HomeMy WebLinkAboutAgenda - 09-15-2009 - 3cORANGE COUNTY
BOARD OF COMMISSIONERS
ACTION AGENDA ITEM ABSTRACT
Meeting Date: September 15, 2009
Action Agenda
Item No. 3 - G
SUBJECT: Oran a County Comprehensive Transportation Plan
DEPARTMENT: Planning and Inspections PUBLIC HEARING: (Y/N) No
ATTACHMENT(S): INFORMATION CONTACT:
1. PowerPoint Presentation Karen Lincoln, 245-2594
2. CTP Timeline Craig Benedict, 245-2592
3. Draft Survey
4. Comprehensive Plan Strategy Form
PURPOSE: To:
1. Receive a presentation from North Carolina Department of Transportation (NCDOT)
Transportation Planning staff, Triangle Area Rural Planning Organization (TARPO)
staff and Durham-Chapel Hill-Carrboro (DCHC) Metropolitan Planning Organization
(MPO) staff on the Orange County Comprehensive Transportation Plan (CTP);
2. Consider approving timeline for the CTP process; and
3. Consider approving CTP survey.
BACKGROUND: In June, the BOCC approved a resolution endorsing a comprehensive
transportation planning study for Orange County with the participation of staff and the
OUTBoard to assist NCDOT with the comprehensive transportation planning process.
The Transportation Element of the 2030 Comprehensive Plan includes creation and
implementation of an Orange County Comprehensive Transportation Plan as Objective T-3.2
for Goal 3 (Integrated Land Use Planning and Transportation Planning).
Links with Commissioners Planning Principles and other Comprehensive Plan Elements
Objective T-3.2 is linked with 1, 2, 3, 4, 5, and 8 of the following.
Orange County Board of Commissioners Planning Principles:
1. Efficient and Fiscally Responsible Provision of Public Facilities and Services
2. Sustainable Growth and Development
3. Encouragement of Energy Efficiency, Lower Energy Consumption, and the Use of Non-
polluting Renewable Energy Resources
4. Promotion of Both Air Quality Protection and the Development of an Effective Transportation
System
5. Natural Area Resource Preservation
6. Preservation of Rural Land Use Pattern
7. Water Resources Preservation
8. Promotion of Economic Prosperity and Diversity
9. Preservation of Community Character.
2
Other elements of the Comprehensive Plan have objectives that are linked with transportation
objectiveT-3.2. Those are:
• Economic Development Objective ED-2.3:
"Promote public transportation, alternative modes of transportation, and encourage
carpooling and park-and-ride participation."
• Land Use Objective LU-3.2:
"Coordinate land use patterns to facilitate the expanded use of nonauto modes of travel, the
increased occupancy of automobiles, and the development and use of an energy-efficient
transportation systems."
• Natural And Cultural Systems Objective AE-7:
"Expand and enhance Orange County's public transportation system." and
Objective AE-8:
"Improve transportation efficiency: promote more public transportation, ride sharing, and
alternative transportation such as bicycles and walking."
• Services and Facilities Objective PS-T-5:
"Include in applied site design standards for residential, commercial, and industrial
development, appropriate road design standards to ensure adequate law enforcement and
emergency vehicle access to the development."
Comprehensive Transportation Plan
The Comprehensive Transportation Plan (CTP) will be a long-range multi-modal plan to serve
present and future travel demand in Orange County. The plan will consist of four maps that
show existing facilities, facilities that need improvement, and recommended new
facilities/alignments for highways, public transportation and rail, bicycles, and pedestrians, with
a cover sheet recording the adoptions and endorsements for the CTP. CTP recommendations
are concepts and any recommended project will go through a rigorous environmental process
before final alignments or designs can be determined.
Coordination with State and Regional A encies
Orange County's CTP will be developed cooperatively with NCDOT, Triangle Area Rural
Planning Organization (TARPO) and Durham-Chapel Hill-Carrboro (DCHC) Metropolitan
Planning Organization (MPO).
DCHC MPO completed much of the work for the MPO CTP during the 2035 LRTP process.
