pamela Jones, Director Page 2 concerning your program. HDR's full service planning and design team makes us the perfect choice to address the community's best interests. Mr. Joseph C. Readling, PE, will serve as HDR's Project Director designated to work with County staff and will coordinate and direct all solid waste related work. Joe has over 24 years of solid waste experience focused in the Southeast. He is supported by a team of experienced HDR professionals including Mr. Robert J. Rella, PE, as HDR's Project Principal, and Mr. Eric A. Wright, PE, for Quality Assurance /Quality Control. Combined, Joe, Bob, and Eric have over 65 years of waste management experience in the Southeast and across the US. As HDR's Carolinas Quality Control Coordinator, Mr. Wright will lead the efforts to ensure project quality from start to a successful completion. Our project team has a reputation for performing innovative, quality work, on schedule and within the allotted budget. We pride ourselves on responsiveness and client satisfaction, and we are committed to the continued development and success of all aspects of the County's solid waste management system. Mr. Robert Rella, PE, Senior Vice President, HDR's East Region Waste Facilities Director, is authorized to bind HDR contractually with Orange County. Mr. Rella is located at 440 S. Church St., Suite 1000, Charlotte, NC 28202, and can be contacted at 704 - 338 -6713 or via email at Bob. Rella(,hdrinc.com. We have formatted our proposal in a manner to ensure compliance with the County's RFQ and to expedite your review and consideration of our submittal. The following gives a brief overview of information covered in each section of our proposal. • HDR Overview — Brief overview of our Company Background and Capabilities. • Understanding — Proposed by our team for the successful completion of the work. • Projects Experience — Provides a brief description of projects recently completed that demonstrate our capabilities in performing the type of services requested. • Staffing — Includes our key members, as well as a brief resume and their role in the upcoming work. • Fee Schedule — HDR's current rate sheet. • QC Procedures — Summarizing HDR's extensive QA/QC program. • Resumes — Full resumes of key staff are provided. We trust that our submittal format and content effectively communicates our team's qualifications and approach related to our solid waste management services, as well as our team's strong desire to provide quality service. In closing, we very much want to serve the County on this upcoming project and pledge to devote the capabilities and experience of our project team to protect the County's interest and serve your needs for solid waste professional services. Please feel free to contact us if you have any questions or need clarification concerning this submittal. Respectfully submitted, HDR Engineering, Inc of the Carolinas Mr. Robert J. Rella, PE Senior Vice President RJR/nct HDR Engineering, Inc. of the Carolinas Im" 14 General Engineering and Environmental Management Services TABLE OF CONTENTS Page Page i 1 L-i 1 HDROVERVIEW ..................................................................... ............................... PROJECTUNDERSTANDING .................................................. ............................... 9 11 PROJECTEXPERIENCE ........................................................... ............................... 43 PROJECTTEAM ....................................................................... ............................... RATESCHEDULE ............................... 51 ..................................................................... 53 QCPROCEDURES ................................................................... ............................... KEYSTAFF RESUMES Page i 1 L-i 15 ^ General Engineering and Environmental Management Services This Page Intentionally Left Blank Page ii l a 16 General Engineering and Environmental Management Services PROPOSAL HIGHLIGHTS HDR has formatted this proposal in a manner to ensure compliance with the County's RFQ, and also to expedite your review of our Qualifications information. This section provides an overview of our submittal, explains our approach to serving Orange County, and emphasizes some key reasons we think HDR is the best team for Orange County. We are proud of our staff and industry expertise, and we hope it shows! HDR Overview— The Overview section includes a brief corporate background of HDR and highlights our longstanding North Carolina solid waste experience. HDR is an employee -owned company providing engineering solutions to public sector clients like Orange County for over 90 years. We remain one of very few full - service, solid waste firms in the nation. To supplement our team, we've included Resource Recycling Systems, Inc. (RRS). RRS has a proven track record with Orange County. An overview of the firm is included at the end of the section. Project Understanding — This section reiterates our understanding of your solicitation, and also explains our approach to serving clients in an on -call contract arrangement. HDR has been doing solid waste work in the Carolinas since the 1970s, and our core business is providing all facets of solid waste planning, permitting, design, and construction services to city and county government. We are at our best when we collaborate with our clients from the planning stages all the way through to certification of the project. One of our best skills is finding ways for clients to save money. Often times, key decisions made at the inception of a project are the defining moments when the financial course is set — and HDR brings vast experience to the table. Project Experience — The Project Experience section starts with a summary of some of the award winning solid waste projects HDR has led in recent years. Following that is a brief description of projects completed by HDR's Carolinas team. We have documented our capabilities through a combination of showcased project examples that cover services similar to those requested by Orange County. The first section focuses on comprehensive solid waste services we've provided to Carolinas clients. Contact information for key references is included at the end of each write -up. After that we've included some national projects in the categories of waste to energy, waste reduction and recycling, and facilities such as MRFs and recycling centers. There are also project sheets for a few RRS projects at the end of the Experience section. Project Team — The strength of our company is our people. HDR's experience, gained through the hard work of dedicated staff, is what differentiates HDR from most other consultants. Your RFQ is for general engineering and environmental services, so we've included numerous categories of work and the key staff that are associated with that type of work. The Project Team section starts with an organization chart outlining key staff we have selected for work with the County. Joe Readling, PE, VP will be the Project Director, supported by Bob Rella, PE, SVP as Project Principal. Joe is HDR's solid waste section manager in the Carolinas with over 24 years of experience. In addition, Joe was recently named as HDR's national Landfill Practice Leader where he coordinates HDR's resources related to landfill services on a national level. Bob is HDR's east region manager for solid waste and facilities. In his east region role, Bob is intimately familiar with HDR's resources as well as keeping abreast of solid waste industry trends both nationally and abroad. Joe and Bob have worked together for over 15 years in the Charlotte office and will ensure that Orange County gets the needed resources. You'll see as you review our Project Team section that we've showcased a lot of resources. Understand that our Carolinas team located in Raleigh and Charlotte has great depth and experience, and will coordinate the day -to -day contact with the County and do the lions share of the work on most projects. We've included many of our national resources on the team to demonstrate to the County that our experience is a real differentiator for HDR. That does not mean we will load up your projects with expensive experts from far and wide. On most occasions, our industry experts are used as support resources to our local staff and may not even be a "visible" part of the team. Managing our Page 1 fal 17 General Engineering and Environmental Management Services resources this way gives the County the best of both worlds — local, seasoned staff managing and completing your projects, with the expertise of the broader team within easy reach. Rate Sheet- We've included a rate sheet as requested in the RFQ. HDR works for some of the largest municipalities in the Carolinas, as well as some of the smallest. We could not be ranked #2 in the nation in solid waste work without providing excellent service and value. Quality Control Procedures - HDR has some of the best in -house programs in the industry for providing quality control in our work. Resumes - HDR has assembled a team of qualified professionals capable of supporting the County's engineering needs. Full resumes of key staff are included as the final section of our proposal. We trust this overview has provided insight into the content of our submittal, and will help expedite your review of sections you consider important. HDR appreciates the opportunity to provide Orange County with our Qualifications, and we look forward to working with you! Page 2 fa .. 18 General Engineering and Environmental Management Services HDR OVERVIEW FIRM HISTORY HDR was founded in 1917 and, over the past 90 years, has grown to over 8,000 professionals in more than 185 offices worldwide including five offices in the Carolinas. The HDR operating philosophy is to be an expertise -driven national firm, which delivers tailored solutions through a strong local presence. Service is what differentiates HDR from firms of similar size. Repeat business stands at 80 percent, a clear indication of client satisfaction and confidence. Professional publications consistently rank HDR among the leading consulting and design firms. You'll have confidence knowing that HDR is a national firm with a small -firm- service approach and a reputation for exceeding clients' expectations. HDR is committed to sustainable business practices for our employees, clients, and communities. Drawing from our vast experience, the knowledge of our solid waste professionals and our 448 LEED® Accredited Professionals, HDR helps clients create sustainable, environmentally sound, and publicly acceptable waste management projects, which incorporate energy management and energy efficiency, renewable energy, greenhouse gas accounting and water conservation. HDR has been responsible for the design of more LEEDO certified square footage than any other firm. As an industry leader in renewable energy engineering, HDR has more than a decade of experience in wind projects. In fact, our projects exceed 16,000 megawatts of generation capacity throughout North America. HDR has experience in other areas of renewable energy including solar, renewable solid fuels, biogas, geothermal, biofuels, hydropower, ocean energy, and, of course, waste -to- energy. SOLID WASTE CONSULTING SERVICES For more than 35 years, HDR has been an innovative leader in developing solid waste management systems and facilities for our public and private sector clients. We have been involved in all aspects of evaluating, planning, designing and procuring both traditional and trend - setting facilities, including landfills, transfer stations, and material and resource recovery facilities. This past year, Engineering News - Record ranked HDR #2 in Solid Waste. Hundreds of communities look to HDR for assistance. They range from small rural hamlets to the nation's giants, including New York City, Chicago, and Los Angeles. HDR has assisted them in their efforts to develop highly efficient, integrated, and sustainable solid waste management systems. From solid waste collection to waste transfer and disposal, HDR has been responsible for facilities that handle one in every ten tons of solid waste nationwide. The firm has been responsible for more than 45 municipal waste combustion facilities, 100 recycling programs, 35 material recovery and composting facilities, 150 transfer stations, and 300 landfills. Recently, HDR principals have been coordinating with solid waste professionals across North America and in Europe to advance the concept of Integrated Waste Management with reuse, recycling, and reduction followed by advanced thermal conversion of the leftover waste. HDR shares the philosophy No Wasted Resources with clients across the United States because we view waste as more than an inevitable byproduct of our lives. We take a life -cycle approach to processes and systems that help clients eliminate inefficiencies and improve environmental performance in solid waste management programs. HDR solutions include cost - effective, socially, and environmentally acceptable integration of appropriate technologies to reduce, recycle, reuse, prevent, and divert waste to the greatest extent possible. Page 3 1 R Sustainable Community Planning Integrated- Systems Analysis Sustainable Return on Inves. Co- Created Implementation Strategies General Engineering and Environmental Management Services NO WASTED RESOURCES Results from an Integrated, Sustainable Approach of Resources - Management I F, Integra"*" 1 L E Diversion Process & Infrastructure Resource Reduction: Up & Downstream Collection: Give Back; Take T ) Back Resource Recovery Residuals Utilization Conversion Technologies Waste -to- Energy Value -Added Goods Production Landfill Storage Page 4 l l 20 General Engineering and Environmental Management Services HDR Carolinas Information HDR has operated in the Carolinas nearly 50 years. Our ability to draw upon company -wide resources is a great strength in meeting and exceeding your expectations and complements our rich history with clients throughout the Carolinas. To meet the needs of our clients throughout the Carolinas, we maintain offices in Raleigh, Charlotte, Sunset Beach, Rock Hill, and Charleston. Our Carolina offices provide engineering services in the areas of solid waste management, landfill design, waste -to- energy, transportation, water resources, water and wastewater treatment, environmental assessment and remediation, power supply and energy management, and planning. Our Charlotte office serves our clients as HDR's Southeastern Design Center. Services HDR offers management, planning, and engineering solutions in the areas of Federal, Energy and Resource Management (FERM), Transportation, and Water. The services required for your facilities will come predominantly from the FERM area and will include the following capabilities. SOLID WASTE MANAGEMENT CONSULTING • Comprehensive solid waste management consulting • Local, state, and federal regulatory compliance and management • Program planning and evaluation • Program management and assistance • Public meetings and presentations • Information /communications services • Budgetary, financial and enterprise fund planning, management, and administration SOLID WASTE MANAGEMENT ENGINEERING • Comprehensive solid waste management engineering services • Engineering certification of reports, documents, and submissions • Design services and technical support for solid waste management programs • Engineering reviews and evaluations • Project supervision, monitoring, and oversight • Year -end closure /post closure care certifications ENVIRONMENTAL MONITORING AND CONSULTING • Comprehensive environmental consulting • Groundwater management • Surface water management • Leachate management • Hydrogeological assessments • Regulatory reporting and correspondence • Public meetings and presentations • Permit compliance consulting Page 5 till 21 General Engineering and Environmental Management Services HDR is an innovative leader in developing solid waste management systems and facilities for our public and private sector clients. We have been involved in all aspects of evaluating, planning, designing, and procuring both traditional and trend - setting facilities. Based on our history and experience noted above, over 10% of the nation's waste is processed or disposed of in a solid waste facility designed by HDR. HDR is fully aware of, and routinely monitors, changes in legislation and regulations that may affect the County's solid waste management and operations. We have established a strong understanding of the NC Department of Environment and Natural Resources (NCDENR) regulations and regulatory impacts on your business. We also have a broad knowledge of national legislation and regulations, which enables HDR to successfully complete projects. Our presence in North Carolina since 1961 has provided extensive interaction with the NCDENR personnel on a variety of projects including solid waste management planning, facility siting studies, permitting, design, and construction of numerous innovative waste management facilities. HDR's employees are very involved in the Solid Waste Association of North America ( SWANA) on both the national and local level. Several of the staff on the Carolinas team are members of national and local technical committees. Mr. Joe Readling is an officer of the North Carolina Chapter of SWANA and is an active member of the Policy Committee. Joe also is Chair of the Technical Committee. Mr. Ed Shuffier is a founding member and Past President of the North Carolina Chapter and currently serves on the Chapter's Training and By -Laws Committee. Mr. Dean Ferry is a certified trainer with SWANA and regularly provides training to landfill and transfer station operators. HDR Experience in Orange County's Category of Services HDR has vast experience in completing projects of similar scope as requested by the County. We have provided engineering services related to solid waste projects for numerous clients in the Carolinas and Virginia including: North Carolina Clients • City of Charlotte ■ City of Greensboro ■ City of Winston -Salem ■ Carteret County ■ Gaston County ■ Mecklenburg County ■ Moore County ■ Wake County ■ Coastal Regional Solid Waste Authority ■ Guilford County ■ Chatham County ■ Triangle J Council of Governments Virginia Clients • Allied Waste Industries • Southeastern Public Service Authority • Roanoke Valley Resource Authority South Carolina Clients • Charleston County • Greenville County • Williamsburg County • Georgetown County • Sumter County • Florence County • Oconee County • Horry County Solid Waste Authority • Richland County • Beaufort County • Appalachian Council of Governments (ACOG) • Three Rivers Solid Waste Authority Following is an experience matrix identifying services similar to those that will be required by the County. Page 6 1 al 22 General Engineering and Environmental Management Services PROJECT EXPERIENCE MATRIX BY SERVICE CATEGORY Project Experience SOLD WASTE U410 MW CONSKTING Comprehensive Sorxl Waste Managerr W Consniting Local, State and Federal Regulatory Cwnp lance and Man Program Planning and Evah2 ion Public Meetings and Presentations InformaiionlCom aicattons Services 8w1getary, Financial and Et*epdo Fund Planning, Management, and Adrrwtistta Wn SOLED WASTE MANAGEMENT ENGdNEER1NG Comprehensive Solid Waste Management Enginsenng Servkes Er*eering Certification of Reports, Documents and Submissions Design Services and Technical Support far Solid Waste Management Programs Engineering Review and Eraluatlm Project Supervision, Monitoring and Oversight provide Year4'-W Owureftat Closure Care Certifications ENWrlRONAlENTAL MONtTORWO AND CONSULTING Comprehensive Environmental Consulting Lznd h Gas Monitoring, Repaft and Management Groundwater Samptire Monitoring, and "ement Surfam WaW Sampling, Moab ft and Management Leachale Sampling, Mo�tormg, and Managenwit HYdrogeological Assesameb Public Meetings and Presentations Pernfdco t Ganswq Page 7 1 aq 23 General Engineering and Environmental Management Services Resource Recycling Systems, Inc. Overview HDR has included Resource Recycling Systems, Inc., (RRS) as a part of our team. Following is an overview of their firm. Additionally, key RRS project experience and staff resumes are included following the HDR experience and resumes. RRS is a nationally recognized environmental consulting and engineering firm specializing in solid waste resource management, recycling based manufacturing and by- product reuse for private, composting, public and non- profit local, regional, state and national programs. Founded in 1985, and organized as a Michigan corporation in 1986, (Federal ID Number 38- 2649280), RRS has provided supporting engineering and consulting services to many leading recycling and waste management programs across North America. Mission RRS is committed to environmental leadership by developing a full infrastructure approach to diverting materials from the waste stream and substituting recycled content materials for those using natural resources. Demonstrated Experience in Developing Environmental Leadership and Recycling Systems The RRS team of consultants includes disciplines in the fields of business development (strategic planning, management consulting, financial analysis, legal); project engineering (civil, industrial, and environmental), natural resource planning /economics; communications /training; and environmental science. Credentials in these professional disciplines complement the individual experience of the firm's consulting personnel, which combine to provide more than 200 years of direct involvement with recycling programs and facilities of all types. One -Stop Shopping: RRS clients benefit greatly from the ability of RRS to handle project needs comprehensively through one efficient firm. We have the in house capability to provide everything from preliminary conceptual services throughout on- going project management and assistance to long term development support. Systems Approach: "Business as Usual" is no longer an option in today's world. RRS specializes in systematic program review, evaluation and recommendation processes to move clients forward with effective strategies tailored specifically to their needs. The result is numerous award winning, efficient, affordable and sustainable programs. Unique Specialization: The Systems Approach that is unique to RRS provides its clients with waste management and recycling program planning, design, review and implementation in a way that only a firm which specializes in this area, and only this area, can provide. Services and Sectors Projects RRS is ready to assist you with any recycling or waste stream management project: • Recycling Based Engineering Grant or Loan Funding • Technical Assistance & Evaluation Strategic & Business Planning • MRF /Recycling Facility Design Economic /Financial Analysis • Equipment Specification & Procurement Program Training /Evaluation • Facility Siting & P2 Waste Assessment Market Research /Negotiation • Raw Material Sourcing & Procurement Public Policy & Programs • Collection /Processing System Design Page 8 fal 24 General Engineering and Environmental Management Services PROTECT UNDERSTANDING Orange County's Solid Waste Management Department (Department) is seeking a qualified consulting firm to provide multi- disciplined general engineering /solid waste services to support the ongoing and recurring engineering and environmental needs of the County's solid waste management program. The Department consists of comprehensive recycling and waste reduction programs, solid waste convenience center operations, limited municipal waste collection, solid waste planning, and education and landfill functions. The projects and services required to support the Department will include, as a minimum, the following: • Preparation of presentation material for public meetings, including AutoCAD drawings, poster boards, renderings, etc. • Attendance at meetings • Preparing design and bid documents for Department projects • Assistance in preparing scope of work requests for proposals • Assistance with review of bid documents and proposals • Facility design and permitting • Planning and operations analysis • Preparing drawings, calculations, evaluations, estimates, assessments, etc. • Examples of the possible types of projects that may be included: • Design of recycling /solid waste convenience centers /drop -off sites • Landfill closure planning and post - closure care • Permit amendments, modifications, and renewals • Interpretation of rules /legislation • Master planning • Financial assurance analysis • Compliance and mitigation Other potential project requirements may include: • Landfill gas management and recovery • Composting • Fleet management and collections • Construction management and administration • Groundwater /leachate management • Landfill closure and redevelopment • Geotechnical engineering • Gas and groundwater assessment and remediation • Quality assurance /quality control • Materials handling and recovery • Site assessment • Transfer station design and construction • Waste stream analysis and minimization • Cost of services, rates, and financial planning • Risk assessment • Recycling and waste reduction • Alternative waste technologies The County's approach for procurement of these services will be through the issuance of task orders. The task order will specify the specific services to be performed by the selected engineer. HDR is very familiar with this approach, having participated in more than 75 projects across the country through a master services /task order agreement. Based on this Page 9 1 il. 25 General Engineering and Environmental Management Services experience we have developed a disciplined and responsive approach. Upon initiation of requested engineering services from Orange County, the HDR Project Director, Mr. Readling, will immediately identify and assemble the correct mix of skilled technical staff for the work. The assembled team will review the request, visit County staff /the site (as appropriate), and develop an action plan and milestones for the work. In doing this up -front work, questions can be raised, recommendations for improving the scope of work can be made, and a preliminary cost estimate can be developed. Based on this information, the Project Director will develop a scope, schedule, and not -to- exceed cost estimate. Once the Task Order is approved, the Project Director will oversee the technical effort, working closely with the assigned Project Task Manager and the Department staff, to ensure that the project assignment is completed to the satisfaction of the County. By working closely with our clients, we ensure project understanding and acceptance during all phases of each project. Regular team meetings with internal technical staff, as well as milestone meetings with clients, allow the HDR team to keep client interests at the forefront of each project as it develops from the conceptual plan into the final documents used for construction. The HDR team prides itself on providing innovative solutions for all of our clients. Sometimes those solutions are developed during client meetings. So listening and understanding the client's needs is paramount on any given project. Some of our clients whose project examples show our commitment to using a flexible, collaborative approach include: • Winston - Salem, NC • Greensboro, NC • Wake County, NC • Mecklenburg County, NC Please refer to our Experience section for more specific details about the numerous projects we have completed for these clients. HDR's overall goal is to serve our clients in the best possible way by listening, scoping, monitoring, designing, and implementing projects on time and within budget. To do this, HDR Project Task Managers are trained to identify client goals and objectives through communication, define the scope of services accurately, control the flow of the project by monitoring the staffing requirements, conduct project meetings, invoice correctly, and provide progress reports to the client on a regular basis. Proper review of the project at milestone intervals, continuous client feedback, and documentation of all project - related activities and decisions are critical to the success of a project. Once the project is completed, the HDR Project Task Manager will make sure the project is closed out properly, including providing backup files to the client and properly archiving the project so that, if issues arrive in the future, the project files can be retrieved quickly. HDR understands that the successful respondent will be required to show proof of professional liability insurance in types and amounts satisfactory to the County, and cite any and all claims that have been filed against the professional liability insurance carrier by the respondent within the past ten years. Page 10 1 i \. 26 General Engineering and Environmental Management Services PROJECT EXPERIENCE HDR has partnered with our clients to develop a number of projects that have achieved award winning recognition as summarized in the following table. As a testimony to our experience and capabilities, we have compiled the following select project descriptions of our current general solid waste management clients. Following those are representative types of future projects that may be required for the continued successful operation of the County's Solid Waste Management Program. Page 11 1 aq 27 .{ General Engineering and Environmental Management Services Greensboro, North Carolina PLANNING ACTIVITIES From the initial design activities in Phase I, HDR developed a Master Plan of the site to provide for proper implementation of proposed facilities including disposal cells, borrow operations, site buffers, and areas for leachate and gas management systems. This plan identified the additional properties that the City would need to acquire to provide adequate waste disposal capacity in the most economical manner. The Master Plan resulted in the acquisition of additional properties that increased the total landfill facility to an area of approximately 767 acres. report. Page 12 11. R 28 General Engineering and Environmental Management Services a`.k tre�a WHITE STREET LANDFILL Beginning in 1993, HDR worked closely with City staff to develop a state mandated "transition plan" for the White Street Sanitary Landfill. The plan was developed to describe the remaining landfill operations at the current site as an approved disposal facility. HDR has worked with the City of Greensboro since 1994 to permit and construct the Phase III Subtitle D municipal solid waste unit and to optimize the facility capacity at the approximately 800 -acre White Street facility. HDR has been responsible for the development of technical documentation including a site study and construction permit application, as well as plans, specifications, operation plans, and cost estimates for the implementation of the project components. Work also included the preparation of bid documents, bid evaluation, submittal reviews, and construction inspection /quality assurance. In addition, HDR has prepared closure /post- closure plans for the existing facility, permitting for borrow areas, plans for HDR performed rigorous fate and erosion and sedimentation control, and other landfill monitoring services. The transport modeling at the White Street first 25 -acre Subtitle D cell was constructed in 1997 for $6.9 million, prior to the Landfill to gain NCDENR approval of a lower cost, more environmentally NCDENR January 1, 1998, deadline. The construction of an additional 14 -acre protective alternate liner system. cell was completed in January 2001 at a cost of $3.2 million. Following that HDR provides operational support to project, a 13 -acre cell was completed in November 2004 at a cost of $2 million. the Greensboro Landfill, reviewing all HDR prepared the bid documents and provided construction administration and facets of its operation on a quarterly construction quality assurance services for each project. The total 52 -acre basis. The landfill received the first "Certificate of Exemplary Performance" landfill unit has been designed and constructed to operate as a potential issued by NCDENR. hinraactnr In 2000, HDR submitted an alternative liner demonstration for Phase III, Cells 2 and 3, to allow the use of a geosynthetic clay liner in the base liner preserving the City's limited soil resources. In addition, HDR developed and implemented a Landfill Facility Operation Audit process in 2000. The audit, conducted semi - annually, reviews all facets of landfill operations including record keeping, safety, equipment maintenance, permit compliance, and operation efficiency. The audits resulted in an exemplary rating by NCDENR. The City of Greensboro was the first landfill to receive this award from the state In 2001 HDR prepared a Solid Waste Certificate of Exemplary PCrformCNR City af' 6�eerzsoa*a tt?��itc. streea Landfill Management Study Update to a prior study prepared in 1996. The intent of both the original study and the update was to analyze waste management options available to the City to confirm the best long -term strategies. The Update considered resource recovery technologies including mass bum, refuse derived fuel (RDF), gasification, and MSW composting. Additionally, land disposal options were reviewed including expansion of the White Street Landfill; development of a new, in -county landfill; or out -of- county disposal. The findings of the report confirmed that, from an economic standpoint, continued disposal of MSW at White Street was the least cost option. However, due to the long Page 13 1 l .. 29 General Engineering and Environmental Management Services legacy of waste disposal at White Street and the numerous residential areas adjacent to the landfill, the City decided to close the landfill to MSW waste and construct a transfer station to haul the waste out of the county to a private landfill. In 2007, HDR developed a Construction & Demolition (C &D) Landfill Master Plan to assist the City in weighing its options with respect to continual disposal operations on -site. This evaluated anticipated landfill fill dates under varying waste acceptance rates and landfill capacities. This work included the submittal of Permit Modifications for Phase III to increase the waste side slopes from a 4- horizontal to 1- vertical to a 3- horizontal to 1- vertical. LANDFILL GAS HDR conducted a study of Greensboro's unlined Phase II gas system in 2001 to identify potential enhancements in collection efficiency and to provide insight on improved operations. In 2002, HDR designed the landfill gas collection system for Phase III. This design required the addition of a skid - mounted flare and blower system that would allow the City to either flare the landfill gas or integrate it into Phase III's transmission pipeline to Cone Mills. The flare and blower system was bid and constructed in 2002 along with Phase A of the landfill gas collection system. HDR also assisted the City in its annual air quality reporting from 2000 to 2005 and currently provides this service. This includes assisting the City in performing and submitting its air quality toxics modeling. HDR is currently providing oversight for the landfill staff on a weekly basis to ensure good operation of its landfill gas systems and compliance with New Source Performance Standards (NSPS) and National Emission Standards for Hazardous Air Pollutants (NESHAP) regulations. TRANSFER STATION HDR was selected for the Design & Permitting of the Transfer Station and development of an RFP to solicit proposals for hauling and disposing of the City's Municipal Solid Waste (MSW). The recently completed 900 tons per day (TPD) municipal solid waste transfer station facility consists of a tipping area, administrative offices, facilities for drivers, a citizen drop -off area, scale house, access roads, and on -site, synthetically - lined, sand filter for stormwater management. The transfer station utilizes a bi -level (full grade separation), non - compacted, direct -dump design, consisting of two refuse hoppers, a tipping area on the upper level, and a load -out area on the lower level. The maneuvering area, tipping floor, and operations /control areas are fully enclosed by a pre - engineered metal, panel -type, building. A separate tipping area outside of the transfer building accepts waste from local citizens. Included at the 10 -acre facility site is a 20,000 square foot Surface Sand Filter (SSF). This constructed SSF facility provides stormwater quality treatment and controls peak rates of discharges. Immediately adjacent to the SSF is the MSW trailer staging area, a high use area with 15 over - the -road semi - trailers at any given time. A curb and gutter collection system collects runoff from this area and the scale house, citizen's recycling center, 32,000 -sf. Building, and all drives. Page 14 i 1 R .