HomeMy WebLinkAboutAgenda - 01-21-2010 - 6eORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: January 21, 2010 Action Agenda Item No. ~_ SUBJECT: Buckhorn-Mebane Economic Development District Phase 2 Utility Concept Plan and Design Proposal DEPARTMENT: Manager's Office PUBLIC HEARING: (Y/N) No Planning and Inspections Economic Development ATTACHMENT(S): INFORMATION CONTACT: 1.a Efland Buckhorn Mebane Small Area Frank W. Clifton, Jr., County Manager, Plan Planning Area -Utility Planning 245-2300 1.b. Efland Buckhorn-Mebane Small Area Willie Best, Assistant County Manager, Plan Planning Area -Utility Planning 245-2300 (Focus Area) Craig Benedict, Planning Director, 1.c. Buckhorn-Mebane Master Utility Plan 245-2592 1.d.1 Buckhorn EDD Phase 1 Sanitary Brad Broadwell, Economic Development Sewer Plan Director, 245-2326 1.d.2 Buckhorn EDD Phase 1 Water Plan Pam Jones, Asset Management and 1.d.3 Cost Estimate Summary Purchasing Services Director, 2.a.1 Buckhorn EDD Phase 2 Sanitary 245-2652 Sewer Plan Clarence Grier, Financial Services 2.a.2 Buckhorn EDD Phase 2 Continued Director, 245-2453 Sanitary Sewer Plan John Roberts, County Attorney, 2.b. Buckhorn EDD Phase 2 Water Plan 245-2318 2.c. Buckhorn EDD Phase 2 Cost Estimate Summary 3.a. Buckhorn EDD Phase 3 Sanitary Sewer Plan 3.b. Buckhorn EDD Phase 3 Water Plan 3.c. Buckhorn EDD Phase 3 Cost Estimate Summary 4.a. Buckhorn EDD Phase 4 Sanitary Sewer Plan 4.b. Buckhorn EDD Phase 4 Cost Estimate Summary 5. Buckhorn EDD Phase 5 Sanitary Sewer Plan PURPOSE: To provide a utility concept plan report and design proposal in the Buckhorn- Mebane Economic Development District (EDD) Corridor. BACKGROUND: There are multiple projects in this Efland-Buckhorn-Mebane corridor (see Attachment 1). Some of the projects are underway (i.e. State/EPA grant and construction review) such as the Environmental Protection Agency Special Appropriations (EPA SPAP) grant 2 for Central Efland and North Buckhorn sewer improvements. At the BOCC meeting on October 19, 2009, the County Manager's Office and Planning provided an overview of utility planning in the area. Many of these various projects are inter-related so a complete summary list is included as Attachment 3. However, the focus of this agenda item and discussion will be linked to the Buckhorn EDD Phase 2 noted in Attachment 2. Buckhorn EDD -Mebane Coordination This information relates to the continued utility planning with the City of Mebane consistent with the March 1, 2004 Orange County/City of Mebane Utility Service Area Agreement. Specifically, the agreement includes the City of Mebane's agreement for utility extension by private/public entities into an approximate 1,000-acre EDD area. However, there were not specific allocations reserved for that area that would help Orange County obtain certified business site status. by the State. Therein, staff proposes to work with the City of Mebane to augment the agreement. Utility design planning has been completed to illustrate how an orderly and multi-phase plan of development could occur and how an anchor development such as Buckhorn Village could complement the utility master plan for the larger Buckhorn EDD and Office, Commercial/Light Industrial Nodes. To this end, Orange County, City of Mebane, Buckhorn Road Associates and its engineering consultants (Summit Engineers) embarked on a conceptual investigation to find out: a. what needs to be