The DCHC Transportation Advisory Committee, at its meeting in August, reviewed a schedule
for completing development of the CTP that proposes releasing a draft DCHC MPO CTP for
public comment in December 2009. The proposed schedule coordinates with development of
Orange County's CTP but is a little ahead of the County's CTP process. For example, the
DCHC MPO will hold a public hearing on its draft CTP in February 2010 while Orange County
will hold a public workshop on its CTP alternatives in February 2010.
Staff is in contact with Burlington-Graham Metropolitan Planning Organization (BGMPO) and
Town of Mebane staff regarding the Orange County CTP proceedings. The portion of Orange
County within the BGMPO must be adopted by that organization when BGMPO adopts its CTP.
Timeline for Orange County CTP
Attachment 2 is the proposed timeline for the CTP process. The schedule proposes a public
workshop the last week in September with a public comment period through November. The
3
CTP Committee and the Orange Unified Transportation Board (OUTBoard) will use the public
input and comment from the Planning Board, the Economic Development Commission, the
Commission for the Environment, and the Transportation Services Board to develop a draft
CTP, which will be presented at a second public workshop in February.
The DCHC MPO will be developing the MPO CTP during the same timeframe. The MPO CTP
will include that portion of Orange County within the Metropolitan Area Boundary. The timeline
in Attachment 2 includes the proposed timeline for the MPO CTP.
CTP Survey
The OUTBoard has endorsed a survey for public input. The survey, Attachment 3, will be
available online and at convenient public locations throughout the County for citizens who do
not have access to the Internet. The CTP Committee and the OUTBoard are developing a
public awareness plan to apprise the public of the CTP development.
FINANCIAL IMPACT: The Comprehensive Transportation Plan will require planning staff
resources and material costs for maps for the public outreach meetings and copies of the CTP
Survey.
The Planning and Inspections Department's 2009-2010 operating budget has adequate monies
for public outreach and material costs. However, retirements and a frozen 0.53-full-time
employed transportation planner planning position are severely stretching transportation
planning human resources. Transportation planning in Orange County has increasingly
become and could continue to become more important and time-consuming in the future.
The Planning Department is working with the County Manager and Human Resources to
analyze staffing impacts. This project can still move forward at this time.
RECOMMENDATION(S): The Manager recommends the Board:
1. Receive the presentation.
2. Approve the timeline for the CTP process; and
3. Approve the release of the CTP survey.
4
Orange County
Comprehensive Transportation Plan
.~
i
;:; ;, NCDOT Transportation ~`
•1 Planning Branch
~~s. .=# n
~'%t September 15, 2009
,Updated Long Range Planning
Process
toroughfare ,. ... ..
.... ...............
Comprehensive
T
ln
Plan r
spOrtetlon
~ Rl
CTP
an (
)
rn. oa way-
Hi¢nvay Inbnshs
7M NEW WAYI •
How is a CTP used in an RPO?
ay Projects would be selected from a CTP for inclusion in the
Transportation Improvement Program (TIP)
• The CTP has a 2530 year
time span and is not fiscally
constrained t•anp[et~ermive
• TIP is a 7-year planning Trargportatlon plan
document and funding (ZS30 Y~ Pte)
schedule, adopted by NCDOT
Board of Transportation
TIP (7
• Please note -this process is Y~ Plan)
currently being modified.
Previous Transportation Planning
in Study Area
• Orange County Thoroughfare Plan -study completed in
1990, but never adopted
• Durham-Chapel Hill-Carrboro MPO is currently working
on a study for their area, which includes the
municipalities of Chapel Hill and Hillsborough
- We are coordinating with c,`~
the DCHC study ~
{,,r
What is a CTP?
(Comprehensive Transportation P)an)
• Along-range, multi-modal transportation plan
• Developed cooperatively with NCDOT, the local planning
organizations, and representatives from the county and
its municipalities
• Emphasizes incorporating local land use plans and
community goals
• Adopted at 3 levels -local (county/municipalities),
regional (MPO/RPO), and state (NCDOT)
ansboro -^- ~ '- c
i
i
wAe
MPO
cw
~urlingt ~~
~wao G ham rham-
Ch pel Hill
Triangle -~ - ~ ~ rrbo-~
MAO Ca
Area RPO ~ ~,,,,,,,~;, ~ M
(TARPO) o
Boundaries
ME ~~
Fayettevill
I+MOwo
MPO
1
How is a CTP used in an MPO?
