HomeMy WebLinkAboutAgenda - 04-06-1999 - 9d4 ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: Apri16, 1999 Action Agenda Item # ~~ SUBJECT: Report on Chatham County's request to access its Jordan Lake water allocation through OWASA's Jordan Lake property and approved intake location DEPARTMENT: County Manager ATTACHMENT(S): (under separate cover) Draft County Letter Carrboro Letter Chapel Hill resolution OWASA Letter & attachments PURPOSE: PUBLIC HEARING: Yes No BUDGET AMENDMENT: Yes No INFORMATION CONTACT: County Engineer Extension 2303 TELEPHONE NUMBERS: Hillsborough - 732-8181 Durham - 688-7331 Mebane - 227-2031 Chapel Hill - 967-9251/968-4501 To present to the BOCC: a) a report on Chatham County's request to access its Jordan Lake water supply allocation through OWASA's Jordan Lake property and approved water supply intake site as well as responses from the Towns of Chapel Hill and Carrboro to OWASA relative to that request; and b) for the Board's review, revision and approval, a draft letter from the BOCC to OWASA outlining the County's response to the Chatham request. BACKGROUND: On October 1, 1998, elected and appointed officials and staff from Carrboro, Chapel Hill, Hillsborough, Orange County and OWASA met with elected officials from Chatham County at the OWASA offices in Carrboro to discuss utility, planning and watershed protection issues of concern to all. The primary issue discussed was Chatham County's inability to obtain a sufficient supply of raw water from Jordan Lake through the existing intake structure, pumping system and raw water mains on the east side of the lake (controlled by Cary and Apex). Margaret Pollard, Chair of the Chatham BOCC indicated that it was unlikely that the equipment in the existing intake system could or would be upgraded to meet Chatham's raw water demands. Ms. Pollard also indicated that the most viable solution apparent to Chatham would be for Chatham to withdraw water using the approved intake site on the western side of t - - __-___ -~~ I 4 provide the funding necessary to accomplish the construction and to provide the operation and maintenance costs. Mr. Fransen indicated that his own agency is split as to whether the state should undertake the responsibility for owning and operating the intake/pumping facility. Complicating the process under which the state could and would take responsibility for the western intake are a number of additional concerns and political pressures relative to the entire Jordan Lake allocation and withdrawal process from jurisdictions downstream of Jordan Lake. These jurisdictions are concerned about the assimilative capacity of the Cape Fear (for discharges of treated wastewater) and the effect of Jordan Lake instream flow augmentation releases and allocations on that capacity. It is likely that there will be at least some political level opposition from these jurisdictions and their legislators to anything that would facilitate withdrawals from Jordan Lake (as opposed to allowing the water to be released for instream flow augmentation). In conclusion, there does not appear to be any potential for developing a regional solution to the western Jordan Lake intake/pumping facility issue that would be sufficiently prompt to satisfy Chatham County. It appears that Chatham options will include: a) depending on the state to convince Cary and Apex to provide more water from their intake/pumping facility; b) negotiating an arrangement with OWASA for constructing anintake/pumping facility; or c) constructing their own intake/pumping facility. RECOMMENDATION: The Administration recommends that the BOCC: 1. Receive and review the attached material including the draft of the letter providing input to OWASA 2. Identify the major issues that the BOCC wishes to address, including any new issues raised in the Engineer's notes 3. Direct staff to revise the letter as necessary to accurately reflect BOCC intentions 4. Direct the staff to bring the revised letter back for BOCC review and approval (at a future meeting) "~ ~~ Apri16, 1999 Mr. Daniel C. VanderMeer, Chair Boazd of Directors Orange Water and Sewer Authority PO Box 366 Carrboro, NC 27510-0366 Dear Mr. VanderMeer: The Orange