Loading...
HomeMy WebLinkAboutAgenda - 11-17-2009 - 6bORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: November 17, 2009 Action Agenda Item No. ~o - b SUBJECT: Expansion of Durham-Chapel Hill-Carrboro Metropolitan Area Boundary DEPARTMENT: Planning and Inspections PUBLIC HEARING: (Y/N) No ATTACHMENT(S): 1. Letter from DCHC MPO 2. Map of Proposed Expansion 3. Roles of MPO and RPO 4. PowerPoint Presentation 5. DCHC MPO Background and History 6. MPO Frequently Asked Questions INFORMATION CONTACT: Karen Lincoln, 245-2594 Craig Benedict, 245-2592 PURPOSE: To: 1) Receive a presentation from DCHC MPO (Durham-Chapel Hill-Carrboro Metropolitan Planning Organization) staff; and 2) Direct staff on preparing a response to DCHC MPO. BACKGROUND: The TAC (Transportation Advisory Committee) of the DCHC MPO, at its November 17, 2009 meeting, directed Lead Planning Agency (LPA) staff to initiate the process to expand the Metropolitan Area Boundary (MAB) in western Orange County along the I-40/I-85 corridor, and to get feedback from Orange County. Attachment 1 is a letter from the TAC requesting Orange County's response to the proposed expansion of the MAB. Attachment 2 Is a map showing the proposed MAB expansion. The DCHC MPO is investigating expansion at this time because the MPO is beginning the process of developing the 2040 Long Range Transportation Plan (LRTP) that will list the highway, transit, fixed-guideway, bicycle and other transportation services and facilities that are planned for construction through year 2040. Federal legislation requires that an MPO's metropolitan area boundary contain, at a minimum, the entire Urbanized Area (UZA), as defined by the U.S. Census, and should contain the area beyond the UZA that is expected to be urbanized within the next twenty years or that is affected by urban policies and influence. Attachments 5 and 6 prepared by the LPA in 2006 are respectively a Background and History of DCHC MPO Membership and MAB and Frequently Asked Questions. Expansion of the DCHC MAB will take in a portion of Orange County that is in the Triangle Rural Planning Organization (TARPO), separating the northern portion of the County's rural transportation planning area from the southern part of the rural transportation planning area. 2 Expanding the DCHC MAB into an area of Orange County currently in TARPO would result in a loss of NCDOT planning funds equal to $1 per every 10 people removed from the TARPO planning area. The local match could decrease, stay the same or increase. The NCDOT required local match of 20% is divided equally among the four participating counties, so each county's local match could decrease proportionately to the decrease in NCDOT funding for TARPO. However, the local match could remain the same or may have to be increased in order to maintain the same level of services from the Triangle J Council of Governments (TJCOG). TARPO would also lose Congestion Mitigation and Air Quality (CMAQ) funds which are based on population within the air quality maintenance or non-attainment areas in the rural planning area. Orange County would also potentially lose CMAQ funds that TARPO allocates to Orange and Chatham counties based on the percentage of each county's population in TARPO within the air quality maintenance area. Target CMAQ funds available to TARPO equal $171,848.75 each year for the five years 2013 through 2018. Orange County is potentially eligible for $101,768 of those funds based on Orange County's share of 59.22%. NCDOT funding would not be reduced until after the 2010 Census. DCHC MPO federal funding would not be affected until after the 2010 Census and would be based on population within the Census defined UZA (urbanized area). If population in the area of the proposed MAB expansion in Orange County becomes urbanized as defined by the 2010 Census, DCHC would receive additional funds. The DCHC CMAQ allocation would also increase but Orange County would face a more competitive process for applying for those CMAQ funds through the MPO. Attachment 3 is a table detailing legislation, structure and governance of MPOs and RPOs and relates to Orange County's role in the DCHC MPO and the TARPO with respect to transportation planning. FINANCIAL IMPACT: There will be no financial impact related to expanding the MAB until after the 2010 Census. After the 2010 Census, Orange County could experience increased TARPO dues (currently $7,500 per year) and reduced TARPO CMAQ (Congestion Mitigation and Air Quality) funds (currently $101,768 per year). RECOMMENDATION(S): The Manager recommends the Board: 1. Receive a presentation from DCHC MPO (Durham-Chapel Hill-Carrboro Metropolitan Planning Organization) staff; and 2. Direct staff on preparing a response to DCHC MPO: a. Option 1 -Leave the MAB as is until findings of the 2010 Census identify the new UZA; b. Option 2 -Endorse expanding the Durham-Chapel Hill-Carrboro Metropolitan Area Boundary along the I-85/I-40 corridor; or c. Option 3 - Endorse the Burlington-Graham Metropolitan Planning Organization's expansion further along the I-85/I-40 corridor as Mebane's urbanized area expands. 