Loading...
HomeMy WebLinkAboutAgenda - 03-03-1999 - 8dORANGECOUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: March 3. 1999 Action Agenda Item SUBJECT: CARL AND TERESA CHAMBERS MAJOR SUBDIVISION — PRELIMINARY PLAN ACTION BY: March 17, 1999 DEPARTMENT: PLANNING PUBLIC HEARING: Yes _X_No BUDGET AMENDMENT REQUIRED: Yes X No ATTACHMENT(S): Application Resolution of Approval Private Road Justification Maps Preliminary Plan Planning Board Minutes 12/3/97 Planning Board Minutes 2/3/99 INFORMATION CONTACT: Jim Hinkley EXTENSION: 2584 TELEPHONE NUMBERS: Hillsborough -732-8181 Durham -688-7331 Mebane -227-2031 Chapel Hill -968-4501 PURPOSE: Consideration of the Preliminary Plan for Carl and Teresa Chambers Major Subdivision BACKGROUND: The proposed eight -lot Chambers major subdivision is located in Cedar Grove Township (Tax Map No. 2.33..2J) on the north side of Carr Store Road (SR 1352) between NC 86 (2,000± feet to the east) and the intersections of Compton Road (SR 1353)(2,200± feet to the west) and Eno Cemetery Road (SR 1383)(1,900± feet to the west). The area is designated as Agricultural - Residential in the adopted Land Use Element of the Comprehensive Plan, and accordingly is zoned AR(U- ENO- PW)-- Agricultural- Residential (Upper Eno Protected Watershed). An exception to this zoning is found in the southernmost 2.5 acres of Lot 1 on the south side of the proposed subdivision where the designation is AR(U- ENO -CA) Agricultural- Residential (Upper Eno Critical Area). Surrounding land uses are wooded and single - family residential. Adjoining parcels are zoned AR. The proposed subdivision encompasses 19 acres. It consists of seven two -acre lots and a five -acre lot located partially in the Upper Eno Critical Area. Lot sizes average 2.37a. 2 The subdivision would be accessed from the north side of Carr Store Road via existing Pore Road (private) —a Class A cul-de -sac to be constructed as an extension of an existing access easement.' The Class A designation is justified because there are larger lots and wider setbacks, and the proposed development is located in a protected watershed. Moreover, covenants will protect permanent open space and prohibit further subdivision. No stub -out is recommended for the proposed subdivision because lands to the north are reserved permanently for flood control purposes, and lands to the west lie within the 100 -year floodplain along the East Fork Eno River. Following the flexible development option as offered in Section IV -B -10 of the Subdivision Regulations, the Concept Plan was approved by the Planning Board on December 3, 1997. (See attached 12 -3 -97 Planning Board Minutes). The proposal includes 7.75a or 41 % openspace which will be privately owned and reserved in the form of conservation easements or restrictive covenants. Except for 50' front yards, each lot is enveloped on the sides and the rear by conservation easements having a minimum width of 40' around identified building areas. The purpose of the easements is to protect woodlands on gentle slopes, streams, and adjacent stream buffers. In addition to these natural buffers along side and rear lot lines, easements follow the subdivision boundaries. Planning Board Recommendation The Planning Board unanimously recommends adoption of the Preliminary Plan for the Carl and Teresa Chambers Major Subdivision to the Board of County Commissioners with the conditions listed in the proposed attached Resolution of the Orange County Board of Commissioners. Also please see attached Planning Board minutes for February 3, 1999. RECONUAENDATION: The Administration recommends approval of the Preliminary Plan for the Carl and Teresa Chambers Major Subdivision, with the conditions listed in the Resolution of Approval. 1 The developers propose to have the name of Pore Road changed to Chambers Court. 3 RESOLUTION �n THE ORANGE COUNTY BOARD OF COM IISSIONERS Date March 3, 1999 Name of Subdivision. Carl and Teresa Chambers Major Subdivision Owner /Applicant Carl and Teresa Chambers The Board of County Commissioners hereby approves the Carl and Teresa Chambers Subdivision Preliminary Plat, dated November 20, 1998, and subject to fulfillment of requirements specified herein. Before the Final Plat can be recorded: A. Sewage Disposal All lots shall contain adequate septic disposal and repair areas, approved by the Orange County Division of Environmental Health. 