Loading...
HomeMy WebLinkAboutAgenda - 11-23-2009 - E1 L • ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: November 23, 2009 Action Agenda Item No. E. 1 SUBJECT: State of the 2030 Comprehensive Plan DEPARTMENT: Planning and Inspections PUBLIC HEARING: (Y/N) No ATTACHMENTS: INFORMATION CONTACT: Craig Benedict, 245-2592 1. 2030 Comprehensive Plan Implement- Tom Altieri, 245-2575 ation Reporting —A Composite of Department Reports PURPOSE: Planning Staff to provide a status report on the implementation of the 2030 Comprehensive Plan. BACKGROUND: This November marks the first anniversary of the adoption of the 2030 Comprehensive Plan. The adopted Plan includes a recommendation for Comprehensive Plan Element status reports to the Board of County Commissioners (BOCC) every other year beginning one year after Plan adoption; Staff sees this first Report (Attached) as a starting point from which to build, with the goal being a reporting process that is responsive and becomes more useful with each report. To this end, staff offers its own ideas for improvement at the conclusion of the report and requests constructive feedback from the BOCC and Managers Office. Each County department involved in preparing an Element of the Comprehensive Plan has participated in this reporting process, each completing and submitting a standardized reporting form. All reporting departments are thanked for their participation, which began this past April when staff met to discuss implementation and an acceptable reporting format. Although the Report is 50-pages in length, due to the large number of Plan objectives (263), it is not essential to read the entire document. These objectives are the pool of ideas that may be helpful for staff, advisory boards, and BOCC to review each year as priorities are developed. The Introduction to the Report (pp. 2-3) includes a description of its structure, which is intended to guide the reader through the document to key information. Therefore, it is advised that the reader begin with the Introduction and then proceed at their pleasure. FINANCIAL IMPACT: There is no direct public fiscal impact regarding this item. RECOMMENDATION: The Manager recommends the Board receive the report from staff. l 2030 Comprehensive Plan ' Implementation Reporting -- A Composite of Department Reports November 2009 Table of Contents Introduction (Structure of Report, Reporting Departments, and Associated Advisory Boards) p. 2-3 1. Implementation Actions a. Work Completed pp. 3-4 b. Work Initiated pp. 4-6 2. Element Objectives and Status Economic Development pp. 7-11 Housing pp. 12-14 Land Use pp. 15-20 Natural and Cultural Systems Agriculture pp. 21-22 Air and Energy pp. 22-24 Cultural Resources pp. 25-26 Natural Areas pp. 26-29 Water Resources pp. 29-33 Parks and Recreation pp. 34-37 Services and Facilities Water and Wastewater pp. 38-40 Education p. 40 Library Services pp. 40-41 Erosion Control pp. 41-42 Solid Waste pp. 42-43 Public Safety pp. 43-44 Transportation pp. 45-47 Summary Chart p. 48 3. Additional Comments or Items to Report p. 49 4. Conclusion pp. 49-50 1 l 1 2030 Comprehensive Plan 3 Implementation Reporting -- A Composite of Department Reports Introduction: This November marks the first anniversary of the adoption of the 2030 Comprehensive Plan. The adopted Plan includes a recommendation for Comprehensive Plan Element status reports to the Board of County Commissioners (BOCC) every other year beginning one year after Plan adoption. Although Planning Staff believes that this report and process is meaningful, it will be the first to acknowledge that reporting methods can be improved. Staff sees this Report as a starting point from which to build, with the goal being a reporting process that is responsive and becomes more useful with each report. To this end, staff offers its own ideas for improvement at the conclusion of this report and requests constructive feedback from the BOCC and Managers Office. Structure of Report: The following Report is provided in four (4) sections. Information in Sections 1-3 is as reported by the staff associated with each respective Element of the Comprehensive Plan. A look into the contents of each section is provided below. Section 1 - Implementation Actions are conveyed in two parts: 1 a. Work "Completed" and 1 b. "Work "Initiated". Section 2 - Provides the relationships between reported work items and 2030 Comprehensive Plan Objectives. As Section 2 is lengthy, due to the large number of Plan Objectives (263), a Summary Chart of the information is provided on p• 48. The status of each Objective is indicated as either Initiated, Completed, Completed/Ongoing, Ongoing, or No Action. In a few cases, staff volunteered additional written description of work towards a particular Objective (This may be something to add to all status reports in the future). . Following is a brief explanation of the terms used and how they have been applied to describe status: Initiated- Work has been started and progress made towards achieving Plan objective. Completed or Completed/Ongoing- Objective is task specific and work has been completed or a portion is complete but work remains (i.e. "Objective AE-1:Assess and implement the current countywide greenhouse gas emissions inventory and action plan target reductions." In this example, the inventory has been completed but implementation remains -- status is "Completed/Ongoing"). Ongoing- In some cases, Plan objectives are not task specific but are expressions of policy or an ideal end state. "Ongoing" indicates that work has been initiated and is to be continued or maintained. (i.e. "Objective LU-2.1: Maintain the rural, low- 2 i L 4 density land surrounding Chapel Hill and Carrboro Transition Areas as Rural Buffer land, as designated on the Land Use Plan. Future consideration should be given to designating Rural Buffer areas around other municipalities where such interest exists" This example is an expression of policy and until changed, maintaining lands as Rural Buffer will be ongoing. No Action- Not part of current work plan. Action may need to be initiated through Capital Improvement Plan. Section 3 - Provides an opportunity for respective staff to convey any additional, pertinent comments or items to report (As most staff had nothing additional to report, this may be a section to delete from future status reports). Section 4 - Includes Planning Staffs concluding remarks regarding the reporting process, need for constructive feedback, and ideas to improve future reports. Reporting Departments: Economic Development Commission, Housing and Community Development, Planning and Inspections, Environment and Resource Conservation, and Parks and Recreation Associated Advisory Board(s): Economic Development Commission, Affordable Housing Advisory Board, Planning Board, Agricultural Preservation Board, Commission for the Environment, Historic Preservation Commission, Parks and Recreation Advisory Council, and Orange Unified Transportation Board 1. IMPLEMENTATION ACTIONS a. General Statements of Work Completed (bulleted list): Economic Development • The importance of compact and higher density development in areas served by water and sewer and the desirability of mixed use projects that support walkable communities is an understood concept of preferred development in the County and is reflected in most economic development and planning policies (ED-2.1 and ED-2.2). • The Business Climate Work Group provided a report on its assessment of private sector job creation in its July 2006 update to the EDC Five-Year Strategic Plan (ED-3.4). Housing • Repaired health and safety deficiencies in 23 deteriorated dwelling units throughout the County. (H-1.1 and 3.3). • Provided rental assistance to 10 homeless families during the last fiscal year. (H-1.1 and 2.2). 3 Land Use 5 • Land use and zoning amendments establishing Efland/Cheeks Highway 70 Overlay District. • Zoning amendment relating to the amount of development of non-residential land uses within certain watershed overlay districts. • Process to prepare a Unified Development Ordinance (UDO). • Process to implement Small Area Plans. • Process for the Planning Board to develop recommendations annually for Comprehensive Plan implementation work items. • First Comprehensive Plan status report to BOCC. Natural and Cultural Systems • Greenhouse Gas Emissions inventory completed in spring; co-sponsored w/ Chapel Hill, Carrboro, Hillsborough and UNC-Chapel Hill. • CFE completed 2009 State of the Environment Report in spring. • CFE and ERCD staff held Environmental Summit in September. • HPC sponsored first joint meeting of preservation/historical organizations in May. • Renewable energy stimulus project t(solar water heaters) submitted 9/21/09. Parks and Recreation • PR 1.4 Some alternative funding sources have been identified, and funds received for park operations purposes. • PR 2.4 The IPWG has developed and approved a "Guiding Principles Governing Community Use of Schools for Recreation" document for consideration by the municipal and school boards within Orange County. This has been adopted by all jurisdictions except Chapel Hill and Orange County (slated for BOCC consideration 11/5/09). • PR 3.2 Individual park master plans have been implemented (and park construction completed) at Efland/Cheeks Community/School Park, Little River Regional Park and Natural Area, Cedar Grove Park, Eurosport (West Ten) Soccer Center, and master plans completed for Blackwood Farm Park and Hollow Rock Access Area (New Hope Preserve). Services and Facilities • Annual Schools Adequate Public Facilities Ordinance Report. • Bioretention at Farmers' Market (Stormwater Management). • Library Services Strategic Plan. • Solid Waste Advisory Board report. Transportation • American Reinvestment and Recovery Act (ARRA) grant application for transit vehicles and Twin Creeks Park Greenway (Authorization to Construct greenway approved by NCDOT. • Orange Unified Transportation Board developed work plan. 4 6 b. General Statements of Work Initiated (bulleted list): Economic Development • Development of the necessary tools and policies to attract businesses to the County will continue to be of primary importance. • The development of local and regional partnerships are vital to the success of economic development in Orange County and will continue to be a focus. • Pursuit of the County's desired businesses (clean and green) will continue. • Public outreach and education on the objectives of the county's economic development priorities will continue. Housing • Began survey of County Mobile Home Parks to determine condition and confirm location. (H-4.1) • A local non-profit organization began construction of a 50 unit affordable housing subdivision for first-time homebuyers earning less than 60% of the area median income. (H-3.1 and 3.2) • Began repair of five duplexes to be available for lease by individuals with disabilities. (H-1.3 and 3.2) Land Use • Comprehensive Plan implementation. • Unified Development Ordinance (UDO). • Small Area Plan implementation. • Establishment of consistency between Water and Sewer management, Planning and Boundary Agreement and Land Use Plan. • Zoning amendment relating to Outdoor Lighting. • "One-stop" Central Permitting. Natural and Cultural Systems • Farmland Protection Plan completed by APB and other ag agencies, ready for BOCC consideration/approval in November. • Observation Well Network (Orange WellNet) authorized and underway. Partner MOAs approved. • Staffs from all organizations working to develop Greenhouse Gas study implementation phase. • ERCD is pursuing acquisition of additional high priority natural areas and wildlife habitat for the County's Seven Mile Creek Preserve. • Extent of mature hardwood forest harvested between 2003-2008 was determined for the State of the Environment 2009 report. • Mountains-to-Sea Trail and nature preserve reports prepared, for October BOCC consideration. Parks and Recreation • PR 3.2 The park master plan for Fairview Community Park will be implemented in 2009-2010. • PR 4.4 A Recreation Needs Assessment will be included in the Parks and Recreation winter Program Guide. 