SUBJECT: Bradshaw Quarry Road Solid Waste Convenience Center: Scenarios and
Strategies to Maintain Operations for Remainder Fiscal Year 2009-10
DEPARTMENT: Solid Waste Management PUBLIC HEARING: (Y/N) No X
ATTACHMENT(S): INFORMATION CONTACT:
Staff Analysis Gayle Wilson, Solid Waste
Management, 968-2885
Gwen Harvey, Assistant County
Manager, 245-2307
PURPOSE: To provide the BOCC with operating scenarios and funding strategies for
continuing the Bradshaw Quarry Solid Waste County Convenience Center (BQR SWCC) for the
remainder of FY 2009-10 (January-June 2010).
BACKGROUND: A BOCC decision was made during the FY 2009 -10 budget process to close
the BQR SWCC (including the elimination of one Center Operator position) effective September
20, 2009. The BQR SWCC was recommended for closure due in part to its lowest statistical
use. At its September 15t" meeting, the BOCC rescinded the closure and stated its intent to
maintain BQR SWCC operations through the calendar year.
The BOCC adopted a budget amendment on October 20t" in the amount of $23,517 from the
County's undesignated fund balance to fund BQR SWCC operations until January 2, 2010. The
BOCC also requested a report on December 15t" with options for funding the BQR SWCC,
within the current Sanitation budget, for the remainder of the fiscal year. Under the current
format for operations/schedule, the projected cost to maintain BQR SWCC operations for the
remaining six-month period, January -June 2010, is $42,996, of which $24,490 are personnel
costs and $18,507 are operational costs. It should be noted that one full time Solid Waste
Convenience Center Operator position has already been vacated in anticipation of the BQR
SWCC closing.
Solid Waste Management has reviewed and considered a variety of operating scenarios and
funding strategies to keep the BQR SWCC open within budgetary constraints. Four different
models are depicted below for BOCC discussion. A staff analysis with additional details on
how the recommended scenarios and strategies were derived is attached as
background.
Considerable discussion on this issue also occurred at the November 17t" Solid Waste Plan
Work Group (Work Group) meeting. Suggestions were received from both the public and Work
Group on both short and long term solutions to maintain BQR SWCC operations. It was
suggested at the Work Group meeting that providing both short and long term options to the
BOCC for consideration on December 15 would be useful. However, given the Thanksgiving
holiday, the Solid Waste Management Department's focus on the Board's December 7th solid
waste transfer station agenda item, preparation for a December 3~d SWAB meeting and other
workload, time did not allow a substantive discussion of longer term options for inclusion in this
report to the BOCC.
Operating Scenarios and Funding Strategies to Maintain BQR SWCC for the
Remainder of FY2009-10
Scenario I: Continue all current BQR SWCC operations
Funding Strategy: Allocate County General Fund Balance:
• If one FTE is utilized for staffing $ 42,996
• If non-permanent employees are utilized for staffing $ 37,506
The remaining scenarios assume a two day a week operation at BQR SWCC only versus the
current four day a week operation with requisite funding achieved through a combination of
service reductions to create savings for reallocation and/or allocation of County General Fund
Balance.
• A savings of $16,536 is projected if one FTE is utilized for staffing or $21,996 if non-
permanent employees are utilized.
• The funding needed for a two day operation utilizing one FTE would decrease to $26,490 or
$21,000 if non-permanent em to ees are utilized
Utilizing Utilizing
One Non-
FTE Permanent
Employees
Scenario II. Convert to a two day a week operation at only the
BQR SWCC, close on remaining holidays and eliminate yard
waste acceptance at four Solid Waste Convenience Centers
Funding Strategy:
1. Reallocate $10,000 earmarked for BQR SWCC closure $ 10,000 $10,000
costs
2. Close on the remaining holidays $ 5,700 $ 5,700
3. Eliminate the acceptance of yard waste $ 7,083 $ 7,083
4. Allocate County General Fund Balance 3 707 $ 0
$26,490 $22,783
Scenario II (a). Convert to a two day a week operation at only
the BQR SWCC, close on remaining observed holidays and
not eliminate yard waste acceptance at four Solid Waste
Convenience Centers
Funding Strategy:
1. Reallocate $10,000 earmarked for BQR SWCC closure $10,000 $10,000
costs
2. Close on the remaining holidays $ 5,700 $ 5,700
3. Allocate County General Fund Balance 10 790 $ 5,300
$ 26,490 $ 21,000
Scenario II (b). Convert to a two day a week operation at only
the BQR SWCC, do not close on all remaining holidays and
eliminate yard waste acceptance at four Solid Waste
Convenience Centers
Funding Strategy:
1. Reallocate $10,000 earmarked for BQR closure costs $10,000 $10,000
2. Eliminate the acceptance of yard waste $ 7,083 $ 7,083
3. Allocate County General Fund Balance 9 407 $ 3.917
$ 26,490 $21,000
Long Term Funding Options Under Consideration for all Orange County
Solid Waste Convenience Centers
• Reduce hours/days of service at some or all sites
• Reduce services at some or all sites
• Initiate Solid Waste Fee County wide for selected group or all residents to partially or fully
fund Convenience Center operations
• Initiate fee for Bulky item disposal
• Pay as you throw for Municipal Solid Waste (MSW)
FINANCIAL IMPACT: There will be a financial impact for keeping the BQR SWCC open beyond
January 2, 2010. Specific impacts will depend upon which operating scenario and funding
strategy is determined by the BOCC.