~ Projects would be selected from a CTP for inclusion in the Long
Range Transportation Plan (LRTP), then further selected for
inclusion in the Transportation Improvement Program (TIP)
• Adds LRTP into the same CampreF~sive
process as with an RPO Transportation Plan
• The LRTP is the fiscally (2530 Y~ ~~)
constrained portion of the Long Range
CTP, has a minimum 20 year Transportation Plan
time span, and is adopted by (Min. 20 year plan)
the MPO's Transportation
Advisory Committee
T~ (7
• Please note -this process is Y~r PSI
currently being modified.
Components of a CTP
• Emphasis on multi-modal
- Highway
- Public Transportation and Rail
- Bicycle and Pedestrian (ex. greenways such as
Mountains to the Sea trail)
f~
Components of a CTP (cont.)
• Strategic Highway Corridors
- Ultimate vision for ~,
maintaining statewide
mobility -specifically "
identifies the desired facility
type for each corridor
- Impact on our study area:
® I-40/I-85 -Freeway
• NC 86 -Upgrade to ~ .,
Expressway '~._.._,_~~
Durham-Chapel Hill-Carrboro MPO (DCHC)
& Burlington-Graham MPO (BGMPO)
Boundaries
- Dmhun Chapvl Hill-
~
~~x
C i it one AIPn
r
1 Ttrcnn i 4ra nvi! e
I
i
r
&niiugion-Graham \IPU ~
Oran~{e:rl -
c r I
r
1
i
,
;
~
~
t
,'; ~
~
! !/ ' ~ Du 1c1n
t ,, Wake
Components of a CTP (cont.)
• Map set and written report
• Recommendations
- Existing, Needs Improvement, Recommended
• Highway Categories
- Freeways, Expressways, Boulevards, Other Major
Thoroughfares, Minor Thoroughfares (see end of
presentation for detailed information)
5
2
Example CTP (cont.)
Public Transportation /Rail Map Bic c~le_Map
^ ~ ~ ~t
% _ ; -~,
~ ~' _
i
~ r„ ~ . ~ -;
~.;' -
j~~~,,~ -
' --
li-'r -
* .:~t
Benefits of a CTP
• Common, cohesive future transportation vision among
the county, its municipalities, NCDOT, and the planning
organizations
• Emphasis on incorporation of local priorities, local land
use plans, commundy goals, and statewide goals
(Strategic Highway Corridors)
• Customer-friendly documentation
• Emphasis on multiple modes of transportation eases
travel demand and allows travelers more chdces
• Well-informed public
• Corridor protection for future growth needs
Transportation Planning Process
Develop Alternatives
Example CTP (cont.)
Transportation Planning Process
Progress/Next Steps
• Committee progress
8 Vision Statement/Goals and Objectives
® Modeled Roadways map -
® Public survey and distribution plan - -
-Currently: public awareness meeting plans
- Currently: data collection and projection
- Next committee meeting -September 16
• Items
- Public Survey
• Go-Live date of September 16, pending approval
• Open through October 31
-Timeline
• Public awareness meeting
lC!
3
Thank you! Questions?
Orange County CTP Webslte:
htlp://www. ncdot.org/dohlpreconstructftpb/planning/orargecounty.htm I
Sarah Ewell Scott Walston
Transportation Engineer I Triangle Unit Supervise
NCDOTTPB NCDOTTPB
(919) 733-0705 (919) 733-4705
swezzell@ncdot.gov swalston@ncdot.gov
Paul Black Andy Henry
Transportation Planner Transportation Planner
Triangle RPO DCHC MPO
(919) 55&9397 (919) 560-4366
pblackQtjcog.cxg andrew.henryQdurhamnc.gov
More into at www.rx;doLOrg/-tpb
Freeway Facility
• High mobility, low access
• 55mphorgreater
• Cross section: minimum 4 lanes with
_ . - - median
r Connections provided only at
U3 74 Near Waynesvllk interchanges; all cross streets are
grade-separated
• Driveways rat allowed
• Traffic signals not allowed
• Examples: I-40, I-95, US 64 from Radcy
~ Mount to W ilgamslon, US 1 from Raleigh
to Sanford
"`J
US 264 Fast of F95
Boulevard Facility
• Moderate mobility, moderate access
'. ..'~ 30 to 55mph
"'"' Cross section: minimum 2 lanes with
median
• Connections are at-grade intersections
US 70 Fast of Gddsboro for most major and minor cross streets
• Driveways allowed -primarily rght-
iNrght-out; consdidation and sharing
~~~- ~ access is encouraged
• Traffic signals allowed
- Examples: US 1 in Ralegh, NC 55
(Holly Springs Bypass), US 70 from
Clayton to Gamer
Cary Parkway
Highway Categories...
