Loading...
HomeMy WebLinkAboutAgenda 04-20-1999 - 8bORANGE COUNTY BOARD OF COMMISSIONERS Action Agenda Item No. 8 -b ACTION AGENDA ITEM ABSTRACT Meeting Date: Apri120, 1999 SUBJECT: Housing Rehabilatation Contract Award DEPARTMENT: Housing/Community Development PUBLIC HEARING: (Y/N) .. ATTACHMENT(S): INFORMATION CONTACT: Bid Results Tara L. Fikes Work Specifications TELEPHONE NUMBERS: - -eat. 2490 Hillsborough 732-8181 Chapel Hill 968-4501 Durham 688-7331 Mebane 227-2031 PURPOSE: To award one housing rehabilitation contract for the HOME Housing Rehabilitation Program BACKGROUND: The Housing and Community Development Department solicited bids from qualified housing rehabilitation contractors participating in the County's Housing Rehabilitation Program. Sealed bids were solicited from participating contractors on April 8, 1999. The informal bidding process is governed by the North Carolina General Statues §143-131 and does not require a minimum number of bids. Bid results are attached. Present program procedures provide that housing rehabilitation contracts be awarded to the lowest responsible bidder. FINANCIAL IMPACT: Total funding provided by the HOME Investment Partnership Program. RECOMMENDATON(S): The Manager recommends awarding the following housing rehabilitation contract: Dwelling Unit Bid Amount Contractor Page - 107 Eugene St., Carrboro $39,480 CFW Construction Co., Inc. RESULTS OF BID OPENING OWNER: Page APPLICATION NUMBER: ADDRESS: 107 Eugene Street COST ESTIMATE: $34,640 Carrboro, NC PERCENTAGE OF BID OVER CHECK ONE: JOB BID x COMPANY 1. CFW Construction Co. 2. Diamond Builders 3. 4. 5. 6. $39, 480 $47,315 2 BID OPENED BY: Jim Axelrod TIME OF BID OPENING: 1:00 PM DATE OF BID OPENING: April 8, 1999 WITNESSED BY: Donna Galloway ***********~****,t************************************************* Lowest Acceptable Bid: $39,480 Negotiated Amount: Contractor: CFW Construction Company NAt~ P.O. Box 27466, Raleigh, NC 27611-7466 ADDRESS (919)834-6087 TELEPHONE N[JN~ER COMN~NTS: Submitted by: Bid Approval Date _ Proceed Order Issued Tara L. Fikes Date 04-08-99 13$ UNDER COST ESTIMATE JOB NEGOTIATED BID AMOUNT r 3 ORANGE COUNTY HOUSING REHABII.ITATION PROGRAM SPECIFICATIONS FOR 107 Eugene Street FOR CERALUINE PAIGE PHONE: DATE: 3/3/9 BY: JIM AXLLROD REHAB SPECTAI.IST NOTE TO C NTRACTOR CONTRACTOR SHOULD REFER TO T'HE BASIC SPECIFICATIONS, PROPERTY REHABILITATION STANDARDS, GENERAL CONDITIONS, NORTH CAROLINA BUILDING CODES MATt(JAL, AND ORANGE COUNTY I~DI~JIM'(TM HO[75ING CODE DOCU~ITS. iT IS NOT THE IlQTII~TT OF THE WRITER TO DIRECT ANY CONTRACTOR 70 A SPECIFIC 5UPPI.IER OF MATERIALS CALLED FOR IN 1'H~3 WORK WRI'T'E-UP ONLY TO SPECIFY A TYPE THAT WOULD BE ACCEPTABLE TO'~ HOMEOWNER AND ORANGE COUNTY HOUSING REHABILITATION PROGRAM. Geraldine Paige 107 Eugene St. Carrbora, NC 3/3/99 EXTERIOR: 1. Pressure wash the gutter siding, soffitt and all trim. 2. Install furring strips on the block walls. Install 3/8 inch stryofoam insulation and vinyl siccing. Install aluminum window and door trim. 3, Install a concrete splashblock under each downspout. INTERIOR: LIVING ROOM: 1. Remove the existing door, storm door, window, paneling, carpet, ceiling file and closet door, base and crown mold. 2. Cover all surfaces Kilt. 3. Install'/. inch sheetrock an the walls. Flat tape the shcctrock to the window tdm. Tape and fiinish the sheetrock smooth. 4. Install ~i inch sheetrock on the ceiling. Tape and findsh the sheetrock smooth. 5. Install a six panel, metal insulated door unit with lockset and deadbolt to be keyedthe same. Install peephole and colonial style trim. Fur jamb as necessary. 6. Install an aluminum clad storm door. Door to have a pneaumatie closure and vinyl sweep. ~• _ . 7. Install colonial style baseboard and casing. 8. Paint the ceiling with ceiling white latex paint, the walls with flat latex and the trim with semigloss latex. Paint to cover 4 i 5 Completely. 9. Install a prEhung door unit and closet locksot o~n the linen closet. 10. Install carpet and pad. Carpet allowance to be $14/yd. 11. Install two vinyl replaccmex~t windows 30 inches wide. 12. Cut and frame an opening fora 32 inch door unit next to the front windows. KTTCFIEN: 1. Remove the paneling, ceiling tile, cabinets, base and crown mold, rear door and storm door. 2. Cover all surfaces completely with Kilt. 3. Install a six panel metal insulated door unit. Install a lockset and deadbolt to be keyed the same. Install a peephole and colonial style casing. 4. Install an aluminum clad storm door. Door to have a pneaumatic closurer and vinyl sweep. 5. Install'/a inch sheetrock on the walls. Flat tape the windows and door. Tape and finish the shcctrock smooth. ~ _ 6. Install '/s inch sheetrock on the ceiling. Tape and fitush the sheetrock smooth. 7. Install woods front, factory finish cabinets to match the existing lineal footage. 8. Paint the ceiling with ceiling white latex, the walls with flat latex paint and the trim with semigloss latex paint. Paint to cover completely. 9. Install colonial style baseboard and casing. 