HomeMy WebLinkAboutAgenda - 02-16-2010 - 4fORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: February 16, 2010 Action Agenda Item No. ~{- - -F SUBJECT: Contract Amendment for Engineering and Construction Administration Services for Twin Creeks Greenway DEPARTMENT: AMPS & Planning PUBLIC HEARING: (Y/N) No ATTACHMENT(S): Attachment 1: Budget Attachment 2: Professional Services Contract Amendment Attachment 3: NCDOT Memo Regarding ARRA Project Requirements INFORMATION CONTACT: Pam Jones, AMPS, 919-245-2652 Jeff Thompson, AMPS, 919-245-2658 Karen Lincoln, Planning, 919-245-2580 PURPOSE: To consider approval of the Contract Amendment not to exceed a total of $106,400 for Contract Administration Services with Coulter Jewell Thames, PA (CJT) for the Twin Creeks Greenway Project as required by North Carolina Department of Transportation (NCDOT) as Contract Administrator for American Recovery and Reinvestment Act ("ARRA") funds. BACKGROUND: On December 7, 2009, the Board authorized a bid award in the amount of $498,992.40 for the construction of the .62 mile Twin Creeks greenway project within the Twin Creeks Park site near Morris Grove Elementary School. This construction is scheduled to begin in the spring of 2010. Attachment 1 illustrates the budget originally distributed as an attachment for the December 7th construction bid award abstract. On June 27, 2006, the BOCC also awarded a professional services contract to Coulter Jewell Thames, PA for design and construction administration services for Twin Creeks Phase 1. The contract was a result of advertisement and solicitation from a number of engineering firms in the area and was recommended by a committee which included Recreation and Parks Advisory Committee, County Commissioner and County staff representatives. This original contract includes $25,000 for Contract Administration services provided by the Designer of the project. In December 2009, the County was awarded reimbursement of up to $429,457 of this project cost from the Federal Government through the American Recovery and Reinvestment Act ("ARRA") program funds. These funds will supplement the existing budget attached. ARRA requires -that NCDOT administer fund reimbursements for all of its awarded projects. NCDOT is administering these projects in accordance with its standard published construction guidelines. In accordance with these guidelines, NCDOT requires that all projects be staffed by a Resident Project Representative that must be present during all of the construction activities for inspections, reporting and engineering supervision of the project. The NCDOT ARRA Project Requirements-Local Municipal Requirements Memorandum dated February 8, 2010 2 (Attachment 3) states that Contract Administrator inspections "must be performed whenever Contractor is working at all times". This level of on-site supervision is not customary with County projects, but is required in this instance to receive the ARRA reimbursement funds. CJT meets all of the NCDOT qualifications for this requirement and has agreed to increase its current Contract Administration Services scope and provide the mandated services on a time and material basis not to exceed an additional $81,400, totaling $106,400. This budget is based on 28-week duration of the project. This amendment supplements the $25,000 in Construction Administration services already provided in the original Contract. CJT will provide a qualified inspector to be on site up to 40 hours per week and a professional engineer ("PE") to supervise and supplement the completion of the required duties of up to 10 hours per week. These services and costs are outlined in the Contract Amendment and are commensurate with the professional services rates of this type in the marketplace. FINANCIAL IMPACT: The amended contract for these services is not to exceed $106,400 and will be paid from the budgeted County Capital Project Funds. ARRA funds will reimburse the County up to $429,457 of the contracted $498,992.40 General Construction Contract with McQueen Construction, provided that the County follows the NCDOT project administration requirements. Should the Board not approve this amendment, the County may not be eligible for reimbursement up to the $429,457 amount since it would be in violation of the NCDOT project administration guidelines. RECOMMENDATION(S): The Manager recommends the Board approve and authorize the Chair to sign the Contract Amendment not to exceed $106,400 for Contract Administration Services with Coulter Jewell Thames, PA for the Twin Creeks Greenway Project as required by NCDOT as Contract Administrator for American Recovery and Reinvestment Act ("ARRA") funds. ~ ~ ~,~cN~EN r 1 3 ~'~a~ ~r~~k~ Q~~~~~~~ ~c~Ei~ap~ r~~rr~~r~y ~ud~~~ ~v~rau 1 F~l~~ii~ ~~~ir~~so Source Aene~unlr 2001 'arks and Open Space Band $1,6'13,221 -minus remaining Soccer Superfund porfion (for soccer use a€sewher4 - $625,000 -minus 6uildin stabilization funds 2008 - $150,000 ~ ARRA Trans ortatian Stirriuius fundin U to $429,457 TUTAL ~1,325,G78 ~~arilne~ ~~pertdi~u¢°~s> ~~~ on~~ ~~ e~ Item ~sfimated Arnour~~ .02 mite x 10' w€d® Concrefe Greenway with one 111.5' x 10' Prefiab Steel Bridge (Including clearing, grading, one femporary bridge, sedimentation and erosion ca~tral.devices, raising one manha€o and temporary and permanent seeding} X894,098.54 Additional Construction Administration Foe: (Fui€ Time ~iCDCT Concrete Certified Site lnspectar) ~ 81,400.0!