County Board of Commissioners offers the following comments regarding the local water supply and water quality protection issues discussed at the October 1, 1998 meeting involving Orange and Chatham Counties, the Towns of Carrboro, Chapel Hill and Hillsborough, and OWASA. Cleazly our region's explosive growth makes it imperative that all local jurisdictions work together to protect the quality of all of our natural resources and promote the most environmentally sound usage of those resources. Orange County is located in the upper portions of a number of important and environmentally sensitive water supply river systems. Consequently we aze acutely conscious of the need to be judicious in our efforts to be good stewazds of our available water resources, and of the need to work with the local governmental jurisdictions within and adjacent to Orange County to develop the strategies and accomplish the goals consistent with that stewazdship. In accordance with this philosophy, the Orange County Boazd of Commissioners commends OWASA on its efforts to bring stakeholders in local water supply issues together to discuss issues of mutual concern. Relative to the issues raised at the October 1 ~` meeting, the Boazd of County Commissioners is of course interested in facilitating a solution for Chatham County's water needs. Since there have been additional discussions on this issue since October 1 S`, it would be very helpful for Orange County to receive clarification concerning the options open to Chatham County at the present time, including Chatham County's preferred solution. If an intake on the western side of Jordan Lake is the preferred option, then Orange County would be interested in having discussion with OWASA; state and federal authorities controlling access to and allocation of Jordan Lake water supplies; other local jurisdictions having interest in Jordan Lake's available water supplies; and Chatham County, in consultation Mr. Daniel C. VanderMeer Mazch 16, 1999 page 2 U ~: u :~ u V with the Authority's constituent governments, to explore the use of OWASA's property as a potential intake side to provide access to Jordan Lake water supplies for Chatham County while still ensuring that OWASA's potential access to its Jordan Lake allocation is preserved. The Orange County Boazd of Commissioners is ready to join all existing and potential users of Jordan Lake water supplies in studying, developing and implementing effective watershed and water quality protection strategies. The Orange County Boazd of Commissioners is similarly ready to work with Chatham County to discuss, develop and implement enhanced watershed and water quality protection strategies for University Lake water supplies. If I may provide any additional input or staff assistance, please contact me at your eazliest convenience. I would appreciate your advising the Boazd of County Commissioners when OWASA has ascertained the range of options for meeting Chatham County's water needs, including their preferred option. Sincerely, Alice M. Gordon, Chair Orange County Boazd of Commissioners cc Chatham County Boazd of Commissioners November 30, 1998 TOWN OF CARRBORO NORTH CAROLINA Mr. Dan VanderMeer, Chair OWASA Board of Directors P.O. Box 366 Carrboro, N.C. 27510 Dear Mr. VanderMeer: p ~c~~od~ DEC S 1998 D At the October 1" joint meeting between the local governments and the OWASA Board, it was determined that each local government would discuss a number of issues raised by Margaret Pollard, Chair of the Chatham County Board of Commissioners. It was further determined that each jurisdiction would provide guidance to OWASA Pursuant to that discussion, the Carrboro Board of Aldermen and I have discussed Chatham County's request for cooperation on water-related issues. First, it should be noted that the Carrboro Board of Aldermen is interested in being a good neighbor to our friends in Chatham County. We believe our future is closely connected to theirs and that it is in the best interest of all parties to cooperate whenever and wherever reasonably possible. Second, with regard to the specific issued raised at the October 1` meeting, we provide the following input for your consideration: a) Carrboro does not support the notion of OWASA extracting water from Jordan Lake for consumption by OWASA customers. b) Carrboro could support sharing water with Chatham during emergencies. c) Carrboro supports developing a policy, which would allow Chatham County, access to Jordan Lake water via OWASA'S intake rights. We acknowledge that there are any number of considerations that must be explored to ensure that the interests of all parties are secure. 