HomeMy WebLinkAboutORD-2007-026 - Electrical Systems - CHCCS Capital Project Ordinancep (~~~aov7 - ~ a ~
~ -~a•d ~
Electrical Systems ~hh
Chapel Hill-Carrboro City Schools
Capital Project Ordinance
Be it ordained by the Orange County Board of County Commissioners that pursuant to Section
13.2 of Chapter 159 of the General Statutes of North Carolina, the following capital project is
hereby adopted.
Section 1. .The project authorized provides funds for the installation of additional electrical
outlets in the classrooms at Carrboro Elementary School. Funding for the project
comes from a transfer from CHCCS Elementary School #9 and proceeds from
alternative financing.
Section 2. The officers of the County are hereby directed to proceed with the project within
the budget contained herein.
Section 3.
Section 4.
The following revenue is anticipated to complete this project:
Through FY
2005-06
FY 2006.07 Through FY
2006-07
Sales Tax $0 $0 $0
Im act Fees $0 $0 $0
PSBF $0 $0 $0
1992 Bond Funds $0 $0 $0
1997 Bond Funds $0 $0 $0
Transfer fromElem#9 $125,000 $0 $125,000
Alternative Financin $0 $20,000 $20,000
Total Fundin $125,000 $20,000 $145,000
The following amount is appropriated for this project:
Through FY
2005-06
FY 2006-07. Through FY
2006-07
Plannin /Arch/En in $12,000 $0 $12,000
Land/Assoc Fees $0 $0 $0
Construction $113,000 $20,000 $133,000
E ui ment/Furnishin s $0 $0 $0
Other $0 $0 $0
Contin enc $0 $0 $0
Total Costs $125,000 $20,000 $145,000
Section 5. This ordinance remains in effect from July 1, 2002 until June 30, 2007.
Adopted this 12th day of June 2007.
o0~p-sob7•oaG
G /a-o 7
~.fh
and related supervision to provide social work and case rnanagen~ent services in the schools
and authorised the Chairta sign,
z~ Renewal of Contract wi#h UNC Hoy i#als for DDS to Provide Medicaid 1oriCers
The Board continued the cantract far income maintenance staff at UNC Haspita[s and
authorized the Chair to sign.
aas Bail H~AC stem Re laoement Anal sis Chiller Re iace~nent and Can#ract for
Re laeemen# item Des n Servioes
The Board:
~~ Received the "Orange County Jail H1~A System Upgrade ~ Life Cycle Cast Analysis;';
~} lrxemptthis pro~ectfram the ~ualificatian base selection processfor engineering
services a allowed by NCCS ~ ~R~4.~~;
} Authorize the Purchasing Director to execute ~ contract with Reece Noland McBlrath,
I nc. in the amaunt of ~~,a0a far provision of professional engineering services far
design of a replacement H1~AC system forthe Orange County Jail in accordance with
the attached proposal; and
~~ Authorize the Purchasing Director to execute a contract with Reece Naland ~ Mc~lrath,
Inc. in the amaunt of ~,DOg far provision of professional engineering services for
perfarrnance of an existing building code review in accordance with the attached
prapasal.
bb, Bradford Rid a road yeti#ion for Addi#ion to the state ~[aintained stem
The Board approved recommending to NCDOT that it ac~ep# the request to add Bradford Ride
Road to the State Maintained Secondary Road System.
oc~ Petition far Addition of ubdiv~sion Rands Edbur#on Court and Berwiol~ glace to
the eta#e [aintained ysten~
The Board a roved recornn~ending to NCDOT that if accept a rques# far additions to the State
PIS
Maintained Secondary Road Sysfiern for Bdburtan Court and Berwiclr Place.
dds range Caun#~ Yrans~orta#ion priori#y List„„for the ~a0~,,,M.,~~~ ~ TI R
This item was ren~aved and placed at the end of the consent agenda fvr separate consideration.
ee. Schools Adequate Public Facili#ie Ordnance ~ARFO} ~ A~proyal,,,~f Annual ~0a~
Report
This item was removed and placed at the end of the consent agenda. for separate consideration.
ff~ Duke Baer ~i h#~of-iIIJa a# Durharr~ Technical Communi# Colle ~ ~ Oran e
Cam us
The Board approved a right~af~wyagreementas reclubted by Duke Bnergyfor power linesto
be installed for the Durham Technical Community College satellite campus inthe waterstone
development, in Hillsborough and authorized the Chair to sign;
,Contract A royal wi#h Rfteli l~inanciai Consultants to Conduc# a Ra#e Stud for
the ~flnd Sewer ~s#,,,,,m
The Board awarded a cantraot for professional services associated with conducting a rate study
far the Bfland SewerSystem to Raftelis Financial Oanultants of Charlotte, North Carolina at an
amaunt not to exceed 1 ~,~~g and au#harized the Purchasing Director to execute the cantract
pending final review by staff and the County Attorneys
l7 h. Bu dg e# Am en d m ent ~ ~
The Board approved budget, school and county caps#al project ordinance ar~endrnentsfarfiscal
year 20g~~p7 far Department of Social Services, averring and Management Nan-
Departr~ental, Sheriff ~s Department, Chapel HiII~Carrboro City Schools Capital Pra~ect
Ordinance Corrections, Department on Aging, and Grange Public Transportatian.
ii. A~ricul#ural Suppvr# Bnterpri~s ASS
This stern was removed and placed at the end of the consent agenda far separate consideration.
j~ Resolufion Rec~ues#in~ #hat the Budget for the eta#e of [V~rth Carvlir~_~e
Ap~rav~d by Jul ~, ~0~~_