HomeMy WebLinkAboutAgenda - 03-09-1999 - IIA•
ORANGE COUNTY
Board of Commissioners
Action Agenda Item Abstract
Meeting Date: March 9, 1999
Subject: WTMP Expansion Proposal
Action Agenda
Item No. H. A.
Department: HEALTH Public Hearing Yes X No
Budget Amendment Needed Yes X No
Attachments(s): WTMP Expansion Proposal Information Contact:
System & Inspection Estimates Health Director's Office X2411
Scenarios for Fees/General Fund Division Telephone Number
Letter from OWASA Hillsborough - 732 -8181
Applicant Guide to Environmental Health Permits Chapel Hill - 968 -4501
Mebane - 227 -2031
Durham - 688 -7331
Purpose: To review the proposal for the Wastewater Treatment Management Program (WTMP) Expansion and
consider inclusion of the proposal as a BOCC adopted goal. If approved to go forward, additional work needs to
be done regarding funding methods and detailed costs.
• Background: The current Wastewater Treatment Management Program (WTMP) was approved by the Board of
Commissioners in 1995. The program inspects non - municipal discharging wastewater systems and municipal
sludge sites. These are commonly called "alternative systems" and include low pressure pipe systems, pump
conventional systems, large systems, discharging sand filters, and non - municipal package plants, in addition to
sludge application sites. That program has been in operation and that Board goal is complete except for the
financial surety rules which are in the County Attorney's hands, and the delinquent fee actions which the attorney
has advised us not to pursue at this time. In June 1998, the Board of Health formed an ad -hoc committee to
prepare a proposal for an expansion of the WTMP to include gravity flow septic systems in the WTMP
framework. These are commonly called "conventional systems." The impetus for this expansion came from two
separate meetings in late springlearly summer of 1998. In a joint BOCC and OWASA meeting and in a
subsequent Board of Health meeting it was recognized that existing failure rates are not likely to improve without
action and that centralized wastewater disposal will not be a repair option in many areas of the county in the
foreseeable future.
The ad -hoc committee included representatives from OWASA, the BOCC, the Board of Health and the health
department staff. The Board directed the committee to look at three components for the expansion; education,
homeowner incentives and periodic re- inspections. The attached proposal was developed by the committee and
presented to the Board of Health for action at their November meeting. The Board of Health thoroughly discussed
the proposal and chose the Water Quality Critical Areas of the county as the preferred starting point of the
program and felt that a hybrid model of funding would be an appropriate option. The plan has a heavy emphasis
on homeowner education —both at the onset of the program and as part of the continuing effort.
Since the Board of Health meeting in November, additional staff work has been done that estimates the numbers
of systems within the Water Quality Critical Areas and in the watersheds as a whole in order to better predict the
phase -in need for staffing.
•
1
Staff met with an OWASA Board sub - committee who subsequently recommended that the OWASA Board
support this proposal. Staff also presented the proposal to the Commission for the Environment that also
expressed support for the program. •
Recommendation: To receive the report.
•
•
Orange County Health Department
Wastewater Treatment Management
Program Expansion
0
Orange County Board of Health
Adopted November 19, 1998
W
4
O
•
H�r6
3
4
WTMP EXPANSION
.BOARD OF HEALTH DECISION SUMMARY
November 19, 1998 '
BACKGROUND —
Earlier this year, the Orange County Board of Health sanctioned the formation of an ad-hoe
committee to explore the expansion of the Wastewater Treatment Management Program. The
Board directed the committee to look at 3 components for the expansion, education, homeowner
incentives and periodic re- inspections. The full committee met twice and there was one meeting
of a workgroup. The report from the committee detailing options for the 3 components along
with a full education plan was presented to the Board of Health on November 19, 1998. After
deliberation, the Board decided which options it wanted to be presented to the Board of County
Cprnmicc. -s at their December retreat.
WHY IS THIS EXPANSION NEEDED —
1. To protect and promote public health and preserve natural resources by:
• Protecting watersheds and all. other surface waters.
• Protecting groundwater.
• Lessening the chance of disease transmission from failing septic systems. •
2. To lessen the financial impact of repairing individual septic systems by:
• Extending the average septic system life countywide.
• Preserve all available repair strategies on individual sites.
3. Public sewer extensions into certain areas of the County will not be a viable option in most
instances in the future. Septic systems must then be viewed as a perpetual utility, not a
stopgap until sewer arrives.
BOARD OF HEALTH DECISIONS FOR —
1. Entry into the Program: The BOH chose option 3 (Water Quality Critical Areas) as the
preferred starting point. The following reasons were cited:
• This approach best effects the actions necessary to meet the goals of protection and
promotion of public health for all citizens of the County and to preserve the natural
resources by tackling older neighborhoods with higher rates of failures and also by
starting with the water quality critical areas of the designated watersheds and expanding
the coverage outward from the impoundments. Both rural and town dwellers benefit
immediately from this approach and may realize cost savings over the long haul from
increased average septic system life or relatively lower water treatment costs.
• The latest draft of the Water and Sewer Boundary Task Force agreement allows for sewer
extension only in dire circumstances in many areas of the County. This approach may be
the best method for discovery of situations that are degrading but are still fixable so that
public sewer extensions are not indicated. It also sets the stage for those systems going •
in, either new or replacement, to realize a maximum life span and provides better
assurance that all repair strategies are kept intact.
5
• New and 'M
repaired system owner, while not set for re- inspection before 5 -10 years from
the date of installation approval, would still get tailored educational materials at the time
they begin to use their system.
2. Education Plan - The BOH supported the full education plan as presented with elements
intended for general and target specific audiences. Emphasis was placed on the need for this
comprehensive plan. < .
3. Re-inspection frequency — The BOH agreed with the committee that the 5 year frequency
with the homeowner incentive to extend it to 10 years with proper maintenance was the
preferred option.
4. Funding - The BOH chose the hybrid approach of partially paying for the expansion with
general funds and making up the rest of the costs with annual operations permit fees for
submission to the BOCC. The BOH did not stipulate in this choice what the percentage
breakdown should be but felt that this would be the most equitable method of distributing the
costs of the program to all those who will benefit from its implementation.
PERSONNEL CONSIDERATIONS —
To implement the program as approved by the BOH, the following personnel would be required
at its inception:
• One FTE educational specialist, grade 66
• One FTE Environmental Health Specialist, grade 68
• One -half FTE GIS /database specialist, grade ??
CAPITAL CONSIDERATIONS
To implement the program as approved by the BOH, the following capital items would be
required at its inception:
• One vehicle - $15,000
• Three computers - $6,000
• Three sets of office equipment $3,600
• Additional space - $25- 30,000 — This figure is very rough until some rental
comparisons are made and utility costs are assessed for particular sites.
ADDITIONAL COSTS (Start-up or increased line item costs)
• Mileage cost - $5,000
• Training materials - $15,000
• Phone - $1200
• Travel and Training - $500
• Equipment - $1,000
•
6
ORANGE COUNTY HEALTH DEPARTMENT
ENVIRONMENTAL HEALTH DIVISION
WTMP EXPANSION COMNUTTEE MEETINGS
September 30, 1998
October 21, 1998
November 3. 1998
"In our zeal to promote onsite and cluster systems as a more cost - effective
method of wastewater management in small communities, we have
focused too much on technologies. Our interest in technologies is
performance and cost, while the potential user's interest is in service. To
gain the attention of potential , users, we have often denigrated central
sewerage in favor of decentralized treatment systems. This is a mistaken
approach because onske and cluster systems are not perceived by the
public as providing equal service.... What is good about central
sewerage — central management —is what is bad about onsite systems... .
When we are able to show that onsite systems can be designed and •
operated over extended planning periods to meet water quality and public
health objectives, onsite technologies will gain stature equal to
conventional sewerage. This will be achieved only through centralized
management. While decentralization of treatment is the outcome,
centrah'zation of management must be the approach. "
Richard J.' Otis, P.F.
