HomeMy WebLinkAboutAgenda - 09-15-2009 - 4qORANGE COUNTY
BOARD OF COMMISSIONERS
ACTION AGENDA ITEM ABSTRACT
Meeting Date: September 15, 2009
Action Agenda
Item No. Q- -G~
SUBJECT: Grant Application for Special Appropriations Project for Wastewater Pro-jec`ts~~
DEPARTMENT: County Manager & Planning PUBLIC HEARING: (Y/N) No
ATTACHMENT(S):
Environmental Assessment -Efland
Sanitary Sewer Improvements and
Buckhorn Sanitary Sewer
Improvements North of I-85
Special Appropriations Projects -Region
4 Procedures
INFORMATION CONTACT:
Craig Benedict, 245-2592
Willie Best, 245-2308
PURPOSE: To submit an application to the Special Appropriations Project (SPAP) Division in
the U.S. Environmental Protection Agency's Office for sewer grant funds in the Efland-Buckhorn
area and authorize the Chair and Interim Manager to sign the application.
BACKGROUND: Representative David Price made State and Tribal Assistance Grants (STAG)
earmarks in prior legislative sessions (FY 2003 and FY 2005). Although the associated
engineering reports and design sewer projects have been in the State Department of Water
Quality (DWQ) and EPA review process since May 2008, this grant application is necessary to
secure the earmarks.
These earmarks to Orange County for wastewater projects totaled $900,000 and $500,000
respectively.
There have been discussions in Congress that a rescission of STAG funds may occur in FY
2010 that range between $40 and $140 million. EPA is therefore asking that all previous
earmarks be formally awarded through a SPAP grant application. The application is being
completed by Planning, Engineering and Finance.
Orange County has contacted EPA officials and those officials suggested attendance at a
Special Appropriations Fall Workshop on September 15-17, 2009 in Atlanta. Orange County
will be represented at this conference to fully understand the aspects of the grant process.
The full scope of the two wastewater projects (Central Efland and North Buckhorn) has been
designed; however the construction extent of the projects will be linked to future costs and
available funding. The grant is a County 45% matching grant.
2
Once the conference information is incorporated in the SPAP application, this abstract item will
permit the Manager to sign the application to pursue awards.
FINANCIAL IMPACT: The grants would total $1.4 million. Orange County has $.9 million
remaining in a CIP fund for Efland-Buckhorn sewer projects construction. $300,000 has been
spent on engineering design services for both projects. Therein Orange County has or will be
able to spend at this time $1.4 million which would meet the 45% matching STAG grant ratio.
The project has been estimated by the engineering consultant, Coulter, Jewel, Thames (CJT),
to cost between $4.3 and $4.7 million, so additional funding will be necessary unless the project
is scaled back with the approval of prior review agencies.
RECOMMENDATION(S): The Interim Manager recommends the Board:
1. Approve the submittal of an application, and
2. Authorize the Chair and Interim Manager to sign the application for submittal.
3
ENVIRONMENTAL ASSESSMENT
EFLAND SANITARY SEWER IMPROVEMENTS
AND
BUCKHORN SANITARY SEWER IMPROVEMENTS
NORTH OF I-85,
ORANGE COUNTY, NORTH CAROLINA
A. Proposed Project Description
Orange County is planning to extend sanitary sewer service north of Interstate (I)-85 to
serve lots within the Buckhorn Area (Figures 1 and 2). All utility extensions in the Buckhorn
Area will be owned, operated and maintained by the City of Mebane after construction.
Extensions will be built according to State standards as outlined by the North Carolina
Department of Environment and Natural Resources (NCDENR) for the design of gravity sewers,
pump stations and force mains. All wastewater from the Buckhorn Area will be treated at the
Mebane Wastewater Treatment Plant.
