HomeMy WebLinkAboutAgenda - 09-15-2009 - 4iORANGE COUNTY
BOARD OF COMMISSIONERS
ACTION AGENDA ITEM ABSTRACT
Meeting Date: September 15, 2009
Action Agenda
Item No. 4 - 1
SUBJECT: Resolution Supporting the North Carolina Department of Transportation's
Application for Funding for the Southeast High Speed Rail Corridor
DEPARTMENT: Planning and Inspections PUBLIC HEARING: (Y /N) No
ATTACHMENT(S):
1. Resolution
2. Map of SEHSR Area Projects
3. NC Federal Delegation
INFORMATION CONTACT:
Karen Lincoln, 245 -2594
Craig Benedict, 245 -2592
PURPOSE: To consider approving a resolution supporting the application by the North
Carolina Department of Transportation ( NCDOT) for funding from both the American Recovery
and Reinvestment Act as well as from annual federal budgetary appropriations to implement the
Southeast High Speed Rail Corridor ( SEHSR).
BACKGROUND: The Federal Rail Administration is administering an $8 billion discretionary
grant program to provide capital assistance for high -speed rail corridors and intercity passenger
rail corridors. NCDOT has submitted several grant applications totaling more than $4 billion,
many of which include improvements in the Triangle area. The applications are:
• Piedmont Corridor Service 4th Frequency - includes track improvements in Durham County and
grade separation at Hopson Road
• Piedmont Corridor Service 5th Frequency - includes track improvements in Orange County and
grade separation at Buckhorn Road and NC 10
• Planned Frequencies to Buildout - includes track improvements in Durham County and grade
separation of Glover Road and Ellis Road (south)
• Station Improvements - includes new Hillsborough train station
• Other Speed and Safety Improvements - includes track improvements in Durham County and
Orange County and grade separation at Ellis Road (north)
• Southeast High Speed Rail Corridor Raleigh to Richmond
• Congestion Mitigation
• Western and Southeastern Intercity Passenger Service Expansions
A total of $2.5 billion is requested for the Raleigh to Richmond high -speed rail corridor. This section
has a completed Tier II Environmental Impact Statement (EIS) for a project that would provide a
grade separated track that can accommodate trains up to 110 miles per hour. A parallel multi -use
trail is also being proposed for this section. The section from Raleigh to Charlotte is on existing
N
North Carolina Railroad tracks used for freight and passenger service. An EIS is not required for
improvements on this section and a multi -use trail is not proposed for this section. Attachment 2 is a
map of the high speed rail corridor improvements in the region.
FINANCIAL IMPACT: There is no financial impact to the County for this action item.
RECOMMENDATION (S): The Interim Manager recommends the Board:
1. Approve the resolution supporting the North Carolina Department of Transportation's
application for funding from both the American Recovery and Reinvestment Act as well
as from annual federal budgetary appropriations in order to accelerate the planning, land
acquisition and construction investments needed to help further the full implementation of
the Southeast High Speed Rail Corridor; and
2. Direct the Clerk to forward the resolution to:
• North Carolina's United States Senators;
• United States Congress members representing the Triangle region; and
• United States Congress members from North Carolina serving on the US House
of Representatives Transportation and Infrastructure Committee.