Expressway Facility
• High mobility, low access
• 4510 fi0 mph
• Cross section: minimum 4lanes with
median
US z21 (Marion Bypass) Connections at interchanges (major
cross streets) and abgrade intersections
(minor cross streets)
• Driveways limited in location and
number, right-in/right-out only
• Traffic signals not allowed
~ ~~" Examples: US 117 north of I-00, US 74
just east of F277 in Charlofte
US 220 in Rockingham County
Major/Minor Thoroughfares
• Balanced mobility and access
• 251o SSmph
~t:__ Cross section: minimum 2lanes, no
median; includes facNities with a
~' ~ - continuous left turn lane
US 441 South of Dllkboro Connections are al-grade intersections
• Driveways allowed with full movements;
consolidate and share access when
possible
~' _{
~ Traffic signals allowed
"
. °'-' Examples: NC 66 north of Hillsborough,
US 64 in Siler Cily, US 70 in Kinston,
- NC 166 in Cunitudc Count'
US 13 North of Ahoskie
4
Task Timeline 20 09 20 10
Development of Orange County Comprehensive Transportation Plan (CTP)
fl.
O
V
~
~
y
7
Q
m
y
G~
to
~
V
O
E
O
Z
E
d
D
tea
e0
~
~
d
u_
t
~
~
.
Q
d
~
>
~
>
~
N
7
Q
Develop CTP Vision:
(Adopted goals and objectives of the Transportation Element of Comprehensive Plan)
Establish Community Vision
Conduct Goals & Objectives Survey
Conduct needs assessment:
Collect & project data
b Data collected for 2035 LRTP
~ NCDOT to collect additional data for Orange County and refine model for Orange County
Analyze deficiencies
~ NCDOT to produce deficiency analysis
b NCDOT, DCHC MPO, TARPO presentation to BOCC
b BOCC Endorses data & projections
Develo alternatives Hi hwa ,Transit, Bic cle, Pedestrian
~ Public Workshop
~ Public input.
~ The OUTBoard will coordinate with pertinent advisory boards
~ CTP Committee develops alternative based on data, public comment from the public
worksho and adviso board comment
DCHC MPO
• Develo Draft MPO CTP
• Release Draft MPO CTP for ublic comment
• Public in ut - ublic worksho sin Durham and Oran a Coun
• Trans ortation Adviso Board TAC holds ublic hearin
• Pre are recommended MPO CTP
• TAC ado is final MPO CTP includes ortion of Oran a Coun within the MPO area
Develop Recommended Orange County CTP
~ Hold Public workshop
~ Present to Advisory Boards for comment
~ Present to BOCC for comment
Develop final plan
~ CTP Committee develops final recommendation
~ BOCC holds public hearing
Endorse/Adopt final plan
~ Orange County adopts CTP, endorses MPO CTP
~ DCHC MPO endorses Orange County CTP (area outside MPO)
~ TARPO endorses CTP (outside MPO)
~ NCDOT adopts CTP and DCHC MPO CTP
D
w
3
m
N
00
0
We need YOUR input! Orange County is working with the NC Department of Transportation, the
Triangle Area Rural Planning Organization, the Durham-Chapel Hill-Carrboro Metropolitan Planning
Organization, and the Orange Unified Transportation Board to create a Comprehensive Transportation
Plan (CTP) for the County. It will recommend improvements for highways, public transportation, and
bicycle and pedestrian facilities over the next 25 to 30 years. Although the CTP does not schedule
or fund improvements, it is an essential tool in guiding the safe and effective use of the County's
transportation system. The purpose of this survey is to obtain your opinions and identify
transportation issues that are important to the citizens, businesses, and officials of Orange County.