2. Disclosure that the septic system location may restrict the size and location of improvements shall be included in a document describing development restrictions to be recorded concurrently with the Final Plat. The document disclosing that information on the tentative location of septic systems is available from the Division of Environmental Health. B. Roads and Access 1. Pore Drive (Chambers Court) shall be constructed to Class A private road standards within a 50 -foot right -of -way. Construction shall be inspected and approved by the Orange County Erosion Control Division. �RW A letter of credit or escrow agreement or other security shall be submitted to secure construction of Pore Drive (Chambers Court) to Orange County standards. An estimate of the construction cost must be prepared by a certified/licensed engineer or grading contractor and submitted to the Orange County Planning Department. The financial guarantee must reflect 110 percent of that estimate and be issued by an accredited financial institution licensed to do business in North Carolina. The document describing development restrictions to be recorded with the Final Plat shall state that the financial guarantee will not be released until the road construction has been inspected and approved by Orange County. 2. An erosion control plan for construction of Pore Drive (Chambers Court) shall be submitted by the applicant to the Erosion Control Division for review and approval. 3. A Private Road Maintenance Agreement shall be approved by the County Attorney and recorded with the Final Plat. 4 4. An approved street name sign shall be erected at the intersection of Pore Drive (Chambers Court) and Carr Store Road (SR 1352), as required in Section IV-B-3-c-12 Street:Name Signs of the Orange County Subdivision Regulations. The applicant shall submit either evidence that the signs are in place or a receipt for purchase of the signs. S. Access to all eight lots shall be from Pore Drive (Chambers Court). C. Land Use Buffers and Landscaping 1. Landscaping shall be installed or preserved as indicated on the approved landscape plan for the subdivision and must be inspected and approved by the Planning Department. 2. Provisions for protection of existing trees as shown on the approved landscape. plan shall be included in a document describing development restrictions and requirements to be prepared by Planning Staff and recorded concurrently with the Final Plat. D. Drainage 1. Impervious surface data for all eight lots, pursuant to Article 6.23 Extra Requirements for Watershed Protection Overlay Districts of the Zoning Ordinance, shall be included in the development restrictions and requirements document to be prepared by Planning Staff and recorded concurrently with the Final Plat. The southern one -half of Lot 1 of the subdivision is located in the U- ENO-CA Upper Eno Critical Area where impervious surface limitations are six percent. The remainder of Lot 1 and the other seven lots are located in the U- ENO-PW Upper Eno Protected Watershed where impervious surface limitations are twelve percent, as designated in the Land Use Element of the Comprehensive Plan. BMP's (Best Management Practices) cannot be used to satisfy watershed requirements in this subdivision. 2. Drainage easements, as required, shall be located following review and approval of the Erosion Control Plan. 3. Drainage culverts shall be sized and located as required by the Erosion Control Officer. E. Parkland Eight lots are to be created in the proposed subdivision. As per the decision of the Department of Recreation and Parks, cash in the amount of $3,376 ($422 per lot) shall be paid to Orange County as payment -in -lieu of parkland dedication. The proposed subdivision is located within the service area of the Cedar Grove Community Park. F. Miscellaneous 1. The Final Plat shall contain a title block and vicinity map in accordance with Section V -D-2 Title Block and V -D-3 Vicinity Map of the Subdivision Regulations. 2. Minimum building setbacks and conservation easements shall be stated on the plat and in a document describing development restrictions and requirements to be prepared by Planning Staff and recorded concurrently with the Final Plat. 3 G. Certifications 1. A Certificate of Survey and Accuracy signed by a registered Land Surveyor shall be notarized on the face of the Final Plat. 2. A Dedication and Maintenance Certificate, as provided in Section V -D -6 -b Certificates of Dedication. lad Maintenance of the Subdivision Regulations,.signed by the landowner and developer, shall be on the face of the plat and included in a document describing development restrictions to be recorded concurrently with the Final Plat. 3. A Certificate of Approval shall be signed by the Planning Department. Carl Chambers Teresa Chambers Beverly A. Blythe Clerk to the Board of County Commissioners We, Carl and Teresa Chambers, accept the above listed conditions of subdivision approval and acknowledge that each must be met prior to