done, b. in what sequence c. for what design costs, and d. eventual construction cost. See Attachments 2, 3, 4, and 5 which show these preliminary designs. The above information has been refined, and therefore this topic has come back to the BOCC for discussion. Tonight's item will explain aspects a - d, but is focused on contracting for utility engineering design for Phase 2 only. Staff is suggesting that Orange County expend monies to complete the design work. The engineering design work will be in accordance with City of Mebane utility standards and approved by the city. Although this item does not include funding for construction, when construction of these pre-approved designs are complete (pursuant to a later BOCC decision), the City of Mebane would take ownership and maintenance of these facilities. Later Interlocal Agreement At a later date, an agreement for construction is suggested that would be apublic-private sector agreement between City of Mebane, Orange County and Buckhorn Road Associates (Buckhorn Village PUD applicant). The purpose of the agreement would be to fund future engineering design and construction costs for water and sewer `backbone' infrastructure in the Buckhorn- Mebane EDD. `Backbone' systems refer to the major offsite pipe trunk lines that generally extend sewer system collection points or loop a water system back to the utility plant or other high capacity public infrastructure service point. These types of agreements would analyze and set forth the prorated share contributions. Specific onsite site plan infrastructure would still need to be installed concurrent with individual development proposals by the developer. The Buckhorn EDD Phase 2 (southeast quadrant of Buckhorn Road and I-85/40) includes over 400 acres of primarily undeveloped lands. Orange County has made an investment of over $2 million dollars already in the area to serve Gravelly Hill Middle School and the Eurosport Soccer 3 Complex by providing the first phase of water and sewer infrastructure as noted on the last page of Attachment 1 d. Although this is valuable, necessary and supportive infrastructure for the area, fire suppression and trunk gravity sanitary sewer lines are limited with the existing system. Opportunities After the design is completed for Buckhorn EDD Phase 2, State permitting can be pursued, so a future construction project will be primed for funding. Orange County has been discussing funding for construction options with the City of Mebane since these utilities will be built to their standards, and, after completion, will be maintained by them as part of their overall utility system. These areas are also likely to be annexed by the City of Mebane wherein other services will be municipally provided. Mebane would benefit from the looped water system since it travels through its extra-territorial jurisdiction (ETJ) and city limits in places along Washington Street. In any event, these areas have been intended by economic development land use and favorable tax base and they will remain in Orange County whether annexed by City of Mebane or not. Orange County has investigated American Recovery and Reinvestment Act (ARRA) grants for this type of project. As the BOCC is familiar, stimulus monies are primarily used for construction ready projects where design and permitting is complete. The federal government acknowledges that a significant amount of time can be