3 Member Governments.. , Town of Carrboro Town of Chapel Hil( County of Chatham City of Durham County of Durham Town of Hillsborough NC Department of Transportation County of Orange DURHAM ~ CHAPEL HILL ~ CARRBORO METROPOLITAN PLANNING ORGANIZATION October 21, 2009 Ms. Valerie P. Foushee, Chair Orange County Board of Commissioners 106 Claris Court Chapel Hill, NC 27514 Dear Ms. ushee: ~~~/~~ . The urham-Chapel Hill-Carrboro Metropolitan Planning Organization's metropolitan area boundary currently includes the City of Durham, Durham County, Chapel Hill, Carrboro, Hillsborough, southeastern Orange County, and northeastern Chatham County. As required by the MPO's Memorandum of Understanding, the MPO periodically reviews its boundary to ensure that it encompasses the federally designated urbanized area and the area expected to be urbanized over the next twenty years. The Transportation Advisory Committee (TAC) recently reviewed growth projections for the area and decided to consider expanding the boundary to include the I-85/I-40 corridor in western Orange County. The enclosed map displays the current and proposed metropolitan area boundary. Before the TAC makes a decision, we would like to receive comments from the Orange County Board of Commissioners on this proposal. MPO staff would like to attend a board meeting to describe the background and implications of expansion to this area and to answer any questions that the board may have. MPO staff will coordinate with Orange County staffto schedule this presentation. The TAC will decide whether or not to expand by the end of this year, and the Governor must concur with the MPO' i3 decision before the expansion takes effect. We greatly appreciate the board's thoughts on this proposal. Orange County has been a valued partner in the MPO and we look forward to continuing our cooperative efforts in regional transportation planning. Sincer . Mi 1 oodard, Chair Transportation Advisory Committee Cc: drank Clifton, Orange County Manager Craig Benedict, Orange County Planning Director Kaxen Lincoln, Orange County Transportation Planner enclosure Clty of Durham • Department of Transportation • 101 City Hall Plaza • Durham, Norlh Carolina 27701 • (919) 560-4366 • Facsimile (919) 560-4561 DCHC MPO POTENTIAL MAB EXPANSION AREAS ~~- ~h~~. ` ~~ ~ ~~ l %~` ~ ?'~" ~~~ r --~~ NIC~SB~Ol~OUGH '`.~~ ,'s ~~~ ~ ~ ~ - ~ ~ ,:.~ - - ~ ~ ~, ~ - ,,, ~` ~, 5 ~- ~~, ~ :~ ~, ~J 9 f J H f ) ' `/ T Roles of the MPO and the RPO MPO LEGISLATION 1962 Federal Highway Act: required urbanized areas > 50,000 to adopt transportation plans to qualify for federal transportation funds. Section 134(a) of Title. 23 United States Code directs metropolitan planning organizations, in cooperation with the State, shall develop transportation plans and programs to develop transportation systems, embracing various modes of transportation in a manner which will efficiently maximize mobility of people and goods within and through urbanized areas and minimize transportation fuel consumption and air pollution. Agreements C.F.R. Title 23 Cht.1 § 450.310 Metropolitan planning organization: Agreements. (a) The responsibilities for cooperatively carrying out transportation planning (including corridor and subarea studies) and programming shall be clearly identified in an agreement or memorandum of understanding between the State and the MPO. (b) There shall be an agreement between the MPO and operators of publicly owned transit services which specifies cooperative procedures for carrying out transportation planning (including corridor and subarea studies) and programming as required by this subpart. DCHC MPO (Durham-Chapel Hill-Carrboro Metropolitan Planning Organization) Created by: North Carolina Durham-Chapel Hill-Carrboro Metropolitan Planning Organization Memorandum of Understanding for Continuing, Cooperative, and Comprehensive Transportation Planning between the Governor of the State of North Carolina, City of Durham, Town of Chapel Hill, Town of Carrboro, Town of Hillsborough, County of Durham, County of Orange, County of Chatham, and the_ North RPO LEGISLATION Session Law 2000-123 authorized NCDOT in cooperation with local elected officials to establish Rural Transportation Planning Organizations -. A voluntary organization of local elected officials or their designees and representatives of local transportation systems formed by a memorandum of understanding with the Department of Transportation to work cooperatively with the Department to plan rural transportation systems and to advise the Department on rural transportation policy. RPOs established for the general purpose -of: • Developing long-range local and regional multi-modal transportation plans in cooperation with MPOs and NCDOT; • Providing a public forum for participation in the rural transportation planning process; • Prioritizing suggestions for transportation projects for the STIP(State Transportation Improvement Program); and • Providing transportation-related information to local governments and other interested parties. TARPO (Triangle Area Rural Planning Organization) Created by: Memorandum of Understanding for Cooperative, Comprehensive and Continuing Transportation Planning and the Establishment of a Rural Planning Organization for the County of Chatham and the participating municipalities therein; the County of Moore and the participating municipalities therein; the County of Lee and the participating