recordation of the final plat. Carl Chambers Teresa Chambers Date Date 5 APPLICATIO" FOR PRELIMINARY PLf -•' APPROVAL 6 • MAJOR SUBDIVISION 8/93 . ORANGE COUNTY DATE: m Z PLEASE TYPE OR PRINT (INK ONLY) SUBDIVISION NAME: LOCATION: l �,�li OWNER/DEVELOPER: CC/ , ADDRESS: N . TELEPHONE NO.: AGENT /CONTACT: TELEPHONE NO.: A. SUMMARY INFORMATION: Orange County Tax Map _1_._ Block `/ Lotis) Township Cs //�� ee(Ae— l�j/L7iG. ..L Zoning District(@): _ Total Number of Acres: Phases: Total Number of Late: Average Lot Size: Minimum Lot Size: 19 Number/Type of Structures: (s isting) (proposed) Lineal Feet in Streets: 11 Acres in Open Space: Water Supply: Public (specify) Community lvo' Individual Wastewater Disposal: Public (specify) Community �_ Individual School District. Fire•District: General Land Uses in Area: Critical Areas: !otream /drainageways flood prone areas watershed (specify) historic sites other (explain) Is the property to be subdivided currently under 'farm use value taxation"? Yes_ No_. I( "yea', please contact the Orono* County Tax Office. Subdivision of the property may require payment of deferred taxes under "farm use value taxation '. B. All plats must be submitted on sheet no smaller than one inch equals two hundred feet (1' = 200:) end no larger than one inch equals twenty feet (1 " =20') and must contain the followfng'information: subdivision name ''" zoning of tract and adjacent ' name & address of owner(:) properties se. name & address of subdivider building setback lines by notation (if other than owner) or typical lot layout >• ,' P' l name of surveyor, engineer, 3 ;, location and width of existing and clandscape architect or architect. proposed easements (drainage, address, registration # and seal / utilities, roads, etc.) j(title) Preliminary Plan t/ existing. proposed and adjoining scale, north arrow rights -of -way including dimensions (D date (including revision dates) ✓ and street names and state road Ew township, tax map - block -lot numbers. Lineal feet of rood +J w ''i references centerlines and approximate Parent Parcel Identification E acreage of new street rights -cf- w _(,[_ deed book and paps N of property to be subdivided ' way existing and proposed utilities, CL m _L4_ boundary described with bearings J including type, sizes, hydrants, E H / and distances / valves, manholes total acreage of the tract and existing and proposed curbs, at m acreage of lots, including and gutter* and culverts, including U M a) m excluding area within rights -of- sizes and grades tr way control corner C� z� location and width of alleys, sidewalks, bike lanes, transit systems, and bus stops (please complete reverse side) 3. Where municipal or OWASA sewer is not available, a copy of the Preliminary Plat indicating Health Department soils analysis approval /denial for each lot shown thereon. 4. Where s private road is proposed a written statement by the applicant or his /her authorized representative which sets forth the justification for a private road (see Section IV- 6-3-d -1 of the Orange County Subdivision Regulations). 5. P uxiliary documents, in draft form, prepared in accordance with Section •Vt of. this Ordinance which assure complation'and /or maintenance of improvements required by this Ordinance. Such documents may include, but not be limited to, a private road maintenance agreement, and articles of incorporation and restrictive covenants pertaining to a homeowner's association. These documents may be required as necessary as evidence that the ordinance requirements are being met. 6. Fee - $350.00 plus $6.00 per lot (1 fee for preliminary and final plat). 7. If the subdivision contains 10 lots or more the following information shall be submitted with the application: a. _ Number of years to buildout. b. Number of houses to be built during each year to buildout. C. Average price of houses including lots for each year to buildout. 1, the applicant, hereby certifyAnt the foregoing application is complete and accurate. DA' RE OWNER'S SIGNATURE DATE FEES: Amount PS10- Date Paid ��'- Receipt a D 7 proposed lot lines with dimensions _.IL. � typical street cross - sections and lot & block numbers intersection details including phasing lines design and width of travelway and topography at ten- foot (10) shoulders c � intervals 1/ horizontal alignment and general 0 <., >,.:; water bodies, atreams, floodway / curve data (public roads) H and floodplains !/ ' ' centerline radius on all proposed p p 0 ~ stream buffers phi ne ""'�1 location and size of / !/ streets permanent features such as parcels 0 v dedicated for b c use , u li p buildings, cemeteries, historic (D w recreational use or reserved in / landmarks .