5 • Board consideration of Mountains to Sea Trail corridor and inclusion in parks and 7 land use plans(10/13/09). • Twin Creeks Linear Park and Greenway Trail has approved funding and is slated to begin construction early in 2010. Services and Facilities • Heritage Center Work Group established. • Zoning amendments to permit wireless telecommunication facilities on County owned property. • Central Efland and North Buckhorn Sewer EPA SRF grants and loans. • Eno Economic Development District water and sewer service area discussions with the City of Durham. Transportation • Development of Comprehensive Transportation Plan. • ARRA grant for two light transit vehicles for Orange Public Transportation flexed to Federal Transit Administration contract with Chapel Hill Transit— need Memorandum of Agreement between Orange County/OPT and Chapel Hill/CHT. 6 2. ELEMENT OBJECTIVES 9 (Please identify the Objectives associated with the Implementation Actions reported under item number 1 and indicate status as Initiated, Completed, Ongoing, or No Action) Economic Development Obiective ED-1.1: Focus public education efforts on sustainability issues, looking at the social, economic and environmental contributions of local businesses. (See also Agricultural Objective AG-6.) Recent efforts include public outreach with multiple audiences, serving on speakers' panels, multiple media/publications (e.g. TBJ, Chapel Hill news interviews) Status/Action: Initiated Objective ED-1.2: Form partnerships both within and outside the County to create a stronger business climate and market the changes to existing and potential employers. Important partnership activities include refunding RTRP, serving on RTRP executive Board, development of relationships with local Chambers of Commerce, UNC, local and regional developers. Status/Action: Initiated Obiective ED-1.3: Develop clear criteria defining desirable businesses for the next five years. Identification of the desirability of `green' businesses, laying the groundwork for the EDC Advisory Board to further develop the definition of the `clear criteria' Status/Action: Initiated Objective ED-1.4: Achieve the objective of adding 5,000 new private sector jobs in the County and $125,000,000 in new commercial property by June 2010, with the goal of 75% of the new jobs being filled by County residents. Status/Action: Ongoing Objective ED-1.5: Identify barriers to development of desirable businesses and local businesses, and mitigate these barriers. Primary barriers have been identified as lack of site-ready land, lack of incentives, lengthy development process, and community commitment to business development Status/Action: Ongoing Objective ED-1.6: Provide outreach, recognition and/or expedited service to new and existing businesses that meet development criteria. New businesses are identified through RTRP involvement, existing/business retention program is not yet ready to initiate due to lack of offerings. Status/Action: Ongoing Objective ED-1.7: Enhance Orange County's tourist industry. (See also Cultural Resources Objective CR-8.) Involvement on Convention and Visitor's Bureau supports this facet of Economic Development. 7 10 Status/Action: Ongoing Objective ED-1.8: Explore policies to use in attracting and encouraging development of companies and enterprises that will build and expand upon the County's economic base. Applicable policies include incentives, infrastructure, certified sites, and discussions with local developers, joint economic development work sessions with local Chambers of Commerce, UNC and the Downtown Partnership. The EDC Advisory Board's continued education with respect to the potential use of these available policies will support the ongoing development of these policies. Status/Action: Initiated Objective ED-2.1: Encourage compact and higher density development in areas served by water and sewer. (See also Land Use Objective LU-1.1 and Water and Wastewater Objective WW-5.) Status/Action: Completed Obiective ED-2.2: Encourage mixed use projects that support walkable communities. Status/Action: Completed Objective ED-2.3: Promote public transportation, alternative modes of transportation, and encourage carpooling and park-and-ride participation. (See also Land Use Objectives LU-1.1, LU-3.2 and Transportation Objective T-1.1.) Status/Action: No Action Obiective ED-2.4: Support the County's "Schools Adequate Public Facilities Ordinance." Status/Action: No Action Objective ED-2.5: Identify lands suitable to accommodate the expansion and growth of commercial and industrial uses in the County. Identified lands include the three Economic Development Districts (Mebane, Waterstone, Eno), land located at intersection of 1-40 and Highway 86 (MLK Blvd) in Chapel Hill. Status/Action: Ongoing Objective ED-2.6: Identify areas that are desirable and attractive to major corporate users with access to public transportation networks and possibly rail. See ED-2.5 above Status/Action: Ongoing Objective ED-2.7: Select industrial sites in Economic Development Areas based on present and planned supporting systems, such as public water and sewer, access to adequate highway, rail, or public transportation infrastructures, and minimize detrimental environmental or negative social outcomes. (See also Water and Wastewater Objective WW-15.) See ED-2.5 above Status/Action: Ongoing 8 Objective ED-2.8: 1 1 Adjust ongoing designation and zoning of Economic Development Districts to avoid the area designated as the Rural Buffer. (See also Land Use Objectives LU-3.1 and LU-3.3.) Status/Action: No Action Objective ED-2.9: Consider industrial sites in Agricultural-Residential areas along the U.S. 70/1-85 highway and rail corridor to take advantage of the corridor's locational attributes. A limited number of small scale Rural Industrial Nodes, not requiring urban type services, may be appropriate elsewhere in the County where good access exists. (See also Land Use Objective LU-3.5.) As referenced in ED-2.5 above, suitable sites will be identified based on development suitability and business requirements. Status/Action: Ongoing Objective ED-2.10: Extend public water and sewer into all three Economic Development Districts. (See also Land Use Objective LU-1.1 and Water and Wastewater Objective WW-2.) This is a primary requirement for economic development to occur. Status/Action: Ongoing Objective ED-2.11: Establish adequate information networks throughout the towns and County. Various information networks are continually being developed including utilization of local media outlets, and participation in numerous regional partnerships and work groups. Status/Action: Ongoing Objective ED-2.12: Work with all area universities to identify space needed for businesses created through university research, promote development of such space within the County, and encourage such businesses to stay in Orange County. As identified in ED-2.11 above, numerous partnerships have been and are being developed with local and regional partners, including various university departmental partnerships, from, the Center for Research and Economic Development to the Office of the Chancellor Status/Action: Ongoing Obiective ED-3.1: Develop and nurture partnerships that support workers and their families at all stages of their lives and provide opportunities for lifelong learning and retraining in response to changing economic conditions. Have developed partnerships with multiple workforce development partners including Durham Technical Community College, the JobLink center, the Workforce Development Board, as well as the local schools. Status/Action: Ongoing Objective ED-3.2: Promote access to living wage jobs that offer benefits and career advancement potential. 9 12 See response to ED-3.1 above. Status/Action: Ongoing Objective ED-3.3: Form partnerships with Durham Technical Community College, UNC-Chapel Hill, Chapel Hill/Carrboro Schools, Orange County Schools, and others to provide adequate training and education to enable workers in Orange County to obtain high quality jobs. See response to ED-3.1 above. Status/Action: Ongoing Obiective ED-3.4: In coordination with the Business Climate working group, help communicate the types of jobs the County wants and expects to create so that workers can develop realistic career expectations and obtain appropriate training. The Business Climate Work Group provided a report on its assessment of private sector job creation in its July 2006 update to the EDC Five-Year Strategic Plan. Status/Action: Completed Objective ED-3.5: Ensure that County workers and those preparing for the workforce have access to transportation, child care, elder care, and affordable housing. (See also Housing Objective H-1.5.) Status/Action: No Action Obiective ED-4.1: Enhance historic character by supporting organizations' efforts to preserve, promote, and maintain historic structures, and identify Orange County policies that may be in conflict with these efforts. (See also Cultural Resources Objective CR-2, CR-3, and CR-5, and Housing Objective 3.6.) Status/Action: No Action Obiective ED-4.2: Provide lifelong learning opportunities, from early childhood through senior citizens. Status/Action: No Action Objective ED-4.3: Welcome and promote greater inclusiveness and diversity. The Director serves as the economic development ambassador of inclusiveness and diversity. Status/Action: Ongoing Obiective ED-4.4: Enhance rural and agricultural community character by supporting local agriculture markets, supporting complementary conservation and management tools, and considering tools to make farming more profitable. (See also Agriculture Objective AG-2 and AG-3.) The Agriculture Economic Development Coordinator serves the economic development needs of the County's agricultural community through projects such as the Piedmont Food and Agriculture Processing Center and the PLANT @ Breeze Farm Enterprise Incubator. Status/Action: Ongoing 10 Obiective ED-4.5: 13 Enhance urban character by connecting and supporting existing plans for increasing the commercial tax base and for revitalizing the downtown areas of Carrboro, Chapel Hill, and Hillsborough. Ongoing collaboration with the economic development professionals from Chapel Hill and Carrboro, the director of the Downtown Partnership and the presidents of the local chambers of commerce provide continued opportunities for joint planning. Status/Action: Ongoing 11 i 14 Housing Objective H-1.1: Assist in the rehabilitation and development of affordable housing and promotion of community development programs in the County using multiple strategies including implementation of the Countywide Housing and Community Development Consolidated Plan. Status/Action: Ongoing Objective H-1.2: Concentrate the Orange County Community Development Block Grant Program efforts and resources in those areas of the County occupied by low and moderate- income households and having the most severe housing and community development needs. Status/Action: No Action Obiective H-1.3: Increase the provision of housing assistance for households in need and coordinate with public and non-profit organizations responsible for providing community services and housing in the County. Status/Action: Initiated Objective H-1.4: Coordinate with the municipalities to maintain an adequate supply of residentially designated land to accommodate sustainable levels of population growth and a diversity of housing types countywide. Status/Action: No Action Objective H-1.5: Ensure that a variety of housing types can be developed throughout the County in a sustainable manner that locates housing near employment centers and commercial centers and that efficiently uses existing and planned public services. (See also Land Use Objectives LU-1.1 and LU-6.2, Economic Development Objective ED-3.5, and Water and Wastewater Objective WW-2.) Status/Action: No Action Objective H-1.6: Promote innovative approaches to housing that are responsive to the needs of Orange County, maintain quality and human scale, increase energy efficiency, and reduce construction and maintenance costs. Status/Action: No Action Obiective H-2.1: Accommodate the development of group homes, foster care facilities, transitional housing facilities and other housing types in appropriate locations to provide increased opportunities for social interaction, a de-institutionalized lifestyle, and gainful employment. Status/Action: No Action Objective H-2.2: Continue to address issues of chronic homelessness in Orange County. Status/Action: Ongoing 12 • 15 Objective H-2.3: Increase the number of affordable multi-family housing units which are designed to support the needs of the elderly, especially those with limited incomes. Status/Action: No Action Objective H-3.1: Achieve residential neighborhoods that are attractive and well-maintained. (See also Land Use Objective LU-2.10.) Status/Action: Initiated Objective H-3.2: Require that all new housing built or located in Orange County meet the minimum standards specified in the State of North Carolina Building Code, as well as standards of the Department of Housing and Urban Development and the Farmer's Home Administration, when appropriate. Status/Action: Ongoing Objective H-3.3: Expand assistance in the retrofitting, repair, and maintenance of existing homes owned by financially challenged households, particularly those that are senior citizens. Status/Action: Completed, Ongoing Objective H-3.4: Provide additional housing and rehabilitation assistance that targets and prevents the physical decline of stable neighborhoods. Status/Action: Completed, Ongoing Objective H-3.5: Review and consider the Environmental Protection Agency's (EPA) Energy Star and Water Sense standards for use as an integral part of the County's housing rehabilitation program. Status/Action: No Action Obiective H-3.6: Work within the Orange County government system to identify and resolve existing policies which may be at odds with historic preservation goals, green building approaches, and workforce and affordable housing efforts. (See also Cultural Resources Objective CR-3 and Economic Development Objective ED-4.1.) Status/Action: No Action Objective H-4.1: Continue to permit HUD code-compliant manufactured housing as a form of affordable housing in the County. (See also Land Use Objective LU-4.1.) Status/Action: Initiated Objective H-4.2: Expand assistance for elderly households that have difficulty affording their home property tax. Status/Action: No Action Objective H-4.3: Evaluate the feasibility of development incentives to stimulate the production of needed affordable low income housing. (See also Land Use Objective LU-4.4.) 13 16 Status/Action: No Action Objective H-4.4: Working collaboratively with the towns, identify regulatory barriers to be removed and opportunities for development incentives to encourage the construction of a diverse range of housing types countywide. (See also Land Use Objective LU-4.2.) Status/Action: No Action 14 k . Land Use 17 Objective LU-1.1: Coordinate the location of higher intensity / high density residential and non- residential development with existing or planned locations of public transportation, commercial and community services, and adequate supporting infrastructure (i.e., water and sewer, high-speed internet access, streets, and sidewalks), while avoiding areas with protected natural and cultural resources. This could be achieved by increasing allowable densities and creating new mixed-use zoning districts where adequate public services are available. (See also Economic Development Objectives ED-2.1, ED-2.3, ED-2.10, and Water and Wastewater Objective WW-2.) Status/Action: Ongoing Objective LU-1.2: Evaluate and report on whether existing and approved locations for future residential and non-residential developments are coordinated with the location of public transportation, commercial and community services, and adequate supporting infrastructure (i.e., water and sewer services, high-speed internet access, streets and sidewalks). Status/Action: No Action Objective LU-1.3: Create a "sustainable development checklist" to be included as part of the development review process that would evaluate and report on whether proposed developments are appropriate considering existing on-site environmental conditions and features, whether they are compatible with existing natural and cultural resources, whether adequate provision of public services exist for the proposed land use, and whether the proposed development will enhance community character. Status/Action: No Action Objective LU-2.1: Maintain the rural, low-density land surrounding Chapel Hill and Carrboro Transition Areas as Rural Buffer land, as designated on the Land Use Plan. Future consideration should be given to designating Rural Buffer areas around other municipalities where such interest exists. Status/Action: Ongoing Objective LU-2.2: Continue to protect valuable resource land such as productive agricultural areas, natural areas, historic sites and properties, and potential reservoir sites through the County's Lands Legacy Program, and by directing incompatible development away from these areas through land use and zoning policies and regulations. (See also Natural Areas Objectives NA-5 and NA-17, and Water and Wastewater Objective WW-14.) Status/Action: Ongoing Objective LU-2.3: Require non-residential and higher-density residential developments within Transition Areas to use Best Management Practices (BMP's) for stormwater control, as outlined within the Orange County Zoning Ordinance and Sedimentation Control 15 18 Ordinance, to ensure that potential adverse impacts on the water quality of existing and proposed reservoir sites are avoided. (See also Erosion Control EC-1 and Natural Areas Objective NA-4.) Status/Action: No Action Objective LU-2.4: Evaluate the development potential in rural crossroads communities to identify whether current regulations permit appropriate development that is in character with these communities, and whether potential development in these areas would require significant expansions or cause depletions of public services. Status/Action: No Action Objective LU-2.5: Adopt and implement policies that specify appropriate land uses and intensities of development in Protected and Critical Water Resource Areas that will not have potential adverse impacts on water resources. (See also Water and Wastewater Objective WW-15.) Status/Action: Ongoing Objective LU-2.6: Protect prime reservoir sites from adverse development impacts and ensure that regulations for these areas are appropriate. Status/Action: Ongoing Objective LU-2.7: Refine green building standards to guide the design, siting, construction, and management of publicly owned and managed buildings in a manner that conserves energy and/or uses non-polluting renewable energy sources. Explore the development of green building standards for private development. (See also Air and Energy Objective AE-11.) Status/Action: No Action Objective LU-2.8: Develop performance standards for development on lands with non-renewable resources to ensure a sufficient level of environmental protection for these resources. Status/Action: No Action Objective LU-2.9: Evaluate the carrying capacity of groundwater and surface water resources of the 15 watersheds in Orange County. (See also Water Resources Objective WR-7.) Status/Action: No Action Objective LU-2.10: Develop design standards or guidelines that address scale, density, and aesthetic considerations for residential, mixed-use, industrial, and commercial land uses to promote community aesthetics and the protection of the visual and cultural environment of the County. (See also Housing Objective H-3.1.) Status/Action: No Action 16 Objective LU-3.1: 19 Discourage urban sprawl, encourage a separation of urban and rural land uses, and direct new development into areas where necessary community facilities and services exist through periodic updates to the Land Use Plan. (See also Economic Development Objective ED-2.8.) Status/Action: Ongoing Objective LU-3.2: Coordinate land use patterns to facilitate the expanded use of non-auto modes of travel, the increased occupancy of automobiles, and the development and use of an energy-efficient transportation system. (See also Transportation Objective T-1.1, Economic Development Objective ED-2.3, and Air and Energy Resources Objective AE-8.) Status/Action: No Action Obiective LU-3.3: Discourage new intensive non-residential land uses, or the expansion of existing intensive uses, in the area designated Rural Buffer. (See also Economic Development Objective ED-2.8.) Status/Action: Ongoing Objective LU-3.4: Recognize the right to farm and discourage the location of new non-farm development, particularly more intensive residential development, within farming areas to minimize the incidence of complaints and nuisance suits against farm operations. (See also Agriculture Objectives AG-1 and AG-3.) Status/Action: Ongoing Obiective LU-3.5: Encourage energy and water use in an efficient manner by industries and encourage energy efficient industries to locate or expand in the County in Rural Industrial, Commercial/Industrial, and Economic Development Nodes. (See also Economic Development Objective ED-2.9.) Status/Action: Ongoing Objective LU-3.6: Establish consistency between the Land Use Plan and the Water and Sewer Management Planning and Boundary Agreement and Map. (See also Water and Wastewater Objective WW-3.) Status/Action: Initiated Objective LU-3.7: Ensure that new development patterns in non-residential nodes encourage a clustered, walkable development pattern and discourage strip development. Status/Action: No Action Obiective LU-3.8: Develop a process for implementing small area plan recommendations through the revision of County policies and regulations. Status/Action: Initiated 17 20 Objective LU-3.9: Create new zoning district(s) which allow for a mixing of commercial and residential uses, a mixing of housing types, and creates a more pedestrian friendly development pattern. New districts should be applied in areas where public services exist or are planned for in the future, in areas that promote higher intensity and high density uses on the Land Use Plan map. Status/Action: No Action Objective LU-3.10: Identify prime viewsheds along major transportation corridors and other areas, and amend County land use ordinances to ensure long-term protection of viewsheds. (See also Natural Areas Objective NA-16, Parks and Recreation Objective PR-5.4, and Transportation Objective T-1.5.) Status/Action: No Action Obiective LU-3.11 In response to development plans at Carolina North, including the possible relocation of Horace Williams Airport, review County land use ordinances and amend if needed to protect the interests of Orange County's residents. Status/Action: No Action Objective LU-4.1: Support the use of individual manufactured housing units as a useful housing resource in the County by increasing the opportunities where these units can locate by-right. (See also Housing Objective H-4.1.) Status/Action: Ongoing Obiective LU-4.2: Review and amend the Orange County Zoning and Subdivision Ordinances to identify and eliminate existing regulatory impediments to objectives identified in the Comprehensive Plan. Such objectives include but are not limited to the development of energy efficient buildings within the County, water efficiency standards for new development, and development of affordable housing. (See also Housing Objective H-4.4 and Solid Waste Objective SW-4.) Status/Action: No Action Objective LU-4.3: Determine how private developments can best accommodate or provide public and private commercial recreational facilities to serve Orange County's residents. (See also Parks and Recreation Objective PR-1.3 and Natural Areas Objective NA-10.) Status/Action: No Action Obiective LU-4.4: Encourage the provision of a range of affordable and suitable low and moderate income housing by means of development incentives in order to provide a balanced housing stock for the residents of Orange County. (See also Housing Element Objective H-4.3.) Status/Action: No Action 18 V Objective LU-4.5: 21 Work within the Orange County government system to identify and resolve existing land development