spent on this preliminary work and their interest was to have more responsive job creation from construction. Authorizing the design work at this time will create funding opportunities in the near future and/or be able to be bid for construction in a period when costs are more favorable and prepare a 400-acre economic development area for eventual certification as a state commerce site. FINANCIAL IMPACT: The estimated costs of the engineering design work is approximately $200,000. Funds will come from a combination of general fund and capital project funds. The Financial Services Department will bring back a revised capital project ordinance at a future meeting. RECOMMENDATION(S): The Manager recommends the Board: 1. Approve the master infrastructure utility concept plan for the Buckhorn Mebane Area. 2. Authorize staff to revisit the existing utility service agreement adopted in 2004 with City of Mebane and Attorney's Office and bring back for BOCC review. 3. Authorize up to a $200,000 budget ordinance amendment to fund engineering design activity for this project. 4. Authorize staff to seek proposals for water and sewer utility civil engineering design work for this project. 5. Direct staff to bring back recommendations for final approval by the Board of Commissioners. Regional 1_ ~~ Station Eland-Bu~kh orn Add+tlona! La -Mebane Small yew: Are P ~~~y~~~,•, a la P ~gehorn Nory~ of ~ sewef 1' j1 la n' 1 :n [~ ~a~ 2 • i 9- A re a ~,,a~,~st -Utility PI ''~~,F85, annin ®~~~ ery~ADreer~Mebane • + • • • : • ~9e 8oun~ry, • • • • ..__ _ • s Inctustria Sege Lift Stagy:. North gucyt ~Designaq) {S) ~ucr<h°m E p tNE Quad (3) s~ Etland {Dom west .._.._ meted) {~) Ce~~ Efla (Desi9 dj (g) pj~~ t Efland suckho~n~ Ilage ~g~ r Petro ~ . - 1 SE h~° ~EDD • (2) • Grn~Y Mill Q EDp ~•^d swag ~ )~ (Eastern c~u~d ~ wed use • • • • Station sion) (4) - ~~ Use {orY • • • ~ ~„d T nn~on ~a ~~ ~ a~~~ E~nac ~ Rree ReSe~ o ran • . Reserve ~ Rury~ t,~duga.;a`~Owne,~ areA ~ ^~ if wsnaPeA is a -~~u~+ral Res~q~~! mendeclJ iPL~, Run+IResFden ~-~:er "~rcsr ~~ r+a' ~-'Veter SuPWYAre® a- "'"°°"Q•~ ~, s .,,a, c ~,,,~„~ "~ as °~rp..,~,~~ Reaouroe Pro Ctrl Are$ M"p P^epansy y'~,""'Y and `M`"" ~~Pal J ~~hon grass Mnam ~,,.m .D ~-? Mun;c; J ~~~^ roM„ t ^~m~ ~ s~ ~° rz, za,os /y ~ ~-7 "an ,ae., ~ ~ s1 Jurimy~~ FrJ (D Efiand_BnGk orn- ,' Aadk;anat t_aye~: Meaane Small ~a"e'y Hq meter area pia n pia Buckhor~ Nom enU Sewer nni ~7~a~ ; ~5t ~o s g,~ n°~, n9 A rea _ Utilit ~~,Ees~ 1 ~S~ Y punning ®e~~~,+~ sree^~M~~e B~hom EDD ~„'ua`'- NE Quad ~3) a r~`8r ~( • • • • - • • e9•ntl • • • • • • a,~x • . . • • ~ ~ ~~ Eudch° ED Muceq • SE ~" • . . . • • Eftand T-an .. WSMPgq is _~ Etta • • ~2) • • • • + • Et1~q T~n~ bn ~4~a a^ tended} Ecpn~j r~n~wn'4rea Rege ~ ~ ~ • • + • • + w • • • Gl`dY"'~7 ~'1 ~ Area Reserve `Rust ~ N~O~ nt Arp~a ~O~Y rt yy~MPgq is a~~ ~ - • • • • • • • S ~@ LiJj` 0 Rum R rat Re~entiat ~ -t'uWic Interest qr~ ~ ~ • • • •~b°fj (~~ eskierttia/ per, meter gip • ~.cd meter YArea aa,.,„,~.,,~ ~ • • ~'M~~~Ylectionq ~ ~~ p^swnrv ~~Insre~tions e---, e8s br M' M"'u ~ P~ ~ ~~~tion r~ U awa, ~~~'n'M"°rY- jr' N sdr~ ~a.7 M,ro,q,,,•,~ yq,,,• y ~~ J~O" (ETJJ ~ 3 m Sewer Phase 1 Exlsting Sewer Syste!