� 0 common, with purpose noted _j,L adjoining lot layout names of impervious surface data (if located adjoining property owners. if � LW in water supply watershed) subdivided, subdivision plat name, � vicinity map showing general plat book & page number, and 0 E 0) ,/location of subdivision with streets % perimeter lot numbers. N p 0 and roads identified by State road V , location and size of lots of v / number and name restricted development potential v landscaping and buffer and notation on plot regarding m 0 U N requirements ./ L;/ same stomnwater detention /or township, corporate and extra- and territorial planning jurisdiction lines retention sites and undisturbed which cross the property areas for infiltration purposes (if located in water supply watershed) C. OTHER SUBMITTAL REQUIREMENTS 1. Twenty -five (25) copies of the preliminary plat. 2. One full size copy of an Orange County Tax map (with tax parcels involved clearly marked in pencil). 3. Where municipal or OWASA sewer is not available, a copy of the Preliminary Plat indicating Health Department soils analysis approval /denial for each lot shown thereon. 4. Where s private road is proposed a written statement by the applicant or his /her authorized representative which sets forth the justification for a private road (see Section IV- 6-3-d -1 of the Orange County Subdivision Regulations). 5. P uxiliary documents, in draft form, prepared in accordance with Section •Vt of. this Ordinance which assure complation'and /or maintenance of improvements required by this Ordinance. Such documents may include, but not be limited to, a private road maintenance agreement, and articles of incorporation and restrictive covenants pertaining to a homeowner's association. These documents may be required as necessary as evidence that the ordinance requirements are being met. 6. Fee - $350.00 plus $6.00 per lot (1 fee for preliminary and final plat). 7. If the subdivision contains 10 lots or more the following information shall be submitted with the application: a. _ Number of years to buildout. b. Number of houses to be built during each year to buildout. C. Average price of houses including lots for each year to buildout. 1, the applicant, hereby certifyAnt the foregoing application is complete and accurate. DA' RE OWNER'S SIGNATURE DATE FEES: Amount PS10- Date Paid ��'- Receipt a D 7 8 PRIVATE ROAD JUSTIFICATION for Carl and Teresa Chambers Tax Map #2.33..25 PIN #9858 -72 -4859 1. This Private Road. Justification is for the 60 foot proposed private drive located in the proposed subdivision for Carl and Teresa Chambers located on the north side of Carr Store Road (SR 1352), addresses the criteria on pages 30a and 30b of the Orange County Subdivision Regulations (revised October 16, 1990). 2. The private drive (Pore Drive) will be built to Class A standards according to Orange County Subdivision Regulations. This private road will be serving the proposed 8 lots. A perpetual Road Maintenance Agreement will be submitted with the final map and recorded at the Orange County Register of Deeds office upon final approval by the County Attorney. Also upon final approval, a road sign will be installed. 3. The design of this subdivision preserves the rural character by doubling the minimum lot size. Also, each lot in this subdivision will have setbacks greater than required (50 foot front, 30 foot size and -rear). 4. This property is wooded with mature hardwoods, pines and small hardwoods. There will be restrictive covenants prohibiting clear cutting of any lot. 5. Due to the length of the proposed private drive (Pore Drive) and the low density of this subdivision, Pore Drive would not be accepted by the North Carolina Department of Transportation for maintenance. 6. This subdivision is designed by the Flexible Development standards (conservation option). The current design has preserved 9.35 acres (49 %) of the total area of this tract in a conservation easement to protect wildlife corridors and mature hardwoods. 7. This property is located in the Upper Eno watershed; therefore, a private road with lot sizes doubled will decrease the amount of impervious surface and minimize the amount of storm water runoff. 