SUBJECT: Buckhorn-Mebane Economic Development District Phase 2 Utility Concept Plan
and Design Proposal
DEPARTMENT: Manager's Office PUBLIC HEARING: (Y/N) No
Planning and Inspections
Economic Development
ATTACHMENT(S): INFORMATION CONTACT:
1.a Efland Buckhorn Mebane Small Area Frank W. Clifton, Jr., County Manager,
Plan Planning Area -Utility Planning 245-2300
1.b. Efland Buckhorn-Mebane Small Area Willie Best, Assistant County Manager,
Plan Planning Area -Utility Planning 245-2300
(Focus Area) Craig Benedict, Planning Director,
1.c. Buckhorn-Mebane Master Utility Plan 245-2592
1.d.1 Buckhorn EDD Phase 1 Sanitary Brad Broadwell, Economic Development
Sewer Plan Director, 245-2326
1.d.2 Buckhorn EDD Phase 1 Water Plan Pam Jones, Asset Management and
1.d.3 Cost Estimate Summary Purchasing Services Director,
2.a.1 Buckhorn EDD Phase 2 Sanitary 245-2652
Sewer Plan Clarence Grier, Financial Services
2.a.2 Buckhorn EDD Phase 2 Continued Director, 245-2453
Sanitary Sewer Plan John Roberts, County Attorney,
2.b. Buckhorn EDD Phase 2 Water Plan 245-2318
2.c. Buckhorn EDD Phase 2 Cost Estimate
Summary
3.a. Buckhorn EDD Phase 3 Sanitary
Sewer Plan
3.b. Buckhorn EDD Phase 3 Water Plan
3.c. Buckhorn EDD Phase 3 Cost Estimate
Summary
4.a. Buckhorn EDD Phase 4 Sanitary
Sewer Plan
4.b. Buckhorn EDD Phase 4 Cost Estimate
Summary
5. Buckhorn EDD Phase 5 Sanitary
Sewer Plan
PURPOSE: To provide a utility concept plan report and design proposal in the Buckhorn-
Mebane Economic Development District (EDD) Corridor.
BACKGROUND: There are multiple projects in this Efland-Buckhorn-Mebane corridor (see
Attachment 1). Some of the projects are underway (i.e. State/EPA grant and construction
review) such as the Environmental Protection Agency Special Appropriations (EPA SPAP) grant
2
for Central Efland and North Buckhorn sewer improvements. At the BOCC meeting on October
19, 2009, the County Manager's Office and Planning provided an overview of utility planning in
the area. Many of these various projects are inter-related so a complete summary list is
included as Attachment 3. However, the focus of this agenda item and discussion will be linked
to the Buckhorn EDD Phase 2 noted in Attachment 2.
Buckhorn EDD -Mebane Coordination
This information relates to the continued utility planning with the City of Mebane consistent with
the March 1, 2004 Orange County/City of Mebane Utility Service Area Agreement. Specifically,
the agreement includes the City of Mebane's agreement for utility extension by private/public
entities into an approximate 1,000-acre EDD area. However, there were not specific allocations
reserved for that area that would help Orange County obtain certified business site status. by the
State. Therein, staff proposes to work with the City of Mebane to augment the agreement.
Utility design planning has been completed to illustrate how an orderly and multi-phase plan of
development could occur and how an anchor development such as Buckhorn Village could
complement the utility master plan for the larger Buckhorn EDD and Office, Commercial/Light
Industrial Nodes.
To this end, Orange County, City of Mebane, Buckhorn Road Associates and its engineering
consultants (Summit Engineers) embarked on a conceptual investigation to find out:
a. what needs to be done,
b. in what sequence
c. for what design costs, and
d. eventual construction cost.
See Attachments 2, 3, 4, and 5 which show these preliminary designs.
The above information has been refined, and therefore this topic has come back to the BOCC
for discussion. Tonight's item will explain aspects a - d, but is focused on contracting for utility
engineering design for Phase 2 only. Staff is suggesting that Orange County expend monies to
complete the design work. The engineering design work will be in accordance with City of
Mebane utility standards and approved by the city. Although this item does not include funding
for construction, when construction of these pre-approved designs are complete (pursuant to a
later BOCC decision), the City of Mebane would take ownership and maintenance of these
facilities.