The due date for this survey is October 31, 2009. All answers are ANONYMOUS and will only be used
for the purpose of public input for this plan.
1. If you wish to receive updates on the future developments of the Orange County
Comprehensive Transportation Plan, please provide your email address (your information
will remain confidential):
2. How important are the following transportation issues to you? (Please check the
appropriate box for each choice.)
Very
Important Important Not
Important
Increased walking and biking choices ~ O
Increased bus options O ~ O
Increased rail options O O O
Increased park-n-ride options O O O
Increased carpooling and vanpooling options O O
Lessen long distance automobile travel times [~ O O
Service for low income, elderly, and disabled residents
Economic growth O O O
Preserving the community/rural character and heritage ~ O O
Protecting the natural environment, such as air and water
quality
Sustainable and efficient use of natural and financial ~ O
resources
Page 1
io
3. To alleviate traffic congestion, what measures do you think should be used to improve a
road? (Please choose your top three.)
1 2 3
Build additional travel lanes ~ O O
Widen existing lanes and/or adding shoulders O O 0
Control the access of driveways and cross streets ~ O
Add turn lanes O O
Improve intersection design and traffic signal timing O ~ 0
Add roundabouts O O O
Use less frequent traffic signals O O O
Provide an alternative means of transportation, such as bus,
train, bicycle, or park-n-ride
Promote carpooling and combining trips
Please provide any other ideas:
4. On which of the following major roadways in Orange County would you like to see
improvement efforts focused? (Please choose your top three. Please refer to the map below
for reference.)
1 2 3
I-85 ~ O O
I-40 ~ O 0
US 70 Bypass O O O
US 70 Business
New NC 86
NC 54
NC 15-501
NC 49
NC 57
NC 157 ~ (~ (~
Please elaborate with any specific locations, or with
additional roadways you would like improved:
~.
Page 2
11
57!
~~ -
A ~ __
~,~: ~tc.`~i`L•
TIS~f'A:9[.l ~ 1.CT"IS.~ Eli
TC~S'Y'?d~I-~P
t_;sfi~t;E.: ~~
ski PSI_~
u
~- '~Z;
r , {~#
~.~".'
`~ ,j~
1, - r15 y+rF .
~~~ ~~~'
~'s ~P;
...
f `~
~ 15 - _~ i _
~ y
5. Are you concerned with safety or crash problems at any specific locations? Please include
vehicle, bicycle, and pedestrian issues.
O Yes
O No
If yes, please provide the locations, including road name or intersection:
Page 3
~a
6. When traveling to your area, do you find that you often must go out of your way to reach
your destination, because the most direct route is too congested?
O Yes
O No
If yes, please provide examples of congested routes, including road names, starting area, and
destination:
7. What problems with truck traffic affect your frequently traveled areas? (Please check all
that apply.)
Congestion
Damage to existing roadways, curbs/gutters, signs
Truck traffic on minor streets
Safety
Please provide road names or locations:
8. Orange County has identified three Economic Development Districts in unincorporated
areas targeted for future commercial development. Transportation networks will need to be
considered if development is to be realized. Are you concerned if transportation networks
currently in these districts can adequately support anticipated economic growth? (Please
refer to the maps below for reference.)
O Yes
O No
If yes, please provide the location(s), including road name or intersection:
,~
Page 4
13
Page 5
i~
ii. To which destinations would you like to have taxi, bus, or van service? (Please check all
appropriate boxes.)
Downtown Durham ~ Mebane ~ Roxboro
NC Central University ~ Burlington ~ Chatham County
UNC Hospital ~ Carrboro ~ Yanceyville
Duke Hospital ~ Chapel Hill ~ Danville, VA
RDU Airport ~ RTP
Hillsborough ~ Raleigh
Other (specify below)
12. The Strategic Highway Corridors initiative of NCDOT states that the long-range vision (in
25-30 years) for the NC 86 corridor in Orange County (from Hillsborough to the North) is an
Expressway. The goal of Strategic Highway Corridors is to maintain mobility and
connectivity throughout North Carolina on core highway corridors, and NC 86 serves as a
primary connector from Danville, VA to the Triangle area. An Expressway is a median
divided facility, usually with 4 lanes. The speed limit is 45-60 mph with no traffic signals.
