HomeMy WebLinkAboutS Grant - Grant Application for Haw River Access
1. Name of trail project: Old Greensboro Highway Haw River Trail Access Acquisition
NORTH CAROLINA'S
2007 NATIONAL RECREATIONAL TRAILS PROGRAM
GRANT APPLICATION FORM
2. Applicant: Orange County
3. Federal tax identification number: 566000327
4. Organization's Fiscal Year Beginning and Ending Dates: July 1, 2006 -June 30, 2007
5. Individual authorized to receive communications concerning this project:
Name: Lori Taft
Title: Orange County Recreation & Parks Management Director
Address: (Include your 4-digit zip extension)
P.O. Box 8181
Hillsborough, NC 27278-2438
Phone: (Day) (919)245-2673
Fax Number : (919)644-3042
6. County: Orange
Project number 07RTP-
(DPR use only)
Email: ltaft@co.orange.nc.us
7. US Congressional District: Congressional District 4 Congressman David Price
8. NC Legislative Districts: Senate: District 23 Senator Eleanor Kinnaird
House: District 50 Representative Bill Faison
3
• Application Page 1
9. Amount of RTP Funds Requested: $75,000 •
10. -Value of Cash Match and/or In-kind Services: $18,750
Note: Must equal or exceed 25% of the RTP funds requested
11. Complete this sentence in 10 words or less. We will use the RTP awazd for authorized
paddle access to Haw River in Orange County.
12. Check the following phrases that best describes your trail project
X_ New Trail Construction
X Extension of an existing trail
Trail Maintenance or Trail Restoration
Trail Facilities
X Land Acquisition for this Trail Project
13. User Groups allowed to use this trail. (please check all that apply)
X_ Walker/Hikers
Equestrians
Bicyclers
Off-Highway Vehicles
X Canoeists/Kayakers •
X Persons with Disabilities
14. Describe in feet or miles (if any) the amount of trail to be built or maintained:
Develo~ingpaddle access at Old Greensboro Hi~hway will bride the longest existing
stretch of the Haw River Trail without amenities or official access, about 12 miles
spanning three counties.
15. List the facilities (if any) that are to be acquired or built with this grant:
The grant money will be used for purchase of land.
16. Provide acreage and reason you need to acquire land for this trail project:
The 8 19 acre parcel is not onl~currently being used as an unofficial access, but is a high
uriori~ parcel for riparian protection. Current private landowners aze unable to meet the
management demands that the increase of Haw River Trail paddlers are requiring.
17. List any existing facilities (if any) that are currently available to support this new trail or
existing trail project (trail head pazking areas, restrooms, drinking water, etc.):
Improvements to the access upstream at Saxapahaw and downstream at Chicken Bridle
road (the main access points associated with the Old Greensboro accessl are both
improving their facilities creatins a recreational svstem Qan at Old Greensboro access.
Currently at Old Greensboro there is a dirt access road in the DOT right-of-wav.
Application Page 2 - •
5
•
•
18
19.
20
The proposed trail project provides a link in or segment in (check all that apply)
~_ a statewide trail plan (NC's Mountains-to-Sea Trailj
X a regional multi-county trail plan (2 or more counties)
X a joint city-county/county-county/city-city trail plan
X a local River Trail and a Hiking Trail
(example: a local park and a greemvay .)
pazk specific (within boundary of an existing park)
List by title the plan in which your trail is included:
2006 Haw River Trail Memorandum of Understanding including 5 counties and 4
municipalities
The proposed trail project
~ will be managed and maintained by applying agency's regulaz staff with
assistance of volunteers
will be managed and maintained by volunteers
Other:
The trail project will be open to the general public
X seven days a week, during daylight hours
during limited days and hours
by invitation/appointment only
Other:
21. The proposed trail project:
X will not be receiving any support or funding from anon-governmental source.
will be receiving some support or funding from anon-governmental source.
22. Provide information about past RTP grants received including the year grant was
awazded and very brief description of project:
Yeaz: Awazd Amount:
Description:
Yeaz: Awazd Amount: .