Y.P., Ayres Associates, Madison, WI
1998 ASAE Onsite Conference
On September 30, 1998, the ad -hoc WTMP Expansion Committee met at the
Southern Human Services Building in its first session to forge details for the
proposal. In attendance were Brenda Crowder - Gaines and Rick Marinshaw of the
Orange County Board of Health, Margaret Brown of the Orange County Board of
Commissioners, Pat Davis and Barry Jacobs of the OWASA Board, John Link and
Paul Thames of the Orange County Manager's office, Gene Bell of the Orange
County Planning Department, Ed Kerwin of the OWASA sUA and Rosie
Summers, Ron Holdway, Tom Konsler and Cornelia Ramsey of the Orange
County Health Department. A work group also met on October 21 to further •
discuss details of the expansion. A final meeting of the full committee met on
November 3 and finalized some of the details for the proposal.
Page 1 of 12
7
This group was formed under a directive from the Orange County Board of Health
to provide input to the three main components of the expansion to include gravity
flow septic systems in the WIMP framework The components are education,
homeowner incentives and re- inspections. Outlines of the history of the current
WTMP initiatives and the expansion were presented to the committee for
consideration and guidance. Rosie Summers and Ron Holdway facilitated the
discussions:
The impetus to explore the expansion came from a joint meeting of the Board of
Commissioners and the OWASA Board and an ensuing meeting of the Board of
Health. All three boards recognize that existing failures rates (8 -10 %) are not
likely to improve without action and that centralized wastewater disposal will not
be a repair option in many areas of the county in the foreseeable future. Failures
are caused by a variety of factors, most notably poor soils conditions, wetter
seasons and individual household water habits. To prevent premature failures,
long term management must be implemented to extend the usable lives of systems
and preserve repair strategies. Since there are no programs in place in North
Carolina which include management for all on -site systems, staff looked at
examples from several other localities nationwide with a full management
approach in place or under consideration. These localities included Georgetown
Divide in California, Ten Towns jurisdiction in New Jersey, Cuyahoga County in
• Ohio and Jamestown, Rhode Island. EPA recommendations were also reviewed
for reference and applicability as well as information from state level agencies in
North Carolina, Michigan, and Hawaii.
After discussion by the committee, the proposal will be presented to the Board of
Health for action pursuant to NCGS § 130A -39. If approved, the proposal` will then
go to the BOCC for funding consideration. Staff would like for the BOCC to have
the proposal for this consideration at their December retreat. In the meantime,
staff will explore the possibility of preparing maps of recent septic system repairs
both by township and in the OWASA service area.
EDUCATION
Current Efforts:
The educational efforts in use in the WIMP area today are by individual contact,
printed material given at the time of occupancy of new homes, other brochures for
existing homes, and the Internet site. Mass mailings are also used, but are not
routine. The emphases of the educational efforts are to promote and protect public
health, preserve water resources, and extend the average life of septic systems in
Orange County. One of the main facts that must be continually emphasized in this
effort is that the systems must be viewed by all parties—homeowners, government
• and private sector contractors —as a perpetual utility which must function for the
life of the house, not just as a stopgap until public sewer arrives.
Page 2 of 12
8
r�
Individual contact with the system owner is the most effective means of education,
but it is also the most labor intensive and sometimes difficult to coordinate. It is
the surest way to familiarize homeowners with the location and fimctional aspects
of their septic system to where they become more competent in its continued
optimal operational performance. In many instances, this type of interaction
reduces" both the perception of intrusion and the feelings of animosity while
providing something more than a technical report in the mail to learn from.
The dissemination of printed material, both for new septic systems and existing
situations, is in place, but several aspects of its use need retooling. A primary
problem is that, in many situations, the ultimate owners of the property are not
known when the Certificate of Occupancy is issued for the home and therefore
they do not get the initial packet of information for their septic system. This same
problem.also holds true when a property is sold or otherwise transferred from one
party to another. Part of the solution to this dilemma will be targeting special
groups for education as mentioned below in the future efforts section. Another
way to approach this problem is the periodic use of mass mailings stressing the
benefits of understanding and properly maintaining septic systems. The mailings
can be individually sent or incorporated into the tax bill mailings.
Regardless of the firture of the WTNT expansion, reviews and reworks of both the
printed materials and the Internet site are underway and should be complete by the •
end of the year.
Future Efforts
General — It is the opinion of the committee that several options should be explored
to better "market" the educational materials. These included:
• Videos on septic systems, especially maintenance
• Education level oriented materials
• Promoting a "conservation lifestyle"
• Yellow Pages ads for repair advice and contact numbers
• Promotion of septic systems as a safe and ecologically sound method
of wastewater disposal
• Promotion of onsite wastewater technologies as an integral part of the
county's infrastructure
Better Reports — Future post - inspection reports should be geared toward enhancing
long -term performance of the system and education of the owner, not just
providing advice for discovered non-compliance and failures. This effort will be
made regardless of the WTW expansion.
Target Groans — Several specialized groups targeted for specific educational go
efforts will help eliminate some of the current problems and prevent future
problems in the expansion. Because of the health department unique role in the
Page 3 of 12
involvement in all aspects of wastewater systems, it will become the local
educational resource for technicians, homeowners, pumpers and other groups with
connections to permitting and management issues.
1. Lending Institutions, Developers, Builders, Realtors and Attorneys: These
getups are targeted for education because they are crucial in passing on
information about septic systems during property transactions, home sales,
closings or even listings of property. The first step of the education could be
accomplished by the Environmental Health staff asking for an appearance
before executive committees or full session meetings of local affiliate groups
on a periodic basis. Update meetings and regular mailings of specific printed
literature will be needed to keep all members current. The committee wanted
somehow to include Realtors and lending institutions in the chain of disclosure
of system type and management requirements, but there was no firm agreement
on how this could be accomplished. In the work group session, a focus group
With representatives from this array of professions was suggested by Margaret
Brown to elicit ideas. on educational efforts.
2. Homeowners Associations: All of these associations would be targeted for
education and all will be encouraged to view ongoing septic system
maintenance as a community effort and a community benefit. The group also
wanted to explore whether, in new developments, requirements for system .
operation can be incorporated into subdivision covenants. A listing may be
available from the "Community Watch" program.
3. Septic System Installers: These contractors are now subjected to a simple
registration process before they can install septic systems in Orange County.
There is no current requirement for licensure or certification either here or
elsewhere in North Carolina. If the expansion goes forward, routine continuing
educational sessions sponsored by the Health Department could be considered
either as a condition of the registration process or to be put on a `Preferred list"
of contractors and his information would be provided to permit applicants.
Some method of sanction and removal of renegade or incompetent contractors
must also be implemented so that frequent violators of installation standards
can be effectively managed.
4. Septic System Pumpers: When a citizen calls a septic pumper today for routine
maintenance of a system, the pumper, in most cases, empties the tank without
regard for the actual level of the biosolids. In some instances, the removal of
biosolids before they reach a detrimental depth is unnecessary and may
adversely affect the biology of the tank. The pumpers would be encouraged
through education to check the biosolids and empty them only when necessary .
An upside of this process is that the pumper could charge a lesser fee when the
tank is not cleaned because they save the costs of disposal at the accepting
wastewater treatment plant plus the travel there to dump the load The
homeowner saves by paying a lesser amount for the pumper's service and the
expected increase of the volume of septage needing disposal is minimized
The startup and equipment costs for the pumpers to implement this practice are
• minimal. The group went further to say that more information is needed from
each pumper on the origins of the septage and on those systems which are
Page 4 of 12
19,.
10
frequently pumped. Staff could prepare and provide to the pumpers a simple,
self carbon, standardized report form to use and submit as they check and
empty septic tanks. This information might give clues to where the septic
system "trouble spots" are in the county. Pumpers are the logical choice to
provide this information as part of the dump report to the accepting utility. As
the information from these reports is compiled, homeowners with frequent
pumps would be sent educational mailers on how to deal with problem
systems.