� 30 u General Engineering and Environmental Management Services Stormwater permitting included compliance with City of Greensboro and State of North Carolina requirements. Design criteria included 85- percent efficiency removal of total suspended solids (TSS), controlled release of the water quality volume over 2 to 5 days, controlling post - development peak discharge rates to pre - development rates, and providing permanent sediment control storage volumes. A flow splitter structure located at the head of the SSF system distributes stormwater to two pretreatment sediment chambers that have a permanent pool. Stormwater then flows through a perforated pipe manifold into the filter bed areas. Attenuation in the sediment chambers is achieved by forcing attenuation of flows through the manifold system. The control of transfer rates also acts as an energy dissipater as stormwater flows onto and over the filter media. Filter media bed dimensions provide for a drawdown period of 40 hours after the runoff event. Filtered flow is collected in the underlying collection system and flows to the outlet riser. During significant (larger than the water quality volume) events, the independent filter beds are inundated and captured runoff volumes overtop both filter beds. Attenuated flows are managed within the footprint of the SSF for events including the 50- and 100 -year, 24 hour durations. The outlet riser is located in the pretreatment chambers, near the flow splitter, to avoid disturbance of the filter media and mature media texture during the management of the larger storm events. The client has reported the SSF provides better access for maintenance. Page 15 l l 31 General Engineering and Environmental Management Services Winston - Salem, North Carolina PIGGYBACK LANDFILL HDR designed, permitted, and provided construction administration services for the 37 -acre expansion of the existing Hanes Mill Road Sanitary Landfill. In accomplishing this task, HDR redesigned the side slopes and final cap of the existing landfill facility to "piggyback" or overlay the liner system of the new unit along the common slope of the current fill area. The ovediner includes a double liner, a witness zone to facilitate the monitoring of potential leachate generation, and a single composite base liner. This facility is the first ovediner permit issued in the state of North Carolina. To address the potential for settlement in the design, settlement devices were installed in the old waste and then loaded with soil overburden to simulate the increased weight of the future waste. Settlement coefficients were developed to model short- and long -term stresses on the liner. MSW LANDFILL EXPANSION HDR completed preparation of the required permit application for the City's 347 - acre (90 lined acres) expansion site. This project began with development of a Key Elements: Master Plan of the site followed by preparation of the Site Study Report. With ' 347 -acre expansion over 12,000 people living within 2 miles of the site, coordination with the public permittingidesign ■ First permitted "piggyback" liner in was a critical aspect of the project. HDR prepared computer - generated imagery North Carolina of the site to help represent the before and after views of the landfill from vantage ■ First permitted alternate liner in points around the facility. Screening methods were evaluated, including use of North Carolina tree cover and engineered berms. Each of the screening options was also - 44-acre closure completed in 1999 9 9 P ■ 40 -acre closure completed in 2007 analyzed for sound attenuation qualities using computer modeling. The permit to ■ 72 acres of subtitle D Landfill construct the first phase was issued in November 2001, and construction of the constructed first cell began in April 2002. The landfill piping system is designed for future bioreactor operation. A permit to operate for the 21 -acre Cell 1 was obtained in October 2004. Construction of the 14- acre Cell 2 was permitted to operate in March 2007. HDR is currently performing the hydrogeologic investigation for Phase 2 of the expansion landfill. MSW LANDFILL CLOSURE HDR completed the design and provided construction administration and monitoring service on the 40 -acre piggyback landfill closure. The closure has a permit modification to use an alternative cap liner system consisting of a geosynthetic clay liner on the 8% slope top. HDR is currently conducting post - closure inspections of the closed facility. GROUNDWATER CLEANUP PILOT STUDY HDR is currently performing a pilot study injecting a food -grade product into the subsurface to enhance chemical degradation of contaminants in the groundwater from the unlined landfill on -site. In addition, HDR is evaluating the type of contamination (i.e., leachate or gas) by conducting specific geochemical tests on groundwater samples that would indicate the source. Page 16 f al 32 General Engineering and Environmental Management Services GAS SYSTEM EVALUATION HDR has been involved in the expansion of the current gas system from the unlined landfill into the lined cells through connection of the leachate collection system to the gas -to- energy plant. HDR has also assisted the City in evaluating the current gas contracts and performing a financial analysis on the system expansion. HDR has designed and is currently managing the construction of the 6,100 -foot gas transmission line from the expansion landfill to the Gas -to- Energy plant. CONSTRUCTION AND DEMOLITION DEBRIS (C&D) LANDFILL C&D LANDFILL SITE ANALYSIS Page 17 1 R, ... 4. 33 General Engineering and Environmental Management Services Wake County, North Carolina HDR is providing engineering consulting services to Wake County through a General Services contract which includes a multitude of projects within the Wake County Environmental Services system and the Wake County Facilities Design and Construction group. HDR has provided consulting services with the closure of the North Wake Landfill, the procurement and operation of the City of Raleigh Transfer Station operations and hauling contractor, environmental assessment of the closed East Wake Landfill, and assistance with establishment and operation of the South Wake Landfill — Phase 1 B. Project activities include assistance with: 4- • Review of closure of construction documents prepared by others. Key Elements. • Oversight of the Phase 1 B construction including review of the construction, w Contract procurement construction submittals and CQA documentation. • Operational assistance • Consulting relating to soil planning and uses for the long -term needs of the ' Construction oversight South Wake Landfill • Preparation of airspace management reports. • Evaluation of South Wake Landfill waste capacity options. • Preparation of contract between the County, the City of Raleigh, and waste hauling contractor. • Review of transfer station construction documents and construction progress. • Assistance with scale house operations such as intercom and security systems. HDR, as a teaming partner with Olver, Inc., assisted Wake County with the establishment and operation of the South Wake Landfill (SWLF) — Phase 1A located in Holly Springs, NC. Project activities include: ■ Assistance with managing the operations portion of the Agreement. Additional work associated with the SWLF included coordination with Waste Industries and the contractor regarding construction materials and activities including other projects and operations at the site. HDR/Olver also provide assistance as it relates to the permitting and construction of the SWLF with the construction of the new scale house, wetlands permitting and mitigation, transfer station operations, and on -site soil resources. Key Elements: • Bentonite amended clay liner • 21 -acre cell and ancillary features • Privately operated, publicly owned landfill • Political and public challenges Since HDR is under contract with both the Wake County Environmental Services Division and the Facilities Design and Construction Division, we have included our contact information for both. Page 18 1 a 34 General Engineering and Environmental Management Services Mecklenburg County, North Carolina HDR has provided a variety of solid waste management services for Mecklenburg County over the past four decades. One of the first projects was the completion in 1972 of a detailed study that evaluated available technologies including incineration, composting, shredding, recycling, baling, and pyrolisis as well as sanitary landfilling. Supporting data included a waste quantity and characterization study determined through two seven - day surveillances at each major disposal site. Also in the early 1970s HDR assisted the County with siting and provided the design for the 160 -acre Harrisburg Park Sanitary Landfill. The design included plans and specifications for all facilities required for normal landfill operations, a computerized earth movement sequence plan, and ultimate use plan for an 18 -hole golf course. The facility was one of the first engineered landfills in North Carolina. Upon reaching the final permitted contours, the landfill was closed to waste disposal operations and currently is the home of the Charles T. Meyers municipal golf course operated by the Mecklenburg County Parks and Recreation Division. #*?*&V=ft* FOMMOSM In the 1980s, HDR served as the County's consultant for its solid waste I I management implementation activities, including the preparation of a request for proposals, contract development, facility siting, preliminary design, and construction management of a 235 - tons /day waste -to- energy facility. Located in the university area in the northeast section of Charlotte, the cogeneration facility provided steam to UNC- Charlotte and generated electricity, which was sold to Duke Power. HDR also completed a study to assess the location and size of a transfer and recycling station. The major tasks were the determination of County-wide waste distribution; review existing and planned solid waste management options and available land for the transfer and recycling station; produce a computerized facility siting analysis; develop a Request for Proposals (RFP) for a firm to design the station; and participated in the evaluation of the RFP process. Recyclable materials were expected to include selected paper grades, glass, aluminum cans, used motor oil, and pet containers. An area for deposit and storage of white goods and other scrap metals was also provided. In the early 1990s, HDR assisted the County in conducting a composition study of the commercial waste stream. The study helped substantiate the significant role that commercial waste. recycling could play in the County's recycling program. FOXHOLE LANDFILL More recently, HDR was selected by the County to assist with the design, permitting, construction administration, and regulatory compliance for the operation of the Foxhole Landfill located on Highway 521 in southern Mecklenburg County. Projects completed to date under the General Engineering Services contract include: Preparation of a treatment and processing permit application for the landfill's on -site yard waste facility. HDR worked with NCDENR through the approval Ni uuubs. Preparation of an operational density evaluation report which evaluates the compaction and airspace usage of the landfill operation. Page 19 faq 35 General Engineering and Environmental Management Services • Permitting and installation of methane monitoring well system. • Revised and permitted an erosion control plan for complete facility development. • Bid, award, and provide construction administration of a clearing and grubbing package for the preparation of the Phase 2 development. • Prepared and submitted a permit amendment for the extension of the Phase I permit to operate. Permit amendment included the modification of the facility operations plan. Currently, HDR is completing the following activities: • Evaluation of the greenhouse gas reporting requirements under 40 CFR 98, Subpart HH. • Assisting County landfill staff with self performance of the initial grading and excavation of the Phase 2 cell. • Oversight of wetlands mitigation through Army Corps of Engineers. • Preparation of a Facility Master Plan. Additionally, HDR will provide future engineering services for the expansion of the next phases of operation. Page 20 11_.J` 36 General Engineering and Environmental Management Services Greenville County, South Carolina INITIAL PLANNING EFFORTS HDR and Greenville County have worked together on solid waste issues since the late 1980's. At that time, HDR was hired to pursue the implementation of a resource recovery facility (RRF) in Greenville County. The purpose of the facility was to significantly extend the life of the County's Enoree Landfill by reducing the waste stream volume through energy and materials recovery. Although the Enoree site was purchased in the mid 1970's and permitted in 1980, it was not developed as a landfill until 1990. HDR was tasked with evaluating the feasibility and siting of an RRF and recommended that a 1000 -tpd mass -bum cogeneration RRF be developed, with a materials recovery facility (MRF) at the front end. County Council did not approve the RRF, but instead decided to take a step back and review all options available for solid waste management in Greenville County. Concurrent with this timing, the legislature passed the South Carolina Solid Waste Policy and Management Act of 1991 (Act). Passing of the Act led to development of the County's Solid Waste Management Plan (Plan), which comprehensively reviewed waste management practices in Greenville County. From 1992 to 1993, HDR assisted the County with the creation of a county-wide plan. The plan was developed under the direction of a 12 member Solid Waste Advisory Council (SWAG). HDR participated in monthly and biweekly meetings over a 10 -month period to develop the plan. The plan included 13 recommendations, covering management issues related to waste reduction, recycling, compliance with solid waste bans, household hazardous waste, and solid waste disposal. Recommendation #9 was to "pursue development of a single regional landfill for in -county Subtitle D waste." The Greenville Public Cooperative (Cooperative) was formed as an outgrowth of the discussion, the Cooperative selected landfilling as the preferred option I DEWIFICATION By February 1995, HDR and the Cooperative had narrowed the field of 15 potential OF POTENTIAL SITES landfill sites to five. All five identified sites were located in the County's jurisdiction. L: tvZiFILI, Around this time, the leadership of the project was transferred from the Cooperative fta, to the County for site selection and development. The Cooperative's final report did not identify the fives sites but instead stated that there were a number of potentially good sites. Page 21 faq 37 az General Engineering and Environmental Management Services LANDFILL SITE SELECTION HDR was selected by the County to continue serving its needs in selecting and developing a new landfill. In the spring of 1997, the County Council appointed an ad -hoc committee to select a site for the future landfill. The committee started the selection process by reviewing all of the sites identified by the Cooperative. In June of 1998, County Council voted to obtain title to the site then known as Site M; subsequently, it was called Southern Greenville County Landfill (SGCL), and today is known as the Twin Chimneys. Landfill. The four parcels comprising the 1,156 acre Site M were subsequently purchased in 1999. Over a period of two and a half years, HDR supervised the drilling and evaluation of 103 soil borings and the installation of 83 piezometers at the new site. HDR conducted wetland identifications on the site and reviewed the site for threatened and endangered species. On December 12, 2001, the Site Hydrogeologic Characterization Report prepared by HDR was approved by the South Carolina. Department of Health and Environmental Control (SCDHEC). HDR prepared the permit application for a MSW landfill facility covering a total of 389 acres in seven distinct units. The design included areas for management o f yard wastes, tires, white goods, recyclables, leachate, and landfill gas, as well as locations for a citizen's convenience center, scales, administrative offices, an education center, and maintenance building. In February 2002, HDR submitted the permit application for the site. On November 20, 2003, the County received MSW landfill permit #231001 -1102 for development of the Southern Greenville County Landfill. ENOREE LANDFILL As planning was ongoing related to the new long -term landfill, the County was also dealing with disposal issues at the Enoree Landfill ( Enoree). Phase I of Enoree was constructed and operated until it was closed and capped in 1994 following the adoption of the Subtitle D landfill regulations requiring landfills to have liners. Landfilling operations ceased at Enoree until July 1995 so that a lined landfill cell (Phase II Cell 1) could be permitted and constructed at the site. In AnAl 100!. +k, (' ­ n+„ ;­ A -- DCD C. A--; -- -ha ---- .....r44 -- ` 38 General Engineering and Environmental Management Services TWIN CHIMNEYS LANDFILL Near the end of 2003, HDR worked with the County to continue development of the SGCLF site. The construction was planned out in an orderly sequence, and a master schedule was developed to identify the interrelationships of tasks. HDR prepared clearing and grubbing specifications and plans, and assisted the County with bidding and selection of the contractor. HDR prepared plans and specifications for grading the site, the first cell, and an initial complement of buildings. HDR also prepared a proforma to aid the County in understanding the changes in cost of services as waste disposal transitioned from Enoree to SGCLF. In 2004, the County issued another RFP for solid waste related engineering it j V o services. HDR was the firm selected to continue the work. The goal was to be ready to accept waste at the Twin Chimneys Landfill by January 1, 2006. In October of 2004 the initial clearing of the site was complete and the grading contract was begun to prepare the site for construction. Construction on Cell 1 began in April of 2005. At the same time, designs for the buildings were being finalized, and construction began on them in July 2005. With the infrastructure and lined landfill cell under construction, HDR began work on z modifying the permit to provide C &D capacity at the site. Cell 1 was completed on schedule and ready for waste by January 1, 2006; however, additional space remained at the Enoree Landfill so transition to the new site was put on hold. In May of 2006, SCDHEC approved the permit ' modification, allowing a C &D landfill as Unit 2 of the facility, and construction began on the first cell for that landfill unit. The Twin Chimneys for which the site is named were revealed near the facility entrance during construction of the first cell. From the beginning, the County and its contractors have worked to preserve those chimneys as monuments. Page 23 l i. q ,. 39 General Engineering and Environmental Management Services Southeastern Public Service Authority, Virginia The Southeastern Public Service Authority of Virginia (SPSA) solid waste management system consists of a 2,000 -tpd RDF (refuse- derived fuel) facility, five transfer stations, and a 300 -acre landfill. All elements in this system were designed by HDR including processes, architectural treatments for all facilities, and the landfill. Early activity included a waste stream definition study where we established tonnages and quantities of waste produced, and projected future generation rates; seasonal variations and monthly fluctuations; and determined the percentage of waste that was recoverable, processible, and nonprocessible for landfilling. The recoverable and processible fraction was analyzed for potential energy yield. The RDF facility contains three process lines, two of which are operational at any given time, with one line always under maintenance. The process includes hand picking and magnetic separation of materials for recycling and three trammel lines for RDF production. RDF is transferred by conveyor to boilers at the nearby Portsmouth Naval Base electrical generating facility. REGIONAL LANDFILL, SUFFOLK, VA Our Carolinas office staff also completed a landfill closure /post- closure plan for the existing Cell 1 - IV. As part of the closure plan, a comprehensive study was performed to evaluate the feasibility of developing a landfill gas (LFG) recovery system with electric power generation. The first phase of this system included conversion of the existing leachate underdrain system into a dual - purpose leachate /landfill gas collection system, which has been in operation since 1993. The LFG system has a 6000 kW generating capacity based upon the recovery of 750 to 1,250,000 standard cubic feet per day (MSCFD) of gas. Additionally, in an effort to minimize construction costs as SPSA struggles with the increased construction costs in the industry, HDR in conjunction with SPSA developed a plan to self - perform closure construction activities. With HDR's assistance, SPSA performed some of the closure activities while managing two subcontracts consisting of fumishing geosynthetics and installing the geosynthetics. SPSA served as the general contractor and performed all the civil site work on the closure. The money SPSA saved through this type of planning has allowed other projects to be funded with the savings. Our Norfolk and Carolinas staff provided Construction Quality Assurance Services for the closure project. HDR designed a 43 -acre cell expansion to the landfill to accommodate an additional 10 to 15 years of disposal capacity. The design of this new cell, designated as Cell V, included an innovative inward gradient design concept. Cell VI expansion (41 acres), also an inward gradient cell, was permitted and constructed in 2005/2006. Page 24 1 al �,. 40 General Engineering and Environmental Management Services Because SPSA is located in a coastal plain with a shallow depth to the groundwater table, the intra- gradient design allowed excavation through the uppermost aquifer into the second. This required HDR to work closely with regulatory agencies and prove the integrity of the system. For example, detailed fate and transport modeling was necessary to illustrate that the proposed liner system was as effective, or more so, than the EPA - mandated system. In response to Virginia's regulations that prohibit the dewatering of aquifers, HDR went through an additional process to receive a special exception for SPSA's Cell V. An innovative approach is Cell V's use of a double- composite liner system installed below the local groundwater table to facilitate an inward gradient (below the normal groundwater level). This greatly improves the landfill economics by gaining additional airspace through significant excavation prior to liner placement, while at the same time affording a higher level of environmental protection. The inward gradient design of Cell V nearly doubled the waste capacity of the original, aboveground design, and increased space at almost no additional capital costs. The result for SPSA is a lower per ton cost for material put in the landfill, and a higher level of environmental protection. Another way in which the intra - gradient design has relieved the Authority's economic burdens is through the soil yielded by the excavation. Prior to this resource being made available, SPSA had exhausted its soil surplus years ago and had been transporting soil to the landfill site at a cost of $6 to $7 per cubic yard. At over 1.5 million cubic yards, the excavation of soil will offset nearly $10 million dollars in cost of importing off -site soil for use as cover material. The SPSA Landfill is an "inward gradient" design, with the liner system placed as much as 30 feet below the local groundwater table. The Cell V design saved SPSA over $17 million in 1999. The 44 -acre Cell VI contiguous expansion was recently permitted and designed, and construction of the first phase was completed in April 2006. In part due to the design innovations of Cell V, the SPSA recently received the highest award presented in Landfill Management by SWANA. HDR has provided landfill design and construction administration service to SPSA since 1984. The permitting process, established in Virginia, includes rigorous documentation of the engineering design. The permitting included extensive leachate modeling to demonstrate that the existing pretreatment facility was adequate to accept the addition of the expansion's flow. Also, a formal regulatory variance was obtained to allow for an alternate liner system. Obtaining this variance has saved SPSA several million dollars by nearly doubling the cell capacity, as well as avoiding bringing in off -site material for landfill cover. The double- composite liner system, installed below the local groundwater table to facilitate an inward gradient, includes a groundwater collection system, soil liner component, and geosynthetic clay liner, as well as dual geomembrane liners. Post - closure care groundwater monitoring is performed by Carolinas and Virginia staff for the closed landfills in Isle of Wight County, Virginia, and the city of Franklin, Virginia. Services included the evaluation and statistical analysis of detection and assessment monitoring data, groundwater flow determination, plume delineation studies, and monitoring well design and installation oversight. Page 25 1 al .. ••. , 41 General Engineering and Environmental Management Services Furthermore, HDR's activities at SPSA included VPDES permitting and compliance activities, groundwater dewatering permitting and compliance activities, monitoring of leachate and groundwater activities, green site planning, daily landfill operations, airspace management reports, local government permitting, transfer station planning, design, and construction, financial planning, and long -term disposal planning. TRANSFER STATION HDR provided the siting, design, permitting, and construction services for a network of nine transfer stations and a 300 -acre landfill. Operational stations are located in Norfolk (1,300 -tpd), Chesapeake (600 -tpd), Franklin (100 - tpd), Landstown (1,500 -tpd), Isle of Wight (100 -tpd), Oceana (800 -tpd), Suffolk (500 -tpd), Ivor (50 -tpd), and Boykins (50- tpd). Page 26 IER Charleston County, South Carolina 42 General Engineering and Environmental Management Services HDR began work with Charleston County in 2002 to permit, design, and manage construction of the proposed US 17 South Subtitle D MSW Landfill. The County acquired the 750 -acre site in the early 1990's to replace the currently active Bees Ferry Landfill. The initial work included a site evaluation by preparation of a Preliminary Hydrogeologic Characterization Report (PHCR). The site was reviewed for threatened and endangered species, as well as cultural resources. HDR delineated over 400 acres of jurisdictional wetlands and coordinated with the U.S. Army Corps of Engineers (USACE) to gain approval of the delineation and to obtain approval of proposed wetland disturbances. During this work, the County was reviewing its long -term solid waste management program, and HDR evaluated the Bees Ferry Landfill for potential expansion in lieu of immediate development of the 17 South site. HDR reviewed expansion options and determined that continued waste management at Bees Ferry was both feasible and economical. The County transitioned HDR to permit, design, Key Elements. and manage construction of a lined Subtitle D P ■ D ermittin and -acre lined landfill n expansion at the Bees Ferry Landfill. Through ■ desi The combination of piggybacking over the old waste and taking the ash monofill out of service increased the design capacity of the lined unit from 3.5 MCY to nearly 10 MCY. U to • Lined landfill piggybacks over initial concept planning, HDR determined that closed landfill piggybacking the new lined expansion over the sideslope of the unlined unit would • Unlined landfill grades afford more capacity at less cost, while providing a more environmentally sound cap redesigned over the unlined landfill. HDR and the County met with SCDHEC to discuss the • Old waste area reclaimed to optimize lined capacity piggybacking option, and after review of other facilities where HDR had • Construction Administration for piggybacked over old waste, they agreed the approach was permittable. Cell 1 and leachate facilities The expansion capacity without piggybacking was initially estimated to be 3.5 MCY, while utilizing the piggyback concept would yield 6.2 MCY. After further design, the expansion area was modified to include decommissioning of the existing ash monofill, which boosted the expansion capacity to a gross airspace of nearly 10 MCY. This significant airspace is expected to provide MSW disposal capacity at Bees Ferry for more than 30 years. During the permitting of the lined expansion, HDR prepared a permit modification for the current, unlined MSW site in order to accurately match the permitted contours to the construction grades. The permit modification was prepared in a manner to give the County flexibility with regard to closure date and tonnage received. The design also allowed co- disposal of C &D waste within the MSW area, which improved the site life of the existing C &D landfill and optimized the use of the soon to be closed MSW area. An 11 -acre area that had received waste was also reclaimed in order to construct the new liner system over the unlined area of the landfill. HDR proceeded to complete the Site Hydrogeologic Characterization Report (SHCR) and the Permit Application for the site. The Bees Ferry Landfill is located near the centroid of the most seismically active area on the eastern seaboard according to USGS seismic mapping. This is due to the historic Charleston Earthquake of 1886. This fact required a rigorous seismic evaluation, including in -situ shear wave analysis to determine the most sensitive frequency for the site. HDR has designed completely new infrastructure for the Bees Ferry Landfill including a new Convenience Center, Scalehouse, Administration Building, Roads, and Landscaping. HDR is currently providing Construction Administration for Cell 2 expansion. Page 27 11. R ' 43 General Engineering and Environmental Management Services .vx r Gaston County, North Carolina HDR redesigned the unlined Gaston County Sanitary Landfill to meet Subtitle D requirements. Activities included the development of a Master Plan of the site to provide for proper implementation of proposed facilities including a construction and demolition landfill, a yard waste composting facility, lined sanitary landfill cells, leachate treatment facility, and landfill gas venting system. HDR submitted a site study to the North Carolina Department of Environment and Natural Resources (NCDENR) desianatino aDDroximately RR The first 13 -acre cell of the Subtitle D facility was constructed in 1997, prior to the NCDENR January 1, 1998, deadline. The cell was constructed for approximately $3.4 million. HDR's work included the preparation of bid documents, bid evaluation, submittal review, and construction administration. HDR prepared a permit modification to allow the use of a geosynthetic clay liner (GCL) as an alternate liner. The second 16 -acre cell was placed into operation in 2002. The development of the initial Subtitle D cell and the closure of the unlined phase of the landfill were completed in accordance with the Master Plan prepared for the facility by HDR. HDR installed a methane monitoring system at the landfill and determined during routine monitoring that levels exceeded the regulatory limits at the property boundary. In response to this finding, HDR prepared a remediation plan that defined the nature and extent of the problem, and proposed alternatives for a remedy. The first phase of the plan has been approved by the North Carolina Division of Solid Waste. The solution in this case included property acquisition incorporating a passive LFG system with active system capability. Page 28 The Gaston County Landfill is one of the first in North Carolina to implement a leachate recirculation project to accelerate the biodegradation of the waste and minimize leachate disposal requirements. Under HDR's guidance, Gaston County completed the site grading and clay liner installation of its lined Cell 2 using county forces. Self- performing the work saved the county almost $1 million. IM Sarasota County, Florida 44 General Engineering and Environmental Management Services HDR has been assisting Sarasota County with its solid waste program since 2004 and has provided services for both the active Central County Solid Waste Disposal Complex (CCSWDC) and the closed Bee Ridge landfill. Key Elements: ■ 54- acre landfill expansion permitting/design ■ Landfill Master Gas Plan for 295 -acre landfill ■ Phase I LFGCCS design, permitting, and construction administration ■ Partial closure design (including solar cap), HDR prepared a permit permitting, and construction application, construction administration ■ Landfill gas utilization project documents, and served as design, permitting and Engineer of Record for an construction assistance ■ Borrow study x approximate 54 -acre expansion of the CCSWDC Class I landfill. The Phase II design incorporates several design and operational improvements over the previous Phase I design. These improvements were identified during a thorough review of the site history and during discussions with County staff and were presented in a Phase II Basis of Design Report as a precursor to the permitting effort. These improvements include provisions for potential future leachate recirculation and bioreactor operations, provisions for a potential future vertical expansion of up to 100 feet, increased airspace by removing sideslope benches, and minimization of the number of leachate transfer pumps required by designing all Phase II sumps to drain by gravity to a single pump station. The project also includes a 9,700 -foot leachate force main to an existing leachate storage tank. Due to the absence of suitable clay liner material in the vicinity of the landfill, Phase II incorporates a double synthetic liner system consisting of (from the top down) 2 feet of operational cover, a geonet composite drainage layer, a 60 -mil HDPE primary liner, a geonet composite leak detection layer, a 60- mil HDPE secondary liner, and a geosynthetic clay liner (GCL) placed over a prepared subgrade. In order to minimize the quantity of fill required for the low -lying site, an extensive field exploration was conducted to accurately identify historical high groundwater levels and to characterize foundation conditions including settlement parameters. The $18.5 project was well below the estimated construction cost and was completed five months ahead of schedule. Several landfill gas projects have been completed or are in progress for Sarasota County. HDR prepared a Landfill Master Gas Plan and Basis of Design Report that provides recommendations for the layout of landfill gas facilities for the entire 295 -acre Class I landfill. HDR has also provided assistance with reviewing and recommending a developer for a landfill gas utilization project for the Bee Ridge Landfill. Other services provided include preparing Title V Annual Operating Reports and Tier II sampling and testing at CCSWDC, and design and permitting of the Phase I landfill gas collection and control system (LFGCCS). HDR is currently providing construction administration services during the installation of the Phase I LFGCCS. HDR is currently designing and preparing permit documents for the partial closure of Phase I of the CCSWDC. The design includes a temporary final