Description:
23. Applicant response - If you wish to explain/clarify your response to any of the above
questions, please indicate the question by number and explain briefly:
The Haw River Trail (HRT) has been selected as a section of urimary route for the
Mountains to Sea Trail and has become an important part of a systemic economic
revitalization proiect for the communities involved. Old Greensboro Hiahwav access is the
most important access on the HRT because it takes the `on caner' narinership between
• Application Page 3
~o
Alamance County, Chatham Count and Orange County and makes it a reality. Without
this development, the Saxapahaw access is without atake-out location and the Chicken •
Bride access development is without aput-in upstream, relegating each to only %z of their
recreation potential. Finally, this location is an important acquisition as it brid es the gan
between the land acquisition in Chatham County with projects upstream. Without this
bridge access, successful preservation and recreation projects to the south dead-end at the
count line.
•
Application Page 4 ,
7
NORTH CAROLINA'S 2007 RECREATIONAL TRAILS PROGRAM
APPLICATION SIGNATURE PAGE
"On behalf of the applicant, I hereby certify the information contained in the attached application
is true and correct. I understand this application will be rated on the basis of the information
submitted and the submission of incorrect data or an incomplete application can result in this
application being eliminated from consideration for funding."
"I hereby certify the applicant will comply with all applicable local, state and Federal laws and
regulations."
"I hereby certify the availability of the 20% required share of the total project costs as
represented in this application."
Sign
By
Title
• Attested by
Note: Non-profit organizations applying for RTP funding for a project located on lands
managed by a governmental agency must have the approval of the chief executive officer
of the affected land managing agency. This approval is to be represented by the signature
of the chief executive officer below.
Approved this
day of
By
JOJ'I ~ i s
Title
For the
(Affected Agency)
• Application Page 5
SCHEDULE A
2007 RECREATIONAL TRAII~S PROGRAM
SCOPE OF WORK FORM
Agency/Organization Name: Orange County
List Your Agency/Organization's Fiscal Year: July 1, 2006 -June 30, 2007
Project Title: Old Greensboro Highway Haw River Trail Access Acquisition
Amount of 2007 RTP Funds Requested: $75,000
A. Project Description: Thisproject's goal is to purchase the land currently being used as an
unofficial river access at the Old Greensboro Hi way Bride and improve the currently
dangerous river access methods. This development provides facilities at what is currently
the most important Haw River Trail access and maximizes the potential trail
improvements conducted by the partnering counties and municipalities of Alamance
County, Chatham County, Saxapahaw, Swepsonville, Burlington and Graham
B. Contract Period:
Should your agency or organization be awarded this RTP grant, you will be expected to
complete this project within two years from the date of award of a fiilly executed contract
with the Department of Environment and Natural Resources.
Note: Grantee cannot begin work until a fully executed contract is on file with the
Department of Environment and Natural Resources, Division of Purchase and Services.
C. Estimated Project Cost And Matching Cost Information:
1. Amount of RTP Grant Requested
2. Cash Match
3. In-Kind Match Labor, Services, Land and Materials
4. Total Project Cost
(This amount is the total of lines 1, 2 and 3 and
should at a minimum tota125% or greater of
the amount of the RTP grant award)
Note: This value must equal the value listed for
Total Project Costs in Section D below.
$75,000-
$18,750
$ 93,750
8
•
•
Schedule A -Page 1 of 5 •
• D. PROJECT DELIVERABLES AND VALUE OF CASH MATCH AND IN-KIND
SERVICES
•
•
2007 RECREATIONAL TRAILS PROGRAM SCOPE OF WORK
PROJECT DELIVERABLES
Project Deliverable Amount of Amount of Total Estimated Payment Schedule
Estimated Estimated Cost For Each
Cost To Be Costs To Be Listed
Paid With Paid With Deliverable
RTP Funds Grantee's (Add RTP and
Cash Match Grantee's Cash
Match
Project Deliverable
Information (define quantity
such as in numbers, feet or .
