Loading...
HomeMy WebLinkAboutNS Purchasing - Summitt Engineering Construction Services for Justice Facilities Expansion Projectj~a~~~/~ ~<' I ~~ ORANGE COUNTY BOARD OF COMMISSIONERS • ABSTRACT ACTION AGENDA ITEM Meeting Date: June 26, 2007 Action Agenda Item No. ~ _b~ SUBJECT: Contract Approval: Construction Materials Testing and Observation Services for Justice Facilities Expansion Project DEPARTMENT: Purchasing and Central PUBLIC HEARING: (Y/N) No Services ATTACHMENT(S): Proposal Contract INFORMATION CONTACT: Pam Jones (919) 245-2652 • PURPOSE: To consider approving a contract with Summit Engmeenng, Hillsborough, North Carolina to perform construction materials testing and construction observation in conjunction with the Justice Facilities Expansion Project. BACKGROUND: Commencement of construction of the 40,000 square foot addition of the New Courthouse is imminent. In order to ensure independent test results, project owners are generally responsible for retaining a firm to provide materials testing and observations of certain activities during construction. Representative examples of such work include: testing of concrete after it is poured in place to ensure it is of a mix that would provide the stability needed and specfied for the building; and observation to ensure proper compaction of soils during the construction of parking lots. A broader explanation of the scope of services is listed in the attached proposal Summit Engineering is a local fine that has provided similar services to the County in the past. Summit has proven its ability to provide quality service to the County on other projects at a reasonable cost. Further, the firm's proximity to this project is a benefit to the County since it would be able to respond quickly and at minimal travel expense to the site as the need arises. This contract exceeds the County's Manager's authorization to approve professional service contracts ($5,000) and is therefore submitted for Board approval. • FINANCIAL IMPACT: Estimated expenditures for materials testing and observation of a typical project of this type are $12,000 and are included in the project budget. 2 RECOMMENDATION(S): The Manager recommends that the Board approve a contract with Summit Engineering, Hillsborough, NC to provide construction materials testing and observation • for the Justice Facilities Expansion Project; and authorize the Manager to sign a contract to effect the work. • • 3 ~ ~ ,SUMMIT Consulting Engineers, PLLC Mav ± 1. '_007 Ms. Pamela Jones. Director Orange County Purchasing Department PO [3ox 8181 Hillsborough NC 27278 GEOTECNNICAL • PLANNING • ENGINEERING •~SURYEYING • CONSTRUCtIONMANAGEMENT Reterertce: Revised Proposal for Construction Materials Testing and Obsen anon Sen•ices Proposed Expansion to the Uranze Counh• Justice Facility Hillsborou~h_ North Carolina Dear Ms. Jones: In accordance with your request. Summit Consulting Engineers is pleased to submit this proposal to provide construction materials testing and obsen•atiori services during constntetion of the proposed expansion to the Orange County Justice Facility in Flillsborouglt. North Carolina. INTRODUCTION • Summit Consulting Engineers, PLLG is a consulting engineering fine. which specializes in geotechnical engineering and construction materials testing and inspection services. Summit provides excellence- in professional services to a wide range of private clients and public agencies. We have credible experience in the geotechnical and materials testing industry• with an excellent. reputation with various state agencies and municipalities. Summit has a qualified team of professional engineers and technicians available to exceed your expectations for performance. We have extensive experience on similar projects, and .~e understand your goals and objectives to ensure the standard of care for this project. Summit operates under the guidance of our Quality System Manual, ~~hich addresses all requirements of ASTM E 329 =`Standard Practice for Use in Evaluation of Testing and Inspection .Agencies as Used in Constn~ction.'~ and AnSHTU R18 "Establishin~_ and Implementins a Quality System For Construction ~9aterials ~festing Laboratories." Uur objective is to pmride the quality of sen-ice. ~~hich results from implementing the qualit}' system described by the manual and required by the referenced standards. 