} Geatecl~nieat Testin ~ 26 OOOAO Landscaping and Site Amenities: (Signage, Qenches, Doggie U~lasto Staflans and Trasf~/ ~ 65,000.00 Rec ciin Rece tacies Construction Conlin enc 1 d% $ 89,409.88 Tofiai ~ 1,155 908.39 t~rr~ Ar~munt .02 mice x 'i0' wide Cc~r~cre#e Greenway wifh one '111.8' x 14° Prefiab ~teei Bridge tlnciuding clearing, grading, one temporary bridge, sedimentation anr# erosion control devices, raising one manhole anci temporary and pennanen-t seeding) X498,992.40 Additional Construction Administration Fee: (Full Tr`me NCDOT Concrete Gerti#fed Site lns faectc~r} $ 81,4fla.00 Geoteclmical Testin $ 26,(3Q0.00* Landscaping and Site Amenities: (aignage, Benches, Doggie Waste Stations and Tr«sh! Rec clin Rece tacles $ 65,000.00* Cansfr uction Gantin errs 15°!0 $ ?4,845.86 Total $746,241.26 `~ Estimated 5 ~~~ ~ ~: .. Coulter~Jeweli Thames, Pa 111 WEST MAIN STREET DURHAM, NORTH CAROLINA 27761 p919.682.0368 f919.688.5646 ~~ IuI1 fiiiig Cs; laB !' 4lu i e LETTER OF AMENDMENT TO AN EXISTING CONTRACT made this 7th day of January, 2010 To The OWNER Orange County -Asset Management and Purchasing Services PO Box 8181 Hillsborough, NC 27278 Attn: Leff Thompson By The SITE CONSULTANT Coulter Jewe[1 Thames, P.A. 1 [ 1 West Main Street Durham, North Carolina 27701 For Landscape Architecture and Civil Engineering Services For additional services related to the construction administration and inspection of the greenway trail at the Twin Creeks District Park located in Gan'boro, North Carolina. Description This proposal is for additional Civil Engineering services related to the construction administaration and inspection of the greenway trail at the Twin Creeks District Park. During the design phase of the project, Orange County was able to obtain ARRA funding for a portion of the trail construction. A requirement of receiving ARRA funding for the project is that fitl[ time inspection services be provided, and that construction phase services be provided as if the project were a NCDOT project. The ARRA funding also . requites additional state and federal reporting requirements be met during construction. The construction phase services requited by ARRA exceed the scope of construction phase services in the design contract for the greenway trail. , This proposal does not include NCDOT certified testing of construction materials. Orange County will be responsible for contracting with a certified testing firm to provide construction material testing as required by NCDOT requirements. The construction material testing required includes, but is not timited to, soil density tests, stone density test, concrete sampling and tests. ADDITIONAL SCOPE OF BASIC SERVICES: t Construction Phase Services L.0 ( Provide a resident project representative who will be at the site at times construction crews are working who will be responsible for preparing and maintaining all written documentation necessary to satisfy NCDOT to comply with A.R.R.:4, funding procedures for the Twin Creeks Greenway Project. L02 Prepare daily reports, journals and Togs of all construction activities and construction work performed in accordance with NCDOT guidelines. 1.03 Document the receipt of atl materials, equipment and machinery delivered to the site. 6 1,04 Obtain receipts and tickets of materials delivered to the site. Document the day and time of the- arrival of all materials to the site. 1.05 Maintain a daily payment journal of all work performed, quantity of materials installed and associated costs as it relates to bid items and the Contact. 1.06 Validate all monthly pay estimates for review by the Engineer that will be forwarded to the Orange County for payment. 1.07 Coordinate the scheduling of all NCDOT certified inspectors at times that materials (stone base, concrete etc...) are being placed by the Contractor. 1.08 Coordinate the scheduling of all compliant testing by a NCDOT certified materials testing firm for construction of the trail (NCDOT certified mateeial testing fum to be provided by Orange County). 1.09 Provide daily inspection oversite. i .10 Bring to the attention: of the Engineer unforeseen problems so they may be corrected in a . timely manner so as not to hinder or slow construction. Document all unforeseen problems and associated costs for review by NCDOT. 1.11 Attend periodic construction meetings as stipulated by the Engineer. 1.12 Review project submittals and Change Orders. 