miles
# 1 Project Deliverable: $75,000 $4,250 $79,250 Upon Completion of
Purchase, 8.19 acre parcel Each Listed
for access development and Deliverable
riparian protection
#2 Project Deliverable $6,000 $6,000. Upon Completion of
Surveys, appraisal, closing Each Listed
cost Deliverable
#3 Project Deliverable $1,000 $1,000 Upon Completion of
Signage Each Listed
Deliverable
#4 Project Deliverable Upon Completion of
Each Listed
Deliverable
#5 Project Deliverable Upon Completion of
Each Listed
Deliverable
Project Contingency Fund ~ $7,500 $7,500
Must equal 10% of RTP
funds re uested
Totals Total RTP Total to be Total Cost of
Funds Spent by Deliverables
Grantee
Show Totals on this line $75,000 $18,750 $93,750
Schedule A -Page 2 of 5
i~o
2007 RECREATIONAL TRAILS PROGRAM SCOPE OF WORK
VALUE OF NON CASH - IN-KIND LABOR, SERVICES AND MATERIALS
Value of Non Cash - In-Kind Services
(define the hours or services to be provided) List Value of
Non-Cash -
Inkind Services
in this Column
Value of Land Acquired for this RTP Grant Project
General Labor Valued at $9.00 Per Honr -Provide the
estimated number of volunteer hours to be performed and
describe the work to be accomplished by volunteers on the
project to be funded by this RTP Grant
Trai! Construction and Maintenance Supervision Valued
at 512.00 Per Hour -Provide the estimated number of
volunteer hours of supervision work to be performed and
describe the work to be accomplished. by volunteers on the
project to be funded by this RTP Grant
Excavating and Loading Equipment Operators Valued at
$14.00 Per Hour -Provide the estimated number of volunteer
hours of equipment operator work to be performed and
describe the work to be accomplished by volunteers on the
project to be funded by this RTP Grant
Fair Market Value of Donated Specialized Services, e.g.,
Carpenters and Masons - Provide a list of specialized
services expected to be donated, the approximate number of
hours, fair market value of these services and what work will
be performed to help accomplish this RTP grant project.
•
•
Schedule A -Page 3 of 5 •
•
Value of Donated Equipment and Operator -List the
expected equipment to be donated for use on this project, the
approximate hours, fair market value of these services and
what work will be preformed to help accomplish this RTP
grant project.
Value of Donated Materials -List materials you expect to be
donated and the approximate value of these materials.
Value of Pre-Approved Project Planning and
Environmental Compliance Costs -List the value of any
project planning and/or environmental compliance cost
incurred for this project less than 18 months before the award
of contract.
Value of Land Acquired for this Trail Project -List the TBD
appraised value of property acquired by the grantee for this
project that was acquired less than 18 months before the award
of contract.
Total of All Non-Cash In-Kind Services List Totals Here
TOTAL PROJECT CO5TS -Add all deliverable costs and List Total Project
the value of all non-cash in-kind services. This total shall Costs Here
equal or exceed the awarded grant amount by 25% and be the
same as listed on a e 1 of this Sco of work form line C-4 .
$
E. REQUIRED SIGNATURE
This Scope of Work describes to the best of our knowledge, the project we will complete with
this 2007 Recreational Trials Program grant.
Project Manager Date
Note: The State Trails Coordinator will sign this document when the application and scope of
work are approved for funding. Coordinator's signature not required for submission of
application.
State Trails Coordinator
Date
• Schedule A -Page 4 of 5
101
SCHEDULE C •
NORTH CAROLINA'S
2007 RECREATIONAL TRAILS PROGRAM
ENVIRONMENTAL REVIEW REQUIREMENTS
To complete your RTP application and become eligible for funding, you must submit the
following documents with your 2007 Recreational Trails Program application.
X A topographic map
X A site map
X A project description sheet
1. A topographic map
Provide a copy of the 1:24,000 United States Geological Service (USGS) topographic map (or
map portions, clearly marked with USGS quad name), which shows your complete project site.
Indicate the project boundaries cleazly on both maps.