Connections are made at interchanges, public roads, and right-in/right-out driveways.
Which of the following would you suggest for anorth-south corridor to achieve this goal?
(Please check any you would support.)
(Please refer to the map below for the current alignment of the NC 86 corridor from
Hillsborough to the North [dashed line] in Orange County, and refer to the image below for
an Expressway example. Visit www.ncdot.org/doh/preconstruct/tpb/SHC/ for more
information on Strategic Highway Corridors.)
Keep/use existing NC 86 corridor
Re-route the north-south corridor to other
roads (specify roads below)
Construct a completely new north-south
corridor
Keep/use existing NC 86 corridor with a new
western bypass of Hillsborough
Keep/use existing NC 86 corridor with a new
eastern bypass of Hillsborough
Other (specify below)
Please elaborate on above choices:
Page 6
i5
13. A critical issue affecting traffic flow in the county is traffic through downtown
Hillsborough from northern Orange County. In your opinion, what would be the best way to
address this issue? Please provide your suggestions.
v
14. What other transportation issues would you like to see addressed in Orange County? Is
there anything we forgot to ask?
~I
Page 7
i~o
In the remaining questions, we would like to verify that this survey has reached a wide variety of our
residents. Research has found that factors such as age, race, and income affect travel behavior.
Therefore, while strictly anonymous, the following questions are important. They are optional and for
informational purposes ONLY.
15. In what community of Orange County do you live? (If you live in an unincorporated area,
please choose a township (TS) from the map below.)
O Town of Carrboro
O Town of Chapel Hill
O Town of Hillsborough
O City of Durham
O City of Mebane
O Bingham (TS)
O Cedar Grove (TS)
O Chapel Hill (TS)
O Cheeks(TS)
O Eno (TS)
O Hillsborough (TS)
O Little River (TS)
O Other (please specify your involvement or tie to the county)
Page 8
17
16. What is your age?
O Under l8 O 35-44 (~ 65-74
O 18-24 O 45-54 O Over 74
0 25-34 O 55-64
17. How would you classify your race? (Please check alt that apply.)
Asian ~ Hispanic ~ White
Black ~ Native American ~ Other
18. How many people live in your household, including yourself?
~1 ~2 O3 O4 O5 O6
19. What was your household income last year?
O Below $30,000
0 $30,000 - $49,999
O 7+
0 $50,000 - $69,999 O $90,000 or above
0 $70,000 - $89,999 O I choose not to answer
20. Where did you get this survey?
O Library
O Post Office
Q Local Store or Shop
O Government Building
O Community Building
O Mail
O Newspaper
O Government Website
O TV
O Meeting
O Email
O Social Networking Website
O Other (please specify):
Page 9
ig
Thank you for your participation in this survey! Your input is vital in developing a plan that meets the
needs of the residents and visitors of Orange County. Please feel free to make copies or share the
survey website (www.surveymonkey.com/orangecounty) with your family and friends as well -all
input is welcome! To request extra copies of the survey, use the contact information at the bottom
of this page.
Please return this survey by October 31, 2009. You may return it at the same location you picked it
up, or you may mail it to the following address:
Sarah Ezzell
NCDOT Transportation Planning Branch
1554 Mail Service Center
Raleigh, NC 27699-1554
Survey results should be available by November 9, 2009. You may view them on the website at the
bottom of this page. You may also use the contact information at the bottom of this page to
request a copy of the results.
For further information, please contact:
Email: OrangeCTP@co.orange.nc.us
Phone: (919) 245-2594
OR please visit the following website:
Orange County Comprehensive Transportation Plan:
www.ncdot.org/doh/preconstruct/tpb/planning/orangecounty.html
Page 10
Attachment 4 19
Board of County Commissioner's Goal,
Priority and Comprehensive Plan Objectives Strategy Form
Date: Se tember 15, 2009
Title: Com rehensive Trans ortation Plan
Princi les/Goals:
Princi les:
1. Efficient and Fiscal) Res onsible Provision of Public Facilities and Services
2. Sustainable Growth and Develo ment
3. Encouragement of Energy Efficiency, Lower Energy Consumption, and the Use of Non-Polluting
Renewable Ener Resources
4. Promotion of Both Air Qualit Protection and the Develo ment of an Effective Trans ortation S stem
5. Natural Area Resource Preservation
6. Preservation of Rural Land Use Pattern
8. Promotion of Economic Pros erit and Diversit
Goals:
Transportation Goal 1: An efficient and integrated multi-modal transportation system that protects the natural
environment and communit character.