301 WEST MAIN STREET. CARRBORO. NC 27510 • 19191 942-8541 • FAX 19191 988-7737 • TDD 19191 988.7717 AN EQUAL OPPORTUNITY EMPLOYER Page 2 Mr. VanderMeer November 30, 1998 If you have further questions or need clarification, please don't hesitate to call. Sincerely, ~v~~ Michael Nelson Mayor Cc: Margaret Brown, Chair, Orange County Board of Commissioners Rosemary Waldorf; Mayor, Town of Chapel Hill Horace Johnson, Mayor, Town of I-Tillsborough M~Baret Pollard, Chair, Chatham County Board of Commissioners ~Tohn Link, Orange County Manager Cal Horton, Chapel Hill Town Manager Eric Peterson, I~illsborough Town Manager Bob Morgan, Carrboro Town Manager Ed Kerwin, Executive Director, OWASA Members of the OWASA Board of Directors ~NP4EL h~< t ~~ G t ` n ~~ ~~ oRTy cab°v~~ TOWN OF CHAPEL HILL 3O6 NORTH COLUMBIA STREET • CHAPEL HILL, NORTH CAROLINA 27S 1 C OFFICE OF THE MAYOR February 3, 1999 ,::,. (919) 968-2714 FAX (919) 967-8406 Chairperson Alice Gordon DISTRIQUTED Orange County Commissioners P.O. Box 8181 S^ d/G Hillsborough, North Carolina 27278 /- P~-~. T~.,...e / - T L:N k Dear Chairperson n: ~~~ F- ~~ /L3 D i~ Attached is a copy of a resolution adopted by the Council at its January 29a' meeting. The Council supports Chatham County's use of OWASA owned land to draw water from Jordan Lake, provided such use is compatible with OWASA's long-term plans. The Council also encourages all users and potential users of Jordan Lake water to initiate a study and long-term plan to preserve Jordan Lake's water quality. Please let us know how if you have any questions regarding the Council's position on this item. sincerely, Rosemary I. Waldorf Mayor -~ - - _~-~.~ .. , ._ ... ... . ~, ` t FEB - 5 ~~~ ~, .,, .~,. .., k I, Joyce A. Smith, CMC, Interim Town Clerk of the Town of Chapel Hill, North Carolina, hereby certify that the attached is a true and correct copy of Resolution (99-1-25/R-12) adopted by the Chapel Hill Town Council on January 25,1999. This the 29~' of January, 1999. A RESOLUTION ADVISING OWASA OF THE CHAPEL HILL TOWN COUNCIL'S POLICY GUIDANCE REGARDING CHATHAM COUNTY'S REQUEST TO OWASA TO COOPERATE IN THE USE OF WATER FROM JORDAN LAKE (99-1-25/R-12) WHEREAS, Jordan Lake represents an important future raw water supply option for OWASA and the citizens of Chapel Hill; and WHEREAS, the development of raw and finished water supplies can be an impetus to growth and development of heretofore undeveloped azeas; and WHEREAS, sewer lines in watersheds, high amounts of impervious surface, and many point sources degrade the quality and increase the treatment expenses of our drinking water; and WHEREAS, growth in the University Lake watershed is of concern to the Chapel Hill Town Council and those who drink water from University Lake; and WHEREAS, .the Chapel Hill Town Council believes that the Chatham County Boazd of Commissioners understands their concerns; and WHEREAS, all jurisdictions share an interest in protecting the Jordan Lake water supply watershed; and WHEREAS, the Chatham County Boazd of Commissioners has expressed interest in collaborating with OWASA on developing a water intake system at Jordan Lake; and WHEREAS, OWASA has solicited feedback from its constituent governing boards; and WHEREAS, Chapel Hill Town Council recognizes the potential environmental, technical, and economic benefits of a collaborative project with Chatham County: NOW, THEREFORE, BE IT RESOLVED by the Council of the Town of Chapel Hill that the Council support Chatham County's use of OWASA owned land that may be suitable for the siting of an intake and other facilities necessary to draw water from Jordan Lake, to the extent such use is compatible with OWASA's long-term plans. BE IT FURTHER RESOLVED that the Council invites