Later Interlocal Agreement
At a later date, an agreement for construction is suggested that would be apublic-private sector
agreement between City of Mebane, Orange County and Buckhorn Road Associates (Buckhorn
Village PUD applicant). The purpose of the agreement would be to fund future engineering
design and construction costs for water and sewer `backbone' infrastructure in the Buckhorn-
Mebane EDD. `Backbone' systems refer to the major offsite pipe trunk lines that generally
extend sewer system collection points or loop a water system back to the utility plant or other
high capacity public infrastructure service point. These types of agreements would analyze and
set forth the prorated share contributions. Specific onsite site plan infrastructure would still
need to be installed concurrent with individual development proposals by the developer.
The Buckhorn EDD Phase 2 (southeast quadrant of Buckhorn Road and I-85/40) includes over
400 acres of primarily undeveloped lands. Orange County has made an investment of over $2
million dollars already in the area to serve Gravelly Hill Middle School and the Eurosport Soccer
3
Complex by providing the first phase of water and sewer infrastructure as noted on the last
page of Attachment 1 d.
Although this is valuable, necessary and supportive infrastructure for the area, fire suppression
and trunk gravity sanitary sewer lines are limited with the existing system.
Opportunities
After the design is completed for Buckhorn EDD Phase 2, State permitting can be pursued, so a
future construction project will be primed for funding. Orange County has been discussing
funding for construction options with the City of Mebane since these utilities will be built to their
standards, and, after completion, will be maintained by them as part of their overall utility
system. These areas are also likely to be annexed by the City of Mebane wherein other
services will be municipally provided. Mebane would benefit from the looped water system
since it travels through its extra-territorial jurisdiction (ETJ) and city limits in places along
Washington Street.
In any event, these areas have been intended by economic development land use and
favorable tax base and they will remain in Orange County whether annexed by City of Mebane
or not.
Orange County has investigated American Recovery and Reinvestment Act (ARRA) grants for
this type of project. As the BOCC is familiar, stimulus monies are primarily used for
construction ready projects where design and permitting is complete. The federal government
acknowledges that a significant amount of time can be spent on this preliminary work and their
interest was to have more responsive job creation from construction.
Authorizing the design work at this time will create funding opportunities in the near future
and/or be able to be bid for construction in a period when costs are more favorable and prepare
a 400-acre economic development area for eventual certification as a state commerce site.
FINANCIAL IMPACT: The estimated costs of the engineering design work is approximately
$200,000. Funds will come from a combination of general fund and capital project funds. The
Financial Services Department will bring back a revised capital project ordinance at a future
meeting.
RECOMMENDATION(S): The Manager recommends the Board:
1. Approve the master infrastructure utility concept plan for the Buckhorn Mebane Area.
2. Authorize staff to revisit the existing utility service agreement adopted in 2004 with City of
Mebane and Attorney's Office and bring back for BOCC review.
3. Authorize up to a $200,000 budget ordinance amendment to fund engineering design
activity for this project.
4. Authorize staff to seek proposals for water and sewer utility civil engineering design work
for this project.
5. Direct staff to bring back recommendations for final approval by the Board of
Commissioners.
Regional 1_
~~ Station
Eland-Bu~kh
orn
Add+tlona! La -Mebane Small
yew: Are P
~~~y~~~,•, a la P
~gehorn Nory~ of ~ sewef 1' j1 la n' 1 :n
[~ ~a~ 2 • i 9- A re
a
~,,a~,~st -Utility PI
''~~,F85, annin
®~~~ ery~ADreer~Mebane • + • • • : •
~9e 8oun~ry, • •
• •
..__ _ • s
Inctustria
Sege Lift Stagy:.
North gucyt
~Designaq) {S)
~ucr<h°m E p
tNE Quad (3)
s~ Etland
{Dom west
.._.._ meted) {~)
Ce~~ Efla
(Desi9 dj (g) pj~~ t Efland
suckho~n~
Ilage ~g~
r
Petro
~ . - 1
SE h~° ~EDD •
(2) • Grn~Y Mill Q EDp
~•^d swag ~ )~ (Eastern c~u~d
~ wed use • • • • Station sion) (4)
- ~~ Use {orY • • •
~ ~„d T nn~on ~a ~~ ~ a~~~ E~nac ~ Rree ReSe~ o
ran • .