5. Wastewater System Operators and Management Entities: These groups are
mentioned because of their wide range of activities and impacts in multiple
areas. All area municipal wastewater treatment plants will be encouraged to
accept septage, principally because, if the expansion is implemented, the
volume of this material will increase manifold. There may also be some grant
monies available for construction upgrades for municipal plants in the near
future which might be available for a septage receiving station. Other
operators and management entities are included for periodic education because
of the ever changing technologies in the wastewater disposal field. A preferred.
list of these firms could also be produced in conjunction with a quality
assurance program crafted by staff.
HOMEOWNER INCENTIVES
Types of Incentives: •
Many incentives were discussed and the following were put forth as options for
consideration. These incentive examples generally assume that fees will be the
sole or partial base of funding the expansion.
Extension of the Re- inspection Fregnency — Homeowners who check and pump
their systems according to recommended guidelines would be eligible for an
extension of the minimum review period for inspection by the Health Department.
For example, if the review frequency is set at 5 years, any septic system checked
and. pumped as necessary would not be inspected by the Health Department for 10
years provided the owner supplies proper documentation to our office. The
extension would be granted only once during each re- inspection cycle, meaning the
Health Department would inspect the system at least every 10 years. Similarly,
owners who opt to become certified in system operation, manage their systems and.
report findings to the Health Department could be granted extensions, but not
exclusions. This certification generally requires attendance to a school for 4 days
and passing a exam on the presented material. Checking the system would involve
measuring the solids depths in the septic tank and pumping if necessary; assessing
the condition of the filter and cleaning or replacing as needed and reporting this
information either directly or indirectly to the Health Department.
Community Benefits — Another type of benefit discussed was reduction of septage •
dumping costs for citizens located in designated watersheds. This benefit is a
consideration because the individual watersheds will be further protected with the
Page 5 of 12
11
•
implementation of the WTUP expansion. The
imp xp granting of this benefit would be
strictly at the discretion of the owner of the particular impoundment, either
OWASA, the Town of Hillsborough or the City of Durham. Each governing board
would be approached and asked about its willingness to entertain such a move
before any details are worked out It is probably not feasible to consider this
approach in the case of Jordan Lake because of the multi jurisdictional watersheds
and water allocations.
Volunteers for B= into the Program — It was suggested that one incentive to
draw existing systems into the program could be the waiving of fees for the first
consultation and inspection for volunteering owners.
Sliding Fee Scale. — This incentive was mentioned not only in the context of having
differing fees for various sizeJtypes of systems, but also when the ability to pay is a
factor. At this time, Environmental Health does have varying fee charges in .
permitting of systems based on the design wastewater flow of the structure and this
procedure can easily be extended to re- inspections. Generally, all systems sized at
600 gallons per day and under are assessed like fees and those above that figure are
based on the total gallonage.
The issue of developing sliding fee scales based on ability to pay presents a
different challenge however, as there is no staff ability in place for qualifying
• applicants. Even if some method of initial qualification evolves, the ability and
mechanics for re- certification for each round of inspections is onerous and
problematic.
MANAGEMENT RE- INSPECTIONS
Entry into the Program —
There seemed to be consensus on new and repaired systems being automatically
entered into the program and that taking on all systems in the county immediately
or in a short period of time is not practical. Volunteers will always be accepted as
staffing allows, even without the expansion being approved. Requiring entrance
for properties having just been transferred was also discussed, but there was no
agreement on this option because the housing turnover rate for rural Orange county
was not known by any member of the committee and therefore the impact of this
requirement is not known. Staff will try to extract some figures from the overall
county turnover rate and then estimate the yearly number of homes this
requirement would affect The mechanics for this requirement are still discussed
below.
New Systems — In the current WT NIP rules, all newly installed alternative and
pump systems are automatically entered into the re- inspections cycle as part of the
• permitting process. The main classes of systems which now require entry are low
pressure pipe systems (LPPs), pump conventional systems and large residential
Page 6 of 12
12
and non - residential systems. The frequency of the re- inspection cycle can vary r
from every six months to once per five years.
This proposal would add all new gravity flow systems and the review frequency
time would start' at the time the operation permit (final approval) is issued for the
system. In-the past few years, the average number of new gravity flow systems has
been approximately 500 per year.
Repaired Systems — As with the new systems, all repaired systems can be included
in the programs during the permitting and implementation of the repair strategy. In
the past few years, the average number of repaired systems has been approximately
90 per year.
Volunteers - As stated above, there will be nothing to prohibit volunteers from
entering into the program, and, in practice, it will be encouraged. There will need
to be some type of perpetual legal authorization given by the owner for the right of
entry to avoid misunderstandings during the re- inspections in the future. A yearly
"cap" on volunteers may be needed so that resources can be adequately
maintained.
Post Sale — The cause for the requirement of an inspection at or after title transfer
for homes with septic systems is touted by EPA in their on -site wastewater
recommendations for State and local governments' consideration.. According to •
EPA, many states are considering this mandate and all states or localities should
"develop a program for regular inspection" of on-site systems. It must be decided
whether the post sale inspection, if adopted, should happen immediately or within
a given time window after the transfer (e.g., six months) or if the home should
enter into the program and have its first inspection at the first review frequency. If
an inspection is to be required immediately, the cost could be integrated into the
closing fee. The, work group also suggested that the type and age of the systems
might determine whether the inspection is immediate or delayed. The advantage
of making the requirement at transfer or post sale is that the Health Department
'will not be a party to the transaction negotiations between the buyer and seller and
consequently not be subjected to the artificial pressures of closings and other
financial transactions. There are now adequate private sector inspectors available
for the pre -sale functionality assessments and systems needing repairs should be
flagged during that process.
Ovtions — At the last meeting, the committee decided the following three options
should be considered for implementation. New and repaired systems (option 1)
should be a part of either of the other two options, if selected
1. Only New and Repaired Systems — This option offers the easiest transition
into management of gravity flow systems and is similar to the way alternative
systems are entered into management now. But it does not address the issue
of immediate watershed protection nor is there any consideration for •
Page 7of12
13
• targeting neighborhoods with older systems or those with poor soils. All of r '
the funding options would be feasible for this option.
.2. Systems at the Time of Sale of the Home — This option was explored by the
group with the fimding method being the assessment of an inspection fee at
closing and afterwards, the fimdmg for future inspections could come from
the variety listed below. With the housing turnover in the State estimated at
just over seven years, and the County's likely higher, most homes should be
included by the end of the second turnover period or approximately 15 years.
At the end of this 15 year period, all non - participating homes would be
entered into the program.
3. Systems Radiating from the Designated Watersheds — In this option, the
systems in the water quality critical areas of all designated watersheds would
fall under inspection in the first 5 years. In the next 5 years, the systems in
the rest of the designated watersheds would be brought in and in the next 5
years, the rest of the systems in the County would be inspected. This
approach is most effective for watershed quality management. Subdivisions
with older homes and poorer soils could also be defined and prioritized for
inclusion, also. The group discussed that this method might be best fiuided
with an annual operations permit fee charged to all those affected
households. Eventually, all homes in the County with on-site systems would
be assessed this annual fee.
•
Frequency —
Perhaps the most difficult aspect of this proposal to define is how often the gravity
flow systems should be inspected. There are varying opinions on the
recommended frequency, of pumping, usually based on tank size and population
served, but most sources recommend checking an average septic tank every 3 -5
years and pumping if necessary. Additionally, a new State General Statute,
effective 1 -1 -99, requires that each new or repaired septic system installed in North
Carolina be equipped with an effluent filter on the outlet end of the septic tank
These filters are to "Be designed and constructed so as not to require maintenance
more frequently than once in any three -year period under normally anticipated
use." (House Bill 1462). These conditions lend considerable argument to
establishing the re- inspections frequency at three years.
