Loading...
HomeMy WebLinkAboutAgenda - 12-15-2009 - 4iORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: December 15, 2009 Action Agen a , Item No. `t- ~ SUBJECT: Justice Center Facility Project Change Order and Revised Capital Project Ordinances DEPARTMENT: Asset Management & PUBLIC HEARING: (Y/N) No Purchasing Services (AMPS), Financial Services ATTACHMENT(S): Proposed Change Order Capital Project Ordinances for: Justice Center Facility Emergency Services Relocation at Meadowlands INFORMATION CONTACT: Pam Jones, AMPS, 245-2652 Jeff Thompson, AMPS, 245-2658 Gary Humphreys, Financial Services, 245-2453 Paul Laughton, Financial Services, 245- 2152 PURPOSE: To consider approving 1) a change order for the Justice Center Facility capital project in order to comply with life safety code issues, and 2) capital project ordinances for the Justice Center Facility and Emergency Services Relocation at Meadowlands projects. BACKGROUND: The renovation phase of the Justice Center Facility project started in January 2009 and was scheduled for completion in June 2009. The completion was delayed while several options were explored to provide code worthy fire protection assemblies in the renovated areas. This extra effort was necessitated by a more destructive asbestos abatement procedure than was originally anticipated. The original design for the renovation phase included several key tenets: 1) to utilize geothermal technology in the HVAC system for both existing and new space at the New Courthouse; 2) to resist the employment of sprinklers in the renovation area in order to preserve accidental water damage of the Mural Courtroom artwork; and 3) to update the electrical and lighting systems of the existing facility. No other major renovations were called for in design. The demolition and asbestos abatement occured in early 2009 to complete the electrical work and the installation of geothermal HVAC in the renovated area. Until the employees were moved from the existing building to the new addition, the extent of abatement that would be necessary could not be determined. In the final analysis, the removal of asbestos around radiators and existing HVAC ductwork required significant intrusion into the plaster areas of the existing Courthouse, which in turn compromised the fire rating assembly. The build team, consisting of the designer (Corley Redfoot Zack Architects), Orange County Building Inspections, Hillsborough and Orange County Fire Marshals, and County Staff, worked closely through three iterations of re-design and cost evaluation over several months to arrive at the most efficient and lowest cost solution. The proposed design focuses on a building sprinkler 2 system that protects both the Mural and Battle courtrooms. The Mural sprinkler system will incorporate a dual triggered "pre-action" mechanism that will provide protection against the premature discharge of water onto the artwork and murals; water will only be discharged in the case of a fire in that area. The construction scope and pricing based on this design is attached. Should this proposed change order and capital project ordinances be approved, completion of the facility will start immediately and will be completed in the first quarter of 2010. FINANCIAL IMPACT: The attached change order for the Justice Center Facility project totals $294,009. This project, with a currently approved budget of $11,979,103, has available funds of $157,000 towards this change order. Staff proposes the remaining $137,009 needed to fund the change order be transferred from the Emergency Services Relocation at