cover on the south slope of Phase I where it is anticipated that Phase III will be constructed in approximately 2020. The temporary final cover will consist of an exposed 60 -mil HDPE geomembrane that will enable Sarasota County to control landfill gas generation on the slope while reducing maintenance issues associated with a temporary soil cover. HDR also prepared a feasibility study for the potential use of flexible photovoltaic panels on the exposed geomembrane in order to generate electricity for sale to the local electric utility. The study indicated that Sarasota County could construct a 144 -kW SEC system on the 10 -acre south slope that will pay for the temporary closure and solar electric system and provide a net profit in electric sales over the life of the facility. The County is therefore including the solar electric system in the partial closure permit application. Page 29 1 L_ 45 General Engineering and Environmental Management Services HDR has also been selected by Sarasota County to provide landfill gas to energy ( LFGTE) services at the CCSWDC. HDR has been supporting conceptual development of a landfill gas -to- energy facility, which included a study that clearly showed that the County's revenue potential would be maximized through County development as opposed to a developer -owned structure. HDR will assist the County with project development and permitting, assist with the procurement of major equipment, prepare construction packages for phased execution of the LFGTE facility, provide LFGTE construction bidding services, provide system start -up services including training and testing, and provide construction administration services. Other assistance provided by HDR for the Sarasota County solid waste program include estimating the useable remaining volume within Phase I, preparing financial assurance cost estimates, preparing operational fill plans for Phase I, land use planning for the CCSWDC, and providing borrow soil requirement estimates for all phases of landfill development. Page 30 f al 46 General Engineering and Environmental Management Services Exposed Geomembrane Solar Cap for the Tessman Road Landfill Closure San Antonio, Texas Emerging technologies offer new ways to channel the byproducts left by decomposing waste in closed landfills in productive ways. While there has been much progress made in technologies to convert waste into energy prior to landfilling, new ways to transform residual methane gas from closed landfills into renewable energy offer a sustainable solution for what has traditionally been a difficult dilemma for many communities. Working with Allied Waste at the Tessman Road Landfill outside San Antonio, Texas, HDR is providing engineering design services to modify plans to close a portion of the landfill that has reached its permitted fill limits. The new design will feature an Exposed Geomembrane Solar Cap (EGSC), a revolutionary new concept that marries old and new technologies to transform landfills into renewable energy generators using the cleanest of all energy sources: the sun. The Tessman Road Landfill project will give Allied Waste the opportunity to field test the use of solar panels placed directly on the exposed geomembrane surface of a closed landfill to generate solar energy. The thin, flexible panels are designed to conform to the uneven contours of a landfill surface and are laminated with weather - resistant polymer to withstand harsh climate conditions. If Allied Waste finds success at the Tessman Road site, it hopes to roll out EGSC technologies at many of the landfills it operates around the country. Early estimates indicate that a full roll -out of EGSC technology by Allied Waste has the potential to generate enough renewable energy to power 300,000 homes. Looking at the benefits another way, full implementation of this technology could give Allied Waste credit for offsetting nearly 6.5 billion pounds of carbon emissions each year. Exposed Geomembrane Solar Cap for the Tessman Road Landfill Closure, Texas • Field test of solar panels on exposed surface of closed landfill cell to generate renewable energy • Flexible, thin and weather resistant laminated polymer solar strips designed to conform to uneven contours of landfill surface Page 31 IE 47 General Engineering and Environmental Management Services Moore County Sanitary Landfill, Moore County, North Carolina HDR is currently assisting Moore County and its 11 municipalities with the preparation of an update to the County's Solid Waste Management Plan. The update is being prepared in accordance with North Carolina General Statute 130A- 309.09A to establish waste reduction goals for a 10 -year planning period. The planning process involves an assessment of existing conditions and systems, an analysis of recycling markets, the establishment of future needs and goals, recommendations for future systems, and the formulation of an action plan. Public participation will also be an important component of the planning process. Los Angeles, California The City of Los Angeles is striving to accelerate diversion goals to 70 percent diversion by 2015, to add materials and curbside collection programs, and to convert the City's 700+ collection trucks to clean- burning liquefied natural gas by 2010. HDR is assisting the City in developing its Solid Waste Integrated Resources Plan that is envisioned to be the City's 20 -year zero waste master plan. The process includes a two -phase approach that involves the following project elements: ■ Advisory Committees. This process includes house meetings, stakeholder and advisory committees, multiple public workshops in each Council District, Citywide conferences and a coordinated media and public information program. Financial Planning Analysis. This project includes extensive financial planning to ensure the affordability and the ability to finance our recommendations. HDR is researching and assessing the cost and viability of options for waste reduction, recycling, and other waste diversion and the options for management of residual materials. Page 32 FEE 48 General Engineering and Environmental Management Services • Regulatory/Policy Planning. HDR is reviewing and documenting the City's history, regulatory features, and policies, monitoring the current and pending State and Federal regulations and legislation, and evaluating potential impacts on the City's planned programs and facilities. • Innovative Technology. HDR is researching and assessing a range of diversion options, providing a list of possible waste prevention and recycling policy and program options, likely to be available for implementation within the City in the next 20 years. • Site Evaluation. HDR is analyzing the identification of existing and planned infrastructure and services and project generation, disposal and diversion through the 20 -year planning period. • Strategic Planning. This multi -year program culminates in a long term strategic plan to guide the City's waste management policies, programs and facility development. HDR is assisting the City in the development of a stakeholder -input and decision - making process, conducting research and presenting information, facilitating the evaluation of options, and producing a plan that is practical and visionary. ■ Implementation Plan. HDR will produce an action plan detailing the steps, decisions, timeframe and budget requirements to implement the plan. Guilford County, North Carolina HDR completed a 10 -year comprehensive solid waste management plan for Guilford County, NC, in accordance with the requirements of North Carolina General Statute 130A- 309.09A. This plan was developed in cooperation with all units of local government in Guilford County (including seven municipalities) and included the public in the planning process. The plan covers existing solid waste management needs and services, and presents recommendations for future actions to be taken by local governments in meeting projected solid waste management needs. Included in the analysis are an evaluation of the generation rates and management of Guilford County's current residential, commercial /industrial, and construction and demolition waste streams; projections of future waste stream generation rates and management needs; the identification of local waste reduction goals; and the conduct of a full cost analysis /performance measurement. The completed plan, including recommendations and associated implementation, was formally adopted by all units of local government. HDR provided assistance to the County with updating the Plan in accordance with the General Statutes in 2003. Page 33 FER 49 General Engineering and Environmental Management Services Citizen Convenience Center, Hilton Head Island, Beaufort County, South Carolina HDR provided engineering and construction administration services for the Town of Hilton Head Citizen Convenience Center. Set in an attractive, wooded parcel near the center of the Island, the facility has been well received since its opening in summer of 2004. The one -way d rive through concept was developed as a result of minimizing theH;' removal of trees and promoting an uncluttered a earance due to the r PP high traffic volume. This facility has significantly exceeded the County's forecast for collecting recyclables. Citizen Convenience Center, St. Helena, Beaufort County, South Carolina HDR provided engineering and construction management services for the St. Helena Citizen Convenience Center. This Design /Build project required significant interfacing and permitting with numerous utilities, governmental agencies and citizen groups. The design made allowance for future expansion of the facility to serve the growing sea island areas. This facility has significantly exceeded the County's forecast for collecting tires and white goods due to its layout and amenities; this in turn helps the County to control litter and blight Drop -Off Convenience Center, Oconee County, South Carolina HDR designed and prepared bid packages for nine recycling drop -off convenience centers located at sites throughout the county. HDR personnel provided construction management services for the facilities. Each center was uniquely engineered to fit the topography of its site. T he engineering design for each center included civil and mechanical aspects including retaining walls, pavement, and earthwork to accommodate the design criteria for each facility. Construction management and administration services included bidding, pre -bid conferences, review of shop drawings, quantities, field orders, and change orders as needed. Page 34 1 ER 50 General Engineering and Environmental Management Services Citizen Convenience, Twin Chimneys Landfill, Greenville County, South Carolina At the Enoree Landfill, Greenville County handled residential customers and self unloading waste trucks together at the landfill tipping face. This could cause significant problems especially during wet weather operations. In order to eliminate this problem the Twin Chimneys Landfill site was designed to include a separate area for receiving residential loads and transferring them to the working face. HDR worked with the County to establish the design criteria and the resulting residential drop -off center. The center was designed to separate residential customers from the waste trucks as early as possible and to provide an obvious destination for the residents. The building provides about 12,000 square feet of covered space and two drive- through pits with locations for storing three trailers along the retaining wall. The paved area is large enough to accommodate special collection events; tire, white goods and yard waste drop off; along with mulch pickup areas. An attendant kiosk is located on the inbound drive to greet customers and direct them to the appropriate unloading spot. Page 35 fal �} 51 General Engineering and Environmental Management Services Dekalb County, Georgia center to host tours of the facility. In 2004, DeKalb County selected HDR to be their solid waste consultant. One of the first assignments requested by the County was the design of new state -of -the -art transfer station to replace their existing transfer station and abandoned solid waste incinerator, located in the County administrative complex. HDR proceeded with the planning and the development of a 1700 ton per day transfer station and administrative services complex. This effort included the design of a new 40,000 square foot transfer station facility and adjacent 21,000 square foot administration /office building. The administrative /office building is also designed as a training and information HDR services included site evaluation, permitting, engineering, design, construction administration and construction monitoring activities. The project work included the demolition and remediation of an existing incinerator. Siting issues included stream buffer requirements and the removal of invasive plant species. Design was completed at the end of 2006, and construction completed in December 2008. Full operations were initiated in January 2009. Staten Island, New York Page 36 IER 52 General Engineering and Environmental Management Services Los Angeles County Sanitation Districts, California HDR provided planning, design and construction support services to the districts on this 4,400- ton - per -day materials recovery and transfer station. Initially, HDR prepared preliminary facility designs and operational evaluations in support of the district's environmental review process. Owned and operated by the County Sanitation District No. 2 of Los Angeles County, the facility will enable the Districts to receive and transfer solid waste, and sort select loads of commercial waste to recover recyclables. Completed in July 2005, the facility now processes 250 tons of waste per day. With slight adjustments and quick additions, Puente Hills Materials Resource Facility (PHMRF) could reach a maximum capacity of 4,000 TPD and recover more than 600 TPD. The project includes a 210,000- square -foot enclosed materials recovery and transfer building. HDR prepared the specifications for the procurement of the materials recovery equipment in phases, with the first phase designed to process 500 TPD of mixed commercial waste. The tipping floor and transfer area is being designed to receive and transfer the residuals from the full 4,400 tons per day. The transfer ports are being designed to retrofit with compactors should it become necessary in the future. The project also includes entry and exit scale facilities, a maintenance facility for station rolling stock, a fueling station and a public recycling drop off facility. The project also includes a two -story administration building with an attached walkway to PHMRF to allow tours, which can safely view the operations. Great effort is given to keeping noise and pollutants away from the neighbors and out of public view. The facility was built green with recycled steel, low- emission equipment and high - efficiency HVAC. The adjacent Puente Hills Landfill has 100 miles of gas collection piping and the world's largest landfill gas energy facility, which provides almost all of the MRF's power. The facility was awarded the SWANA 2006 Gold Award of Excellence. City of Phoenix, Arizona Faced with a fast - growing population, Phoenix needed to quickly replace Skunk Creek Landfill, one of the city's last urban facilities. Once closed, waste would have to be shipped from the city's northern neighborhoods to a facility 60 miles away. Without a station to separate waste and recyclables, shipping could be cumbersome — and costly. The solution was the 450 -acre, $40 million City of Phoenix North Gateway Campus, including the 4,000 tons - per -day North Transfer Station and Material Recovery Facility (NTS -MRF). The facility has an administrative building, two scale houses, a maintenance facility and fueling station. An IT communications center, materials recovery line and commercial transfer areas were drawn into the design. Top - loading ports were built to accommodate expansion at NTS -MRF, which can now process 320 tons of waste per day. HDR and partner JRMA provided programming, design and construction services. To withstand the harsh heat and relentless sun, the 42 -acre facility had to have a durable shell and efficient operations to conserve electricity and water. The expansive NTS -MRF, including the 180,000- square -foot transfer facility where recyclables are first separated from waste, lights its exteriors with power generated from a solar grid. Long roof overhangs shade interiors and reduce cooling needs while highly reflective and emissive roof paint minimizes heat radiation and improves HVAC performance. More than 90 percent of structural steel used in the NTS -MRF is recycled. The NTS -MRF was carefully erected between native desert floodplains with a minimal footprint and a profile evoking the desert landscape. Displaced native plants, including the protected Saguaro cactus, were relocated to preserve the surrounding desert habitat and lessen water needed to nourish non - indigenous plants. Page 37 l DR 53 g General Engineering and Environmental Management Services Pinellas County, Florida HDR has provided consulting services to Pinellas County, Florida since 1975. HDR was the original consulting engineer for the 2,100 -tpd Resource Recovery Facility. HDR developed procurement documents (RFQ, RFP), assisted in vendor selection and contract negotiation, and prepared the feasibility study for the facility financing. HDR also provided Engineer - of- Record Services and Construction Observation. A number of modifications have been made to the facility, the most significant of which were a plant expansion from 2,100 -tpd to 3,150 -tpd, an extensive air pollution control retrofit in order to meet the clean air act amendments, and the Capital Replacement Project (CRP). Services for the CRP included the original development of specifications and scope of work, contract negotiations, construction observation, and performance testing. The CRP was an outgrowth of litigation brought forward by Wheelabrator Pinellas, Inc. (WPI) concerning disputed share of electrical capacity revenue. As part of the out of court settlement of issues, a plan to rehabilitate aging plant components was developed by WPI, the County and HDR. The purpose of the CRP was to prepare the facility for competitive selection of a new operator, or reselection of WPI, under a new O +M Agreement upon expiration of the original agreement with WPI (which was extended for an additional 3 years while the CRP was completed). The main element of the CRP was the re- design of the boiler convection passes (evaporator superheater and economizer) in order to restore design steam conditions. Other key restoration projects completed concurrently included: • Refurbishment of cooling towers • Replacement of water treatment (demineralizer) trains • Upgrade of plant control systems • Upgrade of refuse cranes and replacement of trolleys • Tipping floor modifications to improve traffic flow and increase floor storage capability. HDR represented the County in the specification, design review, and construction administration of this $55 million project. Upon project completion, all original goals were met or exceeded, with the Facility attaining record performance in MSW throughput and electrical generation in 2005 and 2006. After the CRP was completed in 2004, initial work for the Operator Reprocurement effort began. The County selected another consultant for the reprocurement effort, while HDR remained the Independent Consulting Engineer. During this period, we experienced first hand some of the difficulties encountered during the sunset years of WPI's contract. In general, HDR sought to encourage "long term" thinking with respect to plant 0 &M issues on the operator's part, and to assure that essential maintenance and renewals met with the County's short term objectives. Operating staff retention issues developed over future employment concerns. Ownership of spare parts became a contested issue. Nevertheless, despite difficulties, essential assets were preserved; plant turnover to a new operator went relatively smoothly, as the County entered into a new 0 &M Agreement with a 17 year term. When HDR transitioned out of our Independent Engineer role in 2007, the electrical capacity "rolling average" was over 90 %. HDR continues to provide miscellaneous engineering services for the Facility. Page 38 f_l 54 General Engineering and Environmental Management Services Lee County, Florida "HDR's participation in this project proved to be extremely beneficial to the County by providing knowledge and expertise, particularly during the contracts negotiation phase with Covanta. Particularly helpful was the demonstrated expertise of Mr. Don Castro during all phases of the project development; from contract negotiations through construction completion." Lindsey J. Sampson, PE, Director, Lee County So /id Waste Division In 2005, HDR was retained by Lee County, Florida to assist with the 636 ton - per -day (TPD) expansion of the County's 1,200 TPD mass - bum resource recovery facility. This expansion represents the first waste -to- energy facility permitted in the U.S. under EPA's New Source Performance Standards. HDR developed the Engineer's Feasibility Report for the project's $123 million financing. We assisted the County in negotiating the Construction Project Management Agreement, and the New Service Agreement with the facility operator, Covanta Energy Corporation. For the Unit 3 Construction Project Management Agreement, HDR assisted in the negotiation of the new unit's "Basis of Design," the performance standards and acceptance testing, protocols, Interim Operation (prior to Acceptance) terms, construction -period services, and start -up services. We provided construction administration and oversight for Unit 3, which went into service in November, 2007. HDR assisted the County with New Service Agreement negotiations including provisions for enforcement of repair and maintenance standards, tipping floor and refuse pit management, annual O +M fees, and guarantees. In February, 2007 HDR was given the additional assignment by the County of performing Service Agreement Oversight Services. Tasks include development of monthly maintenance punch - lists, inventory lists, regulatory compliance monitoring and permitting, conducting monthly operations review meetings, and quarterly and annual reports. The Lee County Resource Recovery Facility Expansion Project received the 2008 Renewable Energy Project of the Year Award from Power Engineering magazine. The facility has also recently won the Florida Chapter of the American Public Works Association "Project of the Year" award in the Structures and Environment category. Page 39 1 L. 55 General Engineering and Environmental Management Services • >•t ....ate• The following are a few key projects completed by RRS that are representative of the type of services Orange County may need. Also included is a summary of past work RRS has done for the County. MRF Processing, Recyclables Collection Evaluation and Processing Feasibility; 61% Diversion Solid Waste Recycling Strategy (2007 — Present), Orange County, North Carolina Orange County's county-wide public works based recycling and solid waste program is targeting an increase in overall waste diversion to 61% by 2012. Since 2007, RRS has been working closely with County staff and the Planning work group to develop recommendations for achieving this goal. Highlights include: Improved recycling processing arrangements through private merchant MRF service partnerships - As part of this initial work, the RRS team worked closely with staff to implement a competitive procurement process that enabled market informed decision making regarding out - sourcing of recycling processing services from existing MRFs in the Research Triangle area compared to proposals for a County -owned dual and /or single stream 25,000 ton per year MRF. Proposals were received from MRF operators like FCR, WMRA, Tidewater Fiber, Paperstock Corporation (Sonoco), and Pratt. These potential MRF operational arrangements were compared with a public sector operated MRF approach with new equipment from CP Manufacturing, BHS, Bollegraf, Machinex, Sherbrook/OEM, and /or other MRF equipment suppliers. The decision to contract for MRF processing services has helped focus the County's solid waste planning process and direct implementation work towards cost effective modifications of recycling transfer arrangements at the Eubanks Road operations. Improving recycling collection economics and recovery by moving to dual stream recycling - RRS assisted the County and local communities with feasibility analysis for upgrading curbside recycling system to increase performance for single - family, multi - family, and small commercial establishments. This has included performance benchmarking, performance projections (lbs /hh recovery, participation rates, worker productivity), collection cost modeling, alternate scenario analysis (different collection frequencies, single stream versus dual stream, RecycleBank incentives, etc.), tipping location analysis and alternate truck type analysis (side load versus rear load, compaction versus non - compaction). This analysis was used both for their solid waste plan and as inputs for program implementation in subsequent fiscal years. The analysis has also included examining solid waste franchise arrangements for rural waste collection and commercial waste and recycling collection. Expanded recycling opportunities for rural residents, multi- family and commercial sectors - RRS has worked closely with County staff and the work group to systematically investigate and develop recommendations for optimizing curbside and drop-off /convenience center services for waste and recyclables. Options have been developed; operational and financial performance modeled; pros and cons reviewed; conceptual layouts developed and discussions facilitated with staff, the Plan work group and County leadership; targeted at developing recommendations for expanding rural recycling, upgrading existing centers, creating new neighborhood and District convenience centers, adding materials, streamlining operating costs and more. Long- range financial projections and strategy development - RRS developed a ten year financial model for use in determining costs of waste transfer, continued C &D landfill operation, recycling system upgrades, and system rates and charges. Scenarios have been run using the model to facilitate strategic decision making for both planning and budget development purposes. Page 40 1 L. ` 56 u General Engineering and Environmental Management Services Residential Waste and Recycling Franchise Procurement and Single Stream Recycling (2009 — Present) Town of Hilton Head, South Carolina Resource Recycling Systems is working with the Town of Hilton Head Island on the procurement of residential (single and multiple family) waste and recycling services. The ultimate goal is to move from an open market system with five haulers to contracted or franchised waste /recycling services for the entire island with one or two haulers to manage all waste and recycling for all residential customers who currently receive or have the option to receive individualized waste service from their door. Town Council Goals Work has included meetings with individual waste haulers, material processing facilities, and the Town procurement and legal staff in addition to individual briefing meetings with Town Council members. A scoring matrix has been used to help the Town Council prioritize the importance of a set of program services /options, service /value costs as well as social /environmental criteria helping RRS develop RFP specifications that match the priorities and needs of the Town Council and the community, identified to include the following: 1. Lowering costs to citizens 2. Lowering road maintenance costs 3. Achieving sustainability and "green" town goals 4. Increasing public safety 5. Improving service 6. Increasing recycling rate Unique Features The Island presents unique challenges, with nearly all residents having access to a free County funded (through taxes) recycling and waste drop -off and the standard of practice for service at the household being "service yard" based with the collection worker taking waste from either a back door or side yard service corral. Service frequency can be as much as two or three times a week during the peak tourist season with some units requiring Saturday service to handle weekly rentals. Additional challenges are presented by the wide range of seasonal, villa, condo, plantation and rental planned unit development communities making up the majority of the 24,000 plus households on the island. RFP Structure The RFP process will include standardized recycling services, with a separate contract for recycling processing. Each household will receive recycling bins with weekly collection, additional bins available for free on request, RFID tags on each bin and a reward system (such as RecycleBank) provided to reach high diversion performance. The program should include complaint and complaint resolution tracking along with fines for a contractor's failure to perform, in order to ensure franchisee compliance with contract and to ensure customer satisfaction and include a provision to cover town costs for contract management (complaint tracking, etc.) and education /outreach in order to ensure successful program performance. Page 41 1 a r° 57 ..i General Engineering and Environmental Management Services "Super" Drop -Off Station, MRF, Transfer Station, and Compost Site Development (1992 — Present) City of Ann Arbor and Washtenaw County, Michigan RRS has led the development of Washtenaw County's Solid Waste Plan and program implementation for the region, especially the City of Ann Arbor since its founding in the mid 1980's. RRS drafted the 2001 City of Ann Arbor Five Year Solid Waste Plan as well as the 1989 Washtenaw County Plan including negotiations with area landfills for long -term commitment of capacity and payment of tipping fee surcharge. By taking a role in both policy and implementation phases of this project RRS is able drive the focus on solid waste management in the region toward a Zero Waste outcome. RRS has developed system plans for many key programs in Washtenaw County including the City's recycling facility, transfer station, super drop -off area and yard /food waste composting facility - all owned by the City of Ann Arbor and operated by third party contractors including FCR, Inc. and Recycle Ann Arbor, a not - for - profit service provider. Recent projects include a five year City Solid Waste Plan Update for that system (1999- 2001), a Commercial Recycling Feasibility Study (2000 -01), Washtenaw County Solid Waste Plan Revision (1998 -99), Solid Waste Transfer Truck Transport and Waste Disposal (Year 2001 -02); Performance Based Contracting for Recycling Services (2003), Business Case Justification for Transfer Station, Recycling Facility, Compost Facility and Super Drop -off Expansions /Upgrades (2003 -04). Recently, in order to accomplish an overall diversion goal (including the entire commercial sector) of greater than 60 %, RRS has coordinated a major push in commercial recycling for the City of Ann Arbor. This first step in creating a Zero Waste program included the following initiatives: • Capital funding for MRF /Transfer Station and recycling collection upgrades; • Increased recycling collection services to small businesses using curbcarts; • Expanded pilot program for food waste composting; • Recycling requirements for all businesses, whether serviced by the City or not; • Recycling at public recreational facilities, schools, and institutions; • Technical support to businesses in reducing waste and maximizing recycling; • Alliances with area governments to support regional commercial recycling Specific action plans were then developed for implementing each of these initiatives as part of a multi- sector steering committee process that engaged business leaders from across the community in understanding options and developing acceptable and viable plans for implementing key components of the commercial recycling system including ordinances, contracts, funding mechanisms, technical assistance tools and supporting systems. The program is now in its early stages of implementation. RRS represents the City as the Owner's Engineer for a series of upgrades to the City owned MRF. Operations at this MRF are carried out by FCR who is now in year 13 of a 20 year agreement. Recent RRS engineered facility changes include an updated container sorting line and a new commercial recyclables sorting system with an OCC screen. RRS also executed the re- location of a 300 ton per day transfer station from one portion of the City of Ann Arbor Solid Waste Management Campus to another. Page 42 faq ". 