municipalities therein ; ~, u Roles of the MPO and the RPO MPO RPO DCHC MOU TARPO MOU Carolina Department of Transportation in cooperation with the United the County of Orange; and the North Carolina Department of States Department of Transportation. Transportation (NCDOT) Transportation plans and programs and land use policies and programs for the planning area having regional impacts will be coordinated with the Triangle Transit Authority (now Triangle Transit) and the Capital Area Metropolitan Planning Organization, and the Trian le J Council of Governments. STRUCTURE STRUCTURE Planning Area Planning Area C.F.R. Title 23 Cht.1 § 450.308 Metropolitan planning organization: NCGS Article 17 Chapter § 136-211 Metropolitan planning area boundaries. (a) The metropolitan Rural Transportation Planning Organization includes planning area boundary shall, as a minimum, cover the UZA(s) representatives from contiguous areas in three to fifteen and the contiguous geographic area(s) likely to become counties, with a total population of the entire area represented urbanized within the twenty year forecast period covered by the of at least 50,000 persons according to the latest population transportation plan described in § 450.322 of this part. The estimate of the Office of State Planning. boundary may encompass the entire metropolitan statistical area or consolidated metropolitan statistical area, as defined by the Bureau of Areas already included in a Metropolitan Planning the Census. For geographic areas designated as nonattainment or Organization shall not be included in the area represented maintenance areas (as created by the Clean Air Act Amendments of by a Rural Transportation Planning Organization. 1990 (CAAA)) for transportation related pollutants under the CAA, the boundaries of the metropolitan planning area shall include at least the boundaries of the nonattainment or maintenance areas, except as otherwise provided by agreement between the MPO and the Governor under the rocedures s ecified 450.310 * of this art. *§ 450.310(f) If the metropolitan planning area does not include the entire nonattainment or maintenance area, there shall be an agreement among the State department of transportation, State air quality agency, affected local agencies, and the MPO describing the process for cooperative planning and analysis of all projects outside the metropolitan planning area but within the nonattainment or maintenance area. The agreement also must indicate how the total transportation related emissions for the nonattainment or maintenance area, including areas both within and outside the metropolitan planning area, will be treated for the purposes of determining conformity in accordance with the U.S. EPA conformity regulation (40 CFR part 51). The agreement shall address policy mechanisms for resolving conflicts concerning transportation related emissions that may arise between the metropolitan planning area and the portion of the nonattainment or maintenance area outside the metropolitan planning area. Proposals to exclude a portion of the nonattainment or maintenance area from the planning area boundary shall be coordinated with the FHWA, the FTA, the EPA, and the State air quality agency before a final decision is made. rn B m G Roles of the MPO and the RPO MPO RPO Planning Area C.F.R. Title 23 Cht.1 § 450.306 Metropolitan planning organization: Designations and redesignation. (a) Designations of metropolitan planning organizations (MPOs) made after December 18, 1991, shall be by agreement among the Governor(s) and units of general purpose local governments representing 75 percent of the affected metropolitan population (including the central city or cities as defined by the Bureau,of the Census), or in accordance with procedures established by applicable State or local law. To the extent possible, only one MPO shall be designated for each UZA or group of contiguous UZAs. More than one MPO may be designated within an UZA only of the Governor(s) determines that the size and complexity of the UZA make designation of more than one MPO appropriate. Approval of metropolitan planning area boundaries by the FHWA or the FTA is not required. DCHC MPO MAB (Metropolitan Area Boundary) TARPO Planninu Area • Chatham County area outside DCHC MPO and participating DCHC Planning Area defined by the MAB is the Durham-Chapel municipalities therein; Hill-Carrboro Urbanized Area as defined by the United States Moore County and participating municipalities therein; Department of Commerce, Bureau of the Census, plus that area . Lee County and participating municipalities therein; beyond the existing urbanized area boundary that is expected to Orange County area outside DCHC MPO and BGMPO become urbanized or be affected by urban policies within a (Burlington-Graham Metropolitan Planning Organization). twenty-year period. The MAB will be periodically reviewed and revised in light of new developments, basic. data projections for the current planning period, and as may otherwise be required by federal and state law. D n~ m w Roles of the MPO and the RPO MPO DHCH MPO Structure The DCHC MPO shall include the boards of general purpose local government -Durham City Council, Chapel Hill Town Council, Carrboro Board of Aldermen, Hillsborough Board of