Meadowlands Capital Project. This amount also includes $10,000 for contingencies that may arise during the sprinkler construction. The Emergency Services facility has been completed for some time and currently has an unencumbered amount of approximately $187,000 available. With the exception of installation of wire mesh window coverings sufficient to withstand flying debris in a high wind event, the project is complete. The cost of the window coverings has been set aside and is not included in the stated unencumbered amount. RECOMMENDATION(S): The Manager recommends the Board: 1) Approve a change order in the amount of $294,009 to the Justice Center Facility Project needed to comply with life safety code issues; 2) Approve the attached Justice Center Facility and Emergency Services Relocation at Meadowlands Capital Project Ordinances; and 3) Authorize the Manager to sign the change order. -. .. ...- -~ --~--. -.._. -- --- ---~-~--- ...---~--- .-. ... _ - .:. _- . ... - - --- ~--. _.. 3 ~ ®~ ®~ ~ u x ~ o n 5 t r n c t t o n Company t n c. November 30, 2009 Ken Smith Corley, Redfoot, Zack 222 Cloister Ct. Chapel I-1iI1,1~IC 27514 RE: Qrange County .Tustice Expansion Mr'. Smith, Bordeaux Construction Company, Inc. is hereby isslyiiig a foxxnal change px~aposal for the above referenced pz~oject for your review and approval, - CP #5X13 Summary of C&~~ges per County Regrcested ~tevirron~ d,~rted 09/2S/09 "Code Revisions": 1~"eclianical Room XG 48 " "Schedule Impacting Scope": Demo, Remove D&F, New framing and patching, Ziire Rating of Wa11s, New D/F/H. " ® Labor: $935.00 ~ - - e Material: $269:.00 ~ Subcontractor. N!A ~ Unit Prices (D/F1I-~ & (New Wall): $1,185.00 "Nora~Sefiedule Impacting Scope: New Base a Subcontractor: $124„00 Tlegtibule XG 49 "Schedule Impacting Scope": Demo, Remove D&F, New framing and patching, hire Rating of Walls, New D/F/PL s Labox: $2,574.00 ® Material: $838.00 o Subcontractor: N/A ~ .Unit Prices (D!FlII): $S,OOQ00 "IVon-Schedule Irnpaciarxg Scope: New Base & Casing a Subcontractor: $2,640.00 FQ Box 293x, Dnrhan~, A1C 27715-2935 100 E. Btitania Ava, Durham, NC 277051 (919) 220-1141 tel {919) 220-1147 fax vvZV~.Sorc(caaxconstructionco com _ --- _.. .. _ 4 ~ ~ R ® lW A U x C o h s t r u c t l n n Company J n c. Storage XG02 "Schedule Impacting Scope"; Remove D&H and New D&H. Unit P'1ice (D/F/H): $2,500..00 Non-Schedule Inapading Scope: New Base 1~ Casing (N/A) YestibuleXG01 - "Schedule Impacting Scope": Demo, R.emave D&F, New framing and patching, Fire Rating of Walls: ~ ' Labaz: $5'75.00 - e Material: $27500 ® Subcontractor: N/A "Nora-Schedule Irnpactrng~Scope: New_ Base & Casing a Subcontractor: $1,240.00 Stair XS`-1 - "Schedufe ImpaetingScope": Demo, Remove D&F, New framing and patching, Fire Rating of Walls: - - e Laboz: $4,7$0.00 ® Material: $1,920.00 ® Subcontcactoz: N/A e Unit Price (D/F/H); $2,500.00 "Non~Sehedule Impacting Scape: New Base & Casing ® Subcontractor: $1,240.00 Starr XS-2 . "Schedule Impacting Scape": Demo, Remove D&F, New flaming and patching, Fire Rating of Wails, New D/F/H. ® Laboz: $3,670,00 a Material: $1,630.00 ~ Subcontractor: $2,116..00 (Revisions per SK110509-A} ~ Unit Pzioes {D/F/H}: $5,000.0(1 . "Nora-Sclaedrele Impaacting Scope: New B ase & Casing ~ S1lbcontractol: $i,500.00- PO Box 2935, Durham, NC 27715••2935 100 E. Sritania Ave-, Durham, NC 27704 {919) 220-1141 teI (919) 2Z0-i1A7 fae • mxw.botdeamtcobstiuctionco.am - l~ ~ Fa ~ ~ A U X .Constructeon Company inc. Staii'~~-1 . "Sclaeduie Impircfirrg Scope": Demo, Fire Kating of Walls, New D!F/I~. s Labor: $740.,00 - - + ~ Material: $644.00 ~ ~ - . ® Subcontractoa•: N/A ® -Unit Prices (Df1=/II): $2,500.00 `4Yoh~Schedule Impacliiag Scope: New Base & Casing (N/A} Mural Corrr~roorrt "Schedule Impacting Scope": Scaffolding and Cleaning ® Laboz: $720:00 - Mateziai: $2$8.00 ~ Subcontractoz: $10,262.00 Stair~S 2 "Schedule Impacting Scope": Demo, Remove D&F, New framing and patching, Fire Rating of Walls, Ne~.v D/F/H. ~ ~ - ~ Labor. $1,9A5,04 o IvFaterial: $960.00 a Subcontractor: N/A ® ullit Prices (D/F/H}: $2,50o.0a "Non-yS'cfiedule Impacting Scope: New Casing ® Subcontractor: $1,040.00 StairX,~-1 "Schedule Xmpacting Scope": Ne~v framing and patching,. Fire Rating of Wa11s, New D/F/H. ~ . ~ Labor: $1,550.00 ' a Material: $375.00 A Subco~.ctor: N/A ® Unit Prices (D/F/I~): $2,SOOAO won-~Sehedatye I,napacting Scope: New Casizlg a Subcontractor: $500.00 PO Box 2935, Durham, NC 27715-2935 100 ?~_ Btitania Ave., Diu-ham, tvrC 27704 (919} 22(3-1141 tel (914} 220-1147 fa.4 ' t~tv~~bonleaueconstructionw.~rom .. _ ....._....__ . .... ... ... ..- - -6 ~ ~ ~ ~ E A ~ X Cons ruction Company In c ~ Canby x2o~ ~ - ~ . "Scleedrrle ~'mpacling Scope": New framing and patching, Fire Rating of WaIIs, New D/F/H, Paill~ Re-work Door X20_S _ • Labor: N!A • Mafei7al:I~IlA • SubcontzaCt42: $2, I40.,00 _ . • Unit Prices~(D/l/H}: $965,00 "11Ton~5cJ~iedule Irsrpactirzg Scope: New Casing ® Subcnntracfoz~: $1,000.00 Attic Walkway "Sc)iedrele Impacting Seo~e": Demo & WaIkway_ Framing- - - - - - - _ .- - - • Labor. $5,940.00 - _ -T ® Maferial:4,400.00 e Subcontzactoz: N!A "Non-Sclcedule .Impacting Scope: (N/A) Mechanical Revisions {.ire Dampers & DuetRemoval & Re-Install per Inspections Dept: Revisions), Duct Itrsutataart Removal raid Re-Irrstadlation: $23,682.00 Electrical Revisions; . I. {fife Safety Kevisions per Inspections Dept: Re~vasiorrs): X19,651.00 2. Relocation of electrical panels iit stairwell XS-l as requested ny QCBI offrce $19,910.0.0 ~ ~ ~ . 3. Patching of'70 sgft {$2o/sgft) of masonry 3aarll demoed for piping $I,400.OU Plumbi:tg Revisiarrs: {Qil Murder Pump per Bldg Inspections Dept. Regcrest) ,s3,3so.vo SpranklerRevisrans: ® Frrrrtislr & Install complete ,Fare Protertiort Systerrt based on Shop Drawings received 11/24/09 ~IOD, 000.00 PO Box 2935, Durham, I~tC 27715-2935 IDD E. Britania rive, Durham, i 1'C z77D4 (919) 220-tt41 tet (919} 220-117 fax tvcvty bo rdeaaxconstrnctionca.com ~® R® E A U X •- Construction Company. Inc BCC Direct Labor Cost: $`,2.3,469.00 BCCDirect Material C©st: $.II,S99.00 BCCDirectSubeontractor Cos~~ $19I,7S1.00 BCC Direct Unit Price Cost: $24,650: DO Buililets Risl~ $4,71,5.00 - ~ • ~'hange -Order Band: $2, 91I.OD ~ • Taxes &-Irrsurar:ce on Labor: $8,214 0.0 Sates Tax: $898.00 BCC CO Olt&P (Prime@ IS~6): $6,627 00 BCC CO OH&P (Subcontractors @ 10%): $19,175.00 Total Cost: $294,009.00 Please see the attached proposal breakdown and pricing from Bordeaux Construction Company. Xfproposnl is approved and r~ecrrted by December 16`h, 2009, the rxew ~Tinal" Completion date for the above referenced project will be April2.3'd , 2010 *Upon acceptance of tlxis proposal by the owner and execution of art change order by the owner; Bordear~c Construction reserves' the right to review the schedule impad for code improvement revlsiorzs, the schedule impact of asbestos abatement revision arsd delays as associated with extended overhead cos#,per revisions regxxested by Orange Cou-xty Building Lzspections Departmen> Sincerely, - ~ . $ordeaug C ns - "o Coffipatxy, Jf>QC. Chad Lloyd Project Manager ~ ~ - PO Bog 2935, Durham, NC 27715-2935 100 E Bxitania Ave ,Durham, NC 27744 (919) 220-1 ill. tel ~ (9i9) 220-1147 