Chatham County, Carrboro, Orange County and OWASA to join Chapel Hill in encouraging all users and potential users to initiate a study and long-term plan to preserve Jordan Lake's water quality. This the 25`~ day of January, 1999. OWASA ORANGE WATER & SEWER AUTHORITY Quality Service Since 1977 December 18, 1998 Mr. Rick Givens, Chairman Chatham County Boazd of Commissioners P.O. Box 87 Pittsboro, NC 27312 Dr. Alice Gordon, Chair Orange County Board of Commissioners Post Office Box 8181 Hillsborough, NC 27278 Mayor Horace Johnson Town of Hillsborough Post Office Box 429 Hillsborough, NC 27278 Mayor Michael Nelson Town of Carrboro 301 West Main Street Carrboro, NC 27510 Mayor Rosemary Waldorf Town of Chapel Hill 306 North Columbia Street Chapel Hill, NC 27516 r~ ~iII.11~~~~v~r U DEC ~ . l~_3 SUBJECT: Discussion Paper on Jordan Lake Water Supply Options for OWASA Deaz Mr. Givens, Dr. Gordon, Mayor Johnson, Mayor Nelson, and Mayor Waldorf: The OWASA Boazd of Directors has requested me to send the attached discussion paper to all local government participants in the October 1, 1998 "Jordan Lake as a Regional Resource" meeting. We believe that further collaboration between OWASA and Chatham County offers resource management, environmental, and economic benefits that will not be realized if future Jordan Lake water supply decisions are based only on the needs of individual users. However, we request that you offer cleaz and concise policy guidance to OWASA so that we may determine as soon as possible whether to proceed with, or defer, any further consideration of joint efforts with Chatham County in this matter. We look forward to your response and further discussion when we reconvene in Mazch 1999 as agreed at our joint meeting of October 1, 1998. 400 Joncs Ferry Road Equa! Opportunity Emp/over Voice (919) 968-4421 PO BOX 366 Printed on Recycled Paper FAX (919) 968-4464 Carrboro, NC 27510-0366 crwcs: on'asa. or~r Mr. Givens, Dr. Gordon, Mayor Johnson, Mayor Nelson, and Mayor Waldorf December 18, 1998 Page 2 Please feel free to call on OWASA for any additional information or clarification that you may need in the meantime. Sincerely, V ~ii~i~, ;Lt~L `iu;~ Dan C. VanderMeer Chairman DCV/jr Enclosure c: OWASA Boazd of Directors Mr. Tom Fransen, Chief, Water Allocation Section, NC Division of Water Resources Mr. John Moms, Director, NC Division of Water Resources Mr. Charlie Horne, Chatham County Manager Mr. Cal Horton, Chapel Hill Town Manager Mr. John Link, Orange County Manager Mr. Robert Morgan, Carrboro Town Manager Mr. Eric Peterson, Hillsborough Town Manager Ed Kerwin, OWASA Executive Director OWASA ORANGE WATER & SEWER AUTHORITY Quality Service Since 1977 Discussion Paper Jordan Lake Options for OWASA December 18,1998 What's the purpose of this discussion paper? This paper provides follow up information to the "Jordan Lake as a Regional Water Source" meeting among officials of Carrboro, Chapel Hill, Chatham County, Hillsborough, Orange County, and Orange Water and Sewer Authority held on October 1, 1998. The OWASA Boazd of Directors discussed this information at their December 10, 1998 meeting with the intent that this discussion paper would support discussions of individual elected boards as they work with Chatham County on matters of mutual interest, including collaborations or possible cooperation between OWASA and Chatham County on development of water resources. What happened at the October 1,1998 joint meeting? A representative of the North Cazolina Department of Environment and Natural Resources provided an informational presentation about Jordan Lake, the allocation process, its value as a regional resource, and the expectation that only one water intake site will be developed on the western side of Jordan Lake. Representatives from each of the local entities briefly described their respective long and short term interests in Jordan Lake. The central question of the meeting was posed by Chatham County: "Is there interest in OWASA working with Chatham County to develop an intake, even if Chatham needs it earlier than OWASA would otherwise?" The meeting participants agreed to discuss this question and related issues within their individual