Reserve ~ Rury~ t,~duga.;a`~Owne,~ areA ~ ^~ if wsnaPeA is a
-~~u~+ral Res~q~~! mendeclJ
iPL~,
Run+IResFden ~-~:er "~rcsr
~~
r+a' ~-'Veter SuPWYAre® a- "'"°°"Q•~ ~,
s .,,a, c ~,,,~„~
"~ as °~rp..,~,~~
Reaouroe Pro Ctrl Are$ M"p P^epansy y'~,""'Y and
`M`"" ~~Pal J ~~hon grass Mnam ~,,.m .D
~-? Mun;c; J ~~~^ roM„ t ^~m~ ~ s~ ~° rz, za,os /y ~
~-7 "an ,ae., ~ ~
s1 Jurimy~~ FrJ (D
Efiand_BnGk
orn-
,' Aadk;anat t_aye~: Meaane Small
~a"e'y Hq meter area pia n pia
Buckhor~ Nom enU Sewer
nni
~7~a~ ; ~5t ~o s g,~ n°~, n9 A rea _ Utilit
~~,Ees~ 1 ~S~ Y punning
®e~~~,+~ sree^~M~~e B~hom EDD
~„'ua`'- NE Quad ~3)
a
r~`8r
~(
• • • • - •
•
e9•ntl • • • • • •
a,~x • . .
• •
~ ~ ~~ Eudch° ED
Muceq • SE ~" • . . . • •
Eftand T-an .. WSMPgq is _~ Etta • • ~2) • • • • + •
Et1~q T~n~ bn ~4~a a^ tended} Ecpn~j r~n~wn'4rea Rege ~ ~ ~ • • + • • + w • • • Gl`dY"'~7 ~'1
~ Area Reserve `Rust ~ N~O~ nt Arp~a ~O~Y rt yy~MPgq is a~~ ~ - • • • • • • • S ~@ LiJj`
0 Rum R rat Re~entiat ~ -t'uWic Interest qr~ ~ ~ • • • •~b°fj (~~
eskierttia/ per, meter gip •
~.cd meter YArea aa,.,„,~.,,~ ~ • •
~'M~~~Ylectionq ~ ~~ p^swnrv ~~Insre~tions
e---, e8s br M'
M"'u ~ P~ ~ ~~~tion r~ U awa, ~~~'n'M"°rY- jr' N
sdr~ ~a.7 M,ro,q,,,•,~ yq,,,• y
~~ J~O" (ETJJ ~
3
m
Sewer Phase 1
Exlsting Sewer
Syste!>7 with
Water Phase 3 Sewer Phase 4 Transmission
Proposed 7,000 LF Propesed 2,080 LF to the Tawn of
of 16" Water Main of 8" Gravity Sewer Hillsborough
(Service Area 200 iService Area 88
Acres) Acresi
Water Phase 2
Proposed 11.000 LF ~ Sewer Phase 3
16" Water Main ~ Proposed 7,200 LF
(Service Area 5G6 '~~ of 8" Gravity Sewer
Acresi iceArea 158
To City of Mebane e'~+-
Waterand Sewer
System Sewer Phase 2
Proposed 7,600 LF
of 10" Gravity Sewer Phase 1
Sewer (Service Existing Sewer
_ _ _ _ ~ Area 446 Acres) Service Area
Sewer Phase 5 : 95.50 Acres
Proposed 12,100 LF Sewer Phase 1 r ~'
t
of 12" Gravity Sewer Existing 8" + -
(Service Area 423 Gravity Sewer ` '
Acres) ~
n
Sewer Phase 1 ae.,~, ~ _ -- - - - - -_ _ _
Existing City of ~. ~s„~,~,,~_ : ~,
Mebane = s ~'-
Southeastern Water Phase 1
Regional Pump Sesver Phase ' Existing 12"
Station Existing 6" Force Water Main Water Phase 3
Sewer (Service Area Proposed 3,300 LF
(Abandcned in Sewer Phase 2 446 Acres) of 12" Water Main
Sewer Phase ?} Proposed 20,000 ..,,__ (Service Area 104
LF of 8" - 10" Sewer Phase 1 Acres)
Sewer Phase 5 Force Sewer to Existing Gravelly Hill Pump Station
10,380 LF of 10" Mebane Present Capacity 205 G.P.M.
Force Sewer Southeastern Ultimate Capacity. s25 G.P.M. Sewer Phase 4
(Abandoned) Pump Station Proposed Gravelly Hill Pump Station No 2
Initial Capacity 125 G.P.M.