In addition, Orange County is planning to extend its sanitary sewer collection system into
unsewered areas along United States (US) Highway 70 in the Efland Community (Figures 1 and
3). The extension of this system will require the construction of a 250 gallons per minute
(GPM) pump station (Brookhollow Road Pump Station). The Efland sewer system extensions
will be owned by Orange County after construction. Maintenance of the system will be provided
by the Orange Water and Sewer Authority (OWASA) who is under contract with Orange
County. Extensions will be built according to State standards as herein before referenced for the
sewer construction in the Buckhorn Area. All wastewater flow from the Efland Community will
be treated at a municipal wastewater treatment plant owned and operated by the Town of
Hillsborough, who is also under contract with Orange County for receiving and treating
wastewater from Orange County's collection system.
B. Purpose and Need for Proposed Project
The purpose of the Buckhorn sanitary sewer improvements north of I-85 and the Efland
sanitary sewer improvements is to provide public sewer to property owners who signed a public
petition issued by Orange. County, service for lots with failing septic tanks, and to provide
sanitary sewer service to undeveloped lots within the service area.
C. Alternatives Analysis
C.1 Alternative A: No Action: Do not extend the sanitary sewer system. Existing
residences with failing septic systems will continue to fail further contaminating surface
water and the groundwater supply. Residences may have to be purchased and
demolished in the future to prevent further contamination.
C.2 Alternative B: Proposed Action: Extend public sanitary sewers to developed and
undeveloped lots in the Efland and Buckhorn areas to eliminate private septic tank
systems, some of which are failing. With existing sanitary sewer lines for both areas
carrying wastewater to an existing municipal wastewater treatment plant, conveying
wastewater from these areas via the proposed system is the most environmentally safe
and economical option. All piping will be pressure tested and constructed with water
tight joints. The proposed system will eliminate septic tanks in both communities for
developed lots. Undeveloped lots will be able to connect to public sewer should they
ever be developed by the property owner. Eliminating septic tanks will remove a point
source of pollution that is prevalent in both the Buckhorn and Efland Communities.
Wastewater received will be treated at municipal wastewater treatment plants in Mebane
(for the Buckhorn Area) and Hillsborough (for the Efland Community).
2
,.
~, ~ -a
,. - ,
F F ~ i.~' V +-. ~_ ~ 1 U
l .. ~ }l ~:
Lt4SAfi " ~ ~`
.. " ~r r ~ -.- :i
_ _~ ~p V
f ~. .
i r ,l~
M
~_..~ ,~. 4 J.~ _ ~F, E. ~ d sa~dr°m ,ements ~~,;>; r
: ,
'~ ~, , ~ t i 3 an Broo 0 ow Road Pum t~ on ~--' -~ .'
''i ~'c t .
j r [2 w _ 4. Y~ "per _ ~.
/y ~ i _ 77 ~~ ~~ }LPL ~ ~ 1~ ~ .~. ~ i ~~.`, yA~n (~1' 1' n]
._ 1
..
'. S ~ _ ° "i ~~ ~~~ _ It )~ L7~r~ ~~1~ f4i11 t~,~ _ t ~ s~~~.T~ts ~ 1~ 1
~ /1~1 ~ ~ iv -- i~" 'n
a.-.5..1 i ~ ~_ -,..~ _.. S + ~ ~ ~ ~'lSTT IP11: ~S n t
_~ -~.
' y
~.~ ~~ "tip + ~.1 f --- ..;1~ ~ t - 1, ~ ~:~ ~~±..
,'
j r 4_ ~ 4 1 1 {_! ~ I ~
s~
I I~
- ~.,~ = ~ -ti. ~ _ ~ ,,~ ~ _ -~~
_~ ~
,: -
', - - --~' ~ ~- ~.._ - ,._ VuYS ~ i z
-'
, LZ _.~r - tw k.