policies that may be in conflict with historic preservation goals. (See also Cultural Resources Objective CR-3.) Status/Action: No Action Objective LU-4.6: Prepare an analysis of subdivision trends in the County, providing pros and cons of Minor, Major, and Exempt Subdivisions, and recommendations on any ordinance amendments that may be appropriate. Status/Action: No Action Obiective LU-5-1: Prohibit new development in special flood hazard areas as defined by the Federal Emergency Management Flood Insurance Rate Map, effective February 2, 2007. Status/Action: Ongoing Objective LU-5-2: Continue to implement the Orange County Hazard Mitigation Plan. Status/Action: Ongoing Objective LU-5-3: Develop and coordinate an emergency disaster plan and community education program to increase awareness of the dangers of natural and human-made emergency events and understand how best to prepare. Status/Action: No Action Objective LU-6.1: Undertake a comprehensive effort to inform and involve the citizens of Orange County in the land use planning process. Status/Action: Ongoing Objective LU-6.2: Maintain a cooperative joint planning process among the County municipalities and those organizations responsible for the provision of water and sewer services to guide the extension of service in accordance with the Comprehensive Plan, the Orange County-Chapel Hill-Carrboro Joint Planning Agreement and Land Use Plan, and the policies of the municipalities. (See also Water and Wastewater Objective WW-4.) Status/Action: Ongoing Objective LU-6.3: Develop internal process audits and customer surveys to ensure customer satisfaction of the development review and approval process. Status/Action: No Action Objective LU-6.4: Develop educational and public information programs to increase awareness of the potential for the design, construction and rehabilitation of commercial and residential 19 22 structures that are energy efficient and/or use non polluting renewable energy sources. Status/Action: No Action Objective LU-6.5 Establish a "one-stop" County central permitting office. Status/Action: Initiated Obiective LU-6.6 Evaluate and consider the "Community Building" recommendations of the Shaping Orange County's Future's Task Force. Status/Action: No Action Objective LU-6.7 Add an index to the adopted Comprehensive Plan and develop an executive summary of its contents. Status/Action: No Action 20 Natural and Cultural Systems 23 Agriculture (AG) Objective AGA: Recognize and support the right to farm. Protect farm operations from incompatible adjacent land uses or activities that will adversely affect the long-term agricultural investment in land and improvements. (See also Land Use Objective LU-3.4.) Status/Action: Ongoing Draft Farmland Protection Plan completed, BOCC to consider in fall 2009. Obiective AG-2: Pursue new measures (some of which may require special legislation) to make farming more profitable, such as additional programs for tax assistance. (See also Economic Development Objective ED-4.4.) Status/Action: Initiated Farmland Protection Plan speaks to economic development issues for farmers, including potential options for property taxes. Objective AG-3: Develop programs and associated infrastructure facilities to make local farms more economically viable, including local farm product processing, development of a distribution center, and marketing initiatives. (See also Land Use Element Objective LU-3.4 and Economic Development Objective ED-4.4.) Status/Action: Ongoing Piedmont Food and Agricultural Processing Center underway. PLANT @ Breeze Farm Enterprise Incubator program completed second season in spring of 2009. Objective AG-4: Minimize the negative impacts of future public projects (such as roads, utility lines, etc) on farming operations and productive farmland. Conduct public review of projects proposed by entities that have the power of eminent domain, and consider the impact of such actions on agricultural activity. Status/Action: No Action Objective AG-5: Teach the next generation about farming, support apprentice options, and promote the pursuit of farming as an occupation. Develop community awareness of farming. Status/Action: Ongoing PLANT @ Breeze Farm Enterprise incubator program completed second season in spring of 2009. Objective AG-6: Develop a single clearing-house information source for current agricultural topics, agricultural programs, and events sponsored by Orange County and/or for local farmers in conjunction with the Orange County Farms website. (See also Economic Development Element Objective ED-1.1.) Status/Action: Ongoing The Economic Development Department's website includes several informational links for Orange County farmers including www.Oran.geCountvFarms.org . Reorganization and affiliation of Soil and Water Conservation District with ERCD providing for more-coordinated response to agricultural issues. 21 24 Obiective AG-7: Complete an examination of the local food system, and create a regional sustainable food network, whereby local residents consume 10% locally grown and produced products in five years. Status/Action: Initiated This concept is part of the previous Agricultural Center Work Group planning effort, and has been discussed and outlined by County and outside agencies, but not pursued to date due to funding. Objective AG-8: Encourage the use and production of natural fuel alternatives to petroleum-based products and pursue new types of energy sources. Status/Action: Initiated Proposed Master Energy Plan would examine potential altemative energy sources. New funding is becoming available from USDA for altemative-fuel farm equipment in 2010. Objective AG-9: Encourage farmers to continue to be model environmental stewards and promote good forest stewardship management practices using state and federal programs that provide financial assistance. (See also Natural Areas Objective NA-8.) Status/Action: Ongoing Land Conservation Seminar series is being finalized that will feature sessions on private conservation and forest stewardship and management— to begin in January 2010. Air and Energy Obiective AE-1: Assess and implement the current countywide greenhouse gas emissions inventory and action plan target reductions. Status/Action: Completed, Ongoing Inventory completed, implementation on-going (November 19 worksession update). Objective AE-2: Adopt a carbon reduction plan to reduce County green house gas emissions by a target to be determined by the ongoing Greenhouse Gas Emissions Study by the year 2020. Status/Action: Ongoing Potential targets have been identified in the GHG study, pending public forums in each jurisdiction and elected board discussions on target-setting. Objective AE-3: In addition to local actions, the County should continue to join appropriate regional initiatives meet or perform better then Federal ozone standards. Status/Action: Ongoing County is a member of the NC Air Awareness Network, sending email alerts to all employees on ozone alert days and works to encourage County employees to take steps to mitigate ozone. 22 Objective AE-4: 25 Work towards the installation of an ozone monitor in Orange County. Status/Action: Initiated Funding provided in CIP 2009-2019 for an ozone monitor. Preliminary conversations held with NCDAQ regarding potential installation and costs. Objective AE-5: Develop an accounting and assessment of air and water pollution impacts in Orange County (both increases and decreases). (See also Water Resources Objective WR-15.) Status/Action: Initiated Staff has begun studying such mechanisms and reviewing literature and other programs. Obiective AE-6 : Minimize ozone exceedances by a percentage to be determined from future data by the year 2015. Status/Action: Initiated Action toward this objective is tied to AE-2 and AE-4 above. Obiective AE-7: Expand and enhance Orange County's public transportation system (See also Transportation Objective T-1.6.) Status/Action: No Action Objective AE-8: Improve transportation efficiency: promote more public transportation, ride sharing, and alternative transportation such as bicycling and walking. (See also Transportation Objective T-1.1 and Land Use Objective LU-3.2.) Status/Action: No Action Subcommittee work on Environmental Stewardship Action Committee (ESAC) includes efforts to develop Best Workplace for Commuters status for Orange County govemment, pending Board consideration. Obiective AE-9: Promote the use of more fuel-efficient vehicles, and vehicles that use sustainable alternative fuels such as biofuel and electricity. Status/Action: Ongoing As part of County Vehicle Fuel Conservation Policy and Environmental Responsibility Goal, new vehicle purchases are default fuel-efficient and alternative- fuel, unless justification is provided for a different approach. GHG community action steps are likely to include promoting awareness of alternative fuel vehicles in the community. Obiective AE-10: Convert the County's vehicle fleet to fuel efficient and low-emissions vehicles. Status/Action: Ongoing Adopted Vehicle Fuel Conservation Policy addresses preference and default for alternative fuel vehicles, has been in place since 1212005. Few new vehicles purchased during this timeframe. Obiective AE-11: 23 26 Improve the energy efficiency of buildings through several action steps: 1) upgrade existing buildings, including County and school buildings; 2) educate planning and building inspection officials about the technologies and techniques of energy efficient construction; and 3) encourage the use of LEED "Gold" (or equivalent) as a standard in new construction. (See also Land Use Objective LU-2.7.) Status/Action: Ongoing Interdepartmental workgroup is focusing on improving energy efficiency in existing county building, through ARRA stimulus grants, and completed building energy assessments. Smaller scale projects include installing new storm windows on future park buildings, part of Twin Creeks (Cate farmstead) stabilization. Objective AE-12: Provide a system for builders, owners, lenders, appraisers, and buyers of buildings to assess the energy efficiency of structures. Status/Action: No Action Objective AE-13: Develop an inventory of funding opportunities, programs, credits, etc., that can be used to improve energy efficiency and to generate sustainable power. Identify ways for the County to facilitate the use of these options by County businesses, institutions, and residents. Status/Action: No Action Obiective AE-14: Develop an accounting of Orange County agricultural and animal-related resources in order to assess: 1) the potential for heat and power generation; 2) the potential for distribution; and 3) the potential customers that could purchase the power generated and ancillary products. Status/Action: No Action Objective AE-15: Foster participation in green energy programs such as installation incentives for solar hot water/solar generation/solar tempering in residential or commercial construction. The County should develop programs that will link citizens and businesses with options for alternative and sustainable energy sources. Status/Action: Ongoing County staff recently applied for ARRA renewable energy stimulus funding to install solar water heaters for County Jail and two existing school buildings joint application with Orange County schools and Chapel Hill-Carrboro City schools. Future opportunities will include other energy efficiency, renewable energy and revolving loan possibilities. Objective AE-16: Develop the use of alternative fuels and waste-derived fuels that will convert landfill, water treatment, agricultural, and wood wastes into heat and electricity. Status/Action: Ongoing County and UNC have partnered on Landfill Gas to energy project that will convert landfill methane to energy used for UNC facilities. 