2. A site map
Provide one copy of a site map of the project itself. The map must have a scale and a north •
arrow, and the route of the proposed trail or location of the trail facilities must be cleazly
indicated. If the project involves a combination of new trail construction and trail
maintenance/restoration, the locations of these two activities must be cleazly mazked along the
length of the trail on the site plan.
3. A project description sheet
The attached description sheet will be used to assess the impacts of your project on cultural and
natural resources--its accurate completion cannot be overemphasized. If it is not completed, your
application will not be considered for funding.
Schedule C -Information
•
•
(~~ hem ~""~;~;~:
and amation list of rules
ricer map
~t _ {j
~ ~.
_,,
one ~ ,
BoatIatuick co {
~~ents sire o ~d~e
''~~pl~ on ~ese
a s-nallPr scale,
~~
n~~~,t~ Hill re~~ n
~~b ~ a~
~:
~~
f\at~ Snrfare Trai!
~`
tau. I0
"- _ cat p~S area
Gra^{.
~Cl `~rr5s road
~-
iJ 4.-~
'~'L ~t~,Ny'h. ~~ ~
.~ ~ ~~
_ ~ r
~~ rte:
c~; ~e<i~s ~,
is site tc~jj be
as a "Stop and designed
me~~g that Drop location
the fatties d~~°re ~r~ fiat ~
that «ould .,such as piciuc tables,
unite ~~ to
linger at ~e site
~Ption~ .~dditio3is:
Pri~~re gated
access t~~
~; ~ Relocation of
~'' ~ -~'ri~ate propern rn'erra~-
tt
~~.,~ g sigls
1~
2007 RTP
PROJECT DESCRIPTION SHEET •
PROJECT NAME Old Greensboro Highway Haw River Trail Access Acquisition
PROJECT APPLICANT Orange Countv
I. Landscape description
1. How many acres in the site will be impacted by the proposed trail construction?
Impact will be minimal as displayed in the site plan map. Land trail feet constructed in
this project will only include trails from the parking area to the river access area.
2. Describe the past land use of the land impacted by the proposed trail construction (for
example, reforested land, former agricultural fields, etc.)
There is an existing dirt road access branching ofd of a near by private driveway which is
mostly within the DOT right-of--way. The remaining area has been left in a natural state
for over 5 years.
3. Describe the site's general land cover as accurately as possible (for example, 40%
hardwoods, 30% Pines, 30% open field)
100% forested
4. If there is flowing water or open water on the site, please describe it.
The Haw River forms the western boon of the parcel in question.
5. If there is a wetland on the site, please describe it, noting the acreage it includes. Show its
extent on the enclosed site map. Please refer to the National Wetlands Inventory Map
http://wetlandsfws.er.usgs.gov/wtlnds/launch.html.
It is unclear exactly how many acres of the varcel is wetland, although almost the entire
parcel is within the 100 year floodnlain. It is possible that as much as 90% of the parcel
is wetland.
6. Describe the site's general topography as accurately as possible (for example, 40% steep
bluff`s, 40% floodplain, 20% gentle ridges)
80% flood plain. 20% gentle slopes
Schedule C--Page 1 of 4
15
• 7. What aze the significant plant communities on the site? (for example., bottomland forests
of sweetgum, tulip trees, and ash; part of site covered in honeysuckle) Include
approximate age and size of trees.
This bottomland hazdwood area has 50-80 veaz old Sycamore trees Oaks Ash_ Box elder
etc.
8. What animal species have been noted on the site?
Bald Eaeles freQUent the Haw River Wildlife Corridor Ospreys numerous fish species
deer, fox, and other animals frequent this rich corridor and this site
9. Threatened. and Endangered Species:
Are there federally-listed Threatened or Endangered Species or designated Critial Habitat
listed for your county? (X) yes ( ) no
NOTE: Refer to http://www.fws.gov/southeast/es/county%201ists.htm
If yes, what is/are the species? Bald Easle, Roanoke Bass, Carolina Darter American
Eel, Red-Cockaded Woodpecker Atlantic PiQtoe Brook Floater Dwarf Wedgemussel
Green Floater, Savannah Lilliput Yellow Lampmussel Butternut. Creamy tick-trefoil
Michaux's Sumac, Smooth Coneflower Sweet Pinesan Torrey's Mountain-mint
•
10. Has the site ever been known or suspected to have hazardous wastes, or has the site ever
been zoned commercial or industrial? ( )yes (X) no
If yes, please, list them and indicate their location on the site map.