boazds and reconvene as a large group during the first week in March 1999. A date and location have not yet been specified (Attachment 1). What are OWASA's long and short term interests in Jordan Lake? Jordan Lake represents an important future raw water supply option for OWASA. Existing sources at University Lake, Cane Creek, and the Stone Quarry Reservoir, as well as the potential benefit of an expanded Stone .Quarry Reservoir, can not sustain the community's needs indefinitely. OWASA is committed to maintaining a viable and reliable range of future options. More detailed information on the extent and timing of future water needs is currently being developed through OWASA's Comprehensive Water and Sewer Master Plan project. Preliminary water supply and demand data will be available by the spring of 1999. 400 ]ones Ferry Road Equa! Opportunity Emp/oyer Voice (919) 968-442 I PO Box 366 Printed on Recycled Paper FAX (919) 968-4464 Carrboro, NC 27510-0366 irwn:oHasa.or~ Discussion Paper -- Jordan Lake Options for OWASA December 18, 1998 Page 2 What stake does OWASA already have in Jordan Lake? Since 1988, OWASA has held a Level II (long term) allocation of 10 percent of Jordan Lake's water supply storage capacity. This is expected to support an average withdrawal of 10 milliott gallons per day (mgd). OWASA makes an annual payment of approximately $19,000 to the N.C. Department of Environment and Natural Resources for this allocation. Additionally, OWASA owns 125 acres of land adjacent to U.S. Army Corps of Engineers property on the western side of Jordan Lake, south of Highway 64 (Attachment 2). OWASA purchased 88 acres in 1989 and 37 acres in 1995 for a total cost of $550,000. The Corps' amended Jordan Lake Master Plan designates an offshore intake site adjacent to this azea, per recommendations of an engineering study conducted for OWASA in 1991 at a cost of $35,000. It is important to note that no regulatory action has been taken to grant OWASA or any other entity the right to use this site for water withdrawal purposes. OWASA currently has a $60,000 contract with NCDOT to install a casement under U.S. 64 in the vicinity of Mt. Gilead Church Road as part of the U.S. 64 improvement project. This will allow the installation of a future water transmission line without the major expense of boring or tunneling under the highway. Similar arrangements aze planned as NCDOT improves Highway 15-501. What do we know about Jordan Lake's water quality? Data available from the past 10 years indicate that water quality in Jordan Lake is good and neazly indistinguishable in quality from other Triangle area water supply reservoirs, except in the northernmost section upstream of S.R.1008, where it is highly enriched with nutrients. Comprehensive watershed/water quality studies exist for other important reservoirs in the Triangle region, but no such study has been conducted for Jordan Lake. Consequently, there is no credible technical basis for estimating the water quality impacts of development projects or other activities proposed near Jordan Lake or in the watershed. Since 1988, OWASA has participated in the Triangle Area Water Supply Monitoring Program, which has several sampling sites in Jordan Lake and expects to contribute funds and staff support to the Jordan Lake watershed study proposed by the Triangle J Council of Governments. Additionally, OWASA plans to participate in special efforts to develop and calibrate a nutrient response model in order to determine whether nitrogen removal is warranted at wastewater treatment plants upstream of Jordan Lake. What facilities would OWASA need to withdraw water from Jordan Lake? Three basic systems would be needed to withdraw water from Jordan Lake and treat it at the OWASA's Jones Ferry Road Water Treatment Plant (WTP) in Carrboro: (1) intake system, (2) two pumping stations, and (3) a transmission pipeline. Intake facilities would be located to provide water in sufficient quantities, even during low lake levels. The intake must draw from multiple levels in the lake in order to obtain the highest quality water at any given time. Discussion Paper -- Jordan Lake Options for OWASA December 18, 1998 Page 3 The