Commissioners, Durham County Board of Commissioners, Orange County Board of Commissioners, and Chatham County Board of Commissioners; North Carolina Department of Transportation; aTransportation Advisory Committee; a Technical Coordinating Committee; and various agencies and units of local, state, and federal government participating in transportation planning for the area. City of Durham is the administrative entity and serves as the LPA (Lead Planning Agency). GOVERNANCE Responsibilities Transportation policy decisions within the DCHC Planning Area are the shared responsibility of the TAC (Transportation Advisory Committee), the N.C. Board of Transportation, and participating local governments. The TAC is responsible for: • Keeping the policy boards informed of the status and requirements of the transportation planning process; • Assisting in dissemination and clarification of decisions, inclinations and policies of the policy boards; • Providing opportunities for citizen participation in the transportation planning process; • Establishing goals- and objectives for the transportation planning process ; • Reviewing and approving of the Comprehensive Transportation Plan and any changes; RPO TARPO Structure TARPO includes boards of general purpose local government for Chatham County and participating municipalities therein, Moore County and participating municipalities therein, Lee County and participating municipalities therein, and Orange County, the North Carolina Department of Transportation, aRural Transportation Advisory Committee and a Rural Technical Coordinating Committee. Triangle J Council of Governments is the administrative entity and serves as the LPA (Lead Planning Agency) for coordinating transportation planning in the four county area. GOVERNANCE Responsibilities The RTAC (Rural Transportation Advisory Committee) serves as a forum for cooperative transportation planning decision making for TARPO. The RTAC is responsible for: • Keeping local elected boards informed of the status and requirements of the transportation planning process; • Assisting in dissemination and clarification of decisions, inclinations and policies of local elected governing boards and NCDOT; • Helping ensure meaningful public participation in the rural transportation planning process; • Establishing goals, priorities and objectives for the rural transportation planning process; • Endorsing and reviewing changes. to adopted transportation plans within TARPO; Roles of the MPO and the RPO MPO RPO Responsibilities • Reviewing and approving a Prospectus for transportation Responsibilities Endorsing, reviewing and approving a Planning Work planning that defines work tasks and responsibilities for the Program for transportation planning that defines work tasks various agencies participating in the transportation planning and responsibilities for the various agencies participating in process; TARPO; • Reviewing and approving the transportation Unified Planning Work Program/ • Reviewing and approving the Transportation Improvement Endorsing, reviewing and approving transportation Program. improvement projects that support and enhance both regional and local transportation in the four counties in • Revising membership in the Technical Coordinating TARPO. Committee; • Reviewing and recommending changes to the National Highway System, Functional Classification, Urban Area Boundary, and Metropolitan Area Boundary DCHC TAC Membership RTAC Membership Voting members: • Two (2) members of Durham City Council Voting members: • One (1) member of Chapel Hill Town Council One (1) member of the Chatham County Board of • One (1) member of Carrboro Board of Aldermen Commissioners • One (1) member of Hillsborough Board of Commissioners One (1) elected municipal official representing the • One (1) member of Durham County Board of Commissioners municipalities within Chatham County that have elected to • One (1) member of Orange County Board of Commissioners become members or TARPO • One (1) member of Chatham County Board of Commissioners One (1) member of the Lee County Board of • One (1) member of North Carolina Board of Transportation Commissioners • One (1) elected municipal official representing the Non-voting members: municipalities within Lee County that have elected to • A Division Administrator of Federal Highway Administration and/or become members or TARPO Federal Transit Administration or their representatives One (1) member of the Moore County Board of • A Triangle Transit Board of Trustees member Commissioners • Other local, regional, state or federal agencies impacting trans ortation in the tannin area, at the invitation of the TAC Roles of the MPO and the RPO MPO RPO DCHC TAC Membership RTAC Membership Other members: One (1) elected municipal official representing the • Environmental Protection Agency (EPA) municipalities within Moore County that have elected to • NC Department of Environment and Natural Resources become members or TARPO (NCDENR) • One (1) member of the Orange County Board of • Triangle J Council of Governments (TJCOG) Commissioners • •Raleigh-Durham Airport Authority One (1) member from the NC Board of Transportation • • Triangle Transit Authority (TTA) representing Division 8 • • Duke University • • University of North Carolina at Chapel Hill • • North Carolina Central University • • Carolina Trailways • Research Trian le Foundation of North Carolina D v c~ w 0 11 12 U.S. Code of Federal Regulations: The MAB must include the entire urbanized area as defined by the Census and "the contiQUOUS area expected to beco in DCHC MPO MOU: "The MAB will be pperiodically reviewed and revised in light of new developmen ~ . .. r 1 1 The DCHC MPO Transportation Advisory Committee must approve the MAB. The Governor must concur before the expansion takes effect. 