58 General Engineering and Environmental Management Services PROJECT TEAM Organization Chart HDR's team of professional planners, scientists, and engineers has been assembled to provide the full range of skills necessary to successfully support waste management engineering services and associated regulatory requirements. We offer an organized and highly qualified group of professionals, with extensive experience on similar projects, who are prepared to begin the work promptly. Ptoject Primal Project Director Quality Control /Quality Assurance Robert J. Rel'la, PE, Joseph C. Readling, PE Eric A. Wright, PE. Senior vice President Vice President Professional Associate Landfill Services Waste Reductionl/Recrcling, Materials Recovery/ * Doug DeCesare, PE *Ruth Aube Convenience Centers Tom''ianoschak, PE Jim'Frey, RRS * Ed Shuffler, PE Eric Wright, PE Aaron Burman, RRS Michelle Leonard Kerry Sandford, RRS LFG/Renewable Enerov CollectionfFleet Regulatory Liaison * Carlo Lebron, PE * Dale James ` Joe Readling, PE Brian Bird, PE Garrett Williams, El Allison Trulock Ed Shuffler, PE Sarah Futrell, El Doug DeCesare, PE Compliance/Mitigation/ Construction Administration Facility Planning /Design Hydrogeology * Dean Ferry, CET * Bob Rella, PE * Mike Plummer, PE Philip Westmoreland, PE Ed Shuf€ier, PE Aaron White, PG Laura Patterson, El Glenn Gray, AIA - Architectural Brad Stone, PE Henry Antshel, PE - Structural Alternative Technology Joel Johnson, PE - Mechanical Mark Atkinson, PE - Electrical * Bob Relta, PE Michael Greenberg * Denotes Lead Team Member for each category of project. Below are brief biographical sketches of members of the project team as identified on the Organization Chart. Full resumes of select project team members are provided in the Resume section at the end of our qualification Statement. Page 43 fal 59 General Engineering and Environmental Management Services The staffing for any projects identified by the County will include senior solid waste professionals who have technical expertise in all areas of solid waste management. HDR has over a dozen professionals in North Carolina whose primary focus is Solid Waste Management and Environmental Monitoring. The average years of experience for these individuals in the Solid Waste profession is 15 years, with the lead team members averaging more than 20 years in the industry. In addition to the senior team members cited on the Organization Chart, junior analysts and engineers will also be participating on projects in order to complete the work more cost - effectively. HDR can also draw from more than 250 solid waste professionals across North America. Led by Mr. Joseph C. Readling, PE, VP, this experienced team will undertake all projects that arise for the County to continue its successful Solid Waste Management Program. Mr. Readling is an experienced project manager and will have access to HDR's proven management tools. These tools include regular conference calls, server -based file sharing (ProjectWise and FTP), network messaging (Microsoft Communicator), video meeting places (Live Meeting and Net Meeting), real time accounting, and HDR's QA/QC program. Mr. Readling strongly believes that communication is the most important component of a successful project and will serve as the point of contact with the County's staff and members of the project team. Mr. Readling, serving as Project Director, will be the key point of contact with the County. He will be responsible for the development of all task orders and will select the appropriate team members for the successful completion of each project task. Mr. Readling has more than 24 years of experience and serves as the Team Leader of the solid waste staff in HDR's Carolinas offices —the largest solid waste staff within HDR nationwide. Additionally, Mr. Readling serves as HDR's Landfill Practice Leader nationwide. His background includes experience in solid waste management and planning, and he is a key technical resource for HDR in the design and operation of lined landfills. He has managed many innovative solid waste projects in the Southeast, including the first liner- over -waste (piggyback) project ever approved in North Carolina. Joe has been involved in solid waste projects for landfills, transfer stations, convenience centers, scalehouses, maintenance facilities, fueling facilities, MRFs, collections, and other planning and infrastructure projects in North Carolina since the 1980's. Joe has an excellent working relationship with NCDENR staff, and is a regular contributor to professional organizations. Joe has served as the President of the Solid Waste Division of NCAPWA, and is currently serving as Secretary on the board of NCSWANA and is an active member of the Policy and Technical committees. Mr. Robert J. Rella, PE, SVP, will serve as Project Principal, assisting Mr. Readling with the selection of team members for completion of identified project tasks. Mr. Rella is an experience solid waste engineer, with specific expertise in the design and operation of solid waste management facilities. He has a proven track record working for municipal solid waste agencies in the East. Mr. Rella also serves as HDR's East Regional Technical Director for Solid Waste and Facilities. He has successfully managed numerous waste management projects over the past 18 years, including 14 transfer station projects. Mr. Rella is a civil engineer experienced in all aspects of planning, engineering, design, and construction of power generating, commercial, industrial, and public facilities, including more than 25 waste processing facilities and waste -to- energy facilities. Mr. Eric A. Wright, PE, will serve in the role of Quality Control and Assurance Coordinator for all projects. Mr. Wright currently serves as HDR's Carolinas Quality Control Coordinator. He has 20 years of experience in municipal solid waste landfill design and construction quality control. His responsibilities include project design, preparation of plans and specifications; permit applications for submittal to state agencies, and construction management. As a technical resource for HDR, Eric has worked on landfill design projects in the Carolinas, Virginia, Georgia, Florida, Washington, and Puerto Rico. He has held the primary design responsibility and Quality Control reviews for over a dozen landfills. Page 44 faq General Engineering and Environmental Management Services Doug DeCesare, PE - Landfill Services/ Regulatory Liaison Mr. DeCesare is a Project Manager with 15 years experience in solid waste and environmental projects including landfill permitting and design, leachate collection system design and treatment, landfill closure design, leachate recirculation system design, landfill gas collection system design, transfer station permitting, stormwater management design, construction administration, and construction quality assurance. Mr. DeCesare's responsibilities include oversight of the HDR project team. Thomas Yanoschak, PE - Landfill Services Mr. Yanoschak is a registered professional engineer with more than 20 years of experience. His areas of expertise include geotechnical engineering, hydrogeological studies, MSW, C &D and industrial landfill permitting, engineering design and construction, civil site design, environmental projects, and water resources engineering. Mr. Yanoschak has been responsible for client management and project oversight of many solid waste projects for both public and private clients. He has been involved with the permitting, design, and construction of over 50 landfills in eight states, Puerto Rico and Venezuela. Ruth Abbe, VP - Waste Reduction / Recycling Ms. Abbe is a recycling and solid waste management specialist and project manager with more than 18 years of experience in facility and collection procurement, contract negotiation, program planning, and financial analysis. She is HDR's national practice leader in zero waste planning and heads up the sustainability services group which focuses on zero waste planning, toxics reduction, long -term energy management and energy efficiency, renewable energy, green house gas accounting, water conservation, green building, and sustainable urban planning. Ms. Abbe will assist in the evaluation of the potential for increased diversion and recycling alternatives. Ed Shuffler, PE - Materials Recovery / Convenience Centers / Facility Planning / Design Mr. Shuffler brings more than 30 years of experience dedicated to the planning, development and implementation of local and regional solid waste management projects. He is one of the most experienced solid waste professionals in North Carolina, with work dating back to the late 1970s. As a founding member and past President of the North Carolina Chapter of SWANA, he has been actively involved in the extensive changes in solid waste across the state. His design experience includes the preparation of technical reports, permit applications, engineering drawings, specifications, contract documents and construction cost estimates. He has also conducted studies on collection, waste quantities and composition, energy and materials markets, and the feasibility of energy and resource recovery from solid waste. Mr. Shuffler's demonstrated performance includes the successful completion of numerous solid waste management projects. Page 45 I-ELI 61 General Engineering and Environmental Management Services Carlo F. Lebron, PE — Landfill Gas / Renewable Energy Mr. Lebron has been with HDR for over nine years. During that time a majority of his focus has been on landfill gas projects. He has experience on over 100 landfill gas projects; these include .. evaluation, design, permitting, construction, operation, and gas to energy. Mr. Lebron has ;< worked on landfill gas collection system projects all over the country and outside of the United States as well. Mr. Lebron has experience in construction management and landfill gas monitoring and oversight. He has extensive experience with Title V permitting and other regulatory requirements associated with landfill gas collection systems such as NSPS and NESHAP. Mr. Lebron is very proud of the fact that the past two sole SWANA excellence awards for landfill gas have gone to his projects. Mr. Lebron is also Vice Chair for Field Services in SWANA's Landfill Gas Technical committee. Currently, the committee's main focus is to revise the Field Practices manual for Landfill Gas operations. Brian Bird, PE — Landfill Gas / Renewable Energy Mr. Bird has 29 years of mechanical engineering experience with industrial, institutional, commercial and governmental clients. He has been actively involved in power plant and cogeneration feasibility studies and design, including biomass and landfill renewable energy projects. He is experienced with all facets of landfill gas -to- energy initiatives, including economic justification, planning, permitting, interconnections, equipment procurement, and construction of new generation facilities. Additional experience includes design of district heating and cooling systems. for campus and institutional settings. Garrett Williams, El — Landfill Gas / Renewable Energy Mr. Williams is a 2006 graduate of the University of North Carolina at Charlotte with a degree in Civil Engineering. Garrett joined the Solid Waste group in Charlotte in January 2007, and has several years of part time experience in field surveying, commercial development site work, and civil design using AutoCAD. Dale James — Collection / Fleet Mr. James is a Senior Consultant for HDR Engineering, Inc. of the Carolinas' Environmental and Resource Management Group. He has over 39 years experience in the solid waste management field, and retired as Solid Waste Manager for a large North Carolina municipality. Mr. James is the current State Treasurer for the North Carolina Chapter of the American Public Works Association and served the Chapter as President in 2001. Mr. James is also a member in good standing with SWANA since its inception as a Solid Waste Professional Organization Allison Trulock — Collection / Fleet Ms. Trulock is a Senior Project Manager with more than 12 years of experience in the solid waste industry. Ms. Trulock specializes in solid waste and recyclables collection options evaluations and efficiency studies, procurement assistance, and ordinance review and development. Ms. Trulocks collection options evaluation experience includes evaluating the potential for legal challenge, financial analyses, impact on rate payers and level of service, and administrative complexity of implementing changes to collection systems. Her collection efficiency experience includes route observations and balancing, benchmarking, cost analysis and public /stakeholder outreach. Her procurement experience includes assisting communities in drafting procurement documents, developing selection criteria, benchmarking, evaluating proposals and developing presentations. Page 46 1 ER 62 General Engineering and Environmental Management Services Sarah Futrell, El — Collection / Fleet Ms. Futrell is a recent graduate from NC State University with a degree in Civil Engineering. Sarah joined the Solid Waste group in Charlotte in June 2007. Her work focus is solid waste planning and analysis. She has coordinated a citizen's committee reviewing a county's solid waste management systems that resulted in an updated solid waste management plan. She has also assisted with various solid waste permits, airspace reports and cost estimates. Michael Plummer, PE — Compliance / Mitigation / Hydrogeology Mr. Plummer has 13 years experience in solid waste and industrial landfill projects. His experience includes design, hydrogeologic site investigations, permit applications, construction quality assurance documents, contract documents, construction estimates financial cost proformas, landfill gas system design and construction, and facility master planning. Aaron White, PG — Compliance / Mitigation / Hydrogeology Mr. White is an experienced geologist in both environmental and geotechnical investigations. His areas of concentration are Phases I and II site assessments, mineral surveys, underground storage tank analyses, groundwater exploration, groundwater monitoring and modeling, environmental remediation, and geotechnical investigations. He is specialized in the operation, monitoring, and permitting of Municipal Solid Waste Landfills and is currently certified by the State of Virginia as a Class I and II Facility Operator and a Professional Geologist in North Carolina, as well as Virginia. In addition, Mr. White has project management experience on projects ranging from small, fast -paced projects to large, multi - disciplined residential, commercial, and municipal projects. His software application experience includes GINT, FLOWNET, SpilICAD, AQTESOLV, QuickFlow, Solute, DUMPStat, CARStat, LandGEM, Visual MODFLOW, and other various Environmental Protection Agency (EPA) and Virginia Department of Environmental Quality (VDEQ) programs. Bradford M. Stone, PE — Compliance / Mitigation / Hydrogeology Mr. Stone has over 14 years of environmental experience in the solid waste industry. He has extensive experience in environmental and regulatory permitting of waste management facilities; landfill design and operational plan development; environmental compliance audits; groundwater and landfill gas interactions and remediation; methane remediation and landfill gas extraction systems; compliance monitoring; corrective measures evaluations; construction management; and CQA services. Mr. Stone has successfully participated in the permitting, environmental compliance, and construction of municipal landfills across the Southeast (including North Carolina, South Carolina, Georgia, Florida, Alabama, and Tennessee) Mr. Stone has successfully negotiated numerous environmental issues with state environmental agencies in the southeast including, site acceptability evaluations and permitting of groundwater and methane monitoring; corrective measures evaluations; methane migration; landfill gas management and remediation; and closure construction issues. Dean Ferry, CET — Construction Administration Mr. Ferry, a Senior Construction Coordinator, has more 30 years of experience in construction quality assurance, resident engineering, and laboratory testing. He has an extensive background in the day -to -day operation and construction of solid waste landfills and ancillary facilities. Mr. Ferry will be responsible for the coordination of CQA personnel, geotechnical and geosynthetics laboratory testing, review of all field documentation, preparation of certification reports, and performing constructability review of the project. Mr. Ferry has provided CQA services over 16 million square feet of landfill liner installation at more than 20 facilities in the eastern U.S. Page 47 1 L. .., .. , 63 General Engineering and Environmental Management Services Philip A. Westmoreland, PE — Construction Administration Mr. Westmoreland has 11 years experience in solid waste and environmental projects including landfill design involving composite base liner systems, leachate collection systems, gas collection, and final cover systems. His responsibilities include design, preparation of plans and specifications, construction coordination, project scheduling, and cost estimating. Laura Patterson, El - Construction Administration Ms. Patterson is a Solid Waste Junior Engineer with HDR in Raleigh, NC. She has a Bachelor of Science in Biological Engineering with concentrations in Environmental and Agricultural studies. She has two years of experience in Solid Waste, and two years of experience in Erosion and Sedimentation Control. Ms. Patterson's responsibilities include Construction Administration services for solid waste projects in North Carolina, South Carolina, and Virginia. Michael Greenberg — Alternative Technology Mr. Greenberg has more than 20 years of experience in the solid waste management field. His experience includes project management, rate and performance reviews, program and system costing and analysis, independent engineering assessment, and landfill analysis. He has developed numerous economic assessment models for rate evaluation and setting through his detailed work with independent engineering assessments for bond financings. In addition, he has developed computer costing models and has assisted in compiling a large solid waste systems database of costs and options for solid waste facility development. Mr. Greenberg is an accomplished project manager with an untarnished track record for completing all assignments with the highest level of professionalism, on time and within established budget. He regularly manages HDR's largest and most complex projects, including many that involved technology assessments, procurement of solid waste processing, disposal facilities and integrated resources planning. Glen Gray, AIA - Architectural Mr. Gray has spent the majority of his career immersed in the production and administration of Contract and. Construction Documents. He has been a LEED Accredited Professional since 2003 and has been involved in over $60 million in LEED certified projects. He has been actively involved in the aspects of design, production, and construction of highly technical projects over his career. This experience has resulted in a thorough understanding of all aspects of the design and construction process, with a special focus on constructability and cohesiveness of documents. Henry M. Antshel, PE — Facilities Planning Design t Structural Mr. Antshel leads the structural design group in Charlotte. He has 40 years of experience in civil structural engineering design and analyses experience concentrated in the water, environmental, industrial and municipal facilities, power and energy, waste, and metals sectors. He has special skills in construction, rehabilitation and repair, vessel design, and protective coatings specification. Mr. Antshel has diverse and broad experience in the heavy industrial process arena, including experience in managing and coordinating large projects and multidiscipline staff activities. Page 48 IM 64 General Engineering and Environmental Management Services Joel Johnson, PE - Mechanical Joel Johnson has over 20 years experience as a mechanical systems design engineer and project manager concentrating in fluids and heat transfer applications. Experience includes piping networks, pumps stations, gravity sewers, collection systems, well water and large intake screen design and building plumbing and HVAC design. Mark Atkinson, PE - Electrical Mr. Atkinson has over 25 years in engineering management, engineering, construction, and project execution, with broad skills in both leadership and technical subject matter. His background includes comprehensive experience in electric infrastructure operations ranging from the most technical engineering challenges through complete turnkey construction management. Mr. Atkinson's career working with utilities as well as in the electrical consulting and construction arena has provided him extensive knowledge of electric systems engineering, construction, planning, and operations, as well as considerable experience in system reliability and power quality. His hands -on involvement in institutional and military infrastructure has given him considerable experience in the design of commercial /industrial power distribution including backup generation and utility paralleling. Mr. Atkinson has executed many contracted infrastructure projects in the role of design/build manager or general contractor and is very familiar with capital project life cycles from concept through completion. SUBCONSULTANTS As indicated, HDR is pleased to include Resource Recovery Systems, Inc. (RRS) as part of our team. RRS has worked with Orange County in the past, and including them on our team will ensure that the County receives the best possible service from the most experienced professionals in the industry. The people at RRS combine a wide range of experience and ability to meet the needs of the County's recycling requirements. Below is a brief description of key personnel that have been involved with Orange County on prior projects. HDR may draw on the balance of other RRS staff as needed, including RRS engineers, consultants, and systems specialists as needed. Mr. Jim Frey, RRS Principal and CEO, is an expert in market analysis, review of local conditions, and feasibility assessments. Jim has significant experience providing innovative management services to public and private entities, working with all aspects of program review, evaluation and planning, goal setting, economic analysis of options, regulatory and organizational strategies, and program /service recommendations. Jim has received numerous industry accolades and, as an RRS founder, has led the philosophy and growth of the firm since its beginning. Mr. Kerry Sandford, Senior Engineer, specializes in equipment design, specification, integration, installation, and maintenance in both the solid waste and energy fields. As a co- founder of RRS, he has been involved with the company for nearly 25 years. Most recently, Kerry has operated his own equipment design, fabrication, installation, and integration service. Kent' is a trained electrical engineer with early career experience in electronics system design. His innovative designs and long time experience make him a valuable addition to any Project Team. Page 49 fal 65 General Engineering and Environmental Management Services Mr. Aaron Burman, Project Engineer, brings a background in renewable energy and sustainable waste systems, specializing in new program cost estimation, securing quality equipment and services, and ensuring efficient implementation. His AutoCAD and ARC GIS background facilitates route consolidation and commercial recycling expansion. Aaron uses his expertise in waste - related carbon emissions, municipal and university greenhouse gas inventories, and high - diversion program implementation to give a leading edge to RRS facility design projects. Page 50 f L.l 66 General Engineering and Environmental Management Services RATE SCHEDULE As requested in the qualifications requirements, the following is an hourly billing rate schedule for HDR staff. LABOR (BILLING RATES) Project Principal /Director $190 /hour Senior Project Manager $150 - $185 /hour Project Manager $125 - $150 /hour Senior Project Engineer $135 - $175 /hour Project Engineer $95 - $130 /hour Engineering Intern $70 - $95 /hour Project Technician $75 - $95 /hour Construction Coordinator $75 - $125 /hour Hydrogeologist/Geologist $85 - $120 /hour Environmental Scientist $90 - $125 /hour Senior CADD Designer $90 - $110 /hour CADD Technician $60 - $90/hour Administrative Support $65 - $80 /hour Page 51 i al = >e 67 General Engineering and Environmental Management Services This Page Intentionally Left Blank Page 52 faq 68 General Engineering and Environmental Management Services QC PROCEDURES HDR's Quality Project Management is founded on the belief in "Quality Focus" and "Customer Services ". A key element of this program is a total involvement by all personnel of the firm, ensuring that the key technical specialists are matched to the project. The HDR Team is committed to provide the necessary resources to meet the established milestones of the project. Another key element of the program is the fact that it is a continuous effort, occurring from the project inception to its conclusion. Senior engineers with no direct project involvement are used in the process to provide an independent review, thus employing their knowledge and expertise. The HDR Team will operate under the overall guidance of HDR's corporate Quality Assurance (QA) Program. HDR's QA Program provides a means to meet the requirements for audits and managerial controls, including a clear definition of authority and responsibilities for organizations and personnel, while concurrently documenting that Quality Control (QC) requirements are met. HDR's QA Program requires QC Quality Control is an integral part of HDR's professional activities based on a tiered structure and provides appropriate guidance for conducting services. and completing those activities. HDR's QA Program requires all HDR employees associated with project activities (e.g., marketing, legal, managerial, financial and technical) to comply with the provisions of the QA Program when those activities affect quality. All components of HDR's QA Program are contained in (or included by reference in) the Quality Assurance Program Plan (QAPP). The QAPP is maintained as a controlled document and consists of two volumes. The first volume contains 18 sections, which collectively describe the managerial controls, quality verification and overview activities unique to HDR's QA Program. The second volume contains the implementing procedures (e.g., QA Procedures, QC Procedures and Technical Procedures), which present requirements for quality - related activities and guidance on how they are to be conducted and completed. Previously prepared guidance documents, standards, procedures, and /or manuals have been included in the QAPP by reference, specifically those portions that address quality- affecting activities or requirements. HDR's QAPP meets the QA requirements contained in the quality standards documents ANSI /ASQC Q 9001 -1994 (i.e., ISO -9001) and ASME NQA -1 -1989. The QAPP also provides a continuous, interactive process by which revisions and updates to the QA Program are solicited and /or provided by personnel for the program to constantly reflect new and different methods for improving quality. ELEMENTS OF QUALITY PLAN Organization - Establishes and describes the authority, responsibilities and organizational structure for individuals conducting quality- related activities within and for HDR. Descriptions of responsibilities and various figures illustrate that personnel and organizations responsible for conducting quality- assuring functions have sufficient authority and organizational freedom to identify quality problems and to initiate, recommend, or provide solutions to problems and verify implementation. To cant' out the activities associated with the QA Program, they have direct access to whatever levels of management are required to implement the program. QA Program - Establishes and describes the requirements for planning, implementing and maintaining the QA Program. HDR corporate policies, standards manuals, corporate manuals and procedures are used to implement the QA Program. Management reviews of the QA Program are conducted regularly to assess the effectiveness and adequacy of implementation. These reviews are based primarily on the information and data obtained during quality verification activities, such as inspections, audits and surveillance. The requirement to evaluate each project and assign it to one of three quality tiers is addressed. ■ Control - Establishes and describes requirements for control of professional services. Page 53 l u_\ rlik General Engineering and Environmental Management Services • Instructions, Procedures and Drawings - Establishes and describes requirements for the content, development, review, and approval of instructions, procedures, and drawings. Requirements pertaining to control and issuance are also included. • Professional Services - Control measures are also established for professional services that involve reports, studies, investigations, permits, environmental audits and assessments. Control measures are implemented from the initial project establishment stage through completion of the project. The purpose is to provide documented controls over quality activities and establish quality standards, performance objectives and technical requirements. Verification activities are conducted to control deviations from standards and procedures, and instructions are provided for the review of quality activities for the accuracy and completeness of services. Requirements address project calculations, use of computer, programs, design verification, preparation, dissemination and use of the project guide, QC reviews, data analysis, and data validation. • Procurement Document Control - Establishes and describes requirements for initiating and controlling documents for procuring project - related items and professional services. Controls are established for the review of procurement documents to determine whether quality requirements are correctly stated, inspectable and controllable and that adequate acceptance and rejection criteria have been prepared, reviewed and approved in accordance with QA Program requirements. • Document Control - Establishes and describes requirements for the control, identification, review, approval, and issuance of documents and changes thereto. Control measures are established so that quality requirements are adequate and appropriately stated prior to issuance and implementation. Obsolete or superseded (outdated) documents will be removed and /or replaced by applicable revisions to prevent inadvertent use. • Control of Processes - Establishes and describes requirements for the control of processes. The documented formal instructions, procedures, drawings, checklists or other appropriate mechanisms that have been established as control measures, provide guidelines for quality assurance oversight by qualified personnel. • Inspection - Establishes and describes inspection requirements. Inspection is conducted as a verification activity to document that activities, including prior inspections, are properly completed in accordance with documented instructions in procedures. • Corrective Actions - Establishes and describes corrective action measures for promptly identifying, documenting and correcting conditions adverse to quality. Corrective actions implemented are documented and reported to management. Requirements for the administration of corrective action requests are included. • Quality Assurance Records - Establishes and describes requirements for the identification, generation, maintenance, and storage of QA documents related to project activities. Requirements for control of records and project master files are included. • Audits - Establishes and describes requirements for audits and surveillance. These are conducted in order to verify implementation of the QA Program, document compliance, and determine where corrective action is needed. • Procedures - Quality review procedures are ongoing, minimizing changes upon final inspection. Standard practices include the following: • Independent quality review by senior technical managers, representing each major discipline with day -to- day involvement in a project. • Management Information System, which maps out project activities by phase, discipline, and task. All project activities are updated on a bi- weekly basis. This enables close monitoring of each manageable work element (MWE). Page 54 fal 70 General Engineering and Environmental Management Services Project Control Guide is compiled at the onset of each project, identifying team players, including client representatives, along with their assigned responsibilities. The scope of the contract meetings, clarifications, and changes are documented. Weekly Team Meetings are held, addressing project status, schedules, and work yet to be completed. Prior to submission deadlines, all documents are reviewed. Project Manager attends all team meetings to ensure that cost is being monitored throughout the process. A graphic representation of HDR's Quality Assurance Program is provided on the following page. Page 55 Z aq 71 General Engineering and Environmental Management Services "k Crri, Page 56 1 L- Relevant Project Experience SOLID WASTE INTEGRATED RESOURCES PLAN City of Los Angeles, California Project Manager. Orchestrating a one -year stakeholder engagement process consisting of 100 key constituent meetings, 75 business meetings, 36 house meetings, 36 working group workshops, and 3 citywide conferences to obtain public input on the development of the stakeholder -driven Solid Waste Integrated Resources Plan (SWIRP). The SWIRP I plan will identify the policies, programs and facilities that will be necessary to reach the City's goal of 93 percent diversion. The SWIRP II planning process will include the development of an implementation plan, facilities plan, financial plan and Environmental Impact Report. ZERO WASTE OPERATIONAL PLAN City of Palo Alto, California Project Manager. Conducting public meetings with zero waste task force, city council committees, and full city council. Developing a detailed operational plan identifying the policies, programs and facilities that the City will need to reach 73 percent diversion by 2011 and 90 percent diversion by 2022. Tasks include: waste characterization analysis, program and facility descriptions, regional facility capacity analysis, economic analysis, and implementation plan. LONG RANGE RESOURCE RECOVERY FACILITY PLAN County of Santa Cruz, California Project Manager. Conducting stakeholder outreach process to engage public support for new "zero waste transfer station ". Facilitating public meetings in each supervisorial district. Developing a long range plan for the development of resource recovery facilities for the County including: organics composting facility, construction and demolition facility, materials recovery facility and transfer station, and potential alternative Ruth C. Abbe Education Vice President Bachelor of Arts Degree in Philosophy and Fine Arts, National Practice Leader, Zero Waste Planning Amherst College Professional Experience Professional Affiliations Past - President, Northern Ms. Abbe is a recycling and solid waste management specialist and project manager with California Recycling Association more than 18 years of experience in facility and collection procurement, contract Past - President, Alameda County negotiation, program planning, and financial analysis. She is HDR's national practice Source Reduction and Recycling leader in zero waste planning and heads up the sustainability services group which focuses Board on zero waste planning, toxics reduction, long term energy management and energy Past - Chair, Alameda County efficiency, renewable energy, green house gas accounting, water conservation, green Local Task Force(Waste building, and sustainable urban planning. Reduction Advisory Board Past - Chair, City of Alameda She has worked with more than 50 communities and private sector clients to plan and Recycling Task Force develop their recycling and solid waste management programs. She is familiar with state Board Member, East Bay of the art collection and recovery equipment and specifications, collection routing League of Conservation Voters methods, and financing plans. As a member of the City of Alameda Recycling Task Force, Board Member, Californians she developed one of the first citywide residential single - stream collection programs. She Against Waste has assisted jurisdictions in planning and implementing residential single- stream collection and residential and commercial food waste collection programs, including; program planning, public outreach, technical assistance and employee training. Relevant Project Experience SOLID WASTE INTEGRATED RESOURCES PLAN City of Los Angeles, California Project Manager. Orchestrating a one -year stakeholder engagement process consisting of 100 key constituent meetings, 75 business meetings, 36 house meetings, 36 working group workshops, and 3 citywide conferences to obtain public input on the development of the stakeholder -driven Solid Waste Integrated Resources Plan (SWIRP). The SWIRP I plan will identify the policies, programs and facilities that will be necessary to reach the City's goal of 93 percent diversion. The SWIRP II planning process will include the development of an implementation plan, facilities plan, financial plan and Environmental Impact Report. ZERO WASTE OPERATIONAL PLAN City of Palo Alto, California Project Manager. Conducting public meetings with zero waste task force, city council committees, and full city council. Developing a detailed operational plan identifying the policies, programs and facilities that the City will need to reach 73 percent diversion by 2011 and 90 percent diversion by 2022. Tasks include: waste characterization analysis, program and facility descriptions, regional facility capacity analysis, economic analysis, and implementation plan. LONG RANGE RESOURCE RECOVERY FACILITY PLAN County of Santa Cruz, California Project Manager. Conducting stakeholder outreach process to engage public support for new "zero waste transfer station ". Facilitating public meetings in each supervisorial district. Developing a long range plan for the development of resource recovery facilities for the County including: organics composting facility, construction and demolition facility, materials recovery facility and transfer station, and potential alternative 73 technology for residual waste reduction. The County's Buena Vista Landfill is scheduled to close by 2015 and the County must maximize diversion of materials and identify long- term capacity for residual wastes. Tasks include: facility conceptual design, siting analysis, public meetings, and implementation plan. STOPWASTE PARTNERSHIP Alameda County Waste Management Authority, California Client Representative. Part of a five - member consulting team that is in its first year of assisting the Partnership, which includes the Authority, Pacific Gas & Electric, East Bay Municipal District, and the Economic Development Alliance for Business. Provides solid waste diversion and waste prevention technical assistance to large- and medium -sized businesses and public agencies in Alameda County. The Partnership currently has more than 60 active clients, with the goal of diverting 7,500 tons per year through the development of ongoing relationships that begin with on -site assessments and development and implementation of recommendations, and to continue with monitoring and reporting of diversion. Developing 10 new clients in three business sectors. Providing organics technical assistance to large generators of organic materials. 