1000 Corporate Drire Suite 101 Nilkborough, NC 21278 Page I of 7 314-A North Madiwn Bovkrard Roxboro, NC 21573 Tekpho~ (919) 732-3683 Foz (919( 732-6676 wwwsummit-engineercom Telephone (336) 599-3900 Fax (336) 594-7226 • In an effort to maintain the highest qualit`~ control standard; ~~ ithin our company. our laharatcrn~. equipment. and personnel are inspected both by our internal Oualiq Control Group and external a~_cncies such as vC'UO'1": ~Ve have recently completed the process of haying our soils and concrete laboratory inspected and certified b~~ NCDO"f. We maintain a staff of certified engineerim~ technicians that ~~e helie~e are uniqueh qualitied to perf~~rm the x~il and materials testis= services for this project. Currenth, ~~e have o~~er ~0 c~mstruction en~_ineering and inspection personnel wi~rking on projects acri~ss the state. Uur technicians are certified in area; of concrete testing, asphalt pavement placement. :oil density. :1 BC sampling. borrow pit samplin~_. OSHA safeh~. radiological safeh• and 2au~te use. and erosicin control implementation:. PROPOSED PROJECT PERSONNEL Summit ~~ill assign Mr. Don Deg+ey, a Professional Engineer with over 17 years of relevant experience to serve as the project manager for this project. He will coordinate all testing activities includin; providing specific instructions to Summit personnel. reviewing all Geld reports for accuracy and completeness. resolvin, anv questions or problems as they develop. and preparing summary reports of observation and testing actin hies at regular intervals. Summit. will assign an engineering technician who has extensive experience with this type of building • construction. The technician assigned to the project becomes a key project team player and should be able to make expedient acid appropriate recommendations that could otherwise holdup construction activities. Summit Consulting Engineers µ~ill provide the specified construction materials testing from our local office located in Hillsborough. North Carolina. SCOPE OF SERVICES Based upon our experience on similar projects, the services Summit expects to provide would include but not be limited to the followine work elements: earthwork foundations. cast-in-place concrete, structural steel and fireproofing. Our primary objective is to verify that the work is performed and installed in accordance with the project documents. Soils/Earthwork: I . Obsen~ation of proofrolling activities prior to till placement and providin_, recommendations for unstable or unsuitable soils. if encountered. '_. Continuous observation and density testing during soil/slime fill placement. ;. Ohtaining soil and stone samples far laboratory testing including soil classitication. Atterberg limits. gradation and standard proctor determinations. -t. Verifyim, placement and performing density testing of foundation ~~all and retaining wall • Pale 2 of 7 5 • backfilling activities. Foundation: I. Observation. verification and testing of hearin~_ capacit? of ali foundations and pmvidin~ recommendations ~~~here unsuitahle hearing conditions exist. if encountered. '_. Provide observation and testin_: of concrete Burin, all ti~undation placements. includin_ slump, air content. unit ~~eight. temperature and fabrication of compressive strem_th cylinders. 3. As requested. verif~• the size, location and placement of reinforcing steel ~rithin finrndations. -1. If encountered, quantify rock removed from the foundations and verify quantities .with on- site personnel. Concrete: I . Provide sampling, testing and observation of concrete placements. including slump, air a~ntent. unit weight. temperature and fabrication of compressiv=e stren_th specimens. ?. If needed: observe and document post-tensionin~~ activities. Report elongation data immediately for review and approval b.' the Structural Engineer. • .i. As requested, verify the size. location and placement of reinforcing steel Structural Steel: Provide continuous observation and testing of shop and field full and partial penetration welds and multipass fillet.velds. 3. Provide visual weld inspection, shear stud testing:, and verify bolted connection as required by the specification. Sprayed Fire Resistant Materials: I. Perform thickness testing in accordance with ASTM E605 at a rate of 35% of the structural columns and beams as required by code and (test/10,000 sf on all other members. '. Perform density and bond strength testing of the fireproofing in accordance with ASTM E b0~ and ASTM E 7:6 at a rate of I test /10.000 sf on columns, beams and deck. Please note, as you likely are aware, The Department of Labor, Occupational Safeh~ and Health Administration has issued new mandatory requirements for steel erection, which are effective as of Januar}• 18, 2002. 