Sewer Phase 3 Ultimate Capactyy 1i5 c pnn
Gravelly Hill Pump Station Replacement
Ultimate Capacity: 700 G.P.M. Proposed 2.800 LF of 4" Force Sewer
TYPe~ Built-In-Place (Service Area 65 Acres)
Legend BUCKHORN - MEBANE EDD N Map produced by Summit Conaulfing Engineers
~v' a EDD Water and Sewer ~ tooo corporate Drive, sine log
All Phases A Millaborough, NC 27278
Voice: (819) 732-3893 Fax (919) 732-6876
EDD Future t nch equals 70o feet www.summit-engineeccom
D
A
N
rr
n
Existing Sewer
System with ,~~
US 7p Transmission
to the Town of
~'
c -~-,.,. Hillsborough
To City of = RA1LRp~
Mebane
Pump Station z ~~"
X85
Existing 8"
Gravity Sewer
Existing 6"
Force Sewer
WEgT TFN ~
Existing Sewer
Service Area
99.60 Acres
-•~.
Gravely Hit E
Middle School Soccer
~x
Existing Gravelly Hill Pump Station
Present Capacity: 205 G.P.M.
Ultimate Capacity: 325 G.P.M.
~Cyrrr~
Q Existing Sewer Service Area
Existing Sewer Manhole
~~ Existing Gravity Sewer
~ ~ Existing Force Sewer
® Existing Sewer Pump Station
.EDD
Phase 1
BUCKHORN EDD
Sanitary Sewer
N
Map produced by Summit Consulting Engineers
1000 Corporate Drive, Suite 101
H*sborough, NC 27278
Voice: (919) 732-3883 Fax: (919) 732-6676
1 ink equals 1,400 feet wwwsummlt~nyineercom
D
to
C9
3
m
a
:~
To City of
Mebane
'i~L
w\rEN
lJs ~0
RA/LRQ
Existing Water
-, Service Area
~ 85 446 Acres
~....
Existing 12"
Water Main
~--~'
Cxavdly HiN Euro
Middle School Soccer
Legend Phase1 N
Map produced by $UmmR Consulting Engineers
Existing Water Service Area BUCKHORN EDD ~ looo corporate Drive, suite 101
•^ Existing 12" Water Main H~Isborough, NC 27278
Voice: (919) 732-3883 Fax: (919) 732676
" Ei~ Domestic Water with Limited Fire Suppression , inch equals 1,400 feet ~s~~t-«+g++~r•~
D
w
n
3
c~
~.
c.
N
~~
ATTACHMENT id3
BUCKHORN EDD - MEBANE SERVICE AREA
COST ESTIMATE SUMMARY
PHASE 1 (EXISTING) -Gravelly Hill Middle School- and Eurosport Soccer
Center
(Completed 2007)
a. Buckhom EDD Sewer Phase I -100 acres
1. Gravelly Hill 205 gpm Sewage Lift Station (upgradeable to 325
gpm, 7700 Linear Foot of 6" Sewage Force Main
(Pumping/Releasing to Petro 8" Gravity Sanitary Sewer) 100
Linear Foot of 8" Gravity
2. Cost: approximately $1,450,000, including engineering and
design
b. Buckhom EDD Water Phase I -100+ acres
1. 7700 Linear Foot of 12" Water Main (Connects to Mebane System
at Petro)
2. Cost: approximately $550,000, including engineering and design
work for Central Efland and North Buckhorn
vs ~o
ai ~---,~.._.
R.4ILRpgp
~ Proposed Sewer
Z Service Area
44fi Acres
10,000 Feet
West to
Existing City
of Mebane
Pump Station
Existing 6"
Force Sewer
(Abandoned)
Proposed 20,000 LF of
8" -10" Force Sewer
Estimated Cost
Proposed 7,600 LF of
10" Gravity Sewer
Estimated Cost
Existing Gravelly Hill Pump Station
Present Capacity: 205 G.P.M.
Ultimate Capacity: 325 G.P.M.
Sewer Service Ama
• Proposed Sewer Manho{e
atttttltu Purposed GraVlly Sewer
t~Proposed Fora Sewer
• Fxisteq Sewer Manttok
~~ Exislinp Gravity Sewer
Fxialirp Sewer Pump Station
'' FAD
Phase 2
BUCKHORN EDD
Sanitary Sewer
N
1 inch equals 1,400 feet
Map produced by Summit Consulting Engineers
1000 Corporate Orive, Suite 101
HiNsborough, NC 27278
Voice: (919) 732-3883 Fax: (919) 732-6676
www summit-engineer.oom
N
A
N
tJ
N
:...