RFS' A009 " (,),°
Attachment 1 3
RESOLUTION SUPPORTING THE APPLICATION
BY THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION
FOR FUNDS UNDER THE AMERICAN RECOVERY AND REINVESTMENT ACT AND
ANNUAL FEDERAL BUDGETARY APPROPRIATIONS TO ACCELERATE THE
DEVELOPMENT OF THE SOUTHEAST HIGH SPEED RAIL CORRIDOR
WHEREAS, the United States Department of Transportation designated the
Washington- Richmond - Raleigh- Charlotte rail corridor for future high -speed rail
development in 1992; and
WHEREAS, a system of corridors have been designated nationally by the United States
Department of Transportation, one being the Southeast Corridor, as the above
described system is known; and
WHEREAS, extraordinary economic and population growth in the Southeast region
requires a comprehensive, multi -modal transportation system; and
WHEREAS, high speed rail service will provide business and leisure travelers with a
competitive alternative to air and automobile for trips between 100 and 500 miles; and
WHEREAS, much existing rail right of way is already in place which could
accommodate improvements to passenger rail service; and
WHEREAS, construction of a high speed rail corridor between Washington, DC and
Charlotte, NC through the Triangle region will provide transportation options, ease the
rate of congestion growth in the corridor, improve safety and energy effectiveness,
improve air quality and improve transportation efficiency while minimizing impacts; and
WHEREAS, an adjacent multimodal trail that would be constructed in conjunction with
the Southeast Corridor north of Raleigh will create an additional multimodal travel
option; and
WHEREAS, the North Carolina Department of Transportation has been actively
planning for and investing in the proposed Southeast Corridor in cooperation with the
Virginia Department of Transportation and other partners;
NOW, THEREFORE, BE IT RESOLVED the Orange County Board of Commissioners
supports the application by the North Carolina Department of Transportation for funding
from both the American Recovery and Reinvestment Act as well as from annual federal
budgetary appropriations in order to accelerate the planning, land acquisition and
construction investments needed to help make the full implementation of the Southeast
High Speed Rail Corridor a reality.
Attachment 1 4
Upon motion of Commissioner , seconded by Commissioner
2009. the foregoing resolution was adopted this the day of ,
I, Donna Baker, Clerk to the Board of Commissioners for the County of Orange, North
Carolina, DO HEREBY CERTIFY that the foregoing is a true copy of so much of the
proceedings of said Board at a meeting held on September 15, 2009, as relates in any
way to the adoption of the foregoing and that said proceedings are recorded in the
minutes of said Board.
WITNESS my hand and the seal of said County, this day of , 2009
Clerk to the Board of Commissioners
—
'Mebane NCDOT ARRA Rail Projects i N
Qi�' /• i .
t
„Hillsborough
i r •,�
;r
r�
�f
a
r �
� X
k
r
t.,
,
.r
4�
,.• . ,4 � r'
Durham
ham
T.
NVI
♦ r �y
�_ :. .� . .• � l �S -- '._ s :ice`"} �� f'F„�(. e - ..
7
-_
i,
1
r
1
Chapel Hi
l�fk �=k�
$y+ a ,
Try�
• � l
T n
a-
car
rboro ,
.'
t
Ja , -
Iv
.s
r � -
® Crossing Closing - - Rail Improvement
t
O Rail Separation Existing Rail L,
Proposed Station Street Centerline 1s ,
' r 0 05 1 2 3 4
MPO Boundary Miles
Attachment 3 6
Federal Delegation Contact Information
Senators representing North Carolina
Senator Richard Burr
217 Russell Senate Office Building
Washington, D.C. 20510
Fax: (202) 228 -2981
Senator Kay Hagan
521 Dirksen Senate Office Building
Washington, D.C. 20510
Fax: (202) 228 -2563
Congressmen representing the Triangle region of North Carolina
Representative David Price
2162 Rayburn House Office Building
Washington, D.C. 20515
Fax: (202) 225 -2014
Representative Bob Etheridge
1533 Longworth House Office Building
Washington, D.C. 20515
Fax: (202) 225 -5662
Representative Brad Miller
1127 Longworth House Office Building
Washington, D.C. 20515
Fax: (202) 225 -0181
Congressmen from North Carolina
serving on the House Transportation and Infrastructure Committee
Representative Howard Coble
2468 Rayburn House Office Building
Washington, D.C. 20515
Fax: (202) 225 -8611
Representative Heath Shuler
422 Cannon House Office Building
Washington, D:C. 20515
Fax: (202) 226 -6422