HomeMy WebLinkAboutAgenda - 02-02-1999 - 9aORANGE COUNTY
BOARD OF COMMISSIONERS
ACTION AGENDA ITEM ABSTRACT
Meeting Date: February 2,1999
1
Action Agenda
Item # 4•dl
SUBJECT: SUP -2-98 Gearon Communications
DEPARTMENT: PLANNING PUBLIC HEARING: Yes ,x No
BUDGET AMENDMENT REQUIRED: Yes _x_No
ATTACHMENT(S): INFORMATION CONTACT:
Findings of Fact Eddie Kirk
Materials compiled in separate binder: Extension: 2582
Application and associated materials
Complete record of public hearings
Lists of property owners who spoke at public hearings
and maps identifying their properties
Minutes of Planning Board
TELEPHONE NUMBERS:
Hillsborough 732-8181
Durham 688-7331
Map of tower sites in Orange County Mebane 227-2031
List of tower sites showing any collocation sites Chapel Hill 967-9251
Article from Sept., `98 Zoning and Planning Law Report
PURPOSE: To consider a Class A Special Use Permit application for the construction of a
telecommunication tower.
BACKGROUND: The property is located in Bingham Township approximately 1155 feet north of
NC Highway 54 with the access proposed from O'Day Drive, an existing private
road. The entrance from NC 54 is approximately 600 feet west ofBethel-Hickory
Grove Church Road (SR 1104). A 2.77 acre tract is proposed with a 10,000 square
foot leased area and an additional area designated as a fall zone easement. The
property is zoned Rural Buffer (RB) and University Lake Protected Watershed
(UNIV-PW).
The applicant is requesting a Class A Special Use Permit under Article 8.8.17a of
the Orange County Zoning Ordinance to construct a 230 foot telecommunication
tower (please refer to the attached letter from the applicant to Eddie Kirk dated
August 18, 1998), an equipment cabinet, and an area for future additional
r
. 2
telecommunication carriers. The tower will be a free standing lattice structure and
light steel gray in color.
The application proposes a type C 40-foot landscaped buffer around the facility
with existing trees meeting the buffer requirement. The site is presently wooded
and existing vegetation will only be disturbed to accommodate the tower and
entrance road.
There are no existing towers within one mile of this site on which the applicant
could co-locate. An application from Spectrasite Communications, Inc. fora 199
foot telecommunications tower approximately 1.33 miles east of this site was
denied by the Orange County Board of Adjustment on November 9, 1998.
The application indicates this tower can structurally accommodate 5 users. Gearon
has indicated they are willing to negotiate with other users to attach additional
communication facilities provided they do not interfere with the primary purpose
of the tower.
The facility will be unmanned; therefore, water and sewer facilities will not be
required. Once constructed the tower will only be visited for scheduled
maintenance and emergencies.
August 24. 1998. Public Hearing
The application was presented at a joint public hearing before the Orange County
Board of County Commissioners and the Orange County Planning Board on
August 24, 1998. Minutes of that public hearing and items submitted as evidence
are included in the binder provided.
Planning Board Recommendation
On October 13, 1998, the Planning Board, in a 5 to 2 vote, recommended denial
of the Class A Special Use Permit for the following reasons: 1) photographs, as
required by Article 8.8.17a.1 d.2.h, of aclearly-visible balloon floated at the
proposed tower location to the maximum height of the tower were not taken from
property of residents that would be impacted by the use, so the visual impact of
the proposed tower could not be assessed from the submitted photographs; and 2)
the applicant failed to provide convincing evidence, as required by Article 8.2.1 2,
that the use will maintain or enhance the value of contiguous property. The
minutes of the Planning Board meeting on October 13, 1998, (continuation of the
October 7, 1998, meeting) are included in the binder provided.
The Public Hearing was resumed in the November 17, 1998, Board of County
Commissioners meeting. Additional comments were heard from the applicants
and those opposed. The Public Hearing was closed and the case was referred to
the December 1, 1998, meeting for a decision. Draft minutes from the
November 17, 1998, meeting aze included in the binder provided.