The committee debated extensively whether to set the review frequency at 3 years
or 5 years during the meeting. It was finally decided that 5 years would be the
more reasonable approach if the standards for effluent filters met certain design
and maintenance standards beyond the minimum required in the State rules. The
agreement on the best way to approach the visit was to set the re- inspection
frequency at 5 years with a notice going to each homeowner in the initial
maintenance packet and also in the second year of operation. These documents
• would state the necessity of checking/pumping the septic tank and the allowance of
a 5 year extension if the tank is checked If the homeowner provides evidence of
Page 8 of 12
14
checking/pumping before the fifth year of operation, the inspection would be r
postponed until the end of the tenth year and a new cycle starts from that
inspection. The extension would be granted only once during each inspection
cycle, so the longest period of time a system would go without departmental
inspection is 10 years. It may also be prudent to not grant exemptions to systems
over a,certain age (e.g., 15 -20 years) because aging systems present more problems
and are more susceptible to failure. If no response is received by the Health
Department, the fifth year visit from the health department would proceed on
schedule.
Once the expansionbegan, a sampling of systems could be inspected in 2 -3 years
to determine if the filters will be problematic before the fifth year inspections are
due. If the sampling indicates high numbers of problems with the filters, then the
review frequency could be revised as appropriate by the Board of Health.
It is important to keep in consideration that this expansion will require a
commitment to significant resources, especially personnel, in the coming years, if
re- inspections are part of the framework. There will also be some start up
Personnel costs involved which may not be subsidized if fees .are the payment
basis. Some models detailing resource needs will be put together by staff for
review on the entry mechanism is established..
•
Other Issues
Water and Sewer Boundary Task Force Document — This agreement will allow
water and sewer extensions to many areas of the county only to alleviate declared
adverse public health conditions. In some areas, extensions may not be a.
possibility under any circumstances. Therefore on -site sewage systems must be
considered the primary and perpetual method of wastewater treatment and disposal
in any unsewered area. With the finalization of this document supposedly
imminent, it is imperative that all aspects of on -site sewage disposal, from
permitting to installation to long term management, be given proper consideration
to assure system life is maximized, repair areas maintained and users educated as
to their responsibilities in helping achieve these goals.
Accordingly, the "toolkit" which matches repair /response options for failing
systems to all designated areas of the county must be put into place concurrently
with the WSBTF document and understood by all governmental/utility agencies
with jurisdictional authority in those areas.
Space for Housing Personnel — If approved and implemented, this expansion will
require additional personnel. Presently, the space to house additional employees in
the Environmental Health office is severely limited. Additional office space will
be needed for this expansion. •
Page 9 of 12
•
15
FINANCIAL CONSIDERATIONS
Costs
When the cxxisting WTMP proposal was presented in the late 1980'x, David K
Griffith and Associates conducted the study to establish the fee level and other
related financial considerations. The fees approved for the implementation of the
program were approximately one -half of the DMG recommendation and one FTE
was funded to start the work. At present, the direct fees account for approximately
one fourth of the FTE salary costs and the percentage of fee reimbursement
gradually increases each year. Because the DMG methodology was based
primarily on direct costs, staff doesn't believe it to be the best way to approach the
estimation of costs for the expansion.
The Institute of Government is conducting a study of the costs for environmental
health services in several counties across North Carolina which is based on a more
comprehensive cost allocation model. The first draft of this study is due out soon
and should offer a more accurate way to look at the actual costs of providing
education and inspections. When finalized and if fees are part of the funding
mechanism, staff will prepare a fee schedule for the committee's review based on
the IOG methodology and findings. CIP needs ' such as computers, technical
equipment and vehicles will also be figured into the fee base.
The direct costs for each inspector will be salary and fringes, vehicle, computer
equipment, field equipment, and office furniture.
Funding —
There are several options for paying for this program expansion. It is staff's
recommendation that the option selected also be used to fund the existing WTMP
activities.
'General Fund — The general fund is the first option for covering the expenses of
this program. The principal argument against using the general fund is that
municipal citizens would be paying for inspection of county resident's septic
systems. However, it must be considered that the watersheds for the three main
impoundments (and a proposed fourth) serving the Towns of Catrboro, Chapel Hill
and Hillsborough are mostly comprised of county lands served by on -site septic
systems. This expansion will be a benefit in the protection of those reservoirs.
The general fimd approach would also eliminate take the "ability to pay" and non-
payment issues and be much easier to administer from the Health Department's
perspective.
Special Fund — Although a special fund, even an enterprise fund, could be
• considered, there was not much support for its use with the committee. This
method would allow for the charging of a monthly fee to each enrolled owner for
Page 10 of 12
r"
16
the management oversight of their system. One of the localities studied in
California use this method and the monthly fee was $12.50 in 1992.
Service District — The county engineer proposed a "sewer tax district" for
consideration. Although there are limitations for its use, it would help address the
inequities and ability to pay issues. This tax district would be developed as a
service district as prescribed in GS 153A -300 and applies only to certain parts of
the County. If the district extends into municipalities, it must be approved by those
affected towns or cities. The formation of these districts is a BOCC responsibility
and there is a limit on the amount of tax that can be levied in their use.
Fees — WTMP was originally approved to be a fee - sponsored program with the
first years augmented by the general fund until the numbers of inspections reached
a sustaining level. If the expansion is to be financed by fees, an accurate cost
allocation model, developed with help from the Institute of Government study,
should be used. Advantages to using fees -are: they can be structured differentially
so that larger or more complex systems pay more; they are easily adjusted to meet
operational expenses; and have little or no impact on the County's tax raze.
Disadvantages to using fees are the cost and methods of their collection, delinquent
and non - payment remedies, and that benefits are realized by citizens who don't
participate in the fee payment.
There were two basic models of fees discussed by the group. The first was a "per •
inspection fee which is billed after the inspection service is rendered. The second
was an annual "operations permit" fee which would be part of the annual tax bill
and spreads the cost of the re- inspection over the length of the 5 years review
frequency.
Hybrid — During the first meeting, the committee seemed to support a combination
of fees and general fund monies to finance the program. The advantage to this
approach is.that all citizens, as beneficiaries, help support the costs of the work but
the individual system owner bears the majority of the costs. The disadvantages of
'fee administration, payment collections and non- payment/delinquencies remain
with this system. It must be also be assured that the proportions and mechanisms
of funding are well understood by everyone involved and that the commitment to
using general fund monies for this purpose is strong.
At the final meeting, however, the group was leaning more towards the annual
"operations permit" fee with the caveat of providing some relief or options to those
with limited ability to pay.'
Fee Collection Methods
Current Method - Fees are now assessed, billed and collected through the
Environmental Health office. There are some type inspections which are not being •
Page 11 of 12
17
• billed on advice from the county attorney. No remedies for delinquencies and non- r,
payments are being used, also based on the attorney's advice.
ManUer's Method — The manager has suggested the use of the annual tax mailings
as a vehicle for billing and collecting the fees. According to him, this is similar to
billings from other county agencies on the tax bill. While all the remedies for
collection of delinquent taxes would not apply if the fees go unpaid in this setup,
the collection rate would probably be much higher than it now is and current
remedies for non - payment would not be lost. This method would be applied to
both the `per inspection" and the annual "operations permit" options.
Financial Security
The final aspect of the expansion proposal discussed by the committee was the
financial security for repair of septic systems when they fail. The types of security
requirements discussed were bonding, revolving funds, escrow accounts, up front
replacement money, initial dual drainfield installation, and a low interest/no
interest capital reserve fund coming from fee augmentation.
The committee reached no agreement on whether a security plan was necessary for
all systems, which method would be better or how any plan would be
implemented. There was general agreement that larger and higher risk systems
• should be under some sort of security plan for eventual repairs and that lower
income citizens should have access to grants or low interest loans for system
replacement. The county attorney will also provide guidance on this matter before
the plans are finalized.
