Loading...
HomeMy WebLinkAbout2010-120 AMS - Coulter Jewell Thames, PA - Amendment to Contract for greenway trail at the Twin Creeks Park111 WEST MAIN STREET DURHAM. NORTH CAROLINA 27701 p919 682.0368 f919.688.5646 F a.,.,.~g ..,, ~ ,.,.~~e LETTER OF AMENDMENT TO AN EXISTING CONTRACT made this 7th day of January, 2010 To The OWNER Orange County -Asset Management and Purchasing Services PO Box 8181 Hillsborough, NC 27278 Attn: Jeff Thompson By The SITE CONSULTANT Coulter Jewell Thames, P.A. l I 1 West Main Street Durham, North Carolina 27701 For Landscape Architecture and Civil Engineering Services For additional services related to the construction administration and inspection of the greenway trail at the / Twin Creeks District Park located in Carrboro, North Carolina. ~~ Description This proposal is for additional Civil Engineering services related to the construction administration and inspection of the greenway trail at the Twin Creeks District Park. During the design phase of the project, Orange County was able to obtain ARRA funding for a portion of the trail construction. A requirement of receiving ARRA funding for the project is that full time inspection services be provided, and that construction phase services be provided as if the project were a NCDOT project. The ARRA funding also requires additional state and federal reporting requirements be met during construction. The construction phase services required by ARRA exceed the scope of construction phase services in the design contract for the greenway trail. This proposal does not include NCDOT certified testing of construction materials. Orange County will be responsible for contracting with a certified testing firm to provide construction material testing as required by NCDOT requirements. The construction material testing required includes, but is not limited to, soil density tests, stone density test, concrete sampling and tests. ADDITIONAL SCOPE OF BASIC SERVICES: 1 Construction Phase Services l .Ol Provide a resident project representative who will be at the site at times construction crews are working who will be responsible for preparing and maintaining all written documentation necessary to satisfy NCDOT to comply with A. R. R.A. funding procedures for the Twin Creeks Greenway Project. 1.02 Prepare daily reports, journals and logs of all construction activities and construction work performed in accordance with NCDOT guidelines. 1.03 Document the receipt of all materials, equipment and machinery delivered to the site. l .04 Obtain receipts and tickets of materials delivered to the site. Document the day and time of the arrival of all materials to the site. 1.05 Maintain a daily payment journal of all work performed, quantity of materials installed and associated costs as it relates to bid items and the Contract. 1.06 Validate all monthly pay estimates for review by the Engineer that will be forwarded to the Orange County for payment. l .07 Coordinate the scheduling of all NCDOT certified inspectors at times that materials (stone base, concrete etc...) are being placed by the Contractor. l .08 Coordinate the scheduling of all compliant testing by a NCDOT certified materials testing firm for construction of the trail (NCDOT certified material testing firm to be provided by Orange County). 1.09 Provide daily inspection oversite. 1.10 Bring to the attention of the Engineer unforeseen problems so they may be corrected in a timely manner so as not to hinder or slow construction. Document all unforeseen problems and associated costs for review by NCDOT. 1.11 Attend periodic construction meetings as stipulated by the Engineer. 1.12 Review project submittals and Change Orders. 1.13 Perform substantial completion and final completion inspections. All other provisions of the existing Contract between Orange County and Coulter Jewell Thames will remain in effect. COMPENSATION: The exact amount of construction phase services to be provided to Orange County will vary depending on the actual construction duration and days worked by the Contractor. Therefore, Coulter Jewell Thames, PA proposes to provide the construction phase services on an hourly basis, at the rates listed below, which will be invoices to the County monthly. The hourly rates listed include our transportation cost to the site and at the site. The estimated dollar amount of construction phase services to be provided by Coulter Jewell Thames, PA has been calculated based on a construction duration of 28 weeks, with the resident project representative and project manager staffing the project 40 hours per week and 10 hours per week, respectively. Monthly invoices will update both Orange County and Coulter Jewell Thames, PA on the construction phase services budget. Construction Administration and Inspection Budget Personnel Weeks Hours/Week Billing Rate Amount Resident Project Representative 28 40 $65.00/hour $72,800.00 Project Manager 28 ]0 $120.00/hour $33,600.00 $106,400.00 The design contract for this project included a fee of $25,000.00 for construction phase services. The construction phase services portion of the previous contract will be nullified by the approval of this Amendment. The Construction Administration and Inspection Budget above reflects a total increase in construction phase services of $81,400.00. Standard Hourly Rates Project Resident Representative---------------------------------------- $ 65.00/Hr. Licensed Project Engineer---------------------------------------------- $120.00/Hr. Licensed Landscape Architect------------------------------------------ $120.00/Hr. Licensed Land Surveyor-------------------------------------------------$110.00/Hr. 2-Man Survey Crew------------------------------------------------------$125.00/Hr. AutoCAD Technician----------------------------------------------------$ 65.00/Hr. Engineer Intern------------------------------------------------------------$ 85.00/Hr. Respectfully tendered this 7th day of January, 2010 For The Consultant COULTER JEWELL THAMES, P.A. ~. V > Daniel A. Je ell, RL , ASLA President Date: ~~ ~~ ~~ ATTEST Steven P. Bailey, PE Vice resident Date: ~~ /~ FOR The 9iwner: // (/,d~~ Name/ i le/Dat 31~1~ Attest Name/Date/Title ~ <~' "''^""`'" ~~ k. da °~'~- 74 3llll~o