RECOMMENDATION(S): The Manager recommends the Board receive and consider the
operating scenarios and funding strategies presented by Solid Waste Management, request any
additional information necessary to aid discussion, and provide direction to the Manager
regarding funding Bradshaw Quarry Road SWCC operations for the remainder of Fiscal Year
2009-2010. Ultimately, a more formalized and sustainable arrangement to the funding of solid
waste convenience centers is necessary and appropriate going forward. Alternatives are under
active review and will be presented for consideration at a future point in time, possibly within the
FY 2010-11 budget process.
4
Bradshaw Quarry Road Solid Waste Convenience Center
Solid Waste Management Staff Analysis
The table below reflects the current users by Solid Waste Convenience Center since the
conversion to the current four-day schedule.
Actual User Volumes Averages Per Day- October 2009
Center Monda Tuesda Frida Saturda TOTAL
BQ 103 55 117 67 342
ER 466 465 527 554 2012
FR 295 274 296 445 1310
HR 222 252 268 328 1070
WG 619 563 746 895 2823
Estimated cost to maintain existing 4-day/week service at the BQR SWCC for the full six
months is $42,996 or $7,166 per month.
SWM staff has developed an array of options and funding sources for maintaining some
level of service at BQR SWCC for the current fiscal year. These options represent
various modifications in days, hours, and services possible in order to provide funding
from the existing Fiscal 2009/10 budget.
Funding Alternatives that do not include Service Impacts
1. Reallocate $10,000 earmarked for the BQR SWCC closure.
In the current Sanitation budget, $10,000 is earmarked for the restoration of the BQR
SWCC site. If the BOCC approves the continuation of BQR SWCC operations, staff
recommends these funds be reallocated to offset BQR SWCC operational and
personnel costs. However, if the BOCC elects to close BQR SWCC on June 30,
2010, this $10,000 would be needed in the next fiscal year.
2. Use the County's General Fund Balance to provide all or a portion of maintaining the
BQR SWCC for the remainder of the fiscal year.
Funding Alternatives that do include Service Impacts
Given the typical requirement to publicize and promote any changes to residents it would
be difficult to make any of these changes until February 1, 2010 allowing one month to
plan, execute and advertise any changes the BOCC may ultimately decide.
Decrease days of operations to two days only at the BQR SWCC
Current hours of operations at all centers are from 7 a.m. to 6 p.m. on Monday,
Tuesday, and Friday; 7 a.m. until 5 p.m. on Saturday; closed Wednesday, Thursday
and Sunday. A decrease in hours would result in decreased personnel costs.
Changing to only two days of operation would result in a savings of $16,536 if a FTE
was utilized or $21,996 utilizing temporary staff. In this scenario changing to a
5
temporary employee does provide savings of slightly over $5,000. The Board may
consider the two days the BQR SWWC operates from the usage table above.
2. Close all Solid Waste Convenience Centers on County Holidays.
SWCC will open the following County observed holidays through January 2,
November 27 (day after Thanksgiving), and December 28 (normal workday following
the Christmas day holiday) By closing the remaining 3 holidays through June 30,
2010, it is anticipated that $5,700 may be saved.
3. Eliminate the acceptance of yard waste at the four remaining centers.
Yard waste is accepted at the four largest Convenience Centers. It has never been
accepted at the BQR SWCC. A total of 399 tons of yard waste were accepted at the
centers during 2008-09 FY. Currently the same tons are projected for this FY. If yard
waste acceptance was eliminated effective February 1, 2010, it is projected that 170
tons would not be received for disposal. The average number of loads per week by
Centers is: Ferguson Road 2; High Rock ~ .75; Walnut Grove 2.75; Eubanks
Road ~ 2.75. The elimination of yard waste acceptance for 5 months, February 1 thru
June 30, at the four other centers is projected to save approximately $7,083. This
savings includes tip fees and collection costs.
Various Approaches Available
1. Change to a two-day operation utilizing a FTE with a projected cost of $26,490 or
utilize a temporary employee at a projected cost of $21,000 to operate the BQR
SWCC for the remaining FY.
2. Reallocate the $10,000 earmarked for the BQR SWCC site restoration in this year's
budget and apply to any anticipated cost reduction.
3. Close all SWCCs on the remaining County Holidays, January 1-June 30, 2010,
resulting in an anticipated savings of $ 5,700.
4. Eliminate the acceptance of yard waste at the four remaining centers for the
remaining part of the FY would result in an anticipated savings of $7,083. (This
option affects a larger population of the county and will require a considerable
education and outreach campaign for this option to be utilized. Projected starting
date February 1, 2010.)
5. Use the County's General Fund Balance.