24 Cultural Resources (CR) 27 Objective CRA: Provide for the systematic identification of historic buildings, objects, districts, sites, structures and archaeological sites. Update and improve these inventories at regular intervals. Status/Action: Ongoing The HPC is always updating the inventory, informally, as part of the annual Certified Local Government Report. Members are also updated when a building is demolished through the Quick Response Team (QRT) program. Objective CR-2: Establish stronger partnerships with preservation organizations for the dissemination of information on current topics and to provide hands-on training, such as "how to" publications, examples of design guidelines, technical briefs, etc. (See also Economic Development Objective ED-4.1.) Status/Action: Ongoing As part of this year's Preservation Month (May) activities, the HPC sponsored the first joint meeting with all of the major historic and cultural resource preservation organizations in the County, including discussion of joint opportunities. . Objective CR-3: Work within the Orange County government system to identify and resolve existing policies which may be in conflict with the County's historic preservation mission. (See also Economic Development Objective ED-4.1, Housing Objective H-3.6 and Land Use Objective LU-4.5.) Status/Action: Ongoing ERCD staff is already working more closely with Planning and Inspections staff on permitting requirements for historic properties, such as Murphey School. Objective CR-4: Strive to make the community more aware of the activities of the Historic Preservation Commission and its place in County government. (See also Economic Development Objective ED-4.1.) Status/Action: Ongoing The HPC operated an informational-booth at the Last Fridays'Event in Hillsborough during Preservation Month. Objective CR-5: Promote existing programs that offer financial incentives for preservation purposes and pursue new programs to encourage the purchase, preservation, maintenance or adaptive reuse of historic landscapes, and historic and soon to be historic structures. (See also Economic Development Objective ED-4.1.) Status/Action: No Action Objective CR-6: Develop and strengthen educational programs to make history engaging to the public. Status/Action: No Action 25 28 Objective CR-7: Encourage publication of material relating to the County's heritage. Status/Action: Ongoing The HPC is currently reviewing and finalizing draft Design Standards for Local Landmarks. Objective CR-8: Determine the appropriate level of heritage tourism promotion in Orange County based on interests and concerns of residents and coordinate heritage tourism efforts with existing programs in the county. (See also Economic Development Objective ED-1.7.) Status/Action: No Action Obiective CR-9: Explore ways to inform the public about archaeology, how archaeologists conduct investigations and what they do with the findings. Consider "virtual" archaeological display options to share information from County-sponsored cultural resources surveys without risking salvage concerns. Status/Action: No Action Objective CR-10: Establish a dialogue with the other jurisdictions in and adjacent to Orange County to address cultural resources in areas with or without designated Historic Preservation/District Commissions. Status/Action: Ongoing As part of this year's Preservation Month (May) activities, the HPC sponsored the first joint meeting with all of the major preservation organizations, including representatives from the three municipalities in the County. Objective CRA 1: Increase public information/awareness endeavors to promote land and cultural resource stewardship — for individual homes, historic farmsteads and their associated landscapes — as well as alternative means of private property dedication and preservation. Status/Action: No Action Objective CR-12: Provide for a user-friendly public input process for systematic acquisition of and contribution to information about cultural resources Status/Action: No Action Natural Areas (NA) Objective NA-1: Conserve high-priority natural areas and wildlife habitats, including wetlands, rivers and streams, floodplains, steep slopes, prime forests, wildlife corridors, and other critical habitats. (See also Water Resources Objective WR-1.) Status/Action: Ongoing 26 ERCD is pursuing opportunities to acquire additional land for the County's Seven 29 Mile Creek Preserve—land that is both ecologically significant and strategically important for future public access, site management and for planned NC Mountains- to-Sea Trail through Orange County. ERCD is planning a series of landowner education/assistance workshops in cooperation with Orange Soil & Water Conservation, Eno River Association, and NC Forest Service to be held in late 2009-early 2010. Objective NA-2: Conduct more frequent updates to the County's inventory of natural areas, and include previously unsurveyed areas of the County. Status/Action: Initiated ERCD working with NC Natural Heritage Program to update County inventory based on more recent findings/data gathered by state entities. No progress yet, however, on a County-initiated survey of new areas. Objective NA-3: Develop a more detailed and consistent methodology for monitoring changes in forest cover throughout the County, and specifically the extent of mature hardwood forest. Status/Action: Initiated ERCD determined the reduction in mature hardwood forest that occurred between 2003-2008 and included in the State of the Environment 2009 report. Further refinement still needed, however, to develop the methodology for future applications. Objective NA-4: Encourage adequate stormwater runoff controls in existing developed areas and require these controls for new subdivisions to protect sensitive downstream aquatic habitat. (See also Land Use Element Objective LU-2.3 and Erosion Control Objective EC-1.) Status/Action: No Action Objective NA-5: Prohibit development that would cause adverse impacts on highly significant natural areas and wildlife habitat. (See also Land Use Objective LU-2.2 and Water and Wastewater Objective WW-14.) Status/Action: No Action Objective NA-6: Develop a way of monitoring common indicator species as a way to measure the "state of biodiversity" in Orange County. Status/Action: No Action Objective NA-7: Ensure that significant natural areas and wildlife habitat located on County-owned lands are protected with adequate ecosystem management practices and stewardship. Status/Action: No Action 27 ,l 30 Obiective NA-8: Encourage forest management practices on both public and private land that minimize disruption and fragmentation of intact hardwood forests. (See also Agriculture Objective AG-9.) Status/Action: Ongoing Stewardship and Management Plans are underway for County natural landholdings that include forest management recommendations and the nature of the hardwood forest habitat present. Public seminar to be held in 2010 on promoting sustainable forest management. Obiective NA-9: Encourage long-term productivity of farms and timber lands through best land-use management practices and conservation agreements. (See also Parks and Recreation Objective PR-1.1.) Status/Action: Ongoing The Orange Soil & Water Conservation office and County Forester continue to actively promote and encourage agricultural and forestry BMPs using technical assistance and financial assistance through federal and state cost-share programs. Lands Legacy conservation agreements address the use of best management and forest stewardship on these lands. Obiective NA-10: Require that all major subdivisions (defined as having more than 5 lots according to the Orange County Subdivision Regulations) include within their boundaries open space suitable for low-impact recreation and wildlife habitat. (See also Land Use Objective LU-4.3 and Parks and Recreation Objectives PR-1.3 and PR-4.1.) Status/Action: Ongoing The subdivision ordinance requires that most major subdivisions set aside a minimum of 33% open space for low-impact recreation and wildlife habitat. Obiective NA-11: Develop a comprehensive conservation plan for achieving a network of protected open space throughout Orange County, which addresses 1) threats to important natural areas; 2) connectivity between protected areas; 3) coordination with neighboring counties; and 4) sustainable management of critical natural resources. (See also Parks and Recreation Objective PR-5.4.) Status/Action: No Action Obiective NA-12: Establish a system of nature preserves that protect large areas of undeveloped land (including significant natural areas) surrounded by low-density development and working farms and managed forests. (See also Parks and Recreation Objective PR-5.4.) Status/Action: Initiated ERCD is working on a proposed Seven Mile Creek Preserve master plan that includes consideration, with Planning and Inspections, of an Upper Eno Nature Preserve concept (or Conservation District) for future BOCC consideration. Objective NA-13: Promote clustering of residential development and dedication of large areas of undisturbed land for low-impact recreational use by residents and for wildlife habitat. 28 Where feasible, these areas should be contiguous to neighboring tracts of 31 undisturbed land. (See also Parks and Recreation Objective PR-5.1.) Status/Action: No Action Objective NA-14: Encourage developers and neighborhood associations to protect undeveloped community open space through formal conservation agreements. Status/Action: No Action Objective NA-15: Protect land in and around biologically significant areas, and connections between these areas, to allow for the maintenance of native wildlife and plant populations and their functional relationships. Status/Action: No Action Objective NA-16: Create a system of public and private open space and conservation areas, including parks, nature preserves, and scenic vistas representative of the Orange County landscape. (See also Land Use Objective LU-3.10, Parks and Recreation Objective PR-5.4, and Transportation Objective T-1.5.) Status/Action: Ongoing The County's Lands Legacy program (within ERCD) continues to work in cooperation with landowners and other conservation partner entities to protect the most important natural and cultural resource lands through a variety of means. Priorities are determined by an Action Plan approved by the BOCC. Objective NA-17: Maintain and protect land that contains valuable productive resources, such as prime farmland and prime forestland, by directing incompatible development away from these areas. (See also Water and Wastewater Objective WW-14, Land Use Objective LU- 2.2, and Natural Areas Objective NA-5.) Status/Action: Ongoing The Planning and Inspections Department is overseeing the development of a proposed Strategic Growth and Rural Conservation Plan, which (in tandem with the adopted Comprehensive Plan) is intended to help implement this objective. A public hearing on phase three of this project was held August 24, 2009. Water Resources (WR) Objective WRA: Preserve natural resources such as grasslands, woodlands and wetlands to allow for water recharge of ground water and water quality protection. (See also Natural Areas Objective NA-1.) Status/Action: Ongoing This is occurring as part of the Lands Legacy Program and is a program objective. Objective WR-2: Create long-term conservation programs for ground water and surface water that will help extend the life of our finite existing water supplies. (See also Water and Wastewater Objectives WW-1 and WW-11.) Status/Action: Initiated 29 32 H2Orange initiative and Orange WellNet include action and objectives toward this end, with planning underway. Objective WR-3: Coordinate acquisition of open space for watershed protection purposes with neighboring counties, for watersheds providing drinking water to Orange County or neighboring citizens. Status/Action: Ongoing Coordination among Upper Neuse basin jurisdictions is accomplished and occurs through the Lands Legacy Program and other conservation partners. Several Lands Legacy acquisitions have been accomplished for watershed protection. Objective WR-4: Coordinate possible nutrient trading and stormwater credits between the towns and County, including possible stream buffer acquisition or other land conservation approaches. Status/Action: Ongoing ERCD staff is continuing to work with other departments and adjoining jurisdictions on developing nutrient trading programs with regard to the Jordan Lake Nutrient