Transportation Goal 2: A multi-modal transportation system that is affordable, available, accessible to all users,
and that romotes ublic health and safet
Transportation Goal 3: Integrated land use planning and transportation planning that serves existing
development, supports future development, and is consistent with the County's land use plans which include
rovisions for reservin the natural environment and communit character
Transportation Goal 3: Integrated land use planning and transportation planning that serves existing
develo ment.
Economic Development Goal 2: Infrastructure that supports desired development.
Land Use Goal 3: A variety of land uses that are coordinated within a program and pattern that limits sprawl,
preserves community and rural character, minimizes land use conflicts, supported by an efficient and balanced
trans ortation s stem.
Natural and Cultural Systems Goal 1: Energy conservation, sustainable use of non-polluting renewable energy
resources, efficient use of non-renewable energy resources, and clean air.
Objective:
Objective T-3.2:
Create and implement an Orange County Comprehensive Transportation Plan that provides the framework for
a comprehensive and connected transportation system supporting a mix of all transportation modes, including
sidewalks and bicycle facilities, bus and rail transit facilities, and highways. The plan should be coordinated
with the goals and objectives of this Comprehensive Plan and seek to maintain and enhance community
character and the natural environment.
Economic Development Objective ED-2.3:
Promote public transportation, alternative modes of transportation, and encourage carpooling and park-and-
ride artici ation.
Land Use Objective LU-3.2:
Coordinate land use patterns to facilitate the expanded use of nonauto modes of travel, the increased
occu anc of automobiles, and the develo ment and use of an ener -efficient trans ortation s stems.
Natural And Cultural Systems Objective AE-7:
Ex and and enhance Oran a Count 's ublic trans ortation s stem.
Natural And Cultural Systems Objective AE-8:
Improve transportation efficiency: promote more public transportation, ride sharing, and alternative
trans ortation such as bic cles and walkin .
Attachment 4 20
Services And Facilities Objective PS-T-5:
Include in applied site design standards for residential, commercial, and industrial development, appropriate
road design standards to ensure adequate law enforcement and emergency vehicle access to the
develo ment
Res onsible Entit
a. Lead De artment: Plannin
b. Su ortin De artment s : Environment and Resource Conservation
Parks and Recreation
A in Oran a Public Trans ortation
Economic Develo ment
Adviso Boards
Oran e Unified Trans ortation Board
Plannin Board
Pur ose:
The CTP provides guidance for selecting projects to implement transportation goals/objectives (for selecting
ro~ects to be funded in the Trans ortation Im rovement Pro ram throu h various fundin mechanisms .
Im lementation Strate /Action Plan:
To develop along-range multi-modal plan to serve present and future travel demand in Orange County by
mapping existing facilities, facilities that need improvement, and recommended new facilities/alignments for
hi hwa s, ublic trans ortation and rail, bic cles, and edestrians.
Fiscal Im act:
The Comprehensive Transportation Plan will require planning staff resources and material costs for maps for
the ublic outreach meetin sand co ies of the CTP Surve .
'' Public Involvement Process:
The schedule proposes a public workshop the last week in September with a public comment period through
December. The CTP Committee and the Orange Unified Transportation Board (OUTBoard) will use the public
input and comment from the Planning Board, the Economic Development Commission, the Commission for the
Environment, and the Transportation Services Board to develop a draft CTP, which will be presented at a
second public workshop in February. The process calls for a public hearing in May 2010, with final BOCC
a royal in June 2010.
a. Timeline
b. `Notice to Proceed': ro osed for Se tember 15, 2009
c. Ado tion: ro osed for June 2009
Work Product:
Four (4) maps that show existing facilities, facilities that need improvement, and recommended new
facilities/alignments for:
1. Highways
2. Transit
3. Bicycle Facilities
4. Pedestrian Facilities.
Technical Re ort.
Re ortin /Monitorin /Evaluation:
Re orts in A ril and Ma for comment and direction; Final in June.