'this regulation affects the type and amount of concrete testing required for steel structures. The following is an excerpt from 29 CFR Part 1926. Pa_t 3 of 7 l~ • 1926.752 Site la~•out, site-specific erection plan and construction sequence. ~u~ .-1/~prurcd ru heL•in.creel erNrliar. Before authorizing the commencement of steel erection. the contmlline c~~nlractor shall ensure that the steel erector is provided with the follc~~+ing ~+ritten n~ititicationsv (I - The concrete in the footings. piers and ~~alls and the mortar in the masonry piers and „~alls has attained_ on the basis of an appropriate AS'fh1 standard test method of field-cured samples. either 75 percent of the intended minimum compressive desi~~n strength or sufficient strength to uippart the loads imposed durin_ steel erecticm. y (?) Any repairs. replacements and modifications to the anchor bolts were conducted in accordance fb) C'~~naneruemen/ ofr~e~el erec~i~»a A steel erection contractor shall not erect steel unless it has received written notification that the concrete in the footings. piers and walls or the mortar in the masonry piers and .+alls has attained, on the basis of an appropriate AST41 standard test method of field-cured samples. either 75 percent of the intended minimum compressive design strength or sufficient strength w support the loads imposed during steel erection. COST OF SERVICES The observation and testing services required for this project will be provided on an as-requested basis. as scheduled by Orange County. or your designated representative. Please note. the 'cost of our services is directly related fo the project schedule and the number of visits made to the project for testing and obsen-anon services. We have no control aver the project schedule and are on site only when requested by you or your designated representative. The project will be invoiced on a time and materials basis for actual work performed in accordance with the attached unit rate schedule. Our office in Hillsborough is located approximately 2 miles from the project site. This local presence allows us timely response with on-site consultation and can result in substantial savings both in travel time and mileage charges. Our close proximity also gives us the ability to quickly react to last minute scheduling that occurs from time to time on construction projects. Based on our experience with projects of similar scope, Summit estimates the cost for construction materials testing and observation services to be $ 12,000.00. This cost includes on-site technician, travel costs, engineering oversight and supervision, and laboratory testing. SUMMARY COMMENTS The philosoplty° of Summit Consulting Engineers is to maintain a high standard of quality in the perforniance of our engineerin_, testin, and inspection functions. 1~'e consider our compam~ to he a service organisation and our success depends on timely and appropriate response to the concerns of our clients. 'this is accomplished by experienced personnel. thorough training. properly maintained and calibrated equipment and diverse facilities. We believe the difference in our services can be found in the quality and commitment of the supervisory support staff and field personnel. Many of Summit's clients • Page 4 of 7 • are repeat customers due to this difference. The personnel •++'e leave proposed for this project +vill be +~aluable members of the constnrction team by their proven performance not onth~ ~+•ith the quality in +vhich they perfiinn their specified duties but also ++ith dispute resolution and pmhlem solving. Summit rerir_nizes that this. like all project.. is an important one_ and ++e feel that the quaiit~ of the ohsrrcatlon and testrn_ sen ices pro+~ided ++ill have a ~,reat impact on the success ~~f the project. Summit has extensive experience +4ith this type of project and is capable of proiidin`_ high yualit> ohsrrvation and testinr~ services. N'e hope this proposal has gi+en an indication of our yualitications. experience and abilities: Summit ~+elcumes flee chance to +rork un a project ++here qualit~• ol'en~ice i; a major cansidcration. You are invited to visit our office and laborau~ry facilities at your convenience. so that +ve can denumstrate the quality of our operation. Please call to schedule a tour or if you require am additional information to assist in dour decision regarding our proposal. Surttntit Consulting Engineers appreciates the opportunity to otter its services to you and look. fon+ard to working ++itlt you. Respectfulh~ Suhmitted. SUMMIT CONSULTl~1G ENGINEERS. PI,LC : f,- , /~ t t/ ~ f Don Ue+ve~•. PE ~- Geotechnical Manager J Attachments: Schedule of Standard Rates and Fees L::Geotechnical~Proposals~Orange County -Construction Materials Testing. Expansion to Justice Faciliiy.duc • Pair 5 of 7 ~~SUMMIT ~~,.