>7 with Water Phase 3 Sewer Phase 4 Transmission Proposed 7,000 LF Propesed 2,080 LF to the Tawn of of 16" Water Main of 8" Gravity Sewer Hillsborough (Service Area 200 iService Area 88 Acres) Acresi Water Phase 2 Proposed 11.000 LF ~ Sewer Phase 3 16" Water Main ~ Proposed 7,200 LF (Service Area 5G6 '~~ of 8" Gravity Sewer Acresi iceArea 158 To City of Mebane e'~+- Waterand Sewer System Sewer Phase 2 Proposed 7,600 LF of 10" Gravity Sewer Phase 1 Sewer (Service Existing Sewer _ _ _ _ ~ Area 446 Acres) Service Area Sewer Phase 5 : 95.50 Acres Proposed 12,100 LF Sewer Phase 1 r ~' t of 12" Gravity Sewer Existing 8" + - (Service Area 423 Gravity Sewer ` ' Acres) ~ n Sewer Phase 1 ae.,~, ~ _ -- - - - - -_ _ _ Existing City of ~. ~s„~,~,,~_ : ~, Mebane = s ~'- Southeastern Water Phase 1 Regional Pump Sesver Phase ' Existing 12" Station Existing 6" Force Water Main Water Phase 3 Sewer (Service Area Proposed 3,300 LF (Abandcned in Sewer Phase 2 446 Acres) of 12" Water Main Sewer Phase ?} Proposed 20,000 ..,,__ (Service Area 104 LF of 8" - 10" Sewer Phase 1 Acres) Sewer Phase 5 Force Sewer to Existing Gravelly Hill Pump Station 10,380 LF of 10" Mebane Present Capacity 205 G.P.M. Force Sewer Southeastern Ultimate Capacity. s25 G.P.M. Sewer Phase 4 (Abandoned) Pump Station Proposed Gravelly Hill Pump Station No 2 Initial Capacity 125 G.P.M. Sewer Phase 3 Ultimate Capactyy 1i5 c pnn Gravelly Hill Pump Station Replacement Ultimate Capacity: 700 G.P.M. Proposed 2.800 LF of 4" Force Sewer TYPe~ Built-In-Place (Service Area 65 Acres) Legend BUCKHORN - MEBANE EDD N Map produced by Summit Conaulfing Engineers ~v' a EDD Water and Sewer ~ tooo corporate Drive, sine log All Phases A Millaborough, NC 27278 Voice: (819) 732-3893 Fax (919) 732-6876 EDD Future t nch equals 70o feet www.summit-engineeccom D A N rr n Existing Sewer System with ,~~ US 7p Transmission to the Town of ~' c -~-,.,. Hillsborough To City of = RA1LRp~ Mebane Pump Station z ~~" X85 Existing 8" Gravity Sewer Existing 6" Force Sewer WEgT TFN ~ Existing Sewer Service Area 99.60 Acres -•~. Gravely Hit E Middle School Soccer ~x Existing Gravelly Hill Pump Station Present Capacity: 205 G.P.M. Ultimate Capacity: 325 G.P.M. ~Cyrrr~ Q Existing Sewer Service Area Existing Sewer Manhole ~~ Existing Gravity Sewer ~ ~ Existing Force Sewer ® Existing Sewer Pump Station .EDD Phase 1 BUCKHORN EDD Sanitary Sewer N Map produced by Summit Consulting Engineers 1000 Corporate Drive, Suite 101 H*sborough, NC 27278 Voice: (919) 732-3883 Fax: (919) 732-6676 1 ink equals 1,400 feet wwwsummlt~nyineercom D to C9 3 m a :~ To City of Mebane 'i~L w\rEN lJs ~0 RA/LRQ Existing Water -, Service Area ~ 85 446 Acres ~.... Existing 12" Water Main ~--~' Cxavdly HiN Euro Middle School Soccer Legend Phase1 N Map produced by $UmmR Consulting Engineers Existing Water Service Area BUCKHORN EDD ~ looo corporate Drive, suite 101 •^ Existing 12" Water Main H~Isborough, NC 27278 Voice: (919) 732-3883 Fax: (919) 732676 " Ei~ Domestic Water with Limited Fire Suppression , inch equals 1,400 feet ~s~~t-«+g++~r•~ D w n 3 c~ ~. c. N ~~ ATTACHMENT id3 BUCKHORN EDD - MEBANE SERVICE AREA COST ESTIMATE SUMMARY PHASE 1 (EXISTING) -Gravelly Hill Middle School- and Eurosport Soccer Center (Completed 2007) a. Buckhom EDD Sewer Phase I -100 acres 1. Gravelly Hill 205 gpm Sewage Lift Station (upgradeable to 325 gpm, 7700 Linear Foot of 6" Sewage Force Main (Pumping/Releasing to Petro 8" Gravity Sanitary Sewer) 100 Linear Foot of 8" Gravity 2. Cost: approximately $1,450,000, including engineering and design b. Buckhom EDD Water Phase I -100+ acres 1. 