3
Because agenda for the December 1, 1998, Boazd of Commissioners meeting was
so full and the complete record of the November 17, 1998, public hearing was not
available at that time, Special Use Permit Application SU-02-98 was not placed
on the December 1, 1998, agenda. Minutes of the November 17, 1998, meeting
and supplementary materials presented at the hearing by the applicant became
available only recently. The complete record of all proceedings concerning this
application is included in the accompanying binder.
Administration Recommendation
The Administration recommends that the Boazd of County Commissioners deny
the Class A Special Use Permit per the Planning Boazd recommendation.
Staff finds that the applicant has not carried its burden in proving that the use will
maintain or enhance the value of contiguous property. Evidence presented at
both public hearings, an Impact Investigation prepared by Joseph Smathers, Jr.
and an Impact Study by Morgan & Company, Inc., do not provide convincing
evidence. Specifically, those reports do not furnish information relating to the
proximity (distance) from existing towers of properties used in the analyses nor
compaze those distances with proximity of the proposed tower to properties on
Greenfield Road. Those reports do not compare sales (market values) of the
properties before construction of a tower with sales (mazket values) of the
properties after construction of a tower; nor do those reports provide any
comparison of properties within an area impacted by a tower with respect to sales
of properties in closest proximity to the tower (or properties where the tower is
most visible) with sales of properties farthest from the tower (or from which the
tower is not very visible).
Recent public hearings on Special Use Permits for telecommunication towers
raise questions about the compatibility of such towers in residential
neighborhoods. While the public hearings on Special Use Permits for
telecommunication towers are evidentiary or quasi judicial hearings, the questions
raised aze of a county legislative nature. The Boazd of County Commissioners
may need to consider legislatively what the evidence needs to show.
If the Board of County Commissioners does decide to find in the affirmative on
the specific and general findings, the Planning Staff recommends the Special Use
Permit be subject to the following conditions:
1. Existing and proposed vegetation shall be installed and/or maintained as indicated on the
site plan.
2. The height of the tower shall not exceed 235 feet including the lightning appurtenance.
3. Security shall be submitted by the applicant and approved by the County Attorney
guaranteeing the removal of the tower in the event it is abandoned or unused for a period
of 12 months. A cost estimate shall be provided by a qualified contractor. The amount
of the security shall be 110 percent of the estimate. The form of security shall be
approved before building permits are issued.
4. The factlily and its equipment shall comply with all federal, state and local emission
requirements.
5. The electro-magnetic radiation levels shall maintain comp/lance with requirements of the
Federal Communications Commission, regarding emission of electromagnetic radiation.
Within 30 days of installation of equipment on the tower, and within 30 days of the
installation of any additional equipment in the future, the tower owner shall provide
documentation of emission levels in relation to FCC standards. In addition, the tower
owner must provide documentation of emission levels within five working days if so
requested by Orange County. Orange County may make such requests at any time, nor
to exceed four times per year.
6. The minor subdivision creating the proposed lot must be approved and recorded in the
Orange County Register of Deeds Office prior to recording of the Special Use Permit and
prior to issuance of a building permit for the lower.
7. A fa// zone easement as indicated on the site plan shall be submitted by the applicant and
reviewed by the County Attorney. This easement shall be recorded with the Special Use
Permit.
8. /f any condition of this Special Use Permit shall be held invalid or void, then this Special
Use Permit sha// be void in its entirety and of no effect.
5
ARTICLE 8 8 17a - TELECOMM iNlrnrlON TOWERS 1"Y " indicat nmQlianc~ "No" indicates Non nm of
PLANNING
BOARD BOARD OF
RECOMMENDED EVIDENCE SUBMITTED COMMISSIONERS
FINDINGS TO SUPPORT FINDIN ~S FINDINGS
Ordinance Regl~iremanrc
8.8.17a.1 Additional Information
a. A Site Plan showing site and size x Yes
of all existing structures within
500 feet of the site, existing and
proposed topography at a contour
interval of five feet and any officially
designated floodways and floodplains,
or the presence of alluvial soils.