•
Page 12 of 12
ORANGE COUNTY
WTMP
SYSTEM AND INSPECTION ESTIMATES
TOTAL SYSTEMS IN WATER QUALITY CRITICAL AREAS IN ORANGE COUNTY:
Approximately 1,600
Estimated time to inspect all with one FTE - Approximately 2 -3 years
TOTAL SYSTEMS IN WATERSHEDS CURRENTLY SERVING ORANGE COUNTY TOWNS (CANE
CREEK, UNIVERSITY LAKE AND UPPER ENO):
Approximately 5,800
Estimated time to inspect all with one FTE - Approximately 7 -8 years
TOTAL SYSTEMS IN ORANGE COUNTY (ALL WATERSHEDS):
189000- 20,000
Estimated time to inspect all with one FTE - Approximately 25 years
SOURCES:
ORANGE COUNTY PLANNING DEPARTMENT DATA
ORANGE COUNTY ECONOMIC DEVELOPMENT COMMISSION DATA
NC OFFICE OF STATE PLANNING
ORANGE COUNTY ENVIRONMENTAL HEALTH FILES
P"
00
POPULATION:
Total County Population 107,240
Municipal Population 63,340
Non - municipal Population 43,900
AREA:
Total County 399.8 Mil
Non - municipal* 374.3 Mil
Municipal 25.5 Mil
DENSITY:
Overall County Density 268.2 Persons/Mi2
Non - municipal* 117.3 Persons/Mi2
Municipal 2,483.9 Persons/Mi2
PERSONS PER HOUSEHOLD
Chapel Hill 2.17 (From OSP)
Carrboro 2.04 (From OSP)
Hillsborough 2.50 (From OSP)
Overall Orange County 2.24 (From OCEDC)
(107,240/399.8)
(43,900/374.3)
(63,340/25.5)
ESTIMATED TOTAL NUMBER OF SEPTIC SYSTEMS IN ORANGE COUNTY
18,000- 20,000 (19,000 used in watershed estimate calculations)
* - Includes ETJs and JPAs
19
•
•
•
ESTIMATES OF THE NUMBERS OF SEPTIC SYSTEMS
WATER QUALITY CRITICAL AREAS AND CORRESPONDING WATERSHEDS
ORANGE COUNTY, NC
ORANGE COUNTY WATER
SUPPLY WATERSHEDS
SQUARE
MILES
ACRES
% OF
NON-
MUNIC.
COUNTY
LAND
AREA
#SYSTEMS
IN WQCA
BASED A
SYSTEMS /M12
(METHOD 1)
# SYSTEMS
IN WQCA
BASED ON
POPULATION
DENSITY
(METHOD 2)
# SYSTEMS
IN TOTAL
WATERSHED
BASED ON
SYSTEMS /Ml2
(METHOD 1)
#IN TOTAL
WATERSHED
BASED ON
POPULATION
DENSITY
(METHOD 2)
Upper Eno River
WQCA
22.3
14272
6.0%
1132
1169
Watershed outside of WQCA
36.6
23424
9.8%
Total Watershed
58.9
37696
15.7%
2990
3087
Cane Creek
WQCA
7.5
4800
2.0%
381
393
Watershed outside of WQCA
21.7
13888
5.8%
Total Watershed
29.2
18688
7.8%
1482
1530
University Lake
WQCA
1.5
960
0.4%
72
79
Watershed outside of WQCA
22.1
14144
5.9%
Total Watershed
23.6
15104
6.3%
1198
1237
TOTALS
1585
1640
5670
5854
ro
0
21
•
METHOD 1 -
Number of systems in a given area (WQCA or watershed) = Percentage of square miles of non -
municipal county land in that area times the estimated total number of systems in Orange County
(19,000)
EXAMPLE: For Cane Creek Water Quality Critical Area
# SYSTEMS = 2.004% * 19,000 or 381
METHOD 2 -
Number of systems in a given area (WQCA or watershed) = Overall number of persons per
square mile in non - municipal Orange County (117.4) times the number of square miles in that
given area divided by the average number of persons per household in Orange County ,
EXAMPLE: For Cane Creek Watershed
# SYSTEMS = 117.4 * 29.2 _ 2.24 or 1530
•
• SCENARIO NOTES
These scenarios represent three different methods for funding the WTMP expansion. Since the existing
WTMP activities are proposed to be folded into a comprehensive approach with the expansion, their
numbers are included in these figures. The mechanism for entry into the program is to include all
newly installed systems, repaired systems, alternative systems and those gravity flow conventional
systems which are re- inspected each year. The gravity flow system re- inspections would begin in the
Water Quality Critical Areas in the County, expand into the corresponding watersheds and eventually
into other watershed areas not serving as water supplies for Orange County citizens. The projection is
that entry of all systems in the County would take 15 -20 years.
Because the Board of Health recommended splitting the cost of the program between the system
owners and the general fund, each of the three scenarios has been broken down into 60/40 and 80/20
percentage splits. These splits were arbitrarily chosen by staff.
The first alternative of an annual operations permit fee originated in the WTMP Expansion workgroup
and was the one endorsed by the Board of Health. This fee would be charged to systems owners after
their system is installed, repaired or re- inspected. The fee would subsidize the cost of the next re-
inspection in five years. If new system owners took advantage of the incentive and voluntarily serviced
their system before the fifth year, the fee could be waived for years 5 -10 since no re- inspection would
• be necessary before year 11.
The second alternative would continue fee collections according to the current setup of billing each
existing system owner after their systems are re- inspected. The current WTUT fee is $60 and does not
approach full recovery of the service cost.
The last alternative is one offered by the County Manager which spreads the pro -rated cost to system
owners of the program to all homes/busmesses in the County served by on -site wastewater systems. It
has the advantage of minimizing the financial impact of the program to individuals while eventually
providing for the re- inspection of all existing systems.
Please note that all three paradigms assume 100% collection rates and include only direct personnel and
operating costs and- that revenue collection could lag behind the implementation of the program.
Furthermore, if extensive failures are discovered, there may be more staff requirements for repair
permitting and installation inspection. All system figures are generally based on projected growth rates
and estimates from system installations in the 1990's. Finally, the educational and database positions
are included in the cost estimates but they are not part of the staff requirements listed on the system
estimates spreadsheet.
•
22
System Inspection Estimates
1999 -2014
SYSTEMS
YEAR 1
YEAR 2
YEAR 3
YEAR 4
YEAR 5
YEAR 6
YEAR 7
YEAR 8
YEAR 9
YEAR 10
YEAR 11
YEAR 12
YEAR 13
YEAR 14
YEAR 15
1999 -00
2000-01
2001 -02
2002 -03
2003 -04
200405
2005 -06
2006-07
2007 -08
2008-09
2009 -10
2010 -11
2011 -12
2012 -13
2013 -14
NEW
600
609
618
6271
637
646
656
666
676
686
696
707
717
728
739
REPAIRED
100
102
103
105
106
108
109
111
113
114
116
118
120
121
123
TOTAL
REINSPECTED GFC
750
750
750
750
750
1100
1105
1111
1116
1121
1477
1486
•1499
1510
1522
16799
REINSPECTED ALTER.
225
250
275
3251
375
425
500
575
650
750
850
950
1075
1200
1325
TOTALS
1450
1461
1471
1482
1493
1854
1871
1887
1905
1922
2289
2313
2336
2360
2384
TOTAL RE- INSPECTIONS
DUE
975
1000
1025
1075
1125
1525
16051
1686
1766
18711
2327
24381
2574
2710
2847
STAFF REQUIRED FOR FIELD
INSPECTIONS (1 POSITION
ALREADY EXISTS)
2
2
2
2
2
3
3
3
3
3
4
4
5
5
5
GFC - Gravity flow convntional wasterwater systems
ALTER - Alternative wastewater systems - LPPs, discharging systems, spray irrigations and sludge sites
ro
w
• SCENARIO I -A
Annual Fees /General Fund for New, Repaired and Re- inspected Systems
60/40
YEAR ONE OPERATING COST - $225,000
DRAFT
• Annual Fee Share - $135,000
• General Fund Share - $90,000
NUMBERS OF SYSTEMS SUBJECT TO ANNUAL FEE
• 1,675
• Includes all new systems, repaired systems, inspected existing gravity flow systems, and
inspected existing alternative systems.
• Annual fees would begin to be assessed after installation, repair, or inspection to cover the
cost of the re- inspection in the sixth year of operation after installation or last inspection.
ANNUAL FEE ASSESSMENT - Approximately $81 total or $17 per year for the five year minimum
inspection interval. These are direct personnel and operating costs only.