3 ~ DCHC MPO U[banlzed A[ea and MetropoNtan Area 6o[mdary Y.epskl .a;i;, v •_ ~,}.~, ''4 ~ ~3J u i `;- :~~~ ~~ ,~ _faY.gKi MRB :~ '~ i~~~ li\ i iewb .fE.~ q ~sy y. ' $ He ~ :~ '~ `;,. ~. ' ~: i ~~~y '; - r ~sy,j Y L ~~. . , y a~ to ;v fs ~ , ~ .; t~ f ~}~3, ~''' i ~ s P~~ '•t Ys•'~a f >t F~~ ' ~ ~. .. ~y~, fj{y ~ _ _a`;.- r F";' 4 2 13 i97o -Durham Urbanized Area first designated by the Census, includes the City of Durham and part of Durham County z98o -Durham Urbanized Area expanded to inclvdeChapel HiII,Carrboro, and partof Orange County 1990 -Durham Urbanized Area expanded to include Hillsborough and part of Chatham County zooy. - MAB "smoothed" 5 I-85/I-4o corridor in western Orange County Based on: Land use plans Development . Socio-economic data projections ^ Commute patterns Boundary corresponds with traffic analysis zones and geographic features such as roads and waterways fi 3 A Y~ 15 f..and Use Element of ffie Qrange Coemty Comprehensive Plan Legend: ao r ar ~~>rn Rural Resrdaota€ l RurdA Buller A~rpikuraf Rssid~a~tlel ~Reroume .tuaan i~YneitYpai Extra-FeRitoria! Jurisdictlan 4~inklpat To»n laniK Pub( Interas; fleas ('~ WadloM Weac Ac6vky Notlas Rurd Coirmpm~y Node Raral mad Nock ..... ftund Industrial Npde . ,.., ~CatrmerdelNode . - {AnllfitrCiBNRdul,4ia N2ds , Econotiiic ~svelapmenF ~A lo;rt P9amiAH Nsa- 5 t~ s 17 7 18 8 19 zooo Census Orange County ^ To Durham County: i6,47o = To Wake County: 4,ziz = ToAlamanceCounty: z,o38 Chatham County = To Orange County: 4,zo6 «~ • To Wake County: 2,743 = TaDurhamCounty: z,73g Durham County _; . , , s; b = To Wake County: i3,9z9 ~~ ^ To Orange County: 9,z6z `°'~~ Flow ../'* 9 20 48,39 1G7~475 14341 370 ;60,651 150,673 31,707 543. 11z,z53 43,198 17366 i7~, a~ 1210 8,398 114614 14,341 377,353 o,55a :160,897 31,707 553,55 ~,~53 -46,133 17,3E6 s75,9oz O~~U 1 19 2Q 10 21 t .. Responsibility for Planning and Programming Projects Triangle Area RPO ~ DCHC MPO Comprehensive Transportation Plan, Long Range Transportation Plan, Transportation Improvement Program, STPDA, CMAQ, Enhancements, Etc. Funding for Planning Organizations ^ The DCHC MPO would not receive additional funding for planning because MPO funding is based on the Urbanized Area a After the zoso Census, the Triangle Area RPO would lose approximately ~i for every io people TAC has asked staff to initiate expansion in western Orange County. Solicit feedback from Orange County Board of Commissioners. TAC will review expansion at their December g, zoo9 meeting z~ 11 22 12 23 ~.:Attaclmerit:5:: 2006 Review of MPO Membership and Metropolitan Area Boundary September 11, 2006 The Federal Highway Act of 19b2 initiated a requirement that a continuing, cooperative, and comprehensive (" 3-C") transportation planning process be established for all urban areas over 50,000 in population in order to qualify for federal transportation funds. These urban transportation planning requirements have been administered by the North Carolina Department of Transportation (NCDOT) with the approval of Federal Highway Administration (FHWA) and the Federal Transit Administration {FTA) of the U. S. Department of Transportation (USDOT). There are now 17 urban areas in North Carolina which participate in the " 3-C" transportation planning process, including; Asheville, Burlington, Charlotte-Union, Durham, Fayetteville, Gastonia, Goldsboro, Greensboro, Greenville, Hickory, High Point, Jacksonville, Kannapolis, Raleigh, Rocky Mount, Wilmington, and Winston- Sa(em. Nearly all of these urban areas also include one or more neighboring smaller municipalities. When the Durham Urbanized Area was first designated by the Census in 1970, it consisted of only the City of Durham and a portion of Durham County. The first Transportation Advisory Committee was created for the Durham Urbanized Area in the 1970s. The 1980 Census expanded the Durham Urbanized Area to include the Towns of Chapel Hill and Carrboro and portions of Orange County. Consequently, those governments were added and the name changed to the Durham-Chapel Hill-Carrboro Urban Area MPO. The Town of Hillsborough and northeastern Chatham County were added in 1994 in response to the need for coordinated planning in the area and the requirements ofthe federal transportation bill 1STEA. 1n 1993, the US EPA requested that Butner join the DCHC MPO because of the common air quality issues in Dutchville Township in southwestern Granville County. At the time, the DCHC MPO declined extending MPO membership to Butner. 