Management Rules. Objective WR-5: Promote and participate in regional efforts to plan for use of water supplies in the region in an equitable manner, including contingency planning for water supplies during droughts. (See also Water and Wastewater Objective WW-5.) Status/Action: Ongoing ERCD/Soil and Water staff (as well as Planning and Environmental Health stafo is participating in several regional water planning efforts, including the Jordan Lake Partnership, Upper New Hope Stakeholders Group, TJCOG Water Resources Advisory Committee, Upper Neuse River Basin Association, Falls Lake Stakeholder Group, among other meetings and activities. Objective WR-6: Ensure greater coordination among County agencies on water resources, including cooperative efforts to prevent surface and ground water pollution by addressing failing septic systems and wells. (See also Water and Wastewater Objective WW-19.) Status/Action: Ongoing Water Resources Coordinator serves as convener and coordinator for multi- departmental H2Orange Committee, chairing meetings and attempting to enhance communication and interaction with other departments on various water issues. Greater collaboration and communication has been achieved, particularly with the Falls Lake watershed rules initiative, and on public education and outreach. Objective WR-7: Promote land use patterns that preserve the natural hydrologic system and maintain a sustainable "carrying capacity" balance for the future between ground water and surface water resources. (See also Land Use Objective LU-2.9.) Status/Action: No Action 30 Objective WR-8: 33 Ensure that sufficient water resources are available for farms. Status/Action: Initiated To be discussed with Agricultural Preservation Board at an upcoming meeting. Objective WR-9: Encourage and participate in efforts by the state and other regional jurisdictions to address the future use of Jordan Lake as a water supply, in a manner that links sustainable growth to future water allocation. Status/Action: Ongoing Staff was very involved in the stakeholder and nutrient management rules efforts, and continues participating in Jordan Lake Partnership meetings and activities. Meeting of Chair and Mayors recently held to discuss linkage of growth and water allocation, to be discussed further through TJCOG and the Orange-Chatham Task Force. Objective WRA 0: Establish a county network of ground and surface monitoring wells to assist in water resources planning and drought monitoring. Status/Action: Ongoing ERCD staff is continuing to work on developing Orange WellNet, the newly- approved groundwater observation well network. Recent activities are focused on the use of existing bedrock wells located in the 8 different types of bedrock geology which are present in the county. Obiective WRA 1: Provide incentives and educational information to landowners to increase protection of watersheds and ground water supplies and their inter-relationships. Status/Action: Ongoing ERCD staff has been named a Groundwater Guardian community for 2009, for the seventh consecutive year. Educational activities have occurred and are ongoing through community events and street fairs, as well as the Dealing with the Drought educational forum series. Drought information is posted to the ERCD web site and in the lobby of the Agricultural Center. Obiective WRA 2: Prepare a new Orange County Water Supply Study, and make updated supply and demand projections that can be used to inform future decision-making. Status/Action: Ongoing ERCD staff has worked with staff from the Planning Department to develop water demand projections in support of Jordan Lake Partnership activities, including the Regional Water Supply Plan and possible future Jordan Lake allocation request. Obiective WRA 3: Create a mechanism for intergovernmental coordination of water resources, calculating a comprehensive County "water budget" approach. Status/Action: Ongoing 31 34 Intergovernmental communication and coordination is accomplished by the H2Orange Committee, convened by ERCD with regular meetings to enhance communication and interaction with other departments on various water issues. This committee maintains regular contact with other water providers and water resources stakeholders through the many and varied regional water associations. Objective WR-14: Use the new Water Supply Study (WRA 1) and the State's Neuse River Basin model (2009-10) to evaluate the Upper Eno Watershed and its optimal protection measures. Status/Action: No Action Objective WR-15: Conduct cooperative research on ground and surface water quality, working with other partners in the County and adjoining jurisdictions to address water quality problems such as radon. (See also Air and Energy Objective AE-5.) Status/Action: Ongoing ERCD staff is continuing to develop the new Orange WellNet, the groundwater observation well network. In addition, partnerships are being explored and informational brochures regarding radon and arsenic in groundwater has been drafted and is being evaluated for future public information efforts.. Objective WR-16: Conduct additional research on well yields and wellhead protection to determine if more reliable information on well yields and wellhead protection areas can be discerned with available technology. Status/Action: Initiated Staff has begin discussing what would be involved in such as assessment, and is in the early stages of exploring technology and feasible actions. Objective WRA 7: Reduce the number of 303(d) impaired streams by minimizing impacts of non-point and point source pollution. Status/Action: No Action Objective WR-18: Continue hydrogeologic characterization of the ground water system (including quantifying recharge areas), with emphasis on fractures in the crystalline rocks. Status/Action: No Action Objective WR-19: Develop water efficiency standards for new development in order to decrease per capita water use. Status/Action: No Action Objective WR-20: Promote Best Management Practices for new developments which minimize stormwater runoff. (See also Land Use Objective LU-2.3 and Erosion Control Objective EC-1.) 32 Status/Action: No Action 35 Obiective WR-21: Develop land use policies that promote a `no net loss' principle for groundwater recharge, for each recharge area. Status/Action: No Action 33 36 parks and Recreation Objective PR-1.1: Acquire and /or retain public ownership of parks, recreation facilities, open space, and conservation areas that will serve Orange County. (See also Natural Areas Objective NA-9.) Status/Action: Ongoing This is being accomplished via the County's Lands Legacy Program, with all 1988 park sites now acquired except for Bingham. Planned nature preserves will also include areas for public access, with acquisitions ongoing. A total of 2500 acres have been conserved to date. Objective PR-1.2: Acquire and/or retain lands suitable for siting both indoor and outdoor active recreation facilities to serve all Orange County residents. Status/Action: Ongoing Primary focus to date has been on acquiring lands for outdoor recreation needs, although some sites may have the capability for indoor facilities as determined by the BOCC. Objective PR-1.3: Develop a land use planning mechanism for securing new parks through the development approval process. (See also Natural Areas Objective NA-10 and Land Use Objective LU-4.3.) Status/Action: Initiated Parks and Recreation, ERCD and Planning Directors to meet to plan for updating land dedication and payment-in-lieu process during FY 2010-11. Obiective PR-1.4: Consider alternative funding possibilities for future park facilities, such as non-profit foundations. Status/Action: Ongoing The new Eurospon`Soccer Center exemplifies opportunities for private funding assistance. Other opportunities to be evaluated. Objective PR-2.1: The County will serve as the lead coordinator of regional open space and recreation facility providers in the County (including OWASA, UNC-Chapel Hill, and Duke University), and coordinate regional efforts including future parkland and recreation facility planning, acquisitions, and operations/maintenance of community, district, and regional park and recreation facilities. Status/Action: Initiated This concept was suggested in a 1999 interjurisdictional parks report. The County has taken the lead role in the Intergovemmental Parks Work Group, which has developed recommendations, created a Composite Countywide Parks and Trails Plan map, reviewed proposals and identified projects of mutual interest. Objective PR-2.2: Develop a methodology to be used by regional recreational providers in determining the number of recreation and park facilities needed. The agreed upon methodology should address countywide and community-specific service areas and how needs 34 are determined within those service areas, such as linking facility needs to 37 population growth. Status/Action: Initiated Funding to be requested in FY2011-12 for this purpose. Obiective PR-2.3: Develop a program for land dedication/recreation payment that is effective and comprehensive. Status/Action: Initiated Please see PR 1.3 above. To be reviewed for possible FY 2010-11 update. Obiective PR-2.4: Establish a mechanism to promote shared use of existing public and institutional buildings and grounds for public recreation, as well as for their primary uses. (See also Education Objective E-2.) Status/Action: Ongoing IP Work Group has developed a set of guiding principles and recommendations for the Community Use of School Facilities for Recreation. These principles and recommendations have been approved by three jurisdictions and await action from Chapel Hill and Orange County(November 2009). Obiective PR-2.5: Adopt criteria for evaluating potential land acquisitions for recreation and park facilities in cooperation with other regional park providers. Status/Action: Initiated Refer to Intergovernmental Parks (IP) Work Group for recommendations? Objective PR-2.6: Develop a Memorandum of Agreement among the local governments on joint capital and/or operational funding for future parks and recreational facilities. (See also Education Objective E-2.) Status/Action: No Action Obiective PR-3.1: Locate parks and recreational facilities close to residential areas and transportation nodes, to increase public knowledge and accessibility to these facilities, including alternative transportation modes. Status/Action: Ongoing Transportation, residential service areas and other geographic factors are part of the criteria for parks and recreation facility location as shown in the 1988 Master Parks and Recreation Plan (potentially to be updated in 2010-11). Obiective PR-3.2: Implement individual park master plans, such as the 2006 Fairview Park Master Plan. Status/Action: Completed, Ongoing Several master plans are completed and implemented (Efland/Cheeks Community/School Park, Little River Regional Park and Natural Area, Cedar Grove Park, Eurosport (West Ten) Soccer Center). Fairview Master Plan is bring implemented this fall and winter, with construction imminent. Two other master plans have been completed, for Blackwood Farm Park and Hollow Rock Access Area (New Hope Preserve). 