11. Are there any above ground structures (houses, barns, rock walls, dams, etc.)?
( )yes (X )no
Note: If you are selected for funding, you will need to provide photographs of these
above ground structures.
• Schedule C -Page 2 of 4
~i~
II. Construction description
1. If your application is for construction of new trail •
What is its total proposed length? 200ft of Land Trail
What is the width of your trail? 4-6 ft
Of what material(s) is the trail tread constructed? Natural Surface
2. If your application is for trail maintenance/renovation, what is the total proposed
length?
What is the width of this trail?
Of what material(s) is the trail tread constructed?
3. Check the appropriate boxes to. show all expected trail user groups:
^ hikers/walkers ^ traiUmountain bicyclists
^ horseback riders ^ off-road vehicles (e.g., motorcycles, ATV's,OHV's)
X ADA accessible X canoeist/kayakers/boaters
c c to o heck
4. Estunate the number of trail users per week that you project in ea h a g ry c ed•
50 trail users total
5. If your application is for construction of trail facilities (for example, parking, restrooms,
ramps, canoe platforms, boardwalks etc.) what is the total area that will be impacted?
6, Please describe these facilities as completely as possible, including specific dimensions
(for example, parking area of 70 ft by 85 ft) when relevant:
7. Please describe any construction impact mitigation practices that you will be using:
Schedule C -Page 3 of 4 .
~7
• 8. If this trail includes motorized use, please explain the potential for noise impacts on
surrounding land uses:
9. Have all required pre-construction permits (for example, CAMA, COE Dredge and Fill)
been secured? ( )yes (X) no If no, please explain:
Orange County will proceed with Land Development once land purchase is final.
t
Schedule C -Page 4 of 4
SCHEDULE D
~~ .
RECREATIONAL TRAILS PROGRAM •
FEDERAL ASSURANCES -COMPLIANCE FORM
As the duly authorized representative of the applicant, I certify that the applicant:
Name of Applicant) Orange County
1. Will comply with the provisions of Title H, Americans with Disabilities Act of 1991.
2. Will comply with Section 1302 (e) (2) (C) of the RTP that prohibits the use of grant
funds to accommodate motorized use on trails that have been predominately used by non-
motorized trail users prior to May 1, 1991.
3. Agrees that the construction of new trails crossing Federal Iands in compliance with all
applicable laws, including the National Environmental Policy Act, the Forest and
Rangeland Renewable Resources Planning Act and the Federal Land Policy and
Management Act.
4. Agrees that construction of any recreational trail on National Park Service or National
Forest Service lands for motorized uses will be on Iands proposed for such uses and will
not be on lands in designated wilderness areas and that such construction is otherwise
consistent with the management direction is such approved Land- and resources
management plan.
5. Has the legal authority to apply for Federal assistance, and the institutional, managerial
and financial capability (including funds sufficient to pay the non-Federal share of project
costs) to ensure proper planning, management and completion of the project described in
this application.
6. Will give the awarding agency, the Comptroller General of the United States, and if
appropriate, the State, through any authorized representative, access to and the right to
examine all records, books, papers, or documents related to the assistance; and will
establish a proper accounting system in accordance with generally accepted accounting
standards or agency directives.
7. Will initiate and complete the work within the applicable time frame a$er receipt of
approval of the awarding agency.
8. Will establish safeguards to prohibit employees from using their positions for a purpose
that constitutes or presents the appearance of personal or organizational conflict of
interest, or personal gain.