~ ~,~ SCHEDULE OF STANDARD RATES CONSTRUCTION QUALITY CONTROL FIELD AND LABORATORY TESTING SERVICES Charges will be made at the following rate for engineers, technical and support personnel, equipment for setting up and closing our projects, obtaining and analyzing field and laboratory data, report preparation, and consultation. Description A. Engineering Unit Rate • 1. Principal Engineer $100.00 / hr. 2. Professional Engineer $ 90.00 / hr. 3. Graduate Engineer, E.I. $ 65.00 / hr. 4. Engineering Technician (Soil, Foundations, Concrete, Asphalt) $ 39.00 / hr. 5. Structural Steel Inspector (Vlleld Inspection and Bolt Torque) $ 75.00 / hr. 6. Cadd Technician $ 45.00 ! hr. 7. Administrative/Clerical $ 35.00 / hr. B. Laboratory Soil: 8. Natural Moisture Content Determination (ASTM D 2216) 9. Engineering Classification (ASTM D 2488) 10. Wash #200 Sieve Analysis (ASTM D 1140) 11. Grain Size Analysis with Wash #200 Sieve 12. Atterberg Limits Test: Liquid limit, Plastic Limit, Plasticity Index (ASTM D 4318) 13. Moisture Density Relationship of Soils a. Standard Proctor (ASTM D698) b. Modred Proctor (ASTM D1557) Concrete: 14. Standard Compressive Strength (ASTM C 39) 15. Compressive Strength Cube Nate 6 of 7 r1 LJ $ 4.00 ea.. $ 2.00 ea. $ 40.00 ea. $ 55.00 ea. $ 65.00 ea. $125.00 ea. $140.00 ea. $ 15.00 ea. $ 16.00 ea. ~~. SUMMIT Consulriny Engineas 16. Compressive Strength Grout Prism $ 50.00 ea. 17. Compressive Strength Core Specimen $ 50.00 ea. 18. Concrete Beam, Modules of Rupture $ 40.00 ea. Asahatt • 19. Density Cores (ASTM to 2726) ~ $ 35.00 ea C. Miscellaneous 20. Overtime Saturdays and excess of 8 hrs. /day Time & '/z Sundays and Holidays Double Time 21. Mileage 0.44/mi. 22. Direct Expenses Cost + 15% 23. Coring Equipment -Coring Gun, Generator $250.00/day Pricing for Additional Tests can be quoted upon request. NOTES: 1. Unit prices are in effect for 12 months from date of proposal. 2. All rates are billed on a portal=to-portal basis. 3. Scheduling of field testing and observation services is required no less than the working day prior to the date the services are to be performed. 4. Services cancelled without advance notice will be assessed a minimum 2 hour charge. . 5. A minimum charge of 2 hours applies to field testing and observation services. 6. For construction materials testing and observation services, an engineering review charge to schedule and supervise personnel and evaluate and review reports will be billed a~ a minimum of 0.5 hour per report issued. Concrete compression testing will be charged 0.2 hour of review time for a set of cy{inders. Page 7 of 7 1 1 CK1v7J AIrU L t<enct.~ I: C'uev~^s Rtcrtt~ststrartes :~1 (lient'c Representatiy-e: The C"bent :hall ap{x.int a rcprescntatiyc authurizcd to act on the C"liem"s I+chalf with reiprc-t w the 1'rnicd. The Clitm nr ni rcpresentatiyc;hall make dca.iuns m a timd~ mannw rr~•ardinc all aspens nl' the Project..hall cvamitu docunurot. suhmittrd hy' Summit l`onsuhin_ Fneuttcr5 ~hercinatty:r reftrrcd to as Summits and render Jtcisions m a timely manner d~ avnd unrca.onahlc delay m the orderly and scqucnttal pnN`ns ut Summit". ;en ia:rs and thy: Prglect schedule acaxptcd by C"bent KI Client's Pn~ram and Budget Requirements: Cheat .hall pray ide tiummit full information in a umtk manna? rc_ardm_ all it rcgtnrcmcntc fiv the Prutc~t ntcluding its ol+jccuye;. schedule. aiteria amstraints and bud_ah ntCluding rcaumahle ccmtinecrtctes. ' ('1 Right of Entn-: Client shall pn+r~dr rieht of cola liv Summit" n. aatT. subconsultartts. anJ all ncccssan eympmrnt to complttt the \1'url:. Summit yyill take rcaumablc prccauti:ms w minimi~t damage to propcm. l liens und~YStands that in the mttmal ccxrrse of work x+mc damage ma} occur. the correeuun of which is not pan.of this A_recment. DI Required Information: C'Ittni will famish tiummit all rnfi+rmata+n. rcyuircments. data. rcpnns. sunrys and mstrucunns required to complete thr Scups of Ccn•iccs" including idrntitjing the type and 4+catiun of underground impmvemrnts and utilities. and all r~istint: conditions. Summit shall hayc the n~ht ut rch• upcm the complc[cncss and accyracy of such infi+rmati~m ("licm aclatowied_es that certain assumptions u ill ht made rc~rding existing umditiuns that cannot bt veriliul w ithout Destruction nr damage to tsistins facilities. To the tidlrst carol pennined by law. Client auces io waive all claims against. and to hold harmltsc acrd indemnify. Summit •and etc wbconsultants. tiff damage; to underground impn+vcments and utilities and fctt any ct+stc associated with undtsc:hncd existing cayndilinns. E1 Im•nices: Summit will rrnder invoices eccn~ thirty dyes. Payment is due upon preematiun o(' invoice and is past due thirty (30- days tiom imoict date. ("licnt agctis u. pay a smiCC charge of oat and one half percent (I'."