8. Restrictive covenants will be put on record prohibiting any further subdividing of this Property E OLIN p WEST t ftAo FM co 1347 ,� dC Grove ---- ° ` CARL 8t TERESA CHAMBERS MAJOR SUBDIVISION PRELIMINARY PLAN - -- SITE LOCATION 1.1 = 4000' f 1 N sa >ii /rairiiij�/ r 6.9305 CARL 8Z TERESA CHAMBERS MAIOR SUBDIVISION PRELIMINARY 00 11 ORANGE COUNTIt . LANNING BOARD MINUTES 12,3197 Cameron reported that there was a presentation by the State Historic Preservation Office defining and describing the National Register of Historic Places and how an application is reviewed and ..accepted. Goals were discussed and they decided to once again study the preservation of the St. Mary's Road corridor. d. Ordinance Review Committee Nor meeting. e. Shaping Orange County's Future Allison reported that the six subcommittees continue to meet, identifying issues and formulating goals. The first draft report is due to the Board of Commissioners in March. He noted that he attended meetings for two of the committes, Economy and Tmnsportation/Inftastructure and Services Committee. The Economy Group is working on issues such as creating jobs, and other things relevant to the economy. The Transportation/ Infrastructure Committee split into two groups. The group working on infrastructure will concentrate primarily on sewage disposal and related issues and work on services later. The next scheduled meeting -for the Transportation Committee is December 9. Allison continued to urge citizen participation on the committees. They would lice to have as much citizen input as possible to be sure that all issues are covered. AGENDA ITEM ft SUBDIVISION APPLICATIONS a. Concept Plans (1) Property of Carl dt Teresa Chambers (8 Lots - Cedar Grove) Presentation by Emily Cameron. The property is located in Cedar Grove Township north of Carr Store Road (SR 1126) between NC Highway 86 and Compton Road (SR 1353) and adjacent to the East Fork of the Eno River as shown on the vicinity map. The current zoning is Agricultural Residential (AR), Upper Eno Critical Area and Protected Watershed. The total acreage of the tract is 19 acres. Most of the northern half of the site is a broad, flat ridge top. The rest of the site slopes gently toward the river to the west and to the south where drainage ways join to form an . Intermittent stream flowing to the river. The stream is not indicated on the USGS topographic map and does not require a stream buffer. Except for the soils along the drainage ways, the remainder of the site is generally well drained and suable for septic systems. The property is entirely wooded. The majority of tree cover consists of mature hardwoods. Approximately twenty percent of the site is in early succession as a former field returns to forest. Two large specimen twin trees are indicated on the Concept Plan site analysis. Following the site visit, the proposed road location was adjusted to preserve what are probably the largest uves on the property. 12 The applicants have submitted a Concept Plan for subdividing the property into eight (8) new residential lots that average 237 acres in size. one 5. acre lot is proposed in the Upper Eno Critical Area. The lots will have individual wells and septic systems. Access to Carr Store road will be from Pore Drive, a proposed Class A private road to be constructed as an extension of an existing access easement to serve the subdivision. The road will end in a cul de sac. A right -of -way stub out is not recommended because the adjacent land to the north is permanently reserved for flood control purposes. The Concept Plan follows the conservation option of fleadble development as described in the Subdivision Regulations. The proposal includes 935 acres or 49% open space. The open space will be privately owned as part of the lots and will be reserved through a conservation easement or restrictive covenants. The open space protects wooded land on gentle slopes, streams, the adjacent stream buffers, as well as buffers along each lot line and the subdivision boundaries. The applicant's private road justification and the Staffs evaluation are attachments to these minutes on pages / 3 — ! rI . The private road is. justified through larger lots, larger setbacks, location in a protected watershed, and restrictive covenants to protect permanent open space and prohibit further subdivision. The summary of the Neighborhood Information Meeting is an attachment to these minutes on page (f . The Planning Staff recommends approval of the Concept Plan for the Chambers property under the conservation option of flexible development with a Class A private road and two conditions: 1) Access to all lots shall be limited to Pore Drive; and 2) With the Preliminary Plan, submit draft forms of the homeowners association documents, road maintenance agreement, and restrictive covenants and/or a conservation easementwhich contain use and maintenance provisions for the open space. The restrictive covenants or the conservation easement shall designate a third party as an alternate grantee, in the event the homeowners association is eliminated. Katz asked for clarification of what protection of the area means in a conservation plan. Cameron responded.that it will be included in