No The site plan shows the
structures along with
topography. There are
no floodways, floodplains or
alluvial soils indicated on the
plan.
b. Plans, and elevations for all x Yes No
proposed structures and descriptions
of the color and nature of all exterior
material.
c. A Landscape Plan showing, at the x Yes No
same scale as the Site Plan,
existing and proposed trees, plus
shrubs, ground cover and other
landscape materials.
d. Evidence that the applicant has
investigated the possibilities for
locating the proposed facilities on
an existing tower. Such evidence
shall consist of:
1) A listing of all towers within a x Yes No
'/:-mile (for towers shorter than
200 feet) or 1-mile (for towers
200 feet or taller) radius of the
proposed tower site.
21 Delineation of the boundaries of
the maximum search range within
which the tower equipment can
function as intended. The following
information shall be provided for all
existing towers within the search
range:
fa) Tower height, as measured from Yes No
the ground to the highest point x N/A
of the support structure;
(b) Existing and planned tower Yes No
users; _x_N/A
The application indicates
there will be one equipment
cabinet. The tower will be a
light steel gray.
A Site and Landscape Plan
has been submitted. Existing
vegetation will be maintained
around the perimeter
of the facility.
There are no other
telecommunication towers
within 1 mile of this site.
According to the application
there are no towers within the
search range.
Yes No
Yes No
Yes No
Yes No
Yes No
N/A
Yes No
N/A
6
PLANNING
BOARD
RECOMMENDED
FINDINGS
EVIDENCE SUBMITTED
TO SUPPORT FINDIN
BOARD OF
COMMISSIONERS
FINDINGS
(c) Whether the existing tower Yes No
could accommodate the antenna _ x_N/A
to be attached to the proposed
tower without causing structural
instability or radio frequency
interference; and
(d- If the proposed antenna cannot Yes No
be accommodated on the x N/A
existing tower, assess whether
the existing tower could be
structurally strengthened or
whether the antennas
transmitters and related equipment
could be protected from
electromagnetic interference, and
generally describe the means and
projected cost of shared use of the
existing tower; and
3) A summary explanation of why Yes No
proposed facilities cannot be x N/A
located on any of the existing
towers in the search range.
e. Documentation from applicable state x Yes No
or federal agencies indicating
requirements which affect the appearance
of the proposed tower, such as
lighting and coloring.
f. Draft letter of credit which will x Yes No
guarantee the removal of the tower
in the event that it is abandoned or
unused for a period of 12 months.
g. A listing of all property owners within x Yes No
1000 feet of the parcel shall be
provided. Each property owner shall
be notified of the public hearing in
accordance with Article 2.3.3.4
(Class B Special Use Permit) or
Article 8.4.5 (Class A Special Use
Permit) of this Ordinance.
h. Photographs of aclearly-visible balloon Yes x No
floated at the proposed tower location
to the maximum height of the towers.
Photographs shall be taken from
locations such as: property lines,
and/or nearby residential areas, historic
sites, roadways, including scenic roads
and major view corridors, and other
locations as deemed necessary by the
Planning Staff to assess the visual impact
of the proposed tower.
Yes No
N/A
Yes No
N/A
Yes No
N/A
The Tower will be a light Yes No
steel gray. The application
indicated lighting will be as
required by the FAA- white strobe
at daytime and red blinking at night.
A draft bond has been
submitted and is being
reviewed by the County Attorney.
A condition of approval has been
added regarding security for
removal of the tower.
A listing of property owners was
provided and each property
owner received notification.
Yes No
_Yes _No
Balloon photographs _Yes No
have been provided.
7
PLANNING
BOARD
RECOMMENDED
FINDINGS
EVIDENCE SUBMITTED
TO SUPPORT FINDINGS
BOARD OF
COMMISSIONERS
FINDINGS
i. The Special Use Permit application shall _x_Yes No The application indicates Yes No
include a statement that the facility compliance with all
and its equipment will comply with all federal, state and local
federal, state and local emission emission requirements.
requirements.