•o) per month. ur the maximum rate allowtd by law. at past due acca+unts. Payment of invoices ;hall ncx he subject to any disurunts, set-offs. or backchargts M Clicm unless agreed w in writing by Summit. C"lirm shall pay all costs. exprnsrs. and disiributiuns. including collection agency fees and expyroses. court u+sts and reasonable •atttitnrys' fees incurred by Summit. in the event collection or heal processes are employed to ccrllea outstanding bills. Ft Sales Tar: Clirnt w•tll pen- any applicable sales tax wltencver deemed to Ix due. Payment terms are exclusive ot'sales utx. ~N7'IfLE II: Sl'~t~lll'~S RESP(/\SIa11.ITtES :A) Standard of Carc: Summit shall perfixm the services gllcd lix by this Agreement ycith the Irvel of care and skill ordinarily exercised b}• memlx~rs of the same professions currently practicing under similar a+nditions. ~a other warranty. expressed or implied. is made. Client acknowltdgcs that incrcascd cbsls and changes may t+e required due w omission. ambiguities •and inconststrncirs in the drawings and specifications. Client agrees io set aside a contingtncy of at least : °~. of the Project cmtslrucKion cost to pay for these casts and changes. C'lirnt funkier agrees it will make no claims against Summit fix any such costs and changes covered by wch comingrncy fund. B) Complisace with Laws, C'odea and Standards: Corrsistertt with the professional standard of care. Summit will comply with laws. axles. and • standards applicable to the PntjecK design as of the effective date of this Agreement or the issuance of the construction plans and specifications. w•hichrvcr is lath. C`- ('ertifieations: Summit. shall sign. if requested by Client. a statement that to the best of its knowledge, information and txairf. based in whole or in part ivl information provided by others. the accurst.} of which has sex been verified. that the Prgjtxt has l+eetr completed in gtneral a+nformancc with the plans and sprcitiCations. Cummit shall hex be required to sign any dcx:umertts. ncy manse by wh<un requested. in which Summit is required u+ certify. guarantor or warrant tltt existence of conditions the existence of which Summit has not or cannot accenain [)) Construction Phacte Services: If construction phase sen•ices• are required in the Scope of Cen•icts. the folloycintt trmts shall apply° 11 Site Ubsenation: If :its ohsrn•atiar ytsits arc to he pmcidcd ha Summa. ~ummn :hall visit the cite at inten•als apprapnate to the secret of the canstrununt. •x a; othcnyisr expressly agreed to in the Sa+pr of k~ryices. in order to ohunc the pru2resc and quality of the w•orl. Ci~mplned -by the cunlmMOr Such obstn alien rs nut meant to be an txhau;ticr sheet or a detailed insptctinn of the amtrscux's wort: but rather to allow tiummit.tn l+tcomc gero~ralh• familiar with the praw~~s of the \\'ork and to dctemrine in gcntrsl if the ycorl. is lycing perfi+rmtd in a mannaY indicating that. ychcn fully amtple.KCd. the w-urk will ht in accaxdance with the C'amtracl Documcnu tiummit shall rxu bt required to male VPIVI I IVIrJ rnnunuous ur c~haustiyc inspecti~ars to Check the gttantiq anJ yualin of the acre ,halt Cummit he respcn.ihlc for the C'antractar's failure tc. pcrli.rm the N°o ac:curdancc wuh the C`unv:uh t7,xumc:nt; ~1 Rejection of N-urk: tiummit shall hate the authority to rcjr~l am work of the Cnntradur; that rs ma. m Summtt"s protcs.i~mal judemcnt. m accordance with the Camtrudum IH+CUnrrnts. Vtnher this autlhmty our the •t~wKl lathh IuJemcnt to rCtra ~+r nPt rCll'CI ally .uCh wurl.~ shall suhjtct Summa tv am hahditi nr cau;c of action on Ixhalf of the Ccvrtractors, ;uhcontradors nr am other supplier: nr prroms pa:rfomung pc+nam. of the wort: on [he PrrjCn. 31 \)urk bite tiafety ; i'lirnt asrtix that Summa shall ruu .up~:rctct ax Jirrct_ ur hayc am re;lx+ns~bdity liv. Control nyer w charge oti the Cnntrack+r..' work or the can;trunion Carom. m~Khc+ds. ttchniyuc.. sryucnccs or procCJur~.. or fur the work sac .allay prccauuans ur programs m canncctiun wdh the N'nrk. 