• SCENARIO I -B
Annual Fees /General Fund for New, Repaired and Re- inspected Systems
80/20
YEAR ONE OPERATING COST - $225,000
• Annual Fee Share - $180,000
• General Fund Share - $45,000
NUMBERS OF SYSTEMS SUBJECT TO ANNUAL FEE
• 1,675
• Includes all new systems, repaired systems, inspected existing gravity flow systems, and
inspected existing alternative systems.
• Annual fees would begin to be assessed after installation, repair, or inspection to cover the
cost of the re- inspection in the sixth year of operation after installation or last inspection.
ANNUAL FEE ASSESSMENT - Approximately $108 total or $22 per year for the five year minimum
inspection interval. These are direct personnel and operating costs only.
•
24
25
DRAFT
SCENARIO II-A •
Fee Per Inspection/General Fund for Re- inspected Systems
60/40
YEAR ONE OPERATING COST - $225,000
• Inspection Fee Share - $1352000
• General Fund Share - $90,000
NUMBERS OF SYSTEMS SUBJECT TO INSPECTION FEE
• 975
• Includes inspected existing gravity flow systems and inspected existing alternative systems.
• Inspection fees would be billed for personnel and operating cost recovery after inspections
are completed. No indirect costs are included.
FEE PER INSPECTION - $140
SCENARIO II -B
Fee Per Inspection/General Fund for Re- inspected Systems
80/20
YEAR ONE OPERATING COST - $225,000
• Inspection Fee Share - $180,000
• General Fund Share - $45,000
NUMBERS OF SYSTEMS SUBJECT TO INSPECTION FEE
• 975
• Includes inspected existing gravity flow systems and inspected existing alternative systems.
• Inspection fees would be billed for personnel and operating cost recovery after inspections
are completed. No indirect costs are included.
FEE PER INSPECTION - $185
•
DRAFT
• SCENARIO III -A
Annual Assessment/General Fund for All Systems in Orange County
60/40
YEAR ONE OPERATING COST - $225,000
• Annual Assessment Share - $135,000
• General Fund Share - $90,000
NUMBERS OF SYSTEMS SUBJECT TO ANNUAL ASSESSMENT
• Approximately 19,000
• Includes all on -site wastewater systems in Orange County.
• Annual fees would be assessed at the inception of the expansion to cover the cost of
inspections. It is estimated that all existing systems in the County would be inspected in
15 -20 years.
ANNUAL FEE ASSESSMENT - Approximately $8 per year. These are direct personnel and operating
costs only.
SCENARIO III -B
Annual Assessment/General Fund for All Systems in Orange County
80/20
YEAR ONE OPERATING COST - $225,000
• Annual Assessment Share - $180,000
• General Fund Share - $45,000
NUMBERS OF SYSTEMS SUBJECT TO ANNUAL ASSESSMENT
• Approximately 19,000
• Includes all on -site wastewater systems in Orange County.
• Annual fees would be assessed at the inception of the expansion to cover the cost of
inspections. It is estimated that all existing systems in -the County would be inspected in
15 -20 years.
ANNUAL FEE ASSESSMENT - Approximately $10 per year. These are direct personnel and
operating costs only.
is
26
r�
U
0
9
27
OWASA
January 7, 1999
ORANGE WATER & SEWER AUTHORITY
Dr. Alice Gordon, Chair
Orange County Board of Commissioners
Post Office Box 8181
Hillsborough, NC 27278
Dear Chairs Gordon and Ives:
Quality Service Since 1977
Mr. Tim Ives, Chair
Orange County Board of Health
Post Office Box 8181
Hillsborough, NC 27278
i am writing to express support for continued development of a program for on -site wastewater treatment
management by the Orange County Department of Health and-to endorse the program concepts scheduled for
presentation at the Orange County Board of Commissioners' retreat.
At the invitation of the Health Department, the OWASA Board' assigned Messrs. Pat Davis and Ed Kerwin to the ad
hoc committee convened to explore the Wastewater Treatment Management Program. We were pleased to join in
this effort because we firmly believe that such a program will extend the effective life of septic and alternative
wastewater systems in Orange. County; will protect public health and environment; and will preserve water quality
both in drinking water wells and in watersheds. The ad hoc committee presented a report to the Board of Health in
November. This report described the elements of an expanded program and offered options for program
expansion. OWASA supports the report.
If the Board of Commissioners determines that the program should be implemented, OWASA would like to be
included among the potential partners in developing certain components of program expansion. For example,
OWASA could assist the Health Department in developing GIS and other program information and data
management systems. OWASA could also assist in identifying and articulating the benefits of the program.
Currently, we are expanding the data monitoring for septage discharged at our Mason Farm Wastewater Treatment
Plant by local haulers. This information will further support the Health Department's surveillance system.
Finally, we are particularly enthusiastic about the option suggesting that the program focus initially on septic and
other alternative treatment systems in watersheds in Orange County. Clearly, this option would both add to the
protection of our water supply and to the surface and ground waters that will eventually serve the new Hillsborough
reservoir.
I want to thank the staff of the Board of Health for including OWASA in this important activity and congratulate them
for an excellent first step expanding the program.
Sincerely 1yo�� ,
ursr�
0Cr� V "--r�^}�
l �I -A" sty
Dan VanderMeer, Chairman
Board Of Directors
c: Horace Johnson, Mayor, Town of Hillsborough
Michael Nelson, Mayor, Town of Carrboro
Rosemary Waldorf, Mayor, Town of Chapel Hill
Board of Directors, OWASA
Cal Horton, Town Manager, Chapel Hill
Ed Kerwin, Executive Director, OWASA
• John Link, Manager, Orange County
Bob Morgan, Town Manager, Carrboro
Eric Peterson, Town Manager, Hillsborough
Rosemary Summers, Director, Orange County Department of Health
400 Jones Ferry Road Equal Opportunity Employer Voice (919) 968 -4421
PO Box 366 Printed on Recycled Paper FAX (919) 968 -4464
Carrboro, NC 27S 10 -0366 trTrtt: o1Vasa.Oro
H1�fis
...N.
EveryWhere.
EveryDay.
EveryBody.
Acknowledgements
Department Environmental Health Division
)epartment Office of Community Education
rth Carolina School of Public Health
M M p ff �
Applicant Guide
to Environmental Health
Permits
T L°3QW 7
Orange County Health Department
Environmental Division
What's the Purpose of this Guide ? ??
This guide is made to help you understand your customer rights and
responsibilities and to take you through the steps of applying for
environmental permits.
What if I Have Questions?
If you have questions about any of the contents of this booklet or any other
questions about the permit process contact the:
Orange County. Health Department
Environmental Health Division
P.O. Box 8181,306-C Revere Road
. Hillsborough, NC 27278
www.statenc.us/Orange/envhlth/
Hillsborough
(919) 732 -8181 ext. 2360
Chapel Hill
(919) 967 -9251 ext. 2360
Mebane
(919) 227 -2031 ext. 2360
Durham
(919) 688 -7331 ext. 2360
Office hours are 8-5 Monday through Friday for walk in service. The field
staff is normally in the office 8-9AM and 4:30 -5PM
2
NOTES
Other Orange County offices you may wish 1
Coop ext. 732•
Planning Department and 732•
Building Inspections
'ERTIFICATE OF OCCUPANCY
Who Issues?
luation of soil OCHD
) would occur
use
ind septic system
struction
►stems-
)peration Permit
OCHD
OCHD
Building Inspections
OCHD
OCHD
Building Inspections
Table of Contents
Customer Service Policy
What to do first?
Frequently Asked Questions
How Much do Permits Cost?
Environmental Health Fee Plan
Legal Definitions
Appeals Procedure
Checklist for Certificate of Occupancy
Notes
4
6
10
16
17.
18
20
22
23
3
Customer Service Policy
Orange County Health Department
Environmental Health Division
CUSTOMER RIGHTS
All services of the Orange County Environmental Health Division will be
provided according to the
following principles of customer service.
• All clients will be treated with respect and courtesy, regardless of their
age, race, ethnicity, religion, economic status, lifestyle, nationality, or
gender.