7700 Linear Foot of 12" Water Main (Connects to Mebane System at Petro) 2. Cost: approximately $550,000, including engineering and design work for Central Efland and North Buckhorn vs ~o ai ~---,~.._. R.4ILRpgp ~ Proposed Sewer Z Service Area 44fi Acres 10,000 Feet West to Existing City of Mebane Pump Station Existing 6" Force Sewer (Abandoned) Proposed 20,000 LF of 8" -10" Force Sewer Estimated Cost Proposed 7,600 LF of 10" Gravity Sewer Estimated Cost Existing Gravelly Hill Pump Station Present Capacity: 205 G.P.M. Ultimate Capacity: 325 G.P.M. Sewer Service Ama • Proposed Sewer Manho{e atttttltu Purposed GraVlly Sewer t~Proposed Fora Sewer • Fxisteq Sewer Manttok ~~ Exislinp Gravity Sewer Fxialirp Sewer Pump Station '' FAD Phase 2 BUCKHORN EDD Sanitary Sewer N 1 inch equals 1,400 feet Map produced by Summit Consulting Engineers 1000 Corporate Orive, Suite 101 HiNsborough, NC 27278 Voice: (919) 732-3883 Fax: (919) 732-6676 www summit-engineer.oom N A N tJ N :... '\ 185 Existing Gravity Sewer to City of Mebane Industrial w Drive Pump Station z ~ WEST T Fro 0 ~ ~ Existing City c n of Mebane Southeastern O Regional Z Pump Station Proposed 20,000 LF of 8" -10" Force Sewer Estimated Cost Legend Q Sewer Service Area Phase 2 Continued N ~ Proposed Force Sewer Map produced by Summit Consulting Engineers Existing Sewer Manhole BUCKHORN EDD ~ 100o Corporate Drive, Suite 101 Existing Gravity Sewer ~J H~sborough, NC 27278 ® E i ti S P S Voice: (919) 732-3883 Fax: (918) 732-6676 wwW summft~n i x s ng ewer ump Station anitary Sewer g neer.com 1 inch equals 1,200 feet EDD N n lD 7 N G1 N ~\ Proposed 11,000 LF of 16" Water Main Estimated Cost vs ~o ~ ~~~RO,~ Proposed Water Service Area 5a6 Acres / gs -... ~``` ' GraveNy HAI Etmos ' Middle Sdiool Soccer WEST TEN ~ • . . Legend Phase 2 N Map produced by Summit ConsuRing Engineers water Service Area BUCKHORN EDD 1000 Corporate Drive, Suite 101 ~ Proposed 16" Water Main Hipsborough,NC 27278 •~ Existing 12" Water Main Domestic Water with Fire Su reSS1011 1 inch Voice: (918) 732-3883 Fax: (819) 732-6676 pp equals 1,400 feet www.summit-engineer.com EDD !v n s 3 m N 6 l3 ATTACHMENT 2c COST ESTIMATE SUMMARY PHASE 2 - Buckhorn EDD, SE Quadrant (aka Orange County/City of Mebane Utility Agreement Area 1 a) (Proposed - 446 ~ acres) a. Sewer 1. 7600 Linear Foot of 10" Sanitary Sewer (SS) 2. 20,000 Linear Foot of 8 "-10" Sewer Force Main 3. Estimated construction cost: $1,156,000 4. Estimated design cost: $147,660 b. Water 1. 11,000 Linear Foot of 16" Water Main 2. Estimated construction cost: $945,000 3. Estimated design cost: $50,600 SUBTOTALS [approximate] SEWER AND WATER CONSTRUCTION COST: $2,101,000 SEWER AND WATER ENGINEERING DESIGN COST: $198,260 Proposed Sewer Service Area VS ~0 158 Acres Rq/LRpgD Proposed 7,200 LF of 8" Gravity Sewer t $~ Estimated Cost Gravelly Hill Pump Station Replacement Ultimate Capacity: 700 G.P.M. Type: Built-In-place Estimated Cost: Sewer Service Area • Proposed Sewer Manfwk t~Proposed Gravity Sewer ~ Proposed Force Sewer • Fxiatirp Swier ManAde ~ Existirq Graviy sewer Exiatirp Sower Pump Station EDD Phase 3 N Map produced by Summit Consulting Engineers BUCKHORN EDD ~ 11700 Corporate Drive, suite tot H*sborough, NC 27278 Voice: (919) 732-3883 Fax: (919) 732-6676 Sanitary Sewer 1 inch equals t,ao0 feet wwwsummlt~ngineer.com D N A s fD 7 W 01 ~- sedWater P $eryice Area 200 Acres ~--,.