'these nJtts and rtspcrosihilitiCS arc solely tlxne ul' the pain ax pants perlbmung the actual constructum .+f the Project. Neither the pndisannal achy iris; of Summit. nor the prcstncc of Summit prrw+nntl and suhccvnultants at the constmction site. shall rcliayc the l'ontraCtivs and am uthtx rntin of thcir'uhlieatian.. duuas and rL~lx+n:ihilitirs mcludine but ne8 broiled to. comstruction means. mtthaxl>. scyucnct. techniques ttt procedures rteassan far pwfittming, superintrnclmg att cattdmating all pc+nions of the N'ork safely anJ in accordance with any heahh or safcn requirements of am rcculau+n agency. Thr t'h~rot at_TC•es that the C'lirnt Summit and its subamsultants .hall be indcmnificd M thr Conlradarrs and shall hr made adJnit+nal insureds tntJrr the Contracu.n' ~wneral. umbrella and ecccss liability insurance lx+licies. ~- Submittalz and tihop Drawings: If the Ccupr ul ticniccs includcw the rtyicya of Cc+ntractor submittak anJ s1u+p drawing. then Summit will rahicw such submittals •and shop Jrawingi for lhC limited put•pnse of checking lift confi~rmancr with the design tc+nCept expressed and the infi+tmaticm provided in the Construction Dcycumtnu This review shall ruu include review of the accuracy ctt ecmtpletenass of details, such as quantities. dimensions, yyctghts or gauges. lahriwti:m prcxxsscs. construction means or methods. ccxtttlination of the work wish uthtr trada:s or construction safcn precautions. all of which arc the responsibibty of the Ccmlractors. the rth•ityv shall lx axrducled with rtasonahle promptness yyhde allrnring sulTicicm time in Summits judgment w pcrntit adcquare rcyiryr (ttvitw of a specific ' shall not indicate that Summit has rcviraed the corset acscmhl} of which the its contponaau Summit shall not be respnnsihle Pctt am deviations from the C'o fh.cuments ncu brought to its attention in writing by the Contractor. Summit shall rmt I+r required to rccityv partial submissions or those for which submissions of correlated dems have ncu bttn rcceicrd. $) Requests for ('larifitation ur Interprcgtion: Summit shall pmyidc. with reacortahle promptness. ycritttn responses w requests tiom Contractors far clarification and interpretation of the requirements of the Contras IAx:umcnts. If such requests felt information. clarification or interpretation arr. in Summit's professional opinion. for inlonnation readily apparent fiom rcasonablr ob;enation of field conditions or a r~w-icw= of the Contract lkx:umcnts, or rcasemahly infcrahlc [he:n:t~ont. Summit shall he erotitled w additional comprn+atictn at its regular billing rates far its time spent responding w such requests. 61 Record Dercumen[s: II'rryuired M• the Scope of Sen•ices. upon armplction ol'thc Work. Summit shall compile for and deliver to the Cliem a reproducible set of Record fhtcutrtcnts conforming to the marked-up prints. drawings and cnhrv data tumished to Summit by the Contractor This set of Record Documenu will chow significant changes made during construnion. Becawr these Record Documents are ha+ed un unverified inli~rmalitm- provided by other ponies that Summit well assume to be reliable. Summit canncu and dtww nut warrant their accuracy. EI Insurance: Summit shall maintain wtxker's compensation insurance required by law. Cummit rrprescnts and warrants that it maintains general liability anJ propttty damage insurantx C'tnificates for such pc+licies shall be provided -o Client upon written request C'litnt ;hall maintain at its own cast and e~ptnse. its own etneral liahihtr and property damage insurance. C'licnt and Summit ycaivc all rights against each othcv and tiummiYs subcumultanls. aecnts and rmplo«tis liv damages caused by any peril to the extent rnvcred fi~ the property insurance maintained by Client except to the extent such procexds are held he Client a; nvstre This waiver of subrogation shall be ell'ectiyt as to a person ax entity even though that person or entity would otherwise have a duty of indemnification. contrecturd yx otherwise. did run pay the insurance premium dtrrcih ur indirectly. and whether nr not the pcrsim or tntit~ had an in;urablr sourest in the prnptrtp dnma~ed. ArTick 111: Crnenl L.eeal Provisions 11 Ownership of fk+cuments: Drawinc;. specifications and all ether documcntc pfCirarcat M Summit cv its subeonsuhants. including those in electronic term rculltnivch "lksign Dt+crrmrnts")are insttvrrtertts ufscnix Summa shall rctai common law. slatuwn and other restM1ed riches. includinc aq+)ncht tlxveto. Dysigrr Ih•+cumrnu. includinc [hose in tltctmnia fixm are liunisheel fur u;C se+ with respect u. this .