the covenants to what extent the area will be protected. Katz continued, asking If the ordinance has minimum requirements such as no structures. Cameron responded that there would be a limit of clearing or disturbance of open space and only 506A of the conservation area could be used for septic .systems.. Other sections of the ordinance provide for protection by.stream _ _- buffers and setbacks Selkirk asked about the property to the east Cameron.responded that it is a large tract but is not designated as a wildlife &wklor.in the inventory of natural areas: Selkirk continued asking abonf dweUmgs on fife adjacenF properties. Cameron responded that there were lots created through the minor subdivision process and a Road Maintenance Agreement already 13 exists. Thus, an amendment to the existing agreement will add the proposed lots. Selkirk asked about driveway locations for the existing lots and Cameron indicated those areas on the vicinity map. Barrows asked about the last sentence of condition #2 requiring the ' appointment of a third party in the event the Homeowner's Association. is eliminated. Cameron responded that such a condition had been added to chister and open space plans in order to be sure that it would be permanent and the homeowners could not vote to change that part of the covenants. The Planning Director had indicated that condition should be on all plans. Walters asked what groups or person(s) could be designated as third parties. Cameron responded that there are other entities that would qualify such as Triangle Land Conservancy or The Nature Conservancy. There are not really a lot of options at this time. Strayhorn asked for clarification about a maintenance agreement on open space on an individual lot. Cameron responded that she felt maintenance also means adhering to whatever standards have been set in the covenants and as conditions of subdivision approval. References could be made to clearing storm damage. Also, improvements could be a part of the open space. Stmyhorn continued that his concern was with the wording when it applies to an individual lot; the wording was probably suitable for common open space. Price asked about the private road Cameron responded that was an existing easement that was acquired with the previous minor subdivision and there is a road maintenance agreement on file already. However, the road has not been constructed since there were only two lots. It will be constructed to Class A standards within the easement. Price continued expressing concern with the two acre tract to the east. Cameron responded that property should already be a party to the road maintenance agreement since that lot was created by the minor subdivision. Barrows asked if the concerns expressed at the Neighborhood Information Meeting have been adequately addressed and Cameron indicated then was a good discussion with questions regarding drainage and she felt all-of the concerns have been addressed. MOTION: Allison moved approval as recommended by the Planning Staff. Seconded by Strayhorn. VOTE: Unanimous. (2) Woodgmet Subdivision .. ... (27 Loa - Cheeks Township) Cameron distributed letters that have been received since agenda materials were distributed. The property is located in Cheeks Township at the southern intersection of Moorefields Road (SR 1135) and Dimmocks Mill Road (SR 1134) on the 14 DRAFT ability to provide service. Lincoln responded that responses from those agencies will be included in the Preliminary Plan materials. Strayhorn indicated that he felt this plan was better than a conventional subdivision plan; the road is the main issue and DOT could be asked to revisit the site and provide more information to the Planning Staff. McAdams stated that the applicant has met the criteria for a private road and he also felt there would be some loss of lots due to the suitability of soils for septic systems. It was determined that condition #I regarding public roads should be deleted. McAdams noted that if DOT did not see fit to realign the road then the Planning Board, as a safety measure, could require turn lanes. MOTION: Katz moved denial of the concept plan noting the dangers and that with the traffic increase it would only become worse. Motion died for lack of second. MOTION: Allison moved approval as recommended by the Planning Staff deleting condition #1 requiring public roads adding the condition that NCDOT be contacted for more information regarding alignment of the road. Seconded by Strayhorn. VOTE: 6 in favor. 