9. Will comply with all Federal statutes relating to non-discrimination. These include but
are not limited to: (a) Title VI of the Civil Rights Act of 1964 (P.L. 88-352) which
prohibits discrimination on the basis of race, color or national origin; (b) Title IX of the
Schedule D -Page 1 of 1
Education Amendments of 1972, as amended (20 U.S.C. ' ' 1681-1683, and 1685-1686)
which prohibits discrimination on the basis of sex; (c) Section 504 of the Rehabilitation
. Act of 1973, as amended (29 U.S.C. ' 794) which prohibits discrimination on the basis
of handicaps; (d) the Age Discrimination act of 1975, as amended (42 U.S.C. ' ' 6101-
. 6107) which prohibits discrimination on the basis of age; (e) the Drug Abuse Office and
Treatment Act of 1972 (P.L. 93-255), as amended relating to non-discrimination on the
basis of drug abuse; (f) the Comprehensive Alcohol Abuse and Alcoholism Prevention,
Treatment and Rehabilitation Act of 1970 (P.L. 91-616), as amended, relating to non-
discrimination on the basis of alcohol abuse or alcoholism; (g) ' ' 523 and 527 of the
Public Health Service Act of 1912 (42 U.S.C. 290 dd-3 and 290 ee-3), as amended,
relating to confidentiality of alcohol and drug abuse patient records; (h) Title VIII of the
Civil Rights Act of 1968 (42 U.S.C. 3601 et seq.), as amended relating to non-
. discrimination in the sale, rental or financing of housing; (i) any other non-discrimination
provisions in the specific statute(s) under which application for Federal assistance is
being made, and (j) the requirements on any other non-discrimination statute(s) which
may apply to the application.
10. Will comply, or has already complied, with the requirements of Titles II and III of the
Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970 (P.L.
91-646) which provides for fair and equitable treatment of persons displaced or whose
property is acquired as a result of Federal and Federally assisted programs. These
requirements apply to all interests in real property acquired for project purposes
regazdless of Federal participation in purchases.
• 11. Will comply with the provisions of the Hatch Act (5 U.S.C. ' ' 1501-1508 and 7324-
7328) which limits the political activities of employees whose principal employment
activities are funded in whole or in part with Federal funds.
13. Will comply with the flood insurance purchase requirements of Section 102(a) of the
Flood Disaster Protection Act of 1973 (P.L. 93-234) which requires recipients in a special
flood hazard area to participate in the program and to purchase flood insurance if the total
cost of insurable construction and acquisition is $10,000 or more.
14. Will comply with all Federal environmental laws and regulations.
15. Will cause to be performed the required financial and compliance audits in accordance
with the Single Audit Act Amendments of 1986.
16. Will comply with all applicable requirements of all other Federal laws, Executive Orders,
regulations and policies governing this program.
Signature of Authorizing Official
Title
Date ~~ ~ 7 200'? r
•
i~
Schedule D -Page 1 of 2
Schedule H
d ral Certification Re ardin Lobb in
Fee 9 9 Y 9
(Required of Governmental Agencies and Non-Profit Organizations)
The undersigned certifies, to the best of his or her knowledge and belief, that:
(1) No Federal appropriated funds have been paid or will be paid by or on behalf of the undersigned,
to any person for influencing or attempting to influence an officer or employee of any agency, a Member
of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection
with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal
loan, the entering into of any cooperative agreement, and the extension, continuation, renewal,
amendment, or modification of any Federal contract, grant, loan, or cooperative agreement.
(2) If any funds other than Federal appropriated funds have been paid or will be paid to any person
for influencing or attempting to influence an officer or employee of any agency, a Member of Congress,
an officer or employee of Congress, or an employee of a Member of Congress in connection with this
Federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit
Standard Form LLL, "Disclosure Form to Report Lobbying," in accordance with its instructions.
(3) The undersigned shall require that the language of this certrtcation be included in the award
documents for all subawards at all tiers (including subcontracts, subgrants, and contracts under grants,
loans, and cooperative agreements) and that all subrecipients shall certify and disclose accordingly.