75 PERCENT DIVERSION PLAN AND ALTERNATIVES ANALYSIS Salinas Valley Solid Waste Authority, California Project Manager. Conducted a series of public workshops with the Authority Board to identify the policies, programs and facilities to reach the Authority's goal of 75 percent diversion and 50 years of facility capacity. Currently developing a 75 percent diversion plan for the Salinas Valley Solid Waste Authority which will identify the programs and facilities needed to reach the Authority's goal of 75 percent diversion by 2015. Also conducting an alternatives analysis to identify 50 years of disposal capacity for the Authority through maximizing diversion, utilizing remaining capacity at existing Authority landfills, identifying alternative landfills outside of the Authority, developing alternative technologies to reduce the volume of residual wastes, and, potentially, developing new landfill capacity within the Authority region. PRESENTATIONS "AB 2176 Workshop. " Moderator of the Venues and Special Events Recycling Technical Council workshop co- sponsored by California Resource Recovery Association, California Integrated Waste Management Board, California Department of Conservation, February 2006. "Residential and Commercial Organics Management. " Presentation to the California Resource Recovery Association 29h Annual Conference, July 2005. "Construction and Demolition Debris Workshop. " Moderator for the Construction and Demolition Technical Council at the California Resource Recovery Association 270' Annual Conference, July 2003. "Best Practices in Franchising. " Moderator at the California Resource Recovery Association 26th Annual Conference, July 2002. "Top Ten Policy Issues to Cover in Your Franchise Agreement. " Paper presented to 31 st Annual SWANA Western Regional Symposium, May 2002. PUBLICATIONS "Global Warming, the New Garbage Barge. " Northern California Recycling Association, March 2007. "Sustainable Buildings. " Brown, Vence & Associates Capital Update, April 2003. Co- authored with Ann Guy. "Beyond 50% Diversion. " Brown, Vence & Associates Capital Update, September 2002. Ruth Abbe - Page 2 1 al Douglas T. DeCesare Project Director Education Professional Experience Master of Civil Engineering, North Mr, DeCesare is a Project Manager experienced in solid waste and environmental projects Carolina State University, 2002 including transfer station permitting, landfill permitting and design, leachate collection Bachelor of Science, Civil system design and treatment, landfill closure design, leachate recirculation system design, Engineering, University of North landfill gas collection system design, stormwater management design, construction Carolina, 1995 administration, and construction quality assurance. Mr. DeCesare's responsibilities include Professional Registrations project management, design, preparation of plans and specifications, and construction Professional Engineer, Delaware, No. management. 14943 Issued: 07/01/2006, Expires: 06/30/2010 HDR Project Experience Professional Engineer, North Carolina, No. 24452 Issued: 01/25/1999, Wake County, Bid Preparation, Feltonsville Landfill, NC. Project Manager. Test soils Expires: 12/31 /2010 stockpiled at the South Wake Landfill for use in the base liner system of future phases. Also Professional Engineer, Virginia, No. prepare a bid package for the repair of the existing perimeter road around the Feltonsville 038558 Issued: 06 /13/2003, Expires: Landfill. 06130/2011 Wake County, Landfill, Permitting, Design, and Construction Services, NC. Project Professional Affiliations Manager. Provide consulting, technical support, and construction oversight regarding the American Society of Civil Engineers closure of the North Wake Landfill. Project includes landfill permitting, design, and (ASCE), Member construction services. Society of American Military Engineers Allied Waste Industries Inc., BFI -Allied Brunswick Landfill, Lawrenceville, VA. Project (SAME), Member Manager. Preparation of a borrow plan to direct owner on use of on -site soil for daily landfill Solid Waste Association of North operations. Prepare bid level documents for the expansion of the leachate tanks at the America (SWANA), Member landfill. HDR Tenure Allied Waste Industries Inc., BFI - Allied Fluvanna Transfer Station, VA. Project 12 Years Manager. Prepare transfer station site improvements drawing regarding stormwater control and washdown area. Work also includes updating the operations manual and DEQ solid Industry Tenure waste permit. 14 Years Allied Waste Industries Inc., BFI -Allied King & Queen Cell, VA. Project Manager. Prepare Construction Documents for Cell 5, a 21.7 acre MSW Landfill Cell. Prepare Permit Modifications for alternate liner system and revised final grades. Perform soil test pits in search of clay liner material for the next cell construction King & Queen Landfill. Allied Waste Industries Inc., BFI - Allied, Richmond Landfill, Termination of Post - closure Activity Report, Richmond, VA. Project Manager. Work includes performing a site evaluation and regulatory review, construction documents, and a Termination of Post - Closure Activity Report. Charleston County, Bees Ferry Landfill - Permitting /Design and Construction, SC. Sr. Project Engineer. Work associated with permitting, design, and construction of the Bees Ferry Landfill Expansion. Chatham County, Solid Waste Feasibility Study, NC. Engineer Staff. HDR conducted a solid waste feasibility study to determine the most economically viable and environmentally safe management of solid waste. Chatham County, Triangle J Council of Government, NC. Staff Engineer. HDR was retained to perform a review of regional public landfills nationwide. Develop and issue a 75 letter of interest for a community to host a facility. City of Durham, Phase I, Constr. Admin. Services, Public Service Facilities, Durham, NC. Engineer Staff. The project consists of services to the City of Durham, North Carolina. Phase I includes construction administration of a public service facility consisting of a recycling drop -off facility, small vehicle unloading area, swap shop, drop -offs. City of Greensboro, Cost Evaluation for Phase III, Bioreactor Evaluation, NC. Project Engineer. This contract covers a cost evaluation for Phase III, Bioreactor evaluation, partnering meetings and process and general services provided on an as needed basis. City of Winston - Salem, Hanes Landfill Expansion Cell 1 Design, NC. Engineer Staff. Task includes all necessary permits and construction documents for construction of the first cell of the landfill expansion. City of Winston - Salem, Hanes LF - Const Monitoring /CQA for Cell 3A, NC. HDR was selected for construction monitoring and construction quality control (CQA) for Cell 3A of the Hanes Landfill in Winston- Salem. City of Winston - Salem, Hanes LF - Construction Admin/CQA, NC. Engineer Staff. Work includes Construction Administration, Construction Quality Assurance for the landfill and the leachate management facility for the Hanes Landfill Expansion. Greenville County, New Landfill Siting, Greenville, SC. Engineer Staff. This contract involves the provision of consulting engineering and design services in the siting and design of a new subtitled D Landfill for Greenville County, SC. Guilford County, Design, Permitting, Constr. Admin, Greensboro, NC. Project Manager. Managed the preparation of the site layout, permit application, design, construction contract documents, and construction observation of a scrap tire and white goods collection facility. Durham Transfer Station, Analysis, Durham, NC, MBI,. Project Manager. Structural analysis and repair of damaged transfer station. Moore County, Groundwater Wells and Monitoring, Moore Co., NC. HDR will coordinate the installation of two new monitor wells to replace MW -12 and MW -12D. This includes the preparation and submittal of a work plan for NCDENR's approval. Methane monitoring on a quarterly basis. Olver Incorporated, Wake County, South Wake Landfill, NC. Project Manager. This work includes performing assistance with permitting, planning, and coordination for the start of the South Wake Landfill. Additional work includes coordination efforts include communications with contractors (Waste Industries), soil resource investigations, contractor oversight, test reviews, and permit compliance. Roanoke Valley Resource Authority, Engineering Services, Roanoke, VA. Project Manager. HDR will provide consulting engineering services to review and report on RVRA staff prepared adequacy report for the Replacement Reserves, Closure, and Post - Closure Requirements under the Master Indenture of Trust for the RVRA's Outstanding Revenue Bonds. Southeastern Public Service Authority, 43 -Acre Cell V Expansion, Suffolk, VA. Project Manager General. This work includes providing construction administration and construction quality assurance services during construction of the Cell V Expansion of the SPSA Regional Landfill. Southeastern Public Service Authority, SPSA Transfer Station, Portsmouth, VA. Engineer Staff. HDR prepared a preliminary design report for the proposed SPSA Transfer Station to be located at the regional landfill. Douglas T. DeCesare - Page 2 hiR Dean E. Ferry, CET Registration Senior Construction Coordinator Certified Engineering Technician: NICE Certification No.083457 Professional Experience SWANA Certified Landfill Mr. Ferry, a senior construction coordinator, has more than 27 years of experience in Technical Associate, I. D. No. construction quality assurance, resident engineering, and laboratory testing. He has an 48971 extensive background in the day -to -day operation and construction of solid waste landfills. Mr. Ferry has been responsible for the coordination of CQA personnel, geotechnical and Professional Affiliations geosynthetics laboratory testing, the review of all field documentation, the preparation of American Society of Certified certification reports, and constructability reviews of design projects. Additionally, Mr. Engineering Technicians, Member Ferry has conducted periodic in -house training seminars primarily dealing with the National Institute for Certification monitoring of geotechnical and geosynthetics construction projects. He also has acted as in Engineering Technologies, liaison between regulators, owners, and engineers, and has completed extensive laboratory Member and field - testing. Solid Waste Association of North America(SWANA), Member HDR Project Experience City of Durham, Phase I, Durham, NC. The project consists of services to the City of HDR Tenure 13 Years Durham, North Carolina. Phase I includes construction administration of a public service facility consisting of a recycling drop -off facility, small vehicle unloading area, swap Industry Tenure shop, drop -offs. 31 Years City of Greensboro, Gboro Cells 1, 2, 3 - Construction Monitoring, Greensboro, NC. Resident Project Rep 1. HDR was retained for design and construction monitoring for Cell 3 at White Street. City of Greensboro, Greensboro Transfer Station, Greensboro, NC. HDR was selected for the Design & Permitting of the Transfer Station, and development of an RFP to solicit proposals for hauling and disposing of the City's Municipal Solid Waste (MSW). City of Winston - Salem, Hanes Landfill Expansion Cell 1 Design, Winston - Salem, NC. Engineer Staff. Task includes all necessary permits and construction documents for construction of the first cell of the landfill expansion. City of Winston - Salem, Hanes LF - Construction Admin/CQA, Winston - Salem, NC. Work includes Construction Administration, Construction Quality Assurance for the landfill and the leachate management facility for the Hanes Landfill Expansion. City of Winston - Salem, Old Salisbury Rd Phase IV Construction, Winston - Salem, NC. HDR was retained to perform a Phase IV Construction at Old Salisbury Road. Existing Subtitle D Landfill, Coastal Regional Solid Waste Management Authority, Craven County, NC. Provided construction monitoring services and general site supervision during remediation activities. Acting/ temporary landfill operations manager for the duration of the project. Greensboro Phase III Cells 1 and 2 Expansions, Greensboro, NC. 39.5 -acre Subtitle D Expansion. Resident project representative during the construction phase. Duties include construction monitoring, contract administration, coordination of subcontracted CQA field and laboratory services, and preparation of the certification report. Hanes Landfill 40 -Acre Closure, Winston - Salem, NC. Resident project representative during closure system construction. Responsible for acceptance of the multiple layer 77 configuration and the coordination of the contractor, surveyor, and CQC /CQA field and laboratory service. Hanes Landfill Expansion, Winston - Salem, NC. 10 -acre extension of existing Subtitle D expansion. An alternate liner system was constructed overlying (piggyback) the existing unlined cell. The piggyback configuration includes a relatively impervious clay soil liner /subbase, a Geosynthetic Clay Liner (GCL), and a composite drainage net. Duties as resident project representative included construction monitoring, contract administration, coordination of subcontracted CQA field and laboratory services, and preparation of the certification report. Construction of two 12 -acre expansions consisting of a piggyback configuration tied to a more typical landfill cell. In addition to assisting site personnel with operational issues, duties include construction monitoring and coordination of the contractors, laboratories, and other field services. Subtitle D Landfill Expansion, Winston - Salem, NC. Winston- Salem's first Subtitle D landfill expansion (16 acres). Resident project representative during the construction phase. Duties included construction monitoring, contracts administration, and coordination of subcontracted CQA Field and Laboratory Services. Georgetown County Solid Waste Authority, Georgetown, SC. During the ongoing closure of the unlined landfill is responsible for the coordination of CQA, field, laboratory, and site personnel. Following completion of the work will prepare the final as -built report. Georgetown County Solid Waste Authority, Georgetown, SC. 16 -acre Subtitle D landfill expansion. Resident project representative during the construction phase. Duties included construction monitoring, contracts administration, and coordination of subcontracted CQA Field and Laboratory Services. Horry County Solid Waste Authority, Conway, SC. 28 -acre lined expansion. The design includes a Subtitle D base liner system, leachate collection system, and leachate pretreatment area. Resident project representative for the construction phase of this project. Sumter County Landfill, Sumter, SC. Resident project representative during the 50 -acre closure system construction. In addition to normal duties as coordinator and construction monitor, is an important liaison between the contractor, Sumter County, and the design engineer. Williamsburg County Landfill, Kingstree, SC. Construction coordinator responsible for the supervision during the ongoing construction of erosion and sedimentation control features. Additionally, was retained to assist in the normal operation of the site. Gaston County, General Engineering Services, Gastonia, NC. This contract covers the evaluation of a landfill bioreactor and providing general engineering services on an as needed basis. Southeastern Public Service Auth of Virginia, Suffolk Transfer Station, Suffolk, VA. HDR was retained to provide Construction and Contract Administration for the construction of SPSA's Regional Landfill Transfer Station. Project includes the construction of a Transfer Station, New Scale House, and Citizen's Convenience Center. Dean E. Ferry Page 2 iv_l Michael G. Greenberg Vice President Education Professional Experience Bachelor of Science, Environmental Mr. Greenberg has more than 20 years of experience in the solid waste management field. Engineering, Humboldt State His experience includes project management, rate and performance reviews, program and University, 1985 system costing and analysis, independent engineering assessment, and landfill analysis. He HDR Tenure has developed numerous economic assessment models for rate evaluation and setting 24 Years through his detailed work with independent engineering assessments for bond financings. In addition, he has developed computer costing models and has assisted in compiling a large Industry Tenure solid waste systems database of costs and options for solid waste facility development. Mr. 24 Years Greenberg is an accomplished project manager with an untarnished track record for completing all assignments with the highest level of professionalism, on time and within established budget. He regularly manages HDR's largest and most complex projects, including many that involved technology assessments, procurement of solid waste processing, disposal facilities and integrated resources planning. HDR Project Experience City of Belmont, Belmont - Technical Consulting Services for Solid Waste, Green Waste, and Recycling Collection and Operations Services, Belmont, CA. HDR/BVA assisted the City of Belmont in evaluating its options for management of municipal solid waste, green waste, and recyclables. City of Los Angeles, City of LA - Solid Waste Integrated Resources Plan Development, Los Angeles, CA. Project Engineer. Assisted in planning efforts and evaluation of options for their overall zero waste plan, including participating in the review of proposals for conversion technologies to process the Citys black -bin waste. City of Palo Alto, Palo Alto Zero Waste. Project Manager. Directed development of a Zero Waste Plan for the City including economic analysis and modeling of various diversion plans, programs and facilities including resource recovery options, a conversion technology, a composting facility, C & D processing, MRF, food waste collection, etc. City of San Jose, Integrated Waste Management Zero Waste Plan Development, San Jose, CA. Project Engineer. Assisted the City in scoping and setting up a planning process including review of alternative technology RFI responses. Reviewed and summarized . responses, including the pros and cons from alternative technology vendors including plasma gasification, gasification, pyrolysis, and chemical depolymerization technologies. Met with City officials to discuss responses. Prepared a supplemental memorandum discussing other alternative technologies not proposed to the City including anaerobic digestion, biofuels, and mechanical autoclaving. City of Santee, City of Santee - Sycamore Canyon Landfill, Santee, CA. HDR was retained by the City of Santee to perform as an extension of staff to evaluate the technical aspects of an expansion to the Sycamore Canyon landfill. The landfill expansion was proposed by the landfill owner, a private company. The landfill is located within the City of San Diego, but is adjacent to the City of Santees primary entrance and city boundary. HDR participated in City/developer workshops and meetings, reviewing the EIR and supportive documentation of the proposed landfill expansion. HDR was responsible for assessing and determining if the project proponent's analysis was adequate and accurate in the description of the magnitude of impacts, thresholds of significance and mitigation measures. Of concern 79 to the City was that the impact analysis was through and that mitigation measures could and would be implemented. Additionally, HDR made recommendations on feasible and practicable alternatives to reduce the magnitude of impacts. Compost Facility Design - Alameda County Waste Management Authority, CA. Project Manager. Managed and prepared the design of a compost facility, and provided economic analysis for the Authority. The design utilized a windrow composting approach. Financial Analysis and Rate Deternination - Salinas Valley Solid Waste Authority, CA. Project Manager. Salinas Valley Solid Waste Authority, California. Assists in managing long -term financial analyses focusing on Authority's operating costs and revenues of their landfills and transfer stations, which is used as a strategic decision making tool. Developed a 10 -year budget model to profile expected tonnages and overall system solid waste expenses to project required landfill tipping fee rates. Currently developing a 35 -year model to project future required landfill tipping fees. Global 8 Environmental Management, Inc., ORCY Strategic Business Plan, CHIN. HDR/BVA aided Organic Recycling Technologies Inc (ORCY) in accomplishing their goal of developing projects globally in the waste management and renewable energy arena. HDR/BVA assisted in the initial development activities of the company and the follow -on engineering required to implement selected projects. The developing projects include wind energy projects, composting projects and wastewater facility projects. Imperial County, Imperial County - Neighborhood Clean -up Feasibility Study and Implementation Plan, CA. The Imperial County Planning and Development Services Department has engaged HDR to develop a Neighborhood Clean-up Feasibility Study and Implementation Plan for unincorporated communities of Bombay Beach and Niland. These two neighborhoods are located in the north central County on the East side of the Salton Sea and are plagued by the accumulation of waste, scrap metal, bulky items, appliances, abandoned or inoperative vehicles and other debris on private property and the illegal dumping of solid waste, appliances, tires and other bulky items on public and private property. Independent Engineering Report - Sonoma County, CA. Project Manager. Managed the preparation of an engineer's report to support approximately $21 million in certificates of participation (COP). The report included review of the County's system, disposal capacity, permits, control of waste stream, waste generation, and disposal quantities. HDR modeled the County's capital and operating projects including development of a public tipping building, drop -off recycling area, reuse area and storage building, household hazardous waste facility improvement to the scales, and improvements for the County's Central Landfill. The financial model verified that the current and projected landfill and transfer station tipping fees rate were appropriate to support the expenses of the County's solid waste management system. Independent Engineering Reports - Salinas Valley Solid Waste Authority, CA. Project Manager. Prepared an engineering report to support $9.2 million in revenue bonds. Reviewed the Authority's waste management system, disposal capacity, permits, control of waste stream, waste generation, and disposal quantities. Prepared and modeled several sensitivities of the entire solid waste system including collection, processing, landfilling, administration, and other related programs to confirm landfill tipping rates. Subsequently, HDR prepared an Engineer's Report to support approximately $39 million in bonds to finance the cost of projects integral to the development, operation, and maintenance of the Authority's solid waste management system. As part of the bond issue, HDR reviewed the Authority's budget and capital plan, and projected operating results. HDR reviewed proposed rate adjustments and provided recommendations that addressed inflation as well as increased disposal tip fees at several landfills for six refuse collection companies operating in Michael G. Greenberg - Page 2 i l MM Monterey County. Landfill Biogas Extraction and Utilization - Municipality of Bourgas, Bulgaria. Project Engineer. The Municipality of Bourgas, Bulgaria, is developing a biogas -to- electricity system at the Bratovo landfill. HDR completed a feasibility study of a collection and recovery system that will produce initially 0.5 megawatts. The project will be increased with additional power generation modules and bioconversion technology to two megawatts. HDR also provided engineering, construction, and operational consulting services to create a cost - effective system to improve local environmental, health, and safety conditions. Lemna Intl. Inc., Vietnam - Da Phuoc Solid Waste Disposal Facility and related Waste Transfer Facilities. HDR/BVA provided services to California Waste Solutions (CWS) for the development of a Technical and Financial analysis for various Solid Waste Management Facilities serving the greater Ho Chi Minh City of Vietnam. CWS is offering services to Ho Chi Minh City including the development of a variety of waste management facilities at the Da Phuoc site. The services at this site include a waste receipt unloading area and transfer station, a Materials Recovery Facility, a Compost Facility, and a landfill. Further, we offer to assist CWS with the development of an application to the USTDA for grant funding of further technical evaluations of the proposed project. Materials Recovery and Composting Facility Feasibility Analysis - Alameda County Waste Management Authority, CA. Project Engineer. HDR provided planning and development services for the Authority, working closely with elected officials to prepare a report outlining serveral options for developing composting and materials recovery facilities. Key issues included analysis of franchise obligations; public or private facility ownership, operations, and financing; procurement processes; materials markets; and cost allocation with identification of eight regional subgroups for facility development. For the second phase, HDR facilitated a series of meetings with elected officials and staff representing each subregion to determine which agencies should participate in the development stages of the facilities. Materials Recovery Facility Feasibility Study - City of Glendale, CA. Project Manager. Managed the evaluation of various solid waste processing options, the preparation of several designs for the different options, waste stream analysis, and a detailed cost estimate of a 275 - to 825 -TPD materials recovery facility. This included reviewing different materials recovery and composting type options for the City. Napa- Vallejo Waste Management Authority, Devlin Road Transfer Station Review. HDR/BVA conducted a review of the Devlin Road Transfer Station including meeting with the operator for the Napa - Vallejo Waste Management Authority. HDR developed plans for future C &D processing operations at the Transfer Station, for short-term as well as long- term. HDR also suggested potential modifications to the Transfer Station to improve efficiency for circulation, load out and the scale house. Recology, Norcal - Digester at Tunnel Avenue Facility, San Francisco, CA. HDR is offering assistance to Norcal to develop conceptual planning efforts for both conceptual improvements and operations of a Rotating Aerobic Digester at the Norcal Tunnel Avenue site in the City of San Francisco. Recycling Center and Transfer Station Design - City of Palo Alto, CA. Project Manager. Managed and prepared designs and corresponding economic analyses for several MRF, transfer station, landfill, and curbside recyclables processing scenarios for the City. The design included facility placement on landfill final grading plans. Salinas Valley Solid Waste Authority, SVSWA - Alternative Technology, Salinas, CA. HDR helped the Salinas Valley Solid Waste Authority explore emerging waste conversion technologies with the ultimate goal of choosing an appropriate mix of technologies for the Michael G. Greenberg - Page 3 IM 81 Authority to pursue in its waste management planning. HDR assisted the Authority in preparation for evaluating various technologies by reviewing existing work on this topic and identifying which conferences to attend to learn about the technologies that could be used in pursuit of their goals. HDR also prepared a set of specific criteria with which to evaluate each of the potential waste conversion technologies, focusing on function, impact, and applicability. And HDR prepared a set of specific criteria with which to evaluate each of the potential waste conversion technologies. Salt Lake County Public Works, Salt Lake Valley Waste Planning, Salt Lake City, UT. Project Engineer. Assisted the County in developing a master plan assessing the potential diversion from landfill of materials handled by green waste processing operations, C & D processing, a MRF, transfer station, and various conversion technologies. Santa Cruz County, Long -Range Resource Recovery and Waste Management Facilities. Project Engineer. Assisted the County in developing a master plan as their landfill is closing and required other options for their waste materials. I assessed the potential diversion of materials handled through green waste processing operations, C & D processing, a MRF, transfer station, and a conversion technologies. Solid Waste Management Plan - US Trade and Development Agency, Ajel, Algeria. Project Manager. The City of Jij el, Algeria, wanted to improve their current solid waste management system through the procurement of a modern solid waste collection system, development of a new sanitary landfill, and environmental remediation of existing dump sites. We examined different waste handling technologies to assist them with the most economic means of handling their MSW. HDR examined the potential for developing new solid waste collection, treatment, and disposal systems and implementing environmental remediation measures at the existing measures. Upper Valley Waste Management Authority, Clover Flat Landfill and Upper Valley Disposal Service, Napa, CA. Project Manager. HDR/BVA provided professional consulting services to assist the Upper Valley Waste Management Agency (UVA), in the Development of Alternative Rate Methodologies for Clover Flat Landfill and Upper Valley Disposal Service. HDR provided UVA with a report that documents the recommended rate methodology, presents the status of issues and concerns, and identifies remaining areas of disagreement, if any, that are critical to UVA and the franchisees. Western Placer Waste Mgmt. Authority, WPWMA Plasma Arc Gasification Study, Auburn, CA. Project Manager. Prepared an assessment of a proposal to the Authority to build a facility to handle MSW through a Plasma Arc Gasification process. World Waste Technologies, Inc., World Waste - T01 -4 - MW Richmond MSW Transformation Energy Center, Richmond, CA. HDR assisted World Waste Technologies in producing 20.4 MW of renewable power for delivery in the Richmond MSW Transformation Energy Center for PG &E. By teaming with technology suppliers for second generation gasification, WWT is able to take advantage of its unique technology which extracts previously unrecoverable lignocelullose from post -sorted MSW that is destined for the landfill. This technology has already been demonstrated at commercial scale in its Anaheim facility for the production of 'wetlap for sale to recycle paper mills. As we explore other commercial uses for our technology, we believe that it can be used for production of a renewable biomass feedstock is perfectly suited as fuel for power production. HDR performed Task Orders 1-4: MSW Processing, Design Development Program, MSW Gasification Power Generating Design Development Program, marketing assistance, and the Gasification Overview Report Michael G. Greenberg - Page 4 1al Stephen D. James Senior Consultant Education Professional Experience Instructor for Solid Waste Issues - Institute Mr. James is a Senior Consultant for HDR Engineering, Inc. of the Carolinas' Environmental of Government University of North Carolina at Chapel Hill -1998 and Resource Management Group. He has over 39 years experience in the solid waste Graduate, Municipal and County Public management field, and retired as Solid Waste Manager for a large North Carolina Administration municipality. Mr. James is the current State Treasurer for the North Carolina Chapter of the University of North Carolina at Chapel Hill - American Public Works Association and served the Chapter as President in 2001. Mr James 1995 is also a member in good standing with SWANA since its inception as a Solid Waste Development Training, North Carolina State Professional Organization University HDR Project Experience Professional Affiliations City of Greensboro, Cost Evaluation for Phase III, Bioreactor Evaluation. Sr. American Public Works Association Consultant. This contract covers a cost evaluation for Phase III, Bioreactor evaluation, Solid Waste Association of North America partnering meetings and process and general services provided on an as needed basis. National Solid Waste Management Association City of Greensboro, Gboro 2000/2001 -1 Solid Waste Update, Greensboro, NC. Sr. Consultant. Gboro 2000/2001 -1 Solid Waste Update HDR Tenure City of Greensboro, Gboro Commercial Collection Business Plan, Greensboro, NC. Sr. 9 Years Consultant. This project has been the combination of three tasks to help the City of Greensboro operate competitively in commercial collection of solid waste and recycling. Industry Tenure 39 Years Responsibilities have included determining actual costs for commercial waste handling; analysis of organizational strengths, weaknesses, opportunities, and threats (SWOT); benchmarking analysis of services; and recommending strategies to keep the City of Greensboro competitive in its commercial waste handling. City of Greensboro, Gboro Solid Waste Financial Modeling, Greensboro, NC. Phase one - Investigation into the financial viability of its practices and proposed methods for optimizing SW services. Phase two of the project included benchmarking the organization against other SW collectors and analyzing the Department's strengths, weaknesses, opportunities, and threats (SWOT). The current phase of the project includes a rate study and fee schedule implementation, public /private partnership RFP, and revision of the current code of ordinance. City of Rocky Mount, Solid Waste Management Services. Sr. Consultant. HDR Engineering, Inc. of the Carolinas (HDR) worked with the City of Rocky Mount (City) to perform a comprehensive study of the operations and management practices of the City's Solid Waste Management Division. Davidson County, Stormwater Mgnt Program Development. Provide engineering services in the development of a preliminary stormwater program that will be used to facilitate the discussions of the Stormwater Stakeholders Committee and County Commissioners and Staff. Richland County, Solid Waste Management Audit, Richland, SC. The Department of Public Works in Richland County has recently hired a new General Manager for their solid waste and recycling services. As part of the integration of this new manager and staff, HDR was retained to begin the process of auditing the operations and finances of the section. NM City of Greensboro, Greensboro Department of Transportation Operations Plan, Greensboro, N.C. Provide Engineering and Evaluation of the City's Street Cleaning and Street Sweeping operations to assure maximum productivity at the lowest possible cost. Equipment evaluation and recommendations and program enhancements City of Greensboro North Carolina- Served as the Solid Waste Manager for the City of Greensboro until retirement. Duties consisted of the management and oversight of a comprehensive Solid Waste Management System for a large municipality which included residential MSW and Recycling Collection, Commercial MSW and Recycling Collection, Yard Waste, White good and Bulk Trash Collection Services, MSW Landfill and Composting Operations, Code Enforcement Division and Administrative /Billing Operations. The Solid Waste Management System operated by the City of Greensboro was recognized as a premier program in the Eastern United States. The City enjoyed the latest technologies in both the collection and disposal fields and also partnered with the private sector in the processing of recyclables for the betterment of the environment. Stephen D. James - Page 2 i i'll Education Bachelor of Science, Environmental Engineering, University of Florida, 1999 Professional Registrations Professional Engineer, Alabama, No. 28931 -E, Issued: 10/1212007 Professional Engineer - Civil and Sanitary, Florida, No. 60815 Issued: 01/13/2004 Professional Engineer - Civil, Georgia, No. PE030668 Issued: 10/14/2005 Professional Engineer - Civil and Environmental, North Carolina, No. 034853 Issued: 10124/2008 Professional Engineer - Environmental, Puerto Rico, No. 19601 Issued: 06/16/2004 Professional Affiliations Solid Waste Association of North America (SWANA), Florida, Member, 2002 -2007 Carlo F. Lebron Senior Project Manager Professional Experience Mr. Lebron heads up HDR's Landfill Gas Group. He has experience in landfill gas collection systems and landfill gas to energy projects all across the Country. He has experience on over one hundred landfill gas projects; these include evaluation, design, permitting, construction, operation. Mr. Lebron's landfill experience stretches to over half the states in the country with a majority of the projects in the Southeast. Mr. Lebron has developed a landfill gas group that has experience in construction management and oversight of not only landfill gas collection systems but soil vapor extraction systems and other solid waste construction projects. They have extensive experience with Title V permitting and other regulatory requirements associated with landfill gas collection systems such as NSPS and NESHAP. A sampling of some of the projects that Mr. Lebron has been involved in are as follows: HDR Project Experience City of Greensboro, White Street Landfill, Greensboro, North Carolina Landfill Gas Collection System Master Plan and Design. Produce Master Plan layout for landfill gas collection system. Masterplan included chronological sequencing for phasing construction of landfill gas collection system. Completed analysis, design and details for the Phase III of the landfill. Design include the use of a combination flare station/pumping station to deliver landfill gas to end user over 6 miles from landfill. Special attention had to be paid to existing landfill gas to energy project using common header to end user. Provided field engineering services during construction and start up services at the completion of construction. HDR Tenure Greenville County, Enoree Landfill, South Carolina Landfill Gas Collection System 10 Years Master Plan. Produce Masterplan layout for landfill gas collection system. Master Plan Industry Tenure included chronological sequencing for phasing construction of landfill gas collection system. 