Cn __ ,~ t ~~-F ~ t ,~. a T F _ ~
,. ~
+,,; ~ a ~
,. I ,~ ~
ors `-1;=+° u khorn a °tary~sewer - - ~ _ ! - -" - ~. 3~ j
.- n
,~, ~ lm ove t =a~or~h of ~ ~' • ``. J _ °.. ..is~`~'_' ~~ ~'` ,.~.a"71 1 r, ~ f ~i.. ~~,1+
c+ ,r _
t(
~~ _. ~ - - ~ ---~ l#
+
i~ ~ - 4 ~ to
'[
y(~` ~„,;' r~r ... - ~ }t ~ -..' .. _s ~. ~ rrL1y,lI ~Gt"%~L 7 ~~~~r r i
_ - ,
,.
i _
/~1 ~ ..
~_
~ u
--''- / r,-"'~i3i~ckir+;m ;. rs _ x .~~ ~r ,~a` --,r ~ '-r i. Ur:~ ~~~
rt
i f~
s~ ~ ~ ~ t(S : ~ t l:.~l~t ~>
[ .'rte -' ~~C '~ _' ~ ~ ~ -
.
y !!FF
j f \ ,..1
Figure 1. General location of the proposed Buckhorn sanitary sewer improvements north of I-85, Efland sanitary sewer improvements
and Brookhollow Road Pump Station, Orange County, North Carolina.
CSC
3
Kasen srgr
Er
M
? •~J
< ~ W
~ ~
Z P
~ir4f PROS fG~c
SPECIAL APPROPRIATIONS PROJECTS
REGION 4 PROCEDURES
United States Environmental Protection Agency -Region 4
Revised
December 18, 2008
PAYING FOR
SUSTAINABLE
WATER
INFRASTR,:,CTURE
INNQVATIONS for the 21st CENTURY
~~ 1
~.
a ~~r ~~~~ 5lv
TABLE of CONTENTS
Introduction and Special Appropriations Grants Process Flow Chart
Phase 1 EPA's Appropriations Bill and Special Appropriations Grant Guidelines
Phase 2 Planning Grant Application Preparation and Award
A) EPA Contacts Grantees
B) Grantee Works with EPA to Define Project and Prepare Grant Application
C) Grantee Sends Application to State Clearinghouse
D) Grantee Sends Clearinghouse Comments to EPA
E) EPA Reviews Grant Application and Clearinghouse Comments
F) EPA Awards Grant for Planning and Conceptual Design
Phase 3 Planning Grant Initiation
A) Grantee Procures Project Engineer
B) EPA Grants Management Office Approves Procurement of Engineer or
Grantee Self-Certifies
C) Project Engineer Develops Preliminary Engineering Report
D) Grantee Requests Inclusion on the Region 4 Priority List
E) Grant Reimbursements
F) Reporting Requirements
Phase 4 Environmental Review
A) Grantee Provides Information for EPA to Make Categorical Exclusion
(CE) Determination
B) Grantee Submits Draft Environmental Information Document (EID)
C) EPA Provides EID Review
D) EPA Makes Environmental Determination
Phase 5 Construction
A) EPA Amends/Awards Grant for Construction
B) Grantee Submits Plans and Specs for EPA Review
C) Grantee Advertises and Bids Project
D) Grantee Compliance with the Disadvantaged Business Enterprise (DBE)
Requirements
E) Construction Begins
F) EPA Provides Construction Overview and Inspection
Phase 6 Grant Close Out and Ownership
A) Grantee Reports Environmental Results and Submits Closeout Information
B) Ownership
Appendix A Intergovernmental Review
g
INTRODUCTION AND SPECIAL APPROPRIATIONS PROJECTS FLOW CHART
Each year, the United States Environmental Protection Agency (EPA) receives a budget through
an appropriations bill created by the Congress of the United States and signed by the President.
