HomeMy WebLinkAboutAgenda - 02-02-2010 - 7bORANGE COUNTY
BOARD OF COMMISSIONERS
ACTION AGENDA ITEM ABSTRACT
Meeting Date: February 2, 2010
Action Agenda
Item No. ~ - b
SUBJECT: Efland Sewer System
DEPARTMENT: Planning & Inspections PUBLIC HEARING: (Y/N) No
ATTACHMENT(S):
Memo Regarding Sewer System History
Efland Sewer Map
INFORMATION CONTACT:
Kevin Lindley, Staff Engineer, 245-2583
Craig Benedict, Planning Director, 245-2592
PURPOSE: To provide a history of events regarding the creation of the Efland Sewer System
and special events thereafter.
BACKGROUND: The key dates are noted in the attachment.
FINANCIAL IMPACT: None at this time.
RECOMMENDATION(S): The Manager recommends the Board receive the report. Staff will
periodically update this report as conditions change and various projects go forward.
2
MEMORANDUM
TO: Orange County Board of Commissioners
FROM: Craig Benedict, Planning Director and
R. Kevin Lindley, PE, Staff Engineer
THROUGH: Frank Clifton, Jr., County Manager
DATE: 1/13/10
SUBJECT: Brief history of the Efland Sewer System
This memo is a follow-up to a request by the BOCC for background information on the Efland Sewer
System (system). In the interest of brevity, the information has been condensed to a bulleted list of the
highlights of the last twenty-five years. If there is interest in any of these items, more information can be
provided.
• 1984 Due to reports of failing septic systems in Efland Estates and at the Efland-Cheeks
Elementary School, the BOCC commissioned the McAdams Company to perform
an engineering study for provision of sewer in the Efland Community.
• 1984-85 County began gathering tap requests from the Efland Community, with the
understanding that at least 179 taps would be needed in the initial phase of
construction to make the system viable.
• 1985 Sign-up period ends with 137 customers (individuals, churches, businesses, and
clubs) requesting 191 taps.
• 1985. BOCC adopts "Resolution Establishing Rules and Regulations for the Operation
of a Sewer Collection Treatment System to Serve the Efland Area of Orange
County"
• 1985-86 County chooses Hazen & Sawyer to restudy the Efland area sewer situation and
construction phasing plan. The original Phase I of the McAdams Company plan
is divided into two sections. (See attached map).
County chose to continue with the plan to provide sewer service to the area, even
though 19 of the 191 taps were located outside of the original Phase I area,
dropping the initial number of taps to 172. This was slightly less than the
estimated 179 taps needed for system viability.
• 1987 Construction begins on the portion of Phase I west of Efland-Cedar Grove Rd. A
lack of available funding prevented the County from constructing all of Phase I.
The original system had 109 taps.
• 1988 System construction was completed and began operation.
• 1.991. In a memo from the County Engineer to the BOCC and County Manager, the
system is already being described as financially troubled. At that time, only 75
taps were in service and the Town of Hillsborough, who treats the wastewater
from the system, had just raised their treatment fees by 24%.
3
• 1991-1997 Throughout the 90s, memos from the County Engineer were written regarding
cost estimates for expansion of the system and the pursuit and study of vazious
funding strategies, including Community Development Block Grants, financing
through customer rates or assessments and a district sewer tax. None of these
ideas proved fruitful.
• 1997 County issued a bond of $1.2 million to expand sewer service in Efland.
• 1998-2002 Discussions in memos from the County Engineer focus on steps required to use
the bond money for expanding service in Efland and defining the scope of the
project so a consultant could be hired to begin engineering design work.
• 2002-2003 Scope was expanded to include the Buckhorn Economic Development District
and North Buckhorn community, in addition to the Central Efland expansion. By
this time, the costs to construct the system expansion in Central Efland were faz
above the original estimates prepared in 1996 by the County Engineer. Federal
grants were sought and earmarked in the form of EPA Special Appropriations
Grants (SPAP). (2003 and 2005).
• 2004 Engineering consultant, Coulter, Jewell, Thames, hired to design the Buckhorn
and Central Efland sewer expansion projects and Gravelly Hill water and sewer.
• 2005-2006 Gravelly Hill is sepazated from North Buckhorn and Central Efland projects.
When it became cleaz that regulatory hurdles due to the EPA SPAP grant would
delay water/sewer service provision to the new Gravelly Hill Middle School, the
portion of the project related to the school was separated from the lazger project.
• 2007-2008 Rate study commissioned. Raftelis Financial Consultants concludes that revenues
from customer's monthly rates only cover 20-25% of system costs. Staff develops
and BOCC approves afour-year rate increase plan to increase revenues and make
the system self-funding.