10 Years Charleston County Solid Waste Management Department, Bees Ferry Landfill, Charleston, South Carolina Landfill Gas Evaluation. Reviewed historical data and projected future data to determine the feasibility of utilizing the landfill gas for a gas to energy project. Produced a report summarizing our findings and evaluation. Three Rivers Solid Waste Management Authority, Three Rivers Landfill, Aiken, South Carolina Landfill Gas Collection System Masterplan, Design/Permitting Assistance and Owners Representative Services. Assisted TRSWA in developing a Title V permit renewal application for submittal to the South Carolina Department of Health and Environmental Control Bureau of Air Quality. Provide assistance to TRSWA by reviewing the testing, analytical, and calculation methodology of the recent Tier II testing and reporting in order to advise TRSWA on options regarding installation of the gas collection and control system. During this review a discrepancy was noted in the reporting method. Correcting this discrepancy allowed TRSWA to postpone installation of GCCS. Produced an updated Tier 11 report using the actual 2004 waste acceptance rate as provided by TRSWA. Developed a Gas Collection and Control System Design plan for the Landfill to allow the site to develop an innovative landfill gas collection system. This gas collection system was designed to provide fuel for an alternative waste reduction process. Assisted the client in landfill gas to energy project by providing owners representative services with respect to 85 technical support. This service allowed the client to receive bond funding to own and construct the project. Also assisted TRSWA in monetizing greenhouse gas credits from the early installation of the landfill gas collection system. Currently in the process of developing the next expansion of the landfill gas collection system. Winston -Salem Solid Waste Management Department, Hanes Road Landfill, Winston - Salem, North Carolina Landfill Gas Collection System Design. Evaluated projected waste disposal rates and designed of 6200 foot 24" diameter HDPE landfill gas transmission line for proposed expansion area of the landfill. Design included the use of condensate sumps, air lines and dual contained condensate return lines. Developed bid documents and assisted with prebid meeting to address contractor's questions. Greenville County, Twin Chimneys Landfill, South Carolina Landfill Gas Support Services. Developed the Title V air permit application and prepared the first NMOC report for the landfill. Currently, developing protocol for Tier 2 portion of NMOC project for the County. Sarasota County, Central County Disposal Facility, Sarasota County, Florida Landfill Gas Collection System Masterplan and Design. Produced Masterplan layout for landfill gas collection system. Masterplan included chronological sequencing for phasing construction of landfill gas collection system. Completed analysis, design and details for the first phase of the landfill gas collection system. Developed permit documents for the installation of the first phase of the landfill gas collection system. Currently, developing bid documents for the landfill gas collection system. Carlo F. Lebron - Page 2 f a Education Bachelor of Science, Environmental Sciences /Studies, University of CA Berkeley, 1980 Professional Affiliations Solid Waste Association of North America (SWANA), Southern California Founding Chapter, Member, 2000 -2009 Michelle P. Leonard Solid Waste Business Class Leader Professional Experience Ms. Leonard has 25 years of experience in environmental consulting and project management, with emphasis in solid waste management planning and facilities. She has assisted public and private sector clients in the preparation of solid waste management plans, feasibility studies for transfer stations, material recovery facilities, drop off and buy back centers. As part of these projects, she has completed CEQA assessments, facility permit applications, odor and dust control plans, and other support documents. Ms. Leonard has a strong working knowledge of solid waste management regulations and practices, and has presented numerous successful projects to city, county and State regulators. HDR Tenure Less than a year HDR Project Experience Athens Services, Athens Services San Gabriel Annual Report, San Gabriel, CA. Project Industry Tenure Manager. HDR is preparing the City of San Gabriel Annual Report for the California 29 Years Integrated Waste Management Board, documenting the Citys progress in meeting AB 939 mandate of 50% diversion. City of Los Angeles, Solid Waste Integrated Resources Plan (SWIRP). Since 2007, HDR has been facilitating a six-year citywide public participation process to identify policies, programs and facilities necessary to reach Mayor Antonio Villaraigosa's environmental directives for the SWIRP. Conducted one- on-one meetings with key constituents including City Council offices, Neighborhood Councils, homeowner /community groups, large businesses and manufacturers, environmental justice and advocacy groups, trade associations, surrounding municipalities and regional and State regulatory agencies to solicit their input on the City's Zero Waste plan. Co- managed 64 group workshops, and four citywide conferences to obtain public input on the development of the policies, programs and facilities needed to achieve Zero Waste. Construction & Demolition Recycling, Inc, C &D Recycling, South Gate, CA. HDR is revising site plan and facility plan for Construction & Demolition Recycling Processing Facility. Project includes expanding the facility to include 7 additional acres, and revising the permit to a large volume Transfer Station. Miami Dade County Dept of Solid Waste, Miami -Dade County Solid Waste Management Master Plan, FL. SCS Engineers, Kittitas County SW Management Plan, Kittitas, WA. The project is the 2010 Solid Waste Management and Moderate Risk Waste Management Plan update for Kittitas County, Washington. Non -HDR Project Experience Athens Services, Waste Composition Study, Industry, CA. Conducted a number of waste composition studies at the Athens Services MRF/Transfer Station in Los Angeles County. The studies are conducted in accordance with CIWMB protocol, and include preparation of a sampling plan, sorting of waste into 57 different categories, and preparation of report findings. The results of the analysis are used to determine the recycling rate or recyclable portion of the incoming waste stream from a number of municipalities. California Statewide Generator Study. Project Director. Conducted the waste generator 87 task of the statewide waste characterization study. The study characterized the waste generated, both disposed and diverted, from 10 commercial generators that are major sources of waste in the state. The study consists of field sampling, sorting, and quantification, used to establish a comprehensive waste generation for each business type. City of Irvine, Zero Waste Technical Assistance, Irvine, CA. Project Director. This project originated in 2004 to include conducting waste audits and providing information to businesses on recycling and waste reduction. Since that time, the project has expanded to include outreach and education to schools and other city facilities, zero waste program for restaurants, preparation of a construction and demolition debris ordinance, preparation and negotiations for a semi- exclusive solid waste franchise agreement, and recycling programs for special events and public venues. City of Richland, Solid Waste Management Plan, Richland, WA. Project Director. Completed the Preliminary Draft 2009 City of Richland Solid Waste Management Plan. The plan documents existing waste management policies and programs established and operated by the city. The Plan contains the following sections, Waste Generation, Waste Reduction, Recycling, and Organics; Collection, Transfer, and Disposal; Miscellaneous Wastes; Moderate Risk Waste; and Administration, Enforcement, and Implementation. The project also included Transfer Station Study to evaluate the cost of building and operating a solid waste transfer station in the southern portion of the city. City of Santa Clarita, Waste Generation Study and Disposal Reporting System Review, Santa Clarita, CA. Project Manager. The consultant conducted a waste generation study for the City to establish the current and potential recycling rate in the City. As part of the study, the consultant completed on site waste assessments at the Citys largest businesses, identified diversion from City programs, and other activities in the City that divert solid waste, including recycling, composting, and source reduction. The consultant also completed a comprehensive review and evaluation of the Citys 1999 and 2000 DRS reports, after a 65,000 -ton spike in disposal was reported in 2000. The project includes review of hauler reports and comparison of this data with landfill records. A report to Council will be prepared, with recommendations to correct previous errors and avoid future discrepancies. City of Santa Maria,Collection and Disposal Rate Study, Santa Maria, CA. Project Director. Worked with the city to review the existing collection and disposal rates charged to residents, businesses and industrial customers. A thorough analysis of existing rate structure has been completed, based on the citys budget, operations, and financial reports. A financial model was developed that can be utilized to estimate the appropriate rate structure for all aspects of the city's solid waste system, and to estimate the costs and revenues associated with specific system programs. Downey Area Recycling and Transfer Facility (DART), Waste Characterization Study, Downey, CA. Project Director. Numerous waste stream analyses have been conducted of cities serviced by the facility. The waste streams from the commercial, industrial, and residential sectors are typically sampled for quantities and types of waste and recyclables, and characterizations are established for each individual sector. The information is used in the design of facilities and programs for collection and processing. Interior Removal Specialist/Construction and Demolition Recycling. Project Manager. Prepared all documents and assisted IRS in permitting a Construction, Demolition, and Inert Debris processing and transfer facility. The facility is permitted to handle up to 3,000 tons per day of construction and demolition materials, and will process the materials to divert an average of 75 to 85 percent of the incoming waste. Facility improvements include a sorting line, new scale, baler, and other support operations. As part of the project, assisted in .preparing the application for a revised Conditional Use Permit, CEQA analysis, and hazardous materials permits. Island County Solid Waste Operational Assessment and Benchmarldng Study, Coupeville, WA. Project Director. The goal of this study was to develop data and Michelle P. Leonard - Page 2 IM 88 information that would ensure that the County is providing efficient management of solid waste programs, services, and infrastructure. During the course of the study, we explored possible opportunities for improvements, costs savings, and revenue enhancements. The following analysis was completed, and recommendations were provided in these areas: - Operational Assessment of Current Drop Off Stations - Assessment of Transfer Stations - Evaluate Additional Recycling Opportunities - Evaluate New Capital Investment - Expansion of Curbside Collection Programs - Conduct Benchmarking Survey - Financial Analysis of County Program Lincoln County Washington Solid Waste Management Plan Update. Project Director. The countys solid waste plan was last updated in 1999. The project included an update of the SWMP and incorporation of the Moderate Risk Waste Plan as well. A survey was distributed to eight cities and towns, and to the rural haulers, for input on existing programs, policies and procedures, as well as challenges and opportunities. The county owns and operates a transfer station that was built to serve all of the cities and towns refuse needs. Presently, the facility is underutilized, and the county is considering options for its continued use, including a revised fee structure, privatization, and/or addition of processing capabilities. The future of the facility is one of the primary issues to be addressed in the Plan update. At the inception of the project, a new SWAC was established, as well as new Interlocal Agreements between the cities and county. The project included regular meetings with the SWAC, and monthly updates between the consultant and county. The Plan was prepared in compliance with the Ecology Guidelines for the Development of Local Solid Waste Management Plans and Plan Revisions (December 1999), and includes a SEPA Checklist, WL1TC Cost Estimate, Implementation Schedule and Funding analysis. Los Angeles County Department of Public Works Department, Recycling Program Study. Project Director. Developed an ACCESS database of over 1,400 Los Angeles County departments and facilities. The information was used to identify and maintain a list of existing recycling efforts. The project also involved the formulation of recommendations for the expansion of existing or new recycling programs for all county facilities /departments. Los Angeles County Department of Public Works, Countywide Yard Waste Program. Project Manager. This project was a 2 -year effort to design, implement and manage the Countywide Yard Waste Program. The work involved providing a broad range of public education, outreach and training related to yard waste composting, worm composting, water - wise gardening and grass recycling. The project also incorporates a statistical survey of program awareness and efficacy, and evaluation and monitoring of program results. Los Angeles County Waste Generation Study, Los Angeles County, CA. Project Director. Prepared two waste generation studies to potentially establish a new base year of either 2005 or 2006 for the unincorporated area of Los Angeles County. As part of the project, a waste characterization of residential and commercial generators is also being conducted. Over 1,000 surveys have been distributed to residents, businesses, haulers and facility operators to determine the diversion activities throughout the County. Results from the surveys of grasscycling and organics, inert materials, materials recovery facilities and transfer stations, scrap metal and electronics will all be calculated to determine the optimum new base year for the County. Norwalk Industries/Ecology Auto Parts Facilities, Revised Permits for Transfer Station and Green Waste Chipping and Grinding Facility, Santa Fe Springs, CA. Project Manager. The existing transfer station will be expanded to handle up to 100 tpd of municipal solid waste, and the Green Waste Operation will be expanded to process up to 500 tpd. The consultant has prepared the facility plans for both operations, and an Odor Management Plan for the Green Waste facility. Orange County Solid Waste Management Programs On -Call Contract, Orange Michelle P. Leonard - Page 3 Fal 89 County, CA. Project Director. Under this 3 -year contract, the consultant completed a variety of studies for the County, including the Waste Generation Study, AB 939 Fee Study, Diversion Facility Study, and Self -Haul Waste Study. Task undertaken by the consultant included an analysis of the existing waste diversion and disposal quantities in the county unincorporated area, identification of opportunities to increase landfill diversion, including inventory of green waste composting and chipping and grinding facilities, inert (asphalt and concrete) diversion facilities, and other non - disposal facilities,and an analysis of a potential fee structure for increasing diversion of recyclables from the landfills. Solid Waste Management Plan Update, Benton County, WA. Project Director. In the past, Benton County had worked with neighboring Franklin County to prepare a joint SWMP. For 2006, Benton County will have its own independent plan. The process includes a review of the previous plan recommendations, and updating all of the information to reflect current conditions in the County. An important aspect of this project is participation and involvement of the planning committee, a subcommittee of the local solid waste advisory committee (SWAC). The consultant has presented a number of options for review and consideration by planning committee members, and the recommendations will be forwarded to the SWAC for their final recommendation to the County Commissioners. Solid Waste Management Alternatives Analysis, Sonoma County, CA. Project Manager. Worked with the county and a 35- member Local Task Force to identify and select alternatives for disposal of the county's waste, following closure of its landfill in 2015. The project included an analysis of the existing solid waste management system, projection of future demographics and solid waste generation, review and evaluation of alternatives, and completion of a strategy that may include options for disposal, alternative technologies, diversion programs, and policies. Solid Waste Management Plan Update, Spokane County and the City of Spokane, WA. Project Director. Spokane County is home to almost 500,000 residents and is served by a solid waste system that consists of public and private operations. The Spokane Solid Waste Management System, a department of the City of Spokane, operates two transfer stations, a waste -to- energy plant, and collection service for City residents. The remaining cities and county unincorporated areas are served by private franchised haulers who utilize the Systems facilities. Update of all elements of the County's solid waste plan, with particular focus on infrastructure, waste stream projections, financial impacts of alternatives, transfer system improvements, moderate risk waste, composting options, and addressing construction, demolition, and land clearing (CDL) waste options. Tribal Solid Waste Advisory Network ( TSWAN) Solid Waste Management Plan Template. Project Director. Developed an SWMP template to be utilized by TSWAN member tribes in the Northwest states of Washington, Oregon, and Idaho. Member tribes currently maintain solid waste systems that vary dramatically in sophistication, funding, geographic area of service, and population. The template, held in conjunction with training, will be used by individual Tribes to address issues of concern, streamline their systems, identify system solutions and options from a template pick list, and proceed with implementation measures. Waste Characterization Study, Santa Barbara County, CA. The first study was conducted in 2003, and a second study in 2009. This first study characterized 110 loads of municipal solid waste at the Tajiguas Landfill and the Santa Barbara County transfer station in order to provide detailed composition estimates of waste disposed in Santa Barbara County. The second study was conducted in support of the Countys efforts to site an organics process /waste to energy facility at the landfill. Analysis was conducted of all incoming waste at the landfill for use by potential facility vendors to propose a technology that could utilize the incoming waste stream. Michelle P. Leonard - Page 4 1 L R Education Bachelor of Science, Civil Engineering, University of North Carolina at Charlotte, 1994 Professional Registrations Professional Engineer - Civil, North Carolina, No. 025495 Issued: 01/3112000 Professional Affiliations Solid Waste Association of North America (SWANA), North Carolina, Member, 20042007 HDR Tenure 10 Years Michael D. Plummer, P.E. Senior Project Engineer Professional Experience Mr. Plummer has 15 years of experience in solid waste and industrial landfill projects. His experience includes landfill master planning and disposal options, design hydrogeologic site investigations, permit applications, landfill design, construction quality assurance, contract documents, and construction estimates. Prior to performing landfill work, Mr. Plummer worked in the geotechnical field performing geotechnical subsurface explorations and foundation bearing analysis for a variety of structures. HDR Project Experience City of Greensboro, Greensboro Phase 3; Landfill, Greensboro, NC. Project Manager /Project Engineer. Has provided a variety of consulting services. Tasks include master plan development of the landfill, in addition to designing and constructing the Phase III landfill gas collection/distribution systems and leachate recirculation system. Conducted landfill audits which resulted in NCDENR award to the client. City of Greensboro, White Street Landfill, Greensboro, NC. General Project Manager Industry Tenure and Design Engineer. Project activities include conducting landfill audits (which resulted 15 Years in an award by NCDENR to the Client), design and permitting of a leachate recirculation system with gas recovery capabilities for Phase III, Title V and annual emission reporting for the facility, investigation into and providing operation assistance for the Phase II gas system, design of the Phase III gas system masterplan, project management for the Phase III Flare bidding, award, and installation, management of the construction of the 14 -acre Cell 3 and Phase A of the Phase III gas system and the connection into an industrial users gas pipeline. Conducted a Construction and Demolition debris landfill masterplan for the facility. The masterplan evaluated the completion of Phases II and III with respect to the schedule for developing Phase W under varying disposal tonnages. City of Winston - Salem, Hanes Mill Road Landfill, Winston - Salem, NC. Project Manager/Engineer. Project activities include the design and permitting of a Subtitle D 14- acre baseliner system and 40 -acre closure. Responsibilities for the cell expansion and closure included analysis, design, and details. Additional responsibilities included preparation of bid documents and specifications for the project and providing designer assistance during construction and certification submittal. City of Winston - Salem, Hanes Mill Road LF - Continuous Assistance, Winston - Salem, NC. Project Engineer. HDR will provide the City of Winston -Salem with continuous assistance in planning, maintaining and operating the Hanes Mill Road and Old Salisbury Road Landfills. City of Winston - Salem, Old Salisbury C &D LF - Permitting the Second 5 -Year Cell, Winston- Salem, NC. General Project Manager. Project activities have included managing the construction of the C &D landfill's 14 -acre Phase III and 25 -acre Phase IV, permitting the vertical expansion of Phases I, II, and III and the lateral expansion into Phases IV, V, and VI. In addition, operational assistance has been provided by permitting the site for a Mining Permit to manage their excess overburden, perform annual airspace reports to address landfill operations and life expectancy, and obtaining a permit modification that increased the landfill volume by approximately 30 %. Allied Waste Industries Inc., Richland Creek Landfill Gas Collection System, Atlanta, GA. Design Engineer. Project activities include the design and permitting of a 44 -acre closure of the Richland Creek Landfill. Responsibilities for the closure included analysis, design, and details of the closure. Additional responsibilities included preparation of bid documents and specifications for the project and providing designer assistance during construction. Charleston County, Bees Ferry Landfill - Permitting/Design and Construction, SC. Design Engineer. Project activities include performing the necessary calculations to analyze the stability of the Piggyback section of the lined landfill. Charlotte Motor Speedway (CMS) Vertical Expansion, Concord, NC. General Project Manager. Project activities include the coordination of the construction quality assurance (CQA) for the construction of the 22 -acre CMS Phase V, Cell 2B and the 30 -acre CMS Phase V, Cell 21), design of the 205 -acre CMS vertical expansion and construction quality assurance for the construction of the on -site waste -to- energy facility. Gaston County Landfill, NC. General Project Manager. Project activities include design and preparation of technical specifications and engineering drawings for the 16 -acre expansion Cell 2 and the Materials Recovery Facility. In addition, designed and permitted a leachate recirculation system for Cell 1 with gas collection capabilities and provided general engineering services on an as needed basis. Georgetown County Landfill, SC. General Project Manager. Project activities include the design of an unlined landfill passive gas extraction system, permitting, and construction oversight. King County, Cedar Hills Regional Landfill Area 6 Cell Development, WA. Project Engineer. Cedar Hills landfill area 6 design and implementation is a large, complex project with an estimated construction cost of over $20 million. The project has 45 major tasks, and over 200 subtasks. The project complexity and management requirements have been addressed through development and implementation of a comprehensive and detailed project management plan which includes staff assignments, work scopes, methodologies, budgets, schedules, and QA/AC requirements for each task Rowan County Landfill, NC. General Project Manager. Project activities include designing and permitting the Phase H Hydrogeologic Study and Expansion. In addition, performed the hydrologic investigation and preliminary design for a 5 -acre Construction and Demolition Landfill. Sarasota County BOCC, Phase II Design, Permit, Bid Solid Waste Disposal Complex, FL. Sr. Project Engineer. Provide Sarasota County with design, permitting, and bidding services associated with Phase II of the Central County Solid Waste Disposal Complex. Union County Construction and Demolition Landfill, Monroe, NC. Project activities include permitting of the five -year Construction and Demolition landfill phasing and the erosion and sedimentation control plan for Phase 1. In addition, assisted the county in updating its construction operations for the existing C &D landfill and developing an overall site work plan. Williamsburg County, Preliminary Landfill Design, SC. General Project Manager /Design Engineer. Project activities include feasibility studies of the County's solid waste management system. Analysis included development of alternative disposal options. Currently, services are being provided to assist the County in selecting a private partner and developing a contract. Michael D. Plummer - Page 2 IDR City of Greensboro, Waste Stream Characterization Study, NC. Task leader for Waste Stream Characterization Study. The project involved the identification of residential waste stream components amenable to source reduction. City of Greensboro, White Street Sanitary Landfill Design for Phase III Expansion, Greensboro, NC. Project Manager for the landfill engineering since 1994. Work includes permitting, design, and construction management of the 52 -acre Phase III area, including leachate management facilities. The design included a detailed alternate liner demonstration with evaluation of in -situ groundwater flow characteristics within fractured bedrock to support liner demonstration efforts. A combination gas recovery/leachate recirculation network was also included as part of Phase III. Project Manager for closure of the 120 -acre Phase H area, including coordination and permitting to continue with C &D waste above the capped Phase II area, and for evaluation of long -range disposal options including landfill, composting, waste -to- energy, and privatization. Managed landfill audit program for the City, including review of operations and record keeping programs. The White Street Landfill was the first landfill facility in North Carolina to receive a Certificate of Exemplary Performance from the NCDENR Division of Waste Management. Joseph C. Readling, P.E., VP Education Solid Waste Section Manager Bachelor of Science, Civil Engineering, North Carolina State University 1985 Professional Experience Mr. Readling is a Vice President with HDR and Solid Waste Section Manager for HDR Professional Registrations Engineering, Inc. of the Carolinas. He is experienced in solid waste and environmental Professional Engineer, South Carolina, No. 14347, 1991 projects including landfill design; leachate collection system design and treatment; solid Professional Engineer, North Professional Engineer, North Waste transfer station design; facility support areas including truck scales, fueling stations, Carolina, 1990 and administration and maintenance buildings; site evaluations for resource recovery Professional Engineer, projects; wastewater treatment facilities design including primary, secondary, and tertiary Washington, No. 37311, 2000 treatment; wastewater collection and pumping systems; and water distribution systems. Professional Engineer, Virginia, Mr. Readling's responsibilities include project planning and management, design, No. 25326, 1994 preparation of plans and specifications, and construction management. He currently serves Professional Engineer, Florida, as a director on the NC SWANA board, and is the technical committee chairman. No. 66656, 2007 HDR Project Experience Professional Affiliations Wake County, Transfer Station Operations and Hauling RFP and Contract American Public Works Association (APWA), Member Development, Wake County, NC. Project manager for developing the RFP and ste Assoc Solid Waste Association of North associated contract documents related to the County's solicitation for services to operate America A Member their transfer station and haul waste to the County's new lined landfill. City of Greensboro MSW Hauling and Disposal Competitive Procurement, HDR Tenure Greensboro, NC. Project Manager for the transition of the City's MSW from the City 25 Years owned and operated White Street landfill to a business model utilizing private sector contracts for hauling and disposal of MSW. Procurement included development of an Industry Tenure RFP with various options and scenarios for transfer station operations, waste hauling, and 25 Years disposal. City of Greensboro Transfer Station, Greensboro, NC. Project Manager for the 900 ton per day two hopper full grade separation transfer facility. Work included site evaluations, preliminary design, environmental assessment, development of plans and specifications, bidding, and construction oversight. City of Greensboro, Waste Stream Characterization Study, NC. Task leader for Waste Stream Characterization Study. The project involved the identification of residential waste stream components amenable to source reduction. City of Greensboro, White Street Sanitary Landfill Design for Phase III Expansion, Greensboro, NC. Project Manager for the landfill engineering since 1994. Work includes permitting, design, and construction management of the 52 -acre Phase III area, including leachate management facilities. The design included a detailed alternate liner demonstration with evaluation of in -situ groundwater flow characteristics within fractured bedrock to support liner demonstration efforts. A combination gas recovery/leachate recirculation network was also included as part of Phase III. Project Manager for closure of the 120 -acre Phase H area, including coordination and permitting to continue with C &D waste above the capped Phase II area, and for evaluation of long -range disposal options including landfill, composting, waste -to- energy, and privatization. Managed landfill audit program for the City, including review of operations and record keeping programs. The White Street Landfill was the first landfill facility in North Carolina to receive a Certificate of Exemplary Performance from the NCDENR Division of Waste Management. 