35 r � 38 Objective PR-3.3: Create a new Parks and Recreation Facilities Master Plan Map, to guide future parks planning and help leverage outside funding. Status/Action: Initiated Please see PR-2.2. To be pursued in FY 2010-11. Obiective PR-4.1: Developers shall provide for adequate and appropriate open space suitable for active/low-impact recreation in residential developments. (See also Natural Areas Objective NA-10.) Status/Action: Ongoing Please see PR-1.3. This issue is being reviewed for possible update in FY 2010-11. Obiective PR-4.2: Investigate the potential for public and/or private commercial partnerships and recreational facilities needed to serve Orange County's residents. Status/Action: Ongoing Being pursued in conjunction with PR 1.4 Objective PR-4.3: Work to keep recreational facilities and services affordable and sustainable to the general public. Status/Action: Ongoing Objective PR-4.4: Periodically survey the public, and conduct needs assessments, on recreation services. Status/Action: Initiated Obiective PR-5.1: Locate parks and recreational facilities close to residential areas to encourage informal interaction with nature, encourage walkability, and create areas of wildlife habitat with appropriate recreational facilities within the more populated areas. (See also Natural Areas Objective NA-13.) Status/Action: Ongoing This is an existing priority of the Lands Legacy Program and adopted parks plans. Objective PR-5.2: Landscape parks and recreational facilities with native vegetation and minimize water use where practical. Prohibit use of known invasive non-native species in County facilities, and take steps to eradicate occurrences of same. Status/Action: Ongoing County Landscape Architect and Parks and Recreation staff pursue this regularly, consistent with the adopted Environmental Responsibility Goal. Objective PR-5.3: Ensure public access to County-owned parks and nature preserves, but direct facilities and trails away from the most ecologically sensitive sites. Status/Action: Ongoing This is a stated priority of the Lands Legacy Program, and a paramount consideration in designing parks and nature preserves. 36 Obiective PR-5.4: 39 Encourage development of a system of private open space and conservation areas, including nature preserves, parks, linear parks, and scenic vistas compatible with the character of Orange County. (See also Natural Areas Objectives NA-11, NA-12, and NA-16, and Transportation Objective T- 1.5.) Status/Action: Ongoing This is a stated priority of the Lands Legacy Program and was reiterated in the Joint Master Parks and Recreation Work Group Report of 1999 and other parks planning documents. Connectivity of open spaces is a current priority for Lands Legacy, its conservation partners, and the intergovernmental Parks Work Group. Objective PR-5.5: Develop linear parks and rustic trails in the Rural Buffer, and explore opportunities for preservation and connectivity along other identified stream corridors. Status/Action: Initiated The concept for a New Hope Rustic Woodland Trail has been identified in recent parks plans, as well as in discussions about the Mountains to Sea Trail corridor. This is primary topic for the January 2010 Intergovemmental Parks Work Group. Objective PR-5.6: Create a new Parks and Recreation Facilities Plan Map, to guide future parks planning and help leverage outside funding. (This is the same as 3.3) Status/Action: No Action 37 40 Services and Facilities Water and Wastewater (WW) Obiective WW-1: Maintain a sustainable and high quality supply of ground and surface water so that available resources meet existing and projected needs. (See also Water Resources Objective WR-2.) Status/Action: Ongoing Objective WW-2: Coordinate the provision of potable water and sanitary sewer services with the County's Land Use Plan and Orange County-Chapel Hill-Carrboro Joint Planning Agreement and Land Use Plan, targeting these services to urban, transitional, and economic development districts in a manner that does not endanger environmental resources. (See also Land Use Objective LU-1.1, Housing Objective H-1.5, and Economic Development Objective ED-2.10.) Status/Action: Ongoing Obiective WW-3: Maintain and add new partners to the existing Water and Sewer Management Planning and Boundary Agreement with the Towns of Chapel Hill, Carrboro, and Hillsborough and OWASA. Work to establish similar agreements with the Cities of Mebane and Durham and Orange-Alamance Water System. (See also Land Use Objective 3.6.) Status/Action: Ongoing Objective WW-4: Orange County welcomes opportunities to coordinate with Orange-Alamance Water System to plan future service areas in the County. Status/Action: No Action Objective WW-5: Maintain a cooperative joint planning process among the County, the municipalities, and water and wastewater providers and guide the extension of service in accordance with the Comprehensive Plan, the Orange County-Chapel Hill-Carrboro Joint Planning Agreement and Land Use Plan, and the policies of the municipalities. (See also Water Resources Objective WR-5.) Status/Action: Ongoing Objective WW-6: Develop and implement a process whereby the responsibilities and duties associated with the operation and management of package sewage treatment plants are specified as a requirement of the permitting process for such facilities. Status/Action: No Action Obiective WW-7: Revisit and revise the Water Sewer Management Planning and Boundary Agreement to ensure consistency with the Land Use map and land use categories. (See also Land Use Objective LU-6.2.) Status/Action: Initiated 38 Objective WW-8: 41 Reduce the number of requests from utility authorities and others for plan and zoning amendments needed to accommodate public water and wastewater facilities. Status/Action: No Action Objective WW-9: Ensure that public water and sewer services are provided in those areas that can be practically and efficiently served by these facilities, as provided in the Orange County-Chapel Hill-Carrboro Joint Planning Agreement and Land Use Plan, and as delineated in the Water and Sewer Management Planning and Boundary Agreement, as well as any inter-local government agreement that implements the Agreement. Status/Action: Initiated Obiective WW-10: Ensure that all development projects of a dense character have access to clean, safe, and reliable water supplies. Status/Action: Ongoing Objective WWA 1: Increase educational efforts that increase citizen understanding of water quality problems and the need for water conservation. (See also Water Resources Objective WR-2.) Status/Action: Ongoing Objective WW-12: Prohibit package sewage treatment plants in the Watershed Critical Areas. Status/Action: No Action Objective WWA 3: Prohibit the establishment of public water and sewer services in the areas designated as Watershed Critical Areas, except to address emergency public health situations. Status/Action: Ongoing Objective WW-14: Designate prime reservoir sites in the County, and protect those sites from adverse development. (See also Natural Areas Objectives NA-5 and NA-17 and Land Use Objective LU-2.2.) Status/Action: Initiated Obiective WWA 5: Prohibit commercial and industrial land uses from locating and/or expanding within identified Watershed Critical Areas. (See also Economic Development Objective ED- 2.7 and Land Use Objective LU-2.5.) Status/Action: Initiated Objective WW-16: Ensure that the type of wastewater disposal facilities serving a development are appropriate given present and future demand for service, the distribution of users, and the capacity of the natural environment to absorb the impact. Status/Action: Ongoing 39 42 Objective WW-17: Ensure that buyers of property within the County are fully informed about the on-site sewage disposal requirements of their property. Status/Action: Ongoing Objective WW-18: Allow on-site wastewater disposal in rural areas where soil conditions are acceptable. Where there are unacceptable soils, state-approved on-site sewage disposal systems shall be required. Status/Action: No Action Objective WW-19: Establish a continuing wastewater treatment inspection program within identified Protected and Critical Water Resource Areas. (See also Water Resources Objective WR-6.) Status/Action: Ongoing Education (E) Objective E-1: Continue the coordination of planning activities among the School Boards, Planning Boards, Planning Departments, and other jurisdictions to provide for the future space needs and appropriate location of schools to meet the long-term educational needs of Orange County residents. Status/Action: Ongoing Obiective E-2: Continue to work with parks and recreation providers in the County to identify opportunities for co-location and shared funding of school and public recreational "joint use"facilities. (See also Parks and Recreation Objective PR-2.4.) Status/Action: Ongoing Obiective E-3: Achieve an equitable distribution of educational facilities. Status/Action: Ongoing Objective E-4: Develop a standard that requires residential developers to provide an adequate amount of acreage to meet future school facility needs. Status/Action: No Action Objective E-5: Increase educational opportunities for older persons. Status/Action: Ongoing Library Services (L) Obiective L-1: Develop a comprehensive 3-5 year strategic plan that places priority on achieving a vision of countywide equitable library services and resources for all citizens of Orange County, and identifies specific measures for implementing Library Service Standards adopted by the Board of County Commissioners. Status/Action: Completed 40 Obiective L-2: 43 Adopt a long-range library facility plan that takes into consideration the needs of the entire County and is based on 20-year population projections. Status/Action: Ongoing Objective L-3: Establish an Orange County Heritage Center to make accessible the local history materials now located in various facilities. Status/Action: Initiated Objective L-4: Establish a branch library to serve the central west area of the County centered on Cheeks Township that will accommodate the future population growth of this area over the next 10-20 years. Status/Action: No Action Objective L-5: Provide additional library services to people in the southwest area of the County centered on Bingham Township. Status/Action: Initiated Obiective L-6: Evaluate the rural community for the establishment of cybraries or small branch libraries to provide access to library resources at these more distant sites. Status/Action: Ongoing Erosion Control (EC) Obiective EC-1: Continue to use. Best Management Practices (BMP's) for stormwater control, as outlined within the Orange County Zoning Ordinance, Stormwater Ordinance, and Sedimentation Control Ordinance, to minimize potential adverse impacts on the water quality. (See also Land Use Objective LU-2.3, Natural Areas Objective NA-4 and Water Resources Objective WR-20.) Status/Action: Ongoing Obiective EC-2: Protect and maintain the chemical, physical, and biological quality and integrity of water supply reservoirs. Status/Action: Ongoing Objective EC-3: Prohibit activities that adversely affect surface and ground water systems that may serve or do serve as a public water supply. Status/Action: Ongoing Objective EC-4: Use low-impact stormwater design principles when developing new or retrofitting existing drainage systems that do not functionally approximate the natural drainage pattern. Status/Action: Ongoing Obiective EC-5: Minimize sedimentation and erosion to reduce the transport of sediment and pollutants to surface waters. 