• All clients will have the requested service completed in a timely
manner with consideration to the department's current workload, staff
demands and adverse weather conditions.
• Clients with requests involving a public health or medical emergency,
or disasters, will be given priority.
• All clients are encouraged to be present when the services are
performed.
• All clients will be given'full explanation of any performed
service and, if appropriate, a- written report may be provided.'
• All clients will be provided with an appeals process if they are not
satisfied with the findings or decisions of the Division Staff.
4
(c) A person who wishes to contest a decision o:
Health under subsection (b) of this section shall ha,
ange County District Court within 30 days after the
board. The district court may affirm, modify or rev,
for the reasons stated in N.C.G.S. 150B -51. Judicia
administrative penalties shall be de novo by the dis
Please call or write the office if you have questic
assistance.
kLS PROCEDURE
)cedure, for actions brought before the Orange
ease note that the purpose of an appeal is with
3 enforcement of the regulations. An appeal is
the regulations. The appeals procedure is as
ange County Board of Health. Policy adopted by
4 and incorporated in Board's By -Laws:
iretation and enforcement of rules adopted by the
end concerning the imposition of administrative
lealth Director shall be conducted in accordance
zle. The aggrieved person shall give written
)unty Health Director within 30 days of the
ill contain the name and address of the aggrieved
-nged action and a statement of the reasons why
Upon filing of the notice, the Orange County
working days, transmit to the Orange County
►eal and the papers and materials upon which
'Health shall hold a hearing within 15 days of the
'ie board shall give the person not less than 10
place of the hearing. On appeal, the board shall
or reverse the challenged action. The Orange
ae a written decision based on the evidence pre -
>n shall contain a concise statement of the reasons
Customer Service Policy
(cont.)
CUSTOMER RESPONSIBILITIES
Residents and other dients using services of the
Environmental Health Division are expected to.
• Treat the Division staff with respect and courtesy.
• Complete all applications and provide supporting documents as
required by laws and rules.
• Pay applicable fees at the time of application and before any service is
.performed.
• Comply with any conditions of applications, permits,
authorizations or other documents generated in the Dnrislon.
W1
WHAT TO DO FIRST?
Pre- Construction Process
The proper siting and installation of wastewater and groundwater
systems is important for the protection of the environment and public health
Whether you plan to build, add to a home, or alter the use of your property you
must past apply for the appropriate permits and authorizations The permitting
process can take some time and involves visits to both the Environmental Health
Office and the Planning Department. Below is a list of permits you may need.
1. IMPROVEMENT PERMIT
If you are building a house or subdividing a lot and
there have been no prior evaluations of the lot, you
need to begin with an IMPROVEMENT PERMIT APPLICATION.
Along with the application and fee, you will need to:
• provide a site plan or plat and have property
lines located
• show where you plan to place the house
• make sure that all property lines are visible on
the site
1
Septic Tank System- means a subsurface wastewa
settling tank and a subsurface disposal field.
Sewage- means the liquid and solid human body w
by water -using fixtures and appliances, including f
foodhandling. The term does not include industrial
that is combined with industrial process wastewate
Site plan- means a drawing not necessarily drawn
and proposed property lines with dimensions, the 1,
appurtenances, the site for the proposed wastewate
ter supplies and surface waters.
Wastewater- means any sewage or industrial proc
transmitted, or collected from a residence, place of
assembly, or other places into .a wastewater system
Wastewater system- means a system of wastewat
posal in single or multiple components, including
lic or community wastewater system, wastewater r
ical or biological wastewater treatment system, an,
chemical toilet used only for human waste.
)EFINMONS
initions of some of the terms used in this book
r Chapter 130A of the General Statutes of
r.ment for occupancy of a residence, place of
ably.
routine maintenance including replacement of
ment to an existing wastewater system.
repared by a registered land surveyor, drawn to a
than 60 feet, that includes: the specific location
urtenances, the site for the proposed wastewater
r supplies and surface waters. `Plat' also means,
the local planning authority and recorded with
)py of the recorded subdivision plat that is
Ls drawn to scale.
ater System- means a single system of
and disposal owned and operated by a sanitary
listrict, a water and sewer authority, a county or
teration, replacement, or relocation of existing
tem.
ie, dwelling unit in a multiple family structure, ho-
work camp, manufactured home, institution or any
2. WASTEWATER SYSTEM CONSTRUCTION AUTHORIZATION
If there have already been evaluations of the lot
and /or an IMPROVEMENT PERMIT has been issued,
your next step is to apply for the WASTEWATER SYSTEM
CONSTRUCTION AUTHORIZATION. In addition to filling out the
application, you will need to:
• submit the plat or site plan of property,
showing the proposed driveway and house site
• submit a floor plan of the house, and
• stake out the house on the lot and clearly
Identify the property lines.
Both applications must contain the signature of the property owner or the
owner's legal representative.
3. WELL PERMIT
Apply for this permit if you are drilling a new well or replacing an existing
well.
4. BUILDING PERMIT
An application for this permit is provided by the Planning and
Inspection Department upon issuance of the IMPROVEMENT
PERMIT and the WASTEWATER SYSTEM CONSTRUCTION
AUTHORIZATION.
7
S. OPERATION PERMIT
There is no separate application for this permit. It is
issued upon approval of the septic system.
6. EXISTING SYSTEM INSPECTION
You will need an EXISTING SYSTEM INSPECTION if.
• you are subdividing property that has an existing
house on a parcel. This insures that a repair area for the
septic system will remain with the existing house.
• you are adding on to an existing house, or making
Improvements that require a BUILDING PERMIT. If
you plan to add on any room that could function as
a bedroom, the septic system may need to be
upgraded.*
• you are moving a mobile home onto a vacant lot
or into a mobile home park.
*Before Buiidi-ng Permit issued.
8
ENVIRONMENTAL I
FEE PLAN
I. All fees will be assessed according to the
of proper application to the Environmental Health
Orange County Health Department
2. Any protest or appeal concerning, the pays
a final determination made before any service is i
3. All fees must be paid in full before the ser
4. A refund can be given for any service not
where more than one fee has been paid for the s
quired additional field trips to a site or property v%
appropriate fees.
S. No refunds will be given if any portion of t
permit issued, inspection made).
6. Any wastewater permit or authorization is
will be for a specific site, lot or property as define
rules along with any conditions stipulated. Any us
documents has the responsibility to reimburse thE
their Issuance. The Orange County Health Depart
responsible for refunds or reimbursements in sud
party in such negotiations.
7. Denial, suspension or revocation of any pt
necessitate the refund of any fee paid for the per
8. All refunds will be made in accordance wit
procedures.
.H DO PERMITS COST?
acre site)* $190
)N $100
$140
$50
$30
with 5 bedrooms or less. Larger houses or
teflow may be subject to higher fees.
Itions prior to subdivsion, or in the concept stage
idividual's best interest to hire a private licensed
ary soil evaluations.
rivate licensed soil scientists which can be made
E
FREQUENTLY ASKED QUESTIONS
The permitting process for septic tank systems and wells has gone through
several changes in recent years This information will provide some answers to
common questions about the permitting process
If the lot has never been evaluated before, which permits do I need to
get in order to build a house or to subdivide a lot?
You will, need to start with an application for an IMPROVEMENTPERMITfor each
proposed septic site. Since you will be charged for each proposed site and if you
have a large tract of land, it may be in your best interest to first hire a private
licensed soil scientist to do preliminary evaluations on the suitability of the soil.
What does the Orange County Health Department
(OCHD) do to issue an IMPROVEMENTPERMIT.
The OCHD does a site evaluation to determine the suitability of your soil for a
septic tank system. The "site evaluation" has replaced the "pert test" as the
method to determine if there is a large enough area of suitable soil to support a
septic system and a repair area. This area must be free from any proposed
buildings, driveways, wells, or other improvements. In general, an area of 1/4 to
1/2 of an acre is needed just for the septic system and repair area.
The IMPROVEMENTPt:RMITwiil Indicate that a site has been found that is
suitable for the system installation, provided that the house location, number of
bedrooms, wasteflow restrictions, and other conditions are met
If the property is to be subdivided, or separated from another tract, The Planning
Department requires that the site evaluation be done before the plat can be
recorded.