8
8.8.17a.2 Standards of Evaluation
The following specific standards shall
be used in deciding upon an application
for approval:
a. Adjacent to residential zoning
districts, minimum setbacks from
the base of the tower to the
property boundary shall be equal
to the height of the tower. The
setback may be reduced to no less
than one-half of the tower height if
easements for the remaining setback
distance are granted by adjoining
property owners.
b.Adjacent to non-residential
uses or non-residential zoning
districts, minimum setbacks
from the base of the tower to the
property boundary shall be the greater
of 20% of the tower height, or the
minimum required setback.
c. A Type C Landscape Buffer shall
be provided between the tower and
adjoining property. Existing vegetation
may be removed only to the extent
necessary to accommodate the tower,
equipment buildings, and support
structures such as guy wires.
PLANNING
BOARD
RECOMMENDED
FINDINGS
_x_Yes No
N/A
_x_Yes No
N/A
_x_Yes No
d.The site plan shall indicate a location x Yes
for at least one equipment building
in addition to that proposed for use by
the applicant.
e. Security fencing is provided around the x Yes
perimeter of the site.
The telecommunications equipment
planned for the proposed tower cannot
be accommodated on an existing tower
due to one or more of the following
reasons:
No
No
The planned equipment would Yes No
exceed the structural capacity _ x_N/A
of existing and approved towers,
considering existing and planned
use of those towers and the towers
cannot be reinforced to accommodate
planned or equivalent equipment
at a reasonable cost.
EVIDENCE SUBMITTED
TO SUPPORT FINDINGS
The site plan indicates
the closest property line
is 250 feet from
the tower. The tower is
proposed to be 230 feet
in height.
The tower is 250 feet from
the quarry property.
A Type C Landscape Buffer
will be provided around the
base of the tower facility.
Existing vegetation will only
be disturbed to accommodate
the tower and entrance road.
The site plan indicates an
area reserved for co-location.
An 7 foot chain link security
fence is indicated around
the site.
BOARD OF
COMMISSIONERS
FINDINGS
_Yes No
N/A
_Yes No
N/A
Yes No
Yes No
Yes No
Yes No
N/A
PLANNING
BOARD
RECOMMENDED
FINDINGS
2. The planned equipment
would cause radio frequency
interference with other
existing or planned equipment
for these towers, and the
interference cannot be prevented
at a reasonable cost.
Yes No
_ x_N/A
3. Existing or approved towers do Yes No
not have space on which the x N/A
equipment can be placed so it can
function effectively and
reasonably in parity with similar
existing or approved equipment.
4. No tower or other suitable facility x Yes No
exists in an area where the
equipment to be placed on the
tower will function in its intended
manner.
g-The Communications tower is _x_Yes
structurally designed to support at
least one additional user, and the
Special Use Permit includes a
statement that owner of the tower
is willing to permit other user(s)
to attach communication facilities
which do not interfere with the primary
purpose of the tower, provided that
such other users agree to negotiate
a reasonable compensation to the
owner from such liability as may result
from such attachment.
h) The color of the tower is of light tone, _x~Yes
except to the extent required by
law, so as to minimize its visual
impact.
i) The towers will not be artificially _x~Yes
lighted unless required by the FAA,
FCC or other federal or state agency.
Where such agencies allow a choice
between painting the tower or installing
strobe lighting, painting shalt be the
preferred choice.
EVIDENCE SUBMITTED
TO SUPPORT FINDINGS
The application indicates
there are no other towers
or facilities available.
9
BOARD OF
COMMISSIONERS
FINDINGS
Yes No
N/A
Yes No
N/A
Yes No
N/A
No The application indicates
the tower will structurally
be able to accommodate
additional users.
No The application indicates
the tower will be a light
steel gray.
No The application indicates the
tower will be lit as required
by the FAA- with white strobe
during the day and red blinking
at night.
j) The tower and antenna will not result _x,Yes No
in a significant adverse impact on the N/A
view of or from any historic site,
scenic road, or major view corridor.