Since 1994, EPA's budget for State and Tribal Assistance Grants (STAG) has included funding
for a number of "special needs" projects identified in the appropriations bills by name and dollar
amount. Funding of these projects is in the form of a 55% reimbursement grant from EPA. A
reimbursement grant is one in which the grantee incurs the costs, and then submits the invoices
for such costs to EPA for payment at the federal percentage rate of the grant, no greater than
55%. EPA refers to these projects as Special Appropriations Projects (SPAPs); however, some
people refer to them as STAG projects because they are identified in the STAG portion of our
budget. The authority to award the SPAPs grants has been given to the ten regional offices
within EPA. Region 4 in Atlanta, Georgia, awards the SPAPs grants for the southeastern states,
i.e., Alabama, Florida, Georgia, Kentucky, Mississippi, North Carolina, South Carolina, and
Tennessee.
This procedures manual is intended to be a tool to assist grantees in understanding the grant
process requirements and provisions related to these SPAPs for wastewater, drinking water and
storm water needs in Region 4. It is loosely organized into six phases that follow the process
flow chart shown on the following pages. Included in the phases are the specific requirements
for those actions. Please note that the states of AL, KY, MS and NC assist EPA in the
administration of these grant to varying degrees; therefore, the process may differ slightly in
those states.
Since EPA cannot award funds for final design and construction until it completes an
environmental review of the project, the grantee has two award process options. The first option
is to request a grant for planning and conceptual design to prepare the needed preliminary
engineering report and environmental information document with federal funds. The grant
would then be amended to include funds for the construction phase of the project once the
environmental review was completed by EPA. The second option is to request funding only for
final design and construction, thus paying for the planning and environmental information
document with local funds. In this option the grant would be awarded once the environmental
review once EPA had completed its review.
As with any document all comments are general in nature and specific project requirements may
vary. Please note that this document is prepared as a reference tool for general nroiects
and that the federal regulations will apply first in cases of conflict. This document is also
part of the Region 4 workbook entitled, "Workbook for Special Appropriations Grants," and is
available on line at httu://www.eua.aov/re~ion4/water/gtas/SPAPs workbook.html.
2
Region 4 Generic Process for Special Appropriations Projects (SPAPs) Grants
Involving Project Planning, Design, and Construction
(Some EPA activities may have been assigned to State programs)
President signs
Appropriation Bill - - - - ~ ~ - - - - ~ ~
1 EPA HQ
prepares
EPA contacts grantee SPAPs
guidelines
i
Grantee works with EPA to define project, _ _ _ _ _ ~
environmental results and prepare grant application
Grantee sends application to ~r
State Clearinghouse Grantee sends
application to EPA
Grantee sends Clearinghouse
comments to EPA
EPA reviews grant application and
Clearinghouse comments
Grant for planning requested
EPA awards partial grant for planning and
preliminary design only
Grantee procures project engineer per
federal regulations
EPA Grants Management Office reviews I
procurement of engineer or grantee self-
certification
Grant for construction only requested
Grantee procures project engineer per
own requirements
Project Engineer develops
Preliminary Engineering Report
~u
1
Grantee requests inclusion on EPA Region 4 Priority Funding List
Grantee provides information for EPA to make
Categorical Exclusion (CE) determination
Project not Iligible for CE Projec\ligible for CE
Grantee develops draft Environmental
Information Document (EID) with public
participation
Grantee submits draft Environmental
Information Document (EID)
including Crosscutter coordination
EPA provides initial review of EID
~ Grantee holds public meeting/hearing if needed ~
Grantee revises EID if necessary
EPA makes
environmental determination
No significant environ- Major environmental
mental impacts found impacts found
I EPA issues CE I
EPA prepares Environmental EPA prepares Environmental
Assessment (EA) and Finding of Impact Statement (EIS) and
No Significant Impact (FNSI) Record of Decision (ROD)
EPA awards/amends grant for construction
Grantee submits Plans and Specifications (Specs) to
State and obtains necessary permits
Grantee submits Plans and Specs for EPA review
EPA issues letter to advertise and bid project
Grantee advertises and bids project
Grantee makes preliminary award
Grantee submits bid documents for EPA review
~ EPA issues notice to proceed letter
Grantee awards bids
~ Construction begins ~
I EPA provides construction
overview and inspections
Construction is completed
° Grantee Reports Environmental Results
and Grant is closed out