1 opposed (Katz - reasons already stated). Strayhorn stated that this proposed development is probably only the first of many to come. If this is not the type of development desired, then, the community needs to get active to try and change what is allowed in order to avoid such situations in the future. Andrews also commented that the location is some distance from area schools and expressed concern that several school buses would be required to serve this subdivision once it is built out. Barrows reminded citizens that Township Advisory Council meetings are the best way to get concerns regarding development to the Planning Board and on to the Commissioners. She encouraged them to attend TAC meetings and express their concerns. b. Preliminary Plans 0 (1) Carl & Teresa Chambers (8 Lots - Cedar Grove Township) Presentation by Jim Hinkley. The proposed eight -lot Chambers major subdivision is located in Cedar Grove Township (Tax Map No. 2.33..2J) on the north side of Carr Store Road (SR 1352) between NC 86 and the intersections of Compton Road (SR 1353) and Eno Cemetery Road (SR 1383). { K�/ The area is designated as Agricultural Residential in the adopted Land Use Element of the Comprehensive Plan, and accordingly is zoned AR(U -ENO- PW)-- Agricultural Residential (Upper Eno Protected Watershed). An exception to this zoning is found in the southernmost 2.5 acres of Lot 1 on the south side of the proposed subdivision where the designation is AR(U- ENO-CA) Agricultural Residential (Upper Eno Critical Area). Surrounding land uses are wooded and single family residential. Adjoining parcels are zoned AR The proposed subdivision encompasses 19 acres. It consists of seven two- acre lots and a five -acre lot located partially in the Upper Eno Critical Area. Lot sizes average 2.37a. The subdivision would be accessed from the north side of Carr Store Road via existing Pore Road (private) —a Class A cul de sac to be constructed as an extension of an existing access easement which the developers propose to change the name from Pore Road to Chambers Court. The Class A designation is justified because there are large lots and wider setbacks, and the proposed development is located in a protected watershed. Moreover, covenants will protect permanent open space and prohibit further subdivision. No stubout is recommended for the proposed subdivision because lands to the north are reserved permanently for flood .control purposes, and lands to the west lie within the 100 -year floodplain along the East Fork Eno River. Following the flexible development option as offered in Section IV -B -10 of the Subdivision Regulations, the Concept Plan was approved by the Planning Board on December 3, 1997. The proposal includes 9.35 acres or 49% open space which will be privately owned and reserved in the form of conservation easements surrounding identified building areas. The purpose of the easements is to protect woodlands on gentle slopes, streams, and adjacent stream buffers. In addition to these natural buffers along each lot line, easements follow the subdivision boundaries. Planning Staff recommends approval of the Preliminary Plan for the Carl and Teresa Chambers Major Subdivision, with conditions listed in the Resolution of Approval (copy an attachment on pages ) and the recommendation that conservation easements not be included in the 50' front setbacks designated for the development. This suggestion would remove 1.6a of open space making the total 7.75a or 41 %. MOTION: Selkirk moved approval as recommended by the Planning Staff with the conditions listed in the Resolution of Approval and the recommendation regarding conservation easements. Seconded by Andrews. VOTE: Unanimous. (2) Village of the Oaks, Phase V (9 Lots - Bingham Township) Presentation by Jim Hinkley. The applicant proposes a nine -lot major subdivision which is shown as straddling the Orange - Alamance County Line in the northwest quadrant of 15 RESOLUTION OF THE ORANGE COUNTY BOARD OF COMMISSIONERS Date Name of Subdivision Owner /Applicant March 17, 1999 Carl and Teresa Chambers Major Subdivision Carl and Teresa Chambers /X/-- ? _3-99 7 The Board of County Commissioners hereby approves the Carl and Teresa Chambers Subdivision Preliminary Plat, dated November 20, 1998, and subject to fulfillment of requirements specified herein. Before the Final Plat can be recorded: A. Sewage Disposal 1. All lots shall contain adequate septic disposal and repair areas, approved by the Orange County Division of Environmental Health. 