\grerment Clirnl is permitted to rtnain copies of the Iksi~n L:/GtrotechnicalK'untncts/Onnge County -Construction Slaterials Testin>;. E:pension to.lustice Facility. Ilillslxrrvwgh.doc 12 of 31 it Ikrcumrnts. including thou m eletxrnnic lirmt. fix mfiinnarion and rrlcrcnre in connection with the Pmjrct. l'licnt shall not use tht I1e;ien (krrumrnts. including m tlr~trcrnir limn famished M Summit irr its xut+ccrn:ultatri, un alhrr t>. lire addition: to this Prnlcct. or far the completion of this I'roirct h~ . uitMrw the r~prcss wntlcn Ccm,rnt ~rl'Sumrnit ~\nt trues without ttrinrn ~~rnsrnt ,hall hr at ('I rein-, nsl and till Ir~al responsrhlm l'hrnt au+t. to hold h:rrrttlr,c anJ inJrnuut~ ~ummn and ns .ut+:r+n,uhant; firm im inJ all diems. ,tut;. Jrman.l,. clama_~". lrahihur,. anJ ar,h. mdudur' rrasrrnahlc attornct tCr,- arnm2 liam su.h rru,c nl Rctrntion of ItrMUrnrnts: tiummn tit ell n~tant. pursuant o+ n. u,twl lrrcument rctrntitxt ptnc~~. rruxJ, rcliting u+ the Norl Grr a prri++J ++1 three ut [tars Gdlowm~ armpktiun of the lL,rrl+ ftunrns thi> prnt~d. rrtorJ, gill hr maJc atatlahlc hr the (lirnr :tit ~ummn", orrice, durm_+ nurm:tl hu,mr>, hour, uprm set rn r ? r day's nnucr (~) ~shesurs and Ilarardnus \laterialx: ('tilt" ++thrntr,r ,pecilicallc pr.r+rdcd m tftr ticopr ul~ tirnrccs. tiummit and ns ,ul+cunsultants ,hall h:nr na re;pomtMht~ tiff the Jrsarsrn. prr,encr. hanJlm_e. mmutal. or Jisprr,il al ashrair, ar h:vardous ur toxic material: It1 7crmination and Sucprnsion: 7~hr, .~erranrm mad hr ternunatrJ M .ether pam upon stern r't Jabs written nnlice in the r+rnl ul';uhst:unial lailurc M the other pam' to perlirrnt m accnrdancr u nh the terms hcrcol' such termutauan ,hall oat be el7cartr dlhr,uh;tantial fadure rs remedied hrtixe rxpiralian ol'the ;etcn r7t digs. ('hrni, failure fir pad im~ucrs within [him 1 !trl Jabs shall hr Jrcntrd a :uh,lautial liulurc to prrtirrm In :uch tern[. Summa mat tcmtrnatr this Aarcrmrm or tmmedtitrh susprnJ the prni~mtancr of srntres anal :uch lailurt~ has been cured Ihr ('lirm mat trrminatr then .\nrcemrnl lire its rnmcnrencc upon IourtcYn 1 111 Jays t+rinrn notice In the rtrnl ul a trmnnatiun li+r a+nermrncr. C lien[ till pat Summit fire sea ra~s performed to the trmm~atian rl7cctrte daft plus rcasonahlr tenninrtr+m expenses within tent t Ito wlrnJar dais of rttcrpt of i ling( mtutrr. In the rt•rnt the prated. or am phis[ of rt is JelacrJ lire reaans heconJ tiummit': rontnrl. unhllyd wort. wtll ht imurcrJ at the standarJ hour([ tarts fix the actual number of boon rxpendrJ Complded pha,ts will ht hilleJ m Ices quoted herein. F.) Disputes: In an r1Tnn w rr,trhr and conlhrts that ariec during the dc~tgn rrr ruction of the I'nrjrd or atler cinnplrtion of the Prrrjrd. all claims. disput+r- ~rr matters in qucspon hrrt+'ccn tht pantts to this .agrcunent that arise out of elate to this A+_rrrmcm ur the breath thrrcrof shall br suhmineJ ro nonbinding mediation hctixcr neutral third-pam mediator acccptabk w Mah pantts. Such mediation shall hr a cundili+nt precedent k"r the rnmmcncrmrm nl'am Ir~al :uaon arising irut of thi::\+sr+xment es+xpt thi>,c Irgat pr+krrdin+_c related to ('li~mt', railure to pay. - - The mediation :hall hr conducted m accordance with the C unstnrctiirn Industn' Slydiatitm Rules of the American .Arbitretiun Assnciatiun currcnll~ in etTed unltss the pMics agree othrrwist. fhr coo of the mrdiaurr shall he home equally by the panics.:\ demanJ lire mediation shall Me made within a reasonable time alter the claim. disport nr other matter hoc arisen. In no e~'rnt shall such Jrmand hr made aticr the date applicable stamtrs of limitation ur repou: would bar a Itgal rrr cqurtahlc action based on such claim. dispute or oth+x maucv In tht rt'cnt of litigatiirn relating to the sut7icirncy or aJryuary of prrformancr of services called for by this Agreement should tiummit obtain a jud,nttnt dismissing C'lirnt"s action or claim or other resolution wherein Summit is not required to make compensation to C'lirnt in excess of its final nlTer mad[ to ('(tent in tht mraiiation. Summit shall br crotitlrJ to rcro~cr all rants incurred in the drftnse of the claim indudine sta(T time. court costs. repir- witness Pres. and reasonable anome~:: firs. and other claim rrlatrJ expencrs FI ('hoice of lawvl'enue: Phis :\grcemrnt .hall hr unvrmrJ M the laws of the slate m which the Summit ol7icc rdentifirJ below r, Incited. with+ru- rceard a+ its law• of umlhca of law,. Am Icgal xrtiun cx pnrccrdine :hall I+r vcnutd in the Stitt ur 1•cJcral Cuun ncarcq Ihr mumripalm in whrrh Summit"s ot7icr is IvcatrJ (:) titatute of LimitationsJRcpuse: C'ausrs of artiun p+:nainme to thi, :lgrrrrncm shall hr JednrJ to bast accnrrJ anJ the applicable .