93 City of Winston- Salem, Hanes Landfill Closure and Expansion, Winston - Salem, NC. Project Principal for the 40 acre closure at the Hanes Landfill. Work included preparation of plans and specifications to close the lined unit that was piggybacked over the original unlined landfill. The project was coupled with the 13 acre Cell 2 base liner expansion. City of Winston - Salem, Hanes Landfill Expansion, Winston - Salem, NC. Project Manager for landfill engineering since 1994.40 -Acre Lined Expansion. Work included design, permitting, and construction monitoring of a 40 -acre unit that was the first piggyback liner design ever built in North Carolina. Evaluations for the overliner included use of settlement plates to analyze actual settlement potential within the waste and use of ground penetrating radar (GPR) to locate waste anomalies that could cause damage to the liner system due to differential settlement. The project includes double containment in critical areas of the liner system, and a leachate management area with provisions for leachate recirculation. This facility was also the first to receive approval from the NCDENR for use of an alternate liner system. City of Winston - Salem, Old Salisbury C &D- Landfill, Winston - Salem, NC. Project Manager /Certifying Engineer. The project included site approval for approximately 25 years of C &D capacity, and ongoing permitting, design, and construction oversight of landfill cells. City of Winston - Salem, Hanes Landfill Expansion, Site Study 2. Work included design and permitting of the 347 -acre expansion site adjacent to the existing landfill. Neighborhood concerns, including line -of- sight, pre- and post - development views, noise attenuation, and screening options were evaluated as a part of the permitting process. Construction monitoring of the first 22 -acre cell is ongoing. Hanes Landfill Unlined Landfill Closure, Winston - Salem, NC. Work included design, permitting, and construction management of a 42 -acre closure. This closure included remediation of slopes as steep as 1:1, and the closure cap was designed to exceed the regulatory minimum standard to reduce the potential for future groundwater impacts. The final grades of the unlined landfill were modified to improve drainage conditions prior to capping, resulting in over $8 million in additional tipping fees prior to closing. Gaston County Landfill Subtitle D Expansion, Gaston County, NC. Project Manager/Design Engineer for the Subtitle D Expansion. The work extended from permitting through construction monitoring. Southeastern Public Service Authority of Virginia (SPSA) Cells V and VI, Inward Gradient Landfill Expansions, Suffolk, VA. Project Principal. This work included the preparation of a Part A and Part B Applications, groundwater withdrawal special exception permitting, construction contract documents, bidding, construction administration and observation, and certification. The SPSA Cell V and VI expansion is 84 acres and approximately 40 feet below existing ground surface. Southeastern Public Service Authority of Virginia (SPSA) Cells I -IV Closure, Suffolk, VA. Project Principal. This work included the preparation of a minor permit modification for a revised final cover system for Cells I -IV at the SPSA Regional Landfill and construction contract documents for first phase of closure (approximately 72 acres). Southeastern Public Service Authority, Suffolk, Virginia. Project Manager /Design Engineer for conceptual design of 500 -tpd transfer station. HDR completed the design of a new 500 -tpd transfer station that has been constructed at the Suffolk Regional Landfill Facility. The facility is a full grade separation, two- hopper system with tunnel scales. The facility area includes a citizen drop -off area, administrative offices, and a new scalehouse. HDR services included, site evaluation, facility planning, permitting, design construction documents, bidding and award, and construction administration. Joseph C. Reodling - Page 2 1 al 94 Southeastern Public Service Authority, Chesapeake, Virginia. Transfer station floor rehabilitation using 10,000 psi micro- silica concrete. Transfer station site modifications including pump station, force main, refueling station and other site work. Greenville County, South Carolina. Senior technical advisor for the Twin Chimneys landfill permitting, design, constuction, and infrastructure development. Charleston County, Bees Ferry Landfill - Permitting/Design and Construction, Charleston, SC. Project Manager for the lined expansion of the County's existing MSW landfill. The site is comprised of over 300 acres, and the work consists of preliminary design and planning, all permitting, and development of construction plans for the lined expansion. The design included airspace optimization by piggybacking the new liner system over old waste. Charleston County, Bees Ferry Landfill - Permitting /Design and Construction, Charleston, SC. Project Manager for modification of the County's MSW permit for the unlined landfill. Work included revised grading to reclaim an area that had received waste, and revision of the phasing and grading plans to better incorporate the proposed lined expansion. US 17 South Landfill (Proposed), Charleston, South Carolina. Project Manager for the proposed US 17 South MSW Landfill located in western Charleston County. This site comprised over 750 acres. The work included preliminary design and planning, hydrogeologic investigations, wetland delineation, and initial solid waste permitting thorugh SCDHEC. The project was deferred in favor of expanding the County's existing landfill. York County Solid Waste Management Plan Update, York County, SC. Project Manager for the County's solid waste management plan update. Work included facilitation of a 14 member citizen's advisory committee, review of emerging waste management technologies, evaluation of landfill needs, establishment of landfill siting criteria, and presentation of findings to County Coucil. Three Rivers Solid Waste Authory, Title V Permit Renewal Application, SC. Project Manager for the Three Rivers SWA in developing a complete Title V permit renewal application for submittal to the SCDHEC BAQ. Williamsburg County Landfill Partnership, Williamsburg County, SC. Project Manager for the County helping evaluate options to develop a lined MSW landfill facility involving Public - Public or Public - Private partnership(s) for permitting, design, financing, construction, and operations. Work is ongoing at this time. Williamsburg County Landfill, SC. Project Manager for various solid waste projects including feasibility studies for expansion of the County's landfill and privatization of the waste stream. Design Engineer for C &D permits. Georgetown County, Sanitary Landfill Expansion, Georgetown, SC. Design Engineer for the 40 -acre lined expansion. The design included base liner system, leachate collection system, and on -site pretreatment of leachate. Horry County, Sanitary Landfill Expansion, Conway, SC. Design Engineer for the 27- acre lined expansion. The design included base liner system, leachate collection system, and on -site pretreatment of leachate. Sarasota County BOCC, On Call Solid Waste Services, FL. Project Principal and Senior Technical Advisor for a variety of projects including the 55 acre Phase II expansion permitting and design, borrow studies, airspace analyses, landfill gas to energy feasibility studies, Phase I partial closure permitting and design, and sustainability studies related to development of an eco park on and adjacent to landfill property. Joseph C. Readling - Page 3 i al 95 Robert J. Rella, P.E. Waste Facilities Dir East Region Education Professional Experience Master of Science, Civil Engineering (Geotechnical /Civil Engineering), Mr. Rella, Regional Director of HDR's Solid Waste and Facilities Design Programs, is n Manhattan College, 1987 experienced in all aspects of planning, desi and construction of power p p p g� gn> P Bachelor Science, Civil generating, commercial, industrial, and public facilities. His experience includes project Engineering, Manhattan College, management; project feasibility studies; Engineer -of- Record evaluations; project financing; 1979 site evaluations and testing; engineering analysis and design; contract negotiations; proposal evaluations; value engineering; and quality control. Professional Registrations Professional Engineer - Civil and HDR Project Experience Environmental, South Carolina, No. 18139 Issued: 04/11/1997 City of Greensboro, Greensboro Transfer Station, Greensboro, NC. Project Director. Professional Engineer - Sanitary, Assigned to the City to assist HDR's Project Manager in the development and Florida, No. PE65455 Issued: implementation of the City's overall solid waste management plan. This effort includes 12/04/2006 planning, permitting, design, construction monitoring, financial analysis, and feasibility Professional Engineer, Georgia, evaluations associated with solid waste collection and disposal. No. PE0302381ssued: 03 /31/2005 Professional Engineer, Indiana, City of Winston - Salem, North Carolina. Project Principal. Overseeing all project services No. PE10707595 Issued: 03/05/2007 associated with the implementation of expansion of the City's solid waste disposal facilities. Professional Engineer - Civil and HDR's efforts include planning, permitting, design, construction monitoring, financial Sanitary, Maryland, No. 21677 analysis, and feasibility evaluations. Issued: 01/1711996 Confidential Client, Georgia. Lead Design Engineer. A 6000 ton - per -day rail haul transfer Professional Engineer - Structural, New Jersey, No. GE -37329 Issued: facility. This effort includes the planning, permitting, conceptual design and detail design 01/17/1992 associated with the main processing facility and all ancillary site structures. Responsibilities Professional Engineer -Civil and included coordinating all interdisciplinary activities, permitting, client interface, and overall Structural, New York, No. 066835 management for the production of technical specifications and construction drawings. Issued: 03/09/1990 Charleston County, Five Year Contract, Solid Waste Projects, SC. Principal. Five year Professional Engineer - Civil, North contract to provide permitting, engineering design and construction administration for solid Carolina, No. 22474 Issued: 01/15/1997 waste projects for the Charleston County Solid Waste Department. Work includes 52 -acre Professional Engineer - Civil and unlined closure, 16 acre lined MSW Expansion, landfill infrastructure, Operational support, Land Surveying, Pennsylvania, No. and C & D landfill support. 04225OR Issued: 12/31/1991 Duke Energy, North Carolina. Client Manager. Providing a variety of consulting services and technology support associated with several electric power generating facilities. Tasks Professional Affiliations include the technical evaluation of specific control technologies, and the development of National Society of Professional Engineers (NSPE), Member disposal options for air pollution control scrubber by- product for several coal -fired steam Solid Waste Association of North stations in the Carolinas. The disposal study included analysis for quantity generation, re- America (SWANA), Member use, site availability, and facility configuration and geometry. Dutchess County Resource Recovery Agency, Dutchess County - HDR Tenure Engineering/Technical Support Services, NY. Project Manager. Modifications to the 20Years resource recovery facility (RRF), bottom ash and flyash system modifications, expansion of existing administration building, development and evaluation of materials recovery facility Industry Tenure 30 Years (MRF), design and construction monitoring of MRF building repairs and equipment installation, monitoring RRF facility performance, and miscellaneous tasks to support the Agency's facilities and operation. 97 Gainesville Regional Utilities, Waste -to- Energy Consulting Services, FL. Consultation Services for Renewable and Waste to Energy Options. Gaston County, General Engineering Services, Gastonia, NC. Project Principal. All services provided relating to implementation, expansion, closure, and construction of the County's solid waste disposal facilities. DeKalb Co. Transfer Station, Demolition & Rough Grading Approval Assistance, GA. Sr. Civil Engineer. DeKalb County Transfer Station Demolition & Rough Grading and Regulatory Approvals, Preliminary and Final Design/Bid. Lee County, Lee County Resource Recovery Facility Unit 3 Expansion, FL. HDR was selected by the County as their Consulting Engineer to 1) develop a financial feasibility study for the proposed facility expansion, and 2) design and provide construction administration of the expansion. Unit 3 (the third combustion train) will handle an additional 636 tpd of waste and generate an additional 19 megawatts of electricity. The Unit went on line Fall of 2007. HDR is also providing monitoring and annual reporting of the WTE facility. Orange County Govt., North West Transfer Station, FL. Engineering services for the design, permitting and construction of a new solid waste transfer station and ancillary facilities in the northwest portion of the County. Southeastern Public Service Authority, SPSA General Services, Suffolk, VA. Project Principal. Landfill development and operations, steam plant modifications and operations, and RDF facility modifications and operations. Projects include landfill expansion and development, transfer station upgrade and maintenance, combustion facility maintenance and retrofit, and new facility design and construction. Sumter County, Landfill Closure. Project Manager. HDR was selected to provide Sumter County with consulting services related to closure of their existing landfill. Town of Mount Pleasant, Solid Waste Collection Study, Mt. Pleasant, Mount Pleasant, SC. Project Manager. HDR will evaluate the impacts associated with the direct haul of all waste to the Bee's Ferry Landfill should the resource recovery facility close. USACE - Savannah (Ft. Bragg), Ft. Bragg Bldg No. 2 -1138 HVAC Upgrade, Fort Bragg (U.S. Army), NC. Contract Manager. Replace HVAC System, Bdg 2 -1138 (Ft. Bragg) USACE - Savannah (Ft. Bragg), Renovate ARHOC Barracks Bldg M4540, Ft. Bragg, Fort Bragg (U.S. Army), NC. Contract Manager. HDR will provide professional services to develop construction documents (drawings and specifications) to renovate and repair Barracks Bldg M -4540. USACE - Wilmington District, WilmCOE- Millingport School Sewer, NC. Project Manager. This Task under an On -Call Contract is to prepare Plans and Specifications for Millingport Elementary School Wastewater Collection System in Stanly County, NC. Robert J. Rella - Page 2 fal Ed L. Shuffler Sr. Technical Advisor Education Professional Experience Bachelor of Science, Civil Mr. Shuffler has 30 years of experience dedicated to the development and implementation of Engineering (Engineering), University of North Carolina, 1977 local and regional solid waste management projects, specializing in the areas of siring, development, design and permitting of sanitary landfills. Many of these projects have Professional Registrations included the development of lined landfills to meet proposed Subtitle D requirements. His Professional Engineer, North design experience includes the preparation of technical reports, permit applications, Carolina, No. 011041 Issued: engineering drawings, specifications, contract documents and construction cost estimates. 01/01/1983, Expires: 12/31/2010 He has also conducted studies on collection, waste quantities and composition, energy and Professional Engineer, Virginia, materials markets, and the feasibility of energy and resource recovery from solid waste. Mr. No. 034702 Issued: 02/28/2000, Shuffler is also experienced in the site selection, planning, and design of landfills and Expires: 02/28/2010 transfer stations. Professional Affiliations Solid Waste Association of North HDR Project Experience America (SWANA), Member Albemarle County, Charlottesville, VA. Project engineer for design and preparation of plans and specifications for synthetic liner for five -acre cell and one -acre leachate basin. HDR Tenure 21 Years Allied Waste Industries Inc., BFI -Allied Brunswick Landfill, Lawrenceville, VA. Sr. Project Engineer. Preparation of a borrow plan to direct owner on use of on -site soil for daily Industry Tenure landfill operations. 32 Years Allied Waste Industries Inc., On -Call, Landfill Permitting, Design, and Construction Services, VA. Sr. Project Engineer. Landfill permitting, design, and construction services on an as needed basis. Boone, NC. Project manager responsible for evaluation of existing landfill to determine site life, operational and environmental concerns, and preparation of comprehensive operational plan submitted to state. Charlotte, NC. Project manager for development of landfill gas migration control plan; project manager responsible for data collection and design of sanitary landfill, including preparation of state application for permit. Development of solid waste disposal implementation plan, including evaluation and selection of candidate sanitary landfill sites, economic analysis of resource recovery alternatives, and review of possible source separation programs. City of Concord, NC, Solid Waste Program Evaluation, NC. Project Manager. Study and evaluate the City of Concords municipal solid waste management program including curbside collection of residential solid waste and recyclables as well as the public education program. City of Greensboro, NC. Project manager for design of major vertical expansion over existing landfill. Also designed vertical expansions to existing landfills for town of Chapel Hill, NC; Hall County, GA; and Northampton County, VA. The Northampton County project was unique in that it included installation of liner and leachate collection system over previously landfilled area prior to expanding vertically. City of Greensboro, General Engineering Services, NC. Sr. Project Engineer. Providing engineering services for various requests by the client. .. vim City of Greensboro, Landfill Gas Services, 2008 - 2013, NC. Sr. Project Engineer. To provide landfill gas services support to the City of Greensboro's White Street Landfill. This support includes preparing Title V reports, landfill gas designs, training of personnel, maintenance of equipment and miscellaneous on call services. City of Greensboro, Phase III ,Cell 3, Landfill Gas System Expansion, NC. Sr. Project Engineer. City of Greensboro, White Street, Phase 3, Partial Landfill Closure, NC. Sr. Project Engineer. Providing engineering services for permitting and preparation of Phase 3 closure bidding documents. City of Greensboro, White Street, Phase H, Closure Design Documents, NC. Sr. Project Engineer. City of Winston - Salem, Hanes Phase 2 Construction Permit Application, NC. Sr. Project Engineer. HDR will perform a design hydrogeologic investigation to complete the design and submittal of a construction permit application for the Hanes Landfill Expansion Phase 11. City of Winston- Salem, OSR Phase 6 Bid/Award, NC. Sr. Project Engineer. HDR produced bidding documents and plans for the construction of the Old Salisbury Road C &D Phase 6 Basegrade. City of Winston - Salem, Solid Waste General Services, NC. Sr. Project Engineer. HDR was retained to provide Solid Waste General Services for Winston - Salem. Fairbanks North Star Borough, South Cushman Landfill Feasibility Study. AK. Sr. Project Engineer. Greenville County, Cell 3, Twin Chimneys Landfill, SC. MSW Cell 3 development. Engineering plans and specifications for contractor bids. Horry County, SC. Principal design engineer for expansion of sanitary landfill. Development of design includes wetlands mitigation, preparation of site hydrogeologic characterization report, and synthetic liner and leachate collection system. King County, WA, Cedar Hills Regional Landfill Refuse Area 7 Development, Maple Valley, WA. Sr. Project Engineer. HDR assisted King County with design plans for the construction of Cedar Hills Regional Landfill Refuse Area 7, an 18.3 acre landfill in SE King County. HDR is provided an engineering report, a cost estimation plan, and a specific implementation schedule. This project went out for bid in Fall of 2008, at which time, HDR will provided bidding assistance. Landfill Evaluations, Various Locations. Completed numerous landfill evaluations and closure plans. Served as project engineer for evaluation of existing landfill and review of proposed contract to evaluate feasibility of six-county regional landfill Loudoun County, VA. Project engineer for design and preparation of plans and specifications for 25 -acre landfill expansion, including synthetic liner and leachate collection system. Mecklenburg County Solid Waste, US 521 Landfill, NC. Sr. Project Engineer. HDR is providing solid waste services which include preparation and submittal of all documentation to provide strategic and tactical expertise for the design, operations, regulatory compliance, and management of the US 521 Landfill for a five year period. Mecklenburg County, NC. Project manager for solid waste management implementation activities, including preparation of request for proposals, contract development, facility siting, preliminary design and construction management of 235 -tpd waste -to- energy facility. Ed L. Shuffler - Page 2 i i l 100 Responsible for preparation of feasibility study, which included facility siting and preliminary design of transfer and recycling station. Responsible for feasibility study, including analyses of waste quantities and composition, energy markets, technical alternatives, assessment of financial issues and life cycle cost analysis for 100 -tpd to 200 -tpd waste -to- energy facility. Project manager for planning, permitting and preliminary design for 320 -acre lined landfill. Moore County, C &D Landfill Permit Modifications /Landfill Planning, NC. Sr. Project Engineer. Prepare permit modification to expand the Moore County C &D Landfill and assist the County with planning for future C &D disposal needs. Moore County, Solid Waste Management Plan 2009 Update, NC. Project Manager. Prepared 2009 update to the Moore County Solid Waste Management Plan as required by North Carolina Department of Environment and Natural Resources (NCDENR). Moore County, Solid Waste Management Plan Update, NC. Sr. Project Manager. Solid Waste Management Plan Update for Moore County. Multiple Sanitary Landfills, Various Locations. Responsible for numerous sanitary landfill siting studies which included identification of potential sites, evaluation of site characteristics, conceptual design and public hearings. Principal design engineer for siting of ash residue and bypass waste landfill for Metropolitan Knox Solid Waste Authority's proposed 900 -tpd resource recovery facility in Knoxville, TN. Also been involved with landfill siting projects for Horry County, SC; joint siting study for Mitchell and Yancey counties, NC; city of Charlotte, Mecklenburg County and Union County, NC; Spokane, WA; and private client in Columbia, SC. Olver Incorporated, Olver, Assist Gaston County Expansion, NC. Sr. Project Engineer. Providing design and engineering services to Olver, Inc. for permitting and constructing Gaston County, Unit 2, landfill expansion. Olver Incorporated, Wake County, South Wake Landfill, NC. Sr. Project Engineer. Landfill permitting, design, and construction services for Wake County's South Wake Landfill. Roanoke Valley Resource Authority, Engineering Services, Roanoke, VA. Sr. Project Engineer. HDR will provide consulting engineering services to review and report on RVRA staff prepared adequacy report for the Replacement Reserves, Closure, and Post - Closure Requirements under the Master Indenture of Trust for the RVRA's Outstanding Revenue Bonds. Siting/Feasibility Studies, Various Locations. Responsible for siting and feasibility analysis and preparation of technical reports, engineering plans and construction documents for numerous solid waste transfer stations ranging in size from 50 -tpd to 1,300 -tpd. Projects include Mecklenburg County, Charlotte, Winston -Salem and Union County, NC; Horry County, SC; and Southeastern Public Service Authority, Chesapeake, VA. Wake County, Landfill, Permitting, Design, and Construction Services, NC. Sr. Project Engineer. Provide consulting, technical support, and construction oversight regarding the closure of the North Wake Landfill. Project includes landfill permitting, design, and construction services. Western Piedmont and Centralina Council of Governments, NC. Project manager responsible for identification and economic analysis of resource recovery alternatives for 12- county area. Ed L. Shuffler - Page 3 l DR 101 Allison S. Trulock Senior Project Manager Education Professional Experience B.S. Political Science and Ms. Trulock is a Senior Project Manager with more than 12 years of experience in the solid Economics, Florida State University, 1996 waste industry. Ms. Trulock specializes in solid waste and recyclables collection options evaluations and efficiency studies, procurement assistance, and ordinance review and HDR Tenure development. Ms. Trulock's collection options evaluation experience includes evaluating 1 Year the potential for legal challenge, financial analyses, impact on rate payers and level of service, and administrative complexity of implementing changes to collection systems. Her Industry Tenure collection efficiency experience includes route observations and balancing, benchmarking, 13 Years cost analysis and public /stakeholder outreach. Her procurement experience includes assisting communities in drafting procurement documents, developing selection criteria, benchmarking, evaluating proposals and developing presentations. Ms. Trulock is a member of HDRs internal EECBG and Green Project Stimulus Funding Task Force, with an emphasis on renewable energy. The HDR Task Force has been tracking Energy Efficiency and Conservation Block Grant ( EECBG) initiatives since they were signed into law in 2007. The HDR Task Force continues to closely monitor federal actions relating to EECBG as well as the State Energy Program, including funding amounts, approaches for distribution, and requirements for applicants. Ms. Trulock is also a member of HDRs internal Sustainable Policy & Funding Research Team, which tracks grant, loan and other funding opportunities from the Stimulus Package as well as the Omnibus Spending Bill, related to energy efficiency and conservation as well as renewable energy. This HDR Task Force also tracks legislative initiatives and changes impacting our clients. Ms. Trulock has assisted clients with grant application packages, identifying alternative funding sources, and has assisted in the facilitation of workshops to develop effective objectives and strategies for grant pursuits. Ms. Trulock has developed, reviewed and revised comprehensive solid waste and zoning ordinances for numerous communities including, Sarasota County, FL; Bloomsburg, PA; Lakeland, FL; Escambia County, FL; Orlando, FL; Lamar County, GA; Dalton - Whitfield SWA; and Boca Raton, FL. She is particularly skilled in making revision recommendations to address policy and program changes. In addition, Ms. Trulock is experienced with managing national and regional data collection projects and related database design activities. HDR Project Experience Solid Waste Management Program Evaluation, City of Concord, NC. Project Manager. Ms. Trulock is currently serving as Project Manager for this on -going collection efficiency study. The scope of this project encompasses the development of a baseline for the current operations of the system, including current average set -out rates; length of each route; amount of time spent on the route by each vehicle; turn- around time for disposal; vehicle downtime; on -route productivity; and current staffing levels /configuration. These metrics, along with other system components, will be benchmarked with similar communities. Potential system alternatives will be indentified, and then evaluated. The evaluation of potential modifications will include annual O &M and estimated capital costs, as appropriate; estimated payback period; potential for legal challenges; ability to meet City financial obligations; impact on rate payers; impact on level of service; and administrative complexity 103 (including potential changes to appropriate ordinances). EECS Development, Volusia County, FL. EECBG Alternative Funding Sources Lead. Ms. Trulock served as EECBG application and alternative funding sources lead on this project. The purpose of this project was to assist Volusia County as it relates to positioning for federal funding. HDR facilitated an informal strategic planning and visioning session aimed at enhancing Volusia Countys competitive position for current and future federal funding. Specific services included coordinating a workshop with County staff, developing an agenda, moderating the workshop, and preparing a white paper for County staff to use after the workshop in the development of the EECS. Greenhouse Gas Management and Monitoring Plan, Charlotte County, FL. Project Manager. Ms. Trulock is currently serving as Project Manager for the development of a Greenhouse Gas (GHG) Management and Monitoring Plan for Charlotte Countys Zemel Road Landfill. On September 22, 2009, the Environmental Protection Agency (EPA) issued a final rule for mandatory reporting of Greenhouse Gas (GHG) from large GHG emissions sources in the United States. Under EPAs Mandatory GHG Reporting Rule (Reporting Rule), owners or operators of municipal solid waste (MSW) landfills that accepted waste on or after January 1, 1980 and generate methane (CH4) in amounts equal to 25,000 metric tons of carbon dioxide equivalent (CO2e) or more per year must report GHG emissions from MSW landfills. The Plan will address requirements laid out in the Reporting Rule, and will include templates for data collection as well as calibration schedules for equipment. Miami -Dade County Solid Waste Master Plan, Miami -Dade County, FL. Assistant Task Leader. Ms. Trulock is currently serving as an Assistant Task Leader. In mid -2009 HDR was retained by Miami -Dade County to prepare a long -term Solid Waste Master Plan for the Department of Solid Waste Management (DSWM). Phase I consists of evaluating DSWMs facilities & identifying future needs; performing a Waste Composition Study; determining solid waste generation rates & making projections; defining regulatory & policy issues; evaluating the DSWMs financial program & identifying issues; identifying preliminary alternatives; and performing a fatal flaw analysis. Another task is the establishment and conduct of a citizen Solid Waste Advisory Committee and facilitation of a public input and advisory process. Tasks for Phase II will depend on the results of Phase I, but will consist of a detailed analysis of alternatives identified, implementation strategies and cost projections. Ms. Trulock is currently assisting with the Task to evaluate current and future solid waste management needs. In this role, she is responsible for assessing the Countys Solid Waste Management Collection System and Recycling and Diversion Program, evaluating capacity, identifying deficiencies, and potential options for further evaluation. She is also responsible for assisting in the development of needs projections. PET Sheet Production Study, National Association for PET Container Resources. Project Manager. Ms. Trulock is currently serving as Project Manager for this study on behalf of NAPCOR and the NAPCOR Thermoformers Council. The purpose of the study is to conduct a survey with respect to the production of PET thermoformed packaging, and the amount of recycled content incorporated in that packaging, in the United States and Canada. This information will be used to provide a baseline by which a recycling rate for this packaging can be calculated in the future. Plastic Bottle Recycling Rate Study, Association of Post - consumer Plastic Recyclers. Project Manager. This annual project quantifies the amount of post - consumer PET plastic bottles recycled each year. Ms. Trulock has served as project manager for this project for the last several years. Her responsibilities include designing and updating the database, organizing and performing the mail -out, tracking surveys returned by mail, organizing follow -up, reviewing completed surveys, organizing data entry, performing quality control and logic checks, and developing a summary report of findings. Rapid City, SD Solid Waste Management Plan, Rapid City, SD. Assistant Project Allison S. Trulock - Page 2 IDR 104 Manager. Ms. Trulock assisted in developing a Solid Waste Management Plan document based on multiple technical memos prepared throughout multiple phases of this project. HDR was retained by Rapid City to update the Citys Solid Waste Master Plan. The tasks of the project included summarizing current and projected system needs in terms of capacity and define the operational issues and program changes to be addressed in the next 20 years; to assess current operational practices and future requirements; to evaluate site use alternatives; and to evaluate technologies and waste management activities for possible inclusion in the Solid Waste Management Plan; to work with the City to prepare a system definition based on the evaluation of technical and economic factors, decisions, features; define the need for additional land, future development requirements, and the organization of those features into a functionally efficient strategy; and to provide a short-and long -term plan for solid waste management, incorporating the City and public inputs and including an implementation plans for the key elements. Solid Waste System Evaluation, City of Hialeah, FL. Project Manager. Ms. Trulock is serving as Project Manager for this ongoing collection efficiency study. Ms. Trulocks primary responsibilities encompass the operational and customer outreach aspects of the collection system evaluation. The operational and customer outreach aspects of the project include: modeling the current collection system, performing an operational benchmarking, obtaining customer feedback through customer surveys, identifying potential alternatives to the collection system, modeling alternatives, evaluating impacts of alternatives, and obtaining stakeholder feedback regarding alternatives. The financial aspects of the project include: performing a financial benchmarking, preparing a revenue sufficiency analysis, developing an allocated cost -of- service study, developing rate design alternatives, developing projected customer statistics, developing projected solid waste system expenses, developing projected revenues, and integration of the five -year capital improvement plan. Non -HDR Project Experience Solid Waste Collection Procurement, Town of Davie, FL. Procurement Assistance. Ms. Trulock assisted in evaluating the Towns existing residential and commercial solid waste collection system and conducting a solid waste, recyclables and yard waste collection procurement. Ms. Trulock assisted in evaluating potential system changes, including converting to automated or semi- automated collection for single - family residential households and converting to a pay -as- you -throw bag system. Once all options were analyzed, Ms. Trulock assisted the Town in developing the procurement documents and draft agreement. Solid Waste Commercial and Residential Collection Procurement Assistance, Miramar, FL. Procurement Assistance. The City of Miramar had not re -bid its solid waste collection contract in nearly 20 years. Ms. Trulock assisted the City in preparing a presentation to the City Commission that evaluated the prior experience of the vendors that had submitted proposals. She also consulted with the City on mechanisms to make up for revenue shortfalls resulting from a decline in the monthly charge that the Citys franchise fees were based upon. Ms. Trulock assisted the City in negotiating a contract with the selected vendor, and she developed the actual terms and conditions of the contract document. Miramars collection contract was particularly complex as a result of the Citys inter -local agreement with Broward County. Collection Procurement, Sarasota County, FL. Pre - Procurement Assistance. Ms. Trulock provided pre - procurement assistance which included conducting a rate study of similar collection contracts, evaluating various procurement approaches and developing a schedule and timeline for integrating all the various implementation activities. She also assisted in drafting essential sections of the procurement documents including the scope of services and evaluation criteria and assisted the County in drafting a new contract. Allison S. Trulock - Page 3 lal 105 Polystyrene Recycling Rate Study, Alliance of Foam Packaging Recyclers. Project Manager. This project quantified the amount of polystyrene recycled each year. Ms. Trulock served as Project Manager for this project for three years. Her responsibilities included: designing and updating the database; organizing and performing a survey mail out; tracking surveys returned by mail; organizing a telephone follow -up for those companies that didnt respond to the mail -out; reviewing completed surveys; organizing data entry; performing logic checks and quality control queries on the entered data; and developing a summary report of the findings. Recycling Rate Study, American Chemistry Council Plastics Division. Project Manager. This annual project quantifies the amount of post- consumer plastic bottles recycled each year. Ms. Trulock has served as project manager for this project for the last several years. Her responsibilities included the following: designing and updating the database; organizing and performing a survey mail out; tracking surveys returned by mail; organizing a telephone follow -up for those companies that didnt respond to the mail -out; reviewing completed surveys; organizing data entry; performing logic checks and quality control queries on the entered data; and developing a summary report of the findings. Recycling Rate Study, Association of Post - consumer Plastic Recyclers. Project Manager. This annual project quantifies the amount of post - consumer PET plastic bottles recycled each year. Ms. Trulock has served as project manager for this project for the last several years. Her responsibilities included designing and