2. Disclosure that the septic system location may restrict the size and location of improvements shall be included in a document describing development restrictions to be recorded concurrently with the Final Plat. The document disclosing that information on the tentative location of septic systems is available from the Division of Environmental Health. B. Roads and Access Pore Drive (Chambers Court) shall be constructed to Class A private road standards within a 50 -foot right -of -way. Construction shall be inspected and approved by the Orange County Erosion Control Division. •• A letter of credit or escrow agreement or other security shall be submitted to secure construction of Pore Drive (Chambers Court) to Orange County standards. An estimate of the construction cost must be prepared by a certified/licensed engineer or grading contractor and submitted to the Orange County Planning Department. The financial guarantee must reflect 110 percent of that estimate and be issued by an accredited financial institution licensed to do business in North Carolina. The document describing development restrictions to be recorded with the Final Plat shall state that the financial guarantee will not be released until the road construction has been inspected and approved by Orange County. 2. An erosion control plan for construction of Pore Drive (Chambers Court) shall be submitted by the applicant to the Erosion Control Division for review and approval. 3. A Private Road Maintenance Agreement shall be approved by the County Attorney and recorded with the Final Plat. 2 4. An approved street name sign shall be erected at the intersection of Pore Drive (Chambers Court) and Carr Store Road (SR 1352), as required in Section IV- B- 3 -c -12 Street Name Sims of the Orange County Subdivision Regulations. The applicant shall submit either evidence that the signs are in place or a receipt for purchase of the signs. 5. Access to all eight lots shall be from Pore Drive (Chambers Court). C. Land Use Buffers and Landscaping Landscaping shall be installed or preserved as indicated on the approved landscape plan for the subdivision and must be inspected and approved by the Planning Department. 2. Provisions for protection of existing trees as shown on the approved landscape. plan shall be included in a document describing development restrictions and requirements to be prepared by Planning Staff and recorded concurrently with the Final Plat. D. Drainage Impervious surface data for all eight lots, pursuant to Article 6.23 Extra Requirements for Watershed Protection Overlay Districts of the Zoning Ordinance, shall be included in the development restrictions and requirements document to be prepared by Planning Staff and recorded concurrently with the Final Plat. The southern one -half of Lot 1 of the subdivision is located in the U- ENO -CA Upper Eno Critical Area where impervious surface limitations are six percent. The remainder of Lot 1 and the other seven lots are located in the U- ENO -PW Upper Eno Protected Watershed where impervious surface limitations are twelve percent, as designated in the Land Use Element of the Comprehensive Plan. BMP's (Best Management Practices) cannot be used to satisfy watershed requirements in this subdivision. 2. Drainage easements, as required, shall be located following review and approval of the Erosion Control Plan. Drainage culverts shall be sized and located as required by the Erosion Control Officer. E. Parkland Eight lots are to be created in the proposed subdivision. As per the decision of the Department of Recreation and Parks, cash in the amount of $3,376 ($422 per lot) shall be paid to Orange County as payment -in -lieu of parkland dedication. The proposed subdivision is located within the service area of the Cedar Grove Community Park. F. Miscellaneous The Final Plat shall contain a title block and vicinity map in accordance with Section V -D -2 Title Block and V -D -3 Vicinityy ap of the Subdivision Regulations. Minimum building setbacks and conservation easements shall be stated on the plat and in a document describing development restrictions and requirements to be prepared by Planning Staff and recorded concurrently with the Final Plat. G. Certifications 3 A Certificate of Survey and Accuracy signed by a registered Land Surveyor shall be notarized on the face of the Final Plat. A Dedication and Maintenance Certificate, as provided in Section V -D -6 -b Certificates of Dedication and Maintenance of the Subdivision Regulations, signed by the landowner and developer, shall be on the face of the plat and included in a document describing development restrictions to be recorded concurrently with the Final Plat. 3. A Certificate of Approval shall be signed by the Planning Department. Cart Chambers Beverly . Blythe Clerk to the Board of County Commissioner; ITeresa Chambers We, Carl and Teresa Chambers, accept the above listed conditions of subdivision approval and acknowledge that each must be met prior to recordation of the final plat. Carl Chambers T resa Chambers 12 • Ur-) Date 17-le- —0 o Date