intake structure could be located either onshore or offshore. An onshore structure would be served by multiple underground pipes extending into the lake at different depths below the water surface (Attachment 3). An offshore structure located in the lake would employ multiple intake gates at different depths providing water back to shore through a single pipeline (Attachment 4). The preferred intake configuration would be determined through additional engineering analysis. A pumping station is needed to transport water from the intake system through approximately 15 miles of transmission pipeline to OWASA's WTP. An additional booster pump station would be needed to overcome friction losses and elevation changes between Jordan Lake and Carrboro. A potential pipeline route is shown in Attachment 5. How much will these facilities cost? The cost figures provided are very preliminary and represent rough estimates only. Facilities Cost Assumptions Water Intake System $2.0 million 50 mgd intake structure with 1,000 feet of piping Pumping Stations $5.9 million 50 mgd pumping station structure with 10 mgd of installed capacity and a 10 mgd booster pumping station Transmission Pipeline $18.6 million 80,000 feet of 36 inch pipeline Total $26.5 million What options are available to OWASA and Chatham County for collaborating on the withdrawal and transmission of water from Jordan Lake? What are their advantages and disadvantages? There appear to be five basic options available for collaboration, but substantially more engineering work will be needed to identify and develop the list of possible options: Do not collaborate on any facility development at this time, but allow OWASA's property to be used by Chatham County or others. 2. Collaborate on a joint intake system only. 3. Collaborate on an intake system and make a portion of OWASA's Jordan Lake property available for Chatham County to use in pumping raw water to its own treatment plant. 4. Collaborate on an intake system and pumping station at the lake. 5. Collaborate on an intake system, pumping station at the lake, and portions of the transmission pipeline. Discussion Paper -- Jordan Lake Options for OWASA December 18, 1998 Page 4 The U.S. Army Corps of Engineers and the N.C. Department of Environment and Natural Resources have expressed the strong desire to have only one intake system located on the west side of Jordan Lake. Limiting construction to one facility would minimize environmental and community disruptions and provide substantial economies of scale. The only known disadvantage to OWASA in proceeding with a joint intake system would be the expenditure of capital funds in advance of OWASA's actual need for the facility. Depending on the scale, cost, and financing method for project, it is possible that present value costs to OWASA should be lower under this near term collaborative scenario than if OWASA deferred its investment to the future. Cooperation on a joint pumping and transmission system would provide many of the same benefits noted above, but because these facilities must be cazefully tailored to the specific needs of each user, they aze less accurately estimated in advance than the more generic requirements for an intake system. OWASA would incur significant additional expenses before such facilities were needed if it participated with Chatham County in a joint project to provide pumping and transmission facilities in addition to an intake system. If OWASA and Chatham County cooperate on a joint intake system, OWASA believes that it could make a portion of its Jordan Lake property available for Chatham County to use in pumping raw water to its treatment plant. What other utilities might share a cooperative interest in a regional intake system? Orange County, Durham, and possibly Greensboro might have a future interest in Jordan Lake water. Cary and Apex might be interested in supporting an intake structure on the western side of Jordan Lake with sufficient capacity to supply their own needs during an emergency or shutdown of their existing intake on the eastern side of the lake. These possibilities and others will be evaluated through OWASA's Comprehensive Water and Sewer Master Plan