1n 2004, the DCHC MPO approached Orange County, Roxboro, Person County, Butner, Granville County, Pittsboro, and Chatharri County in regard to MPO expansion. At the time, the DCHC MPO decided not to expand because the 2030 Long Range Transportation Plan (LRTP) for the MPO was well under way and expansion would delay the plan. The TAC directed the MPO staff to reexamine MPO expansion at the beginning of the 2035 LRTP update. Over time, the role of MPOs has shifted. Historically, Lang-range transportation plans (sometimes called Thoroughfare Plans) for this area, and indeed for most urban areas in .. the State, have traditionally focused on highways. Automobile travel is the dominant form of transportation, with transit accounting for less than ten percent of all trips. 1n the past, land use development has encouraged campus-like employment centers away from 24 Attachment 5 where people live or shop. These suburban-type land use patterns have generated an increased demand for highways while discouraging non-auto alternatives. It is not surprising that the past thoroughfare plans have not contained an integrated, multi-modal recommendation. Now, the MPO has given strong emphasis to balanced, multi-modal ,.. _: alternatives in the transportation planning process as evidenced: by the:2030long-range transportation plan, other modal plans, and the Transportation Improvement Program (TIP) project priorities. Based an changes in state law in 2000, NCDOT has carried out the process of establishing Rural Transportation Planning Organizations {RPO's}throughout North Carolina far all rural areas not yet within an existing MPO. Although, organized and tasked in a manner very similar to MPOs, RPOs are grounded in state law rather than federal and are intended to address and improve rural area transportation planning processes. An MPO's coverage is delineated by its Metropolitan Area Boundary (MAB) that is supposed to include surrounding areas that are expected to become urbanized within the next twenty years but are not yet within another MPO. Based on this factor as well as others, some areas currently in RPOs may be considered qualified to become members of the MPO and thus may be offered the opportunity to join. Current NCDOT policy is that local municipal government may be members of either an MPO or RPO, but not both. Depending on boundaries, county governments could be members of multiple MPOs and/or RPOs although being members of more than one or two organizations could become burdensome. Organization As required by federal law, the " 3-C" process in each urban area is carried out by its Metropolitan Planning Organization (MPO). A Memorandum of Understanding {MOU), signed by the participating local governing boards as well as NCDOT and FHWA, establishes the specific framework for how each MPO operates. In North Carolina, each urban area's MPO is defined as an "umbretla" organization which includes alI member local governments, USDOT, NCDOT, and other providers of transportation services (such as the Raleigh-Durham International Airport Authority). The MPO administrative structure has three main components: 1. Transportation Advisory Committee {TAC) - is the governing policy board for the MPO. The TAC's membership includes elected officials representing (and appointed by) each local government, the area's representative on the North Carolina Board of Transportation, advisory non-voting members representing FHWA and TTA, and other members as may be authorized in the MOU. The TAC provides.policy direction for the planning process, facilitates communication , .._ and coordination between the member jurisdictions, and guides the development of a coordinated, muItimodal transportation program for the planning area. The TAC directs the " 3-C" process through its annual review and approval of the 25 Attach~rrient 5 MPO's Unified Planning Work Program (UPWP) and the MPO's Transportation Improvement Program (TIP} and through review and approval of changes to the Long Range Transportation Plan {LRTP) and Comprehensive Transportation Plan (CTP}. .. ,. .. 2. Teehnicad Coordinating Committee (TCC} - is comprised of staff representatives of the various member governments, NCDOT, FHWA (non-voting), and other agencies such as T3COG, TTA, Research Triangle Foundation, local universities, and RDU Airport. The TCC has the responsibility of supervising and coordinating the comprehensive transportation planning process, and for making recommendations to the TAC and respective local and state agencies pertaining to that process. 3. Lead PlanningAgeney (LPA) -provides staff support to the MPO. The LPA develops the draft documents, prepares TAC and TCC meeting materials, schedules meetings, administers the distribution of federal transportation planning (PL) funds to member governments, and carries out the directives of the TCC and TAC. The City of Durham Transportation Division currently serves as this area's LPA. Work Activities It is the responsibility of the TGC to annually develop two documents for review and approval by the TAC, NCDOT and USDOT; a Unified Planning Work Program (UPWP} and a Metropolitan Transportation Improvement Program (MTIP). The UPWP describes all transportation planning work activities to be conducted during the fiscal year by the member agencies as well as the amounts of various federal, state and local funds to be expended. The UPWP is created every,fiscal year. The MPO receives Section 104(f) (PL funds) to carry out the required transportation planning functions. These monies ($373,549 in FY 06-07) are utilized by the MPO as recommended by member agencies and approved by the TAC. Quarterly invoices are sent to the NCDOT for review and reimbursement. In addition, the DCHC MPO utilizes the Surface Transportation Program Direct Apportionment funding (STP-DA}. In FY 06- 07, the DCHC MPO was allocated approximately $3.5 million in STP-DA funding. The STP-DA fitnds, unlike the PL 104(f) funds, can be used far construction activities as well as planning. The local TIP (often referred to as the Metropolitan TIP, or MTIP} must include all transportation improvement projects for which federal funds are to be expended. The MTIP is created biennially simultaneous with the State TIP (STIP) process. The MPO and NCDOT work together to program projects using federal funds in the MTIP and STIP. Though not required, the MTIP-mayal5o include. state- and Locally-funded - - transportation projects. 26 Affachment 5 In addition, any changes to the Durham-Chapel Hill-Canrboro Urban Area LRTP and CTP must be approved by the TAC. Changes to the CTP must also be approved by the State Board of Transportation. Recent changes in applicable federal laws have expanded the responsibilities of the MPO. For example, requirements of the Clean Air Act Amendments of -1990 have focused greater attention on improving air quality. ' In .. . ......... . reviewing proposed revisions to the LRTP and TIP, the TCC and TAC must determine that the proposed change does not negatively affect air quality. Federal Transportation Acts: SAFETEA-LU, TEA-21, and ISTEA The approval of ISTEA in 1991, TEA-21 in 1998, and SAFETEA-LU in 2005, placed greater responsibility on the MPO in the development of a comprehensive transportation planning process, requiring elements for transit, bicycling and pedestrians as well as the traditional emphasis on roads. Specifically, the MPO is now responsible for developing, in cooperation with the State and affected transit operators, a comprehensive, tong-range transportation plan and expanded transportation improvement program for the area. The transportation planning process must now include additional considerations such as land use, intermodal connectivity, methods to enhance transit service, and needs identifed through the management systems. The MTIP must be consistent with the long-range transportation plan and must include all projects in the metropolitan area that are proposed to be funded with federal funds. Relationship with NCDOT Historically, NCDOT has maintained a close, direct working relationship with local governments. The " 3-C" MPO process has been a supplement to this relationship, not a substitute for it. MPO member governments are free to continue this direct relationship as they see fit.. Primarily, the MPO process facilitates better communications, more infprmed decision-making processes, and the ability,to stimulate greater regignal support for local transportation needs. DCHC MPO sees itself in a partnership with NCDOT that is intended to address the transportation needs of all of our citizens. For More Information Felix Nwoko, Transportation Planning Manager DCHC MPO 101 City Hall Plaza Durham, NC 27701 919-560-4366 (p) Felix.nwokondurhamnc.gov www.dchcmpo.or~ AitacflY~ierf 6`: 2006 Review of MPO Membership and Metropolitan Area Boundary 27 Frequently Asked .Questions September 11, 2006 1} What is the Durham-Chapel Hill-Carrboro Metropolitan Planning Organization (DCHC MPO}? The DCHC MPO is one of 17 MPOs in North Carolina that have been established to fulfill the federal requirements originally established in 1962 of maintaining a continuing, cooperative, and comprehensive (3-C) transportation planning process in order to qualify for federal transportation funds. MPOs are required for all areas designated by the Census as urban in nature and above 50,000 in population. 2} What area does the DCHC MPO currently cover? The DCHC MPO consists of all of Durham County, including the City of Durham, eastern Orange County, including the Towns of Carrboro, Chapel Hill, and Hillsborough, and northeastern Chatham County. See the attached map. 3} Haw many members are there? The MPO's policy board, the Transportation Advisory Committee (TAC), consists of elected officials from the following jurisdictions: • City of Durham (2) • Town of Chapel Hill (1) • Town of Carrboro (1) • Town of Hillsborough (1) • Durham County (1} • Orange County (1} • Chatham County (1) • North Carolina Board of Transportation (1 -appointed by the Governor) The TAC also includes two non-voting members from the following organizations: ~ Triangle Transit Authority ('TTA) • United States Department of Transportation (USDOT}- The MPO's staff body the Technical Coordinating Committee (TCC), consists of 30 staff members of the member governments, NCDOT, local universities, the Triangle 3 Council of Governments, the Raleigh-Durham Airport Authority, the Research Triangle Park, _ Foundation, and Carolina Trailways. 28 Attachment 6 Most TAC and TCC members have designated alternates. The Chair and Vice-Chair positions for each committee are subject to elections at the beginning of each calendar year. . 