~.._VS 70 RAILROAD ~p00 LF PrO~~ Water Main of 16 ated Cost Estim --'~'- Water Pry $Ce Area 10~ Acres 185 -4 1 t _ .. - i WEST TEN `~• ~' "'~ phase 3 Legend Q~,ter Service Area ~~r Prop~~ Water Main ~~ Pjcisting 12" Water Main _ r~ sed 3,300 LF of ~~ W~~rCost Estima .i gUCKHORN END , ink eQusts , ,A°° feet Fire Suppression Additional pomestic Water vnth mit Cor~suttin9 Engineers MaP P~Od'uced ~ Sum 1000 CON°~NC ~8u~10919) 732-x'76 Higsbor°u9 732-3883 F~c. t Vie: tgsurtmi<„eng~neer•Wm ,mow. n 3 7 w is `` EDD ICS ATTACHMENT 3c COST ESTIMATE SUMMARY BELOW PHASE 3 /S NOT SUGGESTED AT TH/S TIME: This phase and Phase 4 are part of the comprehensive infrastructure master plan of the entire Buckhorn-Mebane EDD area. PHASE 3 - Buckhorn Economic Development District (EDD), Northeast Quadrant (246 acres aka Orange County/City of Mebane Utility Agreement Area 2a) a. Sewer i. 7200 Linear Foot of 8" Sanitary Sewer; Gravelly Hill Pump station replacement. ii. Estimated construction cost: $848,000. iii. Estimated design cost: $38,520. (doesn't include pump station design cost) iv. 2080 Linear Foot of 8" Sanitary Sewer; v. Estimated construction cost: $87,110. vi. Estimated design cost: $11,128 b. Water i. 7000 Linear Foot of 16" Water Main; ii. Estimated construction cost - $532,000. iii. Estimated design cost: $32,200 Proposed 2,080 LF of 8" Gravity Sewer US Estimated Cost ~ ~0 Proposed Sewer Service Area 88 Acres X85 Proposed 2,800 LF of 4" Force Sewer Estimated Cost Proposed Sewer Service Area 65 Acres Proposed Gravelly Hill Pump Station No. 2 Initial Capacity: 125 G.P.M. Ultimate Capacity: 175 G.P.M. Estimated Cost: Legend Q Sewer Service Area • Proposed Sewer Manhole Proposed Cxavity Sewer ~ Proposed Force Sewer ^ Proposed Sewer Pump Station EDD Phase 4 BUCKHORN EDD Sanitary Sewer N 1 inch equals 1,400 feet Map produced lyy Summit Consulting Engineers 1000 Corporate Drive, Sude 101 H~sborough, NC 27278 Voice: (919) 732-3883 Fax: (919) 732-6676 www.summit-engineer.com N A N A N -1 V /~ ATTACHMENT 4b COST ESTIMATE SUMMARY BELOW PHASE 4 /S NOT SUGGESTED AT TH/S TIME: This phase and Phase 3 are part of the comprehensive infrastructure master plan of the entire Buckhorn-Mebane EDD area. PHASE 4 -Buckhorn EDD, Southeast Quadrant; Eastern Extension (75 acres) (Note: Presently not part of Orange County/City of Mebane Utility Agreement) a. Sewer; i. 2800 Linear Foot of 4" Sewer Force Main; New Pump station #2. ii. Estimated construction cost - $342,890. iii. Estimated design cost: $14,980 (doesn't include pump station design cost) b. Water; i. 3300 Linear Foot of Water Main; ii. Estimated construction cost - $188,000. iii. Estimated design cost: $15,180. Proposed Sewer Proposed Sewer Service Area Service Area 222 Acres 423 Acres 185 T Existing. GravKy Sewer to Proposed 42,100 LF City of Mebane lndustria! w of 42" Gravity Sewer Drive Pump Station ? Estimated Cost. z ~ 0 U ~ Existing City of Mebane 9,660 LF of 8" -10" _ Southeastern Force Sewer From ~ Regional Existing Gravelly Hill Z Pump Station Pump Station (Installed in Phase 2) ~ 10,380 LF of 10" ~ Force Sewer ` I (Abandoned) . . • t e ..,r --~-.._ Q Sewer service Area t' Proposed Sewer Manhole Phase 5 N Map produced b1' Summit Consulting Engineers Proposed Gravity Sewer Proposed Force sewer FUTURE BUCKHORN EDD 1000 Corporate Drive, suite 101 Higsborough, NC 27278 ~~~~ Face ~"~ Voice: (919) 732-3883 Fax: (919) 732676 t3dsting Sewer Pump Station Sanitary Sewer 1 inch equals 1,200 feet www.summit~ngineercom Future EDD 01 n 7- 3 m cr+