Loading...
HomeMy WebLinkAboutAgenda - 05-06-2010-13 (2)= rrFo ~ m q'~- i o n ~'~~M ORANGE COUNTY PLANNING & INSPECTIONS DEPARTMENT Craig N. Benedict, AICP, Director ®S°~gt ' gQ4,~A Administration 131 W. Margeret Ln. (919) 245-2575 „ * ;2 P. O. Box 8181 (919) 644-3002 (FAX) , ~' Hillsborough, NC 27278 www.co.orange.nc.us ° ~r~h 6a~°~`P MEMORANDUM TO: Orange County Board of County Commissioners COPIES: Frank Clifton, County Manager FROM: Craig Benedict, Planning and Inspections Director Kevin Lindley, PE, Staff Engineer DATE: April 14, 2010 SUBJECT: Utility discussions with the Cities of Mebane and Durham Discussion has begun with both the City of Mebane and the City of Durham regarding provision of utilities in the Buckhorn EDD and Eno EDD. A Request for Qualifications has been written soliciting engineering firms to design and give cost estimates for constructing a core water and sewer infrastructure in the Buckhorn EDD. Since this would be an extension of the City of Mebane's system, they are currently reviewing the RFQ before issuance. In addition, Craig has met with Ted Voorhees, Deputy City Manager in charge of Operations, to discuss extension of utilities from Durham's system into the Eno EDD. Also of note, discussions are pending with the City of Mebane to take over operation of the Efland Sewer System. This would involve re-routing the wastewater flow from the Town of Hillsborough to the City of Mebane via the Gravelly Hill sewer lift station on West Ten Road. All Efland sewer customers would then become out-of--town customers of the Mebane sewer system and the County would no longer own or operate the Efland sewer system. The Town of Hillsborough has no objection to this plan, as it frees up capacity in its wastewater treatment plant. The rerouting of the sewer flow, would have an expensive upfront cost, but there would be no ongoing cost of operating the system to the County and the rates the customers pay are expected to be less than those projected if the County were to continue operation of the system. Mebane Durham utility discussions memo 041410