10
What if I am looking at a subdivision lot or a tract that has already
is system is installed? been through the Improvement Permit process?
3s installed the system and called for
Your next step is to apply for a WAS7FWA7FR SYSTEM CONS7RUC7Z0N
end verifies the installation and issues an
AUTHORIZ477ON. The CONSTRUC7I0NAUMOR0477ONis the permit that is
the system to be placed into use and allows
needed in order to obtain a building permit and to install the septic system. The
and a Certificate of Occupancy from Building
building permit will not be issued unless you have a valid CON_ STRUCTION
ccially those with pumps, require several visits
AU7HORIZ477ON.
on septic tank system care refer to '777e Needs
chure (available at OCHD Environmental Health
Will I need to get a survey of the property?
Each site will be evaluated on a case -by -case basis. The existing and proposed
property lines must be dearly identified in the field. If the survey is recent, a new
survey may not be needed.
For properties where identifying property lines affect site approval, a current
survey will be needed in order to issue an IMPROVEMENTPERMl7. Depending
on the property, you may need to provide known reference {mints in the field,
such as existing buildings or surveyed benchmark points.
11
Where can I get a PLATor M7EPLAN?
The owner of the property may have a current survey of the property, or for
recent subdivisions, our office may have file information or resources that will
assist in the development of your site plan. For lots under 3 acres a 1=50' scale
would be appropriate, for larger lots 1=10W is fine.
SITE PLAN
175'
TN
PROPOSED
SEPTIC SYSTEM
275' Future
�j Iml
F;O7U$0 1
w0'
7v (D
H WY 54
12
Can the OCHD give me some idea of suitabilil
velopment potential of lots?
The OCHD no longer performs PRELIMINARYSOIL
like to have some idea of your ability to develop a
subdivision, you will need to be in contact with the
With a private licensed soil scientist who is familiar
systems. OCHD can provide a list of licensed soil 9
How long are permits valid? '
An IMPROVEMENTPERMITis valid:
• for 5 years if site plan is submitted, or
• without expiration if a plat is provided.
A CONSMUC 7ONAU7HORIZ477ONis valid:
for up to 5 years and as long as that site has
after permit expiration, another application m
All permits and authorizations will become t
revocation if:
• information submitted on the application is Inc
• the site is altered; or
• the intended use changes
• issuance was based on incorrect or inadequab
NMI
PRESENTED 3 -9 -99
JOINT ORANGE COUNTY BOARD OF
HEALTHAND BOARD OF COUNTY
COMMISSIONERS MEETING
WHYNEE
• Promote and protect public health
• Extend septic system life
• Preserve septic repair areas
• Protect designated watersheds and other
surface waters
• Protect groundwater
• Prevent disease transmission
• The cavalry - public sewer - isn't coming
WHO BEN
• Everyone in the County
• Septic System Owners
— Longer system life
— Less exposure to pathogens
— Groundwater better protected
• Towns' Water Consumers
— Watersheds better protected
— Treatment costs may be lower over the long
haul
coMPo
• Education
— Basic education plan for systems owners
— Specialized education for certain groups
• Lending institutions
• Neighborhood associations
• System installers, operators and pumpers
• Realtors and homebuilders
• Homeowner incentives
• Re- inspections of systems
METHODS OF ENTRY INTO
THE PR(
Three options:
• New and repaired systems only
• All homes at property transfer
— Including new and repaired systems
�• Starting with WQCA's of watersheds and
radiating outward
— Including new and repaired systems
— Including other older developments
PERS ; 5
Personnel requirements will be larg .
dependent on the method of entry selected.
It is important to consider that long range
requirements (15 -20 years) will be
considerable. Technical, educational,
database and support staff could total 15 -20
or more in the future, depending on the
framework selected
PER SIO
Option 1 - New and Repaired Sys 0,
— One education specialist immediately
— One -half GIS /database specialist in 2 -3 years
— One EHS in 2 -3 years
—1 -3 more EHS's to be added in 5 years as the
first round of re- inspections come due
• Personnel
• Equipment
• Training materials
• Space
PERS ; 5
Personnel requirements will be larg .
dependent on the method of entry selected.
It is important to consider that long range
requirements (15 -20 years) will be
considerable. Technical, educational,
database and support staff could total 15 -20
or more in the future, depending on the
framework selected
PER SIO
Option 1 - New and Repaired Sys 0,
— One education specialist immediately
— One -half GIS /database specialist in 2 -3 years
— One EHS in 2 -3 years
—1 -3 more EHS's to be added in 5 years as the
first round of re- inspections come due
PERS.
Option 2 - At Property Transfer
— One education specialist immediately
— One- halfGISIdatabase specialist immediately
— At least one EHS immediately
— More EHS's to be added as workload dictates
PERS
Option 3 - Watersheds Areas Our
— One education/database specialist immediately
— One- halfGISIdatabase specialist immediately
— One EHS immediately
— More EHS's to be added as workload dictates
There is very little room for expanslo` e
current Environmental Health offices. If
approved, new space will be needed.
FUNDING Q v
Mw
• Generalfund
• Special fund
• Service district
• Per inspection fees
• Annual fees
• Hybrid -
Any funding option must be approved by the
BOCC upon recommendation by the HD
and BOH
GENERAL-
Advantages
• Everyone in the County pays equally
• No staff requirement for collection and tracking
• Eliminates some of the "ability to pay" and
non-payment issues
Disadvantages
• Everyone in the Count pays equally
• Adds to the tax rate
SPECIAL (ENTERPRISES
Advantages
• Does not add to the tax rate
• No other distinct advantage for this scale
program
Disadvantages
• Ability to pay is not considered
• Department/division responsible for
billing/collections/non-payments
SERVICE DIS,
Advantages
• Applied equally in designated areas
• No staf j requirement for collection and tracking
• Eliminates or lessens impacts of "ability to
pay" and non-payment issues
Disadvantages
• Increases tax rate in the designated areas
• Must be approved by towns if the area extends
into corporate limits
�.e
Advantages
• Direct payment for inspection service
• Can be structured for size and complexity of
systems
• Can be collected through tax mailings
• If an annual fee is chosen, the cost of the
service can be spread over many years
Disadvantages
• Some citizens who benefit from the program
don't pay (towns' water consumers)
• Collection/non-payment issues can be a
headache if E. H. staff bills and collects
• Ability to pay is not an automatic consideration
CONCLLa
• BOH may approve, amend or not'
• BOH may elect to chose options or forward
to the BOCC as is for funding consideration
• BOH has responsibility for making the rules
for the program
• Funding issues must be approved by both
the BOH and the BOCC
BOH DECISION 11
MIL
Education and Re- inspections - Op
— Comprehensive education plan for all systems
— Start inspections of existing systems in the
WQCAs and expand outward
— Include new and repaired systems for review in
S /10 years
BOH DECISION 1.
Funding Option - Hybrid
— A combination offees with some unspecified
percentage of the total operation cost paid for
out of the general fund
— Fee should be structured as an annual
operational permit fee
SCENt
• Based on full year's cost - $225,061
— 60/40 split = $135,000590,000
— 80/20 split = $180,000/45,000
• Based on direct costs only
• Existing WTMP cost included
SCEN I
• Annual Fee /General Fund Split
— For 60/40 ratio, annual fee would be $17 /year
— For 80/20 ratio, annual fee would be $22/year
• Fees are based on cost recovery for
inspection every five years and the yearly
prorated share to be included with the tax
bill or similar mailing.
SCENA I
• Fee Per Inspection/General Fund Sp
— For 60/40 ratio, fee would be $140
— For 8020 ratio, fee would be $185
• Current fee is $60
• Fees billed after inspections are completed
SCENA
°y
• Annual Assessment/General Fundr'
— For 60/40 ratio, assessment would be $8
—For 80/20 ratio, assessment would be $10
• Assessment charged to all system owners in
OC on the tax bill or similar mailing. Some
would not be inspected for 15 -20 years or
longer.