fax ti~~sacv.bordcauxoustructionco.com o R p - aooq - ~ 87 Justice Center Facility Capital Project Ordinance Be it ordained by the Orange County Board of County Commissioners that pursuant to Section 13.2 of Chapter 159 of the General Statutes of North Carolina, the following capital project ordinance is hereby adopted. Section 1. The project authorized provides funds for the construction of an addition to the Justice Center. This amendment provides for a transfer of sales tax proceeds of $137,009 from the Emergency Services Relocation at Meadowlands Capital Project to this project to cover project costs. Section 2. The officers of the County are hereby directed to proceed with the project within the total budget contained herein. Section 3. The following revenue is anticipated to complete this project. Prior Amendments Amendment FY 2008/09 FY 2009-10 FY 2009-10 FY 2009/10 12-15-2009 Alternative Financin $10,200,000 $0 $10,200,000 2l3rds Net Debt Bonds 190,000 $0 190,000 Sales Tax 497,961 $1,091,142 $137,009 1,726,112 Total $10,887,961 $1,091,142 $137,009 $12,116,112 Section 4. The following amount is appropriated for this project Prior Amendment FY 2008/09 Amendments FY 2009-10 FY 2009-10 FY2009/10 12-15-2009 Desi n $1,032,961 $341,142 $0 $1,374,103 Construction 9,855,000 $137,009 9,992,009 Other $750,000 $0 $750,000 Total $10,887,961 $1,091,142 $137,009 $12,116,112 Section 5. This ordinance supersedes any previous Capital Project Ordinances for this project. Section 6. This ordinance shall remain in effect until the Board of County Commissioners takes action to amend the ordinance or close the project ordinance upon completion of the project. Adopted this 15t" day of December 2009. ~RD - aoo~ - ~ 8~3 s Emergency Services Relocation at Meadowlands Capital Project Ordinance Be it ordained by the Orange County Board of County Commissioners that pursuant to Section 13.2 of Chapter 159 of the General Statutes of North Carolina, the following capital project is hereby adopted. Section 1. The project authorized provides funds for the purchase of the Meadowlands Drive facility and for upfitting the facility to accommodate the relocation of the Emergency Services Department. Proceeds from alternative financing, two-thirds net debt bonds, and transfers from other funds/projects finance the project. This amendment provides for the transfer of sales tax proceeds of $137,009 from this project to the Justice Center Facility Capital Project. Section 2. The officers of the County are hereby directed to proceed with the project within the budget contained herein. Section 3. The following revenue is anticipated to complete this project: Through FY Amendment 2008-09 ~ 2009-10 FY 2009/10 12-15-2009 Sales Tax $1,300,000 ($137,009 $1,162,991 2001 Bonds $0 0 $0 Private Placement $1,685,000 0 $1,685,000 2/3 Net Debt Bonds $200,000 0 $200,000 Transfer from Pazks Operation Base Capital Project $222,765 0 $222,765 Transfer from General Fund (Court Operations Reserve) $200,000 0 $200,000 Transfer from Emergency Tele hone Fund $60,958 0 $60,958 Total Fundin $3,668,723 .$137,009 $3,531,714 10 Section 4. The following amount is appropriated for this project: Through FY Amendment FY 2008-09 2009-10 FY 2009/10 12-15-2009 LandBuildin $1,757,765 $0 $1,757,765 Planning/Architect/Eng $50,000 ($37,009) $12,991 Construction $1,800,000 ($100,000) $1,700,000 E ui ment $60,958 $0 $60,958 Total Costs $3,668,723 ($137,009 $3,531,714 Section 5. This ordinance shall be in effect from the original date of adoption, March 24, 2003, until June 30, 2010. Adopted this 15th day of December 2009.