• May 2008 Environmental Assessment and Engineering Report for North Buckhorn/Central
Efland project is submitted to the State's Construction Grants and Loans division
for review.
• July 2009 Rates raised first time in 20 years. This was the first of four increases over the
next four yeazs.
• Sept 2009 Craig Benedict, Planning Director, and Kevin Lindley, Staff Engineer, attend EPA
workshop on applying for and administering the EPA SPAP grants.
• Dec 2009 State Construction Grants and Loans division approves the Engineering Report
and recommends a Categorical Exclusion (i.e., environmental cleazance) to the
EPA Regional office in Atlanta.
• Dec 2009 EPA Grant Application draft is submitted to State Construction Grants & Loans
section for review.
Legend
Q 10 Year Transition
®20 Year Transition
- I ' EDD
',
~ i ~'
i (Confirmed and ratified by the BOCC On Water and Sewer Management
Planning and Boundary Agreement
jf' ~-~
-;~-- ____ i~~ ~ . April 21, 2001) ~ Phase i west
~`- Pha
I E
}
~f``_..~
`
''
i se
ast
r ~ ~ } ~ ~_
1 { Phase II
_
_~
~ f
-,~ ~'~~ i ~
'• Hancor, Barber & Ross
~ Richmond Hills Subdivision
~'
~ ~ ~
~
_.
! Extensions
r. -
r ~ ~
f _
~
1 ~ >~ Fire Station
"-~_
i `\
III
'~~ Efland Cheeks Park
0
~._ ___ ~'~r- „ ~ and Community Center
'~~~~
__~ ----~r--- - ---, ~' ~,.
`~, ~ j ~ ~ ~
~~
~,~~ ._.
I J
~ ,~ = 2000'
~
i 11
___ _ ~ __ _.~
~~ ~ ~ ~ ~
r-
_
~ . _~ _ _~ ,~ . . -°` !
I
..,
r
~
~_
~ ~
i
Lots within
. .
Crrt~cal
~
•
~
te-
~~-__ _,. __
'
i (
l
,_-:~
~~`~-. ..~._, _~~
~ '~. i
r Area of
Watershed ~
^
f
1 i . _
~ ~
~ ~ 1 ~T~
+` ,1
___ - _.~_
- --
-- ~
~ y ~ ~ .. were
d
d
~
~71~ Y~'f' 'A ~ `,
~
~
~
~ ~ I r
r ~ -
,, ~ ~._.
, ex
u
ed
from Sewer ^
r.
i !
T
,- ~
f
i
V
~'
Plan.
1
~ 7h
f ~
+
.~ -- .~~, ~ ~ ~ -
~
~ V
~
~
~r.
1
-~l .
__~ p _
_ -- ~
f _
~ :_-fr ~r
--
_ _
~
.- 1~.
~ ti
NI ,
~ '
t. ( ~ I ~-
~
~
-
,
~
_ ~
~ -
-
: I~L~ ~ . ~~
H
1 ~ , -- - - ~ i -! ~ .'
~-~_ ,~
w ~ `--4y1
.. _ ..
.__~ - `~,
- ~ -,,.. _~ - _ II _
~T C. ~
._ _. -
, _ .._
,~-,,1 - ~
Last Amended August 15, 2000 ~"a
Z nformg+; ~~-, S-l-en-~
MEMORANDUM
TO: Orange County Board of Commissioners
FROM: Craig Benedict, Planning Director and
R. Kevin Lindley, PE, Staff Engineer
THROUGH: Frank Clifton, Jr., County Manager
DATE: January 11, 2010
SUBJECT: Using EPA Grant Money for Rogers Road Sewer Improvements
At the October 20, 2009 regular BOCC meeting, a citizen raised the question of whether money from the
EPA Special Appropriations (SPAP) grants could be used to provide public sewer service to the Rogers
Road community. Staff has determined that using this money for a Rogers Road public sewer extension
project is not possible. The money from the grants has already been committed to the extension of sewer
service in the North Buckhorn and Central Efland communities. These projects will not be financially
viable without the money from the EPA grants. The entire funding scheme for the Central Efland/North
Buckhorn Sewer project has been predicated upon using the full amount of the two SPAP grants for
construction of the sewer extension.
The money from these two particular SPAP grants has been committed to the Central Efland/North
Buckhorn sewer projects. After completion of these projects, there may be a possibility to request a
similar grant/earmark to help pay for sewer extension into the Rogers Road community. In addition,
there are low cost loans available from the State's Clean Water Revolving Loan Fund that may be
available to fund the construction portion of the Rogers Road project. There is currently a work group
comprised of elected officials set up to study and discuss strategies regarding infrastructure, such as
public sewer, in the Rogers Road community. The work group may be able to offer financing
suggestions for such a project in the future.