11. Install'/. inch luau plywod on the flaor. Prepare the surface for vinyl. Iiastall vinyl, shoemold and %etal trim. Vinyl allowance to be $14/yd 2 6 ' 12. Clean the windows and storm windows. FRONT BEDROOM: 1. Remove the charred furring strips and replace with likesize lumber 2. Remove the paneling, carpet, baseboard and entrance and closet door 3, Cover all surfaces with Kilz. 4. Install ~a inch styrofoam insulation on the exterior walls. 5. Ynstall one vinyl rcpalcement window and trim. 6. Install th inch sheetrock on the walls and ceiling. Tape and fizush the sheetrock smooth. 7. Remove the existing front window and frame in the opening. 8. Install colonial style baseboard and casing. 9. Install a six panel entrance and closet door .Install a privacy lockset and a closet lockset. 10. Install 1x12 shelf, closet rod and bracket in the closet. 11. Paint the ceiling with ceiling white latex paint. paint the walls with flat latex paint and the trim with semigloss latex paint. Paint to cover completely. 12. Install carpet and-pad. Carpet allowance to be $l.4%yd: ' REAR BEDROOM: 1. Remove the wall and ceiling covering to the furring strips. 3 2. Install ~i inch strofoam insuiativn on the exterior walls. 3. Cover all surfaces with Kilt. 4, Install'h inch sheetrock on the walls and ceiling. Tape and finish the sheetrock smooth. 5. Paint the ceiling with ceiling white Iatex paint, the walls with flat latex paint and the trim with semigloss latex paint. Paint to cover completely. 6. Install a six panel entrance and closet door. Install a privacy lockset and a closet lockset. 7. Install a 1x12 shelf and closet rod in the closet. 8. Install colonial style baseboard 9. Install carpet and pad. Carpet allowance to be $14/yd. 10. Clean the windows and storm windows. BATH: 1. Remove the fixtures, door, wall covering and ceiling covering. 2. Cover all exposed surfaces with Kilz. 3. Install MR sheetrock on the walls and'fz inch sheetrock on the ceiling. Tape and finish the sheetroek smooth. 4. Install colonial style baseboard. 5. Install a si7c panel entrance door and privacy loclcset. 8. Paint the walls and trim semigloss latex and tho ceiling with ceiling white latex. Paint to cover completely. 9. Install 1/4 inch loan plywood on the floor. Prepare the plywood for vinyl. Install roll vinyl floor covering, shoemold and metal trim. 10. Install a five piece accessory kit, to include, tumbler, 4 8 papa holder, soap dish and two towel racks. 11. Clean the window and storm window. PI,ITII~ING: 1. Install a one piece fiberglass tub unit and washerless faucets. Install all necessary waste and supply conueetions. 2. Install a 19 inch wood front vanity and molded marble 'I'op. Install a washerless faucet. Install all necessary waste and supply connections, including p-trap assembly and cutoffs. 3. Install a handicapp commode. Install new cutoff. 4. Install a seven inch, double bowl stainless steel sink im the kitchen. Install a washerlcss faucet, p-trap assembly and cutoffs. 5. Install a frostfree exterior faucet. 6. Install a washing machine box. ELECTRIC: 1. Install a 150 amp service, including new mast and weather fiend. 2. Install GFI outlets in the kitchen and bath. 2. Install an electric smoke detector in the hall and the new addition. ~ ~-- 4. Install washer and dryer outlets. 5. Install new outlets, switches and covers. 7. Install a dryer vent under the floor, extend to the exterior. 8. Install new fixtures in each room and each exterior entrance 9. Remove all damaged wiring and receptacles in the front bedroom and replace . S 9 MECHANICAL: 1. Remove the existing furnace and duct work. 3. Install an 859b or better efficient gas furnace with electronic ignition. Install insulated duct work. Install all necessary electric and mechanical connections. INSUI.ATxON: 1. Install R-30 insulation in the attic. 2. Install R-19 insulation under the floor. 3. Install a 6 mil vapor barrier in the crawl space. ADDITION: Addlrion to be 14x12 Removc dirt as necessary to provide adequate height from the ground to the bottom of the floor joists. Materials to be: Footer 8x8x16 cindcb2ocka termite stueld 2x8 pressure treated sills anchor balls 2x8 pine floor joists and band 'h inch subfloor S/8 inch flniSh _ 2x4 framing 2,vinyl windows, size to match existing windows plywood sheathing 2x8 ceiling joists and rafters 'h inch roof sheathing _ _ 151b felt ZO gear warranty three tab shingles venta ridge ventilation system vinyl siding and soffitt, 3/8 insulation, aluminum, fascia and trim 32 inch, six panel door unit with extended jambs and privacy lockset 'h inch sheetroek for the walls and ceiling c 10 colonial style bascboard carpet and pad (carpet allowance to be $14/yd.) paint the ceilings ceiling white the walls with flat latex and the trim with semigloss latex 13b inch, six panel door unit 1, privacy lockset ~, closet lockset 1x12 shelf, brackct and closet rod fixture, switch and outlets to code ADDITION TOTAL provide a tcrnnite and powder post beetle inspection and treatment. TOTAL :i W J 3