Project now underway. Are there any other collaborative opportunities to consider? There can be substantial local and regional benefits if OWASA, Chatham County, and others participate in a Jordan Lake watershed study. Other regional benefits beyond OWASA's purview might be facilitated through OWASA's participation with Chatham County on an intake system. As mentioned on previous occasions, it would be highly desirable to OWASA and its customers if the zoning and development requirements in Chatham County's portion of the University Lake watershed were consistent with rules in place in Orange County's and Carrboro's jurisdictions. At some time in the future OWASA will require Chatham County's approval to construct the infrastructure needed to transmit water from Jordan Lake to OWASA's facilities in Orange County. Discussion Paper -- Jordan Lake Options for OWASA December 18, 1998 Page 5 OWASA and Chatham County have agreed to establish an emergency only finished water interconnection along U.S. 15-501 at the Orange County line. Chatham has already invested $120,000 to extend its 16- inch pipeline to the OWASA system. This emergency only interconnection will provide long-term benefit to both parties. What is OWASA's recommendation? OWASA believes there would be substantial environmental, technical, and economic benefits from collaborating with Chatham County to develop a regional raw water intake system at Jordan Lake, even though OWASA is not expected to need Jordan Lake water for at least ten years (this estimate is currently being refined through OWASA's Comprehensive Water and Sewer Master Plan project). OWASA does not propose participating in the joint development of pumping and transmission facilities from Jordan Lake to OWASA at this time due to the high costs and relative absence of short term need. There may be an opportunity to make a portion of OWASA's Jordan Lake property available for Chatham County to use in pumping raw water to its own treatment plant. Additional engineering analysis is needed to more fully evaluate these opportunities. The OWASA Boazd of Directors believes that it is highly desirable that the March 1999 follow-up meeting with local governments and the OWASA Boazd be scheduled as suggested during the October 1, 1998 Joint Meeting. Given the range of collaborative arrangements that presently exist or aze possible for the future, it would be beneficial for all parties to establish and reinforce a strong constructive partnership with Chatham County at the eazliest opportunity. Whatever the outcome of future meetings of Chatham County officials with their counterparts from Orange County, OWASA staff should maintain close communications with Chatham County engineering personnel to monitor the development of the Chatham water supply and distribution system and to identify opportunities for technical cooperation. Dan C. VanderMeer Chairman ATTACHMENT 1 Notes from Joint Meeting between Carrboro, Chapel Hill, Chatham County, Hillsborough, Orange County, and OWASA Topic: Jordan Lake as a Regional Water Source October 1, 1998 Ground Rules (Meeting Facilitator Peg_Carlson, Institute of Government) • Pocus on interests, not positions • Stay focused • Tesi assumptions • Make statements and invite questions Presentation By Tom Fransen, North Carolina Department Of Environmental And Natural Resources, Division Of Water Resources What Are Your Short- And Long-'T'erm Interests In Jordan Lake C/crane! Hil! Interested in protecting water quality and preserving OWASA's access and allocation. No immediate need, but want to keep Jordan Lake as a future resource. Hillsborou~/r Want OWASA to keep options open in case we need water in the future (long-term, not short- term). Clrat/ram County We have both immediate and long-term interests to meet our growing needs. We see cunrcrtt intake as a possibility and would like to use the OWASA intake location soon, if possible. We are at maximum capacity some days now, we want to create a partnership around this regional resource. Carrboro_ We have no short-term water needs and may not have long-term needs. We are interested in cooperating with Chatham County to meet emergency needs. Orar:~e