1.13 Perform substantial completion and final completion inspections. AI I other provisions of the existing Contract between Orange County and Coulter Jewell Thames will remain in effect. COMPENSATION: The exact amount of construction phase services to be provided to Orange County wi Il vary depending on the actual construction duration and days worked by the Contractor. Therefore, Coulter Jewell Thames, PA proposes to provide the construction phase services on an hourly basis, at the rates listed below, which will be invoices to the County monthly. The hourly rates listed include our transportation cost to the site and at the site. The estimated dollar amount of construction phase services to be provided by Coulter Jewell Thames, PA has been calculated based on a construction duration of 28 weeks, with the resident project representative and project manager staffing the project 40 hours per week and 10 hours per week, respectively. Monthly invoices will update both Orange County and Coulter Jewell Thames, PA on the construction phase services budget. Construction Administration and Inspection Budget Personnel Weeks HoursJWeek Billing Rate Amount Resident Project Representative 28 40 $65.00/hour $72,800.00 Project Manager 28 10 $120.00/hour 533.600.00 $106,400.00 'The design contract for this project included a fee of $25,000.00 for construction phase services. The construction phase services portion of the previous contract will be nullified by the approval of this Amendment. The Construction Administration and lnspection Budget above reflects a total increase in construction phase services of $81,400.00. 7 Standard Hourly Rates Project Resident Representative---------------------------------------$ 65.00/Elr. Licensed Project Engineer------------------------------------------- $120.00/Hr. Licensed Landscape Architect------------------------=--------------$120.00/Hr. Licensed Land Surveyor----------------------------------------------$ [ 10.00/Hr. 2-Man Survey Crew--------------------------------------------------$125.00/Hr. AutoCAD Technician----------------------------------------------------$ 65.00/Fir. Engineer Intern--------------------------------------------------------$ 85.00/Hr. Respectfully tendered this 7th day of January, 2010 For The Consultant COULTER 1EWELL THAMES, P.A. ~' `~ ~.. Daniel A. J ell, RL , ASLA President Date: ~. ~ ~ r ~ FOR The Owner: Name/Title/Date ATTEST Steven P. Bailey, PE Vice resident Date: ~ 7 ~ Attest Name/Date/Title 8 STATE ox' NORTH CAROLINA DEPARTMENT OF fiRANSPORTATION BEVERLY EAVES PERDUE Gov~uvox 8 February 2010 MEMORANDUM TO: FROM: SUBJECT: Local Municipalities J.M. Mills, PE Division Engineer EUGENE A. CONTi, JR. SECRBTARY ARRA Project Requirements-Local Municipal Responsibilities NCDOT Construction Manual • Online at: http://www.ncdot.gov/doh/operations/dp_chief eng/constructionunut/formsmanuals/construction/ Contract Administration General Requirements (Attachment 1, Construction Manual, Division 1 General Requirements section pg. 1-10) • Prime Contractor Prequalified bidders on NCDOT list only • Subcontractors Request for Subcontract (Attachment 1, Construction Manual, Records & Report section pg. R- 21s-z21) Inspection • Must be performed whenever Contractor is working at alI times • Inspector's Daily Report ' • Project Diary (Attachment 2, Construction Manual, Records & Report section pg. 207-210) Tes • Minimum Testing requirements Found online at: Search by material type • Independent sampling (Quality Assurance testing) Material & Test Unit staff Guardrail, steel, metal poles, torque on bolts Resident Engineer staff Concrete, asphalt DBE Compliance/Trackina • Submit payments monthly or at project completion if only one invoice is submitted to RE to enter into DBE tracking system • Changes/modif cations/replacements must be approved Page 2 ARRA Local Guidelines Erosion Control • Requirements • Erosion & Sedimentation Control Report (Attachment 3, Construction Manual, Erosion & Landscaping Division 16, pg 1-7) Record keepinQ/documentation • Progress Schedule Chart • Engineer's Weekly Summary • Annual EEO Review {Attachment 4, Construction Manual, Records & Reporting, pg. R-211-216) Supplemental AQreements/Change Orders • Determine purpose and need Must be within original project scope • Contractor and Engineer negotiate fair and reasonable price Pricing breakdown {documentation example attached) must be provided from Contractor to LPA and forwarded to Resident Engineer with oversight Documentation required describing work, location and justification (NCDOT example attached) • FHWA concurrence required • Prior to ANY work commencing, approval must be obtained. Verbal agreements without approval may constitute ineligible charges (Attachment 5, Construction Manual, Records & Reporting, pg. R-114-123) P. O. Box 14996 Greensboro, NC 27415-4996 Telephone No. (336( 334-3192 Fax No. (336 334-3637