Yes No
Yes No
Yes No
The application indicates the Yes No
tower and antenna will not N/A
result in a significant adverse
impact on the view of or from any
historic site, scenic road or major
view corridor. There are existing
trees around the proposed site.
10
PLANNING
BOARD
RECOMMENDED EVIDENCE SUBMITTED
FINDINGS TO SUPPORT FINDINGS
kl All abandoned communication towers x Yes
shall be removed within 12 months
of the cessation of use. A bond or
other security guaranteeing the
removal of the tower in the event that
it is abandoned or unused for a period
of 12 months shall be posted. A cost
estimate shall be provided by a qualified
contractor. The amount of the security
shall be 1 10 percent of the estimate.
No A draft bond has been
submitted. A condition
of approval has been
added regarding security
for removal of the tower.
A determination shall be made that x Yes
the facility and its equipment will
comply with all federal, state and
local emission requirements, and
the Special Use Permit shall include
a statement that the facility and its
equipment will comply with all federal,
state and local emission requirements.
m-The Special Use Permit shall include x Yes
a condition that the electro-magnetic
radiation levels maintain compliance
with requirements of the Federal
Communications Commission,
regarding emission of electromagnetic
radiation. Within 30 days of installation
of equipment on the tower, and within
30 days of the installation of any
additional equipment in the future,
the tower owner shall provide
documentation of emission levels in
relation to FCC standards. In addition,
the tower owner must provide
documentation of emission levels within
five working days if so requested by
Orange County. Orange County may
make such requests at any time, not to
exceed four times per year.
No The application indicates
compliance with all federal,
state and local emission
requirements. A statement to
this effect will be included with
the Special Use Permit.
No A condition of approval has
been added that the electro-
magnetic radiation levels
maintain compliance with
requirements of the Federal
Communications Commision
regarding emission of electro-
magnetic radition.
BOARD OF
COMMISSIONERS
FINDINGS
Yes
No
Yes
Yes
No
No
11
nRTici F R-7.1 & 8.2.2 -APPLICATION COMPONENTS ~"Will" indicates comnliance• "Will Not" indicates
Non-compliance)
("Is") ("Is Not")
Ordinance Requirements
In accordance with Article 8.2.1
and 8.2.2 of the Zoning Ordinance,
the Board of Adjustment shall also
consider the following general
conditions before the application
for Special Use shall be approved:
Article 8.2.1 & 8.2.2
The use will maintain or promote
the public health, safety and
general welfare, if located
where proposed and developed and
operated according to the plan
as submitted.
Article 8.2.1
The use will maintain or enhance
the value of contiguous property
(unless the use is a public
necessity, in which case the use
need not maintain or enhance the
value of contiguous property-.
Article 8.2.1
3. The location and character of
the use, if developed according
to the plan submitted, wilt
be in harmony with the area in
which it is to be located and
the use is in compliance with the
general plan for the physical
development of the County as
embodied in these regulations or
in the Comprehensive Plan, or
portion thereof, adopted by the
Board of County Commissioners;
PLANNING
BOARD BOARD OF
RECOMMENDED EVIDENCE SUBMITTED COMMISSIONERS
FINDINGS TO SUPPORT FINDINGS FINDINGS
__~._Will_Will Not The applicant indicated this _WiII~WiIt Not
will provide continuous wireless
service for residences and businesses.
It will also provide wireless service
for 91 1 and emergency needs. -
_WilllX`Will Not Joseph Smathers, a real estate _Will_Will Not
appraiser, submitted a report
and testified that the tower will
not impact the value of surrounding
properties. Several property owners
disagreed with Mr. Smathers conclusions.
GIs _Is Not The applicant indicated the tower ^Is _Is Not
is located next to the stone
quarry and that the site is heavily
wooded. The tower is permitted in
this zoning district with approval
of a Special Use Permit. The
Comprehensive Plan does not
speak to Cellular Towers.