updating the database, organizing and performing the mail -out, tracking surveys returned by mail. Organizing follow up phone calls, reviewing completed surveys, organizing data entry, performing quality control and logic checks, and developing summary report of findings. Recycled PET End -user Study, National Association for Plastic Container Recovery. Project Manager. Ms. Trulock conducted this annual study to quantify the amount of post - consumer recycled PET resin utilized by end - product manufacturers. The key components of the project include: designing a custom database; conducting a survey of approximately 100 companies; compiling survey results into the database and checking data for reasonableness; and developing a project report to discuss the findings of the study. Recycling Markets Database Update, Alliance for the Polyurethanes Industry. Project Manager. As Project Manager for this national database update and expansion, Ms. Trulock was responsible for locating companies eligible for the API database, designing the database, entering the data into the database and organizing and performing a survey mail -out to all companies included in the database. Ms. Trulock coordinated a telephone follow -up to those companies that did not respond to the mail out. After the company information was collected and entered into the database, she performed logic checks and quality control queries on the database to ensure accurate information was collected. Ms. Trulock then wrote a letter report summarizing the data and prepared the data for inclusion on the web site. Waste Transfer, Transportation and Disposal Procurement Services, Citrus County, FL. Procurement Assistance. As part of the larger design/build project for a transfer station, Ms. Trulock assisted the County in the task of developing a draft long -haul and disposal contract to be included in the procurement documents. In order to assure the County has the most preferred terms for the long -haul and disposal contract, Ms. Trulock interviewed other communities in Florida that have recently been through the process of designing and building a transfer station, procuring an operator for the facility and/or procuring final disposal services in order to ascertain which elements of the process the communities felt went well and what they would change. Allison S. Trulock - Page 4 fal Education Bachelor of Science, Geological & Related Sciences (Geology), Virginia Polytechnic Inst St U, 1997 Professional Registrations Registered Professional Geologist, North Carolina, No. 1939 Issued: 12115/2003, Expires: 06/30 /2010 Registered Professional Geologist, Virginia, No. 2801001522 Issued: 05/08/2003, Expires: 08131/2011 Waste Mgmt Facility Operators License: Class I- Transfer Station; Class II- Sanitary Landfil, Virginia, No. 4605002109 Issued: 12/06/2000, Expires: 12/3112010 (will not renew) Aaron J. White Geologist Professional Experience Mr. White is an experienced geologist in both environmental and geotechnical investigations. His areas of concentration are Phases I and 11 site assessments, mineral surveys, underground storage tank analyses, groundwater exploration, groundwater monitoring and modeling, environmental remediation, and geotechnical investigations. He is specialized in the operation, monitoring, and permitting of Municipal Solid Waste Landfills and is currently certified by the State of Virginia as a Class I and Il Facility Operator. In addition, Mr. White has project management experience on projects ranging from small, fast - paced projects to large, multi- disciplined residential, commercial, and municipal projects. His software application experience includes GINT, FLOWNET, SpillCAD, AQTESOLV, QuickFlow, Solute, DUMPStat, CARStat, LandGEM, Visual MODFLOW, and other various Environmental Protection Agency (EPA) and Virginia Department of Environmental Quality (VDEQ) programs. HDR Project Experience Facility Operator, Virginia, No. 4605 City of Winston - Salem, Old Salisbury Road (OSR) Groundwater Monitoring, Winston - 002109 Issued: 1210612000, Expires: 1213112010 Salem, NC. QA/QC Technical Reviewer. HDR was retained by the City of Winston Salem to performing groundwater and compliance monitoring at Old Salisbury Road Landfill. Professional Affiliations City of Winston - Salem, Assessment of Corrective Measures, Winston - Salem, NC. National Ground Water Association, QA/QC Technical Reviewer and Advisor. HDR was retained to develop and implement a Member, 1998 - Present corrective action plan related to groundwater contamination at the site. Work included Solid Waste Association of North evaluation of more than 10 remediation measures and selection and implementation of America (S Old Dominion, Member, 2004 -Pre sent proposed remedy including introduction of Hydrogen Release Com p ounds ( HRC ) to accelerate degradation of the contaminants. HDR Tenure City of Winston - Salem, Ground Water Monitoring, Old Salisbury Rd. Landfill, 6 Years . Winston - Salem, NC. QA/QA Technical Reviewer. Groundwater monitoring at Old Salisbury Road construction and demolition landfill. Industry Tenure 12 Years City of Winston - Salem, Groundwater Monitoring, Hanes Landfill, Winston - Salem, NC. QA/QC Technical Reviewer. Performed groundwater and compliance monitoring at Hanes Mill Rd. Sanitary Landfill. Private well baseline sampling for area surrounding the Hanes Mill Rd. Sanitary Landfill City Charleston County, Bees Ferry Landfill - Permitting /Design and Construction, SC. Staff Geologist. Performing environmental monitoring and investigations associated with permitting, design, and construction of the Bees Ferry Landfill Expansion. SPSA Regional Solid Waste Facility, Suffolk, Virginia. Task Manager & CQA Representative. This project involved a sanitary solid waste facility for the local service authority. Mr. White was in charge of the following tasks: Hydrological and geological investigation for Part A permitting of Cell VI & VII; Groundwater monitoring well and gas probe installation and drilling oversight; Groundwater Withdrawal Special Exception Application for Cell VI and VII (dewatering for inward gradient waste cell); Compliance Monitoring of Cell V dewatering operation; CQA of Cells I- IV Closure; and CQA of Cell VI Phase 2 Construction 107 Moore County, Groundwater and Landfill Gas Issues Assistance, NC. Geologist. Assist County with Ground Water and landfill gas issues at the existing Landfill. Moore County, Groundwater Wells and Monitoring, Moore Co., NC, NC. Geologist. QC Reviewer. HDR Coordinated the installation of two new monitor wells to replace MW- 12 and MW -12D. This included the preparation and submittal of a work plan for NCDENR's approval and methane monitoring on a quarterly basis. Allied Waste Industries Inc., BFI - Allied King & Queen Landfill, VA. Project Geologist. Prepared Construction Documents for Cell 3, a 21.7 acre MSW Landfill Cell. Performed soil test pits in search of clay liner material for the next cell construction King & Queen Landfill. Prepared Permit Modifications for alternate liner system and revised final grades. Allied Waste Industries Inc., BFI - Allied, Richmond Landfill, Termination of Post - closure Activity Report, Richmond, VA. Geologist. Work included performing a site evaluation and regulatory review, construction documents, and a Termination of Post - Closure Activity Report. Caldwell County, Yadkin River Reservoir Environmental Assessment, NC. Geologist. QC for ESA Reporting. Project consists of continuing efforts to obtain FONSI and move to design of an off - channel reservoir and water treatment plant. HDR to complete environmental work including Environmental Assessment, habitat analysis, and stream reclassifications. Charleston County, Bees Ferry Landfill - Permitting /Design and Construction, SC. Geologist. Work associated with permitting, design, and construction of the Bees Ferry Landfill Expansion. Greenville County, Twin Chimneys Landfill, Greenville, SC. Geologist. QC Reviewer. HDR was retained to provide engineering services for a greenfield landfill site. Project included; grading P &S, convenience center, maintenance bldg, scalehouse /admire building. Southeastern Parkway and Greenbelt, Cities of Chesapeake and Virginia Beach, Virginia. Staff Scientist. The project entailed delineating and assessing wetlands, identifying land use, and preparing a natural resources report for a proposed approximately 20 mile long roadway. Southeastern Public Service Authority, Landfill Groundwater and Gas Compliance Monitoring and Consulting Services, VA. Project Manager. Provide Groundwater and Gas Environmental Consulting and Monitoring/Sampling of 1)Suffolk Regional Landfill 2) Franklin Landfill 3)Isle of Wight Landfill 4) Hosier Road Landfill. Southeastern Public Service Authority, SPSA 2008 -2009 Environmental Consulting, VA. Project Manager. Provided Groundwater and Gas Environmental Consulting and Monitoring/Sampling of 1)Suffolk Regional Landfill 2) Franklin Landfill 3)Isle of Wight Landfill 4) Hosier Road Landfill. Williamsburg County, Groundwater /LF Gas Sampling, SC. Geologist. QC Reviewer. Groundwater/LF Gas Sampling for Williamsburg County landfill. Williamsburg County, Landfill Engineering Services, Williamsburg Co. LF, SC. Geologist. QC Reviewer. Landfill engineering services for Williamsburg County Landfill. Project activities include feasibility studies of the County's solid waste management system. Analysis included development of alternative disposal options. Currently, services are being provided to assist the County in selecting a private partner and developing a contract. Aaron J. White - Page 2 fill Eric A. Wright, P. E. Education Professional Associate Bachelor of Science, Agricultural Recognizing that professionalism, superior technical development and individual Engineering, Comell University, accomplishments are essential to its success, HDR grants this title to extraordinary 1985 professional staff who, through their creative efforts and dedicated commitment to personal excellence, have obtained exceptional levels of technical and professional Professional Registrations achievement. Professional Engineer, South Carolina, No. 18072, 1997 Professional Engineer, North Professional Experience Carolina, No. 019027, 1993 Mr. Wright is a Project Manager with experience in municipal solid waste landfill design, construction and demolition landfill design, construction quality assurance and quality Professional Affiliations control. His responsibilities include project design; preparation of plans and American Society of Agricultural Engineers (ASAE), Member, specifications; permit applications for submittal to state agencies; and construction 1989 - Present management. Landfill engineering work has been performed for clients in North Carolina American Society of Civil and South Carolina. He provides design assistance for other HDR offices with clients in Engineers (ASCE), Member, Florida and Washington. He has had primary design responsibility for over 10 landfills, 1989- Present and has provided construction quality control reviews of more than six landfills. He was American Public Works active on the NC SWANA chapter's technical committee, where he reviewed draft rules Association (APWA), Member, for construction and demolition landfills prepared by North Carolina regulators. He 1995- Present regularly analyzes leachate and groundwater data for several landfills to assist with Solid Waste Association of North operational, compliance and future production issues. This analysis has successfully America (SWANA), Member, 1995 - Present identified impending pump failures so that repairs could be made prior to failure. This analysis has also been used to predict leachate generation potential of proposed landfills Solid Waste Association of North America (SWANA), North based on current methods of operation. Carolina, Technical Committee Member, 1998- Present HDR Project Experience HDR Tenure Twin Chimneys Landfill, Greenville County, South Carolina. Project Manager and 16 Years Engineer responsible for identifying and analyzing potential landfill sites. This is a long term project with multiple contracts. The 1,145 -acre site selected is projected to provide Industry Tenure disposal capacity for about 50 years. Public participation was an important part of the 21 Years successful siting process. Eric directed preparation of hydrogeologic study, site application, design of site support facilities, and preparation of the permit application. The initial permit application included engineering for seven MSW units totaling 389 lined acres. The site was permitted by SC DHEC. The permit has since been modified to replace a MSW unit with a C &D unit. He oversaw the construction of site infrastructure, including three buildings designed under his direction. Since initial landfill permitting, Eric has prepared bid documents and managed construction of the first two cells, and construction of Cells 3 and 4 is pending at this time. Moore County, North Carolina, Landfill Closure. Designed closure plan for 14 -acre MSW unit, oversight of construction, and certified closure. Design of maintenance facility site. Oversaw waterline installation. Design of a 22 -acre C &D landfill unit. Helped County negotiate a C &D landfill permit by addressing potential site contamination issues. Helped County develop a groundwater investigation to provide a preliminary evaluation of the old unlined MSW units at the site. King County, Cedar Hills Regional Landfill Area 6 Cell Development, WA. Project Engineer. Cedar Hills Landfill Area 6 design and implementation is a large, complex project with an estimated construction cost of over $20 million. The project has 45 major 109 tasks, and over 200 subtasks. The project complexity and management requirements have been addressed through development and implementation of a comprehensive and detailed project management plan which includes staff assignments, work scopes, methodologies, budgets, schedules, and QA/AC requirements for each task. King County, WA, Cedar Hills Regional Landfill Refuse Area 7 Development, Maple Valley, WA. Project Engineer. Cedar Hills Landfill Area 7 planning and design. This project was initiated recently and is expected to be similar to the Area 6 project. Carteret County, North Carolina, Landfill Closure. Designed closure plan for 26 -acre MSW unit, oversight of construction, and certified closure. Hanes Mill Road Landfill, Winston- Salem, North Carolina. Assisted with design and permitting of the 37 -acre lined landfill. The facility is the first overliner "piggy back" project permitted in North Carolina. The 37 -acre unit is full and preparing for closure. Permitting of a 100 -acre lined MSW expansion unit. Analyzed leachate production data to refine design of leachate system for the expansion unit. Plan preparation and oversight of unlined landfill closure. White Street Landfill, Greensboro, North Carolina. Project Engineer. Prepared permit application for 52 -acre Subtitle "D" landfill unit at the 700 + -acre facility. Prepared construction plans and specifications for all three cells. Provided assistance with bids and recommendations. Analyzed leachate production data to refine design for subsequent cells and recirculation system. Coordinated gas extraction well locations for existing 120 - acre landfill unit. Prepared permit applications for alternative liner system and leachate recirculation system. Old Salisbury Road Landfill, Forsyth County, North Carolina. Project Engineer for the design and permitting of a 108 acre construction and demolition landfill. Hardin Landfill, Gaston County, North Carolina. Project Engineer responsible for producing permit applications, obtaining permits, and designing approximately 30 -acre landfill unit. Prepared bid documents and construction plans and specifications. CRSWMA Landfill, Tuscarora, North Carolina. Project Manager and Engineer responsible for producing permit applications, obtaining permits, and designing approximately 20 -acre unit. Prepared bid documents, construction plans, and specifications for the 20 -acre unit. Enoree Landfill, Greenville County, South Carolina. Project Manager and Engineer responsible for four sets of construction plans and specifications to build a total of five cells with more than 50 acres of capacity. HDR successfully modified the permit to lower base grades and permit the use of an alternate liner system. Bees Ferry Landfill - Permitting /Design and Construction, Charleston County, SC. Project Engineer. The site is comprised of over 300 acres, and the work consists of preliminary design and planning, all permitting, development of construction plans for the lined expansion, as well as piggybacking over old waste. He prepared the permit modfication to reduce the footprint of the unlined MSW unit in prepartion for the permit to construct a lined MSW unit adjacent and on top of the unlined unit. Prepared the permit application for an 80 acre lined MSW unit. He impressed DHEC personnel with a statistical determination of the seasonal high groundwater datum for the site. He prepared construction plans and specifications for the first piggyback cell. He is currently overseeing the construction administartion of the construction of the leachate management system and the cell construction. Eric A. Wright - Page 2 1 L.` Education Master of Science, Civil Engineering, North Carolina State University, 1988 Bachelor of Science, Civil Engineering, North Carolina State University, 1984 Professional Registrations Professional Engineer - Civil, Florida, No. 44200 Issued: 03/15/1991, Expires: 02/28/2010 Professional Engineer - Civil, Georgia, No. 25776 Issued: 01/06/2000, Expires: 12/31/2010 Professional Engineer - Civil, North Carolina, No. 18887 Issued: 01/22/1993, Expires: 12/31/2010 Professional Engineer - Civil, South Carolina, No. 15700 issued: 09/23/1993, Expires: 06/30/2010 Professional Engineer - Civil, Virginia, No. 043303 Issued: 04 /12/2007, Expires: 04 /30/2010 Professional Affiliations American Society of Civil Engineers (ASCE), Member, 1985 -2006 Solid Waste Association of North America (SWANA), Member, 2000- 2006 American Academy of Environmental Engineers, Member, 2005 -2006 HDR Tenure 4 Years Thomas M. Yanoschak Senior Project Manager Professional Experience Mr. Yanoschak is a registered professional engineer with more than 16 years of experience. His areas of expertise include municipal solid waste and industrial landfill design and permitting, civil site design, geotechnical engineering, environmental projects, hydrogeological studies, and water resources engineering. Mr. Yanoschak has been responsible for client management and project oversight of many solid waste projects. Mr. Yanoschak has participated in the following types of projects while at previous employers: HDR Project Experience Onslow County, Solid Waste Rate Study Update, NC. Project Manager. Provide Onslow County, North Carolina, with an update to a previous solid waste rate study. Purpose is to recommend an increase in tipping fees at the Subtitle D landfill to ensure the balance within the County's Solid Waste Enterprise Fund. Wake County, Landfill, Permitting, Design, and Construction Services, NC. Provide consulting, technical support, and construction oversight regarding the closure of the North Wake Landfill. Project includes landfill permitting, design, and construction services. Charleston County, Bees Ferry Landfill - Permitting/Design and Construction, SC. Project Engineer. Work associated with permitting, design, and construction of the Bees Ferry Landfill Expansion. Greenville County, Greenville - Twin Chimneys, Greenville, SC. HDR was retained to provide engineering services for a greenfield landfill site. Includes grading P &S, convenience center, maintenance bldg, scalehouse /admin bldg. Wake County, South Wake Landfill, N. Landfill permitting, design, and construction services for Wake County's South Wake Landfill. Sarasota County BOCC, Bee Ridge and Central County Landfill, Landfill Gas to Energy Projects, FL. Sr. Project Engineer. HDR has provided assistance with reviewing and recommending a developer for a landfill gas utilization project for the Bee Ridge Landfill and assisting the County in developing a landfill gas to energy project at Central County Solid Waste Disposal Complex (CCSWDC). Other services provided include Title V compliance reporting. Industry Tenure Southeastern Public Service Authority, Landfill Groundwater and Gas Compliance 25 Years Monitoring and Consulting Services, VA. Sr. Project Engineer. Provide Groundwater and Gas Environmental Consulting and Monitoring/Sampling of 1)Suffolk Regional Landfill 2) Franklin Landfill 3)Isle of Wight Landfill 4) Hosier Road Landfill. Southeastern Public Service Authority, SPSA Southampton Co Greensite, VA. Assist SPSA with the planning and development of a greensite for a future Subtitle D Landfil Sarasota County BOCC, Financial Assurance Cost Estimates, FL. Project Engineer. Provide cost estimates under various scenarios for the closure and post - closure care of a MSW landfill Sarasota County BOCC, Landfill Borrow Study, FL. Project Engineer. Evaluate construction and operational borrow soil needs over the lifetime of a 295 acre MSW landfill. 111 Sarasota County BOCC, Remaining Airspace Analysis, FL. Project Engineer... Performed detailed analysis of the remaining useable capacity within a landfill and estimates of when the capacity would be exhausted. Sarasota County BOCC, Additional Phase II Design, Permitting, and Bidding Services, FL. Project Manager. Phase H Design, Permitting, and Bidding Services Out -of -Scope Work Sr. Project Engineer. Review RFPs received by the County for the use of Landfill Gas from the Bee Ridge Landfill to produce energy. Sarasota County BOCC, Continuing Professional Engineering Services, FL. Project Manager. Provide Sarasota County with engineering services to prepare 75 percent complete permit documents for the final closure of Phase I of the Central County Solid Waste Disposal Complex (CCSWDC) Class I landfill. Sarasota County BOCC, Phase II Cell Expansion, Misc. Services, FL. Sr. Project Engineer. Provide Sarasota County with miscellaneous on -call services related to the design and permitting of Phase II of the Central County Solid Waste Disposal Complex in Sarasota, Florida. Sarasota County BOCC, Phase II Design, Permit, Bid Solid Waste Disposal Complex, FL. Project Manager. Provide Sarasota County with design, permitting, and bidding services associated with Phase II of the Central County Solid Waste Disposal Complex in Sarasota, Florida. Sarasota County BOCC, Phase II Expansion, Preliminary Design, FL. Project Engineer. Prepare preliminary design, preliminary construction cost estimate, implementation schedule, and detailed scope of services for Phase II of the Central County Solid Waste Disposal Complex (CCSWDC) in Sarasota, Florida. Sarasota County BOCC, Phase II Landfill Cell Design, Permitting, and Bidding, FL. Project Manager. Provide Sarasota County with additional engineering services related to the Phase II landfill cell design, permitting, and bidding. Sarasota County BOCC, Phase II, Hydrogeological Study, FL. Develop and implement a hydrogeological study for a 60 acre landfill expansion project including drilling activities, piezometer installation, laboratory testing, and geotechnical and hydrogeological analyses. Sarasota County BOCC, Updated Financial Assurance Cost Estimate, FL. Project Manager. Provide Sarasota County with updated Financial Assurance Cost Estimate (FACE) forms for the Central County Solid Waste Disposal Complex (CCSWDC) Class I landfill and the Bee Ridge closed landfill. Southeast Industrial Land Services Inc., Oconee County C &D Landfill, GA. Sr. Prj. Engineer. HDR conducted a hydrogeological study as part of a Site Acceptability Report submitted to the State of Georgia. HDR was previously involved in analyzing this site for the possibility of a landfill. The site was subsequently deemed acceptable for a construction and demolition landfill. Other responsibilities included public involvement, including participating in meetings with county commissioners, state regulators, and attorneys. Currently HDR is designing this C &D Landfill. St Johns County, Waste Transfer Station, FL. Sr. Project Engineer. HDR was retained by St. Johns County to design, permit and construct a new solid waste transfer station at a property located near US 1 and Stratton Road in St. Johns County, Florida. The transfer station facility was permitted and designed to handle a throughput of 1000 tons /day of municipal solid waste. St. Johns County required planning and layout of the facility to accommodate future rail operations, and required connection improvements to US -1 and railroad crossing upgrades. Thomas M. Yanoschak - Page 2 1 L.l 112 Resource Recovery Systems (RRS) Resumes The following resumes are for key staff with RRS that have previously worked with Orange County. A4%11 in Jim Frey www.regcle.com RRS Principal and C.E.O. BOARDS Michigan Environmental Mr. Frey is CEO and co- founder of Resource Recycling Systems Advisory Counci /to the (RRS). He brings to RRS projects his thirty years of expertise in Michigan Department of recycling and waste management program development both as Environmental Quality, public services and private enterprises. Jim began his career Member growing non -profit recycling programs from start -ups to full -scale Michigan Waste Reduction municipal collection services and MRF operations. Since 1986, Jim has Advisory Committee, Chair turned his attention to RRS clients and developing their resource recovery Center for Environmental capacity. Poacy, Economics and Jim oversees the ongoing development of RRS and its practice areas. Jim Science and the has developed and managed numerous projects since the founding of RRS. Environments / Capita/ . material recovery and solid waste management systems, Network Director • recycling based manufacturing and market development initiatives Stewardship Network Director • business - industrial environmental management programs and Board President He targets development of robust infrastructure and carrying capacity for Leslie Outdoor Science Center, each stage of the material recovery process — from generation to Director convenient/cost effective collection to final product use in recycling based Ecology Center, Director manufacturing. Advisory Committees on State Jim's role in RRS projects is targeted at high value -added client centered Solid Waste Policy consultancies where his strategic project development skills are directed at Development, Solid Waste understanding client needs, requirements, resources, goals and objectives Planning, Landri /l Capacity, and then focusing RRS and client resources on cost effective problem Recycling Market solving action strategies. In this way Jim is able to best apply his expertise Development, Member in project scoping, resource allocation, client liaison, cost/benefit analysis, risk assessment, system planning, project justification, approval and Michigan Solar Energy procurement. Association, Director and Chair Jim is often involved in project negotiations that bring together key Ann Arbor Energy Commission, stakeholders representing both public and private sector interests as they Member and Chair, build long -term partnerships that create a foundation for program growth many years into the future. These groundbreaking initiative have included AWARDS creating multi jurisdictional program consortiums and authorities; 2002 Lifetime Achievement procurement of long -term public /private partnerships for solid waste Award Recycling Michigan R g handling and material recovery systems; negotiation of solid waste disposal Coalition surcharges, mandatory recycling requirements and disposal bans; facilitating adoption of g p recycling legislation and ordinances; facilitating development of corporate waste reduction and recycling policies; and EDUCATION providing and delivering training as part of executive level leadership MBA (High Distinction) from the development and technology transfer initiatives. University of Michigan Ross Jim has spread his "resource recycling systems" development expertise as Graduate School Of Business an instructor for Environmental Entrepreneurship for the University of Rackham Graduate School, Michigan Business School's Corporate Environmental Management Program University of Michigan. (CEMP) and as a presenter at conferences and seminars on the Graduate Work.' development of recycling infrastructure, the role of the public and private environmental Quality sectors, industrial waste minimization and solid waste management planning and procurement. BPh, Grand Valley State Representative project work includes: University Numerous Counties, Public Works, Authorities and Districts: Solid Waste and Recycling System Planning and Implementation for many of the region's PRESENTATIONS award winning and highest performing resource recovery programs. 'Successful Funding Programs Bondholder Lawsuit Due Dilligence Analysis: Analysis for Bondholder Lawsuit covering pricing, capacity and supply projections for solid waste resource Used in Michigan's Recycling recovery projects of a Detroit area solid waste authority Programs" Business Development and Startup Support: Business planning, financing and development for a variety of recycling based private and non -profit enterprises. RRS www.recycle.com Resumes 113 114 IN Aaron Burman _r�yde,�o� RRS Project Manager and Staff Engineer PR03ECT EXPERIENCE EXPERTISE MRF Design As an engineer for RRS, Aaron designs Material Recovery • Economic Feasibility Analyses Facilities, Drop -off Stations and heads up the green- building features of these projects. He calculates required space for • MRF Design tipping, processing and material storage. In addition he works with • Construction Management municipalities to analyze the economics of their recycling processing • Material R Recycling Research options, including hauling and limited processing. He will also research new material markets for individual facilities to pursue. Aaron works with civil • Recycling Market Studies engineers to design the utilities, grading and site layouts. He applies for • Conceptual MRF Expansion state operating licenses for new facilities. For MRF expansion projects, he Plans writes equipment and building specifications, manages RFPs and writes • Solid Waste Processing recommendations. He is also RRS's lead CAD technician group. Licenses For compost facilities, Aaron models facility viability, overall capacity and • Compost Facility Design operating expenses. He specifies new equipment to purchase. He develops operating plans that manage costs, odors, equipment and labor. He • Compost Facility Operating designs new facilities and oversees their construction, interfacing between Plans contractors and municipalities. • Photovoltaic System Design Before working with RRS, Aaron sold, designed and installed grid -tie • PV Installer photovoltaic systems. He also oversaw and installed ground water and soil remediation systems for contaminated gas stations, dry cleaners and other • Hydrologic Modeling sites. He modeled rivers, ground water, and sediment transport and presented a paper at the United States Geophysical Union Conference. CERTIFICATIONS Aaron leads the RRS Carbon Management team, along with his duties as the Project Manager for projects including those requiring Enterprise Fund Compost Operator Training — analysis. Completed 2006 in Michigan N Certified Photovoltaic Installer — REPRESENTATIVE PR03ECT EXPERIENCE Passed 2005 in California Solar Proiects Coordinator Engineer In Training - Oct 2004 — Oct 2005 EIT /FE — Passed 2002 in Sustainable Technologies — Alameda, CA Colorado Solar Projects -Sold over $250,000 in projects EDUCATION - Coordinated all parts of grid -tie PV projects from 2kW — 13.5kW systems Colorado School of Mines , - Designed system based on power usage, energy prices Golden, Colorado, Major: and required voltages Engineering with Electrical Environmental Construction Specialty, Minor: Public Affairs - Prepared bids for projects totaling $150,000 (McBride Honors Program), -Chose equipment based on engineering specifications G.P.A. 3.77/4.0, Graduated: Dec - Participated in numerous groundwater treatment and soil 2002 vapor extraction system installations Hydrologist SPECIALPR03ECT WORK Nov 1999 — Oct 2005 Haiti Solar Project — EWB United States Geological Survey — Lakewood, CO Aug 2003 — Apr 2005 Computational Modeling Rural School Electrification - Programmed hydrologic models in C + +, FORTRAN and - Designed and installed other scripting languages battery- backup PV system for - Designed algorithm to determine depth of water from school in rural Haiti LiDAR (Light Distancing and Ranging) waveforms - Designed structure to hold 55 -Co- author on paper presenting research of flow over 2D solar modules using mostly and 3D dune shapes locally available materials - Presented results at American Geophysical Union - Coordinated shipping of Conference in December 2004 materials and trip logistics RRS www.recycle.com Resumes 115 ` Kerry Sandford www.recycie,com Senior Engineer Representative Project BACKGROUND Experience Recovery Potential Analysis• ' In the early 1980s, Mr. Sandford led the development of Recycle Ann Arbor to an award winning, city-wide curbside recycling Ana lysis of waste stream based program, setting up processing capabilities as the program progressed. In on waste sorts, published waste 1985, Mr. Sandford co- founded Resource Recycling Systems with James stream data, comparison to Frey. In 1998, Mr. Sandford established his own recycling equipment comparable communities or manufacturing and installation /consulting company where he assisted businesses, examination of Eureka! Recycling in site selection, facility layout, equipment specification current recovery, and ana lysis of and construction oversight. He also designed and built portions of the new ability to implement needed container processing line at SOCRRA. In 2007, Mr. Sandford returned to improvements Services full time consulting work at Resource Recycling Systems. provided for many of the communities where RRS EXPERTISE provided assistance Mr. Sandford is a Senior Engineer at Resource Recycling Systems (RRS). He brings to RRS projects over thirty years of experience in recycling and Education waste management programs. He has experience in the following areas: Bachelor of Science in Facility Specification: Line and facility planning, layout, Engineering, Specialization in documentation and specification. Mr. Electr /ca /Engineering, University Sandford has been designing and specifying of Michigan School of recycling facilities since 1981. He has Engineering (1973) contributed to the design and construction of Supplemental courses in more than 20 MRFs from Michigan to South manufacturing technologies and Korea. Natural Resources Project Management: Mr. Sandford has managed a wide range of MRF construction projects, and has provide construction oversight both as the owner's consultant and as a contractor. Feasibility Analysis: Inspection /Appraisal: MR. Sandford has extensive equipment Analysis of economics of facility inspection experience including new and old construction and operation. equipment. He has appraised a wide variety of used equipment from balers to windrow MRF Specification and turners. Appraisal work has included estimating repair costs and modifications to Procurement: order equipment. Specified full MRF to a few Testing: Mr. Sandford has designed and implemented a pieces of equipment including wide range of MRF measurement tests and multimillion dollar processing studies. These include throughput lines Full range of separation measurement, product quality, sorting and sorting technologies efficiency, time -motion efficiency, equipment durability and energy efficiency. Electrical Design: Design of industrial controls using PLC's mcu's and PC's Mr. Sandford has designed MRF control systems and is thoroughly qualified to evaluate designs from equipment providers. Equipment Design: Mr. Sandford has designed and built recycling equipment utilizing electrical, pneumatic and hydraulic actuation /control. Equipment designed includes a wide range of mechanical and pneumatic conveyors, magnetic separators, can densifiers, mechanical unloading