'\
185
Existing Gravity Sewer to
City of Mebane Industrial
w
Drive Pump Station
z
~ WEST T
Fro
0
~ ~
Existing City c
n
of Mebane
Southeastern O
Regional Z
Pump Station Proposed 20,000 LF of
8" -10" Force Sewer
Estimated Cost
Legend
Q Sewer Service Area
Phase 2 Continued N
~ Proposed Force Sewer Map produced by Summit Consulting Engineers
Existing Sewer Manhole BUCKHORN EDD ~ 100o Corporate Drive, Suite 101
Existing Gravity Sewer ~J H~sborough, NC 27278
® E
i
ti
S
P
S Voice: (919) 732-3883 Fax: (918) 732-6676
wwW summft~n
i
x
s
ng
ewer
ump Station anitary Sewer g
neer.com
1 inch equals 1,200 feet
EDD
N
n
lD
7
N
G1
N
~\
Proposed 11,000 LF
of 16" Water Main
Estimated Cost
vs ~o
~ ~~~RO,~
Proposed Water
Service Area
5a6 Acres
/ gs
-...
~```
' GraveNy HAI Etmos
' Middle Sdiool Soccer
WEST TEN ~
• . .
Legend Phase 2 N
Map produced by Summit ConsuRing Engineers
water Service Area BUCKHORN EDD
1000 Corporate Drive, Suite 101
~ Proposed 16" Water Main Hipsborough,NC 27278
•~ Existing 12" Water Main Domestic Water with Fire Su reSS1011 1 inch Voice: (918) 732-3883 Fax: (819) 732-6676
pp equals 1,400 feet www.summit-engineer.com
EDD
!v
n
s
3
m
N
6
l3
ATTACHMENT 2c
COST ESTIMATE SUMMARY
PHASE 2 - Buckhorn EDD, SE Quadrant
(aka Orange County/City of Mebane Utility Agreement Area 1 a)
(Proposed - 446 ~ acres)
a. Sewer
1. 7600 Linear Foot of 10" Sanitary Sewer (SS)
2. 20,000 Linear Foot of 8 "-10" Sewer Force Main
3. Estimated construction cost: $1,156,000
4. Estimated design cost: $147,660
b. Water
1. 11,000 Linear Foot of 16" Water Main
2. Estimated construction cost: $945,000
3. Estimated design cost: $50,600
SUBTOTALS [approximate]
SEWER AND WATER CONSTRUCTION COST: $2,101,000
SEWER AND WATER ENGINEERING DESIGN COST: $198,260
Proposed Sewer
Service Area
VS ~0 158 Acres
Rq/LRpgD
Proposed 7,200 LF of
8" Gravity Sewer
t $~ Estimated Cost
Gravelly Hill Pump Station Replacement
Ultimate Capacity: 700 G.P.M.
Type: Built-In-place
Estimated Cost:
Sewer Service Area
• Proposed Sewer Manfwk
t~Proposed Gravity Sewer
~ Proposed Force Sewer
• Fxiatirp Swier ManAde
~ Existirq Graviy sewer
Exiatirp Sower Pump Station
EDD
Phase 3 N
Map produced by Summit Consulting Engineers
BUCKHORN EDD ~ 11700 Corporate Drive, suite tot
H*sborough, NC 27278
Voice: (919) 732-3883 Fax: (919) 732-6676
Sanitary Sewer 1 inch equals t,ao0 feet wwwsummlt~ngineer.com
D
N
A
s
fD
7
W
01
~-
sedWater
P $eryice Area
200 Acres
~--,.~.._VS 70
RAILROAD
~p00 LF
PrO~~ Water Main
of 16 ated Cost
Estim
--'~'- Water
Pry $Ce Area
10~ Acres
185
-4
1
t _
..