4) What are the voting procedures for the TAC? Any member, voting or non voting, may make or second a motion. In most cases, approvals of motions are based on a majority vote of the voting membership. When requested by a TAC member, weighted voting procedures are used. Weighted voting uses the following distribution of votes: City of Durham 6'~ Chapel Hill 2 Carrboro 1 Hillsborough I Durham County Z Orange County Z Chatham County 1 N C Department of Transportation 1 TOTAL I5 * Three (3} votes per voting member 5) What other 1VII'Os are nearby? The Capital Area MPO (CAMPO) covers Wake County, southern Franklin County, southern Granville County, eastern 3ohnston County, and northern Harnett County. The Burlington-Graham MPO covers Alamance County and a small portion of Orange County near Mebane. See the attached map. G) What are l2POs? Rural Planning Organizations. (R.POs} were created by North Carolina state law in 2000 to facilitate better transportation planning in rural areas. There are ZO RPOs in North Carolina. RPO's governance procedures and work products are very similar to those of MPO's; however, RPO's are not recognized in federal law. The Kerr-Tar RPO and the Triangle Area RPO are contiguous with the DCHC MPO. Seethe attached map. 'n Why is the DCHC MPO considering expanding? The DCHC MPO is primarily exploring expansion in order to provide more opportunities for cooperative decision-making and coordinated regional transportation planning. _ Commuting trends from the 2000 U.S. Census data show that travel between many areas beyond the current MAB and the DCHC MPO is significant. Granville County, Person County, and northeastern Chatham County are part of the Triangle urban airshed and non-attainment area for ozone air pollution. As such, state and federal transportation 29 Attactiraeit~6- - funding for these areas is already dependent upon the planning decisions made by the DCHC MPO and CAMPO and vice versa. The DCHC MPO is investigating expansion at this time because the MPO is beginning the process ofcreating a 2035 Long Range Transportation Plan (LRTP}. The 2035 LRTP _ -. will list the highway, transit, fixed-guideway, bicycle, and other transportation services and facilities that are planned in the DCHC MPO through the year 2035. The creation of the LRTP will take approximately three years to complete. In order to ensure that we have a comprehensive plan that has coverage over the entire MPO area for many years to come, we are currently considering MAB expansion. 8) What are the financial consequences for local governments of joining the DCHC MPO? The MPO's staff and planning activities are currently funded by the federal government. There are no fees for member governments. Some MPOs charge member governments fees. Many of the federal funding sources used for MPO activities require 20% local matches for use of the funds. The Local matches are typically provided by the member government(s) that requested the project. Currently, federal iaw apportions federal funds to MPOs for transportation planning and transportation improvements based on the MPO's current Urbanized Area (UZA} population. Since the UZA has not changed, expanding the coverage of the MPO does not result in increased federal funding. The current NCDOT policy for distributing federal transportation planning funds to MPOs is partially based on the latest census defined UZA population. Thus, MPO expansion also does not result in increased funding from the state. Planning funds for RPOs currently come from state funds, not federal funds for which they are currently ineligible. In 1989, the North Carolina Legislature passed the Highway Trust Fund Act which established additional state transportation funding resources. As a part of that legislation, an equity formula was established to ensure that each are of the state received equitable amounts of state and federal transportation funding. The equity formula applies to geographic areas that are defined by combinations of NCDOT's 14 current highway divisions. MPO or RPO boundaries currently have no impact on the equity formula funding distribution process used by NCDOT. 4) Are local governments required to join the DCHC NiPO? No. Federal legislation requires that an MPO's metropolitan area boundary {MAB} contain, at a minimum, the entire Urbanized Area (UZA), as defined by the U.S. Census. The legislation. also.. states. that the MA$ should contain the area beyond the UZA that is __ .. expected to be urbanized within the next twenty"years or that is affected by urban policies..... _ , and influence. The DCHC MPO's UZA has not changed recently, but may be expanded by future censuses (see the attached map). Inclusion of the area that is expected to be 30 Attachment 6 urbanized within the next twenty years or that is influenced by urban policies is up to the MPO and the Iocal governments' discretion. 10) Can oar local government be a member of an MPO and an RPO? Current NCDOT policy allows local municipal governments to be members of either an MPO or ltPO, but not both. County governments, which may be split geographically, can be members of multiple MPOs and/or RPOs but the meeting requirements could prove to be burdensome and impractical. 11) Where can I get more information? Felix Nwoko, Transpoz-tation Planning Manager DCHC MPO I01 City Hall Plaza Durham, NC 27701 919-560-4366 (p) FeIix.nwoko(>,durhamnc. gov www.dchcmno.or~