County [nterested in maintaining high water quality and working with others to accomplish this. We have maintained our allocation and are interested in protecting this allocation and making efficient use of the intake. OWASA Long-term interest in maintaining 10 MGD allocation and access to the land we own at Jordan Lake. We support the watershed study and are open to collaborating with neighboring utility providers, subject to local policy goals. We are interested in maintaining water quality as well. S?uestion Posed By Chatham County • Is there interest in OWASA working with Chatham County to develop an intake, even if Chatham needs it earlier than OWASA would otherwise? Questions Raised By Participants • What is the level of participation needed by the various governmental entities (e.g., amount of capital required, short-term vs. long-term costs of developing intake at this time)? • What is driving Chatham County's need (e.g., amount of development)? • Under what conditions might Chatham share/use OWASA's intake location? What are the options? • Dces Chatham have an interest in working with Orange County governments to maintain a rural buffer in southern Orange/northern Chatham area? • Is Jordan Lake indeed considered a regional water supply? Is Chatham included in the region? • Who should be involved in this discussion (i.e., governing boards' role vs. OWASA's role)? • Can we develop a clear sense of each jurisdictions directinterests in Chatham's use of.focdan lake? • In the long term, wilt Orange County entities need to take water from Jordan Lake? • What wilt OWASA's master plan indicate about its timing for the need of Jordan Lake's water? • What forum should this issue come back to? Are participating entities willing to have a conversation with their entice boards and then come back together to discuss? • If Chatham County can act on its own, what is its incentive to cooperate on land use, etc.? The Pariiciuatints Orange County Entities Agreed To Have A Conversation With Their Entire Boards And Then Come Back Together To Discuss Chatham-County's Use Of The OWASA Intake Site On Jordan Lake. TheX Identified Several Pieces Of Information That They Needed Before Thy Would Have This Board Discussion: I. Information from OWASA on projected water use, options £x (and cost of) developing intake site 2. Information from Chatham County regarding water needs 3. Exchange of land use plans and utility line plans between Orange and Chatham counties 4. Engineering information on the possibility of building an intake she that could be expanded later 5. (Possibly) Chatham's estimate of the value of the property lost to Jordan Lake Target date for boards to meet again to discuss interest in participating in cooperative dialogue with Chatham County: first week in March 1999 (specific date to be determined)_ Prepared by Peg Carlson. O GQ O /~ 0 b Z .LN~I WH~~'.L.i,d ___. ~__ ~v' ~. O~ vt'~ ~d `gyp,, 1~9 ~ ~~ s~ o ~~ ~z o ~z _ S 3 M N ~. 250 240 230 J ~ 220 C O .~ n~ w 210 200 190 1ao Distance from Survey Baseline Flood Pool 240.0 Normal Pool 216.0 Low Pool 202.0 Note: Groundline information furnished from a lield survey by Watkins and Associates, Fuquay•Varina, Nonh Carolina Onshore Intake An2e992.~o ae~iz.a 9nan y n x Z H W 0 100 .200 300 400 250 240 230 220 c 0 c~ m w 210 200 190 180 Note; Groundline information furnished from afield survey by WatWns and Associates, Fuquay~Varina, North Carolina or Flood Pool 240.0 Normal Pool 216.0 Low Pool 202.0 Oiishore intake C~ C' z .~- AT128992.A0 devised 9/2/91 Mll 0 100 200 300 400 Distance from Survey Baseline ATTACHMENT 5 f e //{~~cj: CARR ZO~- v ~, \ I~11 l ,s~~ 19`7 ,0 4 E ate . ~ \\ f s 9 tr'o 1S.o ~, U ryE~/ r t Plant o cy~o,~q 't'c ~ly F c.arE // U ,a °' J° °01 RAPE ~ ~. q ~ , ~ v rvJV Iv J ~`rt- rssd ~s~ .,, ,a ~ 'J~,, ooG oo ~rr 0 ~ s o i o o , °o 5 ~ 15~ `,~ ^• ISJI J/ 1~ ~ `9`5 .~ ~1 . _Lfs_•• 70 c~~ . ~ 2:1 w .n a Approximate Scale 1 "=27 miles '~. Station n' _ eases •c~EE ~.~ J 'Y -Raw Water Transmiss(on r , r--, :,,~ SF ~ - ° OP E _. ~ t~ INS ~OWASA `! ";' Property h,~~e- w o~ ?/~~.~ n ~. (/f /~ C'~fF,~ ... ~~ ~5 ` . 3 /„~. ~~ ~~ Water Transmission Route ~- ~'' E R RSV f V ~ ~~ . + ~~ jam, `~~ ,~ r~~