- i
WEST TEN `~• ~' "'~
phase 3
Legend
Q~,ter Service Area
~~r Prop~~ Water Main
~~ Pjcisting 12" Water Main
_ r~ sed 3,300 LF
of ~~ W~~rCost
Estima
.i
gUCKHORN END , ink eQusts , ,A°° feet
Fire Suppression Additional
pomestic Water vnth
mit Cor~suttin9 Engineers
MaP P~Od'uced ~ Sum
1000 CON°~NC ~8u~10919) 732-x'76
Higsbor°u9 732-3883 F~c. t
Vie: tgsurtmi<„eng~neer•Wm
,mow.
n
3
7
w
is
`` EDD
ICS
ATTACHMENT 3c
COST ESTIMATE SUMMARY
BELOW PHASE 3 /S NOT SUGGESTED AT TH/S TIME:
This phase and Phase 4 are part of the comprehensive infrastructure master
plan of the entire Buckhorn-Mebane EDD area.
PHASE 3 - Buckhorn Economic Development District (EDD), Northeast
Quadrant
(246 acres aka Orange County/City of Mebane Utility Agreement Area 2a)
a. Sewer
i. 7200 Linear Foot of 8" Sanitary Sewer; Gravelly Hill Pump station
replacement.
ii. Estimated construction cost: $848,000.
iii. Estimated design cost: $38,520. (doesn't include pump station
design cost)
iv. 2080 Linear Foot of 8" Sanitary Sewer;
v. Estimated construction cost: $87,110.
vi. Estimated design cost: $11,128
b. Water
i. 7000 Linear Foot of 16" Water Main;
ii. Estimated construction cost - $532,000.
iii. Estimated design cost: $32,200
Proposed 2,080 LF of
8" Gravity Sewer
US Estimated Cost
~ ~0
Proposed Sewer
Service Area
88 Acres
X85
Proposed 2,800 LF of
4" Force Sewer
Estimated Cost
Proposed Sewer
Service Area
65 Acres
Proposed Gravelly Hill Pump Station No. 2
Initial Capacity: 125 G.P.M.
Ultimate Capacity: 175 G.P.M.
Estimated Cost:
Legend
Q Sewer Service Area
• Proposed Sewer Manhole
Proposed Cxavity Sewer
~ Proposed Force Sewer
^ Proposed Sewer Pump Station
EDD
Phase 4
BUCKHORN EDD
Sanitary Sewer
N
1 inch equals 1,400 feet
Map produced lyy Summit Consulting Engineers
1000 Corporate Drive, Sude 101
H~sborough, NC 27278
Voice: (919) 732-3883 Fax: (919) 732-6676
www.summit-engineer.com
N
A
N
A
N
-1
V
/~
ATTACHMENT 4b
COST ESTIMATE SUMMARY
BELOW PHASE 4 /S NOT SUGGESTED AT TH/S TIME:
This phase and Phase 3 are part of the comprehensive infrastructure master
plan of the entire Buckhorn-Mebane EDD area.
PHASE 4 -Buckhorn EDD, Southeast Quadrant; Eastern Extension (75 acres)
(Note: Presently not part of Orange County/City of Mebane Utility Agreement)
a. Sewer;
i. 2800 Linear Foot of 4" Sewer Force Main; New Pump station #2.
ii. Estimated construction cost - $342,890.
iii. Estimated design cost: $14,980 (doesn't include pump station
design cost)
b. Water;
i. 3300 Linear Foot of Water Main;
ii. Estimated construction cost - $188,000.
iii. Estimated design cost: $15,180.
Proposed Sewer
Proposed Sewer Service Area
Service Area 222 Acres
423 Acres 185
T
Existing. GravKy Sewer to
Proposed 42,100 LF City of Mebane lndustria!
w of 42" Gravity Sewer Drive Pump Station
? Estimated Cost.
z ~
0
U ~
Existing City
of Mebane 9,660 LF of 8" -10" _
Southeastern Force Sewer From ~
Regional Existing Gravelly Hill Z
Pump Station Pump Station
(Installed in Phase 2)
~ 10,380 LF of 10"
~ Force Sewer
` I (Abandoned) .
. •
t e ..,r
--~-.._
Q Sewer service Area
t' Proposed Sewer Manhole Phase 5 N
Map produced b1' Summit Consulting Engineers
Proposed Gravity Sewer
Proposed Force sewer FUTURE BUCKHORN EDD 1000 Corporate Drive, suite 101
Higsborough, NC 27278
~~~~ Face ~"~ Voice: (919) 732-3883 Fax: (919) 732676
t3dsting Sewer Pump Station Sanitary Sewer 1 inch equals 1,200 feet www.summit~ngineercom
Future EDD
01
n
7-
3
m
cr+