41 44 Status/Action: Ongoing Obiective EC-6: Protect and maintain the existing aquatic, riparian and terrestrial habitats-of fish and wildlife. Status/Action: Ongoing Objective EC-7: Prevent flood damage to public and private property. Status/Action: Ongoing Obiective EC-8: Protect the absorptive, purifying and retentive functions of the natural systems existing in the County. Status/Action: Ongoing Objective EC-9: Provide educational materials and programs to school groups, civic groups, developers and interested citizens about water quality protection. Status/Action: Ongoing Objective EC-10: Develop programs and incentives that encourage the implementation of Best Management Practices, Low Impact Design, and on-site capture of stormwater in development projects. Status/Action: Completed, Ongoing Solid Waste (SW) Objective SWA: Continue to affirm, support, and work towards achieving a 61% waste reduction goal adopted by the County in 1997. Status/Action: Ongoing Objective SW-2: Encourage the recycling of solid waste, including but not limited to the preference for deconstruction practices over demolition, to minimize waste disposed of in landfills. Status/Action: Ongoing Objective SW-3: Evaluate the solid waste collection system presently used by the County in terms of efficiency and long-term sustainability. Recommend alternative systems or means to improve the existing system based on this evaluation. Status/Action: Ongoing Objective SW-4: Use land use planning, zoning regulations, and the process of development approvals to enable the appropriate environmental controls and oversight of necessary solid waste facilities. (See also Land Use Objective LU-4.2.) Status/Action: Ongoing Obiective SW-5: Require new construction and substantial remodeling of non-single family property to set-aside adequate space and access for solid waste management and recycling materials storage on site. 42 T Status/Action: No Action 45 Objective SW-6: Work with municipalities in Orange County to review development proposals to ensure that adequate space for solid waste management facilities is included within site plans. Status/Action: Ongoing Public Safety (PS) Objective PS-T-1: Ensure the provision of adequate public safety protection standards for residential, commercial, and industrial development. Status/Action: Ongoing Objective PS-T-2: Ensure that all state roads in the County receive non-duplicated names to be posted on signs at intersections and that all houses are numbered in order to improve the response times of law enforcement and emergency vehicles. (See also Transportation Objective T-2.3.) Status/Action: Ongoing Objective PS-T-3: Establish and maintain an appropriate level of service for law enforcement and emergency services and ensure the provision of adequate public safety protection standards for residential, commercial, and industrial development throughout the County. Status/Action: Ongoing Objective PS-T-4: Maintain high levels of cooperation and sharing of equipment among all departments and agencies involved in law enforcement, public safety, crime prevention, fire protection, and emergency services to assure a high level of service in a cost effective manner. Status/Action: Ongoing Objective PS-T-5: Include in applied site design standards for residential, commercial, and industrial development, appropriate road design standards to ensure adequate law enforcement and emergency vehicle access to the development. (See also Transportation Objective T-2.3.) Status/Action: Ongoing Objective PS-T-6: Develop a mechanism for cooperation with telecommunication facilities stakeholders regarding the siting and design of towers. Status/Action: Initiated Objective PS-T-7: Manage the number of future wireless telecommunication facilities by identifying preferred locations capable of accommodating service Countywide. Status/Action: Initiated 43 46 Objective PS-T-8: Encourage the expansion of affordable, high-speed Internet access, fiber-optic lines, and other high-speed communication networks to rural and underserved areas. Status/Action: Initiated Objective PS-9 Maintain a radio communication system that ensures reliable notification and oversight of emergency assets, such as personnel, vehicles, and response equipment, throughout Orange County and inter-operability of communication among jurisdictions. Status/Action: Initiated, Ongoing 44 f Transportation 47 Objective T-1.1: Increase the occupancy of automobiles through ridesharing and other means; and expand the use of public transit (including bus and rail), walking, and biking as primary modes of travel. (See also Economic Development Objective ED-2.3.) Status/Action: No Action Objective T-1.2: Facilitate the overall development and use of a transportation system that is more energy-efficient, reduces carbon emissions, and reduces the use of fossil fuels while promoting the use of local renewable and sustainable fuels. Status/Action: No Action Objective T-1.3: Develop new transportation facilities in a manner that has a positive impact or avoids negative impacts on the natural environment, including air quality, water resources, biological resources, and wildlife habitat. Status/Action: Ongoing Objective T-1.4: Develop new transportation facilities in a manner that has a positive impact or avoids negative impacts on the community, including historical or cultural assets, existing neighborhoods, schools and recreational facilities, and the overall rural character in Orange County. Status/Action: Ongoing Objective T-1.5: Identify prime view sheds along major transportation corridors and protect these areas for their scenic and natural resource values. (See also Parks and Recreation Objective PR-5.4.) Status/Action: No Action Objective TAX: Expand the availability and use of public transportation (including bus and rail) throughout the County to provide better connections between employment centers, shopping and service locations, and other key points of interest in both urban and rural areas, particularly for the County's senior and disabled populations and others without access to automobiles. Status/Action: No Action Objective T-2.1: Increase the provision of bikeways and walkways, and also increase supportive facilities such as bicycle parking zones. Status/Action: Initiated Objective T-2.2: Evaluate and serve special transportation needs of the senior population, youth, the economically disadvantaged and the disabled, including both everyday needs and disaster transit provision. Status/Action: Ongoing 45 48 Obiective T-2.3: Increase countywide access for emergency vehicles, including ways to improve response times, both for existing and new developments. (See also Services and Community Facilities Objectives PST-2 and PST-5.) Status/Action: No Action Obiective T-2.4: Improve the provision of public transit facilities and services, and also increase supportive facilities for transit, such as park and ride lots. Status/Action: Ongoing Obiective T-2.5: Improve public education and advertising of existing transit services. Status/Action: No Action Obiective T-2.6: Increase safety awareness between car drivers and bicycle riders, and increase safety for pedestrians. Status/Action: No Action Obiective T-2.7: Construct bicycle facilities in Orange County that will make cycling safer, more convenient, and more efficient. Status/Action: No Action Obiective T-3.1: Improve the County's transportation system by first enhancing existing facilities as opposed to developing new facilities. Status/Action: No Action Objective T-3.2: Create and implement an Orange County Comprehensive Transportation Plan that provides the framework for a comprehensive and connected transportation system supporting a mix of all transportation modes, including sidewalks and bicycle facilities, bus and rail transit facilities, and highways. The plan should be coordinated with the goals and objectives of this Comprehensive Plan and seek to maintain and enhance community character and the natural environment. Status/Action: Initiated Objective T-3.3: Determine the policies to guide connectivity within and between residential developments based on their impact on neighborhood character. Status/Action: No Action Objective T-3.4: Direct development to higher density mixed-use districts along transit corridors and make necessary multi-modal transportation improvements to service lands that are slated for future intense development, such as Economic Development Districts. Status/Action: No Action 46 Objective T-3.5: 49 Use innovative techniques to increase mobility and reduce rush hour congestion. Status/Action: No Action Objective T-4.1: Work with nearby jurisdictions to integrate the County's transportation plans with those of other transportation planning agencies and service providers in Orange County and the Triangle region. The resulting intermodal transportation system should reflect regional goals and objectives to meet projected travel demand and to reduce congestion and reliance on single occupancy vehicles. Status/Action: Ongoing Objective T-4.2: Plan and integrate the County's multi-modal transportation routes and services with regional transportation agencies and transit service providers, agencies and transit providers in neighboring counties, the North Carolina Department of Transportation, Amtrak, and the North Carolina Railroad. Status/Action: Ongoing Objective T-4.3: Revive rail transportation in Orange County and the Triangle region. Status/Action: Initiated 47 r 50 1 1 • • 711H• r: I Primm ■■■i® ■■■I®■■ ■I®■■ ■I®■■■ • �■ ■■■I®■ mmmomitymmmmin • W.NM■■ ■I®■ ■■I®■■■ '. I®■■L.I■I®■■ o ■ ®■■L�li■I®■■■ I®■■ ■I®■■ ■I®■■ ' ■ ®■■ ■I��■■■ .x , i ■■ ■I®■ MOI =mmMu . ® ■■■I®■■■ ' I®■■ ■I�■■■w 'I�■■■ . ®■■ ■I�■■ ■I®■■■ I®■■ q ■ILA■■■ - ■■■I�■■ ■I"- ■■ ■I� ■■■Imm■■[.]■ �■■■ III■■�a ■I�■■ ■I�■■■ I�■■■ ; ®■■ • ■Ic� ■■ ■I�■■ ": ■I�■■■ , I�■■ ■I� ■■■ ■■ �I�■■ r .■I� ■MmIIM=IllNI ■■■I==■■■ ■■■ I�■■ ■I�■■ ■I� ■■■ice■■■ MM■■i" ■ILUM■■■ . 'IIUWM■■ - ■IE=Mmm ;Igo■■ l :■ ��■ f ■I� ■■■Imm■ - '■I=M ■■■Iromm ■■■ mm ■■■Ig.:Wm■■ ■Ium ■■MIME■■ . ■IfM■■■ ®■■ ■I® ■■■I®■ ■■IMM■■ . ■I®■■ " ■ =M■■■ a1® ■■■I®■■ g ■I®■■ - ■1®■■ ■ ®■■ ■Ium�■■ ■I® ■■■IMM■■ « ■1®■■L-i■ ® ■■■Irlin,3m- ■■mI® ■■■IMM■ ■Imm■■ . ■ ■■■ ,`' I�■■ ■I�■■ ■I�■■ ■I� ■■■ E X I I I I I I I I I I I I I I I IM M M ■■ ■I®■■ ■I®■■ ■I®■■ . ■I� ■O■ ®■■ ■ILA■■ =' ■IG�■■ "f' ■I�■■ ■I�� ■ # ■ ®■■■ RIB■■ ■I® ■■■II=IIM■■ � ■I�■■■■ A s 49 3. ADDITIONAL COMMENTS OR ITEMS TO REPORT (Any questions, concerns, or upcoming work to convey to BOCC) Economic Development None. Housing None. Land Use None. Natural and Cultural Systems None. Parks and Recreation None. Services and Facilities None. Transportation Funding for transportation projects is becoming more and more geared toward local project management (grants). Orange County should decide how much the County is willing to participate in funding transportation projects to implement the Comprehensive Transportation Plan that is being developed, and how to manage these transportation grants in the future. More staff will be needed as the County applies for and is awarded more grants funded with federal transportation money. 4. Conclusion Staff has mentioned in numerous abstracts and several presentations that the County's Comprehensive Plan is far reaching and its implementation will be ongoing, which are true statements. However, in staffs attempt to establish realistic expectations, a valuable point may have been missed — implementation has already begun. This Report, although subjective to some degree, clearly demonstrates that the County is taking steps towards Plan implementation. Although much work remains to be initiated and completed, this and subsequent Reports will track progress towards reaching the various Comprehensive Plan goals and objectives. Some yet to be identified implementation actions will require review and amendment to regulations contained within the County's land use ordinances, a majority of which are presently contained with the Zoning Ordinance and Subdivision Regulations. Plan implementation of this nature will take place after the Planning Department has completed its existing, BOCC sanctioned work plan, which includes reformatting existing ordinances into a Unified Development Ordinance (UDO), implementation of 49 50 select items recommended in Small Area Plans, and completion of a Comprehensive Transportation Plan, among other Planning duties. Planning Staff solicits feedback from the BOCC, Manager's Office, and reporting departments to improve the meaning and usefulness of future reports. To serve as a starting point, the following ideas are offered: • Advisory boards were not consulted during this reporting process, which could add value if done in the future. • Include all departments associated with the Services and Facilities Element (Solid Waste, Emergency Services, Libraries, and School System) in the reporting process. • Evaluation criteria, such as performance standards or metrics would provide better measurement of County progress towards Plan goals and objectives than current reporting methods. • Comprehensive Plan status reports could be coordinated with the Manager's Office, as a subcomponent of its comprehensive County reporting efforts. • Comprehensive Plan status reports could provide an opportunity for Planning and Inspections to convey data on building activity to the BOCC (i.e. Major, Minor, Except Subdivision lots created, Certificates of Occupancy issued, building permits, etc.). • Reporting departments could be asked to provide additional description of work towards objectives beyond basic coding: "I", "C", or "O" (Initiated Action, Completed Action, On-going Action). 50