HomeMy WebLinkAboutAgenda - 05-11-2010 - 1ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: May 11, 2010 Action Agenda Item No. 1 SUBJECT: Schematic Design Presentation, Link Center Phase 2 -Commissioners' Meetina Room DEPARTMENT: AMPS PUBLIC HEARING: (YIN) No ATTACHMENT(S): INFORMATION CONTACT: Pam Jones, 919-245-2652 Floor Plan Jeff Thompson, 919-245-2658 PURPOSE: To review and provide comments on the schematic design of the Link Center Phase 2 -County Commissioners' meeting room prior to final construction drawing preparation. BACKGROUND: On February 16, 2010, the Board of Commissioners approved a design contract with Corley, Redfoot, Zack Architects ("CRZ") for Phase 2 of the Link Center. This project phase includes development of a County Commissioners' meeting room and technology associated with its operation as well as restroom and heating and cooling system (HVAC) upgrades necessary to support the more intensive use of this facility. In addition, the project will address existing Americans with Disabilities Act (ADA) compliance and building entry access issues. A critical component of the design process is based upon site visits to other existing board meeting rooms in the area. These site visits occurred on March 30-31, 2010. Commissioners Valerie Foushee and Steve Yuhasz accompanied Ken Redfoot and David Taylor of CRZ on the site visits along with staff from the Clerk's office (Donna Baker and David Hunt), Asset Management & Purchasing Services (AMPS) (Pam Jones and Jeff Thompson), Information Technologies (Kris Land), and The People's Channel (Bill Nichols). The group visited six sites including: Forsyth County, Durham County, Durham City, Wake County, the Town of Cary, and the NC Pharmacy Boardroom. Each facility proved particularly informative in areas such as dais orientation, room layout, acoustics, lighting, sound reinforcement, multimedia management, control systems, audience interaction, pedestrian flow, and television camera integration. The attached schematic design is based on the experience of these site visits and other Board and staff input. The work session will provide the Board an opportunity to review the plan and incorporate additional comments in preparation of construction documents for the bidding process. 2 Per the tentative development timeline below, demolition would commence under a contract issued by the Manager over the summer, with the construction bid prepared for award by the Board after the summer break. A six-month construction time is projected for. completion of the project after the construction bid is awarded. TASK PROPOSED BEGINNING DATE END BY DATE BOCC Action: Authorization to proceed with Construction Documents and Biddin Process 5/11/10 5/11/10 CRZ prepares documents suitable for bidding project and submits documents for re ulato a royal 5/12/10 6/15/10 Demolition Phase 6/01/10 6/30/10 Phase 2 Bid Process 6/15/10 7/15%10 BOCC Action: Phase 2 Bid Award 8/17/10 8/17/10 Phase 2 Construction estimated 6 month duration 9/13/10 3/18/11 FINANCIAL IMPACT: Funding is available for project components as follows: • Project # 30035: Link Center Upfit - $520,480 o Funded via alternative financing approved by the BOCC in April 2009, to be financed as short term debt sold in July 2010. • Project # 30018: HVAC Projects - $90,777 • Project #30019: ADA Compliance - $65,595 • Project # 30023: Building Entry and Access Systems - $75,000 Bids reflecting actual costs will be presented to the Board for approval after the summer break. RECOMMENDATION: The Manager recommends that the Board review and provide comments on the schematic design as presented; and authorize staff and the CRZ to proceed with construction documents and bidding as outlined herein if the Board desires to move forward with the project at this time. N ^RODUCTIONI~ I II I I ~~ q q ROOM MECHANICAL RISER ELECTRIGIL ~i~Cul ROOM ROOM ROOM TABLE AND CHAIR STORAGE SOUND LOCK EI A D S I I O Vo V PUBLIC BREAK LOBBY i ,ROOM O D H1 e ELEV. EQUIP CUST. ~, r ~~~ ENGINEER'S LOGO CORLEY REDFOOT,ZACK~ 1 1 / :o... Y~ : ~ . x~~~.~o.~~ ~.,.~~~. ,~,,.~..,.. H. R U OFFICE H. R OFFICE COMMISSIONER'S STORAGE H. R 9 OFFICE FILE STORAGE H. R H. R OFFICE OFFICE TRAINING/CONE ROOM ROO^ t\ OFF CE OFF CE II OFFICE ~~ ROOM Date 4/30/10 N Scale 1/16" = 1'-0" ® A-1 Title First Floor Plan Project Commission Chamber Renovation Link Government Center Oranee County. North Cazolina