This certification is a material representation of fact upon which reliance was placed when this transaction
was made or entered into.. Submission of this certification is a prerequisite for making or entering into this •
transaction imposed by. Section 1352, Title 31, U.S. Code. Any person who fails to file the required
certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for
each such failure. ~ •
4il• ~~ ~ u ~?r' d~°~~n~itlla~IerS
Signature Title
Agency rgan~zation Date
(Certification signature should be same as Contract signature.)
Schedule H -Page 1 of 1
a~
Schedule I
FEDERAL CERTIFICATION REGARDING DEBARMENT AND SUSPENSION
(Required of Governmental Agencies and Non-Profit Organizations)
The undersigned certifies, to the best of his or her knowledge and belief, that we aze complying
with all provisions of TITLE 49 CFR 29 -TRANSPORTATION, Sec. 29.200 Debarment or
suspension.
(a) Primary covered transactions. Except to the extent prohibited by law, persons who aze
debarred or suspended shall be excluded from primary covered transactions as either participants
or principals throughout the Executive Branch of the Federal Government for the period
of their debarment, suspension, or the period they are proposed for debarment under 48 CFR part
9, subpart 9.4. Accordingly, no agency shall enter into primary covered transactions with such
excluded persons during such period, except as permitted pursuant to Sec. 29.215.
(b) Lower tier covered transactions. Except to the extent prohibited by law, persons who have
been proposed for debarment under 48 CFR part 9, subpart 9.4, debarred or suspended shall be
excluded from participating as either participants or principals in all lower tier covered
transactions (see Sec. 29.110(a)(1)(ii)) for the period of their exclusion.
(c) Exceptions. Debarment or suspension does not affect a person's eligibility for--
(1) Statutory entitlements or mandatory awards (but not subtier awazds thereunder which are
not themselves mandatory), including deposited funds insured by the Federal Government;
(2) Direct awazds to foreign governments or public international organizations, or transactions
with foreign governments or foreign governmental entities, public international organizations,
foreign government owned (in whole or in part) or controlled entities, and entities consisting
wholly or partially .of foreign governments or foreign governmental entities;
(3) Benefits to an individual as a personal entitlement without regazd to the individual's
present responsibility (but benefits received in an individual's business capacity aze not
excepted);
(4) Federal employment;
(5) Transactions pursuant to national or agency-recognized emergencies or disasters;
(6) Incidental benefits derived from ordinary governmental operations; and
(7) Other transactions where the application of these regulations would be prohibited by law.
[60 FR 33041, 33064, June 26, 1995]
Signature
0/~i'Ill~ GDui
Agency rganization
~J
~ha~r ~fa.~~ l~w.~ 7~ ~-~?iA~
Title
,~e,G a 7 aDD 7
Date
~~~n~Iitl/e/~~rS
Schedule I -Page 1 of 1
Page 1 of ~1
as
C
From: Moses Carey [mailto:mcareyi@mindspring.com]
Sent: Tuesday, February 27, 2007 9:56 PM
To: Mike Nelson; Alice Gordon; Barry Jacobs; Valerie Foushee
Cc: Laura Blackmon
Subject: Haw River Public Trail Access
BOCC members;
This is to make you aware that I have authorized the staff to submit a application on Feb. 28th prior to our next meeting for funds
to possibly acquire land for the public Trail Access on the Haw River. It will be placed on the next board consent agenda for your
consideration and approval. This opportunity became available in the last few days and had a short time flame for submission
since the State Trails coordinator requested that we apply. this means that we have a great chance of being funded.
This project has been on our agenda for some time, but has not been a high priority until now after being requested to apply. If
you do not wish to approve this item after the fact, the application can be withdrawn or the money can be declined if funded.
However, I did not want to bypass this opportunity.
I recognize that there are financial implications such as a matching requirement and possibly some type of partnership with
other jurisdictions with whom we signed a MOU in 2006 to work together to achieve this goal in each of our jurisdictions. Th
items can be discussed after approval of the application and funding.
Please call me of the Manager if you have any questions.