[grate, ~+f limnauon anJ opt+,r :hall comntenrr to Hiner the raxhrr.+l~ri[hrr tl>< Jate.dCuh;tvnial C'omplrt:r+n of the I'ngrct or the dart tiununn~, ,cn:.c, .rrr .uhaannalh_ axrplrte III \ssi_ns: \rnhrr the chcrn tiro ~ummn ntat Jcle_tatr :>,.r_m. •x trin,lcr his Jutie, or rntrre,t m thr> .\_rremcnt t+rth.xu axr,rnl ~+f Ihr other ptm. cxspt ~untmn ma. m rts Jrscrcuun utilve yualrlird ~uharn~ult:un: m rho prrti+nn:ntce r~l the ~~r•pr . d tirn tees 1) Force ~lajcurc: \enher pant to tht, \grrrntcnt ;hag hr Irahle to the other Grr Jclat, m prrlirrmin_~ the rhlraatinns ~alkJ tar M tht+ r\_rrrru~mt. ~+r the Jeerer anJ mdirca ctrl. r~tiulune limn .u.h ;Irla~.- [hit irr :uu>rJ M Irt+nr ,tnl.r,. n~rt~. war. :kt, of +_utemntcnt authontir, rxtrurrJnwn writhrr-condiuuni or ~ahrr natural cita.tmphe. ur am other .-au,r heu+nJ the rcaurnahlc [intro( +v armentplauon .rl erthrr pam. .II So Third-yarn Beneficiaries: Sr+thim_ m thu 1+srrrmrnt ,letll treat a comrndual relation,hrp wnh ur _nr am riJu ar hrnrlit to am thirJ pang. 1-1 4~erahilih. Reformation and tuning(: II'am pruti;u,n in then 4_rcenrrnt r, held insaliJ. illegal. ur unrntirrccahtr. [hr rntirrrrahdits ul the rcrnainin_ pnr.r,ums .hall nil t+e impaxrJ thrreM 1 hr utt ahJ. i11re:J ur uncnlirrcr:rhlr Prot rsian ,hall hr rrpL•tcrJ M :! mlllnallt aarptahlr pnr+r~ion. t+hi.h trine sahJ. Ic_~al anJ rnfixcrahlr. taints dose,[ to the pantts' uuentiun unJcrhm_' IhC mvaliJ. ills gal ur unrntirrcrahlt pri~ctuon I tmitauons ul habilit.. inJcmnttirs. anJ athrr rsprrss rcpre,entalion; ,hall wit nr termmauun of th.ts :\grccmem fix am taunt. L) Risk \Ilocation•'I.imiution of Liabilr!h'_ l lien[ :mJ ~ummn hate dr;russcd the ask,'. rewards. inJ the hencfil of the pmlrct :utJ Summit', total Ice ti+r ccnr~rs Ihr nck< bier tcti~n allocatctii such tha- the l Irrnt agree, that to tht fullest extent pemtineJ ht lat+. Sumnut's total liahilitt to (Tern( •rnd c.xtstntdiim urntrtdors anJ suhcontradon lix am anJ all infants. Hann:. losses. csptns+:c. damn^_rs or claim: rxprn,rs •rrisms gut ~+1' Ibis :ltsramrnr liam am taunt or causes. is limned ur ind ,hall not exccrJ tiumnut's tie ur S3jfl.INHt whicheccr is smaller Such taunts induJr but arc not limited to J+ril_T profe,sianal's negligrnrr. nc_+li:rnt nttsrrprr.rntatirxt. errors. omissions. stnct liahihh :utJ breach r+f contract. I lighrr Irmits .rl IiaMlit) irr at'ailable fix a nrsotiated fer- ~II Indemnification: I n the I'ullrst e~trnr prrmtltcJ h~ law. C bent a_n:rs to tndrmnih and hold harmhss \ummil. its officers. Directors. tmplo~+~rs. agents, anJ subennsultants Irom ill claims. dantas+s. injuries. liabilities. roots anJ exprmc•+. uuluJmg rcasirrtable anomc-~, Ii:C, arisrne from nr darned to aria Germ the acts. omissions. nr_h_rncr. fault. breach of rnntricK. breach of wamtnt~. or ;tact Iuthililg ufClicnt or its cmplo~res. i_rnts, cuntardurs anJ xnc~ontracuxs \- Consequential Dame^es: \otw•ithstanJing am other prusisron ol'thrs Agrcrntem and ur the fullest extent penninrd h~ late. neither ('lien[ nor Swntnit shall be liable lix am urnsryuential damages incurreJ Jue to the fault of the other pam' regirdles of the nature of the fault or t+hrther n was committed bg C'liirtt. Summit. their rmplo~crs. a=cots. suhron:ultantc or whcuntradors. Cnnscqurnlial damaeti indult. but are tint IimitcD ut. loss of use and loss ol'prntit. U- Cornplcte :Agreement: This ,lgrrcmcnt constitutes Ihr entire agrcx:mrnt ben+rrn the panics hereto attD Sll(k751'd+.5 all prl'+Inllti unDrrst.•trtdings and agrcemtnts with respect to the Crojrrt nr am' of the pnrv.isions hrreul'. Vo statement. promise. atndition. understanding. mduu:mettt. or reprcsrntation: oral or w•rittcn. cxprr.uD nr nnplicd. which is nM cotnairnJ hercm shill hr hindinE or ealiJ and thi,' A_reemcnt ;hall not hr chaneeD. mcrdlieJ ur altercJ m an}• manner except hg an instruntcm in writing executrJ h. the parties hercm 13p signior[ this .Agreement. gnu are consenting In the'I'erms and C'onditiuns set forth herein. Please roam a copy Inc ~•aundf and return a signet uri_~inal ur Camino Client Orange County Purchasing Department 13\ rSiHnalurel :I'nnt ~iamcr Date _ Summit Consulting Engineers, PLLC Address IUUU Corporate Dri~~e. Suitt; IUI City State Fl,alsborou_~h \C~7378 ~ Dun Uet-w. I'F----- --~_ ' 1 I'nnt 1 Date \l:tt i I.:(1r1- LJGeoterhn(raU(ontrarts'f)range Counq~ -Construction \laterials 1'cstirrg. Espansinn to.lustice Facilih. IIiIIsMrrout;h.Doc 13 of 3)